1/43
DAFTAR HARGA SATUAN PEKERJAAN
UPAH DAN BAHANTAHUN ANGGARAN 2015
PERBAUNGAN
PEMERINTAH KABUPATEN SERDANG BEDAGAI
DINAS PERINDUSTRIAN, PERDAGANGAN DAN PASAR
PT. ARANGSIBU RAYA CONSULTANT
8/18/2019 Laporan Mingguan Sialang Buah.xls
2/43
REKAPITULASI
ENGINEERING ESTIMATE ( EE )
PEKERJAAN : PEMBANGUNAN DAN PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PASAR SIALANG BUAH
LOKASI PEKERJAAN : KECAMATAN TEKUL MENGKUDU - KAB. SERDANG BEDAGAI
TAHUN ANGGARAN : 2015
NO URAIAN PEKERJAAN JUMLAH HARGA
I PEKERJAAN PENDAHULUAN Rp 3,116,30.00
II GEDUNG - A Rp 6,!!2,211.05
III GEDUNG - B Rp "5,2!2,!#"."0
I$ PEMBUATAN KAMAR MANDI BARU Rp 6,302,"0".3"
$ %ASILITAS UMUM Rp 15",2#,510."5
$I PEKERJAAN AKHIR Rp 15,#25,51!.00
A JUMLAH Rp 1,1!0,!0,2".!"B PPN 10 & Rp 11!,0!0,2".#
C TOTAL JUMLAH Rp 1,2#!,!!,"02.36
D DIBULATKAN Rp 1,2#!,!!,000.00
Ter!"#$% & S#' M!"#r T!%# R#'* D# P"+ L!,# J'# De"#-#$ R#'* D# P"+ T!%# R! R-!#+
M'()*, J+ 2015
Dp'/) O' D+) O'
P'4)) P'+) K'* K*+)* P''*7)*)
D*) P'*(+)* P'()8)*8)* ()* P)) C$. N+)*)) C*+)*
ASJMIR FAIAL /ALLAD ST. MM SUPRIANTO
NIP. 1#5!011 1#!012 1 003 9)/ D'/+
M'*8')+ D/')+ O'
K'p)) D*)
P'*(+)* P'()8)*8)* ()* P))
K)+p)'* S'()*8 B'()8)
Dr*. H. RIFAI BAKRI TANJUNG M.AP
NIP. 1#6050 1#!602 1 002
8/18/2019 Laporan Mingguan Sialang Buah.xls
3/43
ENGINEERING ESTIMATE ( EE )
PEKERJAAN : PEMBANGUNAN DAN PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PASAR SIALANG BUAH
LOKASI PEKERJAAN : KECAMATAN TEKUL MENGKUDU - KAB. SERDANG BEDAGAI
TAHUN ANGGARAN : 2015NILAI PEKERJAAN : -
NO URAIAN PEKERJAANOLUME
ANALISAHARGA TOTAL B' Pe3er 4##$
$ U* S* SATUAN (R-) HARGA (R-)
I PEKERJAAN PENDAHULUAN
1 P)p)* P;'/ 1.00 L A 005 56,30.00 56,30.00 0.0
2 D/+'* L)p)* P*() 26.60 B 013 120,1!0.00 3,1#6,"!!.00 0.2"
1;5
8/18/2019 Laporan Mingguan Sialang Buah.xls
4/43
2.8 PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05 5 MCB B@ 0.00
2.; PEKERJAAN INSTALASI AIR
1 P).Pp) A H+4)* D) T))*8 1#.!0 O 016.) 5","20.00 1,12,!56.00 0.10
2 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
3 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1;1>0112.5<
2.< PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
5/43
7.5 PEKERJAAN DINDING = PLASTER
1 P))*8)* B)+ B)) 1 : 2 20.!! E 00" 122,550.00 2,55!,!.00 0.22
3 P'')* K 1 P7 : 3 P "6.00 H 003 53,6"0.00 ,0"!,#20.00 0.35
P'')* B)/ 1 P7 : 3 P 66.0 H 003 53,6"0.00 3,563,6!!.00 0.30
10201952.00
7.8 PEKERJAAN LANTAI
1 L)*) U)) K')/ 0 @ 0 6!.2 G0. 13",#!0.00 !#,,155.20 ".5"
2 P))*8)* D*(*8 K')/ M B)+ )) 12.00 G06#. 350,110.00 ,201,320.00 0.36
>78959;5.20
7.; PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05
5 MCB B 1.00 B P 005 !6,!50 !6,!50.00 0.01
27557>0.00
7.< PEKERJAAN INSTALASI AIR
1 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
2 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
3 R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1809;258.5<
7.> PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
6/43
16 P).K' J*8// .00 O 00 506,120.00 2,02,!0.00 0.1"
1" K)* A B' F 12 .00 O 01! 3",!0.00 151,360.00 0.01
1! Pp) A B' 12 2.00 M O 012 25,#20.00 622,0!0.00 0.05
1# % D)* .00 O 01# 2,#00.00 1"1,600.00 0.01
20 Pp) A K P$C F 3 .00 M O 016.) 5","20.00 230,!!0.00 0.0221 P).A)p M') T;p' Sp)*('7 32.!6 M L00!.) !3,150.00 2,"32,30#.00 0.23
22 R)*8/) A)p B)4) R*8)* 32.!6 M J 020 126,500.00 ,156,"#0.00 0.35
23 R)+*8 Sp)*('7 "."5 M L01".) 35,##0.00 2"!,#22.50 0.02
2 Lp)*/ K) 15.50 M K 022 16,360.00 253,5!0.00 0.02
25 P*+ K)) M)*( P$C .00 J00!.) 02,360.00 1,60#,0.00 0.1
26 $'*) $1 .00
). L+) '*) 1.50 J015.) 510,#0.00 "65,1!3." 0.06
2" S'p7)*/ ()* R')p)* 1.00 U* E 02# ,!0#,260.00 ,!0#,260.00 0.1
SUB TOTAL KM 89702;0;.7;
FASILITAS UMUM
1 R)) B'* 1:3:5 U*+/ A') H)))* :6.5 7 5.!0 D 001 "55,5!0.00 1,0,305.## 3.51
2 R)) B'* 1:3:5 U*+/ S)+)* P+) 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"3 P')/)* K)) M)*(J)*8)* A E@*8 1.00 L T)/ #,500,000.00 #,500,000.00 0.!0
D*(*8 B)) B)+ 1:2 ()) p)8) '@*8 1"1. E 00" 122,550.00 21,00#,35#.25 1."!
5 P))*8)* D*(*8 1:2 S)+)* P+) 5.2" E 00" 122,550.00 65,5.3! 0.05
6 P'')* 1:2 (*(*8 ()) p)8) '@*8 32.!" H 002 5#,110.00 20,26",05."0 1."2
" C) P)8) B)+ ()* E@*8 32.!" %002.) 3",110.00 12,"23,#05."0 1.0!
! D B' S)+)* P+) 0.6! J015.) 510,#0.00 36,"!0.0# 0.03
# J'))* B'* P*+ M)+/ U)) 1.00 L T)/ 2,000,000.00 2,000,000.00 0.1"
10 S)+)* B'* P) U+ 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"
11 P'*8)())* S++ D)) 1.00 U* O 020 2,1"",!0.00 2,1"",!0.00 2.05
12 M'* pp) P''*8/)p)* )p p)/) 1.00 U* P 012.) ,"2",00.00 ,"2",00.00 0.0
SUB TOTAL FASILITAS UMUM 15;2>9510.;5
I PEKERJAAN AKHIR1 P'')* L)p)*8)* A/ 1,10!."6 A 01# !,050.00 !,#25,51!.00 0."6
2 P3K 1.00 S' T)/ 1,500,000.00 1,500,000.00 0.13
3 P'/'4))* P)p)* P)*/ N)) P)) 1.00 U* T)/ 5,500,000.00 5,500,000.00 0."
SUB TOTAL PEKERJAAN AKHIR 15>2551
8/18/2019 Laporan Mingguan Sialang Buah.xls
7/43
ENGINEERING ESTIMATE ( EE )
PEKERJAAN : PEMBANGUNAN DAN PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PASAR SIALANG BUAH
LOKASI PEKERJAAN : KECAMATAN TEKUL MENGKUDU - KAB. SERDANG BEDAGAI
TAHUN ANGGARAN : 2015NILAI PEKERJAAN : -
NO URAIAN PEKERJAANOLUME
ANALISAHARGA TOTAL B' Pe3er4##$
$ U* S* SATUAN (R-) HARGA (R-)
