24
Department of Energy Washington, DC 20585 JUL 14 2003 The Honorable John T. Conway Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW Suite 700 Washington, D.C. 20004-2901 Dear Mr. Chairman: 2003. 0001075 , .- . - -. r .' '. j i' ; I I . - . . .- -'0 - 1 I _ .. J ,- c,.;) .. ." - u The purpose of this letter is to forward to you Revision 2 to the Savannah River Site High Level Waste Tank In-Service Inspection Program. This revised document incorporates the revised schedule to inspect all of the Type III/IlIA waste tanks by the end of 2007. Additionally, reporting criteria has been referenced for the inspection of the secondary containment. A copy of the revised plan has been provided to your staff. The Department remains committed to adjusting the inspection program as necessary should inspection results indicate the existence of, or potential for, accelerated degradation in the Type III/IlIA waste tanks at Savannah River. If you have any further questions, please contact me at (202) 586-0738. Sincerely, A ill. /\,l0l/-- ta:l M. Golan Chief Operating Officer Office of Environmental Management Enclosure cc: Jessie Hill Roberson, EM-l Mark Whitaker, DR-l Jeffrey Allison, SR * Printed wrth soy ink on recycled paper

,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

Department of EnergyWashington, DC 20585

JUL 1 4 2003

The Honorable John T. ConwayChairmanDefense Nuclear Facilities Safety Board625 Indiana Avenue, NWSuite 700Washington, D.C. 20004-2901

Dear Mr. Chairman:

2003. 0001075

~~,,.- .t~ - -.

r .''.

j

i' ; I I .-. ..--'0 -1

I _.. J,- c,.;)..." -u

The purpose of this letter is to forward to you Revision 2 to the Savannah RiverSite High Level Waste Tank In-Service Inspection Program. This reviseddocument incorporates the revised schedule to inspect all of the Type III/IlIAwaste tanks by the end of 2007. Additionally, reporting criteria has beenreferenced for the inspection of the secondary containment. A copy of the revisedplan has been provided to your staff. The Department remains committed toadjusting the inspection program as necessary should inspection results indicatethe existence of, or potential for, accelerated degradation in the Type III/IlIAwaste tanks at Savannah River.

If you have any further questions, please contact me at (202) 586-0738.

Sincerely,

Aill. /\,l0l/-- --~ta:l M. GolanChief Operating OfficerOffice of Environmental Management

Enclosure

cc: Jessie Hill Roberson, EM-lMark Whitaker, DR-lJeffrey Allison, SR

*Printed wrth soy ink on recycled paper

Page 2: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

0~/07/03 MON 16:21 FAX

WSRC-TR-2002-0006I. Rev. 2

In-Service Inspection Program for High Level Waste Tanks

Edited By:B. J. WiersmaK. H. Subramanian

I4J 003

Contributorn:R. L. SindelarM. E.DupontJ. B. ElderW.R. West

R. S. WaltzV. CechB. J. WiersmaK. H. Subramanian

Publication Date: June 2003

DOES NOT CONTAmUNCLASSJFIED CONTROllED 'NUCLEAR INFORMATION

ADC&

E?~f.~Patt~n'tStatusThis internal !IJJU1agement report'is being transmittedwithout DOE patent clearance. and no furthCt"dissemination or publication Shall be made of the reportwithout prior approval of the DOE-SR patent counsel.

Westinghouse Savannah River CompanySavannah River SiteAiken, SC 29808.1 , 11

This document was prepared in connection with wort done under Contract No. DE-AC09-96SRl8500with the U. S. Deparbncnl of Energy

Page 3: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

..

07/07/03 MON 16:21 FAX.WSRC-TR·2002-0006I, Rev. 2

DISCLAIMER

This report was prepared as an account of work sponsored by an agency of the United Slates Government. Neitherthe United States Government nor any agency thereof. nor any of their employees. makes any warranty. exp~ orimplied. or assumes any legal liability or responsibility for the accuracy. completenc:ss, or usefulness of anyinformation.. appararus, product. or process disclosed, or represents that il$ use would not infringe privately ownedrighrs. Reference herein to any specific commercial product, process. or service by trade name, trademark.lIWIufilcturer. or otherwise does notn~y constitute or imply its endorsement. J'CConunendation., or favoringby the United States Government or any agency thereof. The views and opinions of aulhors expressed hcrt:in do notnecessarily slare or reflect those of the United St4Ueli Government or any agency thereof.

14]004

Page 4: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

O~/07/03 MON 16:22 FAX

WSRC-TR-2002-00061. Rev. 2

~005

POCUMENT:

:tITLE:

REVIEWED BY:

WSRC-TR.-2002-OOO61, Rev. 2

In-Service Inspection Program for High Level Waste Tanks

~/~ Date: ,,1"J./o.3B. J. Wje~ma:EditorMaterials Performance eft Corrosion Technology GroupMaterials Technology Section

JbtIrJh~ Date: {, /2)03, ..K. H. Subramanian. EditorMacerials Performance & Corrosion Technology GroupMaterials Technology Section

(l::.~~~:::::'~-Date: (,)2-103p. E pp. echnieal Reviewer {Materials Performance &. Corrosion Technology GroupMaterials Technology Section

~M'C~~l/'(tCQ Date:' fa /~JOJO. T. ler. ManagerMalerials Performance & Corrosion Technology GroupMaterials Technology Seclion

~ Date: lJ,klo3M. E. Dupont. Acting Manager I ,NOB and Materials Reliability GroupSavannah River Technology Ceuter

~_"";"'+--I-__ Date: J 11.-[ &:J.

