Upload
trinhtram
View
218
Download
5
Embed Size (px)
Citation preview
Level crossing
Procter and Gamble
laboratories
Spring Rise
Lynw
ood
Aven
ue
Danehurst Close
Railw
ay li
ne
Nobl
es W
ay
Moore Grove Cres.
RHUL Arboretum
Monkey’s Forehead (PH)
St Cuthbert’s Close
Pars
onag
e Ro
ad
Gowar Hall
Sports Centre
Prune Hill Gate
East Gate
Wedderburn Hall
Sutherland House
The Retreat
Middle Hill
Woodlands
Hockey/ football pitch
3G synthetic rugby/football pitch
Floodlit netball and tennis courts
Natural turf football pitch
Natural turf Rugby pitch
Ripley Springs
Balancing pond
Pond
Canada Copse
Bakeham House
Lake
Sout
hern
Spi
ne
Northe
rn S
pine
Egham Hill (
A30)
Harvest R
oad
Harvest R
oad
Alexandra Road
London Road (A30)
St Jude’s Road (A328)
Prune Hill
Prune Hill
Albert Road
Victoria Street
Chestnut D
rive
South Road
Acad
emic
Bou
leva
rd
International Building
Boiler House
McCrea Building
Horton BuildingMoore
Building
Moore Annex
Bedford Building
Butler Hall
Williamson Hall
Runnymede Halls
Reid Hall
Tuke Hall
Windsor Building
Garden Lodge
Gate House
Founder’s Gate
Piggery Gate
Founder’s Building
Tennis Courts
Founder’s sports ground
Armstrong R
oad
Bakeham Lane
New signalised junction at Piggery Gate
Relocated Campus Services compound
Notes:The use of buildings classified as ‘B’ (operational) is considered to be flexible and can accommodate academic, administrative and general operational uses, unless where identified on the plan for other specific uses.
Key: Buildings Existing building retained Proposed building
Labels Student accommodation Operational use Car park location
Others Potential new/improved campus entrances
Decked car park
Landscaped trail with soft lighting and fitness equip-ment
Landmark operational building (taller features to cre-ate a focal point for the approaching routes)
Pond and environs enhanced/ opened up for general access
Northern principal plaza with a 2-storey kiosk built into the landscape to facilitate access up and down, along with landscaped terraces adjacent for socialising and congregation
Existing services structures to be reclad and used for graphic displays and information displays
Pedestrian/cycling link between the northern principal plaza and East Gate
Southern link road to connect Runnymede Halls car park to Nobles and the Prune Hill gate
Sports facilities
Barrier to prevent general access across the campus (through route for authorised university vehicles only)
Social building for the adjoining residential buildings
New pedestrian entrance to connect with the bus stop
Civic plaza created adjacent to Founder’s
New pedestrian gate to tie in with enhanced pedestrian crossing
lights
Existing Eastfield grass pitches levelled out for more flexible and
competitive sporting use
NORTH
Access (visitors) car park
Street-level pedestrian crossing
Pedestrian connection between the A30 and the rest of the
campus by the Boiler House
Existing footbridge replaced with a street-level pedestrian crossing
point
Energy centre
Botany greenhouses
Pedestrian link to the arboretum
Gardeners’ compound
Controlled crossing point for authorised university vehicles only (no impact on access to
Chestnut Drive)
Southern part of Harvest Road made 2-way with a left-only turn
onto Egham Hill Soft landscaped public space centred around the existing mature trees
Existing structures removed to create an open and usable plaza
B01
01
A01
A01
A02
B02
B01
B04
B03
B05B06
B07
B15
B08
B14
B16
B13
B12
B09
B11
B10
B17
B18
B19
B20
B21
B22
B23
B24
06
11
07
09
10
15
08
16
17
18
19
14
20
21
12
13
A04
A05
A06
A07
A08
A22
A09
A10
A11
A12
A13
A14
A15
A03
A16 A17
A18
A19
A20
A21
Jane Holloway Hall
01
02
03
04
05
OVERALL ACCOMMODATION SUMMARY
