KEGIATAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
PEKERJAAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
KONSULTAN PENGAW : PT. TIAKA SAKA PRATAMA
NOMOR KONTRAK :
KONTRAKTOR PELAKS: PT. SOMID TRAKONAD
NOMOR KONTRAK :
WAKTU PELAKSANAA :
NONEL ASSEMBLY BUILDING CONSTRUCTION
PT. MULTI NITROTAMA KIMIA ( MNK )
RAB PENAWARAN
Code Desc!"#!o$ TOTAL
PRELIMINARY
NONEL ASSEMBLY BUILDING
BILL No & ELECTRICAL INSTALLATIONS *+,-,+&
BILL No MEC/ANICAL WORKS -+0,,+
BILL No - 2IRE ALARM SYSTEM ','*1,0
,'+,'&1,*
WARE/OUSE BUILDING
BILL No & ELECTRICAL INSTALLATIONS -',0,*
BILL No MEC/ANICAL WORKS 0,0&+,
BILL No - 2IRE ALARM SYSTEM ,0,&
1+,'&,--
LOCKER AND LUNC/ ROOM BUILDING
BILL No & ELECTRICAL INSTALLATIONS &','00,+
BILL No MEC/ANICAL WORKS +0,*&+,&BILL No - 2IRE ALARM SYSTEM &,-&&,
1&,&1,-
GENSET ROOM
BILL No & ELECTRICAL INSTALLATIONS +,-*,&
BILL No MEC/ANICAL WORKS ,,*
*,'0,'
UTILITIES
BILL No Pe"33#!o$s. &1,0-,0*
BILL No + OUT DOOR LIG/TING ,*-0,+
BILL No & WATER TREATMENT AND WATER SUPP 1,'*0,''
BILL No /YDRANT SYSTEM +&*,+*,1
BILL No - LIG/TNING PROTECTION SYSTEM +1,00,
BILL No 1 GENSET SYSTEM *+0,1+,
BILL No * TELP/ONE AND INTERCOM ,+-,1
BILL No LAN AND CABLE DATA *-,+1,-
BILL No 0 COMPRESSOR SYSTEM +&&,&*&,+
BILL No ' CCT4 SYSTEM -0,&1,-
,0*0,-1+,-1
TOTAL &,1,'1,1
PROGRES BELUMPose$#3se
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 2/15
KEGIATAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
PEKERJAAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
KONSULTAN PENGAWAS : PT. TIAKA SAKA PRATAMA
NOMOR KONTRAK :
KONTRAKTOR PELAKSANA : PT. SOMID TRAKONAD NO
NOMOR KONTRAK : PERIOD
WAKTU PELAKSANAAN : MINGG
NONEL ASSEMBLY BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMATE UANTITIES
BOBOTRAB PENAWARAN
Code Desc!"#!o$
Preambles
The Works to be new building.
1.00 Ls 0.
1.00 Ls 0.
Land Clearing inside of Assembl !lant Area " 10 m outer the fen#e 1.00 Ls 0.
1.00 Ls 0.
Contra#tor shall allow in the &reliminaries for the following'
Workmens insuran#e ()A*+,+T/ 1.00 Ls 0.
+ite *anagement and stablishment #osts 1.00 Ls 0.
2ui!ment ne#essar for the !ro!er e3e#ution of the Contra#t
1.00Ls
0.,ertime andor une#onomi# working times 1.00 Ls 0.
1.00 Ls 0.
+ubmitting sam!les of materials and e2ui!ment in#lude testing of the same if re2uired 1.00 Ls 0.
&rogress re!orts and !hotogra!hs 1.00 Ls 0.
+ho! drawings 1.00 Ls 0.
As-built drawings 1.00 Ls 0.
ApproxQuantity
Unit ofMeasure
The Contra#t will be awarded on ............. 011 allowing the a!!ointed Contra#tor weeks to!re!are before mobilising to site on....................... The Contra#t Works are to be #om!leted b
99999.. 011.
