November 2013 Contact: Vickie.Wyche@dot.state.fl.us (386) 943-5185 LAKE COUNTY CONSTRUCTION IN PROGRESS 238275-6 SR 429 (Wekiva Pkwy) from Orange County Line to West of Old McDonald Road (Section 4B), 2.447 miles. Design Build new limited access toll road. Estimate completion: Fall 2014 238395-4 US 441 from Martin Luther King Blvd. to Lake Ella Road This project 6 lanes SR 500/US 441 from Martin Luther King Blvd. (SR 460) to Lake Ella Rd. This project is now under construction. Estimated completion: May 2014 (250 Contract days added due to plans error) (79%) Lane Closures: 238394-5 SR 500 (US 441) from North of Griffin Road to Martin Luther King Estimated completion: October 2013 (94%) Construction complete 238429-3 SR 50 and US 27 Interchange This project consists of the widening and reconstruction of SR 50 and SR 25 (US 27) from four lanes to six lanes and includes the addition of sidewalks, bike lanes and drainage improvements. The existing interchange bridges will be replaced with this project. Estimated completion: November 2013 (98%) Lane Closures: November 3 rd to 9 th Road: US 27 & SR 50 Days of the week: all Hours: 8 p.m. to 6 a.m. Direction: all Limits: throughout project limits Closure type: possible/temporary/alternating Lanes: all Description of work: assorted asphalt odds and ends plus inspection 427230-1 SR 44 – Mill and Resurface SR 44 from Lake/Sumter County Line to SR 44/CR 468 Estimated completion: October 2013 (94%) Construction complete

LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

  • Upload
    buikien

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

November 2013 Contact: [email protected] (386) 943-5185

LAKE COUNTY CONSTRUCTION IN PROGRESS

238275-6 SR 429 (Wekiva Pkwy) from Orange County Line to West of Old McDonald Road (Section 4B), 2.447 miles. Design Build new limited access toll road. Estimate completion: Fall 2014 238395-4 US 441 from Martin Luther King Blvd. to Lake Ella Road This project 6 lanes SR 500/US 441 from Martin Luther King Blvd. (SR 460) to Lake Ella Rd. This project is now under construction. Estimated completion: May 2014 (250 Contract days added due to plans error) (79%) Lane Closures: 238394-5 SR 500 (US 441) from North of Griffin Road to Martin Luther King Estimated completion: October 2013 (94%) Construction complete 238429-3 SR 50 and US 27 Interchange This project consists of the widening and reconstruction of SR 50 and SR 25 (US 27) from four lanes to six lanes and includes the addition of sidewalks, bike lanes and drainage improvements. The existing interchange bridges will be replaced with this project. Estimated completion: November 2013 (98%) Lane Closures: November 3rd to 9th Road: US 27 & SR 50 Days of the week: all Hours: 8 p.m. to 6 a.m. Direction: all Limits: throughout project limits Closure type: possible/temporary/alternating Lanes: all Description of work: assorted asphalt odds and ends plus inspection 427230-1 SR 44 – Mill and Resurface SR 44 from Lake/Sumter County Line to SR 44/CR 468 Estimated completion: October 2013 (94%) Construction complete

Page 2: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

November 2013 Contact: [email protected] (386) 943-5185 427246-1 SR 19/500 Mill and Resurface – SR 19 from point south of Slim Haywood Avenue to SR 19/500. Work begin 5/6/2013 Estimated completion: December 2013 (87%) Lane closures: November 3rd thru 7th Road: SR 19 Days of the week: Sunday through Thursday Hours: 7 p.m. to 7 a.m. Direction: northbound and southbound Limits: US 441 to Slim Haywood Rd. Closure type: temporary and intermittent Lanes: all lanes Description of work: road paving 431068-1 SR 19 Bridge Repair (Start Date: September 16, 2013) Estimated completion: January 2014 (35%) Lane closures: September 16th to December 20th Road: SR 19 Days of the week: all Hours: 24-hrs Direction: northbound and southbound Limits (to/from): Lake Saunders Dr. to Ashford Ave Closure type: temporary / two-way two lane traffic through the work zone Lanes impacted: all Description of work: new bridge deck installation

Other Projects Pending 1. US 441 - Widening to six lanes along 4.1 miles from Lake Ella Road to Avenida Central South (FM No. 2383955).

About $16 million in right of way is funded through FY 10/11. Design for six-laning of the 1.9 miles from Perkins Street to SR 44 is in progress, with $25 million in right of way funded through FY 12/13 (FM No. 2383943).

2. US 441 - An environmental study into possible widening along 1.6 miles from SR 44 (old CR 44B) to Lincoln Avenue in

Mt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway 3. US 27 - Six-laning 6.5 miles from Boggy Marsh Road to Lake Louisa Road (FM No. 238422). Design has been

completed and right of way acquired. Construction is not yet funded. 4. SR 44 - Construct eastbound left turn lane at Royal Trails Road (FM No. 419370). Bids are to be received in FY 13/14.