Car parking schedule
Schedules:
010203
13
04
14
05
15
06
16
07
17
08
18
09
19
10
20
11
21
12
Proposed operational new build (non-residential)
Proposed residential new build
Proposed residential new buildProposed residential refurbishment (Founder’s)
Less demolition of existing operational buildings
Less demolition of existing residential buildings
Less demolition of existing residential buildings
Net increase in operational floor space
Net increase in residential floor space
Net increase in residential provision
Highfield Court 1 (as existing)Penrose Court (proposed)Highfield Court 2 (as existing)
Tennis Courts (as existing)
Highfield Road (as existing)
Gowar/ Wedderburn Halls (as existing)
Woodlands (remodelled)
Butler/ Tuke Halls (as existing)
Northern Spine (proposed)Chestnuts (proposed)
Runnymede Halls 1 (as existing)
Sutherland House (as existing)
Runnymede Halls 2 (as existing)
Piggery Gate Reception (proposed)
Runnymede Halls 3 (as existing)
Piggery Gate Main (proposed)
Sports Centre 1 (as existing)
Boiler House (as existing)
Sports Centre 2 (proposed)
Founder’s/ Windsor (as existing)
East Gate (proposed)
Total
95,135m2
74,910m2
c.2,800 beds70 beds
40,135m2
3,782m2
221 beds
55,000m2
71,128m2
c.2,650 beds
14 spaces12 spaces30 spaces
121 spaces
25 spaces
10 spaces
172 spaces
11 spaces
6 spaces88 spaces
13 spaces
19 spaces
15 spaces
7 spaces
78 spaces
500 spaces
8 spaces
8 spaces
41 spaces
17 spaces
10 spaces
1,204 spaces
New Build Student accommodation schedule
General accommodation schedule
A01
B01
A02
B02
A03
B03
B13
A04
A13
B04
B14
A05
A14
B05
B15
A06
A15
B06
B16
A07
A16
B07
B17
A08
A17
B08
B18
A09
A18
B09
B19
A10
A19
B10
B20
B24B23
B21B22
A11
A20A21
B23A22
B11
A12
B12
Penrose 1
Egham HillGardeners’ Compound
2-3 storeys
5 storeys
2 storeys
4 storeysPenrose 2
Piggery Gate 1 2-3 storeys
3-4 storeysNursery site
Piggery Gate 3 3-4 storeys
4 storeys
Bourne 1 3-4 storeys
Harvest Road 2
Hub 3
Horton 2 storeys
3-4 storeys
5 storeys
Queen’s 2 3-4 storeys
Penrose 3Penrose 4
Piggery Gate 2
Campus Services
3-4 storeys
3 storeys
2 storeys
4 storeys
Bedford 3 storeys
4-5 storeys
Wettons 1
Beeches 2
SU 3-4 storeys
4 storeys
Bourne 2 3-4 storeys
Wettons 2Wettons 3
Hub 1
Wilson 3-4 storeys
5 storeys
Northern Plaza Hub 2-3 storeys
Harvest Road 1
Hub 2
Tolansky 3-4 storeys
3 storeys
4 storeys
Queen’s 1 3-4 storeys
Harvest Road 3
Library Depository site
McCrea 3 storeys
3-4 storeys
5 storeys
Elm 2
Electron Microscopy Site
The Hub
Williams 3-4 storeys
4 storeys
5-6 storeys
NoblesGreenhouses
The HubQueen’s Annex
estimated2-3 storeys1 storey
4-5 storeys3-4 storeys
Elm 1
Ripley Springs
Library Hub 3 storeys
4 storeys
4 storeys
Beeches 1
Founder’s
Canada Copse
Kiosk
4 storeys
4-5 storeys
5 storeys
4-5 storeys
2 storeys
Total
Total
New build
New build
Height
Height
Demolition
Demolition2,820m2
1,400m2400m2
(1,448m2)(2,353m2)
(3,146m2)(1,979m2)
(447m2)
(12,076m2)
(6,376m2)
(700m2)
(1,403m2)
(34,014m2)
(9,533m2)
included in Bourne above
included in Bourne below
estimated
(1,918m2)(1,034m2)
(289m2)
(610m2)
(330m2)
(1,950m2)
(935m2)
(3,412m2)
(370m2) estimated
estimated
estimated
(2,536m2)
(see B26)
3,360m2
3,000m2
2,000m2
2,840m2
9,300m2
600m2
2,000m2
1,350m2
5,500m2
6,600m2
2,640m2
3,180m2
3,300m2
7,135m2
1,840m2
3,940m2
3,770m2
4,600m2
3,100m2
1,570m2
5,300m2
5,500m2
4,800m2
4,690m2
9,440m2
450m2
3,200m2
2,360m2
8,900m2
1,600m2
1,490m2
3,600m2
1840m2
4,200m2
2,100m2
300m2
1,000m2 9,300m2
1,800m2
3,000m2
11,000m2
3,180m2
(no new build)
4,500m2
250m2
74,910m2
95,135m2
A
B
Note: New accommodation (provided at approximately 25m2 per bedspace) less demolition at Penrose Court (196 beds) and Beeches (25 beds) results in a net increase of circa 2,650 bedspaces.