~ Date, 'i<1-/",,!>M. W. Loibl, ManagerLWATPS Programs EngineeringClosure Business Unit

\;):y~ td'llp3D. B. Little, ManagerLiquid Waste Area Technical Project ServicesClosure Business Unit

~~ D,'e, 6/fj03M.D. On ILiqui aste DiSPOSlll00 ProjectsClosure Business Unit

Page 5: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

O~/07/03 MON 16:22 FAX1 • '\

WSRC-TR.2002~00061,Rev. 2

Table or Contents

1 INTRODUCTION ~_"''''''''''_''''''''''''''''''''''''''''I''I'''''_''''__'' '_'_'''' ''''''''__ •• _ 1

~006

2 SCOPE ..__..__.__...;....M_.. .... ...4......_.H_ . .................__._....._.... . . 1

3 ~NSIBn.,ITIFS .........__.__._......._.._.._._.__.........&&.......__• __......__•••• _ _ "' ' "-"'-'MH" 1

3.1 LIQUID WASTE AReA TOCHNICALPIlOJECTSERVICES(LWATPS) .•..•...••....•...•..•.....••....•......•.......•.......•...... )3.2 LJQlJJO WASm AREA MA1N'rENANCEPROJEcr SIB\VICES (LWAMPS) 23.3 SAVANNAI-I RIVER TECHNOLOGY CBNTER (SRTC) 2

4 INSPEC110N REQUIREl\fENTS AND METHODS ~o ~ _~_ _. ._••__• _. 2

4.1 SCoPE , 24.2 QUALIFICAnONS OF INSPBCIORS 2

4.2.1 VT /nspector(s) _ 24.2.2 UT ltU~ctor(s) ·· 34.2.3 Data COllectoJ1$) o : 3

4.3 ExAMINATlON MBrHODS 34.3.1 Visual Ex4mination.J (VT) ; 34.3.2 UlJra:sonic Exilmination (en) 34.33 Equipment Qualificarion _ 44.3.4 Procedures 4

5 PRIORITIZATION, FREQUENCY, AND EXTENT OF UT INSPECTIONS _ .._H __.M_ 4

5.1 PRJoRTIlZATION OpTANlCS fOR lIT INSPl!CTJON ·45.2 FIlEQUENCY AND BxJllNT OFlIT 1Nsf'BCJ10N 5

6 AC~ANCE CWTERIAt...".._. I .... ••••_I..H.w•••_.~ , ••__•••_ _.-.~ __••_. 10

1 RECORDS ._. .. -........ _ ...-. 12

7.1 PuRPos2 , 127.2 SCOm _ _ : 127.3 PROCBVURB J27.4 CUSSIFICATJON _ ~ 127.5 MA!NTAINEDREcORDS .~ 127.6 SToRAGBFACO"rTYREQumEMmrn;. 127.7 REPoRT & l.Irn1lR SToRAOE!RECOkDS __ 127.8 VIDEO TAPI!, PJIOTOGRAPHS, SLIDES, MAoNEnC MwIA , 127.9 NOE R2P0Rn 13

8 REFERENCED STANDARDS AND SPECIFICATIONS _ _.." _ _ _.•._. .__.~ 13

APPEND1X~TANK DESIGN AND CONSfRUCTION.__ _ -._.--:--__ ._ 14

GLOSSARY _ ...._I_. .._......._.. ......__,..--._....__~ ._.__. .. 16

Page 6: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07/07/03 MON 16:22 FAX,'.

WSRC-TR-2002-00061. Rev. 2 .

List of Figures

Figure 1. Schedule (or Routine and Augmented Inspections for Type ill and llIA Tanks 7

Figure 2; UOWIapped Surface of.a Typical Type mWaste Tank. D1ustrating TSIP Inspection Requirements andPlllJUleld Inspection E}ttenl at SRS......•........•.••.~ •••..•..••...........................•....•......................•.••.........._._..•.......••••... 9

Figure 3: Decision Logic fot Disposition of General Thinning, Pitting, and Local Thinning 11

Figure 4: Decision Logic for Disposition of Service Induced Flaws _ _ 11

Figure 5: Type n lligh Level Waste TanIc _ 14

Figure 6: Type ill High Level Waste Tank _ _ _ _. __ 15

I4J 007

Page 7: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07/07/03 MON 16:23 FAX.

Record of Revisions

WSRC-TR-2002-00061, Rev. 2

I4l 008

Rev. Date Description

2 ]une2003 Global: Ot:mged CSTE to LWATPS and CSTM to LWAMPS to reflectorganizational changes.