The *ain Contra#t Works are as shown on the &ro:e#t +#hedule that has been !roided with theTender ;o#uments. The Tenderer should use th is s#hedule as a !art of his tender
do#umentation. <e ma reise this s#hedule as he sees fit in the light of his e3!erien#e on
similar works. <oweer in so doing the Contra#t end date shall remain un#hanged.
Ar#hite#tural +tru#tural and *e#hani#al le#tri#al designs and s!e#ifi#ations hae been!re!ared b Consultant howeer the #ontra#tor is to ensure that the final installation is fit for
!ur!ose and that it #om!lies with all lo#al regulations and be-laws.
Where shown the 2uantities of ea#h work item are a!!ro3imate alues onl. The = of > hasbeen in#luded to assist the Tenderer with the !re!aration of his tender !ri#ing onl. The m!loer
does not warrant that the measurements dimensions and the like as shown on the drawings are
#orre#t. Tenderers should satisf themseles as to the #orre#tness of the information !roidedand if ne#essar ad:ust their !ri#ing to in#lude the information that the hae obtained. The
Contra#t is to be a Lum! +um &ri#e #ontra#t. The Tenderer is res!onsible for in#luding all items
of work re2uired to full and !ro!erl #om!lete ea#h =ill item whether or not the are e3!ressl
des#ribed in this =ill of >uantities or shown on the ;rawings.
?f the Tenderer feels that s!e#ifi# work items hae not been in#luded in the =ills of >uantities then
he ma add the work to the s#hedule under the a!!ro!riate se#tion. This should be #learl shownas a se!arate entr..
BILL No Pe?!<!$3!es, Mo@!?!s3#!o$, S!#e Es#3@?!s><e$#,Oe>e3ds, De<o@!?!s3#!o$
Allow for mobilisation of equipment and manpower to site, ompletet!e "or#s and t!en demobilise.
Allow for the establishment of a site offi#e and la down area in the lo#ation as dire#ted b the&T *@
,n #om!letion of the Works allow for the remoal of the Contra#tors site establishment and ladown areas and #lean u! of the working area to the satisfa#tion of the &T *@.
Com!lian#e with <ealth " +afet re2uirements and !roiding all ne#essar !rote#tie e2ui!ment
and #lothing
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 3/15
KEGIATAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
PEKERJAAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
KONSULTAN PENGAWAS : PT. TIAKA SAKA PRATAMA
NOMOR KONTRAK :
KONTRAKTOR PELAKSAN : PT. SOMIT TRAKONAD
NOMOR KONTRAK :
WAKTU PELAKSANAAN :
NONEL ASSEMBLY BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMAT
RAB PENAWARAN
Code Desc!"#!o$
BILL No 3 - ELECTRICAL INSTALLATIONS
&. Lig!i"g #i$!%res
1 TL Lam! 3 $6 W &rodu#t Artolite B*+ <B, ?& 65 #w Bland Cable 66
$ 10
3TL Lam! 3 $6 T!e B*+ T& ?& 08 Artolite #om!lite f it ting and asseories. 15
3 ;own Light &LC 14 W T!e D; 150 ?& 0 Artolite 44 ?ndustrial Lam! ?= ; 0 <&L@ 15 Watts ?& 08 Artolite 5
6E?T LA*& @<& series 6100 " 6500 C-Lu3 +eries Fone 1 Com!a#t 8L #w battter 1
&.+ Lig!i"g A&&essories
1 +ingle swit#h Legrand &le3o 55 + 10 A 50 G with Label <older ?& 55 16
$ +ingle lighting swit#h T!e ?+, &rodu#t @<&. 1
&.& Lig!i"g Cir&%i!s
1 Lighting !oint 105
$ Lighting swit#h !oint 4
&. Po'er O%!le! Cir&%i!s
1 +o#ket outlet 16 A 1!h 5
$ +o#ket outlet $ A $!h 1
&.- Po'er O%!le!