I PEKERJAAN PENDAHULUAN
1 P)p)* P;'/ 1.00 L A 005 56,30.00 56,30.00 0.0
2 D/+'* L)p)* P*() 26.60 B 013 120,1!0.00 3,1#6,"!!.00 0.2"
1;5
8/18/2019 Laporan Mingguan Sialang Buah.xls
8/43
2.8 PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05 5 MCB B@ 0.00
2.; PEKERJAAN INSTALASI AIR
1 P).Pp) A H+4)* D) T))*8 1#.!0 O 016.) 5","20.00 1,12,!56.00 0.10
2 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
3 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1;1>0112.5<
2.< PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
9/43
7.5 PEKERJAAN DINDING = PLASTER
1 P))*8)* B)+ B)) 1 : 2 20.!! E 00" 122,550.00 2,55!,!.00 0.22
3 P'')* K 1 P7 : 3 P "6.00 H 003 53,6"0.00 ,0"!,#20.00 0.35
P'')* B)/ 1 P7 : 3 P 66.0 H 003 53,6"0.00 3,563,6!!.00 0.30
10201952.00
7.8 PEKERJAAN LANTAI
1 L)*) U)) K')/ 0 @ 0 6!.2 G0. 13",#!0.00 !#,6!,##1.60 ".5!
2 P))*8)* D*(*8 K')/ M B)+ )) 12.00 G06#. 350,110.00 ,201,320.00 0.36
>78;0711.80
7.; PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05
5 MCB B 1.00 B P 005 !6,!50 !6,!50.00 0.01
27557>0.00
7.< PEKERJAAN INSTALASI AIR
1 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
2 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
3 R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1809;258.5<
7.> PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
10/43
16 P).K' J*8// .00 O 00 506,120.00 2,02,!0.00 0.1"
1" K)* A B' F 12 .00 O 01! 3",!0.00 151,360.00 0.01
1! Pp) A B' 12 2.00 M O 012 25,#20.00 622,0!0.00 0.05
1# % D)* .00 O 01# 2,#00.00 1"1,600.00 0.01
20 Pp) A K P$C F 3 .00 M O 016.) 5","20.00 230,!!0.00 0.0221 P).A)p M') T;p' Sp)*('7 32.!6 M L00!.) !3,150.00 2,"32,30#.00 0.23
22 R)*8/) A)p B)4) R*8)* 32.!6 M J 020 126,500.00 ,156,"#0.00 0.35
23 R)+*8 Sp)*('7 "."5 M L01".) 35,##0.00 2"!,#22.50 0.02
2 L p)*/ K) 15.50 M K 022 16,360.00 253,5!0.00 0.02
25 P*+ K)) M)*( P$C .00 J00!.) 02,360.00 1,60#,0.00 0.1
26 $'*) $1 .00
). L+) '*) 1.50 J015.) 510,#0.00 "65,1!3." 0.06
2" S'p7)*/ ()* R')p)* 1.00 U* E 02# ,!0#,260.00 ,!0#,260.00 0.1
SUB TOTAL KM 89702;0;.7;
FASILITAS UMUM
1 R)) B'* 1:3:5 U*+/ A') H)))* :6.5 7 5.!0 D 001 "55,5!0.00 1,0,305.## 3.51
2 R)) B'* 1:3:5 U*+/ S)+)* P+) 13.56
D 001 "55,5!0.00 10,26,3.!2 0.!"3 P')/)* K)) M)*(J)*8)* A E@*8 1.00 L T)/ #,500,000.00 #,500,000.00 0.!0
D*(*8 B)) B)+ 1:2 ()) p)8) '@*8 1"1. E 00" 122,550.00 21,00#,35#.25 1."!
5 P))*8)* D*(*8 1:2 S)+)* P+) 5.2" E 00" 122,550.00 65,5.3! 0.05
6 P'')* 1:2 (*(*8 ()) p)8) '@*8 32.!" H 002 5#,110.00 20,26",05."0 1."2
" C) P)8) B)+ ()* E@*8 32.!" %002.) 3",110.00 12,"23,#05."0 1.0!
! D B' S)+)* P+) 0.6! J015.) 510,#0.00 36,"!0.0# 0.03
# J'))* B'* P*+ M)+/ U)) 1.00 L T)/ 2,000,000.00 2,000,000.00 0.1"
10 S)+)* B'* P) U+ 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"
11 P'*8)())* S++ D)) 1.00 U* O 020 2,1"",!0.00 2,1"",!0.00 2.05
12 M'* pp) P''*8/)p)* )p p)/) 1.00 U* P 012.) ,"2",00.00 ,"2",00.00 0.0
SUB TOTAL FASILITAS UMUM 15;2>9510.;5
I PEKERJAAN AKHIR1 P'')* L)p)*8)* A/ 1,10!."6 A 01# !,050.00 !,#25,51!.00 0."6
2 P3K 1.00 S' T)/ 1,500,000.00 1,500,000.00 0.13
3 P'/'4))* P)p)* P)*/ N)) P)) 1.00 U* T)/ 5,500,000.00 5,500,000.00 0."
SUB TOTAL PEKERJAAN AKHIR 15>2551
8/18/2019 Laporan Mingguan Sialang Buah.xls
11/43
ENGINEERING ESTIMATE ( EE )
PEKERJAAN : PEMBANGUNAN DAN PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PASAR SIALANG BUAH
LOKASI PEKERJAAN : KECAMATAN TEKUL MENGKUDU - KAB. SERDANG BEDAGAI
TAHUN ANGGARAN : 2015NILAI PEKERJAAN : -
NO URAIAN PEKERJAANOLUME
ANALISAHARGA TOTAL B' Pe3er 4##$
$ U* S* SATUAN (R-) HARGA (R-)
I PEKERJAAN PENDAHULUAN
1 P)p)* P;'/ 1.00 L A 005 56,30.00 56,30.00 0.0
2 D/+'* L)p)* P*() 26.60 B 013 120,1!0.00 3,1#6,"!!.00 0.2"
1;5
8/18/2019 Laporan Mingguan Sialang Buah.xls
12/43
2.8 PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05 5 MCB B@ 0.00
2.; PEKERJAAN INSTALASI AIR
1 P).Pp) A H+4)* D) T))*8 1#.!0 O 016.) 5","20.00 1,12,!56.00 0.10
2 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
3 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1;1>0112.5<
2.< PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
13/43
7.5 PEKERJAAN DINDING = PLASTER
1 P))*8)* B)+ B)) 1 : 2 20.!! E 00" 122,550.00 2,55!,!.00 0.22
3 P'')* K 1 P7 : 3 P "6.00 H 003 53,6"0.00 ,0"!,#20.00 0.35
P'')* B)/ 1 P7 : 3 P 66.0 H 003 53,6"0.00 3,563,6!!.00 0.30
10201952.00
7.8 PEKERJAAN LANTAI
1 L)*) U)) K')/ 0 @ 0 6!.2 G0. 13",#!0.00 !#,,155.20 ".5"
2 P))*8)* D*(*8 K')/ M B)+ )) 12.00 G06#. 350,110.00 ,201,320.00 0.36
>78959;5.20
7.; PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05
5 MCB B 1.00 B P 005 !6,!50 !6,!50.00 0.01
27557>0.00
7.< PEKERJAAN INSTALASI AIR
1 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
2 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
3 R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1809;258.5<
7.> PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
14/43
16 P).K' J*8// .00 O 00 506,120.00 2,02,!0.00 0.1"
1" K)* A B' F 12 .00 O 01! 3",!0.00 151,360.00 0.01
1! Pp) A B' 12 2.00 M O 012 25,#20.00 622,0!0.00 0.05
1# % D)* .00 O 01# 2,#00.00 1"1,600.00 0.01
20 Pp) A K P$C F 3 .00 M O 016.) 5","20.00 230,!!0.00 0.0221 P).A)p M') T;p' Sp)*('7 32.!6 M L00!.) !3,150.00 2,"32,30#.00 0.23
22 R)*8/) A)p B)4) R*8)* 32.!6 M J 020 126,500.00 ,156,"#0.00 0.35
23 R)+*8 Sp)*('7 "."5 M L01".) 35,##0.00 2"!,#22.50 0.02
2 L p)*/ K) 15.50 M K 022 16,360.00 253,5!0.00 0.02
25 P*+ K)) M)*( P$C .00 J00!.) 02,360.00 1,60#,0.00 0.1
26 $'*) $1 .00
). L+) '*) 1.50 J015.) 510,#0.00 "65,1!3." 0.06
2" S'p7)*/ ()* R')p)* 1.00 U* E 02# ,!0#,260.00 ,!0#,260.00 0.1
SUB TOTAL KM 89702;0;.7;
FASILITAS UMUM
1 R)) B'* 1:3:5 U*+/ A') H)))* :6.5 7 5.!0 D 001 "55,5!0.00 1,0,305.## 3.51
2 R)) B'* 1:3:5 U*+/ S)+)* P+) 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"3 P')/)* K)) M)*(J)*8)* A E@*8 1.00 L T)/ #,500,000.00 #,500,000.00 0.!0
D*(*8 B)) B)+ 1:2 ()) p)8) '@*8 1"1. E 00" 122,550.00 21,00#,35#.25 1."!
5 P))*8)* D*(*8 1:2 S)+)* P+) 5.2" E 00" 122,550.00 65,5.3! 0.05
6 P'')* 1:2 (*(*8 ()) p)8) '@*8 32.!" H 002 5#,110.00 20,26",05."0 1."2
" C) P)8) B)+ ()* E@*8 32.!" %002.) 3",110.00 12,"23,#05."0 1.0!