Sec. 4.3.3.1: Removed surveillance and monitoring.

Sec. 4-3.4: Changed ultrasonic requirement from ASME Section V Article 4to ASME Section V Article 5. Removed ISmC validation requiR:ment.

Sec. 5.1: Changed statement regarding Tank 15 to reflect that 1aJlk has beeninspected.

Sec. 5.2: Changed 27 tanks to 22 tanks to reflect that the augmentedinspection will be performed on 22 tanks. Modified Figure 1 to reflect thenew FY07 schedule.

Sec. 6.0: Added paragraph with regard to the disposition of data obtained On

the secondary tanks.

1 July 2002 Sec. 3.1: Defined the role of the ISIRC.

Sec. 3.3 and 3.4: Combined SaTC and Quality Services to reflectorgani%ational clumges.

Sec. 4.2.2: Added Level ill inspector to the requifement.

Sec. 4.3.2: Table 1 (rev. 0) moved to section 5.2 and re-Iabeled Table 2.Added a~ditionaldetail on mechanism.

See. 4.3.4: Added ISIRC validation.

Sec. 5.1: Added 5 tanks for routine schedule. Added augmented one-timeinspection discussion. Table 2 (rev. 0) re-Iabeled Table 1 and inserted in this~tion.

Sec, 5.2: Added all Type m tanh to be inspected by FY12. Figure 1schedule added. Added FY07 inspection fOl" Tank 15. Added formal review.of program by the ISmc.

0 February 2002 Initial issue for use.

Page 8: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

O~/07/03 MON 16:23 FAX. , - .

WSRC-TR-2002-0006I, Rev. 2

1 INTRODUCTION

In-service inspection of the Savannah River Site (SRS) High Level Waste (HLW) tanh is an essential elementin the demonstration of their structw'aJ integrity to maintain the function cif waste confinettlent lhroughout medesired service life. A revised, code-based in-serviee inspection (lSI) program (which includes both vi1>-ual(Vf) and ultrasonic (1)1') inspections) of the SRS Double Shell (DS)-HLW Tanks bas been developed. Thecurrent lSI program for the HI.W ranks is limited to VI of lbe tank walls. The program herein provides detailsfor tIT inspections that will augment the CUITent lSI program. The prioritization of tanks for ut inspection,lite extent, freqnency. schedule of UT inspection:s, and equipment for lIT inspection are included.

2 SCOPE

An imporlant element in the demonstration of structural integrity of tanks is an lSI program to provide in-situmaterial condition information.. Inspection also provides early detection of degradation, and allows for anappropriate response to maintain structw'al integrity. The current lSI program for tho HLW tanks consists ofthe visUilI inspection of the primary tank waH exteriors for Type It Type n. and Type ill and Type IDA wastetanks, via accessible annulus risers. For purposes of thinlocument. references to TYPe m ranks are inclusiveof Type IlIA tanks. The ur examinations to be done for selected Type m tanks will be used to augment theexisting lSI prognun. and to validate current gencroll thinning, pitting, and stress corrosion cracking models.Validation will be done by establishing an Ultrasonic baseline for specific areas of selected tanks and thenperiodically re-examining \hose areas for any detectable changes. 10e lSI program includes visual inspectionof the interior tank walls of the Single-shell Type IV waste tanks. but not UT inspection of Type IV wastetanks.

This document details the complete upgraded inspection progntm. Elements of the complete program includethe following:

I. Enhanced Visual Inspection. Including Inspection of Secondary Tank

2. Organizational Responsibilities

3. Tanks Selection for UT Inspection

4. Extent of Inspection

5. Frequency of Inspection

6. SChedule of Inspection

1. Equipment

8. Inspector QuaJiiu:ations

9. Acceptance Criteria/Action Umil'l

10. Records Management

This inspection plan includes the ur inspection prognon and a brief sWI1IDarY of the current vr program. Thecurrent vr prognun will be implemented as outlined in WSRC·TR-9S-0076. ''HI..WE Struetunll IntegrityInspection and Monitoring Program". A summary ofHLW tank design and construction is included within theAp~ for reference. '

J RESPONSIBILITIES

3.1 Liquid Waste Area Tcdmical Project Services (LWATPS)

LWATPS shaH:

1

~009

Page 9: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

0~/07/03 MON 16:23 FAX

WSRC-TR-2002-0006I, Rev. 2

I. Develop and maintain plans for inspections. structural integrity, and indicationinvestigations.

2. Generate, review, and authenticate inspection records.

3. Review, validate, report, and disposition inspection results via the In-Service InspectioQReview Committee (ISIRC).

4. Maintain records, ineluding index(s) of inspections.

3.2 Liquid Waste Area Maintenance ProJedSemces (LWAMPS)

LWAMPS shall:

1. Perform applicable inspections in accoidance with qualified inspection procedure(s).

2. Perform surveillance and monitoring as directed by LWATPS.

3. Optnle and maintain surveillance and monitoring equipmenL

4. Perform work and complete records with guidance from LWATPS.

5. Maintain records as appropriate.

3.3 Savannah River Technology Center (SRTC)

SRTCshall:

1. Support disposition of inspection results with guidance from LWATPS.

2. Assist in testing and qualification of specific equipment when requested.

3. Perform inspections in accordance with qualified inspection procedure(s).

4. Perform work and complete records with guidJmce from LWATPS-

5. Administer SRS Operations No~DestructiveExamination (NOE) ~enificationProgram.

6. Perform NOB as requested [lnchiding automated ulb1lsonic and renlOte (crawler) visuaJinspection ofHLW tanks) using certified Level n and Level minspectors.

