LCLS Undulators – Present Status and Future Upgrades. Heinz-Dieter Nuhn – LCLS Undulator Group Leader March 1, 2010. Linac Coherent Light Source. INJECTOR. LINAC. BEAM TRANSPORT. UNDULATOR HALL. Undulator Hall. Room for 2 nd Undulator Line. 33 Undulator Segments Installed. - PowerPoint PPT Presentation

Citation preview

Page 1: LCLS Undulators –   Present Status and Future Upgrades

1 Heinz-Dieter [email protected]

1LCLS Undulator StatusMarch 1, 2010

LCLS Undulators – Present Status andFuture Upgrades

Heinz-Dieter Nuhn – LCLS Undulator Group LeaderMarch 1, 2010

Page 2: LCLS Undulators –   Present Status and Future Upgrades

2 Heinz-Dieter [email protected]

2LCLS Undulator StatusMarch 1, 2010

Linac Coherent Light Source

INJECTOR

LINAC

UNDULATOR HALL

BEAM TRANSPORT

Page 3: LCLS Undulators –   Present Status and Future Upgrades

3 Heinz-Dieter [email protected]

3LCLS Undulator StatusMarch 1, 2010

Undulator Hall

Room

for 2nd U

ndulator Line 33 Undulator Segments Installed

Page 4: LCLS Undulators –   Present Status and Future Upgrades

4 Heinz-Dieter [email protected]

4LCLS Undulator StatusMarch 1, 2010

Short Break Section

Quadrupole and horz/vert Correctors

BFWUndulator Segment

Girder

Segment Slider

Girder Mover (cam)

RF Cavity BPM

HLS Sensor

Part of WPM Support

Page 5: LCLS Undulators –   Present Status and Future Upgrades

5 Heinz-Dieter [email protected]

5LCLS Undulator StatusMarch 1, 2010

Quadrupole

Vacuum Chamber

Undulator Segment

RF Cavity BPM

Girder

Fully Assembled Girder (seen from downstream end)

Page 6: LCLS Undulators –   Present Status and Future Upgrades

6 Heinz-Dieter [email protected]

6LCLS Undulator StatusMarch 1, 2010

Quadrupole Undulator Segment with mu-Metal Shield

RF Cavity BPM

Coordinate Measurement Machine Position Sensor

Girder Precision Alignment on CMM

Page 7: LCLS Undulators –   Present Status and Future Upgrades

7 Heinz-Dieter [email protected]

7LCLS Undulator StatusMarch 1, 2010

Quadrupole

BPM

Manual Adjustments

Segment3.400 m

Cam Shaft Movers WPM

HLS

BFW

Sand-Filled, Thermally Isolated

Fixed Supports

Horizontal SlidesNot visible

Vacuum Chamber and

Support

Long Break 89.8 cm

Short Break 47.0 cm

LCLS Undulator Components

Page 8: LCLS Undulators –   Present Status and Future Upgrades

8 Heinz-Dieter [email protected]

8LCLS Undulator StatusMarch 1, 2010

Vacuum Chamber

Undulator Segment

Magnet Block

Pole Piece

Horizontal Trajectory Shim Holder

Vacuum Chamber Inserted into Gap

Page 9: LCLS Undulators –   Present Status and Future Upgrades

9 Heinz-Dieter [email protected]

9LCLS Undulator StatusMarch 1, 2010

LCLS Undulator Module Pole Canting

• Canting comes from wedged spacers• 4.5 mrad cant angle• Gap can be adjusted by lateral

displacement of wedges• 1 mm shift means 4.5 µm in gap, or

8.2 G • Keff can be adjusted to desired value

Pole canting enables remote K adjustment for fixed gap undulators.

