Total Project Snapshot Report 2013 Legislature TPS Report 59594v1 $3,300,000 Approved Agency: Commerce, Community and Economic Development Grants to Named Recipients (AS 37.05.316) Federal Tax ID: 92-0115279 Grant Recipient: Kodiak Regional Aquaculture Association Project Title: Project Type: Maintenance and Repairs Kodiak Regional Aquaculture Association - Kitoi Bay Hatchery Deferred Maintenance and Upgrades State Funding Requested: $6,588,000 House District: 35 / R One-Time Need Brief Project Description: Major deferred maintenance and necessary upgrades at a state-owned salmon hatchery contractually operated by Kodiak Regional Aquaculture Association. Funding Plan: Total Project Cost: $9,946,000 Funding Already Secured: ($3,358,000) FY2014 State Funding Request: ($6,588,000) Project Deficit: $0 Funding Details: FY 2011 $0.5 million FY 2012 $1.308 million FY 2013 $1.55 million Detailed Project Description and Justification: Project will finish Capital Improvements of State of Alaska-owned Kitoi Bay Hatchery on Afognak Island (Kodiak) Deferred Maintenance and Upgrade projects began in FY2011. ADF&G Inspection Report (March 2012) estimated Corrective Work needed to bring aging structures and systems up to current codes and standards. Estimated total cost has increased ($9.946 million; due to inflation, higher replacement costs). FY11-13 funding ($3.358 million) is significantly short; hence, this request for an additional $6.588 million for repairs/upgrades of Kitoi Bay Hatchery. Project funding will provide: - Planning, management, engineering and architectural plans, permitting, contracting, and site preparation. - Major infrastructure repairs/upgrades to the Kitoi Hatchery dam, bridge, dock, bulk fuel storage and distribution, power generation and distribution, and wastewater treatment systems. - Replace failing pipes and reconfigure hatchery water systems for efficiency and future needs. - Major repairs/upgrades of 4 hatchery buildings, 7 support/storage buildings, and 5 residential buildings to fix interior and exterior structural deficiencies, power and heating systems, energy efficiency, employee safety. - Replace pink salmon incubation building to expand and increase pink salmon production; - Replace 2 structurally deficient buildings to increase sockeye salmon production and increase space for maintenance/mechanics shop, storage, administrative offices and visitor services/educational center. - Replace aged, failing heating systems, transport equipment, incubators, raceways and net pens. For use by Co-chair Staff Only: Page 1 Contact Name: Astrid Rose Contact Number: 465-3271 2:00 PM 5/9/2013

Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

Total Project Snapshot Report2013 Legislature TPS Report 59594v1

$3,300,000

Approved

Agency: Commerce, Community and Economic DevelopmentGrants to Named Recipients (AS 37.05.316)

Federal Tax ID: 92-0115279Grant Recipient: Kodiak Regional Aquaculture Association

Project Title: Project Type: Maintenance and Repairs

Kodiak Regional Aquaculture Association - Kitoi BayHatchery Deferred Maintenance and Upgrades

State Funding Requested: $6,588,000 House District: 35 / ROne-Time Need

Brief Project Description:Major deferred maintenance and necessary upgrades at a state-owned salmon hatchery contractuallyoperated by Kodiak Regional Aquaculture Association.

Funding Plan: Total Project Cost: $9,946,000 Funding Already Secured: ($3,358,000)FY2014 State Funding Request: ($6,588,000)Project Deficit: $0 Funding Details:

FY 2011 $0.5 million

FY 2012 $1.308 million

FY 2013 $1.55 million

Detailed Project Description and Justification:Project will finish Capital Improvements of State of Alaska-owned Kitoi Bay Hatchery on Afognak Island (Kodiak)Deferred Maintenance and Upgrade projects began in FY2011. ADF&G Inspection Report (March 2012) estimatedCorrective Work needed to bring aging structures and systems up to current codes and standards. Estimated total cost hasincreased ($9.946 million; due to inflation, higher replacement costs). FY11-13 funding ($3.358 million) is significantly short;hence, this request for an additional $6.588 million for repairs/upgrades of Kitoi Bay Hatchery. Project funding will provide: - Planning, management, engineering and architectural plans, permitting, contracting, and site preparation. - Major infrastructure repairs/upgrades to the Kitoi Hatchery dam, bridge, dock, bulk fuel storage and distribution, powergeneration and distribution, and wastewater treatment systems. - Replace failing pipes and reconfigure hatchery water systems for efficiency and future needs. - Major repairs/upgrades of 4 hatchery buildings, 7 support/storage buildings, and 5 residential buildings to fix interior andexterior structural deficiencies, power and heating systems, energy efficiency, employee safety. - Replace pink salmon incubation building to expand and increase pink salmon production; - Replace 2 structurally deficient buildings to increase sockeye salmon production and increase space formaintenance/mechanics shop, storage, administrative offices and visitor services/educational center. - Replace aged, failing heating systems, transport equipment, incubators, raceways and net pens.

