Lead-free/RoHS Roadmap
Lee Laboratories & Electrofont
Lee Laboratories Pte. Ltd.
Our Company shall adopt an efficient, far-sighted and thorough (EFT)Environmental Policy through six (LEELAB) key areas:
• Legislation and other requirements must be met在法律条规与其他条件下符合要求
• Encourage the use of more environmental-friendly materials, equipment and technology
鼓励使用对环境更友好的材料,设备和技术• Ensure that activities does not create any nuisance to
our neighbours确保操作状态不会给邻里造成任何不满
• Lessen the quantity of pollutants discharged减少污染排释量
• Awareness must be promoted among employees, suppliers, customers and the general public
促进员工,供应商,顾客和众对此项环保条例的悟解• Best practices are key ingredients to enhance our
company’s environmental image最佳的实践是提高公司的环境形象的关键
Our Company shall adopt an efficient, far-sighted and thorough (EFT)Environmental Policy through six (LEELAB) key areas:
• Legislation and other requirements must be met在法律条规与其他条件下符合要求
• Encourage the use of more environmental-friendly materials, equipment and technology
鼓励使用对环境更友好的材料,设备和技术• Ensure that activities does not create any nuisance to
our neighbours确保操作状态不会给邻里造成任何不满
• Lessen the quantity of pollutants discharged减少污染排释量
• Awareness must be promoted among employees, suppliers, customers and the general public
促进员工,供应商,顾客和众对此项环保条例的悟解• Best practices are key ingredients to enhance our
company’s environmental image最佳的实践是提高公司的环境形象的关键
Lee Laboratories Pte. Ltd.
Lee Laboratories Pte. Ltd.
New environmentally friendly materials will be introduced to meet customer requirements and demands of the European Union Directive (2002/95/EC) on the Restriction of the Use of Hazardous Substances (RoHS)
Lee Laboratories Pte. Ltd.
Managing DirectorLee Choo
Managing DirectorLee Choo
Wern Pin/NicholasWern Pin/Nicholas
SALESSALES
LEE LABLEE LAB
Yang ZhengYang Zheng
Design & Development
Design & Development
CrystalCrystal
QA & ProductQA & Product
Factory ManagerJason Foo
Factory ManagerJason Foo
Sook FungSook Fung
PurchasingPurchasing
ElectrofontElectrofont
IreneIrene
Sample Build Co-ordinatorSample Build Co-ordinator
Kwang Yiang – SMTBernie – COB
Eddie - FA
Kwang Yiang – SMTBernie – COB
Eddie - FA
ProductionProduction
Yang ZhengYang Zheng
Design & Development
Design & Development
Lee Laboratories Pte. Ltd.
Time Perioda) April 2004 to May 2004
b) May 2004 onwards
Action- Start ROHS plan discussion- Decides on which project involves(Eg. 817, 994, 998, 999, etc)-Vendor benchmarking for solder paste/solder wire/flux-Vendor benchmarking for facilities(Eg. Lead-free soldering iron-Discussion of materials used and facilities(Eg. AVL components and SMT machine
- Discussion and preparation of ROHS Project documents(Eg. Bill of materials, Process Spec., QA insp. Spec., Design Testing Spec., etc)- ROHS Compliance Components Request
ROHS Project Time Schedule
Lee Laboratories Pte. Ltd.
Cont. May 2004 onwards
- Samples request for lead-free solder paste/solder wire/flux-Compliation of components ROHS declaration/Temp. profile/Test Report/Material Safety Data Sheet(MSDS)- Compliation of lead-free solder paste/solder wire documents(Eg. Reliability test report/Temp. profile)-Reliability test on ROHS compliance samples(E.g 994, 998, 817, etc)
Lee Laboratories Pte. Ltd.
Sample Builda) Jan 2005
b) Jan 2005 - Feb 2005
c) April 2005
Mass Production• July 2005 • Aug 2005
- A-994-03 & A-994-04 using MultiCORE lead-free solder past paste
- A-998-03,A-999-03 & A-1000-03 using ASAHI lead-free solder paste
- MG 817 AU-LA-01 using ASAHI lead-free solder paste
-A-994-04 ROHS Compliance PCBA shipment-MG 817AU-LA-01 ROHS Compliance modules shipment
Sample Build Evaluation For Optrex Europe
Lee Laboratories Pte. Ltd.
a) Jun 2005
b) Jun 2005
c) Nov 2005 - Dec 2005
• MG 1089FU-SEW-01 using MULTI-CORE lead-free solder paste
• A-997-04 using ASAHI lead-free solder paste
• Plan for sample build for MG 973 FU-SLY-7
Sample Build Evaluation For Leica
Lee Laboratories Pte. Ltd.
April 2005 to Nov 2005 • Manual soldering using SENJU lead-free solder wire for project 1019, 1020, 1022, 1025, 1069, 1071, 1072, 1073, 1074, 1075, 1076, 1077, 1078, 1080, 1081, 1082, 1084 & 1085
Sample Build Evaluation For Optrex Japan
Lee Laboratories Pte. Ltd.