The estimated cost is $340,000. 5. SR 44 (CR 44B) - Design for four-laning the two miles from US 441 to SR 44 is in progress (FM No. 409870). Right of

way is to be acquired in FY 11/12. 6. SR 46 - An environmental study is being conducted by the Orlando-Orange County Expressway Authority along the

16.5 miles from US 441 to Orange Blvd. in Seminole County (FM No. 238275) in conjunction with their study of the Wekiva Parkway.

Page 3: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

November 2013 Contact: [email protected] (386) 943-5185 7. SR 19 - Resurface 1.9 miles from Summit Chase Villas to SR 19/US 441 (FM No. 427246). Bids are to be received in

FY 12/13. The estimated cost is $2.5 million. 8. SR 19 - An environmental study into possible widening along the 4.7 miles from CR 48 to CR 561 is planned for FY

10/11 (FM No. 238319). Design of improvements is funded in FY 13/14. 9. SR 33 - Construct left turn lane at CR 474 (FM No. 423096). Bids are to be received in FY 13/14. The estimated cost

is $660,000. 10. CR 450 - $2.3 million in grants to Lake County through FY 12/13 is to pay for design and construction of paved

shoulders from the Marion County line to Lake Yale Road (FM No. 427480). 11. Rolling Acres Road Sidewalk - $830,000 in grants to the city of Lady Lake through FY 12/13 is to pay for design and

construction of a sidewalk from Vista San Polo to Griffin Road (FM No. 427855). 12. Leesburg/Wildwood Trail - A $2.1 million grant to the City of Leesburg in FY 11/12 is to pay for construction of this

trail from the Sumter County line to US 441 (FM No. 424444). 13. Lincoln Avenue Sidewalk - A $490,000 grant to City of Mt. Dora in FY 13/14 is to pay for construction of a ten foot

sidewalk from Tremain Street to Unser Street (FM No. 429594).

14. CR 561 - $1.1 million in grants to Lake County through FY 13/14 is to pay for construction of a roundabout at the CR 455 intersection (FM No. 429606).

15. CR 470 - A $4 million grant to Lake County in FY 13/14 is to pay half the cost of replacing the bridge over Florida’s Turnpike (FM No. 430238). This is a County Incentive Grant Program (CIGP) project.

16. CR 466A - A $6.9 million grant to Lake County if FY 13/14 is to pay half the estimated right of way costs for widening along the three miles from the Sumter County line to US 27 (FM No. 430253). This is a Transportation Regional Incentive Program (T.R.I.P.) project.

Page 4: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

November 2013 Contact: [email protected] (386) 943-5185

SUMTER COUNTY CONSTRUCTION IN PROGRESS

430642-1 SR 44 Wet Weather/Audible Pavement Markings Estimated completion: October 2013 (98%) Construction complete

427375-1

SR 93 I-75 Milling & Resurfacing Rest Area NB/SB

Estimate completion: November 2013 (66%) Lane Closures: November 4th to 8th Days of the week: all Hours: varies between day (8 a.m. to 8 p.m.) and night (8 p.m. to 8 a.m.) shifts Direction: southbound Limits: rest area only -- no closures on I-75 itself Closure type: temporary [signs alert public to specific closures] Lanes: parking areas, on/off ramps Description of work: milling and resurfacing

Other Projects Pending 1. I-75 – Six-laning along the 21.5 miles from the Hernando County line to Florida’s Turnpike (FM No. 242626). Design is

in progress, with right of way acquisition funded through FY 13/14 (FM No. 2426262/3). FM2426262 Hernando Co. Line to CR 470 construction phase FY 2014/15.

2. SR 48 - Widening to four lanes along the 1.6 miles from I-75 to Main Street (CR 475) (FM No. 2404182). Right of way

is to be purchased in FY 11/12. Bids are to be received in FY 15/16. The estimated cost is $20 million. 3. US 301/SR 44 Intersection - Construct north and southbound turn lanes (FM No. 430188). This is a privately funded

project. Bids are to be received in FY 13/14. The estimated cost is $130,000. 4. US 301 - An environmental study into the possible widening from two to four lanes along the 15.5 miles from CR 48 to

SR 44 is planned for FY 13/14 (FM No. 430132/430133). 5. CR 466 - A $1.6 million grant (CIGP/SCRA) to Sumter County in FY 14/15 is to pay for resurfacing along the 4.5 miles

from US 301 to just east of CR 475 (FM No. 428443). Tentatively to be re-scoped. 6. CR 466/US 301 Intersection - Construct north and southbound turn lanes (FM No. 430187). This is a privately funded

project. Bids are to be received in FY 13/14. The estimated cost is $180,000. 7. CR 475 - A $3.26 million grant to Sumter County in FY 16/17 will pay for construction of paved shoulders and

resurfacing along the 3.7 miles from CR 470 to CR 542, including replacement of the timber column bridge at Jumper Creek with concrete box culverts (FM No. 429944-1).

8. CR 673 – A $2.032 million grant (FY 2017/18) to Sumter County to widen lanes, pave shoulders and resurfacing from

.8 miles west of US 301 to I-75. FM# 433670-1.