1 $4
$ +o#ket outlet 1 &h 16 A @<& T!e ?+, ?& 65 !H with ?+, +wi#th onl for wall 16
3 +o#ket outlet $ &h $ A @<& T!e ?+, ?& 65 !H with ?+, +wi#th 1
&.1 Cable lea(er a"( Tra)
BalaniIed Tra 00 mm 3 00 mm 66
BalaniIed Leader 600 mm 3 00 mm 6
A""o;3$#!
+u!!l and install @<& Legrande or 2ual . Conne#t to !ower and swit#hing #ir#uits
in#luding all #hasing e3isting walls and making good #onne#tions to #ables and #onduit
sstems all ne#essar earthing bonding su!!orting hangers and fi3ing a##esories as
s!e#ified. Also in#lude for ba#king !late in % mm !lwood to the light !ositions as shown
on the Ceiling &lans.
TL Lam! 3 $6 W &rodu#t @<& +eries 6600 " 6604 3 n Fone " 1 ?& 667 #wBland Cable
+u!!l and install lighting a##essories Legrand ATE and @<& series e2ual and
a!!roed in#luding all bo3es #onne#tions to #onduit and wiring sstems earthing
+u!!l and install 8DC @EJ $ 3 .5 mm #o!!er #able in 0 mm diameter &GC #onduitin final sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at
making good terminations at fitting and all ne#essar earthing and bonding re2uirements
(all as s!e#ified/ to'
+u!!l and install &ower ,utlet Legrand or @<& and a!!roed in#luding all bo3es
#onne#tions to #onduit and wiring sstems earthing bonding and fi3ing all as s!e#ified
+o#ket outlet 1 &h 16 A Legrand T!e &le3o 55+ ?& 55 !H with safet shutter,utbow
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 4/15
NONEL ASSEMBLY BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMAT
RAB PENAWARAN
Code Desc!"#!o$ A""o
;3$#!
&.* #ee(er Cable
+u!!l and install Cable feeder ele#tri#al !anel #om!lete with galaniIed !i!e for safet
1 8rom LG*;& to L&&& @onel Ass
@J8B=J E$00 mm H @JJ 1 3 145 mm $0
$ 8rom LG*;& to && AC
@J8B=J E%5 mm H @JJ 1 3 70 mm $0
&. *ro%"(i"g
+u!!l and install =C $5 mm for grounding sstem
1 To L&&& @onel Ass $0
$ To && AC @onel Ass $0
3
&iling Conne#tion 1175
=eam Conne#tion $%
+teel +tru#ture #onne#tion $
4
3.9 PANEL
1 L& && @onel Ass
+u!!l and install !anel #om!lete with a##essories 1
$ && AC @onel Ass +u!!l and install !anel #om!lete with a##essories 1
&.' Tes!i"g a"( Comissio"i"g 1
BILL No 4 - EC/ANICAL ORS
. AIR CON2ITIONIN* NIT
2CT NIT
1 Air Conditioning nit du#ted t!e #a!a#it 140.000 =tuh 1
$ Air Conditioning nit du#ted t!e #a!a#it 50.000 =tuh 1
3 ;ehumidifier #a!a#it 5 w 1
4 ;ehumidifier #a!a#it 15 w 1
SPLIT ALL ONTE2
5 Wall mounted T!e 8T; 50 ;G* - D; 50 =G* - ;A??@ 4
.+ 2%&!i"g
1
0K 3 14K 10
$0K 3 16K 1
K 3 16K 10
K 3 1K $
16K 3 1K
Golume ;am!er 1
+u!!l and install Brounding a##essories bonding all steel #onne#tion =eam #olom
earthing sstem and fi3ing all as s!e#ified
+u!!l and install Brounding earthing sstem ma3 $ ohm in#lude #ontrol bo3grounding
rod C $K #onne#tiontest and bore hole.
