15
Latest Developments in Siemens Large Gas Turbine Portfolio Matthias Fränkle 8000H Product Manager siemens.com/power-gas © Siemens AG 2017 All rights reserved.

Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

Embed Size (px)

Citation preview

Page 1: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

Latest Developments in Siemens Large Gas Turbine Portfolio

Matthias Fränkle 8000H Product Manager

siemens.com/power-gas © Siemens AG 2017 All rights reserved.

Page 2: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 2 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Table of content

• Power Market Challenges for Large Gas Turbines

• The Siemens Heavy Duty Gas Turbine Portfolio

• The SGT5-8000H Gas Turbine

• Operation Flexibility

• Egypt Megaproject

Page 3: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 3 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Challenging energy market in Germany: February 2016

https://www.energy-charts.de/price.htm

High ramps High power output

Wind Intraday Continuous 15 minutes Average Price (right axis) Solar Intraday Continuous 15 minutes Low Price (right axis)

Import Balance Load Intraday Continuous 15 minutes High Price (right axis) Conventional > 100 MW Intraday Auction 15 minutes call (right axis)

Page 4: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 4 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

The Siemens gas turbine portfolio: The right engine for every requirement

Power Generation / Mechanical Drive, Performance at ISO conditions

Heavy-duty gas turbines

Industrial gas turbines

Aeroderivative gas turbines

50H

z 50

Hz

or 6

0Hz

60H

z 450 MW

329 MW

187 MW

310 MW

250 MW

117 MW

53 to 66 / 54 to 62 MW

27 to 37 / 28 to 38 MW

4 to 7 MW

48 to 54 MW

40 / 41 MW

33 / 34 MW

24 / 25 MW

13 to 14 / 13 to 15 MW

8 / 8 to 9 MW

5 / 6 MW

SGT5-8000H

SGT5-4000F

SGT5-2000E

SGT6-8000H

SGT6-5000F

SGT6-2000E

SGT-A65 TR

SGT-800

SGT-A45 TR

SGT-750

SGT-700

SGT-A30 RB and SGT-A35 RB

SGT-600

SGT-400

SGT-300

SGT-100

SGT-A05 AE

39 to 44 MW

Page 5: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 5 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Siemens SGT-8000H series: Reliable, flexible, and proven in commercial operation

Rotor Proven rotor design with internal cooling air passages for world-class fast (cold) start and hot restart capability Easy rotor de-stacking on site due to disc assembly with Hirth serration and central tie rod

Compressor Variable inlet guide vanes and three stages of fast acting variable-pitch guide vanes (VGV) for improved part load efficiency and high load transients High efficiency due to evolutionary 3D blading All rotating compressor blades replaceable without rotor lift or rotor de-stacking

Bearings Active clearance control with Hydraulic Clearance Optimization (HCO) for reduced degradation and clearance losses

Turbine High cycling capability due to fully internally air-cooled turbine section 3D four-stage turbine with advanced materials and thermal barrier coating Shorter outages: All turbine vanes and blades replaceable without rotor lift; vane 1, blade 1 & 4 replaceable without cover lift

Combustion Advanced can annular combustion system

Flexibility Performance Serviceability

61% efficiency in combined cycle

Page 6: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 6 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Siemens evolutionary design circle ensures competitive products based on proven design

Based on field experience

Robust design

Pre-testing and validation

Incremental changes & improvements

Evolutionary design circle

Technology download

Fleet experience by Digital Services

Retrofittable

3-step testing approach Component/ rig testing Full scale engine testing Site testing

Page 7: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 7 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

New technology developments to further enhance customer value of air-cooled gas turbines

Advanced Coatings Super-efficient internal cooling features for blades and vanes

Advanced Blades Firing Temperature Increase

Cooling Air Reduction Aero-Efficiency

Major technology levers to achieve new benchmarks in performance

Firing Temperature Increase Sealing Optimization Aero-Efficiency Increase Emissions Reduction Whole Engine Modeling 3-D Blading Design

Page 8: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 8 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Evolutionary Upgrade Steps based on “built-in” Engine Growth Potential

375MW / 40% 570MW / 60%

400MW / >40% 600MW / >60%

2007 Market introduction

2013 uprate

2016 1st upgrade

• 100% compressor mass flow • As tested, Irsching 2nd build

• 95% compressor mass flow 450MW / 41% 665MW / 61%

• Increased mass flow • Increased TIT • Reduced cooling &

leakage flow

GT MW / % CC MW / % @ ISO conditions, net

• Upgrades are retrofitable • Further upgrades are in development

20xx

Next step: Currently in preparation

Siemens continues to invest in retrofitable upgrade of its existing fleet

Page 9: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 9 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