! D B' S)+)* P+) 0.6! J015.) 510,#0.00 36,"!0.0# 0.03
# J'))* B'* P*+ M)+/ U)) 1.00 L T)/ 2,000,000.00 2,000,000.00 0.1"
10 S)+)* B'* P) U+ 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"
11 P'*8)())* S++ D)) 1.00 U* O 020 2,1"",!0.00 2,1"",!0.00 2.05
12 M'* pp) P''*8/)p)* )p p)/) 1.00 U* P 012.) ,"2",00.00 ,"2",00.00 0.0
SUB TOTAL FASILITAS UMUM 15;2>9510.;5
I PEKERJAAN AKHIR1 P'')* L)p)*8)* A/ 1,10!."6 A 01# !,050.00 !,#25,51!.00 0."6
2 P3K 1.00 S' T)/ 1,500,000.00 1,500,000.00 0.13
3 P'/'4))* P)p)* P)*/ N)) P)) 1.00 U* T)/ 5,500,000.00 5,500,000.00 0."
SUB TOTAL PEKERJAAN AKHIR 15>2551
8/18/2019 Laporan Mingguan Sialang Buah.xls
15/43
ENGINEERING ESTIMATE ( EE )
PEKERJAAN : PEMBANGUNAN DAN PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PASAR SIALANG BUAH
LOKASI PEKERJAAN : KECAMATAN TEKUL MENGKUDU - KAB. SERDANG BEDAGAI
TAHUN ANGGARAN : 2015NILAI PEKERJAAN : -
NO URAIAN PEKERJAANOLUME
ANALISAHARGA TOTAL B' Pe3er 4##$
$ U* S* SATUAN (R-) HARGA (R-)
I PEKERJAAN PENDAHULUAN
1 P)p)* P;'/ 1.00 L A 005 56,30.00 56,30.00 0.0
2 D/+'* L)p)* P*() 26.60 B 013 120,1!0.00 3,1#6,"!!.00 0.2"
1;5
8/18/2019 Laporan Mingguan Sialang Buah.xls
16/43
2.8 PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05 5 MCB B@ 0.00
2.; PEKERJAAN INSTALASI AIR
1 P).Pp) A H+4)* D) T))*8 1#.!0 O 016.) 5","20.00 1,12,!56.00 0.10
2 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
3 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1;1>0112.5<
2.< PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
17/43
7.5 PEKERJAAN DINDING = PLASTER
1 P))*8)* B)+ B)) 1 : 2 20.!! E 00" 122,550.00 2,55!,!.00 0.22
3 P'')* K 1 P7 : 3 P "6.00 H 003 53,6"0.00 ,0"!,#20.00 0.35
P'')* B)/ 1 P7 : 3 P 66.0 H 003 53,6"0.00 3,563,6!!.00 0.30
10201952.00
7.8 PEKERJAAN LANTAI
1 L)*) U)) K')/ 0 @ 0 6!.2 G0. 13",#!0.00 !#,,155.20 ".5"
2 P))*8)* D*(*8 K')/ M B)+ )) 12.00 G06#. 350,110.00 ,201,320.00 0.36
>78959;5.20
7.; PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05
5 MCB B 1.00 B P 005 !6,!50 !6,!50.00 0.01
27557>0.00
7.< PEKERJAAN INSTALASI AIR
1 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
2 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
3 R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1809;258.5<
7.> PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
18/43
16 P).K' J*8// .00 O 00 506,120.00 2,02,!0.00 0.1"
1" K)* A B' F 12 .00 O 01! 3",!0.00 151,360.00 0.01
1! Pp) A B' 12 2.00 M O 012 25,#20.00 622,0!0.00 0.05
1# % D)* .00 O 01# 2,#00.00 1"1,600.00 0.01
20 Pp) A K P$C F 3 .00 M O 016.) 5","20.00 230,!!0.00 0.0221 P).A)p M') T;p' Sp)*('7 32.!6 M L00!.) !3,150.00 2,"32,30#.00 0.23
22 R)*8/) A)p B)4) R*8)* 32.!6 M J 020 126,500.00 ,156,"#0.00 0.35
23 R)+*8 Sp)*('7 "."5 M L01".) 35,##0.00 2"!,#22.50 0.02
2 Lp)*/ K) 15.50 M K 022 16,360.00 253,5!0.00 0.02
25 P*+ K)) M)*( P$C .00 J00!.) 02,360.00 1,60#,0.00 0.1
26 $'*) $1 .00
). L+) '*) 1.50 J015.) 510,#0.00 "65,1!3." 0.06
2" S'p7)*/ ()* R')p)* 1.00 U* E 02# ,!0#,260.00 ,!0#,260.00 0.1
SUB TOTAL KM 89702;0;.7;
FASILITAS UMUM
1 R)) B'* 1:3:5 U*+/ A') H)))* :6.5 7 5.!0 D 001 "55,5!0.00 1,0,305.## 3.51
2 R)) B'* 1:3:5 U*+/ S)+)* P+) 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"3 P')/)* K)) M)*(J)*8)* A E@*8 1.00 L T)/ #,500,000.00 #,500,000.00 0.!0
D*(*8 B)) B)+ 1:2 ()) p)8) '@*8 1"1. E 00" 122,550.00 21,00#,35#.25 1."!
5 P))*8)* D*(*8 1:2 S)+)* P+) 5.2" E 00" 122,550.00 65,5.3! 0.05
6 P'')* 1:2 (*(*8 ()) p)8) '@*8 32.!" H 002 5#,110.00 20,26",05."0 1."2
" C) P)8) B)+ ()* E@*8 32.!" %002.) 3",110.00 12,"23,#05."0 1.0!
! D B' S)+)* P+) 0.6! J015.) 510,#0.00 36,"!0.0# 0.03
# J'))* B'* P*+ M)+/ U)) 1.00 L T)/ 2,000,000.00 2,000,000.00 0.1"
10 S)+)* B'* P) U+ 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"
11 P'*8)())* S++ D)) 1.00 U* O 020 2,1"",!0.00 2,1"",!0.00 2.05
12 M'* pp) P''*8/)p)* )p p)/) 1.00 U* P 012.) ,"2",00.00 ,"2",00.00 0.0
SUB TOTAL FASILITAS UMUM 15;2>9510.;5
I PEKERJAAN AKHIR1 P'')* L)p)*8)* A/ 1,10!."6 A 01# !,050.00 !,#25,51!.00 0."6
2 P3K 1.00 S' T)/ 1,500,000.00 1,500,000.00 0.13
3 P'/'4))* P)p)* P)*/ N)) P)) 1.00 U* T)/ 5,500,000.00 5,500,000.00 0."
SUB TOTAL PEKERJAAN AKHIR 15>2551
8/18/2019 Laporan Mingguan Sialang Buah.xls
19/43
ENGINEERING ESTIMATE ( EE )
PEKERJAAN : PEMBANGUNAN DAN PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PASAR SIALANG BUAH
LOKASI PEKERJAAN : KECAMATAN TEKUL MENGKUDU - KAB. SERDANG BEDAGAI
TAHUN ANGGARAN : 2015NILAI PEKERJAAN : -
NO URAIAN PEKERJAANOLUME
ANALISAHARGA TOTAL B' Pe3er4##$
$ U* S* SATUAN (R-) HARGA (R-)
I PEKERJAAN PENDAHULUAN
1 P)p)* P;'/ 1.00 L A 005 56,30.00 56,30.00 0.0
2 D/+'* L)p)* P*() 26.60 B 013 120,1!0.00 3,1#6,"!!.00 0.2"
1;5
8/18/2019 Laporan Mingguan Sialang Buah.xls
20/43
2.8 PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05 5 MCB B@ 0.00
2.; PEKERJAAN INSTALASI AIR
1 P).Pp) A H+4)* D) T))*8 1#.!0 O 016.) 5","20.00 1,12,!56.00 0.10
2 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
3 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1;1>0112.5<
2.< PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
21/43
7.5 PEKERJAAN DINDING = PLASTER
1 P))*8)* B)+ B)) 1 : 2 20.!! E 00" 122,550.00 2,55!,!.00 0.22
3 P'')* K 1 P7 : 3 P "6.00 H 003 53,6"0.00 ,0"!,#20.00 0.35
P'')* B)/ 1 P7 : 3 P 66.0 H 003 53,6"0.00 3,563,6!!.00 0.30
10201952.00
7.8 PEKERJAAN LANTAI
1 L)*) U)) K')/ 0 @ 0 6!.2 G0. 13",#!0.00 !#,,155.20 ".5"
2 P))*8)* D*(*8 K')/ M B)+ )) 12.00 G06#. 350,110.00 ,201,320.00 0.36
>78959;5.20
7.; PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05
5 MCB B 1.00 B P 005 !6,!50 !6,!50.00 0.01
27557>0.00
7.< PEKERJAAN INSTALASI AIR
1 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
2 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
3 R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1809;258.5<
7.> PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
22/43
16 P).K' J*8// .00 O 00 506,120.00 2,02,!0.00 0.1"
1" K)* A B' F 12 .00 O 01! 3",!0.00 151,360.00 0.01
1! Pp) A B' 12 2.00 M O 012 25,#20.00 622,0!0.00 0.05
1# % D)* .00 O 01# 2,#00.00 1"1,600.00 0.01
20 Pp) A K P$C F 3 .00 M O 016.) 5","20.00 230,!!0.00 0.0221 P).A)p M') T;p' Sp)*('7 32.!6 M L00!.) !3,150.00 2,"32,30#.00 0.23
22 R)*8/) A)p B)4) R*8)* 32.!6 M J 020 126,500.00 ,156,"#0.00 0.35
23 R)+*8 Sp)*('7 "."5 M L01".) 35,##0.00 2"!,#22.50 0.02
2 L p)*/ K) 15.50 M K 022 16,360.00 253,5!0.00 0.02
25 P*+ K)) M)*( P$C .00 J00!.) 02,360.00 1,60#,0.00 0.1
26 $'*) $1 .00
). L+) '*) 1.50 J015.) 510,#0.00 "65,1!3." 0.06
2" S'p7)*/ ()* R')p)* 1.00 U* E 02# ,!0#,260.00 ,!0#,260.00 0.1
SUB TOTAL KM 89702;0;.7;
FASIL ITAS UMUM
1 R)) B'* 1:3:5 U*+/ A') H)))* :6.5 7 5.!0 D 001 "55,5!0.00 1,0,305.## 3.51
2 R)) B'* 1:3:5 U*+/ S)+)* P+) 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"3 P')/)* K)) M)*(J)*8)* A E@*8 1.00 L T)/ #,500,000.00 #,500,000.00 0.!0
D*(*8 B)) B)+ 1:2 ()) p)8) '@*8 1"1. E 00" 122,550.00 21,00#,35#.25 1."!
5 P))*8)* D*(*8 1:2 S)+)* P+) 5.2" E 00" 122,550.00 65,5.3! 0.05
6 P'')* 1:2 (*(*8 ()) p)8) '@*8 32.!" H 002 5#,110.00 20,26",05."0 1."2
" C) P)8) B)+ ()* E@*8 32.!" %002.) 3",110.00 12,"23,#05."0 1.0!