7. Maintain records as appropriate.

4 INSPECTION REQUIREMENTS AND METHODS

4.1 Scope

This section details the VT and UT inspection requirements, including inspector qualifi~tions,

examination methods. and equipment qualification.

4.2 QuaIifk:atioDS of IDspectOni

This section establishes a requirement for certification of peroonnel who perform or assist in thesurveillance. monitoring. and inspection ofHLW tanks.

4.2.1 VT lnspector(s)

Personnel interpreting and/or reviewing data shall be certified lo, at least VT t.e\lellI-L in visualexamination. in accordance with NDEP 2.1.

2

I4J 010

Page 10: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07,/07/03 MON 16:24 FAX

WSRC·TR·2002-00061, Rev. 2

All certified personnel shall pass an annual eye examination given by SRS Medical personnel orSRS Level ill personnel. Penonnel shan meet the following eye examination requirements;

1. Distance vision of 20130 in at least one eye either corrected or uncorrected.

2. Near vision capability to read Jaeger type 1 letters at a distance not less than 12 inches On

a Jaeger Test Chart OJ" Snellen Equivalent.

3. Color vision must be acceptable for the NDB method in which certification is songht.

4.2.2 UT lnspector(s)

Personnel performing trr examinations shall be certified to Level n or Level ill in themethodes) being used, in accordance with NDEP 2,1.

4.2.3 DQ/.a ColkctoT(s)

Data collectors are not required to be certified, but they are required to be proficient inequipment operation and data collection in accordance with the applicable procedures,

4.3 Examination Methods

4.3.1 Visual Examinations (VI')

The following summarizes the current Visual eumination program. As UT data is acquired andthe degradation models and performance of the HI..W bmlcs are validated, recommendations formodifications of this plan will be identified and presented to the DOE for review and approval.

Inspection plans shall be prepared for each inspection period (1 year) prior 10 the actualinspection and shall include the following:

1- Tank identification

2. Access (opening)

3. Bases for ':llch inspection

4, Prequency

5. Access CQnmaints

6. ~~tion~(~ordd&lro)

The visual inspection (V1) interval sball be a maximum of two calendar years using aUaccessible annulus risers for Type I. Type n, and Type m In.W tanks. Increased surveillancemay be necessary 10 monitor relevant conditions pending disposition.

An addition to the current vr program is the detailed examination of the secondary paD. Adetailed inspection through an ~eessible riser in one quadRnt of the tank shall be perfonnedduring a detailed vr inspe4..'lion of the tank. All four quadrants of the secondary shall beinspected within 4 calendar year&.

4.3.2 U1Jnuonlc ExamllUUion (UI)

The following SUJDIJWize.s the tIT examination program. Inspection plans sttall be preplU'ed foreach inspection prior to the actual inspection and shall include the following ali a II1iniJJlum:

1. Tank Identification

3

[4J011

Page 11: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07,/07/03 MON 16:24 FAX

WSRC·TR-2002-Q006I, Rev. 2

2. Access (opening) through which inspection(s) will take place

3. Basis for inspection

4. Frequency (as listed below)

S. Access constraints

6. Inspection type(s) 10 be pc:rfonned (thickness mapping or weld inspection)

7. Extent of examination· minimum area and location to be examined with each inspectiontype.

4.3.3 Equipment QUQU,/icaJion

Equipment includes, but is not limited to cameras (film, digital and video). remote cameras.fibetscopes. ultrasonic inspection instruments lUld delivery systems. This equiP~Dt shall beused for surveillance, moniloring. aod determination of slIUcturlll integrity and in-serviceinspection of HLW tanks. Equipment'used for surveillance, moniloring or inspection (annualdetailed inspections, NDE, structural integrity) shall be qualified for use by performancedemonstJation.

4.3.3.1 CameralVideolVisuallmaging Equipment

All equipment used for structural integrity aDd in-service inspection of HLW tanks shallbe qualified to aJiljUrt~ il mcctlj the lighting and Tcsolution requirements of ASME SectionV, Anicle9.

4.3.3.2 Ultrasonic lesting equipmc:nt

The lIT system (instrument, transducer. scanning device. and cables) shall have thefollowing detection limits (tested at Jh inch nominal thickness): .

1. General corrosion/dUnning detection within 0.020 inches.

2. Pitting detection within 0.050 ~he$. (elliptical or hemispheriea1).

3. Crack depcb detection wilhin 0.100 inches. ~ 0.5 inches long, < 6 inches long.In the absence of an acceptable craclced sample. a machined notch 0.05 inchesdeep x linch long can be used instead of a crack.

