Wall Construction
102.5mm Outer Leaf Brick Rainscreen with80mm Cavity with Stainless Steel Cavity tray to aid with both structureand drainage withStainless steel wall ties every 600 c/c fixed to12mm OSB with Breather membrane fixed to100mm of Quilted Insulation (Rockwool) which has aVapour Control Layer keeping out moisture which is fixed behind20mm Gypsum Plasterboard.
Floor Construction (Top Down)18mm x 175mm T&G Timber Flooring layed on75mm Scructural Screed on150mm EPS Rigid Insulation laid onMonarflex Radon Barrier wrapped over300mm Cast in Situ Concrete Raft foundation on50mm Sand Blinding on150mm Layers of Clean Hardcore
External Construction
500 x 500mm External Paving Slabs on100mm Cast in Situ Concrete slab on50mm Sand Blinding withDrainage layer to soak up moisture on150mm Layers of clean cut hardcore to aid drainage.
Appropriate Sealant to beapplied to area underskirting and plasterboard
100 x 50mm DoubleTimber Sole Platefixed to 225mmThermal Block
All membranes taped at edges and corners
DPC
Weep Hole
Cementitious Board
40mm Rigid InsulationBlock to keep continity ofthermal envelope
Stainless Steel Cavity Tray
102
2075
155
295
50
5010
050
220
Jack Lambourne
C12700655
Building Performance Assignment
Detail A
01 1 : 5Detail A
Key Section
Floor Construction (Top Down)18mm x 175mm T&G Timber Flooring layed on75mm Scructural Screed on150mm EPS Rigid Insulation laid onMonarflex Radon Barrier wrapped over300mm Cast in Situ Concrete Raft foundation on50mm Sand Blinding on150mm Layers of Clean Hardcore
External Construction
500 x 500mm External Paving Slabs on100mm Cast in Situ Concrete slab on50mm Sand Blinding withDrainage layer to soak up moisture on150mm Layers of clean cut hardcore to aid drainage.
All membranes taped at edges and corners
40mm Rigid InsulationBlock to keep continity ofthermal envelope
2075
155
295
50
218
45
13
Water Run Off fromthreshold is caught in AcoDrain
Timber Door
Thermally BrokenAluminium Framed DoorProfile piece with 13mmAluminium Threshold piecein accprdance with TGDPart M
Foam InsulatedCavity Closer
Aluminium Flashing to hiderigid insulation
Aluminium Framed Fixed tothermal block and appropriatetape and sealant is applied
Note: Threshold complies with TGD Part M
Jack Lambourne
C12700655
Building Performance Assignment
Detail B
02 1 : 5Detail B
Key Section
Wall Construction
102.5mm Outer Leaf Brick Rainscreen with100mm Cavity with Stainless Steel Cavity tray to aid with both structureand drainage with50mm PIR Rigid Insulation in cavity fixed to OSB withStainless steel wall ties every 600 c/c fixed to12mm OSB with Breather membrane fixed to100mm of Quilted Insulation (Rockwool) which has aVapour Control Layer keeping out moisture which is fixed behind20mm Gypsum Plasterboard.
200
410
325
120
102
50
100
43
75
50
Roof Construction400mm Concrete Slates on Roof fixed every 325mm C/C onto50 x 35mm Timber Battens which are fixed onto35mm OSB for addtional structural support with aBreather membrane laid with appropriate tapes and seals to control roofmoisture installed with a timber tilting fillet fixed onto50 x 50mm Timber Battens which are fixed onto a 200mm C16 TimberRafter.