+u!!l and ?nstall Air Conditioning nit +!lit du#ted #om!lete with steel hangers anti
ibration mountings and all ne#essar su!!orting a##essories as re2uired ina##ordan#e with the s!e#ifi#ation detail drawing and manufa#turers instru#tions asdes#ribed
+u!!l and ?nstall Air Conditioning nit +!lit Wall mounted #om!lete with steel hangers
;rainDefrigerant &i!e and all ne#essar su!!orting a##essories as re2uired in
a##ordan#e with the s!e#ifi#ation detail drawing and manufa#turers instru#tions as
des#ribed
+u!!l fabri#ate and install the following insulated du#t as s!e#ified #om!lete with allne#essar su!!orts (for +u!!l/
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 5/15
NONEL ASSEMBLY BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMAT
RAB PENAWARAN
Code Desc!"#!o$ A""o
;3$#!
.- a!er S%l)
1 Termination to water su!!l sstem 1
$
15mm diameter B?& !i!e 1
0mm diameter B?& !i!e 16
5mm diameter B?& !i!e 4
8itting and assesories. 1
3 Cold Water a##essories
Bate ale $mm diameter
.1 Se'age a!er
1
$4 mm diameter &GC AW !i!e 14
50 mm diameter &GC AW !i!e
65 mm diameter &GC AW !i!e $100 mm diameter &GC AW !i!e 14
8itting and assesories 1
$
75 mm diameter &GC AW !i!e 1$5
100 mm diameter &GC AW !i!e
Doof ;rain dia 65 mm 14
3 +&T?C TA@
=io 8il +e!ti# Tank Ca!. .000 ltr
4 ,?L TDA& 1
.* Tes!i"g a"( Comissio"i"g 1
BILL No 5 - #IRE ALAR S7STE
-. #ire E$!i"g%iser
1 10
-.+ #ire Alarm S)s!em
1 ;ete#tor
+moke and luminous ;ete#tor $0
Alarm =ell $
=reak Blass 6
$ ?nstallation for 8ire Alarm ( 8DC 3 15 mm H Conduit &GC 0 mm / $%
+u!!l and ?nstall water su!!l line #onne#ted to main water su!!l !i!e. As shown on
drawings. Demoe and reinstall e3isting timber wall after #om!lete the installation.
Cold Water &i!e Balanis !i!e in#luding' fittings hangers su!!ort and all ne#essar
su!!orting a##essories
+u!!l and ?nstall sewage water line #onne#ted to main waste water line !i!e. As shown
on drawings.
+ewage Water &i!e &GC AW !i!e in#luding' fittings hangers su!!ort and all ne#essarsu!!orting a##essories
+torm Water &i!e &GC AW !i!e in#luding' fittings hangers su!!ort and all ne#essar
su!!orting a##essories
+u!!l and ?nstall &ortable 8ire 3tinguisher ;DJ &,W;D #a!. 5 kg #om!lete with
su!!orting a##essories. As shown on drawings
+u!!l and install 8DC 3 1.5 mm #o!!er #able in 0 mm diameter &GC #onduit in final
sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at fitting and
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 6/15
KEGIATAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
PEKERJAAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
KONSULTAN PENGAWAS : PT. TIAKA SAKA PRATAMA
NOMOR KONTRAK :
KONTRAKTOR PELAKSAN : PT. SOMID TRAKONADNOMOR KONTRAK :
WAKTU PELAKSANAAN :