! D B' S)+)* P+) 0.6! J015.) 510,#0.00 36,"!0.0# 0.03
# J'))* B'* P*+ M)+/ U)) 1.00 L T)/ 2,000,000.00 2,000,000.00 0.1"
10 S)+)* B'* P) U+ 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"
11 P'*8)())* S++ D)) 1.00 U* O 020 2,1"",!0.00 2,1"",!0.00 2.05
12 M'* pp) P''*8/)p)* )p p)/) 1.00 U* P 012.) ,"2",00.00 ,"2",00.00 0.0
SUB TOTAL FASILITAS UMUM 15;2>9510.;5
I PEKERJAAN AKHIR1 P'')* L)p)*8)* A/ 1,10!."6 A 01# !,050.00 !,#25,51!.00 0."6
2 P3K 1.00 S' T)/ 1,500,000.00 1,500,000.00 0.13
3 P'/'4))* P)p)* P)*/ N)) P)) 1.00 U* T)/ 5,500,000.00 5,500,000.00 0."
SUB TOTAL PEKERJAAN AKHIR 15>2551
8/18/2019 Laporan Mingguan Sialang Buah.xls
23/43
ENGINEERING ESTIMATE ( EE )
PEKERJAAN : PEMBANGUNAN DAN PENGEMBANGAN SARANA DISTRIBUSI PERDAGANGAN PASAR SIALANG BUAH
LOKASI PEKERJAAN : KECAMATAN TEKUL MENGKUDU - KAB. SERDANG BEDAGAI
TAHUN ANGGARAN : 2015NILAI PEKERJAAN : -
NO URAIAN PEKERJAANOLUME
ANALISAHARGA TOTAL B' Pe3er 4##$
$ U* S* SATUAN (R-) HARGA (R-)
I PEKERJAAN PENDAHULUAN
1 P)p)* P;'/ 1.00 L A 005 56,30.00 56,30.00 0.0
2 D/+'* L)p)* P*() 26.60 B 013 120,1!0.00 3,1#6,"!!.00 0.2"
1;5
8/18/2019 Laporan Mingguan Sialang Buah.xls
24/43
2.8 PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05 5 MCB B@ 0.00
2.; PEKERJAAN INSTALASI AIR
1 P).Pp) A H+4)* D) T))*8 1#.!0 O 016.) 5","20.00 1,12,!56.00 0.10
2 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#0
3 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1;1>0112.5<
2.< PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
25/43
7.5 PEKERJAAN DINDING = PLASTER
1 P))*8)* B)+ B)) 1 : 2 20.!! E 00" 122,550.00 2,55!,!.00 0.22
3 P'')* K 1 P7 : 3 P "6.00 H 003 53,6"0.00 ,0"!,#20.00 0.35
P'')* B)/ 1 P7 : 3 P 66.0 H 003 53,6"0.00 3,563,6!!.00 0.30
10201952.00
7.8 PEKERJAAN LANTAI
1 L)*) U)) K')/ 0 @ 0 6!.2 G0. 13",#!0.00 !#,,155.20 ".5"
2 P))*8)* D*(*8 K')/ M B)+ )) 12.00 G06#. 350,110.00 ,201,320.00 0.36
>78959;5.20
7.; PEKERJAAN ELEKTRICAL
1 L)p+ L 1! = 12.00 B P 006 6,##0 563,!!0.00 0.05
2 S)/) S*8' 2.00 B P 002 26,6#0 53,3!0.00 0.00
3 I*)) P'*')*8)* 12.00 T/ P 001 !",020 1,0,20.00 0.0#
I*)) Sp /*)/ !.00 T/ P 00 "5,!!0 60",00.00 0.05
5 MCB B 1.00 B P 005 !6,!50 !6,!50.00 0.01
27557>0.00
7.< PEKERJAAN INSTALASI AIR
1 G ' 20.!0 J015.) 510,#0.00 10,62",552.00 0.#02 P))*8)* B)+ B)) 1 : 2 2".0 E 00" 122,550.00 3,313,"52.00 0.2!
3 R)) B'* S)+)* P) 2."# D 001 "55,5!0.00 2,105,#52.5! 0.1!
1809;258.5<
7.> PEKERJAAN PENGECATAN = PELAPIS
1 C) K B'* "6.00 %002.) 3",110.00 2,!20,360.00 0.2
2 C) B)/ B'* 66.0 %002.) 3",110.00 2,6,10.00 0.21
3 C) M*;)/ 16."2 M %012.) ,6#0.00 "",216.!0 0.06
80718
8/18/2019 Laporan Mingguan Sialang Buah.xls
26/43
16 P).K' J*8// .00 O 00 506,120.00 2,02,!0.00 0.1"
1" K)* A B' F 12 .00 O 01! 3",!0.00 151,360.00 0.01
1! Pp) A B' 12 2.00 M O 012 25,#20.00 622,0!0.00 0.05
1# % D)* .00 O 01# 2,#00.00 1"1,600.00 0.01
20 Pp) A K P$C F 3 .00 M O 016.) 5","20.00 230,!!0.00 0.0221 P).A)p M') T;p' Sp)*('7 32.!6 M L00!.) !3,150.00 2,"32,30#.00 0.23
22 R)*8/) A)p B)4) R*8)* 32.!6 M J 020 126,500.00 ,156,"#0.00 0.35
23 R)+*8 Sp)*('7 "."5 M L01".) 35,##0.00 2"!,#22.50 0.02
2 L p)*/ K) 15.50 M K 022 16,360.00 253,5!0.00 0.02
25 P*+ K)) M)*( P$C .00 J00!.) 02,360.00 1,60#,0.00 0.1
26 $'*) $1 .00
). L+) '*) 1.50 J015.) 510,#0.00 "65,1!3." 0.06
2" S'p7)*/ ()* R')p)* 1.00 U* E 02# ,!0#,260.00 ,!0#,260.00 0.1
SUB TOTAL KM 89702;0;.7;
FASILITAS UMUM
1 R)) B'* 1:3:5 U*+/ A') H)))* :6.5 7 5.!0 D 001 "55,5!0.00 1,0,305.## 3.51
2 R)) B'* 1:3:5 U*+/ S)+)* P+) 13.56
D 001 "55,5!0.00 10,26,3.!20.!"
3 P')/)* K)) M)*(J)*8)* A E@*8 1.00 L T)/ #,500,000.00 #,500,000.00 0.!0
D*(*8 B)) B)+ 1:2 ()) p)8) '@*8 1"1. E 00" 122,550.00 21,00#,35#.25 1."!
5 P))*8)* D*(*8 1:2 S)+)* P+) 5.2" E 00" 122,550.00 65,5.3! 0.05
6 P'')* 1:2 (*(*8 ()) p)8) '@*8 32.!" H 002 5#,110.00 20,26",05."0 1."2
" C) P)8) B)+ ()* E@*8 32.!" %002.) 3",110.00 12,"23,#05."0 1.0!
! D B' S)+)* P+) 0.6! J015.) 510,#0.00 36,"!0.0# 0.03
# J'))* B'* P*+ M)+/ U)) 1.00 L T)/ 2,000,000.00 2,000,000.00 0.1"
10 S)+)* B'* P) U+ 13.56 D 001 "55,5!0.00 10,26,3.!2 0.!"
11 P'*8)())* S++ D)) 1.00 U* O 020 2,1"",!0.00 2,1"",!0.00 2.05
12 M'* pp) P''*8/)p)* )p p)/) 1.00 U* P 012.) ,"2",00.00 ,"2",00.00 0.0
SUB TOTAL FASILITAS UMUM 15;2>9510.;5
I PEKERJAAN AKHIR1 P'')* L)p)*8)* A/ 1,10!."6 A 01# !,050.00 !,#25,51!.00 0."6
2 P3K 1.00 S' T)/ 1,500,000.00 1,500,000.00 0.13
3 P'/'4))* P)p)* P)*/ N)) P)) 1.00 U* T)/ 5,500,000.00 5,500,000.00 0."
SUB TOTAL PEKERJAAN AKHIR 15>2551
8/18/2019 Laporan Mingguan Sialang Buah.xls
27/43
Analisa SNI Ha
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN SERDANG BEDAGAI
TAHUN ANGGARAN 2015
NO. KEBUTUHAN INDEKS SAT JUMLAH
1 2 3 4 5 6 7 = ( 4 x 6 )A PEKERJAAN PERSIAPAN
A1 M!"#$%$& %!'*+ 1 '2 S+!
Tenaga kerja
Tukang Batu 0.010 org 100,000.00 1,00
Pekerja 0.020 org 65,000.00 1,30
Peralatan 0.500 lot 2,300.00 1,15
J$'*- ,45
Biaa tak ter!uga !an "euntungan 51
$u%la& 3,'6
D+$*%" ,/6
A2 M!'0"# 1 '1 $*"%
Ba&an"au kla( ))) 0.010 %* 3,000,000.00 30,00
Paku 5 + # 0.03 kg 1',000.00 #2
Tenaga kerja -ngko( Pa(ang 0.155 l( 30,#22.00 4,#6
J$'*- 5,43
-er&ea! / Proit 5,32$u%la& 40,0
D+$*%" 4,3
A5 M!'$ 1 '2 P" N' P&!%
Ba&an
"au kla( ))) 0.065 %* 3,000,000.00 1'5,00
Trile 4 %% 1.000 %* 66,650.00 66,65
Paku 5 + # 0.250 kg 1',000.00 4,#5
at inak 1.000 kg 4#,200.00 4#,20
Penuli(an 0.125 l( 313,600.00 3',20
Tenaga kerja -ngko( Pa(ang 0.125 l( 352,00.00 44,10
J$'*- /6,/
-er&ea! / Proit 5',53
$u%la& 456,43
D+$*%" 456,4
A 17 M!'"#%& 1 '2 R"#% AR!"# %0
$ika ongkaran ti!ak !i akai lagi 7
Tenaga kerja
Pekerja 0.1000 org 65,000.00 6,50
Tukang atu 0.0250 org 100,000.00 2,50
"eala tukang 0.0025 org 115,000.00 2
an!or 0.0050 org 101,000.00 50
J$'*- /,7/
-er&ea! / Proit 1,46
$u%la& 11,26
D+$*%" 11,26
A 1/ M!'!&0+-%" 1 '2 *%0+ %!#+"