50
100 x 50mm Timber Battensfixed to underside of 200mmC16Timber Rafter
150mm EPS Rigid Insulation installed below C16 Timberrafter to maintain thermal continuity
Insulated Cavity Closer fixed above Brickwork and cavity insulation
200mm C16 Timber Rafter
100mm EPS Insulation installed inbetweentimber rafters withadditional 50mm EPS Insulation installedabove rafter
16mm SW Soffit Board fixed to18mm SW Fascia Board which is then fixed toa timber tilting fillet
100 x 50mm Timber Battens every 600 c/c
120mm PVC Gutter Piece fixed to18mm SW Fascia Board withaluminium flashing laid into Gutter withEaves ventilater fixed onto the top of the fascia pieceAllowing ventilation under the slates
Jack Lambourne
C12700655
Building Performance Assignment
Detail C
03 1 : 5Detail C
Key Section
Roof Construction400mm Concrete Slates on Roof fixed every 325mm C/C onto50 x 35mm Timber Battens which are fixed onto35mm OSB for addtional structural support with aBreather membrane laid with appropriate tapes and seals to controlroof moisture installed on200mm EPS Rigid Insulation supported by200mm x 50mm Timber Engineered Joists fixed ontoA Vapour Control membrane which maintains air tightness stuck totwo Layers of 12.5mm Gypsum Plaster
Wall ConstructionVentilated Facade System with 18mm Cedar RotatingPanels fixed toa continuous breather membrane/wind barrier to maintain airtightness which is fixed to12mm OSB on the outer leaf with100mm EPS Rigid Insulation (0.023) with an additional70mm EPS Rigid Insulation supported by 70 x 35mm TimberBattens every 400 c/c fixed to18mm OSB fixed to a vapour control layer which maintainsairtightness. This is fixed to a25mm Service Cavity with 25 x 25mm Timber Battens with a20mm Gypsum Plasterboard Finish
25
322
25
2mm Aluminium Flashing fixed topowdercoated aluminium Fascia
Mastic Pointing Beads maintainedalong length of flashing
Aluminium Frame allowing for ventilation flow through roof
Timber Frame of ventilation system fixed back to OSB withAluminium flashing
Aluminium strap piece aids in fixing frame to fascia
208
Jack Lambourne
C12700655
Building Performance Assignment
Detail D
04 1 : 5Detail D
Key Section
Wall ConstructionVentilated Facade System with 18mm Cedar RotatingPanels fixed toa continuous breather membrane/wind barrier to maintain airtightness which is fixed to12mm OSB on the outer leaf with100mm EPS Rigid Insulation (0.023) with an additional70mm EPS Rigid Insulation supported by 70 x 35mm TimberBattens every 400 c/c fixed to18mm OSB fixed to a vapour control layer which maintainsairtightness. This is fixed to a25mm Service Cavity with 25 x 25mm Timber Battens with a20mm Gypsum Plasterboard Finish
25
208
Roof Construction400mm Concrete Slates on Roof fixedevery 325mm C/C onto50 x 35mm Timber Battens which are fixedonto35mm OSB for addtional structural supportwith aBreather membrane laid with appropriatetapes and seals to control roof moistureinstalled on200mm EPS Rigid Insulation supported by200mm x 50mm Timber Engineered Joistsfixed ontoA Vapour Control membrane whichmaintains air tightness stuck to two Layersof 12.5mm Gypsum Plaster
Flat Roof ConstructionBitumen Roofing Felt torched on as a finish and lapped up 150mm over upstand piece onBreather Membrane which is laid and sealed with appropriate agents on150mm PIR Rigid insulation which combines with wall insulation to keep thermal envelope which is laid ontoA vapour control layered membrane wrapped around onto the wall onto20mm OSB fixed onto175 x 45mm C16 Timber battens on20mm Gypsum Plasterboard
200mm x 22.5mm RSJ sized to engineers specs.supporting load of ventilated facade and timber flat rooffixed to 100 x 35mm Timber Batten all supported on a200 x 200mm Steel Column to engineers specs.