For use by Co-chair Staff Only:

Page 1

Contact Name: Astrid RoseContact Number: 465-3271

2:00 PM 5/9/2013

Page 2: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

Total Project Snapshot Report2013 Legislature TPS Report 59594v1

Project Timeline:Construction seasons 2013-2015

Entity Responsible for the Ongoing Operation and Maintenance of this Project:Kodiak Regional Aquaculture Association

Grant Recipient Contact Information:Name: Kevin BrennanTitle: Executive DirectorAddress: 104 Center Ave. Suite 205

Kodiak, Alaska 99615Phone Number: (907)486-6555Email: [email protected]

Has this project been through a public review process at the local level and is it a community priority? Yes X No

For use by Co-chair Staff Only:

Page 2

Contact Name: Astrid RoseContact Number: 465-3271

2:00 PM 5/9/2013

Page 3: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

KITOIHATCHERYINSPECTIONREPORTAlaskaDepartmentofFishandGame

March2012

Page 4: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

 

Page 5: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

2 KitoiBayHatcheryInspection2011

KITOIBAYHATCHERY

Operator:KodiakRegionalAquacultureAssociation(KRAA)

Location:KitoiBay,SouthwestAfognakIsland

PermittedCapacity

Pink 215millioneggs

Chum 28millioneggs

Coho 2.3millioneggs

Sockeye 600,000eggs

YearBuilt: 1964

LandOwnership: AfognakNative Corporation OuzinkieNative Corporation

PNPPermit#: 29

PermitIssueDate: 7/5/1988

ContractExpiration: 11/16/2031

ReleaseSites

Pink KitoiBay

Chum KitoiBay

Coho KitoiBay RuthLake JenniferLake CrescentLake

Sockeye LittleKitoiLake

KitoiisoneoftheoldesthatcheriesstilloperatinginAlaska.Theoriginalstructurewasbuiltin1954asasockeyesalmonresearchstation.Itwasdestroyedintheearthquakeandtidalwaveof1964,andrebuiltin1965.ItisnowoneofthelargestpinksalmonhatcheriesinAlaska.Itproducesreturnsofabout7millionpinksalmon,200,000chumsalmon,160,000cohosalmon,and50,000sockeyesalmoneachyear.

Page 6: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

3 KitoiBayHatcheryInspection2011

2011KITOIBAYHATCHERYFACILITYDESCRIPTION/MAINTENANCENEEDS

BigKitoiDamTheconcretedamis12”thickandapproximately40’wide.Thewaterlevelwas27”belowthetopofthedam.Themainportionofthedamdidnothaveanyobvioussignsofdeteriorationorinstability.Thespillwaywallshaveextensivecracksanditwasreportedthatthebackofthespillwayhadsubsidedrecently.Thedamwasinspectedin2008andfoundingoodcondition.ReportwassenttoandreviewedbyADNRDamSafetyEngineerCharlesCobb.

BigKitoiCreekBridgeThe8’widex30’longbridgeconsistsofthebottomofashippingstoragecontainer.Thereisanintermediatesupportcolumnwithanunknownfoundation.Thesteelframinghassignificantcorrosion,andinsomecaseshascompletelycorrodedthrough.ThebridgeisonlysupposedtobeusedbyATV’s,butduetothesignificantcorrosionthebridgeshouldbedemolishedandreplaced.

CivilThewatersupplysystemconsistsoftwo14‐inchsteelpipelinesfromBigKitoiLaketothehatchery.Theshallowwaterintakewithdrawswaterunderanupward‐actingslidegateattheoutletdam.Therearetwodeepintakes,bothusedsimultaneously.Mostareasreciveamixofshallowanddeepwater,exceptthepinkincubatorswhichreceiveallshallowwater.Theintakeshavenotbeeninspectedrecently,buttheoperatinginstructionsatthehatcheryindicatethatoneintakeis50feetdeepapproximately1500feetfromthedamandtheotheris75feetdeepapproximately2400feetfromthedam.

Tomeetcurrentproductiongoals,waterusevariesthroughouttheyearwithshallowwaterusedforsomeprogramsanddeepwaterforothers.Temperatureistheprimaryfactorindeterminingwhichpipelineisusedforwhichprogram.

FollowingisasummaryofYear2009waterusage:

Page 7: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

4 KitoiBayHatcheryInspection2011

Thewatersupplyhasintermittentperiodsofhighturbidityandthefiltrationisusedatthehatcherytoremoveparticulates.In‐linepressurefiltersareusedthroughouttheincubationroomsandadrumfilterisusedfortheoutsideraceways.

ThereisalsoIHNVinthelakewaterandwaterforboththesockeyeandchumprogramsisdisinfectedwithUVsystems.

Theoperatorshaveexperiencedperiodsoflowlevelgassupersaturationwhicharetreatedwithascreendeckatthechumincubationheadboxandwithdegassingcolumnsatthesockeyeandcohoraceways.Thereisalsoagasstabilizationtoweratthelakethroughwhichthedeepwaterintakesarepiped.Thecohosilosoffersufficientdepthtoallowfishtoavoidsupersaturatedconditions.