4.3.4 Proceduru

All inspections shall be performed according to the appropriate procedures. Inspectionprocedures shall be written in accordimce with ASME Section V Article 5 for ullrasonics andArticle 9 for visual inspection.

S PRIORITIZATION, FREQUENCY. AND EXTENT OF UT INSPECTIONS

5.1 .PrlOrltl2atiOD of Tanks tor UT 1nspedion

AU 27 Type m and llIA lanks will be inspecled by UT over the next 5 years (i.e., by Fl07). Five ofthe 27 tanks were selected for routine inspections, while an augmented inspection is planned for thebalance of the taob. The tanks selected for the routine inspections will provide data for trending anyactive c:orrosion mechanisms that II1lly occur during their remaining service life. The basis for selectionof these tanks was p-esenled within WSRC-TR-2001-00469. Categories were constructed 10 identifytanks wilh similar risks for corrosion. The features considered in the categorization were materials ofconstruction, service history. tank function. and projected future use. A ranking system was developed

4

[4J 012

Page 12: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07,/07/03 MON 16:25 FAX

WSRC-TR.2002-00061. Rev. 2

that provided input into the :selection of lIIe tanks for the routine inspection. The tanks that wereselected for routine inspection are shown in Table 1.

The augmented inspection is scheduled as a one-time inspection and will be utilized to verify lIIat DO

unexpected accelerated corrosion is occurring in the remaining tanks. The same categorir.ationdocument was utilized to prioritize the order in which the tanks will be inspected.

One Type IT tank will be inspected by ur (see Table I). Tank 15 will be inspected twice to validateknown cemoslon models (e.g., stress col1'Osion cracking). The results of the. liT inspection perfonnedOn Tank 15 will be applied to the family of Type I and n tanks, both leaking and non-leaking tanks.

Table 1: Tanks Seleded for UT Examination

Category Tank CAtegory T4nb Seleeud Year ofl" lraspectWn

Type I and II uakagtt Observed Tank 15 FY02Tanks

No-LeafsBge Observed None

T1JM!ill Fre.sh Wmte Receive, Tank 32 FY03Tao~

Waste Processing, Tank 48 FY04

Unconceatrated Sah Solldion Tank 47 FY06

Evqpo,-atar Synem

Evaporator BOItOms Receipt (H-Area) Tank 29 FYOS

Evaporator Feed (P-Area) Tank 26 FY04

5.2 Fr-eq..enq and Extent 01 UT ~tion

The following inspection frequency shall be used for- ur examination of Type 1, Type n. and Type illHLWtanks:

1. Tank 32, a fresh wllSte receiver for the JD».jority of its service history, shall be inspected every7 years. .

5

~013

Page 13: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07/07/03 MON 16:25 FAX

WSRC.TR-2002-0006I, Rev. 2

2. The remaining Type ill ranks that are part of the routine tIT inspection program shall beinspected cvery 10 years.

3. Tanks selected for the augmenled UT inspection shall be scheduled such that aJ122 tanks areinspected once within 5 years (i.e, by the end ofFY07).

4. Tank 15 shall be inspected two times within a tive-YeaI" time span to validate currentdegradation models. Known leak sites will be chancterized in addition to the nonnaI extent of

. examination. The fust inspection was performed in FY02.

5. A fonnal review of lbe lSI program shaD be performed every three years to determine jfadjustments to the routine or augmented program are necessary. Changes to the program maybe made due to discoveI}' of any instances of accelerated corrosion or changes in the tankclosure schedule. The fint review will be perfOIIDed in FY06 and will be conducted by theIn-Seryice Inspeetion Review Comminee (lSIRq.

The combined schedule for the routine and augmented inspections are shown ill Figure 1. Tanks thatare part of the routine program are indicated with number that show each successive inspection, whiletanks included in the augmented program are shown by an "x" or "xx". Tanks included in the routineprogram will be inspected prior to FY06 and the first formal review. The tank closure schedule isbased on the High Level Waste System PIan.

6

[4J 014

Page 14: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

WSRC-TR-2OO2-OOO61. Rev. 2

a::oZ

------

2

2

xxxx

xxxx

1

xx

z

KXxx

FYOO FY04 FYOS FY06 FV07 FY08 FY09 FYl0 FYll FYI:! FY13 FV14 FYt5 FY\l; FYt7 FVt8 FV19 mo FY21 FY22 FV23 FV24 FY25

15

51

FIlS"

Terb

WUle

Wul.I'IocllIIln

'X" II Reduced 1OOp&, One-4lme InspeCllon on TBI1klllncluded In Revllion 1of 151 Plllll

1-...__-011.. The ortglnlllllllven (7) Tanka 10 be rnspscled. 'XX' .. Aedu~ scope Tanks moved fOM'ard!18 part 01 FYG7lSI Schedule

1111.111. ScheOO1e'or nMJuoed scope, one tlmlt Impaction Indudud In Revision 1 D1 (51 plan

.......TanlllChetfuled to be closed alll1ls tims

Figure 1. Schedule for Routine and Augmented Inspections for Type III and lIlA Tanks.