Tenaga kerjaPekerja 0.1000 org 65,000.00 6,50
an!or 0.0050 org 101,000.00 50
J$'*- 7,
-er&ea! / Proit 1,05
$u%la& ,05D+$*%" 3,5
B PEKERJAAN TANAH
B1 M!"##*+ 1 ' "- +0 0!*' 1 '!!&
Tenaga kerjaPekerja 0.#50 -H 65,000.00 4,#5
an!or 0.025 -H 101,000.00 2,52
J$'*- 51,27
-er&ea! / Proit #,6'
$u%la& 5,'6
D+$*%" 53,/6
B11 M!"#$&$# %!'*+ 1 ' #*+"
Tenaga kerjaPekerja 0.250 -H 65,000.00 16,25
an!or 0.00 -H 101,000.00 4
J$'*- 17,/
-er&ea! / Proit 2,56
$u%la& 1',65
D+$*%" 1/,65
B12 M!'%" 1 ' "- (!& 2 ')
Tenaga kerjaPekerja 0.500 -H 65,000.00 32,50
an!or 0.050 -H 101,000.00 5,05
J$'*- 7,55
-er&ea! / Proit 5,63
$u%la& 43,1
D+$*%" 4,13
B1 M!"#$&$# 1 ' 0+& $&$#
Ba&an Pa(ir Urug 1.200 %* #0,000.00 4,00
Tenaga kerjaPekerja 0.300 -H 65,000.00 1',50
an!or 0.010 -H 101,000.00 1,01
J$'*- 14,51
-er&ea! / Proit 15,6#
$u%la& 120,1
D+$*%" 12,13
8/18/2019 Laporan Mingguan Sialang Buah.xls
28/43
Analisa SNI
1 2 3 4 5 6 7 = ( 4 x
B1. M!"#$&$# 1 ' "- +'$"
Ba&an Tana& ti%un 1.200 %* 60,000.00 #2
Tenaga kerjaPekerja 0.300 -H 65,000.00 1'
an!or 0.010 -H 101,000.00 1
J$'*- /2
-er&ea! / Proit 13
$u%la& 106
D+$*%" 16
B16 M!'0"# 1 '2 *+0" +8$% !* 1 ' , $"$% +"# &!0"Ba&an )njuk 6.000 kg 5,500.00 33
Tenaga kerjaPekerja 0.150 org 65,000.00 '
an!or 0.015 org 101,000.00 1
J$'*- 44
-er&ea! / Proit 6
$u%la& 50
D+$*%" 5
9 PEKERJAAN PONDASI
91 M!'0"# 1 ' "0+ $ %*+, '$&" 1 P9 : PP
Ba&an
Batu ela& 15 8%9208% 1.200 %* 210,000.00 252
Portlan! e%ent 202.000 kg 1,1#0.00 236
Pa(ir Pa(ang 0.45 %* 5,000.00 41
Tenaga kerja
Pekerja 1.500 -H 65,000.00 '#
Tukang atu 0.#50 -H 100,000.00 #5
"eala tukang 0.0#5 -H 115,000.00
an!or 0.0#5 -H 101,000.00 #
J$'*- 713
-er&ea! / Proit 10#
$u%la& 26
D+$*%" 326
D PEKERJAAN BETON
D1 M!'$ 1 ' *"+ %!&8 1P9 : PS : 5 KR
Ba&an
P 50 kg7 1'#.00 kg 1,1#0.00 231
Pa(ir eton 0.550 %* 5,000.00 46
:lit Pe8a& %e(in 293 0.'30 %* 250,000.00 232
Tenaga kerja
Pekerja 1.650 H- 65,000.00 10#
Tukang atu 0.2#5 H- 100,000.00 2#
"eala tukang 0.02 H- 115,000.00 3
an!or 0.03 H- 101,000.00 J$'*- 657
-er&ea! / Proit '
$u%la& #55
D+$*%" 755
D1. M!'$ 1 ' B!" 1P9 : 2 PS : KR
Ba&an
P 50 kg7 336.000 kg 1,1#0.00 3'3
Pa(ir eton 0.540 %* 5,000.00 45
:lit Pe8a& %e(in 293 0.10 %* 250,000.00 202
Tenaga kerja
Pekerja 1.650 H- 65,000.00 10#
Tukang atu 0.2#5 H- 100,000.00 2#
"eala tukang 0.02 H- 115,000.00 3
an!or 0.03 H- 101,000.00
J$'*- 737
-er&ea! / Proit 11
$u%la& '06D+$*%" /6
D2 P!'!0+" 1 %# !"#" !0+ *0 $ !0+ $*+&
Ba&anBe(i eton olo(9ulir7 10.500 kg 12,050.00 126
"a;at eton 0.150 kg 15,000.00 2
Tenaga kerja
Pekerja 0.0#0 H- 65,000.00 4
Tukang e(i 0.0#0 H- 100,000.00 #
"eala tukang 0.00# H- 115,000.00
an!or 0.004 H- 101,000.00
J$'*- 141
-er&ea! / Proit 21
$u%la& 162
D+$*%" 162
D2. P!'!0+" 1 %# !"#" !0+ *0 $ !0+ $*+&
P!'!0+" 1 %# !"#" !0+ *0 $ !0+ $*+& 0.100 162,#60.00 16
8/18/2019 Laporan Mingguan Sialang Buah.xls
29/43
Analisa SNI
1 2 3 4 5 6 7 = ( 4 x
D27 M!'0"# 1 '2 !%+0+"# $"$% 0*;
Ba&an
"au kela( ))) 0.045 %* 3,000,000.00 135
Paku 5+10 8% 0.300 kg 1',000.00 5
inak eki(ting 0.100 ltr 6,'00.00
Tenaga kerja
Pekerja 0.520 H- 65,000.00 33
Tukang kau 0.260 H- 100,000.00 26
"eala tukang 0.026 H- 115,000.00 2
an!or 0.026 H- 101,000.00 2
J$'*- 26-er&ea! / Proit 31
$u%la& 23#
D+$*%" 27
D27. M!'0"# 1 '2 !%+0+"# $"$% 0*; -" 2 x %+
Ba&an untuk 2 akai 0.500 &rg 141,3'0.00 #0
Tenaga kerja teta 1.000 H- 65,416.00 65
J$'*- 16
-er&ea! / Proit 20
$u%la& 156
D+$*%" 156
D23 M!'0"# 1 '2 !%+0+"# $"$% %*'
Ba&an
"au kela( ))) 0.040 %* 3,000,000.00 120
Paku 5+10 8% 0.400 kg 1',000.00 #
inak eki(ting 0.200 ltr 6,'00.00 1
Balok kau kela( ))) 0.015 %* 3,000,000.00 45
Pl;oo! teal ' %% 0.350 lr 140,000.00 4'
2.000 t 15,000.00 30
Tenaga kerja
Pekerja 0.660 H- 65,000.00 42
Tukang kau 0.330 H- 100,000.00 33
"eala tukang 0.033 H- 115,000.00 3
an!or 0.033 H- 101,000.00 3
J$'*- 6
-er&ea! / Proit 50
$u%la& 36
D+$*%" 36
D23. M!'0"# 1 '2 !%+0+"# $"$% %*' -" 2 x %+
Ba&an untuk 2 akai 0.500 &rg 252,'0.00 126
Tenaga kerja teta 1.000 H- 3,02.00 3
J$'*- 2/-er&ea! / Proit 31
$u%la& 240
D+$*%" 24
D23. M!'0"# 1 '2 !%+0+"# $"$% %*' &%+0
Ba&an
"au kela( ))) 0.030 %* 3,000,000.00 '0
Paku 5+10 8% 0.200 kg 1',000.00 3
inak eki(ting 0.100 ltr 6,'00.00
Tenaga kerja
Pekerja 0.220 H- 65,000.00 14
Tukang kau 0.110 H- 100,000.00 11
"eala tukang 0.011 H- 115,000.00 1
an!or 0.011 H- 101,000.00 1
J$'*- 122
-er&ea! / Proit 1
$u%la& 140
D+$*%" 14D2/ M!'0"# 1 '2 !%+0+"# $"$% *%
Ba&an
"au kela( ))) 0.040 %* 3,000,000.00 120
Paku 5+12 8% 0.400 kg 1',000.00 #
inak eki(ting 0.200 ltr 6,'00.00 1
Balok kau kela( ))) 0.01 %* 3,000,000.00 54
Pl;oo! teal ' %% 0.350 lr 140,000.00 4'
2.000 t 15,000.00 30
Tenaga kerja
Pekerja 0.660 H- 65,000.00 42
Tukang kau 0.330 H- 100,000.00 33
"eala tukang 0.033 H- 115,000.00 3
an!or 0.033 H- 101,000.00 3
J$'*- 45
-er&ea! / Proit 51
$u%la& 3'6
D+$*%" /6
D2/. M!'0"# 1 '2 !%+0+"# $"$% *% -" 2 x %+
Ba&an untuk 2 akai 0.500 &rg 261,'0.00 130
Tenaga kerja teta 1.000 H- 3,02.00 3
J$'*- 214
-er&ea! / Proit 32
$u%la& 246
D+$*%" 246
D2/. M!'0"# 1 '2 !%+0+"# $"$% *% &%+0
Ba&an
"au kela( ))) 0.040 %* 3,000,000.00 120
Paku 5+10 8% 0.200 kg 1',000.00 3
inak eki(ting 0.100 ltr 6,'00.00
Tenaga kerja
Pekerja 0.220 H- 65,000.00 14
Tukang kau 0.110 H- 100,000.00 11
"eala tukang 0.011 H- 115,000.00 1an!or 0.011 H- 101,000.00 1
J$'*- 152
-er&ea! / Proit 22
$u%la& 1#4
D+$*%" 174
8/18/2019 Laporan Mingguan Sialang Buah.xls
30/43
Analisa SNI
1 2 3 4 5 6 7 = ( 4 x
D M!'0"# 1 '2 !%+0+"# $"$% * *"+
Ba&an
"au kela( ))) 0.040 %* 3,000,000.00 120
Paku 5+12 8% 0.400 kg 1',000.00 #
inak eki(ting 0.200 ltr 6,'00.00 1
Balok kau kela( ))) 0.015 %* 3,000,000.00 45
Pl;oo! teal ' %% 0.350 lr 140,000.00 4'
6.000 t 15,000.00 '0
Tenaga kerja
Pekerja 0.660 H- 65,000.00 42
Tukang kau 0.330 H- 100,000.00 33"eala tukang 0.033 H- 115,000.00 3
an!or 0.033 H- 101,000.00 3
J$'*- /6
-er&ea! / Proit 5'