Page 8: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

5 KitoiBayHatcheryInspection2011

Water Supply Piping at Dam, Big Kitoi Lake Site  Piping, Degassing Tower 

SitePiping:Processwaterdistributionpipinghasbeenmodifiednumeroustimesoverthelifeofthehatchery.Muchoftheprimarysupplypipeisexposed,largediameterPVC.Theoperatorshaveexperiencedbreaksandotherdamagetothepipeasithasaged.Inafewlocations,PVChasbeenreplacedwithHDPEwhichismoredurableandratedforoperatingatlowertemperatures.

Becauseofthenumerousmodificationstothesystem,itisalsorelativelycomplexandnoteasilyunderstoodwithouttrainingorexperience.Replacementofagingpipecouldalsoincludesimplificationofthesystemwherefeasibleandclearidentificationofdifferenttypesofpipesandvalves.

IncubationSystem:FourspeciesofsalmonareproducedatKitoi.Thefacilityispermittedtoincubate215millionpinksalmon,28millionchumsalmon,600,000sockeyesalmonand2.3millioncohosalmon.Thecurrentcapacityislowerthanthis,mainlyinpinksalmonincubationofapproximately185million,buttheoperatorisdevelopingplanstoincreaseproductiontopermittedlevels.

ChumsalmonareincubatedmainlyinNOPADincubatorswithasmallportioninKitoiboxes.Pinksalmon,cohoandsockeyeareallincubatedinKitoiboxes.

MostPinkincubationisconfiguredinsinglepassKitoiboxincubators.Waterissuppliedbyapressurized,closedpipesystem.Thewaterdistributionandfiltrationsystemrequiresapproximately7psiofincomingpressureattheupperlevelofthepinkincubationrooms.Pinkincubationusesmainlyshallowwaterinthefallandwinterandthereislittleornoexcesspressureavailablewhentheshallowwatersystemisflowingatitscapacity.

Page 9: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

6 KitoiBayHatcheryInspection2011

Pink Incubation  Chum UV and Incubator Sockeye UV Coho Incubation

RearingSystem:Pinkandchumfryaremoveddirectlytosaltwaternetpensfromtheincubationrooms.Cohoandsockeyearerearedinracewaysandsiloson‐site.Sockeyearerearedin(14)aluminumracewaysandcohoarerearedin(4)aluminumracewaysand(4)FRPsilos.

HatcheryWastewater:IncubationdrainwaterisdischargedtotheintertidalsegmentofBigKitoiCreek.Theincubationwaterisgenerallyofrelativelyhighqualitywithlowsolidslevels.Incubatordrainwatercanalsobedischargedtothenetpencomplexwhenfryarebeingtransferredandwhenfreshwaterisrequiredatthenetpens.

CohoracewayandsilodrainwaterisalsodischargedtotheintertidalsegmentofBigKitoiCreek.Sockeyeracewaydrainwaterisdischargedtosaltwaterontheeastsideofthesitenearthefloatplaneandbargelandingramp.Racewaycleaningwaterismixedwiththecontinuousracewayeffluent.

TherewerenoNPDESorotherdischargepermitsavailableatthehatchery.ConsultationwithAlaskaDECisnecessarytodeterminecurrentandanticipatedrequirementsforhatcherydischarges.

DomesticWaterandWastewater:Domesticwateristakenfromthemainhatcherywatersupply,disinfectedwithaseparatesmallUVsystemandtwostageparticlefilteranddistributedtothehousing.

DomesticwastewateristreatedbyfiveindependentsystemsthatcombineintooneoutfalltoKitoiBay.Eachhousehasapackagetreatmentplantwithsettlingandaerationchambers.Thedomesticwastefromthehatcherybuildingandbunkhousecombineintooneoneseptictanknearthebargelanding.DuringtheAugust2011visit,someodorwasobservednearthehousingunitswhentheaeratormotorscycleon.Therewerenotobviousodorsorothersignsoffailureatthehatchery/bunkhousesystem,buttheoperatorwaspreparingforapumpingofthehatchery/bunkhouseseptictank.

ComplianceofthesesystemswithcurrentregulationsshouldbeverifiedwithAlaskaDEC.

ElectricalTheKitoiHatcheryispoweredfromasinglepowerplantwiththreedieselfiredenginedrivengenerators.Twogeneratorsareratedfor90KWloads,andthethirdisratedfora76KWmaximumload.Allproducetheirpowerat480Y/277volts,threephase.Atthetimeofthisplantassessment,theloadsrangedaround35KW,totalwithapproximately22KWfedtothehatchery.Generatorno.1hadbeenoperatedapproximately3,500hours,no.2hadbeenoperatedapproximately15,250hours,andno.3hadbeenoperatedapproximately6,100hoursatthetimeofthissurvey.Reportedly,generatorno.1experiencedproblemsforquitesometimeuntilresolutionwasdetermined,returningittoservice.Thisexplainstheinequityofusebetweenthetwo90KWunits.