Page 10: LCLS Undulators –   Present Status and Future Upgrades

10 Heinz-Dieter [email protected]

10LCLS Undulator StatusMarch 1, 2010

Neutral; K=3.4881; x= 0.0 mm Neutral; K=3.4881; x= 0.0 mmNeutral; K=3.4881; x= 0.0 mm

Undulator Roll-Away and K Adjustment

First; K=3.5000; x=-4.0 mm Roll-Away; K=0.0000; x=+80.0 mm

Horizontal SlideHorizontal Slide

Pole Center LinePole Center Line Vacuum ChamberVacuum Chamber

Page 11: LCLS Undulators –   Present Status and Future Upgrades

11 Heinz-Dieter [email protected]

11LCLS Undulator StatusMarch 1, 2010

units

Nominal Undulator Parameter K 3.5

Undulator Period u 30 mm

Undulator peak Field, Bpk Bpk 1.249 T

Full Gap Height (fixed) g 6.8 mm

Undulator Type Planar Hybrid Permanent Magnet

Magnet Material Nd2FeB14

Pole Material Vanadium Permendur

Magnet Block Dimensions h×t×w 66×9×56.5 mm3

Pole Dimensions h×t×w 44×6×48 mm3

Periods per Segment 113

Gap Cant Angle 4.5 mrad

Number of Installed Segments 33

LCLS-I Undulator Parameters

Page 12: LCLS Undulators –   Present Status and Future Upgrades

12 Heinz-Dieter [email protected]

12LCLS Undulator StatusMarch 1, 2010

1. Compensation of spontaneous radiation (linear tapering over 132 m)

2. Compensation of vacuum chamber wakefields (linear tapering over 132 m, for 0.25 nC)

3. Gain enhancement (linear tapering before saturation) [Z. Huang]

4. Enhanced energy extraction (quadratic tapering after saturation) [W. Fawley]

Taper Design Considerations

/ 2E E

/ 0.25% E E

-152

2

10 ˆ/ 0.633T Vm u

EE E B N

e

/ E E

The ratio between changes in E and K to maintain the resonance condition at a given wavelength is

2

21 1.16

dK dKK K

dE d KE

From Wakefield budget based on S2E Simulations

Page 13: LCLS Undulators –   Present Status and Future Upgrades

13 Heinz-Dieter [email protected]

13LCLS Undulator StatusMarch 1, 2010

K Tapering Requirements

K for segment 33

spont

wake

gain

post sat

wakegain

post sat

spont

1.5 Å

15 Å

K for segment 1

0

.3

%

0.3

%

Page 14: LCLS Undulators –   Present Status and Future Upgrades

14 Heinz-Dieter [email protected]

14LCLS Undulator StatusMarch 1, 2010

Figure 3: K Tapering Scenarios (Continuous)Avoid Reliance on Good Field Region at 1.5 Å

Page 15: LCLS Undulators –   Present Status and Future Upgrades

15 Heinz-Dieter [email protected]

15LCLS Undulator StatusMarch 1, 2010

Measured Field Integrals on SN25

0 0

', , 'L z

xB dz dzx y z

0 0

', , 'L z

yB dz dzx y z

0

, ,L

xB dzx y z

0

, ,L

yB dzx y z+200 µmy :

+0 µm

-200 µm

Page 16: LCLS Undulators –   Present Status and Future Upgrades

16 Heinz-Dieter [email protected]

16LCLS Undulator StatusMarch 1, 2010

Beam Based Measurement: 1st Field Integral SN14

Beam Based Measurements

Horizontal (I1X) and vertical (I1Y) first field integrals measured by fitting a kick to the difference trajectory as function of undulator displacement

Reference Point

MMF Measurement

Re

qu

ire

s 2

0 n

m B

PM

re

so

luti

on

SN14

SN14

Page 17: LCLS Undulators –   Present Status and Future Upgrades

17 Heinz-Dieter [email protected]

17LCLS Undulator StatusMarch 1, 2010

Segmented Undulator Pre-Taper

Page 18: LCLS Undulators –   Present Status and Future Upgrades

18 Heinz-Dieter [email protected]

18LCLS Undulator StatusMarch 1, 2010

CMM Keff Measurements for U33/SN20

K=3.468K=3.468

K=3.497K=3.497

Page 19: LCLS Undulators –   Present Status and Future Upgrades

19 Heinz-Dieter [email protected]

19LCLS Undulator StatusMarch 1, 2010

Segmented Undulator K Control

K ADJUSTMENT RANGE(MEASURED)

