LAMPIRAN A CONTOH PERHITUNGAN Contoh perhitungan neraca massa komponen di Gathering Station, Water Cleaning Plant, Water Injection Plant dan Disposal Well dengan data laju alir air dapat dilihat pada Tabel A.1. Tabel A.1 Data Laju Alir Air di BOB PT. BSP – Pertamina Hulu, Zamrud, Siak. Water Management Description BWPD Inlet to Skim Tank 189.499 Returned Water to GS (Pit Pump) 1.198 Nett Total from Zamrud GS 188.051 Injection to WIW Beruk 41.110 Injection to WIP Zamrud 111.228 Total Water Injected 152.238 Injected to Non EOR Well Zamrud 25.722 Injected to Beruk Disposal Well 7.324 Excess Water to Emergency Pit 9.991 Returned Water to GS (Pit Pump) 250 Sumber: Morning Report – GS (12 Mei 2013) A-1

Lampiran KP Novi Wiwa UR

Embed Size (px)

DESCRIPTION

perhitungan neraca massa di GS BOB

Citation preview

Page 1: Lampiran KP Novi Wiwa UR

LAMPIRAN A

CONTOH PERHITUNGAN

Contoh perhitungan neraca massa komponen di Gathering Station, Water

Cleaning Plant, Water Injection Plant dan Disposal Well dengan data laju alir air

dapat dilihat pada Tabel A.1.

Tabel A.1 Data Laju Alir Air di BOB PT. BSP – Pertamina Hulu, Zamrud, Siak.

Water Management

Description BWPD

Inlet to Skim Tank 189.499

Returned Water to GS (Pit Pump) 1.198

Nett Total from Zamrud GS 188.051

Injection to WIW Beruk 41.110

Injection to WIP Zamrud 111.228

Total Water Injected 152.238

Injected to Non EOR Well Zamrud 25.722

Injected to Beruk Disposal Well 7.324

Excess Water to Emergency Pit 9.991

Returned Water to GS (Pit Pump) 250

Sumber: Morning Report – GS (12 Mei 2013)

A-1

Page 2: Lampiran KP Novi Wiwa UR

A. Gas Boot

Gambar A.1 Blok Diagram Alir Neraca Massa Komponen Gas Boot di BOB PT.

BSP ‒ Pertamina Hulu, Zamrud, Siak

Dari data pada gambar didapatkan jumlah total laju alir air pada keseluruhan

proses:

NMK: Finput = Foutput

FGB = -(FPit + FSkim) + FWashTank

185.384 BWPD = -(X + 1.198 BWPD) + FWashTank

FWashTank = (185.384 + 1.198 + X) BWPD

FWashTank = (186.582 + X) BWPD

A-2

Page 3: Lampiran KP Novi Wiwa UR

B. Wash Tank

Gambar A.2 Blok Diagram Alir Neraca Massa Komponen Wash Tank di BOB

PT. BSP ‒ Pertamina Hulu, Zamrud, Siak

Dari data pada gambar didapatkan jumlah total laju alir air pada keseluruhan

proses:

NMK: Finput = Foutput

FWashTank = FPit + FShipping + FSkimming

(186.582 + X) BWPD = (9.991 + 189.499) BWPD

X = -(186.582) BWPD + 199.490

BWPD

X = 12.908 BWPD

Sehingga, FWashTank = (186.582 + X) BWPD

= 186.582 BWPD + 12.908 BWPD

= 199.490 BWPD

A-3

Page 4: Lampiran KP Novi Wiwa UR

C. Skimming Tank

Gambar A.3 Blok Diagram Alir Neraca Massa Komponen Skimming Tank di

BOB PT. BSP ‒ Pertamina Hulu, Zamrud, Siak

Dari data pada gambar didapatkan jumlah total laju alir air pada keseluruhan

proses:

NMK: Finput = Foutput

FSkimming = FPit + FGB + FFilter

189.499 BWPD = (250 + 1.198 + X) BWPD

X = 189.499 BWPD + 1.448 BWPD

X = 188.051 BWPD

D. Filter

Gambar A.4 Blok Diagram Alir Neraca Massa Komponen Filter di BOB PT.

BSP ‒ Pertamina Hulu, Zamrud, Siak

A-4

Page 5: Lampiran KP Novi Wiwa UR

E. Balance Tank

Gambar A.5 Blok Diagram Alir Neraca Massa Komponen Balance Tank di BOB

PT. BSP ‒ Pertamina Hulu, Zamrud, Siak

Dari data pada gambar didapatkan jumlah total laju alir air pada keseluruhan

proses:

NMK: Finput = Foutput

FBalance = FPit + FWIW + FWIP

188.051 BWPD = (X + 41.110 + 111.228) BWPD

X = 188.051 BWPD – 152.338 BWPD

X = 35.713 BWPD

A-5

Page 6: Lampiran KP Novi Wiwa UR

F. Emergency Pit

Gambar A.6 Blok Diagram Alir Neraca Massa Komponen Emergency Pit di

BOB PT. BSP ‒ Pertamina Hulu, Zamrud, Siak

Dari data pada gambar didapatkan jumlah total laju alir air pada keseluruhan

proses:

NMK: Finput = Foutput

FPit = FDisposal + FGB

FWashTank + FBalance + FSkimming = (X + 12.908) BWPD

(9.991 + 35.713 + 250) BWPD= X + 12.908 BWPD

X = (45.954 – 12.908) BWPD

X = 33.046 BWPD

A-6

Page 7: Lampiran KP Novi Wiwa UR

G. Disposal Well

Gambar A.7 Blok Diagram Alir Neraca Massa Komponen Disposal Well di BOB

PT. BSP ‒ Pertamina Hulu, Zamrud, Siak

Dari data pada gambar didapatkan jumlah total laju alir air pada keseluruhan

proses:

NMK: Finput = Foutput

FDisposal Well = FZamrud + FBeruk

33.046 BWPD = (25.722 + 7.324) BWPD

33.046 BWPD = 33.046 BWPD

Maka, dibuktikan bahwa neraca massa komponen telah sama untuk laju alir

masuk dan laju alir keluar pada tiap proses.