Page 10: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

7 KitoiBayHatcheryInspection2011

Thegeneratorsetsareinfairconditionandwillneedreplacementoramajorrebuildinapproximatelyfiveyears.

Theenginesarewatercooledwithanintegratedsystemofheatexchangersandradiators.Thesysteminvolvestwoaircooledradiatorsmountedontheskidssupportinggeneratorsetnos.2&3,andtwotubeheatexchangersmountedtotheexteriorofthebuilding.Thethreecomponentsareintegratedintoasingleloopwiththeengines.Theheatexchangerextractsasmuchheataspossiblefromtheloopforthebunkhouseandoldhatcherybuildingwiththeexcessheatreleasedtotheairfromtheradiators.Theradiatorsexpeltheheatedairintoalargeboxontheexteriorofthepowerplant.Thecoolingsystemisinfairconditionwithsomeneedfornewpipinginsulationnearthepowerplant.Manyofthecomponentswillneedreplacementormajoroverhaulwithinthenextfiveyears.Theboxovertheradiatorexhaustairexitservesapurposeofreducingsnowaccumulationonthefueltanksinthewinter,howeveritalsoreducestheradiatorcoolingcapacityinthesummer.Thisenclosureisinpoorconditionandanewschemeshouldbedevelopedwithconsiderationforsimilarresults,butallowingforbettercoolinginthesummer.

Thefuelfortheenginesisfedfromanabovegroundtankbehindthepowerplantwithsteelpipemanifoldinsidethebuilding.

Thegeneratorsfeeddirectlyintoaswitchboardinsidethepowerplant.Theswitchboardcontainsallcircuitprotectionforthegenerators,generatorcontrols,parallelingcontrols,andtwomaindistributioncircuitbreakers.Onedistributioncircuitbreaker(200ampere)feedsthehatchery,andtheother(100ampere)feedsthebunkhouseandhousing.Thecircuitbreakersforthegeneratorsaremotorcontrolled.

Thecontrolsarecomprisedofprogrammablelogiccontrollers(PLC’s)fortheengine‐generatoroperations,statusconditions,andalarms.Additionally,theymonitortheelectricalconditionsviasolidstateprotectiverelaysandsecurethesystemappropriatelyforfaultconditions.Theyalsofacilitateparallelingoperationsallowingswitchingofthegeneratorsandtwogeneratorstooperatetogethertopowerthehatchery.ThePLCandaccessoriesisoutdatedandinpoorcondition.SomeofitsfunctionsarenolongerusedduetonewergeneratorsandmotorsnotbeingcompatiblewiththeoldPLCsystem.Althoughthiscontrolsystemwaswelldevisedwhenitwasfabricated,itiscomplexanddifficulttomaintaininaremotelocation.

Alongwithreplacingthegeneratorswithinfiveyears,theswitchboardshouldbereplacedwithoneusingmoderncomponents.However,attentionmustbemadetoselectasimplercontrolsystemwithfewercomponents.Suchsystemsareavailabletoday.

Thepowerplantearthgroundsystemisburiedandcannotbeevaluatedfully.Withanymajorwork,thesystemshouldbetestedandupgradedaccordingly.

Consideringtheneedtomaintainoperationofthepowerplantallofthetime,replacementoftheswitchgearrequiresaspecialstrategytoensurecontinuedoperationofthesystem.Thismightinvolveconstructionofanewpowerplant,anddemolitionoftheoldoneuponcommissioningofthenew.Thedesignofanewpowerplantshouldincludeacarefulevaluationoftheloadstoallowthegeneratorstobesizedforoptimaloperationandeconomicalfuelconsumption.Theefforttoconfigureanewpowerplantmightalsoincludeanevaluationofincorporatingahydro‐turbinegenerator.

Page 11: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

8 KitoiBayHatcheryInspection2011

           

Power Plant   Generator No. 2  

 Fuel Tanks 

 Exhaust Air Enclosure  

 Switchboard and Generator Controls 

 Waste Heat Recovery 

Page 12: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

9 KitoiBayHatcheryInspection2011

PowerDistribution:Twoprimaryfeedersissuefromthepowerplantswitchgearasnotedabove.The100amperefeederforthehousingandbunkhouseiscircuitedtoamaindistributionpanellocatedinthepowerplant.Thispanelalsoservespowertotheradiatorfans,theegg‐takeconveyorhydraulicpump,andthepowerplantbranchcircuitpanel.Thehousingisfedseparatelyfromthefeederforthebunkhouse.Boththehousingandthebunkhousecircuitsarefedundergroundwithsingleconductorsinasystemofconduitsandvaults.Thecircuitsinsidethepowerplantareallsingleconductorsinconduit.Thecircuitsexitingfromthemaindistributionpanelappeartobeinfairtogoodconditionwithtenyears,ormore,ofserviceliferemaining(theexceptionmaybetheundergroundconduitwhichisdifficulttodiscern).