$u%la& 455
D+$*%" 455
D. M!'0"# 1 '2 !%+0+"# $"$% *"+ -" 2 x %+
Ba&an untuk 2 akai 0.500 &rg 312,'0.00 156
Tenaga kerja teta 1.000 H- 3,02.00 3
J$'*- 2/
-er&ea! / Proit 35
$u%la& 2#5
D+$*%" 275
D. M!'0"# 1 '2 !%+0+"# $"$% '!8 !"
Ba&an
"au kela( ))) 0.020 %* 3,000,000.00 60
Paku 5+10 8% 0.150 kg 1',000.00 2
inak eki(ting 0.100 ltr 6,'00.00
Tenaga kerja
Pekerja 0.220 H- 65,000.00 14
Tukang kau 0.110 H- 100,000.00 11
"eala tukang 0.011 H- 115,000.00 1
an!or 0.011 H- 101,000.00 1
J$'*- /1
-er&ea! / Proit 13
$u%la& 104
D+$*%" 14
D3 M!'$ 1 ' * !" !&$*"# (15 %# !0+ < !%+0+"#)
Ba&an
"au kela( ))) 0.320 %* 3,000,000.00 '60
Paku 5+12 8% 3.200 kg 1',000.00 60
inak eki(ting 1.600 ltr 6,'00.00 11Be(i eton olo( 110.000 kg 12,050.00 1,325
"a;at eton 2.250 kg 15,000.00 33
Portlan! e%ent 336.000 kg 1,1#0.00 3'3
Pa(ir Beton 0.540 %* 5,000.00 45
:lit Pe8a& %e(in 293 0.10 %* 250,000.00 202
Balok kau kela( ))) 0.120 %* 3,000,000.00 360
Pl;oo! teal ' %% 2.00 lr 140,000.00 3'2
32.000 t 15,000.00 40
Tenaga kerja
Pekerja 5.300 H- 65,000.00 344
Tukang atu 0.2#5 H- 100,000.00 2#
Tukang kau 1.300 H- 100,000.00 130
Tukang e(i 1.050 H- 100,000.00 105
"eala tukang 0.265 H- 115,000.00 30
an!or 0.265 H- 101,000.00 26
J$'*- 4,/23-er&ea! / Proit 4'2
$u%la& 5,421
D+$*%" 5,421
> PEKERJAAN DINDING
E7 M!'0"# 1 '2 +"+"# '!&- $%$&" (5 x 11 x 22) ' !* , '$&" 0!0+ 1 P9 : 2 PP
Ba&an
Bata era& #0.000 & #00.00 4'
Portlan! e%ent 1.'50 kg 1,1#0.00 22
Pa(ir Pa(ang 0.03 %* 5,000.00 3
Tenaga kerja
Pekerja 0.300 H- 65,000.00 1'
Tukang atu 0.100 H- 100,000.00 10
"eala tukang 0.010 H- 115,000.00 1
an!or 0.015 H- 101,000.00 1
J$'*- 16
-er&ea! / Proit 15
$u%la& 122
D+$*%" 122
E/ M!'0"# 1 '2 +"+"# '!&- $%$&" (5 x 11 x 22) ' !* , '$&" 0!0+ 1 P9 : 4 PP
Ba&an
Bata era& #0.000 & #00.00 4'
Portlan! e%ent 11.500 kg 1,1#0.00 13
Pa(ir Pa(ang 0.043 %* 5,000.00 3
Tenaga kerja
Pekerja 0.300 H- 65,000.00 1'
Tukang atu 0.100 H- 100,000.00 10
"eala tukang 0.010 H- 115,000.00 1
an!or 0.015 H- 101,000.00 1
J$'*- /3
-er&ea! / Proit 14
$u%la& 113
D+$*%" 11
8/18/2019 Laporan Mingguan Sialang Buah.xls
31/43
Analisa SNI
1 2 3 4 5 6 7 = ( 4 x
E2/ M!'$ 1 UNIT S!+"% 1,5 > 1 > 1,5 M < &!'!0"" ( &$'- %0+0 %!+*)
:at. Pekerjaan
Galian tana&??????.. B0017 2.2500 %* 51,2#5.00 115
Pa(ir urug ???. B0137 0.10#1 %* #0,000.00 #
@antai kerja???.. 00#/H002 #.5000 % 15#,'6.5 1,14
Plat eton enutu C alok?.
8/18/2019 Laporan Mingguan Sialang Buah.xls
32/43
8/18/2019 Laporan Mingguan Sialang Buah.xls
33/43
Analisa SNI
1 2 3 4 5 6 7 = ( 4 x
J15. M!'0"# 1 '2 &+** !0+
Ba&an
Be(i Proil 6.'60 kg 10,300.00 #1
12.330 kg 12,050.00 14
Pengela(an ??.. $005 9 107 50.000 8% 3,26.20 163
Tenaga kerja
Pekerja 0.334 H- 65,000.00 21
Tukang la( 0.334 H- 100,000.00 33
"eala tukang 0.033 H- 115,000.00 3
an!or 0.01# H- 101,000.00 1
J$'*- 444-er&ea! / Proit 66
$u%la& 510
D+$*%" 51
J13 M!'0"# 1 ' *"# & 8$&+ 0!"# 8*0 23 *!& 3 '
Ba&an
:eng lat 1.050 % 25,000.00 26
Paku 1 8% 3 8% 0.015 kg 1',000.00
Paan kau kela( )) atau ))) 0.005 %3 3,000,000.00 15
Tenaga kerja
Pekerja 0.100 H- 65,000.00 6
Tukang 0.050 H- 100,000.00 5
"eala tukang 0.125 H- 115,000.00 14
an!or 0.005 H- 101,000.00
J$'*- 67
-er&ea! / Proit 10
$u%la& #
D+$*%" 73
J2 M!'0"# 1 M2 8 &+"#" !""# %$&"# &+ 3'< &"#% " &!"#
Ba&an !an Ua& 1.000 %2 110,000.00 110
J$'*- 11
-er&ea! / Proit 16
$u%la& 126
D+$*%" 126
K PEKERJAAN LANGITCLANGIT
K22 M!'0"# 1 '1 *+0*"% K*0+ $%. 6 '' x 2 '
Ba&an"al(i 6 %% 0.0#60 lr '0,000.00 6
Paku eragai ukuran 1 + 3 8%7 0.0500 kg 1',000.00
Tenaga kerja
Pekerja 0.0220 H- 65,000.00 1
Tukang kau 0.0440 H- 100,000.00 4
"eala tukang 0.0044 H- 115,000.00
an!or 0.0010 H- 101,000.00 J$'*- 14
-er&ea! / Proit 2
$u%la& 16
D+$*%" 16
L PEKERJAAN PENUTUP ATAP
L3. M!'0"# 1 '2 !"$$ +"*$'!
Ba&an Ata Iin8alu%e 1.100 %2 50,000.00 55
Tenaga kerja
Pekerja 0.1400 org 65,000.00 '
Tukang kau 0.06#0 org 100,000.00 6
"eala tukang 0.00#0 org 115,000.00
an!or 0.00#0 org 101,000.00
J$'*- 72
-er&ea! / Proit 10
$u%la& 3
D+$*%" 3L17. M!'0"# 1 ' $$"#" +"*$'!
Ba&an Buungan Iin8alu%e 0.2500 % 56,000.00 14
Paku (ekru 3,5E9"ait 2.0000 & 00.00 1
Tenaga kerja
Pekerja 0.0#50 org 65,000.00 4
Tukang kau 0.1000 org 100,000.00 10
"eala tukang 0.0050 org 115,000.00
an!or 0.0025 org 101,000.00
J$'*- 1
-er&ea! / Proit 4
$u%la& 35
D+$*%" 5
O 4 M!'0"# 1 $- 9*0! J"#%% S"& P$+- P0*+"
Ba&an lo(et $ongkok 1.0000 unit 1'1,#00.00 1'1
Tenaga kerja
Pekerja 1.0000 org 65,000.00 65
Tukang atu 1.5000 org 100,000.00 150
"eala tukang 0.1500 org 115,000.00 1#
an!or 0.1600 org 101,000.00 16
J$'*- 44
-er&ea! / Proit 66
$u%la& 506
D+$*%" 56
O 12 M!'0"# 1 ' + P9 +! AF 12
Ba&an PD tie AF J 192E 1.0500 % 5,450.00 5
Perlengkaan !ari &arga ia7 10.0000 K 5,450.00
Tenaga kerja
Pekerja 0.0540 -& 65,000.00 3
Tukang atu 0.0'00 -& 100,000.00 '
"eala tukang 0.00'0 -& 115,000.00 1
an!or 0.02#0 -& 101,000.00 2
J$'*- 22-er&ea! / Proit 3
$u%la& 25
D+$*%" 25
Be(i Beton F 10 %%
8/18/2019 Laporan Mingguan Sialang Buah.xls
34/43
Analisa SNI
1 2 3 4 5 6 7 = ( 4 x
O 16. M!'0"# 1 ' P9 +! AF
Ba&anPD tie AF J 3E 1.0500 % 2',500.00 30
Perlengkaan !ari &arga ia7 10.0000 K 2',500.00 2
Tenaga kerja
Pekerja 0.0540 -& 65,000.00 3
Tukang atu 0.0'00 -& 100,000.00 '
"eala tukang 0.00'0 -& 115,000.00 1
an!or 0.02#0 -& 101,000.00 2
J$'*- 5
-er&ea! / Proit #$u%la& 5#
D+$*%" 57
O 13 M!'0"# 1 - %&" +& 12
Ba&an"ran air J 192E 1.0000 & 20,600.00 20
:ealtae 0.0250 & 1,500.00