TEMPERATURE CORRECTED KACT

TAPER REQUEST

K ADJUSTMENT RANGE(MEASURED)

Page 20: LCLS Undulators –   Present Status and Future Upgrades

20 Heinz-Dieter [email protected]

20LCLS Undulator StatusMarch 1, 2010

Tolerance Budget Analysis

Analysis based on time dependent SASE simulations with GENESISEight individual error sources considered:

Beta-Function Mismatch,Launch Position Error,Segment Detuning,Segment Offset in x,Segment Offset in y,Quadrupole Gradient Error,Transverse Quadrupole Offset,Break Length Error.

The ‘observed’ parameter is the average of the FEL power at 90 m (around saturation) and 130 m (undulator exit)The Results are combined into the Error Budget

Analysis based on time dependent SASE simulations with GENESISEight individual error sources considered:

Beta-Function Mismatch,Launch Position Error,Segment Detuning,Segment Offset in x,Segment Offset in y,Quadrupole Gradient Error,Transverse Quadrupole Offset,Break Length Error.

The ‘observed’ parameter is the average of the FEL power at 90 m (around saturation) and 130 m (undulator exit)The Results are combined into the Error Budget

Page 21: LCLS Undulators –   Present Status and Future Upgrades

21 Heinz-Dieter [email protected]

21LCLS Undulator StatusMarch 1, 2010

Segment K Errors

Module Detuning (Gauss Fit)

Location Fit rms Unit

090 m 0.042 %

130 m 0.060 %

Average 0.051 %

Simulation and fit results of Module Detuning analysis. The larger amplitude data occur at the 130-m-point, the smaller amplitude data at the 90-m-point.

/iq K K

BudgetTolerance

90 m

130 m

Page 22: LCLS Undulators –   Present Status and Future Upgrades

22 Heinz-Dieter [email protected]

22LCLS Undulator StatusMarch 1, 2010

Individual Studies (Example K)

Choose a set of Km/K values to be tested, e.g. { 0.000%, 0.045%, 0.100%, 0.200%}

For each Km/K choose 33 Ks values from a random flat-top distribution with maximum Km.

Apply these errors, Ks, to the respective segment Ks values and perform a GENESIS FEL simulation.

Evaluate the simulation result to extract power levels at the 90 m and 130 m points, P90,m and P130,m, respectively.

Loop

Plot these results, P90,m and P130,m, versus the rms of the distribution, i.e.

Apply Gaussian fit to obtain rms-dependence.

2

220

i

i

q

iP P e

1

12mK K

Page 23: LCLS Undulators –   Present Status and Future Upgrades

23 Heinz-Dieter [email protected]

23LCLS Undulator StatusMarch 1, 2010

Horizontal Segment Misalignment

Horizontal Model Offset (Gauss Fit)

Location Fit rms Unit

090 m 0782 µm

130 m 1121 µm

Average 0952 µm

Simulation and fit results of Horizontal Module Offset analysis. The larger amplitude data occur at the 130-m-point, the smaller amplitude data at the 90-m-point.

BudgetTolerance

90 m

130 m

Page 24: LCLS Undulators –   Present Status and Future Upgrades

24 Heinz-Dieter [email protected]

24LCLS Undulator StatusMarch 1, 2010

Vertical Segment Misalignment

Vertical Model Offset (Gauss Fit)

Location Fit rms Unit

090 m 268 µm

130 m 268 µm

Average 268 µm

Simulation and fit results of Vertical Module Offset analysis. The larger amplitude data occur at the 130-m-point, the smaller amplitude data at the 90-m-point.