WARE/OUSE BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMAT
RAB PENAWARAN
Code Desc!"#!o$
BILL No 3 - ELECTRICAL INSTALLATIONS
3.1 Lig!i"g #i$!%res
1 TL Lam! 3 $6 T!e B*+ T& ?& 58 Artolite #om!lite fitting and asseories.
?ndustrial Lam! ?= ; 0 <&L@ 15 Watts ?& 58 Artolite
3., Lig!i"g A&&essories
1 ;ouble lighting swit#h CL?&+AL
3.3 Lig!i"g Cir&%i!s
1 Lighting !oint
3.4 Po'er O%!le! Cir&%i!s
1 +o#ket outlet 1$ A 1!h
3.5 Small Po'er O%!le!
1 +o#ket outlet 1$ A 1!h
3.6 Cable lea(er a"( Tra)
3.+ #ee(er Cable
+u!!l and install Cable feeder ele#tri#al !anel #om!lete with galaniIed !i!e for safet
1 8rom LG*;& to L&&& WAD<,+
@J8B=J E5 mm H @JJ 1 3 16 mm
3.8*ro%"(i"g
+u!!l and install =C $5 mm for grounding sstem
1 To L&&& Warehouse
+u!!l and install Ar!oli!e . Conne#t to !ower and swit#hing #ir#uits in#luding all #hasinge3isting walls and making good #onne#tions to #ables and #onduit sstems allne#essar earthing bonding su!!orting hangers and fi3ing a##esories as s!e#ified. Alsoin#lude for ba#king !late in % mm !lwood to the light !ositions as shown on the Ceiling&lans.
+u!!l and install lighting a##essories Cli!sal or e2ual and a!!roed in#luding allbo3es #onne#tions to #onduit and wiring sstems earthing bonding and fi3ing all ass!e#ified
+u!!l and install @J* $ 3 .5 mm #o!!er #able in 0 mm diameter &GC #onduit infinal sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at fittingand all ne#essar earthing and bonding re2uirements all as s!e#ified
Lighting swit#h
+u!!l and install @J* $ 3 .5mm #o!!er #able and 0mm diameter &GC #onduit infinal sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at fitting
and all ne#essar earthing and bonding re2uirements (all as s!e#ified/ to'
+u!!l and install &ower ,utlet Cli!sal or Legrand and a!!roed in#luding all bo3es#onne#tions to #onduit and wiring sstems earthing bonding and fi3ing all as s!e#ified
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 7/15
WARE/OUSE BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO
RAB PENAWARAN
Code Desc!"#!o$
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 8/15
KEGIATAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
PEKERJAAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
KONSULTAN PENGAWAS : PT. TIAKA SAKA PRATAMA
NOMOR KONTRAK :
KONTRAKTOR PELAKSAN : PT. SOMID TRAKONADNOMOR KONTRAK :
WAKTU PELAKSANAAN :
LOCKER AND LUNC/ BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMATE U
RAB PENAWARAN
Code Desc!"#!o$
BILL No 3. - ELECTRICAL INSTALLATIONS
3.1 Lig!i"g #i$!%res
1 TL Lam! 3 $6 T!e B*+ T& ?& 08 Artolite #om!lite f itting and asseories. 1.0
;own Light &LC 14 W T!e D; 150 ?& 0 Artolite .0
3., Lig!i"g A&&essories
1 ;ouble lighting swit#h CL?&+AL .0 +ingle lighting swit#h CL?&+AL 4.0
3.3 Lig!i"g Cir&%i!s
1 Lighting !oint $.0
Lighting swit#h !oint 10.0
3.4 Po'er O%!le! Cir&%i!s
1 +o#ket outlet 1$ A 1!h 6.0
3.5 Small Po'er O%!le!
1 +o#ket outlet 1$ A 1!h 6.0
3.6 Cable lea(er a"( Tra)
3.+ #ee(er Cable
+u!!l and install Cable feeder ele#tri#al !anel #om!lete with galaniIed !i!e for safet
1 8rom LG*;& to L&&& L@C< D,,*@J8B=J E5 mm H @JJ 1 3 16 mm 60.0
3.8 *ro%"(i"g
+u!!l and install =C $5 mm for grounding sstem
1 To L&&& L@C< D,,* 15.0
3.+ PANEL
A""o;3$#!#=
+u!!l and install Ar!oli!e . Conne#t to !ower and swit#hing #ir#uits in#luding all #hasinge3isting walls and making good #onne#tions to #ables and #onduit sstems allne#essar earthing bonding su!!orting hangers and f i3ing a##esories as s!e#ified. Alsoin#lude for ba#king !late in % mm !lwood to the light !ositions as shown on the Ceiling&lans.