Tenaga kerja
Pekerja 0.0100 -& 65,000.00
Tukang atu 0.1000 -& 100,000.00 10
"eala tukang 0.0100 -& 115,000.00 1
an!or 0.0050 -& 101,000.00
J$'*- 2
-er&ea! / Proit 4
$u%la& 3#
D+$*%" 7
O 1/ M!'0"# 1 - ;*& &+" 0+"*!00
Ba&an Lloor !rain 1.0000 & 25,000.00 25
Tenaga kerja
Pekerja 0.0100 -& 65,000.00
Tukang atu 0.1000 -& 100,000.00 10
"eala tukang 0.0100 -& 115,000.00 1
an!or 0.0050 -& 101,000.00
J$'*- 7
-er&ea! / Proit 5
$u%la& 42
D+$*%" 42
O 2 M!'$ 1 $"+ S$'$& D*' 'x 4 ', + -+0 +.2
Ba&an
:e;a e(in Bor / Perlengkaan 80.000 $a% 1#0,000.00 13,600
:e;a e(in Po%a 80.000 $a% 30,000.00 2,400
Geoli(trik 1.000 Paket 500,000.00 500
Pia Hi(a PD 2E 40.000 % 15,560.33 622
Pia a(&ing PD 3E 30.000 % 2',500.00 5
Perlengkaan !an ini(&ing 20.00% @( 1,50#,413.33 301
Uji te(t laoratoriu% air laak akai 1.000 Paket 400,000.00 400
Tenaga kerja
Pekerja 7.500 -& 65,000.00 4#
Tukang Bor 10.000 -& 100,000.00 1,000
"eala tukang 5.000 -& 115,000.00 5#5
an!or 2.500 -& 101,000.00 252
J$'*- 21,2
-er&ea! / Proit 3,153,
$u%la& 24,1##
D+$*%" 24,177
P PEKERJAAN ELEKTRIKAL
P 1 M!'0"# 1 T++% I"0*0+ P!"!&"#"
Ba&an
"ael NM 32,5 %%2 6.000 % #,600.00 45Pia kon!uit uPD 20 %% 6.000 % 1,500.00 '
Litting, kotak (a%ung, kle% C alat antu lainna 0.0100 @( 54,600.00
Tenaga kerja
Pekerja 0.1100 -& 65,000.00 #
Tukang @i(trik 0.1100 -& 100,000.00 11
"eala tukang 0.0110 -& 115,000.00 1
an!or 0.0110 -& 101,000.00 1
J$'*- 75
-er&ea! / Proit 11
$u%la& #
D+$*%" 37
P 2 M!'0"# 1 B- S%*& T$"##*, 1 A, 25 A9
Ba&an:aklar tunggal, 10 A, 250 DA 1.000 & 1,200.00 1"otak (a%ung C alat antu lainna 0.050 (et 1,200.00
Tenaga kerja
Pekerja 0.0220 -& 65,000.00 1
Tukang @i(trik 0.0220 -& 100,000.00 2
"eala tukang 0.0022 -& 115,000.00
an!or 0.0022 -& 101,000.00 J$'*- 2
-er&ea! / Proit 3
$u%la& 26
D+$*%" 26
P M!'0"# 1 B- S%*& G", 1 A, 25 A9
Ba&an:aklar gan!a, 10 A, 250 DA 1.000 & 21,00.00 21"otak (a%ung C alat antu lainna 0.050 (et 21,00.00 1
Tenaga kerja
Pekerja 0.0220 -& 65,000.00 1
Tukang atu 0.0220 -& 100,000.00 2
"eala tukang 0.0022 -& 115,000.00
an!or 0.0022 -& 101,000.00
J$'*- 26
-er&ea! / Proit 4
$u%la& 31
D+$*%" 1
8/18/2019 Laporan Mingguan Sialang Buah.xls
35/43
Analisa SNI
1 2 3 4 5 6 7 = ( 4 x
P M!'0"# 1 B- S%*& T&+*!, 1 A, 25 A9
Ba&an:aklar trile, 10 A, 250 DA 1.000 & 23,000.00 23"otak (a%ung C alat antu lainna 0.050 (et 23,000.00 1
Tenaga kerja
Pekerja 0.0220 -& 65,000.00 1
Tukang atu 0.0220 -& 100,000.00 2
"eala tukang 0.0022 -& 115,000.00
an!or 0.0022 -& 101,000.00
J$'*- 23
-er&ea! / Proit 4$u%la& 32
D+$*%" 2
P 4 M!'0"# 1 B- S K"%, 1 P-0!, 1 A, 25 A9
Ba&an
:to "ontak, 1 P&a(e, 10 A, 250 DA 1.000 & 16,000.00 16"ael NM 32,5 %%2 3.000 % #,600.00 22Pia kon!uit uPD 20 %% 3.000 % 1,500.00 4Litting, kotak (a%ung, kle% C alat antu lainna 0.050 (et 43,300.00 2
Tenaga kerja
Pekerja 0.1100 -& 65,000.00 #
Tukang atu 0.1100 -& 100,000.00 11
"eala tukang 0.0110 -& 115,000.00 1
an!or 0.0110 -& 101,000.00 1
J$'*- 65
-er&ea! / Proit '
$u%la& #5
D+$*%" 75P 5 M!'0"# M9B Bx 2 #&$
Ba&anB Bo 2 grou 1.000 & 50,000.00 50"otak (a%ung C alat antu lainna 0.100 (et 50,000.00 5
Tenaga kerja
Pekerja 0.1100 -& 65,000.00 #
Tukang atu 0.1100 -& 100,000.00 11
"eala tukang 0.0110 -& 115,000.00 1
an!or 0.0110 -& 101,000.00 1
J$'*- 75
-er&ea! / Proit 11
$u%la& 6
D+$*%" 36
P 6 M!'0"# 1 B- L'$ SL 13 F
Ba&an@a%u Pijar 1 ; 1.000 & 30,000.00 30"otak (a%ung C alat antu lainna 0.020 l( 30,000.00
Tenaga kerja
Pekerja 0.0550 -& 65,000.00 3
Tukang atu 0.0550 -& 100,000.00 5
"eala tukang 0.0055 -& 115,000.00
an!or 0.0055 -& 101,000.00
J$'*- 4
-er&ea! / Proit 6
$u%la& 46
D+$*%" 46
P 12. M!'0"# 1 U"+ M!0+" P' 25
Ba&ane(in Po%a 1.000 & 4,000,000.00 4,000Perlengkaan C alat antu lainna 0.020 (et 4,000,000.00 0
Tenaga kerja
Pekerja 0.1650 -& 65,000.00 10
Tukang atu 0.1650 -& 100,000.00 16
"eala tukang 0.0165 -& 115,000.00 1
an!or 0.0165 -& 101,000.00 1J$'*- 4,11
-er&ea! / Proit 616
$u%la& 4,#2#
D+$*%" 4,727
M'()*, J+ 2015
Dp'/) O' D+) O'
P'4)) P'+) K'* K*+)* P''*7)*)
D*) P'*(+)* P'()8)*8)* ()* P)) C$. N+)*)) C*+)*
ASJMIR FAIAL /ALLAD ST. MM SUPRIANTO
NIP. 1#5!011 1#!012 1 003 9)/ D'/+
M'*8')+ D/')+ O'
K'p)) D*)
P'*(+)* P'()8)*8)* ()* P))
K)+p)'* S'()*8 B'()8)
Dr*. H. RIFAI BAKRI TANJUNG M.AP
NIP. 1#6050 1#!602 1 002
8/18/2019 Laporan Mingguan Sialang Buah.xls
36/43
8/18/2019 Laporan Mingguan Sialang Buah.xls
37/43
Harsat Bahan Hal 2
DA?TAR HARGA BAHAN BANGUNAN
KABUPATEN SERDANG BEDAGAI
TAHUN ANGGARAN 2015
NO JENIS BAHAN BANGUNAN SATUAN HARGA SATUAN
R.
1 2 3 4
A AGREGAT KASAR, BAHAN PEREKAT BAHAN JADIN@A
1 Bata era& e(in & #00.00
2 Bata era& Bia(a & 636.00
3 Batu "ali %* 210,000.00
4 Batu Pe8a& e(in 293 %* 250,000.00
5 Batu Pe8a& e(in 395 %* 220,000.00
6 Pa(ir Beton %* 5,000.00
# Pa(ir Pa(ang "ali %* 5,000.00
Pa(ir Urug %* #0,000.00
' :e%en P 9 50 kg ak 5,500.00
10 :e%en Puti& kg 4,661.00
11 :e%en Farna kg 4,661.00
12 Tana& Urug %* 60,000.00
13 Air lt 100.00
B BAHAN ?INISHING LABURAN, PENGISI DAN ALATN@A
1 A%ela( lr 3,000.00
2 at Be(i C "au :etara atla8 kg 55,000.00
3 at "au :ei kg 4#,200.00
4 at !a(ar untuk te%ok :etara atla8 lt 22,000.00
5 at elai( untuk te%ok :etara atla8 lt 23,000.00
6
8/18/2019 Laporan Mingguan Sialang Buah.xls
38/43
Harsat Bahan Hal 3
1 2 3 4
I BAHAN PAKU DAN MUR BAUT
1 Paku 1 8% (9! 3 8% kg 1',000.00
2 Paku 5 8% (9! # 8% kg 1',000.00
3 Paku 8% (9! 12 8% kg 1',000.00
4 Paku "ait @engka & 00.00
J BAHAN PERPIPAAN 1.
