Environmental and Economic Impact: This Solar Farm will commercially produce 7,000,000 kilowatt-hours of clean electricity every year- Enough to power 1,000 homes, displacing Largest Private Solar Farm in the Northeast US (New England) Scope: Turnkey Solar Engineer, Procure and Construct (EPC) contract Size: 4.75 Megawatts AC Power, 54-Acre lot Role: Rafael Marrero, SCPM- Project Director

Largest private solar farm in Northeast U.S

Embed Size (px)

DESCRIPTION

Rafael Marrero, SCPM- Project Director Environmental and Economic Impact: This Solar Farm will commercially produce 7,000,000 kilowatt-hours of clean electricity every year- Enough to power 1,000 homes, displacing 500,000 gallons of oil per year that would be needed to do the same

Citation preview

Page 1: Largest private solar farm in Northeast U.S

JH

Environmental and Economic Impact:This Solar Farm will commercially produce 7,000,000 kilowatt-hours

of clean electricity every year- Enough to power 1,000 homes, displacing 500,000 gallons of oil per year that would be needed to do the same

Project: True North Energy- Solar Date: December 2011 – October 2012

Largest Private Solar Farm in the Northeast US (New England)Scope: Turnkey Solar Engineer, Procure and Construct (EPC) contractSize: 4.75 Megawatts AC Power, 54-Acre lotRole: Rafael Marrero, SCPM- Project Director