+u!!l and install lighting a##essories Cli!sal or e2ual and a!!roed in#luding allbo3es #onne#tions to #onduit and wiring sstems earthing bonding and fi3ing all ass!e#ified
+u!!l and install @J* $ 3 .5 mm #o!!er #able in 0 mm diameter &GC #onduit infinal sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at fittingand all ne#essar earthing and bonding re2uirements all as s!e#ified
final sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at fittingand all ne#essar earthing and bonding re2uirements (all as s!e#ified/ to'
+u!!l and install &ower ,utlet Cli!sal or Legrand and a!!roed in#luding all bo3es#onne#tions to #onduit and wiring sstems earthing bonding and fi3ing all as s!e#ified
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 9/15
LOCKER AND LUNC/ BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMATE U
RAB PENAWARAN
Code Desc!"#!o$ A""o;3$#!#=
100 mm diameter &GC AW !i!e 14.
8itting and assesories 1.
75 mm diameter &GC AW !i!e 0.
100 mm diameter &GC AW !i!e 16.
Doof ;rain dia 65 mm 6.
$ +&T?C TA@
=io 8il +e!ti# Tank Ca!. .000 ltr 1.
4.4 Tes!i"g a"( Comissio"i"g 1.
BILL No 5 - #IRE ALAR S7STE
5.1 #ire E$!i"g%iser
1 .
+torm Water &i!e &GC AW !i!e in#luding' fittings hangers su!!ort and all ne#essarsu!!orting a##essories
+u!!l and ?nstall &ortable 8ire 3tinguisher ;DJ &,W;D #a!. 5 kg #om!lete withsu!!orting a##essories. As shown on drawings
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 10/15
KEGIATAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
PEKERJAAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
KONSULTAN PENGA : PT. TIAKA SAKA PRATAMA
NOMOR KONTRAK :
KONTRAKTOR PELA : PT. SOMID TRAKONAD
NOMOR KONTRAK :WAKTU PELAKSAN :
GENSET ROOM BUILDING
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMATE
RAB PENAWARAN
Code Desc!"#!o$
BILL No 3 - ELECTRICAL INSTALLATIONS
3.1Lig!i"g #i$!%res
1 TL Lam! 3 $6 T!e B*+ T& ?& 08 Artolite #om!lite f it ting and asseories. .0
&LC 14 W T!e D; 150 ?& 0 Artolite 6.0
3., Lig!i"g A&&essories
1+ingle lighting swit#h CL?&+AL
$.0
3.3 Lig!i"g Cir&%i!s
1 Lighting !oint 4.0
Lighting swit#h !oint $.0
3.4 Po'er O%!le! Cir&%i!s
1 +o#ket outlet 1$ A 1!h .0
3.5 Small Po'er O%!le!
1 +o#ket outlet 1$ A 1!h .0
3.6 Cable lea(er a"( Tra)
Cable &it 600 mm 3 00 mm H Che#ker &late #oer 4.0
3.+ #ee(er Cable
+u!!l and install Cable feeder ele#tri#al !anel #om!lete with galaniIed !i!e for safet
1 8rom LG*;& to L&&& Benset
@JJ E mm H @JA 1 3 5 mm 4.0
3.8 *ro%"(i"g
+u!!l and install =C mm for grounding sstem
1 To L&&& Benset Doom 4.0
A""o;3$#!#=
+u!!l and install Ar!oli!e . Conne#t to !ower and swit#hing #ir#uits in#luding all #hasing
e3isting walls and making good #onne#tions to #ables and #onduit sstems allne#essar earthing bonding su!!orting hangers and fi3ing a##esories as s!e#ified. Also
in#lude for ba#king !late in % mm !lwood to the light !ositions as shown on the Ceiling
&lans.