BudgetTolerance

90 m

130 m

Page 25: LCLS Undulators –   Present Status and Future Upgrades

25 Heinz-Dieter [email protected]

25LCLS Undulator StatusMarch 1, 2010

Tolerance Budget

Gaussian fit yields functional dependence of power reduction on error amplitude:

Assuming that each error is independent on the others other, i.e. each error source causes a given fraction power reduction independent of the presence of the other sources:

2

2 22

1 12 2 2

0

i

i ii

qf fP

e e eP

tolerancetolerance

fitted rmsfitted rms

fi=qi/ifi=qi/i

2

22

0

i

i

q

iP eP

Page 26: LCLS Undulators –   Present Status and Future Upgrades

26 Heinz-Dieter [email protected]

26LCLS Undulator StatusMarch 1, 2010

LCLS Tolerance Budget

Error Source i fi i fi Units

@ 130 m (24.2% red.)

Hor/Ver Optics Mismatch (-1)0.5 0.71 0.452 0.32

Hor/Ver Transverse Beam Offset 30 0.176 3.7 µm

Module Detuning K/K 0.060 0.400 0.024 %

Module Offset in x 1121 0.125 140 µm

Module Offset in y 268 0.298 80 µm

Quadrupole Gradient Error 8.8 0.029 0.25 %

Transverse Quadrupole Offset 4.7 0.214 1.0 µm

Break Length Error 20.3 0.049 1.0 mm

< 1.10.64</0<1.56< 1.10.64</0<1.56

21

2

0

ifPe

P

21

2

0

ifPe

P

Page 27: LCLS Undulators –   Present Status and Future Upgrades

27 Heinz-Dieter [email protected]

27LCLS Undulator StatusMarch 1, 2010

Model Detuning Sub-Budget

MMF K KK K T x

27

Parameter pi Typical Value rms dev. pi Note

KMMF 3.5 0.0003 ±0.015 % uniform

K -0.0019 °C-1 0.0001 °C-1 Thermal Coefficient

T 0 °C 0.32 °C ±0.56 °C uniform without compensation

K 0.0023 mm-1 0.00004 mm-1 Canting Coefficient

x 1.5 mm 0.05 mm Horizontal Positioning

2

2

ii i

KK p

p

2 2 2 2 2

MMF K K K KK K T T x x

/ 0.020%K K

Page 28: LCLS Undulators –   Present Status and Future Upgrades

28 Heinz-Dieter [email protected]

28LCLS Undulator StatusMarch 1, 2010

Beam Based Alignment Tolerance Verification

Random misalignment with flat distribution of widh ±a => rms distribution a/sqrt(3)

Beam Based Measurements

Page 29: LCLS Undulators –   Present Status and Future Upgrades

29 Heinz-Dieter [email protected]

29LCLS Undulator StatusMarch 1, 2010

Beam Based K Tolerance Verification

Beam Based Measurements

Page 30: LCLS Undulators –   Present Status and Future Upgrades

30 Heinz-Dieter [email protected]

30LCLS Undulator StatusMarch 1, 2010

LCLS Undulator Tolerance Budget

Error Source i fi i fi Units

@ 130 m (24.2% red.)

Hor/Ver Optics Mismatch (-1)0.5 0.71 0.452 0.32

Hor/Ver Transverse Beam Offset 30 0.176 3.7 µm

Module Detuning K/K 0.060 0.400 0.024 %

Module Offset in x 1121 0.125 140 µm

Module Offset in y 268 0.298 80 µm

Quadrupole Gradient Error 8.8 0.029 0.25 %

Transverse Quadrupole Offset 4.7 0.214 1.0 µm

Break Length Error 20.3 0.049 1.0 mm

21

2

0

ifPe

P

21

2

0

ifPe

P

Tolerance Budget ComponentsTolerance Budget Components

Module Offset in x @ zSAT 780 µm

BB VerificationBB Verification

0.060.06

12001200

8.88.8

770770

MEASUREMENTSMEASUREMENTS

Page 31: LCLS Undulators –   Present Status and Future Upgrades

31 Heinz-Dieter [email protected]

31LCLS Undulator StatusMarch 1, 2010

LCLS-II

An initial rough evaluation of LCLS-II undulator parameters will be presented.

