Elizabeth House - 39 York Road - London SE1 7NQ Tel: +44 207 401 0020 - Fax: +44 207 401 0030 www.bouygues-uk.com LARNAKA AND PAPHOS AIRPORTS Under a 25-year PPP deal, Bouygues completed the design and build of facilies at two internaonal airports in Cyprus: Paphos and Larnaka. The contract was Bouygues’ first major reference in airport concessions. KEY FACTS NAME: Larnaka and Paphos Airports CLIENT: Hermes Airports DURATION: 42 months LOCATION: Larnaka and Paphos, Cyprus SECTOR: Transport Infrastructure AWARDS: N/A TYPE OF WORK: New Build Works comprised the full modernisation of the existing buildings, to a design by Pascall and Watson and Stantec Architects. At Larnaka, a 100,000m² terminal was constructed, with a capacity of 7.5 million passengers. At Paphos, a 20,000m² terminal building was completed with a capacity of 2.5 million passengers. In total, 80ha of grounds were landscaped for the project.

LARNAKA AND PAPHOS AIRPORTS

  • Upload
    others

  • View
    16

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LARNAKA AND PAPHOS AIRPORTS

Elizabeth House - 39 York Road - London SE1 7NQ Tel: +44 207 401 0020 - Fax: +44 207 401 0030 www.bouygues-uk.com

LARNAKA AND PAPHOS AIRPORTS

Under a 25-year PPP deal, Bouygues completed the design and build of facilities at two international airports in Cyprus: Paphos and Larnaka. The contract was Bouygues’ first major reference in airport concessions.

KEY FACTS

NAME: Larnaka and Paphos Airports

CLIENT: Hermes Airports

DURATION: 42 months

LOCATION: Larnaka and Paphos, Cyprus

SECTOR: Transport Infrastructure

AWARDS: N/A

TYPE OF WORK: New Build

Works comprised the full modernisation of the existing buildings, to a design by Pascall and Watson and Stantec Architects. At Larnaka, a 100,000m² terminal was constructed, with a capacity of 7.5 million passengers. At Paphos, a 20,000m² terminal building was completed with a capacity of 2.5 million passengers. In total, 80ha of grounds were landscaped for the project.