Page 5: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Lake~SumterMPOTransportationManagementSystem

Traffic Impact Study Review Update – October 2013

City of Bushnell

• Premier Medical Associates – Trip Generation Analysis (10-29-13)

Status: Waiting Traffic Study (Minor LDTA)

Project: Proposed 14,352 SF of Medical Offices

Location: Southwest corner of intersection of SR 48 & CR 603

Access: Full access on CR 603, restricted (right-in only) on SR 48.

Trip Generation: Net new 519 daily trips, with 51 pm peak hour trips (14 entering and 37

exiting)

• Bushnell Family Dollar – Trip Generation Analysis (10-29-13)

Status: Waiting Traffic Study (Minor LDTA)

Project: Proposed 8,320 SF of small discount store

Location: West side of North Main St (C-475), North of Noble Av.

Access: Full access on C-475 and North Wall St.

Trip Generation: Net new 533 daily trips, with 57 pm peak hour trips (29 entering and 28

exiting)

City of Clermont

• Dick’s Sporting Goods – Traffic Impact Study (10-15-13)

Status: Waiting Reservation Request

Project: Proposed 40,000 SF of specialty store

Location: West of the intersection of SR50 & Sandhill View Blvd

Access: Full access on Sandy Grove Ave and Sandhill View Blvd, restricted (right-in/right-out

only) on Hooks Street.

Trip Generation: Net new 559 daily trips, with 49 pm peak hour trips (24 entering and 25

exiting)

City of Eustis

• Mellow Mushroom – Trip Reservation Request (10-10-13)

Status: Trips Reserved

Project: Proposed 7,000 SF restaurant

Location: North side of US441, east of East Crooked Lake Drive.

Access: US441 (right-in/right-out) and full access via parallel service road

Trip Generation: Net new 641 daily trips, with 56 pm peak hour trips (33 entering and 23

exiting)

Page 6: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Traffic Impact Study Review Update – October 2013 Page2

• The Church of Jesus Christ of Latter-Day Saints – Trip Removal Request (10-14-13)

Status: Trips Removed – Project Built

Project: Proposed 24,098 SF Church

Location: Northwest corner of Abrams Rd & Waycross Ave.

Impacted Roadways: Abrams Rd, Orange Ave, SR44 (Old CR44B), Waycross Av, and

US441/SR 500

• First Baptist Church Expansion – Trip Removal Request (10-25-13)

Status: Trips Removed – Project Built

Project: Proposed 33,209 SF Church Expansion

Location: North side of Orange Ave, east of CR 44

Impacted Roadways: CR 44, Estes Rd, Orange Ave, and SR44 (Old CR44B)

City of Fruitland Park

• Spring Lake Apartments – Traffic Impact Study (10-25-13)

Status: Waiting Reservation Request

Project: Proposed 174 multi-family apartments

Location: Spring Lake Rd, west of US 27

Access: Spring Lake Rd.

Trip Generation: New 728 daily trips, with 68 pm peak hour trips (39 entering and 29 exiting)

Town of Lady Lake

• Lexington Park AFL Phase II – Tier 1 Review (10-9-13)

Status: Waiting Reservation Request

Project: Proposed 70-beds assisted living facility

Location: South side of CR466, west of Rolling Acres Rd

Access: CR466

Trip Generation: 245 daily trips, with 20 pm peak hour trips (10 entering and 10 exiting)

• Tree Tops Storage Facility – Tier 1 Review (10-23-13)

Status: No Trips to Reserve

Project: Proposed 798-unit mini warehouse to replace an existing 45-tee golf driving range

Location: Southwest corner of intersection of Rolling Acres Rd & W. Lady lake Blvd

Access: W. Lady Lake Blvd

Trip Generation: Decrease of new net PM peak hour trips

Page 7: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Traffic Impact Study Review Update – October 2013 Page3

• Too Your Health Spa – Trip Reservation Request (10-22-13)

Status: Trips Reserved

Project: Proposed 16,000 SF Health/Fitness Spa

Location: Intersection of US 27/US 441 and Hartsock Sawmill Rd.

Access: Full access on Hartsock Sawmill Rd.

Trip Generation: Net new 527 daily trips, with 56 pm peak hour trips (32 entering and 24

exiting)

• Howell Dental Offices – Trip Reservation Request (10-22-13)

Status: Trips Reserved

Project: Proposed 8,400 SF dental offices

Location: CR 466, west of Rolling Acres Rd

Access: CR 466

Trip Generation: Net 264 daily trips, with 27 pm peak hour trips (8 entering and 19 exiting)

• St. Albans Church – Trip Reservation Request (10-22-13)

Status: Trips Reserved

Project: Proposed 2,546 SF sanctuary

Location: W Lady Lake Blvd, east of Rolling Acres Rd.

Access: Rolling Acres Rd (via W. Lady Lake Blvd)

Trip Generation: 23 daily trips, with 1 pm peak hour trips (0 entering and 1 exiting)

• Village Airport Van Campus – Tier 1 Review (10-28-13)

Status: Waiting Reservation Request

Project: Proposed expansion and relocation of existing facility to 30 vans & 20 employees

Location: W Hermosa St, east of US 441.