Thebranchcircuitpanelinthepowerplantprimarilysupportscircuitstothepowerplantancillaryequipment,butitalsosupportsfeederstotheeggtakebuildingandstorageshed.Thispanelisfedfromthemaindistributionpanelviaa15KVAstepdowntransformerwithanoperatingvoltageof208Y/120,threephase.Thetransformerisinmoderatelygoodconditionandthepanelisinfaircondition.Thecircuitbreakersshouldbereplacedinthepanelinthenextfiveyears.

Thefeederandpanelintheeggtakebuildingarenewandingoodcondition.

Thefeedertothebunkhouseentersadisconnectontheexteriorofthebuilding,andthenastepdowntransformerinthecrawlspace.Thedisconnectisinpoorconditionandshouldbereplacedwiththebunkhouseremodel.Thetransformerisingoodcondition,althoughitisclosetothefloorjoistsandshouldberepositionedtoallowbetterclearance.Thetransformerfeedsasinglebranchcircuitpanelinsidethebunkhouse.Thisbranchcircuitpanelisinpoorconditionandwillbereplacedwiththebunkhouserenovation.

Thefeedertothehousingunitsistappedinundergroundvaultswithsubfeedersroutedtoeachdwelling.Atthedwellings,thecircuitisroutedthroughadisconnectandstepdowntransformerstoyield120‐240voltpower.Meterswithsecondarymaincircuitbreakersmonitorandprotectthefeederintothepanelinsidethedwelling.Thedisconnects,transformers,andmeter/mainsontheoriginalthreedwellingsareinfairconditionandwillrequirereplacementinthenextfivetotenyears.Theequipmentattheduplexisnew.

Thesecondfeederfromtheswitchgearisdirectedtothehatcheryassingleconductorsinburiedconduit.Thisfeedersupportsamaindistributionpanelintheelectricalroom.Themaindistributionpanelfeedsthreeultraviolet(UV)units,aplasmacutterreceptacle,andabranchcircuitpanelviaa45KVAstepdowntransformer.Thispanelisinfairconditionwithsomenewercircuitbreakers,alongwithsomeoldones.Theoldercircuitbreakersshouldbereplacedwithinthenextfiveyears.

Thestepdowntransformeriscircuitedtoa208Y/120voltmaindistributionpanel,alsoinsidetheelectricalroominthehatchery.Thispanelsupportsfeederstobranchcircuitpanelsintheoriginalandnewhatchery,aswellasasmallmaindistributionpanelintheHangerDockbuilding.Thispanelwasoriginallyconfiguredfora120‐240delta,threephaseconfiguration.Anunconventionalneutralbushasbeenaddedtoconvertittosupportawyeconfiguredsystem.Althoughthepanelisingoodcondition,itdoesnotcomplywiththeNationalElectricalCode(NEC).Thispanelshouldbereplacedwithintwoyears.Note:thefeedertothenewhatcherybranchcircuitpanelisundersizedfortheprovidedcircuitprotectionandshouldbecorrected.

Groundbuses,earthgroundsystems,andbondingtotheneutralbusisprovidedinboththe480voltand208voltpanels.Thegroundsystemsdonotappeartobeinterconnected.Withanysystemupgradeinthisbuilding,thegroundsystemneedstobeevaluatedmoreandreconstructedasneededtoyieldonegroundsystemforthewholebuilding.

Page 13: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

10 KitoiBayHatcheryInspection2011

BranchcircuitpanelsAandBarelocatedintheelectricalroomandsupportcircuitsinsidetheoriginalhatcherybuilding.PanelAalsosubfeedsPanelCintheshop.PanelAisoldandinpoorconditionwithapoorlyfastenedcover.Itshouldbereplacedinthenexttwoyears.PanelBisingoodcondition.PanelCisinfairconditionandshouldbereplacedinfiveyears,orless.ThecircuitbreakersinPanelsA&Bshouldbereplacedwithinfiveyears.Thefeederstothesepanelsareallingoodcondition.

Thefeedertothenewhatcherybuildingpanelsisundersizedasnotedabove.Itterminatesinadisconnectontheexteriorofthebuildingwithanoldpanelinsidethebuilding.Thedisconnectisbadlycorrodedandneedstobereplacedalongwiththepanel.Thefeederisalsotappedatthecorrodeddisconnectwiththetapgoingtoanothersmallerdisconnectandpanelfortheadditiontothenewhatchery.Thedisconnectisundersizedforthecircuitandneedstobereplaced.Thefusinginthedisconnectneedstoproperlyprotectthesupportedpanel.Thepanelisingoodcondition.

ThemaindistributionpanelintheHangerDockbuildingsupportsfeederstobranchcircuitpanelsintheHanger,intheNetShed,andintheBarn.Thispanelandfeedersareingoodcondition.Thebranchcircuitpanel(loadcenter)intheBarnisnewandingoodcondition.Thepanelinthenetshedisausedpanelinfaircondition.

