Upload
kelly-andrews
View
52
Download
0
Tags:
Embed Size (px)
Citation preview
Creating the Future.Creating the Future.
PITT COUNTYDEVELOPMENT COMMISSION
Creating the Future.
PITT COUNTYDEVELOPMENT COMMISSION
Creating the Future.
BETHEL, NORTH CAROLINA
11
11
30
1166
1500
13
13
13
64A
64A
64
64
TO GREENVILLE
TO TARBORO
PARMELE
BETHEL
CARSON RD.
CHAR
LIE MAN
NIN
G R
D.
DIXON RD.
HOUSE RD.
BIG OAK RD.
BIG OAK RD.
FLAT SWAMP CHURCH RD.
PARM
ELE
RD.
BLU
E EY
ES R
D.
CREE
K BA
NK R
D.
W. TIMBERLAKE RD.
FORD RD.
MAIN
ST.
LANDSEASTINDUSTRIAL PARK
TO WILLIAMSTON
TO WASHINGTON
17
17
17
264
264
13
13
13
70
64
74
Wilmington
Jacksonville
Morehead City
Atlantic Ocean
PamlicoSound
Outer Banks
Raleigh
Richmond
Norfolk
Williamsburg
40
8595
64
95
11
11
43
Greenville
Ayden
Farmville
Grifton
Bethel
264
11
13
Pitt County
VIRGINIA
SC
NORTH CAROLINA
Greenville
43
EASTERN NORTH CAROLINA
G E N E R A L
P H Y S I C A L
U T I L I T I E S
T R A N S P O R TAT I O N
Size: 788 total acres Lot Sizes: 20-100 acres; 3 small commercial lots (2-3 acres) available; Lots can be subdivided or combined Ownership: Martin County Economic Development Corporation and Pitt County Committee of 100 hold 10 year options on all acreage Location: Pitt and Martin Counties, between Bethel and Parmele Zoning: Industrial Current Use: Agriculture
Elevation: Ranges from 20 meters above MSL (SW boundary) to 23 above MSL (NE boundary) Appearance: Site slopes down gently to the southwest; North, south and west is partly developed with agricultural land and partly wooded, undeveloped land; East area is wooded, undeveloped land Soils: Fine sandy loam; Soil boring and assessment reports available Drainage: Area is outside the 500-year floodplain; Stream identification report available; Jurisdictional delineation report available Environmental: Phase I Environmental Site Assessment did not identify evidence of recognized environmental conditions
Access: US 64 Alternate Highway: US 64 (70 mph interstate quality), US 13 and NC 11 within 1 mile of site Interstate: I-95 is within 30 miles and I-40 is within 90 miles via US 64 Air (Commercial): Pitt-Greenville (PGV) is within 15 miles (20 minutes); Raleigh Durham International Airport (RDU) is within 90 miles (90 minutes) Rail: CSX Transportation, Inc. Ports: Norfolk-120 miles, Morehead City-100 miles, Wilmington-120 miles
Water: 12” main (Bethel) proposed, Greenville Utilities Commission Sewer: 10”-12” proposed, Greenville Utilities Commission Gas: Greenville Utilities Commission or Piedmont Natural Gas can extend Electric: Dominion/Martin-Edgecombe EMC can extend Telecommunications: Fiber optic facilities, digital voice services and broadband internet available
SPECIFICATIONS
INDUSTRIAL PARKLANDSEAST
1
2
4
5
3
6
89
7 15.81 Acres
19.05 Acres
10 16.75 Acres
1115.35Acres
1220.05Acres
CSX Railroad
1339.81Acres
PHASE I
PHASE II
1430.21Acres
18
22.86Acres
2830.70Acres
2921.09Acres
18.89Acres
Propose
d Road
Proposed Roads
US 64A
SR 1166
1924.48Acres
2024.29Acres
2122.30Acres
31.60Acres
2327.38Acres
2418.65Acres
2525.27Acres
2641.01Acres
2741.50Acres
1617 18.95
Acres
7.96 Acres
15
22.43Acres
16.35 Acres
18.61 Acres
18.68 Acres
17.07Acres
41.41 Acres
23.70 Acres
25.11 Acres
30
US HWY 64 & US HWY 13
N
22