Access: W Hermosa St.

Trip Generation: 169 daily trips, with 30 pm peak hour trips (5 entering and 25 exiting)

City of Leesburg

• Holland Park Villas – Tier 1 Review (10-15-13)

Status: Waiting Reservation Request

Project: Proposed 62 single-family homes

Location: South side of Holland Park Rd, east of Picciola Rd.

Access: Primary and secondary entrances along Park Holland Rd.

Trip Generation: 590 daily trips, with 62 pm peak hour trips (39 entering and 23 exiting)

Page 8: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Traffic Impact Study Review Update – October 2013 Page4

City of Wildwood

• Triumph South PUD – Traffic Impact Study (10-30-13)

Status: Reviewed – Small Development

Project: Proposed 91 single-family homes to replace a previously approved site plan (66

single-family homes and 56 townhomes)

Location: South of C-462, north of C-466A

Access: C-462

Trip Generation: Decrease of new net PM peak hour trips

• Fort Knox Self Storage – Traffic Impact Study (10-30-13)

Status: Reviewed – Small Development

Project: Proposed 73,750 SF of warehouse space

Location: Southwest corner of the intersection of C-462 & NE 43rd

Way

Access: C-462 via NE 43rd

Way

Trip Generation: New 184 daily trips, with 19 pm peak hour trips (10 entering and 9 exiting)

• Compass Storage Facility – Trip Generation Report (10-29-13)

Status: Reviewed – Minimal Development

Project: Proposed 98,200 SF of warehouse space with 640 storage units and 1,632 SF of

office space

Location: Southeast corner of the intersection of C-466 & CR 106

Access: CR 106

Trip Generation: New 160 daily trips, with 13 pm peak hour trips (6 entering and 7 exiting)

Page 9: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

2014 TAC Meeting Calendar

Meeting dates for 2014 are scheduled the second Wednesday of the month at 1:30 p.m. at the Lake~Sumter MPO office in Leesburg. There will be no meeting scheduled in March, July or December. January 8, 2014 February 12, 2014 March – NO MEETING April 9, 2014 May 14, 2014 June 11, 2014 July – NO MEETING August 13, 2014 September 10, 2014 October 8, 2014 November 12, 2014 December – NO MEETING

Page 10: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

MINUTES

Lake~Sumter Metropolitan Planning Organization Technical Advisory Committee (TAC) Meeting

Wednesday, October 9, 2013 Lake~Sumter MPO

1616 South 14th Street, Leesburg, Florida

OPENING Chairman Jim Hitt called the meeting to order at 1:33 p.m. and noted that the meeting was properly noticed, and that a quorum was present. Members Present Dottie Keedy Lake County/Public Transportation Dawn McDonald Lake County Schools Debbie Nelson Sumter County Transit Denise Lee City of Bushnell Jim Hitt, Chairman City of Clermont Dianne Kramer City of Eustis Thad Carroll, Vice-Chairman Town of Lady Lake DC Maudlin City of Leesburg Jason McHugh City of Wildwood

Members Absent Fred Schneider Lake County Scott Cottrell Sumter County Michele Janiszewski City of Groveland Frank Watanabe Town of Howey-in-the-Hills Aaron Mercer City of Minneola Mark Reggentin City of Mount Dora Alisha Maraviglia City of Tavares Richard Hatfield City of Umatilla

Staff Present T.J. Fish Executive Director Pam Richmond MPO Project Manager Mike Woods Transportation Planner Francis Franco GIS Manager Olga Marcondes Transportation Planner/Recording Secretary

Others Present Vickie Wyche FDOT Terry Rains FDOT Simone Babb GMB Cliff Tate Kimley-Horn & Associates REPORTS

A. Florida Department of Transportation Ms. Vickie Wyche, MPO Liaison, gave an update on the construction projects in the Lake and Sumter areas.

Page 11: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

October 9, 2013

Page 2 of 4

B. Florida’s Turnpike Enterprise None

C. County Reports None

D. MPO Staff Pam Richmond commented if any members of the committee are interested in seeing micro-surfacing and learning about its benefits and cost-effectiveness, the contractor will be doing some work in Lady Lake said that he will be happy to accommodate anyone. Mike Woods stated that all reports for the Safe Access Study are posted on the web with the exception of Spring Creek Elementary, which is outside of Sorrento. He also said that this Saturday will be the 14th Annual Florida Black Bear & Wildlife Conservation Festival and that the Florida Black Bear Scenic Byway is a partner this year for the event. Olga Marcondes asked the TAC members to review the TIS Review Update Report, which is distributed with the agenda, and update her on the status of projects in their respective areas. Francis Franco pointed out that for those that use the Crash Data System online, he is aware of some of the incompatibility issues from a recent Google Earth viewer update. He said that we are still able to provide the crash reports per request while the viewer is being repaired. T.J. Fish wanted to acknowledge that Dottie Keedy and Ken Harley were appointed to the TAC representing Lake County Public Transportation. He also informed the committee members that Brian Sheahan was appointed as the new Director of Community Safety and Compliance Department.