7

Page 15: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07,/07/03 MON 16:26 FAX

WSRC-TR.2002-00061, Rev. 2

Figure 2 shoW$ the eJ:tent of a routine UT examination. Table 2 summarizes the ell.tent oflhe routine UTexamination.

Table 2: Extent of Routine UT Euminatlon orSRS Waste Tanks

l'lfSpeaion Region ~1ItolJlw.m~ M«tlumism

1. Liquid-Vapor See External Surface Thinning, pitting, andInterface cracldng

2. Liquid-Sludge see External Surface Thinning, pitting, andInlel"face cracking

3. Upper Weld of 5% of accessible CrackingLowa Knuckle of circumference of thePrimary Tank upper weld of the lower

knuckle

4. Lower Knuckle Base See Exlema1 Swface Cnc:kingMetal

,5. External surface of Pour, vertical strips Thinning, pitting, andprimary tmllc along the accessible cracking

height of the tank. Twostrips in each semi-circle (ISOo arc) Of thetank for the accessiblevertical section.

6. Bottom Plate of the Feasibility ofobtaining Thinning. pittingTank access to the tank

bottom will bedeltm1ioed.

7, Vertical and ODe vertical course Crackinghorizontal welds other section and S9b ofthan rhe lower knuckle middle horizontal weld.weld

8. Secondary Tank Extent of euminatioD Thinning, pittingof the bottom plate andsidewall will bedetermined.

8

141016

Page 16: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

I'I

WSRC-TR-2002-00061. Rev. Z

1:1:oZ....<»

6

-- -------- --------- - --- -------------- ------- ----- --------------- _.

;S~ S S~~ ~ ~ ~

1 ~" ....,"',....~

2~t,

i I I I I I I I I I I I I I I I I t::l:l:~ 14

I I I 1 I 1 I I I 1 I 1 1 1-

All Llmll

Figure 2: Unwrapped Surface of a Typical Type m Waste Tank, mustrating TSIP Inspection Requirements (•• • • ) and Planned Inspection Extent (-) at SRS.

Note: Numbers correspond to TSIP Regions for inspoctiOD shown in Table 2.

9

Page 17: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07,/07/03 MON 16:26 FAX

WSRC-TR-2002-00061. Rev. 2

For the augmented inspections a single vertical strip along the accessible height of the lank will be chosen. Theinspection will be for Ihinning, pitting. and stress corrosion aaclcing.

6 ACCEPTANCE CRITERIA

The Tesults of the inspections shall be disposed of in accoTdance with the set of standards, or acccptaDcecriteria, detailed in WSRC-TR-2002-00063, "Acceptance Criteria for Disposition of Inspoction"Results of SRSType ill High Leve.l Waste Tanks:' This set of slamlanf$ prolfides actions in Te$pollse to indications fromultrasonic testing (lIT), and the visual testing (VT) inspections, based On the characteristics or size of theindications. Indications that are below the criteria for successive examination, yet above the detection limit ofthe lIT instrument will be DOted in the inspection repons. These indications will be reviewed anddispositioned by the ISIRC.

The decision logic shown in Figures 3 and 4 will be used to disposition inspection results in accordance withthe acceptance criteria. Figure 3 shows the decision logic for general thinning. pining, and local thinning.Figure 4 shows thD decision logic fOT service induced flaws.

S~sive e",aminations decrease rile inspection interval to 5 years for pilling and thinning and shall berepeated at that interval until three sucb exruninatioDS reveal no additional degradation. For flaws. successiveexaminations decrease the inspection interval [0 3 years and shaJl be done at that inlerVaI, until threeconsecutive examinations show no additional f1:tW growth. Additional examinations double the extent of theregion of the Scheduled examination within a single service category. This shall be accomplished byinspection of an additional 50% in the degTaded tank. and inspection of 50% of a regular inspection in anothert.ank wilhin the same category. The additional tank shall be chosen in accordance with the selection criteria.Degradation fo"und in the additional tank shall be disposed of in accordance with the same acceptance criraia.

The results of lite inspections will be presented to LWDP management. The management will identify Iheappropriate controls, and acceptable operating envelope in accordance with "S/RID Functional Area 16 (WasteManagement) Requirement".

The criteria ofWSRC·TR-2003-00063 will also be used to determine the reportability of any lIT data acquiredfrom the secondary tanks. The ISIRC will determine the applicability of the decision logic to the results of anysecondary tank data.

10

~018

Page 18: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

01107/03 MON 16:26 FAX

WSRC-TR-2002..()()()61, Rev. 2

SuccessiveExamination

ManagementDecision

F'JgUt'e"3: Decision Logic for Disposition of General Thinning, Pilting, and Local Thinning

Figure 4: Decision Logic Cor Disposition of Service Induced Flaws

11

I4l 019

Page 19: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

O~/07/03 MON 16:27 FAX

WSRC-TR.2002.£lOO61. Rev. 2

1 RECORDS

1.1 Purpose

This section establlsbes requirements for the identification. administration and storage of documentsand data generated dwing the performance of surveillance. monitoring and inspection ofHLW Tanks.