1 Pia G)P e!iu% A = 1 192E 6 %1 7 t 4'#,000.002 Pia PD = 2E AF7 t '3,362.00
3 Pia PD = 192E AF7 t 32,#00.00
4 Pia PD = 3E AF7 t 1##,000.00
5 Pia PD = 4E AF7 t 355,450.00
K BAHAN SANITAIR
1 :aringan Air @t " :tainle(( :teel & 25,000.00
2 "ran Air & 20,600.00
3 lo(et $ongkok :tan!ar! Puti& Po(lin unit 1'1,#00.00
4 :ealtie & 1,500.00
L BAHAN PENUTUP ATAP
1 Ata Iin8alu%e Farna % 50,000.00
2 Nok Ata( Iin8alu%e lr 56,000.00
M BAHAN MEKANIKAL
1 :e;a e(in Bor / Perlengkaan ja% 1#0,000.00
2 :e;a e(in Po%a ja% 30,000.00
N BAHAN ELEKTRIKAL 1.5
1 "ael NM 3 2.5 Pri%a 1 rol 50 %7 % #,600.00
2 Pia kon!uit uPD 20 %% tg 6,000.00
3 :kring "a( 2 gro Bia(a unt 50,000.00
4 :aklar Broko Tunggal :tan!ar! & 1,200.00
5 :aklar Broko :eri :tan!ar! & 21,00.00
6 :aklar Broko Trile :tan!ar! & 23,000.00
# :to "ontak Broko :tan!ar! & 16,000.00
@a%u :@ 1 F / itting & 30,000.00
O BAHAN PENGHISAP AIR SUMUR DALAM
1 e(in Po%a Air $et Po;er7 unit 1,6,500.00
2 Po%a Iet u% 500 F + Total Hea! 100 %, inlet 1.5E, ka. 100 ltr9%enit unit 4,000,000.00
P BIA@A UALIT@ 9ONTROL, IINCIIN, PENGUKURAN
BIASA DAN BIA@A PEN@AMBUNGAN
1 Geoli(trik Paket 500,000.00
2 Uji te(t laoratoriu% air laak akai Paket 400,000.00
BAHAN BAKAR DAN PELUMAS
1 inak :olar lt 6,'00.00
2 inak Pelu%a( -li lt #6,300.00
M'()*, J+ 2015Dp'/) O' D+) O'
P'4)) P'+) K'* K*+)* P''*7)*)
D*) P'*(+)* P'()8)*8)* ()* P)) C$. N+)*)) C*+)*
ASJMIR FAIAL /ALLAD ST. MM SUPRIANTO
NIP. 1#5!011 1#!012 1 003 9)/ D'/+
M'*8')+ D/')+ O'
K'p)) D*)
P'*(+)* P'()8)*8)* ()* P))
K)+p)'* S'()*8 B'()8)
Dr*. H. RIFAI BAKRI TANJUNG M.AP
NIP. 1#6050 1#!602 1 002
8/18/2019 Laporan Mingguan Sialang Buah.xls
39/43
Harsat Bahan Hal 4
1 2 3 4
8/18/2019 Laporan Mingguan Sialang Buah.xls
40/43
8/18/2019 Laporan Mingguan Sialang Buah.xls
41/43
Harsat Pekerjaan SNI Hal 68
NO URAIAN JUMLAH (R-)
1 2 7G PEKERJAAN PENUTUP LANTAI DAN DINDING
G0. M'))*8 1 2 )*) /')/ +/+)*
8/18/2019 Laporan Mingguan Sialang Buah.xls
42/43
!nt!h Perhit"n#an Bet!n Hal$74
9ONTOH PERHITUNGAN BETON BERTULANG
TAHUN ANGGARAN 2013
NO. URAIAN HASIL ANALISAOMOR HASI HARGA BERIKUT
ANALISA KEUNTUNGAN
1 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 #,4 Pa " 1007, (lu% 12 27 8%, ;98 0,# < 002 #40,650.00
2 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 ', Pa " 1257, (lu% 12 27 8%, ;98 0,# < 003 ###,0.00
3 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 12,2 Pa " 1507, (lu% 12 27 8%, ;98 0,#2 < 004 06,560.00
4 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 14,5 Pa " 1#57, (lu% 12 27 8%, ;98 0,66 < 006 41,150.00
5 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 16,' Pa " 2007, (lu% 12 27 8%, ;98 0,61 < 00# #3,00.00
6 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 1',3 Pa " 2257, (lu% 12 27 8%, ;98 0,5 < 00 ',5'0.00
# Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 21,# Pa " 2507, (lu% 12 27 8%, ;98 0,56 < 00' '13,2'0.00
Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 24,0 Pa " 2#57, (lu% 12 27 8%, ;98 0,53 < 010 '3,420.00
' Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 26,4 Pa " 3007, (lu% 12 27 8%, ;98 0,52 < 011 '46,210.00
10 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 2, Pa " 3257, (lu% 12 27 8%, ;98 0,4' < 012 1,01',640.00
11 Ha(il Anali(a Pekerjaan 1 %3 eton %utu Q8 2, Pa " 3507, (lu% 12 27 8%, ;98 0,4' < 013 1,02',00.00
12 Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+1#5 Rea! i7 < 014 SR>L
13 Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+225 Rea! i7 < 015 SR>L
14 Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+250 Rea! i7 < 016 SR>L15 Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+300 Rea! i7 < 01# SR>L
16 Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+350 Rea! i7 < 01 SR>L
1# Ha(il Anali(a Pekerjaan Pe%e(ian 10 kg !engan Be(i Beton olo(9ulir7 < 01' 162,#60.00
1 Ha(il Anali(a Pekerjaan Beki(ting untuk Pon!a(i < 020 220,5#0.00
1' Ha(il Anali(a Pekerjaan Beki(ting untuk :loo < 021 23#,20.00
20 Ha(il Anali(a Pekerjaan Beki(ting untuk "olo% < 022 36,400.00
21 Ha(il Anali(a Pekerjaan Beki(ting untuk Balok < 023 3'6,#50.00
22 Ha(il Anali(a Pekerjaan Beki(ting untuk Plat lantai < 024 455,400.00
23 Ha(il Anali(a Pekerjaan Beki(ting untuk L
24 Ha(il Anali(a Pekerjaan Beki(ting untuk Tangga < 026 351,510.00
1. 1 M PEKERJAAN PONDASI (9& B!" '$$ K 175 R! M+x B!0+ 15 %# < B!%+0+"#)
+ Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+1#5 Rea! i7 SR>L+ Pe%e(ian 15 kg !engan Be(i Beton olo(9ulir7 15 Ha(il Anali(a < 017 2,441,400.00
+ Beki(ting untuk on!a(i 5 Ha(il Anali(a < 0217 1,102,50.00
J $ ' * - RE?
2. 1 M PEKERJAAN SLOOP (9& B!" '$$ K 225 R! M+x B!0+ %# < B!%+0+"#)
+ Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+225 Rea! i7 SR>L
+ Pe%e(ian 20 kg !engan Be(i Beton olo(9ulir7 20 Ha(il Anali(a < 017 3,255,200.00
+ Beki(ting untuk (loo 5 Ha(il Anali(a < 0227 1,1',100.00
J $ ' * - RE?
. 1 M PEKERJAAN KOLOM (9& B!" '$$ K R! M+x B!0+ %# < B!%+0+"#)
+ Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+300 Rea! i7 SR>L
+ Pe%e(ian 30 kg !engan Be(i Beton olo(9ulir7 30 Ha(il Anali(a < 017 4,2,00.00
+ Beki(ting untuk kolo% 5 Ha(il Anali(a < 0237 1,'32,000.00
J $ ' * - RE?
4. 1 M PEKERJAAN BALOK (9& B!" '$$ K R! M+x B!0+ 2 %# < B!%+0+"#)
+ Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+300 Rea! i7 SR>L
+ Pe%e(ian 20 kg !engan Be(i Beton olo(9ulir7 20 Ha(il Anali(a < 017 3,255,200.00
+ Beki(ting untuk alok 5 Ha(il Anali(a < 0247 1,'3,#50.00
J $ ' * - RE?
5. 1 M PEKERJAAN PLAT LANTAI (9& B!" '$$ K R! M+x B!0+ 15 %# < B!%+0+"#)
+ Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+300 Rea! i7 SR>L
+ Pe%e(ian 15 kg !engan Be(i Beton olo(9ulir7 15 Ha(il Anali(a < 017 2,441,400.00+ Beki(ting untuk lat lantai 5 Ha(il Anali(a < 0257 2,2##,000.00
J $ ' * - RE?
6. 1 M PEKERJAAN DINDING (9& B!" '$$ K 175 R! M+x B!0+ 15 %# < B!%+0+"#)
+ Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+1#5 Rea! i7 SR>L
+ Pe%e(ian 15 kg !engan Be(i Beton olo(9ulir7 15 Ha(il Anali(a < 017 2,441,400.00
+ Beki(ting untuk !in!ing 5 Ha(il Anali(a < 0267 SR>L
J $ ' * - RE?
7. 1 M PEKERJAAN DINDING (9& B!" '$$ K 225 R! M+x B!0+ 2 %# < B!%+0+"#)
+ Ha(il Anali(a Pekerjaan 1 %3 eton %utu "+225 Rea! i7 SR>L
+ Pe%e(ian 20 kg !engan Be(i Beton olo(9ulir7 20 Ha(il Anali(a < 017 3,255,200.00
+ Beki(ting untuk tangga 5 Ha(il Anali(a < 02#7 1,#5#,550.00
J $ ' * - RE?
KETERANGAN :
Untuk Pekerjaan Plat @antai Beton, Balok Beton !an Pekerjaan Beton lainna !i(e(uaikan !engan kon!i(i ene%atan
Aaila terletak !iata( !an %e%utu&kan enangga %aka !ita%a& Pekerjaan :toot Ferk
8/18/2019 Laporan Mingguan Sialang Buah.xls
43/43
Contoh Perhitungan Besi Hal. 75
9ONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M
BESI BETON POLOS BESI BETON SPIRAL
N D+'!!& B!& B!0+ N D+'!!& B!& B!0+ N. D+'!!& B!& B!0+
'' K# '1 '' K# '1 '' K# '1
1 4.0 0.13 11 12 0.' 1 10.00 0.62
2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.1' 13 14 1.21 3 16.00 1.5
4 5.# 0.20 14 16 1.5 4 1'.00 2.23
5 6.0 0.22 15 1' 2.23 5 22.00 2.'
6 6.5 0.31 16 22 2.' 6 25.00 3.5
# .0 0.40 1# 23 3.26 # 2'.00 5.1'
'.0 0.53 1 25 3.5 32.00 6.31
' 10.0 0.62 1' 2 4.3 ' 36.00 #.''
10 11.0 0.#5 20 31 5.'3
21 32 6.31
MENGHITUNG BERAT BESI BETON DALAM 1 M
1. K*' P&%+0 12 > 12 ' %+ $*"#" 4 "# +. 12 !$#!* +. 3 8&% 2 '
Panjang 1 %3 ukuran 12 12 8% 1 0.12 0.12 7 6'.44 %1
Be(i 4 atang !ia. 12 4 6',44 0,' kg 24#.22 kg A7
Be(i eugel !ia. jarak 20 %% 6',44 0,20 7 4 0,12 7 0, 40 kg 66.6# kg B 7
BERAT BESI BETON UNTUK UKURAN 12 x 12 9M1 DALAM 1 M = 1.3/ %#' ( A < B )
2. K*' &%+0 15 > 15 ' %+ $*"#" 4 "# +. 12 !$#!* +. 3 8&% 2 '
Panjang 1 %3 ukuran 15 15 8% 1 0.15 0.15 7 44.44 %1
Be(i 4 atang !ia. 12 4 44,44 0,' kg 15.22 kg A7
Be(i eugel !ia. jarak 20 %% 44,44 0,20 7 4 0,15 7 0, 40 kg #1.11 kg B 7
BERAT BESI BETON UNTUK UKURAN 15 x 15 9M1 DALAM 1 M = 22/. %#' ( A < B )
. S*; &%+0 15 > 2 ' %+ $*"#" 4 "# +. 12 !$#!* +. 3 8&% 15 '
V 1 0.15 0.20 7 33.33 %1
Be(i 4 atang !ia. 12 4 33,33 0,' kg 11.6# kg A7
Be(i eugel !ia. jarak 15 %% 33,33 0,15 7 2 0,15 7 / 2 0,2 7 0, 40 kg 62.22 kg B 7
BERAT BESI BETON UNTUK 15 x 2 9M1 DALAM 1 M 13.3/ %#' ( A < B )
4. K*' B!" 2 > ' %+ $*"#" 4 "# +. 12 < 2 "# +. 1 !$#!* +. 3 8&% 15 '
Panjang 1 %3 ukuran 20 30 8% 1 0.20 0.30 7 16.6# %1
Be(i 4 atang !ia. 12 4 16,6# 0,' kg 5'.33 kg A7
Be(i 2 atang !ia. 10 2 16.6# 0.62 kg #3.5# kg B7
Be(i eugel !ia. jarak 15 %% 16,6# 0.15 7 2 0.2 7 / 2 O 0,3 77 O 0,40 kg 44.44 kg 7
BERAT BESI BETON UNTUK UKURAN 2 x 9M DALAM 1 M 177.5 %#' ( A < B < 9 )