E. TAC: Members Comments and Reports

None

AGENDA UPDATE None COMMENTS FROM THE GENERAL PUBLIC ON ANY AGENDA ITEMS None

ACTION ITEM

A. Minutes for the September 11, 2013 Meeting MOTION was made by Denise Lee to approve the minutes for the September 11, 2013 meeting; seconded by Dottie Keedy -- motion passed 8-0. Dawn McDonald arrived at this time, quorum is at nine.

B. Functional Classification System Update Pam Richmond introduced FDOT District 5 Functional Classification project manager Terry Rains, and his staff consultants Cliff Tate with Kimley-Horn & Associates and Simone Babb with GMB. They discussed the federal policy and procedures that must be followed during the update of the urban boundaries and functional classification of the roadway system and presented a draft adjusted urbanized area maps. This update occurs every 10 years following the new Census. The reason that these urban/rural boundaries are important is because of federal funds eligibility. He also discussed the scheduling for finalizing this update. Final comments by the committee are due in November. NO ACTION TAKEN

Page 12: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

October 9, 2013

Page 3 of 4

Denise Lee left at this time, quorum is at eight.

C. Advise any final comments for the 2013 Transit Development Plan Major Update and Recommend Approval to the Governing Board T.J. Fish explained that the MPO Governing Board will close the public review period. He said that Mike Woods has worked with Dottie Keedy in making some final changes to make the plan cost-feasible. The Lake County BCC will take action on October 22nd, and then the MPO Board will endorse the update on October 23rd. Then this plan will be presented to the Sumter County BCC in November. Discussion ensues on the comments received up to date. DC Maudlin expressed that the comments on the proposed changes on route 2 have not been addressed on the final draft. MOTION was made by DC Maudlin to remove optional changes on route 2 from the implementation plan; seconded by Jason McHugh -- motion passed 8-0.

D. MPO Request of Municipalities – Installation/Maintenance of Transit Facilities T.J. Fish explained that at the September 25th Board meeting, the consensus was for the MPO staff to draft a letter of request to be sent to municipalities benefiting from the LakeXpress fixed-route transit services to financially partner on the installation and maintenance of transit facilities such as bus stops and shelters. Discussion ensues. The committee members want more information including cost estimates of shelters before making any recommendations to the board. NO ACTION TAKEN

E. Recommend Approval to Amend FY 2018/19 – 2034/35 List of Priority Projects T.J. Fish explained that staff has created an Appendix to the adopted LOPP that is reformatted in order to prioritize projects based on phasing. MOTION was made by Jason McHugh to recommend approval to amend the FY 2018/19 – 2034/35 List of Priority Projects; seconded by Dawn McDonald -- motion passed 8-0.

F. Safe Access Study Matrix Tool Mike Woods explained that one of the final projects for the Lake~Sumter Safe Access Study is the development of a weighted matrix tool to assist with project prioritization and LOPP ranking. He stated that the database is almost finished and they are discussing future enhancements to the database needed. He presented a draft list of matrix variables for consideration. While this is a BPAC project, staff is looking for input from the committee members. MOTION was made by Debbie Nelson to recommend to the board to recognize the Safe Access Study Matrix as an official tool to be used in the prioritization process; seconded by Dawn McDonald -- motion passed 8-0. Dawn McDonald left at this time, quorum is at seven.

G. 2014 Draft Legislative Positions and Priorities T.J. Fish explained that on the September 25th meeting the Governing Board supported a reordering of priorities, moving two funding positions also supported by the Florida MPO Advisory Council. One is the support of indexing local option fuel taxes and the other is to support the direction of motor vehicle registration fees to the State Transportation Trust Fund. He stated that the positions and priorities will be brought back before the MPO Board leading up to the commencement of the 2014 Legislative Session. NO ACTION TAKEN

Page 13: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

October 9, 2013

Page 4 of 4

DISCUSSION ITEMS A. 2013 Horizon Award Nominations

T.J. Fish strongly encouraged the committee members to nominate deserving local governments, people, partners and/or projects that were accomplished during 2013. The awards will be presented at the Seventh Annual Horizon Awards Dinner on January 22, 2014.

PROJECT UPDATES A. Rail Initiatives

Mr. Fish updated the committee on the upgrade of the tracks. He stated that the materials to replace the tracks will be delivered this week. Construction will be ongoing from Plymouth north to Eustis and will be completed by the summer.

B. Lake-Orange Parkway and Wellness Way Sector Plan Mr. Fish stated that we are working with FDOT and Turnpike Enterprise to move the toll feasibility study and the PD&E study forward. Jim Hitt mentioned that they do have a draft plan posted on the Lake County website but they are working on updating the maps.

C. Sumter County Interchanges C-468 and CR 514 Mr. Fish apprised the committee on the two interchanges in Sumter County.

D. Minneola Interchange Mr. Fish commented on the regretful news of the TIGER grant denial but Lake County is pulling funds together to extend Hancock Road by 2016.