 Power Plant Panels  

 Hatchery 480 Volt MDP and Panel B 

 280 Volt MDP and Panel A 

 Bunkhouse Main Disconnect (480 volt)  

Page 14: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

11 KitoiBayHatcheryInspection2011

ResidenceMainDisconnect,TransformerandMeter/Disconnect

DwellingFeederVault

Hanger208VoltMDPandPanel

PowerAppliancesandLightingTheappliancesatKitoiHatcheryincludeanarrayofsmallpumps,heaters,portabletools,compressors,ultravioletdisinfectionunits,refrigeration,andinstruments.Manyoftheappliancesarepermanentlyconnectedtobranchcircuits,whilemanyareconnectedwithcommonandspecialreceptacles.

Thelightingforthehatcheryvariesfromareatoarea.Muchoftheilluminationisaccomplishedwithfluorescentlamps,yetwithextensiveuseofincandescentandmercuryvapor,andsomehighpressuresodium.Mostofthelightingiscontrolledwithmanuallyoperatedswitcheswithsomeoperatedautomaticallyusingphotocells.

FuelStorage:Fueloilisusedtoheatthehatcherybuilding,bunkhouseandresidences,andtocontinuouslyoperatethepowersupplygenerators.Fuelissuppliedtothesiteandstoredin(1)20,000‐galself‐containeddikedtanklocatedbetweenthedockandthehatcherybuilding.Fueloilispresentlysuppliedbybargein55‐galdrumsandpumpedtothemainstoragetankwithadrumpump.Usingamostlyanabove‐groundrigidpipingsystem,fuelismanuallypumpedto(2)2,500‐galself‐containeddikedtanksatthegeneratorbuilding,(4)300‐galtanksateachoffourresidences,(1)300‐galtankatthebunkhouseand(1)300‐galtankadjacenttohatcherymechanicalroom.The300‐galtanksaremountedonprecastconcreteleakandspillcontainmentstructures.Duringpumpingoperations,thehatcherycrewstationspersonnelateachtankbeingfilledandthepumpoperatorandthetankmonitorscommunicatebyradio.

Page 15: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

12 KitoiBayHatcheryInspection2011

Thepipingsystemisvisibleinmostlocations.Whereitgoesundergroundintwolocationstocrossvehicleaccessroutes,thehatcheryoperatorhasinstalledPVCcontainmentpipesleeves.Anundergroundsegmentalsoexistsalongtheroadtothegeneratorbuilding,withnocontainmentsleevesonthepiping.Noleakdetectionsystemwasobserved.Inmostlocationsthepipingisonthegroundsurfaceandnotprotectedfromphysicaldamage.Therewasnoevidenceofrecentspillsorleaks,althoughsomepipejointsdidappeartobemoistwithaslightodoroffueloil.

Thesaltwatersystemusedfordiseasecontrolduringincubationissuppliedbyadiesel‐drivenpumpwithamanually‐filleddaytank.Thedaytankappearstobeacustom‐made,aluminum,single‐walltankwithacapacityofapproximately100gallons.Ahoseanddispenserisusedtopumpfromthemaintankpumproomtothedaytank,adistanceofabout100feet.Thereisnooverfillorspillcontainmentatthedaytankandtheenginefuellinesremovefuelfromthebottomofthetankratherthantop.Anybreaksinthefuellinewouldresultindrainingtheentiretank.Theredoesnotappeartobeaventonthetankwhichcouldaffectengineoperation.

Gasolineisstoredina500‐galdoublewalltankanddispensedbyelectricpumptosmallcontainers.Thetankisfilledbypumpingfrom55‐galdrumsbroughttothesitebybarge.Thereisaspillcontainmentsumpatthetank.

Mostoccupiedbuildingsatthesiteareheatedbyoil‐firedboilers,withtheexceptionoftheincubationbuildingwhichhasonlyelectricwallfansforventilation,andthebarnwhichusesawasteoilfurnace‐forcedair.

DomesticWaterandWastewater:DomesticwateristakenfromabranchoffthehatcherywatersupplyandtreatedwithUV.Domesticsewagefromthehatcherybuildingandfromthebunkhouseispipedtoa3,000gallonseptictankwithapretreatmentcell.Eachresidencehasitsownseptictankwithapretreatmentcell.SeptictankeffluentispipedundergroundtoadischargepointinKitoiBayatadepthofapproximately40feet.Conditionisratedasfair,thoughcodecompliancereviewandupgradesarerecommended.

BUILDINGS:ElectricalPowerGenerationBuilding:Thegeneratorbuildingexteriorenvelopeisinpoorcondition.Theoriginalmetalroofingfailedandexposedfastenermetalroofwasinstalledoveritasastopgapmeasure.Itwasnotdesignatedforwinduplift,lacksflashing,insulationorventilationmeasures.Windowsanddoorsareallbadlydeteriorated.Combustionairintakeandexhaustareinpoorshape,heavilycorrodedandlackingweatherintegrity.Thewallsidingisadualskinmetalsidingwithapproximately1.5”offiberglassinsulationbetweenthepaintedmetalpanels.Itiscorrodedthroughinplaces,lacksweatherintegrityandhasaverypoorprognosis.Thepanelsdostillappeartohavesufficientstructuralintegritytoserveasabackingforreplacementpanels.