1517
520
149
10569
206
The bottom connection of the ventilated facade allows airflow through facade
Jack Lambourne
C12700655
Building Performance Assignment
Detail E
05 1 : 5Detail E
Key Section
25mm External Sand and Concrete Render Finish (Skim)
2mm Aluminium Parapet Capping Piece fixed to Concrete Parapet
Aluminium Flashing Fixed to concrete parapet
150mm PIR Rigid Insulation with a thermal conductivity of 0.023
230 x 225mm Cavity Block (Main Structure of Wall)
Vapour Control Layer Installed on the interior faceof the Cavity block to maintain airtightness
225
150 25
25mm External Sand and Concrete Render Finish (Skim)
Appropriate Seals are installed between the joints of theconcrete parapet piece and the cavity blocks
All membranes taped at corners and edges tomaintain appropriate airtightness throughout thethermal envelope
There is a drip on the concrete parapet piece toprevent any capillary action
EXTERIORINTERIOR
23025
Jack Lambourne
C12700655
Building Performance Assignment
Detail F
06 1 : 5Detail F
Key Section
203
EXTERIOR
INTERIOR
25mm External Sand and Concrete Render Finish (Skim)
150mm External PIR Rigid Insulation with a thermal conductivity of 0.023
230 x 225mm Cavity Block (Main Structure of Wall)
Vapour Control Layer Installed on the interior faceof the Cavity block to maintain airtightness
2 no. 12.5mm Internal Gypsum Plaster
All membranes taped at corners and edges to maintain appropriateairtightness throughout the thermal envelope
2 no. 225 x 100mm Thermal Block maintaining thermal envelope
Double Glazed Theramlly Broken Timber Framed Unit (9mm)
Insulation wrapped around to meet window frame head
Appropriate Sealant
Concrete Lintel
Foam packed inbetween timber battens and concrete lintel
2 no. Timber Battens fixed to lintel which the timber windowframe is fixed to
Internal Air Barrier applied at frame joints
Roof ConstructionBitumen Felt torched on as a finish and lapped up 200mm over a timberfillet piece onA breather membrane/roofing membrane lapped under timber fillet on20mm OSB fixed to200 X 45mm C16 Timber Joists at 400 c/c with 100mm Sheep's WoolInsulation with an additional 50mm Sheep's Wool laid on top inbetween thetimber joists withA vapour control layer laid internally under2 no. 12.5mm layers of Gypsum Plaster
Jack Lambourne
C12700655
Building Performance Assignment
Detail G
07 1 : 5Detail G
Key Section
EXTERIORINTERIOR
Vapour Control Layer Installed on the interior faceof the Cavity block to maintain airtightness
2 no. 12.5mm Internal Gypsum Plaster
Double Glazed Theramlly Broken Timber Framed Unit (9mm)
Insulation wrapped around to meet window frame head
Appropriate Sealant
Concrete Lintel
Foam packed inbetween timber battens and concrete lintel
2 no. Timber Battens fixed to lintel which the timber windowframe is fixed to
Internal Air Barrier applied at frame joints
25mm External Sand and Concrete Render Finish (Skim)
150mm External PIR Rigid Insulation with a thermal conductivity of 0.023
230 x 225mm Cavity Block (Main Structure of Wall)
All membranes taped at corners and edges to maintain appropriateairtightness throughout the thermal envelope
Foam packed inbetween timber battens and concrete lintel
Internal Air Barrier applied at frame joints
DPC installed under concrete sill piece
35mm Timber Battens support timber window frame
Aluminium Flashing Piece fixed onto Concrete Sill
40mm Rigid Insulation Board Installed behind sillDouble Glazed Theramlly Broken Timber Framed Unit (9mm)
Steel Angle piece installed to support above concrete sill piece
18mm SW Windowboard
Jack Lambourne
C12700655
Building Performance Assignment
Detail H
08 1 : 5Detail H
Key Section
EXTERIORINTERIOR
25mm External Sand and Concrete Render Finish (Skim)
150mm External PIR Rigid Insulation with a thermal conductivity of 0.023
230 x 225mm Cavity Block (Main Structure of Wall)
All membranes taped at corners and edges to maintain appropriateairtightness throughout the thermal envelope
2 no. 215 x 100mm Thermal Blocks to continue thermal envelope
160
150
150
5015
0
655
225
External Construction100mm Cast in Situ Concrete slab on50mm Sand Blinding withDrainage layer to soak up moisture on150mm Layers of clean cut hardcore to aid drainage.
Water Run Off fromthreshold is caught in AcoDrain
Appropriate Sealant to beapplied to area underskirting and plasterboard
Floor Construction20mm T&G Timber Flooring onpolyethylene slip sheet onAluminium Underfloor heating system with16mminsulated heating pipes penetrating through insulation in the floor on225mm C16 Timber battens every 400 c/c suspended with225mm Rockwool Insulation installed inbetween battens with aVapour Control layer laid underneath suspended over a150mm Ventilation Space on150mm Cast in situ concrete slab onA radon barrier to prevent any gases rising throughout the structure on50mm Sand blinding on150mm layers of hardcore
Ventilated Block toallow ventilation
2 no. 12.5mm Layers of Gypsum Plaster
215mm Concrete blocks for risingwall on top of 300mm Foundation Pad
35mm Rigid Insulation placed inbetween thermal block and timber battens
Jack Lambourne
C12700655
Building Performance Assignment
Detail I
09 1 : 5Detail I
Key Section