CONFIRMATION OF REPRESENTATIVE ATTENDING GOVERNING BOARD MEETING Jim Hitt stated that he would be the TAC representative attending the Governing Board meeting on October 23, 2013 at 2 pm at the Lake~Sumter MPO. ADJOURNMENT As there was no further business, the meeting adjourned at 3:26 p.m. ______________________________ Jim Hitt, Chairman

Page 14: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

FY 2018/19 - FY 2034/35 List of Priority Projects Amendment–Dec13 Page 1 of 3

LAKE~SUMTER METROPOLITAN PLANNING ORGANIZATION 1

2

RESOLUTION 2013 – 3

4

RESOLUTION OF THE LAKE~SUMTER METROPOLITAN PLANNING ORGANIZATION, 5

AMENDING THE FY 2018/19 - FY 2034/35 LIST OF PRIORITY PROJECTS (LOPP); 6

ADDING AS A NEW PROJECT SR 50 FROM US 98 TO CR 33 TO TABLE 3 AND 7

APPENDIX TABLE 5; ADDING CR 466A FROM SUMTER COUNTY LINE TO SR 25/500 8

(US 27/441) TO TABLE 4 AND APPENDIX TABLE 2; ADDING CR 466A FROM SUNNY 9

COURT TO SR 25/500 (US 27/441) TO TABLE 4 AND APPENDIX TABLE 1; REVISING THE 10

LIMITS OF THE SOUTHERN TERMINUS OF THE WEKIVA TRAIL PROJECT 11

NEIGHBORHOOD LAKES SEGMENT FROM KELLY PARK ROAD TO LAKE/ORANGE 12

COUNTY LINE IN TABLE 7 AND APPENDIX TABLE 1; AND AUTHORIZING 13

TRANSMITTAL TO THE FLORIDA DEPARTMENT OF TRANSPORTATION. 14

15

WHEREAS, the Lake~Sumter Metropolitan Planning Organization (MPO) is the duly 16

designated and constituted body responsible for carrying out the urban transportation planning and 17

programming process for Lake~Sumter Planning Area; and 18

19

WHEREAS, Florida Statutes 339.175; 23 U.S.C. 134; and 49 U.S.C. 5303 require that the 20

urbanized area, as a condition for the receipt of federal capital or operating assistance, has a 21

continuing, cooperative, and comprehensive transportation planning process that results in plans and 22

programs consistent with the comprehensively planned development of the urbanized area; and 23

24

WHEREAS, Florida Statutes 339.175(8)(a), requires that the MPO is responsible for 25

developing, annually, a list of project priorities (LOPP) ranking the transportation needs of the MPO 26

area; and 27

28

WHEREAS, the prevailing principles that must be considered by the MPO when developing 29

the LOPP are preserving the existing transportation infrastructure, enhancing Florida’s economic 30

competitiveness, and improving travel choices to ensure mobility; and 31

32

WHEREAS, the LOPP must be based upon project selection criteria that considers, in part, the 33

MPO long range transportation plan; the Florida Department of Transportation (FDOT) Strategic 34

Intermodal System Plan; criteria consistent with projects eligible to receive funding from the 35

Transportation Regional Incentive Program outlined in Florida Statutes 339.2819(4); the results of the 36

transportation management systems; and the MPO public involvement plan; and 37

38

WHEREAS, the LOPP must be used by the FDOT in developing the five-year work program 39

and must be used by the MPO in developing its transportation improvement program; and 40

41

Page 15: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

FY 2018/19 - FY 2034/35 List of Priority Projects Amendment–Dec13 Page 2 of 3

WHEREAS, the MPO adopted the FY 2018/19 - FY 2034/35 LOPP for state funding for 42

transportation projects on August 28, 2013, and transmitted it to FDOT; and 43

44

WHEREAS, the MPO amended the FY 2018/19 - FY 2034/35 LOPP on October 23, 2013 to 45

include Appendix “A” as a reformatted LOPP in which projects are prioritized based on project 46

phasing rather than by funding category; and 47

48

WHEREAS, SR 50 from US 98 to CR 33 is a two-lane road as it passes through Sumter 49

County connecting four-lane segments on both east and west termini; and 50

51

WHEREAS, SR 50 from US 98 to CR 33 should be studied to determine when additional 52

capacity on this segment may be needed; and 53

54

WHEREAS, CR 466A from the Sumter County Line to SR 25/500 (US 27/441) was split into 55

two phases in FY 2012/13 to be able to use grant funds received from FDOT’s Transportation 56

Regional Incentive Program (TRIP) for both construction and right-of-way in FY 2013/14 then 57

subsequently removed as part of the update of the LOPP because no other state funding would be 58

available; and 59

60

WHEREAS, the agreements between Lake County and FDOT have not been finalized, and 61

both phases of CR 466A from the Sumter County Line to SR 25/500 (US 27/441) need to remain in 62

the LOPP until the funding agreements are completed; and 63

64

WHEREAS, the Neighborhood Lakes segment of the Wekiva Trail project extends from SR 65