Page 16: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

13 KitoiBayHatcheryInspection2011

Generator Building  Roof detail

 Typical window 

  Plywood Exhaust Plenum

Aplywoodplenumwasconstructedthatdirectsradiatorexhaustheattoadjacentfueloiltanks.Thishelpsraisefueltemperaturesothatitdoesnotgelinthewinter.Thesystemshouldbeinvestigatedtoensurethatitdoesnotadverselyaffecttheflowofexhaustairfromthegenerators.Roofingandsidingcouldbereplacedalongwithdoors,windows,louvers,andotherexteriorenvelopeelementsifitisdecidedtoretaintheprimaryequipmentinsidethebuilding(generators,switchgears,etc.)However,ifitisdeterminedtoreplacetheprimarygenerationequipmenttheexistingbuildingcouldbereplacedwithanewgenerationbuildinginstalledonthesitewhiletheexistingplantremainsinoperation.Demolitionoftheexistingbuildingcouldtakeplaceafterthenewbuildingisbroughtonline.Itislikelysomesiteclearing,includingexcavationofadjacentuplandsslopewouldberequiredtoaccomplishalevelsiteonwhichtobuildanewgenerationbuilding.

Page 17: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

14 KitoiBayHatcheryInspection2011

Structural:Thestructuralframingwascoveredbyfireproofing,siding,androofingandcouldnotbevisuallyinspected.Basedontheageofthestructure,itislikelypastitsdesignlifeandshouldbedemolishedandreplaced.

Electrical:Thepowerplantiscircuitedprimarilywithsingleconductorsinelectricalmetallictubing(EMT)withsomeuseofflexibleconduitattransitionsfromstationarysurfacestoequipment.Thecircuitsareinfairconditionwithmorethanfiveyearsofserviceliferemaining.Withfutureremodelstothespace,inactivecircuitsshouldberemoved.Therearefewreceptacles,andallareinfaircondition.Thelightingisaccomplishedwithindustrialtypefluorescentlampedstripfixturesmountedtotheceiling.Manuallyoperatedwallswitchescontroltheiroperation.Theexteriorisilluminatedwithanold“barnyard”typefixturemountedtoapipeadjacenttothebuilding.Allofthelightingisinpoorconditionandshouldbereplacedwiththenextrenovationorreplacementofthepowerplant.

BunkhouseThedeficienciesofthebunkhousehavebeenadequatelycoveredinpriorreports,includingbidreadyconstructiondocumentsandbidsforconstructionthatestablishavalueforthework.Theworkmayproceedassoonasfundingpermits.Thestructurewasnotinspectedasarenovationandadditiontothestructurehavealreadybeendesigned.

Bunkhouse 

Electrical:ThebunkhouseiscircuitedwithTypeNMorUSEcables,whichareingoodcondition.Receptaclesareadequatelyscatteredthroughthebuildinginmostspaceswithsomeminorexceptions.Theyareinfaircondition,butshouldbereplacedsoon.Thelightingincludesbothfluorescentandincandescentfixtures,infaircondition.Thecircuitsshouldberetainedandsupplementedwiththeprojectcurrentlyplanned.Twoorthreecircuitsmighthavetobereplacedduetothegroundwirebeingcut,iftheycannotbeextendedtothenewpanel.

MainHatcheryBuilding:General:ThebuildingisanAmcopre‐engineeredmetalbuilding,60’x93’.Roofingisa24gagemetalroofingwithexposedfastenersinstalleddirectlytoZeeshapedpurlins.Roofinsulationconsistsofsprayappliedpolyurethaneapproximately1.5inchesthick,with½”cementitioussprayfireproofing,appliedtotheundersideofmetalroofing,purlins,andotherroofmountedelements.EstimatedtobeR‐8,thesprayinsulationappearstobeeffectiveinpreventingroofcondensationasiteffectivelypreventsthroughconductanceatsteelsurfaces.Wallsare24gagesteelsandwichpanels,smoothfacedontheinteriorsideandcorrugatedontheoutsidesothatthepanelthickness

Page 18: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

15 KitoiBayHatcheryInspection2011

variesfrom2.5”to4”.VoidspaceinthepanelsisassumedtobefilledwithfiberglassbattinsulationestimatedtobeR‐8.Thewallpanelsareexposedontheinteriorexceptwherecoveredbysubsequentconstruction.

Main Hatchery Building 

ExteriorElements:Grade:Asteepslopealignsalongthenorthsideofthebuilding.Itdrainsintotheareabetweenthetoeofslopeandthelongaxisofthebuilding.Overthelonglifeofthebuildingorganicmaterialhasbuiltupinthearea,aswellasdebriswasheddownfromabove.Itshouldbeexcavatedbackanddrainagestructureinstalledatthebaseoftheslopetopermanentlystabilizegradesanddrainageinthearea.