7.2 Scope

The requirements herein arc applicable to data compiled in surveillance. monitoring. 8trueruraJ

integrity and in-service inspection of m..W tanks- Wriuen repol1S. inspection plans. photographs.slides, videotapes. and other such infoJJDation are subject to the requirements of this section.

7.3 Procedure

Records shall be protected from loss. damage, and unauthorized access. and must be retrievable andlegible. Each employee is responsible for assuring that the records(s) he creates are properlyauthenticated. and plans for adequate retention are implemented_ Records shall be maintained asspecified; when the retention period has expired.

7.4 Classification

The produet(s) of work on the following items shall be eonsidef"ed records and handled ill ac:eordancewith this section: :m..W Type lID and m primary tank.

1.5 Maiutained Records

1. An index ofrecords

2. Inspection plans

3. Repair records

4. Inspection proCedlU'e$

5. InspeetiOD resultslrejx)Jts sbaU be maintained by LWDP 8Dd distributed as appropriate.

6. Images of inspection activities (videotapes, disks. photographs. slides. digital images, etc).

7.6 Storage FaeUin' Requirements

Records shall be stOl"ed in a facility that complies with site storage facility requirements.

7.7 Report & Letter storageJrecords

Paper Tewnb mall be stored in accordance with site requirements for records.

7.8 Video Tape, Photographs, Slides, Magnetic Media

Non-paper media are considered &peCiaUy processed records and require the following additionalstorage and special handling requirements:

1. Store in such a manner so 8S to prevent damage from excessiv~ light. stacking. electromagneticfields (electronic media), temperature. and humidity.

2. Store records separately in individual sleeves. envelopes.·or folders. If tJiese sleeves. envelopes,or folders contain adhesives. the adhesive portion must not come into COntact with the media.

12

~020

Page 20: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

01107/03 MON 16:27 FAX

WSRC-TR-2002-Q006I, Rev. 2

3. Handle film media outside of irs protective enclosure utilizing white conan low-lint or lint-freegloves.

7.9 NnE Reports

NDE group generated records shall be maintained in the NDE Group files and/or at their option orsent to document control. Records maintained by the NOB Group shaJl meet the requirements of thissection.

8 REFERENCED STANDARDS AND SPECIF1CATIONS

B~S2S27 - UC406, "Guidelines for Development of Structural Integrity Programs for DOE High LevelWaste Storage Tanks, IanWlIY 1997.

HLWM·16004. ''Crane Operations in High Level Waste".

NDEP 2.1. "Qualification and Certification of NnE Penonnel".

NDEP 2.5, "Qualification of NnE Procedures (11)".

NDEP4.2. "Visual Examination Vf-l and VT-J (U)".

NDEP 7.9, "Automated Ultrasonic Thickness Examination (U)".

NnEP 7.11. "Automated Ultrasonic Examination ofFenitic Welded Components",

SlRID FA-16 "S/RID Functional Area 16 (Waste Management) Requirements:' WSRC-RP-94-1128-016.Revision 01-19.

WSRC.TR.199S-0076. Rev. 0, "SRS High Level Waste Tank and Piping Systems - Struclural IntegrityProgram and Topical Repon (U)." June 1995.

WSRC-TR-200!..()()4.69. "Selection of Representative High Level Waste Tzmks for Ultrasonic Examination,~

Scprember 2001.

WSRC-TR-2002-00063. "Acceptance Criteria for ur Examination of SRS m..W Tanks:' February 2002.

13

141021

Page 21: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

01107/03 MON 16:27 FAX ~022

WSRC-TR-2002-00061, Rev. 2

APPENDIX: TANK DESIGN AND CONSTRUCTION

This section summarizes pertinent information On the Type II. and m High Level Waste Tanks.

a) Type n Tanks (see Figure S)

Constructed -1955 through 1956

Capacity - 1,030.000 gallons

Material - ASTM A285. Grade B CaIbon Steel

Construction Code - ASMB-S2

Proje<:t Number - 8980 PWo

Four Tanks total. H-Area Tanks 13-16

Five-foot steel secondlll)' containment pan. Material is A285. Grade B carbon sleel

SUielTank

2'-6" At'lfIUlus

Typk;aI TankRiser & Plug

SO-$' Base 6Iab 2, 1" Grout ~18

as'-()' --------'--..lJ

2T-{1'

:-...'

FIgure S: Type II HIgh Level Waste Tank

b) Type m Tanks (Sm Figwe 6)

Constructed - 1967 through 1972

Capacity -1.300.000 gallons

Material- ASTM AS16. Grade 70 Carbon Steel

Construction Code .....ASME~S6

Project Numbers - 9S1232 and 9S0974

Six Tanks total. H-Area Tanks 29-32. F-Area Tanks 33-34

Single wall secondary liner. Material is ASTM A516 Grade 10 carbon steel

c) Type InA Tanks (See Figure 6)

Constructed - 1974 through 1981

14

Page 22: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

07/07/03 MON 16:28 FAX 141023

WSRC-TR-2002-<>0061, Rev. 2

Capacity - 1,300,000 gallons.