46 in Lake County to Kelly Park Road in Orange County. 66

67

NOW, THEREFORE, BE IT RESOLVED by the Lake~Sumter MPO: 68

69

1. The FY 2018/19 - FY 2034/35 List of Priority Projects is hereby amended to add SR 50 70

from US 98 to CR 33 to Table 3 and Appendix Table 5; and 71

2. The FY 2018/19 - FY 2034/35 List of Priority Projects is hereby amended to add CR 466A 72

from Sumter County Line to SR 25/500 (US 27/441) to Table 4 and Appendix Table 2; and 73

3. The FY 2018/19 - FY 2034/35 List of Priority Projects is hereby amended to add CR 466A 74

from Sunny Court to SR 25/500 (US27/441) to Table 4 and Appendix Table 1; and 75

4. The FY 2018/19 – FY 2024/35 List of Priority Projects is hereby amended to revise the 76

limits of the southern terminus of the Wekiva Trail project, Neighborhood Lakes segment, 77

Page 16: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

FY 2018/19 - FY 2034/35 List of Priority Projects Amendment–Dec13 Page 3 of 3

from Kelly Park Road to a new terminus at Lake/Orange County Line in Table 7 and 78

Appendix Table 1; and 79

5. The Chairman of the MPO is hereby authorized and directed to submit the list of priority 80

projects to the Florida Department of Transportation and to the Chairman of both the Lake 81

County and the Sumter County Boards of County Commissioners. 82

83

84

DULY PASSED AND ADOPTED this ______ day of ____________________, 2013. 85

86

87

Lake~Sumter Metropolitan Planning Organization 88

89

90

______________________________ 91

Jim Richards, Chairman 92

Approved as to form and legality: 93

94

95

______________________________ 96

Sanford A. Minkoff, MPO Attorney 97

Page 17: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 18: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 19: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 20: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 21: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 22: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 23: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 24: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 25: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 26: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 27: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 28: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 29: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 30: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 31: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 32: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 33: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection
Page 34: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Page 1 of 4

Lake~Sumter Metropolitan Planning Organization

2014 Legislative Priorities

December 2013

1. Index Local Option Fuel Taxes in the same manner as state fuel taxes

2. Direct motor vehicle license, registration fee increases to the State Transportation Trust Fund

3. Support “Close the Gaps” – Coast-to-Coast Connection of Central Florida Regional Trails for Eco-tourism

4. Enhance and Protect the State Transportation Trust Fund and the Transportation Disadvantaged Trust Fund

5. Amend Statute Regarding Charter County and Regional Transportation System Surtax to create equity among urban counties

Page 35: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Page 2 of 4

Lake~Sumter Metropolitan Planning Organization 2014 Legislative Positions

December 2013

STATEWIDE FUNDING 1. Index Local Option Fuel Taxes

The State of Florida has already passed legislation to index state fuel taxes according to the Consumer Price Index. State gas taxes increase in Florida each year due to this indexing. Legislation is needed to provide the same for local option fuel taxes. Fuel tax revenues for local projects have been affected by decreases in fuel consumption and a flattening of the revenue stream. Indexing would allow a more dependable revenue source for local transportation projects.

2. Direct Motor Vehicle License, Registration and Title Increases to the STTF Return Motor Vehicle License, Registration and Title increases to the State Transportation Trust Fund from the General Revenue. Position is one of six supported by the Florida MPO Advisory Council as part of the Revenue Study Advisory Council’s work on transportation funding options in Florida.

3. Amend Statute Regarding Charter County and Regional Transportation System Surtax The current legislation allows an up-to-one-percent surtax, or sales tax, to be taken before voters as a referendum to fund transportation projects. The law has evolved through the last 25 years for the voter-enabled surtax to now be eligible to all 24 charter counties, as well as to any non-charter county that is part of a Regional Transportation Authority, resulting in 33 eligible urban counties. The transportation surtax is an appropriate referendum option for all Florida urban counties and, as a matter of statewide equity, should be extended to all urban counties served by a metropolitan planning organization. This would raise the number of eligible counties to approximately 40, including Lake and Sumter counties. The position has been supported by the Florida Association of Counties. During the 2013 session, the Florida League of Cities supported a bill that would expand eligibility to municipalities with a population of at least 150,000.

4. Enhance and Protect the State Transportation Trust Fund In recent years, the Florida Legislature diverted massive funding levels from the State Transportation Trust Fund to balance the General Fund. $6 billion in FDOT projects were deleted, totaling more than an entire fiscal year worth of projects. Such diversions of funds will result in the degradation of the state’s transportation system and will dilute Florida’s ability to be globally economically competitive.

5. Enhance and Protect the Transportation Disadvantaged Trust Fund The Transportation Disadvantaged Trust Fund provides Florida’s most vulnerable population access to medical services, nutrition, jobs and educational opportunities. With state-mandated changes in the coordinated system forthcoming regarding Medicaid trips, Florida counties have challenges ahead that will be exacerbated by funding diversions.

