8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
1/16
LAY OUT
Layout is a physical configuration ofworkstation facilities for operations. It is a
spatial arrangement of physical resourcesused for producing a product or providing
service
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
2/16
Need for lay out
When new facilities are created or added
Rearrangement of existing facilities due to
inefficiency, accidents, legal requirements Business Process Reengineering
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
3/16
Principles of lay out
Minimum movement/transportation
Integrated work flow
Safety Ambience
Flexibility
Space utilization Cost minisation
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
4/16
Types of lay out
Basically there are 2 types of processes
depending on flow of work
1) Flow process (oil refining, milk Dairy 2) Discrete (car, bike,TV,book)
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
5/16
Types of lay out for discrete
process
product lay out
Process lay out
Combination lay out Fixed position lay out
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
6/16
Product lay out
Product layout ( line layout, sequential
layout, mass production layout)
Ex car, bike ,bread
Dissimilar equipments are grouped
together in a line to manufacture a product
in a series of steps
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
7/16
Advantages of product lay out
High rate of out put
Low unit cost
High utilization of equipment Low material handling cost
Routing & scheduling built in
Employee specialization Skill requirement of employees low
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
8/16
Disadvantages of product lay out
Dull, monotonous, repetitive work
Inflexibility to changes in design of product/
volume
Shut down of line due to failure of a work station,abseneeism
No resale value of dedicated equipments
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
9/16
Process lay out
Similar facilities /equipments are grouped
together to produce a variety of
items/provide variety of service, but in
small volume
Ex: hospital, university, DTP centre, work
shop
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
10/16
Advantages of process lay out Variety of products /service
Low volume
General purpose machines Multi function worker, with high skill level
No major impact due to failure of a work
station
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
11/16
Disadvantages of process layout
High cost of product/service
Material handling cost high
Less utilization of workstations
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
12/16
Types of process layout
Job shop (very high variety, volume can
be one unit) DIAGRAM
Batch production( medium volume
medium variety)
Group technology layout/Cellular
manufacturing DIAGRAM
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
13/16
Fixed position lay out
Heavy products like ship, air craft
Materials, equipments tools are taken to
site
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
14/16
Product -process matrix
Variety of out put vs volume of out put
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
15/16
SINGLE PIECE FLOW U
SHAPED LAYOUT
EX: LUCAS TVS
Just in Time
workers move from work station to workstation and complete assembly
Multi function worker
Compact lay out. Efficient
8/14/2019 Layout is a Physical Configuration of Workstation Facilities for Operations.
16/16
CRAFT (Computerized relative
allocation of facilities technique) Initial lay out is done
Distance matrix, load matrix & cost per unit are fedinto computer
Initial total cost is worked out . no ofloads*distance* cost per unit
It compares two work stations and exchanges if totalcost is reduced
Continues till no further improvements are possible
Does not give optimal solution