Land UseMaster Plan
Town of BooneLand Use Master Plan
Advisory Committee Kick-off 08.19.08
in association with
Kubilins Transportation GroupRose & Associates
Land UseMaster Plan
Town of Boone
Steering Committee
LAWRENCE GROUP PROJECT TEAM
Craig Lewis, AICP, LEED AP Project Manager
CHARRETTE TEAM
Craig Lewis, Charrette ManagerDavid Walters, RIBA (LG)John Cock, AICP (LG)
Charrette Facilitators Planning & Design Team
TransportationWade Walker, PE (KTG)
Planning & DesignTom Harrington, RLA (LG)Chad Hall (LG)Amanda Huggins (LG)Megan Doskocil (LG)IllustrationDave Malushizky, AIA, LEED AP (LG)
LAND USE PLAN DOCUMENT
Craig Lewis, AICP, LEED APPrimary AuthorJohn Cock, AICP (LG)David Walters, RIBA (LG)
With key contributions byWade Walker, PE (KTG)Chad Hall (LG)Megan Doskocil (LG)
Market AnalysisKathleen Rose, CCIM (RA)
Key Issues• Environmental
Sustainability
• Economic Sustainability
• Infill & Density
• Transportation & Circulation
• Historic Preservation
• Housing Choices & Affordability
• Adequate Infrastructure
• Town and Gown Opportunities
Land UseMaster Plan
Beginning with a baseline of agreement
Land UseMaster Plan
• Staff Kickoff Meeting & Advisory Committee Meeting
• Community Windshield Survey and Walking Tour of Key Areas
• GIS Consolidation and Environmental Resource Mapping
• Stakeholder Interviews/ Reconnaissance Mini-Charrette
Reconnaissance Phase
Land UseMaster Plan
Market Study Recommendations
•Perspective & Market Potential•Demographic Analysis•Cultural/Quality of Life Assessment•Employment/Retail Uses•Residential Tapestry•Economic Development Strategies
Reconnaissance Phase: Economic & Market Study
Land UseMaster Plan
Reconnaissance Phase – Market Analysis
Land UseMaster Plan
• Work collaboratively• Design cross-functionally• Use design to achieve a shared
vision and create holistic solutions
• Work in detail
The Charrette: Principles
Land UseMaster Plan
The Charrette: Typical Schedule (October 15, 20-24, 28)
Land UseMaster Plan
WALK/EVALUATE/DOCUMENT
Land UseMaster Plan
Input: Current Reality + Vision
Output: Implementable Strategic Plan
The Charrette: Principles
Land UseMaster Plan
“The 15,000 student – 1,500+ faculty/staff elephant in the room”
• Parking, parking, parking
• Student Housing (Off-Campus)
• Campus Expansion
• Transit, Bicycle, and Pedestrian Circulation
• Housing Affordability for Faculty/Staff
Land UseMaster Plan
Land UseMaster Plan
Land UseMaster Plan
The Framework Plan
S-1 Preserved Open Space• Parks• Conservation
areas• wetlands• Floodplains• Stream buffers• Wildlife habitat
Land UseMaster Plan
S-2 Reserved Open Space
• Should be protected
• Steep slopes• Vacant parcels 5+
acres• Next to S-1• Not likely for sewer
service
Land UseMaster Plan
S-6 Infill/ Redevelopment• Existing urban
with dense grid• Historic town
core
Land UseMaster Plan
S-3 to S-5: Restricted Growth to Intended Growth
Land UseMaster Plan
Nodes and Corridors
• Neighborhood and Village Centers
• Professional office, service, higher density residential
Land UseMaster Plan
Land UseMaster Plan
Holistic View of Transportation Realms
Land UseMaster Plan
Multi-Modal Transportation Plan
• Livability and balance – “Complete Streets”
• Combine land use and transportation improvements
• Context sensitive solutions – utilize inherent flexibility in design
• Develop multi-modal connections focused on walkability
• Consider full range of options for both parking and transit
Land UseMaster Plan
Best Development Practices and Collector Street Planning
Land UseMaster Plan
COMMUNITY & REGIONAL PLANNING
Land UseMaster Plan
SUBURBAN RETROFIT PLANNING
Land UseMaster Plan
SMALL AREA PLANNING
Land UseMaster Plan
DOWNTOWN PLANNING
Key Plan Components• Land Development & Redevelopment Policies &
Map• Transportation Network Enhancements & Multi-
Modal Plan • Transect-based Framework Plan• Conceptual/Schematic Planning in 3 dimensions
for key parcels/locations in different contexts (best practices)
• Retrofit Plan for Key Suburban Corridors (e.g. 321)
• Downtown and Surrounding Neighborhoods Urban Design/Urban Infill Plan (parcel level)
• Strategic Initiatives for Environmental Sustainability
Land UseMaster Plan
Final Report
Land UseMaster Plan
Final Report and Summary Brochure
Land UseMaster Plan
Summary Posters
Land UseMaster Plan
Post-Charrette
• Advisory Committee Post-Charrette Follow Up – Possible Sub-Committee Work
• Plan Refinement• Plan Document
Preparation• Public Workshop• Presentation to
Elected and Appointed Officials
• Project Closeout
Land UseMaster Plan
Land UseMaster Plan
Land UseMaster Plan
Gra
ph
ic b
y D
uan
y P
late
r-Z
yb
erk
&
Com
pan
y
NATURAL HABITAT HUMAN HABITAT
Land UseMaster Plan
• Start-Up & Reconnaissance Phase– August/September
• Public Design Charrette– 5.5 Days (October 20-25 + closing
presentation)– coordinated with ASU planning workshops
• Post-Charrette Plan Review/Production– 4-6 Months
• Final Public Meetings & Adoption Phase– 1 MonthEstimated Completion Time: 8 – 10
Months
Schedule