Page 36: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Page 3 of 4

Lake~Sumter MPO 2014 Legislative Positions

STATEWIDE POLICY 1. Close the Gaps – Coast-to-Coast Connection of Central Florida Regional Trails for

Eco-tourism Support state funding for completing the Central Florida Coast-to-Coast Trail from Titusville to St. Petersburg, 75 percent of which already has been constructed. This would include closing the gap between the South Lake Trail and the Van Fleet Trail and the gap through south Sumter County between the Van Fleet Trail and the Withlacoochee State Trail. Additionally, seek approval of proviso language from the legislature for the Florida Department of Transportation and the Florida Department of Environmental Protection, Office of Greenways and Trails to work with the Florida Greenways and Trails Foundation and appropriate metropolitan planning organizations to “Close the Gaps” in the statewide trail system with a plan submitted to the legislature by December 30, 2014 and progress reports submitted each year for the next three years.

2. Weight Limits Maintained for Commercial Trucks on State Facilities

In 2010, the Florida Legislature raised truck weight limits on state roads from 80,000 to 88,000 pounds. Nationwide, “pilot projects” continue to push the envelope in terms of allowable weights on state and federal roads, with some states allowing 97,000 to potentially as much as 110,000 pound truck weights – this is without the provision of additional funding to mitigate the impacts of heavier vehicles on roads and especially bridges. The MPO supports maintaining the current weight limits and encourages an assessment of fiscal impact of the recent increase in allowable truck weights on the FDOT.

3. Support a Statewide Comprehensive Rail System

Florida is in need of a comprehensive rail plan that maximizes economic development potential of freight rail while planning for the provision of expanded passenger rail services in urban metropolitan areas and between metro areas.

4. Transportation Related Legislation

With the removal of state-mandated transportation concurrency, the MPO supports legislation that strengthens home-rule rights of local governments regarding regional transportation partnerships and empowers local governments with funding and financing options.

Page 37: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

Page 4 of 4

Lake~Sumter MPO 2014 Legislative Positions REGIONAL PROJECTS 1. Hills of Minneola – Employment Center and Interchange

State grant funding is needed through the State Economic Enhancement and Development (SEED) program or the Transportation Regional Incentive Program (TRIP) for transportation network infrastructure to connect the county roadway network to the proposed Minneola interchange at Mile Post 279 on Florida’s Turnpike. The City of Minneola created a Community Redevelopment Agency (CRA) to assist in financing infrastructure supporting the needed interchange.

2. Lake-Orange Parkway (connector between US 27 Clermont, and SR 429, Orange County)

Funding is sought through the State Economic Enhancement and Development (SEED) program to plan for and construct infrastructure to support a proposed employment corridor that would be developed along a future arterial roadway connecting US 27 south of Clermont in Lake County to SR 429 in Orange County. The corridor would include multi-modal transportation facilities and land uses that target the health and fitness industries. The initiative would be a private-sector-driven partnership supported by the public sector including Lake County and Orange County.

3. Sumter County CR 514 Interchange with I-75 State support is sought for an economic development initiative tied to new access in Sumter County via a potential interchange with I-75 just west of Coleman. With state support in planning and funding the infrastructure to make the new connection to I-75, a major landholding would be catalyzed for private industrial development centered around freight rail and interstate access. The CSX S-Line runs through the property adjacent to the potential interchange at CR 514.

Page 38: LAKE COUNTY CONSTRUCTION IN PROGRESS 238275 · PDF fileMt. Dora is planned for FY 13/14 (FM No. 429356). PD&E underway ... (CIGP/SCRA) to Sumter County in ... Southwest corner of intersection

LAKE~SUMTER METROPOLITAN PLANNING ORGANIZATION

TECHNICAL ADVISORY COMMITTEE

2013 MEMBER LIST

NAME REPRESENTING (vacant) Lake County

Fred Schneider (1st alternate)

Amye King (2nd

alternate)

Dottie Keedy Lake County / Public Transportation

Ken Harley (alternate)

Dawn McDonald Lake County Schools

Scott Cottrell Sumter County

Sue Farnsworth (alternate)

Debbie Nelson Sumter County / Transit

Jackey Jackson (alternate)

(vacant/KittyCooper-interim) Town of Astatula

Denise Lee City of Bushnell

Jim Hitt / Chairman City of Clermont

Barbara Hollerand (alternate)

Dianne Kramer City of Eustis

(vacant) City of Fruitland Park

(vacant) City of Groveland

Frank Watanabe Town of Howey-in-the-Hills

Thad Carroll / Vice-Chairman Town of Lady Lake

DC Maudlin City of Leesburg

Bill Wiley (alternate)

(vacant) City of Mascotte

Aaron Mercer City of Minneola

(vacant) Town of Montverde

Mark Reggentin City of Mount Dora

Jacques Skutt City of Tavares

Alisha Maraviglia (alternate)

Richard Hatfield City of Umatilla

Jason McHugh City of Wildwood

Melanie Peavy (alternate)