Priority is given to the Soft-Xray line, which is likely to be based on short variable gap undulators.

Shortness is required to enable the low beta-functions needed for optimum FEL performance.

Page 32: LCLS Undulators –   Present Status and Future Upgrades

32 Heinz-Dieter [email protected]

32LCLS Undulator StatusMarch 1, 2010

ExistingExistingPhase-0Phase-0Phase-1Phase-10.75-15 Å 0.75-15 Å

4-14 GeV4-14 GeV

FEE-1Existing 112-m Undulator (1.5-15 Å)

0.75 Å0.75 Å

SHAB30 m

Shortened 74-m Undulator

5 m

FEE-2SXR2 (45 m)

5 m

full polarization full polarization controlcontrol

self-seeding self-seeding optionoption

6-60 6-60 ÅÅadjust. gap adjust. gap

6-60 6-60 ÅÅadjust. gap adjust. gap

SXR1 (45 m)3-7-GeV bypass3-7-GeV bypass

4-GeV SXR and 14-GeV HXR simultaneous op’s with bypass line

2-pulse 2-pulse 2-color2-color

No civil construction. Uses existing beam energy and quality.No civil construction. Uses existing beam energy and quality.

full polarization full polarization controlcontrol

Phase-2Phase-2Phase-3Phase-3

EEHG*?EEHG*?

240 nm 240 nm 6 nm 6 nm

Phased Enhancement Plan for LCLS-II

* G. Stupakov, Phys. Rev. Lett. 102, 074801 (2009) * G. Stupakov, Phys. Rev. Lett. 102, 074801 (2009)

5 m

full polarization full polarization controlcontrol

Shortened (1.5-15 Å)

Larger Gap Undulator(0.75-7.5 Å)

self-seeding self-seeding HXR optionHXR option(2 bunches)(2 bunches)

Large GapLarge Gap (0.5-5 Å)(0.5-5 Å)

Large GapLarge Gap (0.5-5 Å)(0.5-5 Å)

Page 33: LCLS Undulators –   Present Status and Future Upgrades

33 Heinz-Dieter [email protected]

33LCLS Undulator StatusMarch 1, 2010

LCLS-I U 1 Enhancement

=

2.8

I pk

= 3

00

0 A

,

xy=

0.6

µm

Page 34: LCLS Undulators –   Present Status and Future Upgrades

34 Heinz-Dieter [email protected]

34LCLS Undulator StatusMarch 1, 2010

LCLS-II U 2 FEL Performance Estimatelin

ear

hel

ical

<>

= 5

m,

= 2

.8I p

k =

20

00

A,

xy=

0.6

µm

Page 35: LCLS Undulators –   Present Status and Future Upgrades

35 Heinz-Dieter [email protected]

35LCLS Undulator StatusMarch 1, 2010

LCLS-II U 2 FEL Performance Estimatelin

ear

hel

ical

<>

= 5

m,

= 2

.8I p

k =

20

00

A,

xy=

0.6

µm

Page 36: LCLS Undulators –   Present Status and Future Upgrades

36 Heinz-Dieter [email protected]

36LCLS Undulator StatusMarch 1, 2010

Beta-Function at 6 nm

Smallest practical beta function 4-5 m is above optimum.

LG~0.65 m for x,y = 4 m

LG~0.69 m for x,y = 5 m

Opt

imum

Page 37: LCLS Undulators –   Present Status and Future Upgrades

37 Heinz-Dieter [email protected]

37LCLS Undulator StatusMarch 1, 2010

‘Optimum’ Beta-Function at 6nm

Optimum beta function would reduce undulator length by more than factor 2 but is not accessible.