The Siemens SCC5-8000H series Flexibility defined

Pow

er

3%/s GT Gradient

10% rated load jump

Purge after shutdown

55 MW/min GT start up gradient, also for cold start

80 MW/min and higher

transient load gradient

Extra power by Evap. cooler Inlet chilling Suppl. firing

Time

Lower Minimum Turndown

80 MW/min and higher

transient load gradient

55 MW/min

transient gradient

Grid Sustaining at under-frequency

5 min

Primary Frequency Response

Fast Start Up

Secondary Frequency Response

Peak Power Part Load

Manual Operation

Fast Shut Down

BLOC Time to Sync

Flex operation line

Standard operation line

Page 10: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 10 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

CCPP Lausward test results Hot Start

0

10

20

30

40

50

60

0

100

200

300

400

500

600

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28time [min]

[MW] [1/s]

GT Speed

ST Speed

Plant Output GT Load

ST Load

ignition

IP B/P open

HP B/P open

IP B/P close

HP B/P close

< 25 min

Page 11: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 11 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

CCPP Lausward test results Ramp with +/- 70 MW/min

20

40

60

80

100

120

140

50

150

250

350

450

550

650

0 8 16 24 32 40 48 56 64 72 80 88 96 104 112 120 128 136time [min]

[kg/s] [MW]

-50MW/min

-15MW/min

-55MW/min

-70MW/min

HP Steam Flow SH Outlet

HRH Steam Flow (calc.)

Plant Output

GT Load

ST Load

Page 12: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 12 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

CCPP Lausward test results Shut Down

50 Hz

0

20

40

60

80

100

120

0

100

200

300

400

500

600

-2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30time [min]

[MW] / [°C] [%]

Plant Output GT Load

ST Load

GT Speed

Exhaust Gas Temp.

engaged

HP B/P open

HP B/P close

IP B/P open

IP B/P close

LP B/P open

LP B/P close

ST Speed

25min

HP Steam Temp SH Outlet

Page 13: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 13 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Early Power to Grid 4.8GW achievement

Nov. 2016 Synchronization of Beni Suef 1st unit GT42 which produces 400MW

4.8GW achieved on Jan 22, 2017

connected to the grid in only 18 months after signing the contract

Jan. 2017 Synchronization of 4 units + 3 units in Burullus + 1 unit in New Capital – 400MW more than promised in total 1.6GW

Dec. 2016 Synchronization of 7 units + 5 units in Beni Suef + 1 unit in Burullus + 1 unit in New Capital in total 2.8GW

Beni Suef Burullus New Capital 1,762 suppliers world wide and > 16,000 workers involved

773 local suppliers and subcontractors

20,000 manpower on the 3 sites (> 95% Egyptian nationals)

67 Mio man-hours since start of projects

Page 14: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 14 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Thank you for your attention

Matthias Fränkle 8000H Product Manger

Freyeslebenstr. 1 91058 Erlangen

Phone: +49 9131 18 85972 Mobile: +49 152 54691225

E-mail: [email protected]

siemens.com

Page 15: Latest Developments in Siemens Large Gas Turbine Portfolio · Latest Developments in Siemens Large Gas Turbine Portfolio ... • The Siemens Heavy Duty Gas Turbine Portfolio ... 600MW

June 2017 Page 15 Fränkle / Siemens AG

© Siemens AG 2017 All rights reserved. AL: N ECCN: N

Disclaimer

This document contains statements related to our future business and financial performance and future events or developments involving Siemens that may constitute forward-looking statements. These statements may be identified by words such as “expect,” “look forward to,” “anticipate” “intend,” “plan,” “believe,” “seek,” “estimate,” “will,” “project” or words of similar meaning. We may also make forward-looking statements in other reports, in presentations, in material delivered to shareholders and in press releases. In addition, our representatives may from time to time make oral forward-looking statements. Such statements are based on the current expectations and certain assumptions of Siemens’ management, of which many are beyond Siemens’ control. These are subject to a number of risks, uncertainties and factors, including, but not limited to those described in disclosures, in particular in the chapter Risks in Siemens’ Annual Report. Should one or more of these risks or uncertainties materialize, or should underlying expectations not occur or assumptions prove incorrect, actual results, performance or achievements of Siemens may (negatively or positively) vary materially from those described explicitly or implicitly in the relevant forward-looking statement. Siemens neither intends, nor assumes any obligation, to update or revise these forward-looking statements in light of developments which differ from those anticipated.

Trademarks mentioned in this document are the property of Siemens AG, its affiliates or their respective owners.

TRENT® and RB211® are registered trade marks of and used under license from Rolls-Royce plc. Trent, RB211, 501 and Avon are trade marks of and used under license of Rolls-Royce plc.