+u!!l and install lighting a##essories Cli!sal or e2ual and a!!roed in#luding all
bo3es #onne#tions to #onduit and wiring sstems earthing bonding and fi3ing all ass!e#ified
+u!!l and install @J* $ 3 .5 mm #o!!er #able in 0 mm diameter &GC #onduit in
final sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at fittingand all ne#essar earthing and bonding re2uirements all as s!e#ified
+u!!l and install @J* $ 3 .5mm #o!!er #able and 0mm diameter &GC #onduit infinal sub-#ir#uit in#luding #hasing e3isting walls and making good terminations at fitting
and all ne#essar earthing and bonding re2uirements (all as s!e#ified/ to'
+u!!l and install &ower ,utlet Cli!sal or Legrand and a!!roed in#luding all bo3es
#onne#tions to #onduit and wiring sstems earthing bonding and fi3ing all as s!e#ified
+u!!l and install Brounding earthing sstem ma3 $ ohm in#lude #ontrol bo3grounding
rod C $K #onne#tiontest and bore hole.
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 11/15
KEGIATAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
PEKERJAAN : NONEL ASSEMBLY BUILDING CONSTRUCTION
KONSULTAN PENGAWA : PT. TIAKA SAKA PRATAMA
NOMOR KONTRAK :
KONTRAKTOR PELAKS : PT. SOMID TRAKONADNOMOR KONTRAK :
WAKTU PELAKSANAAN :
UTILITIES
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMAT
RAB PENAWARAN
Code Desc!"#!o$
BILL No 1 - Preara!io"s.
. +ta#king out .+ +oil ;it#hing
BILL No , - OT 2OOR LI*/TIN*
+. TOER LAP
1
$ &anel =o3 00 3 00 mm
3 8lood Light <&?T 50 W <B, A*AD 7 ADT<,L?T
+.+ CONCRETE #ON2ATION
Con#rete =eam 50
Debar
8orm works
+.& CABLE AN2 INSTALLATION
nder Bround Cable @J8B=J 3 10 mm
nder Bround Cable @J8B=J 3 16 mm
BILL No 3 - ATER TREATENT AN2 ATER SPPL7 S7STE
3., TP INSTALATION
1 &*&
Transer &*& Ca!. 00 L!m head ' $ m
8ibre Blass Tank &anel Ca!a#it ' m$
$ Tower Tank #a!. .000 ltr 8ibre Blass
&i!ing ?nstalation <;& &i!e K
5 8iiting and Gale
3.3a!er S%l)
1
0mm diameter <;& !i!e
5mm diameter <;& !i!e
A";3
+teel Tower Lam! ( &i!e K M $K M 1K / < N %0 m ?n#luding &ainting =ra#ketbase!late an#hor et#
+u!!l and ?nstall water su!!l line #onne#ted to main water su!!l !i!e. As shown on
drawings. Demoe and reinstall e3isting timber wall after #om!lete the installation.
Cold Water &i!e <;& !i!e in#luding' fittings hangers su!!ort and all ne#essar
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 12/15
UTILITIES
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMAT
RAB PENAWARAN
Code Desc!"#!o$ A"
;3
= Lig!"i"g Re&ieer Earl) S!reamer
1 *ono!ole <N 5 m
Con#rete fondation for mono!ole
$ &rote#tion !ost and fen#e for mono!ole
Coa3ial Cable 5 mm
5 Con#rete grounding well ($0 3 $0 3 0 #m/
6 Lightning De#ieer arl +treamer mision G??@B T!e G - 6
7 Lightning Counter 1500 A ri#o
4 Control =o3 &anel ++ 15 3 0 3 $0 for Lightning #ounter
CLig!"i"g Eras!er s)!em 9or B%il(i"g1 Brounding Ding =uilding=onded all stru#ture using =C Cable 50 mm 7
Cable @JA8 50 mm green for !!erground bonded
$ Cadweld #onne#tion to steel stru#ture
++ =olt s#uninsulator et#
5 Coo!er &late 50 3 6 mm 3 ml for 8&= and ground *esh
6 Cu Dod $K 3 6 mL
7 Cu Clam! $K
4 &i!e su!!ort #lam! =C #able for 8en#e
; Labo%r Cos!