Nov 2005 - Dec 2005 -> Plan for sample build for:• MG 978 (Sumitomo)• MG 938 (Applera Holdings)• MG 830 (Eltech)
Sample Build Planning For Other Customers(Sumitomo, Applera Holdings, Eltech)
Lee Laboratories Pte. Ltd.
6.0 Solder Paste Vendor
6.1 Process Spec. Requirement
Asahi Solder Paste
Multicore Solder Paste
Qualitek Solder Paste
Pre-heat 100-150 Deg.C 130-165 Deg.C 100-140 Deg.C Time 50-80 secs 60-120 secs 60-90 secs
Soaking 150-207 Deg.C 165-217 Deg.C 140-170 Deg.C Time 30-80 secs 15-30 secs 60-90 secs
Reflow 207 Deg.C 217 Deg.C 217 Deg.C Time 30-60 secs 30-45 secs 60-90 secs
Peak Temp
Min:220 Max:235 Min:230 Max:250 Min:235 Max:249
Lee Laboratories Pte. Ltd.
7.0 SMT Process Guidelines
7.1 Paste Storage
Storage temp. : 5 to 10 deg. C.
7.2 Production Working Environment
Temp. : 20 to 25 deg. C. Humidity : Less than 60% RH
7.3 Paste Preparation
Thawing time : 4 to 8 hrs. Stirring Time : 60sec approx.
7.4 Paste Printing Stencil Thickness : 6 mils (0.15mm) preferred for fine pitch IC Printing Speed : 20 to 150mm / sec Squeegee Pressure : TBD.
7.5 Paste Printing Guidelines
Condition Preferred Acceptable Reject Remarks Paste alignment to pad 100% <25% out >25% out Smeared paste 0% 0% any smeared Insufficient paste 0% 75% coverage < 75% coverage No paste Any Solder paste height 6 mils > 4.5 mils < 4.5 mils Not done at
the moment.
7.6 Paste Printing Visual Inspection
Pls. refer to Judgment Criteria QA-JC-SMT-01.
Lee Laboratories Pte. Ltd.
8.0 SMT Component Mounting
Condition Preferred Acceptable Reject Remarks Parts loading onto Feeder
Refer to SMT product loading list
Parts mounting onto PCB
Refer to BOM / SMT product loading list
Parts mounting onto pad
100% <25% out >25% out
Paste slumping > 0.3mm min 0.3 mm
< 0.3 mm Distance between two nearest paste.
Lee Laboratories Pte. Ltd.
9.0 Reflow Process Reflow oven temperature & conveyor speed setting will be determined
after profiling and will vary from product to product depending on the size
of the boards and complexity of the component mount upon it.
9.1 Reflow Profile
Condition Setting Ramp Up Rate 1 - 3 C/sec Pre Heat 120 - 165 C (50-100 secs) Soak Time TBD Dwell Time (time above melting pt) 30 -90 secs Peak Temp 230 -250 C Cooling Rate 2 - 4C/sec
Lee Laboratories Pte. Ltd.9.2 Post Reflow Guidelines
Condition Preferred Acceptable Reject Remarks Solder short NA NA Any Insufficient solder 0% < 25% > 25% Dry solder NA - Any
Solder balls NA < = 0.13mm ; max.5/600mm2
> 0.13mm ; > 5/600mm2
All solder balls are entrapped or encapsulated with no clean flux residue.
No wetting NA Any Dull solder NA Any Reflow profile
not optimize. Solder crack NA Any Component crack NA Any Component not
suitable for high temp.
Wrong/missing component
NA Any
Wrong orientation/polarity
NA Any
Alignment out 0% < 25% out > 25% out PCB warpage NA Any PCB delamination NA Any
9.3 Post Reflow Visual Inspection
Pls. refer to Judgment Criteria QA-JC-LFS-01.
Lee Laboratories Pte. Ltd.
10.0 Manual Soldering Visual Inspection Pls. refer to Judgment Criteria QA-JC-LFS-01.
11.0 Lead Free Label Indication To differentiate for Lead free modules / PCB Assembly, we will indicate in our
date code label “YYWWxxx_LF” which means YY – Year, WW – Workweek,
xxx – Operator code, LF – Lead free.
At Outer Carton, under remark column “ROHS Compliance” will be indicated for
at least 1st 3 shipments.
Lee Laboratories Pte. Ltd.
Business /Customer Order
Business /Customer Order SalesSales Lee Laboratories / Electrofont
Internal ReviewLee Laboratories / Electrofont
Internal Review
AdminSupportAdmin
Support
ProcessOrder
ProcessOrder
DeliveryDelivery
CustomerCustomer
ProductDesign
ProductDesign
EngineeringSupport
EngineeringSupport
ManufacturingManufacturing
MaterialControl
MaterialControl
Production& MaterialPlanning
Production& MaterialPlanning
RequireDesign?
RequireManufacturing?
Lee Laboratories Electrofont
Yes
No
Yes
No
ProcessDevelopProcessDevelop
RFQ
SourcingSourcing
Customer Requirement