LG~0.27 m for x,y ~ 0.1 m

Page 38: LCLS Undulators –   Present Status and Future Upgrades

38 Heinz-Dieter [email protected]

38LCLS Undulator StatusMarch 1, 2010

Optimum Beta-Function at 0.6 nm

At 0.6 nm beta function of 4-5 m is close to optimum.

Considered Value

Optimum Value

Page 39: LCLS Undulators –   Present Status and Future Upgrades

39 Heinz-Dieter [email protected]

39LCLS Undulator StatusMarch 1, 2010

Beta Function and Undulator Length

Undulator: 1.80 m Break0.70 m

Break0.70 m

Half FODO Length: 2.50 m

Minimum <x,y> = 5 m

ChicaneRF Cavity BPMQuadrupole

The smallest average beta-function achievable with a FODO lattice is

The FODO length is determined by segment length and break length

Breaks between segments need to be sufficiently wide to allow space for essential components, such as quadrupole, BPM, Chicane.

Smallest practical quadrupole separation is 2.5 m, corresponding to a FODO length of 5 m .

,x y FODOL

EXAMPLE:

Be

llow

s

Page 40: LCLS Undulators –   Present Status and Future Upgrades

40 Heinz-Dieter [email protected]

40LCLS Undulator StatusMarch 1, 2010

Multi-Segment variable gap undulators require phase shifters between segments to adjust gap dependent inter-segment phase slippage. An example for such achicane is shown here. Field levels have been kept low to reduce in-tunnel powerrelease.

Example Chicane Dimensions

L = 9 cm

L = 4.5 cm L =4.5 cm

xmax

L = 24 cm

3 cm

E 7.0 3.0 GeV

r 1.2 6.0 nm

B 203 195 G

x’ 78 175 µrad

xmax 7.6 17 µm

360 360 degXray

x -5.9 -13.2 µm

R56 0.74 3.7 nm

Page 41: LCLS Undulators –   Present Status and Future Upgrades

41 Heinz-Dieter [email protected]

41LCLS Undulator StatusMarch 1, 2010

Undulator TypesA number of different variable field undulator types are under consideration

Parallel-Pole Variable Gap Fixed Linear Polarization

Hybrid or Pure Permanent Magnet

Apple Type Variable Gap Variable Linear/Circular Polarization

Hybrid or Pure Permanent Magnet

Delta Type Variable Phase Variable Linear/Circular Polarization and Intensity

Pure Permanent Magnet

Superconducting Helical Variable Excitation current Fixed Circular Polarization [Substantial R&D required]New Designs …

Key issues arePrecision Hall probe measurementsK stability and settabilityCompact design to mount on movable girders.Gap > 7 mm

Page 42: LCLS Undulators –   Present Status and Future Upgrades

42 Heinz-Dieter [email protected]

42LCLS Undulator StatusMarch 1, 2010

The LCLS-I undulators have performed very well during commissioning and first user operation.Initial parameter development for the LCLS-II undulators has started, giving priority to the new soft x-ray line.The goal is a compact variable gap design to cover wavelengths between 6 nm and <0.6 nm at electron energies in the range 3-7 GeV.The low emittance and lower electron energy require beta functions of order 5 m or smaller for best utilization.Low beta-functions require a short FODO length, i.e., short undulator segments of length 1.8 m and compact break sections.The total length of each of the 2 soft x-ray undulator lines is expected to be about 50 m.

The LCLS-I undulators have performed very well during commissioning and first user operation.Initial parameter development for the LCLS-II undulators has started, giving priority to the new soft x-ray line.The goal is a compact variable gap design to cover wavelengths between 6 nm and <0.6 nm at electron energies in the range 3-7 GeV.The low emittance and lower electron energy require beta functions of order 5 m or smaller for best utilization.Low beta-functions require a short FODO length, i.e., short undulator segments of length 1.8 m and compact break sections.The total length of each of the 2 soft x-ray undulator lines is expected to be about 50 m.

Summary