1 re#tion installation et#
BILL No 6 - *ENSET S7STE
6.1 #EL TAN
1 Weekl Tank #a!. 10.000 ltr. T!e +teel !late #w su!!ort sigh glass enting. t#.
?nstalasi !i!a bahan bakar bla#k steel s#h. 0
$ Gale dan A##essories #lass 150
Water +!arator dia. 0 mm
5 8uel ,il on site for testing #ommisioning
6., *ENERATOR SET
1 &engadaan Benset
T!e C**?@+ &ower Beneration
*odel ' >+L%B5 C75;5
00 kW 50 kGA at &rime Dating
$40G $ !h 50 <I 0.4 &8 1500 r!m
,!en t!e
+ingle ,!eration
?n#luding ' ?ndustrial +ilen#er " 8le3ible 3haust &i!e =atter " Cable
=atter +tandard Tool it *anual =ooks " &arts =ooks
&i!ing +ilen#er - 5 GA
$ ?nstall Benset 5 GA
&ermite from ;e!naker
6.3 PANEL
1 LG*;& B@+T
+u!!l and install !anel #om!lete with a##essories
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 13/15
UTILITIES
DESCRIPTION O2 WORKS 8 BILLS O2 APPRO9IMA
RAB PENAWARAN
Code Desc!"#!o$ A
;
8.1 AIN E:IPENT
1 +DGD
T!e '
?n#luding ' =atter and Charge
*erk '
Terminal <ub !air (,ffi#e/
$ Terminal <ub 16 !air (@onel assembl/
Arrester and grounding sstem
5 *ain 2ui!ment ?nstalation
8., CABLE INSTALLATION
1 Cable ?ntallation outdoor
T& Cable CAT5 #w #onduit &GC from offi#e to @onel Assembl 10 !air
@onnel Ass
Cable ?nstalation T& Cat 5e #w #onduit &GC 0 mm
+o#ket outlet D) 5
Warehouse
Cable ?nstalation T& Cat 5e #w #onduit &GC 0 mm
+o#ket outlet D) 5
$ Lo#ker and Lun#h Doom
Cable ?nstalation T& Cat 5e #w #onduit &GC 0 mm
+o#ket outlet D) 5
,ffi#e and *eeting room
Cable ?nstalation T& Cat 5e #w #onduit &GC 0 mm
+o#ket outlet D) 5
5 *ain +e#urit
Cable ?nstalation T& Cat 5e #w #onduit &GC 0 mm
+o#ket outlet D) 5
8.3 LIN AN2 INTERNET S7STE
G- +AT +stem
BILL No - COPRESSOR S7STE
.1 AIN E:IPENT
1 C,*&D++,D
Ca!a#it ' 47 #fm t!e ' Dotar Conta#t Com!ressor
&ower ' 5 w $&h
&D++D TA@ CA&. 1000 Ltr ?n#luding &resure gauge and safet dei#e.
$ A?D ;D?JD Ca!a#it ' 15 w $ &h T!e C#led Defrigerated
Air 8ilter
5 &resure gauge $00 Dange 0 to 1 =ar
6 =all Gale dia. 5 mm $00 7 =all Gale dia. 1 mm $00
4 Che#k Gale dia. 5 mm $00
% Automati# ;rain
., INSTALATION
1 &i!e ?nstalation B?& +#h 0 ;ia. 5 mm
&i!e ?nstalation B?& +#h 0 ;ia. 1 mm
$ 8itting
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 14/15
905
25.85714
77350
773.5
7/23/2019 Last MNK ME Progres
http://slidepdf.com/reader/full/last-mnk-me-progres 15/15
50,000,000.00
500,000.00
5,278,000.00
3,528,000.00
7,795,000.00
23,98,000.00
4,195,000.00
3,200,000.00
50,000.00
48,244,000.00
1,75,000.00