Material - ASTM A516. GT3de 70 Normaliud (Tanks 25-28,35-31) and A5TM A537. Class I (Tanks 38­51) Carbon Steel

Construction Code - ASME-56

Project Numbers - 9S1463, 951493, 951618, 9S1747. 9S1828

21 Tanks toral. H-Area Tanks 35-43 and 48-51. P-Area Tanks 25-28 and 44-47.

Single wall secoJ\da(y liner. Material is ASTM AS16 Grade 70 carbon steel

rANI( PlJRGF lNlET

-TYPICALT.A~ RISER"Pl\.k'i

\ -:-A1A INLET

1"""1,."......:::ij~_.l--1!'IIIIt----4-H~--.-....~""""'P.~---l..Hl·---1

2'-S"

3' -£. 'ASE SLAB

...»:~- --- -- .

kaTES. TvPE [1]" TAtf(S foIAVE DISTRIIIUT~O COOLING COILS /.TYPE [II TANKS HA~E INSE~TABLE BUNDLE COOLERS

I --TYPICAL ANNll..lJS RlstR

flI~ST AIR INlET PI~S

Figure 6: Type m H1gb Level Waste Tank

IS

Page 23: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

0Z/07/03 MON 16:28 FAX

WSRC-TR-2002-00061. Rev. 2

GLOSSAR.Y

Acceptance Standards - Limits to geometric condition indicaron to avoid a structural instability by maintainingspecified minimum margins against instability.

Additional Examination Standards - Limits on geometric condition indicators that bigger additionalexamination regions ill the examined tank and/or additional tanks within a tank 5~ce category

Certification - Written testiDlony of qualification.

Certifying Authority - The representative of the WSRC who performs the function of NDE personneletttification.

Data Collector - P~sonnel responsible for equipment set-up, opmlting caJne11l and collecting/decoding visualsurveillance or monitoring data.

Equipment Qualification - The act of testing an item, such as a camera system. to determine that the itemmeets (or cxcoeds) the stated requiremencs. Tber~ of this leSt is refetred to as equipment qUalification.

Evaluation - The process of dctennining the acceptability of a pan or item based on a set of acceptance criteria.

Geometric Condition Indicator - Planar Flaw: The characterized length and depth of a planar flaw from an lITexamination. If the distance. bet~n a pair ofco-linear flaws is less than or equal to 6 inches. the pair of flawsshall be consideTcd to be a single flaw of effective length equal to the distance between the farthest flaw ends.If two flaws are parallel but not co-linear, and the pelpCndicular distance between them is less than or equal to0.5 inches. then lhe above rule shall also apply to determine the effective flaw length. This procedure may

. result in the combination of several pairs of flaws into a single effective flllW.

Geometric Condition Indicator - Thickness; Measuremenl.5 of the thickness in a region of the tank wall fromUT examination.

In-service Inspection Review Conunittee (ISIRC) - A committee that will develop the tank specific in serviceinspection plan and review. val~date, report and disposition the inspection ~Us. .

In9pection - Evaluation of an item utilizing visual, ultrasonic or some other NDE method, to a procedure bypersonnel certified to perfonn the inspection.

Inspector - Personnel J"eSPOnsible for implementation of appropriate sections of in-service inspectiop program.Responsibilities include the development and issuance of inspection plans and inspection results.

Interpretation - The process of judging. the cause of aD indication and the lIatutC of a discontinuity.

Monitoring - Ongoing or periodic observation of an item to detect and/or track changes.

NOE - NondeslrUCtive examination: Inspection. testing, examination of an item to determine physicalsoundness or acceptability.

Qualification - Demonstrated skill. training. knowledge. and experience required for personnel to properlyperfonn the duties of a specific job.

Record - A completed document or other medium that provides objective evidence of an item. seTVice, orprocess.

Reporting Standard - Condition indicators that exceed a specified level. above thai associated with thesensitivity of the method of examinatioD, that indicate service-induced degradation of tbe tanlc and are ofinterest 10 the tank structUral integrity. A conclition indicator at or exceeding the Reporting Standard ili arelevant condition as determined in the impection of the tank.

16

~024

Page 24: ,l0l/-- - Defense Nuclear Facilities Safety Board · Aill./\,l0l/----~ ta:l M. Golan ChiefOperating Officer Office ofEnvironmental Management Enclosure cc: Jessie Hill Roberson, EM-l

. .'

0;;07/03 MON 16:29 FAX

WSRC-TR-2002-00061, Rev_ 2

Successive Examination Standards - Limits on geometric condition indicators that trigger- more frequentexounination.~ in me examined lank. The Successive Examination Standards are more limiting than theAcceptance Slandards to account for degradation rates, NnE condition indicator uncertainties, elC.

Surveillance - ObsavatiOD of an item or process to provide immediate information on the item or process.

Training - The structured classroom lI"aining. laborntory exercises, and I or assigned ~lf-s1udy materials as;lpproved by the assigned NDE Level ill, which encompasses the required knowledge nocessaI)' forqualification in a given NDE method.

17

~025