Slope behind hatchery building 

Roof:Metalroofingwaspaintedapproximately2yearsagoinefforttostretchtheusefullifeoftheassembly.Staffstatesthattheroofwasheavilycorrodedpriortothepaintbeingapplied.Corrosionisevidentunderthepaint,especiallyatpaneledges.Thepaintwasastopgapmeasure‐theroofispastitsusefullifeandshouldbereplaced.Theexistingroofingcanremaininplaceandanewmetalroofinstalledontopofit.Insulationcanbeplacedinthevoidspacebetweenexistingandnewroofpanelsasaninexpensivewaytoraisethethermalperformanceoftheroof.Sprayfireproofinghasbecomedislodgedfromtheurethanefoamadhesiveinanumberofplaces.Trowelonfireproofingpatchmaterialshouldbeappliedatallareaswheretheurethaneisexposed.

Page 19: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

16 KitoiBayHatcheryInspection2011

Roof panel corrosion  Exposed insulation

Siding:Metalsidingispastitsusefullife.Baseflashingshaveessentiallyrustedaway.Thepaintfinishisheavilychalkedanderoded.Flashingatwindowsanddoorsaredeteriorated.Newsidingisrecommended,eitherasanoverlayorasacompleteremove/replaceprocess.Sidingreplacementwillbecomplicatedbythelargeamountofelectricalconduitandprocesswaterpipingandequipmentattachedovertheyearstothesidesofthebuilding.Sidingreplacementshouldbecoordinatedwiththeplannedreconfigurationofprocesspiping.

Corroded base flashing.  Deteriorated window frame. 

 Deteriorated siding. 

Page 20: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

17 KitoiBayHatcheryInspection2011

PersonnelDoors:Alldoorsexhibitheavywear,manydonotfullyclose.AllexteriordoorsshouldbereplacedwithinsulatedG90galvanizeddoors,framesandhardware.

Existing deteriorated door  Typical Window

Overheaddoors:Therearetwooverheaddoorsnecessarytoaccesstheprocessandbulkyincubationequipment.Bothdoorsarenecessaryelementsofthefacility,arepasttheirusefullifeandshouldbereplaced.

Windows:Ofthe17originalwindowsonthebuilding,twohavebeenreplacedwithinsulatedvinylunits.Theremainderaresinglepanesteelframewindows.Allexhibitcorrosion,leakinheavyweatherandarepassedtheirusefullife.Theyshouldbereplacedalongwiththemetalwindowflashing.

Canopy:acanopywasinstalledatsomepointinthepastonthenorthsideofthebuildingapproximatelyinalignmentwiththemetalroofofthehatchery.Thecanopywasasitedesignedandbuiltresponsetoaseriousoperationalchallengeandprotectswalkways,doorways,processpiping,fueltank,fueldistributionfromslidingsnowandweather.Itisalightwoodstructureofindeterminatestructuralcapabilityandhasnofoundations.Thecanopyisimportanttothemaintenanceandoperationstakingplaceinthebuilding,butappearstobeatemporarysolutionandisconsideredaliability.Itshouldbereplacedwithagalvanizedsteelcanopystructureshelteringapproximatelythesamegeneralarea.

Page 21: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

18 KitoiBayHatcheryInspection2011

Canopy at Formalin Room 

PeroxideStorageroom:Thestorageroomadjacenttothecanopyappearstobeatemporarystructureframedofwoodandbuiltdirectlyongradewithnofloorstructure.Itappearstobeatemporarystructureandshouldbereplacedinconjunctionwiththecanopyreplacement.Replacementofthestorageroomwillneedtobeaccomplishedinaccordancewithcoderequirementsforhandlingthematerialsused.

BuildingInteriorGeneralComments:Thebuildingisbrokenintotwogeneralareas.Theeasternhalfofthebuildingconsistsofconditionedspacesnormallyoccupiedbystaff.Thewesternhalfofthebuildinghousestheprimaryhatcheryracewaysandrelatedequipment.

Floors:Concretefloorswereoncesealedandpaintedovertimethefinishcoatingshavefailed,leavingfissuresandbubbledsurfacesthattrapdebrisandarevirtuallyimpossibletoclean.Fibrousexpansionjointmaterialoriginallyplacedatcertainslabjointshaslargelydisappearedleavinggapsintheflooropentothesubgradebelow.Duringcleaningactivitiesdebrisladenwaterseepsdownintothese½”gaps.Itissuggestedthattheconcretefloorsurfacesbescrabbledtoremoveexistingcoatingsandlooseconcrete,followedbypowerwashingusinghightemperaturepressurewashingequipment.Onceanacceptablesurfaceisachieved,slabtoppingcouldbeapplied,followedbysealerand/orepoxytypecoating.Aspartofthiswork,permanentbootrinse/sterilizingbasinscanbeformedatdoorwaystoeliminatethelooseplasticbasinspresentlyused.

Failed floor sealer  Typical water damage at wall and door 

Page 22: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

19 KitoiBayHatcheryInspection2011

Walls:Wallsbetweenwetareas(incubationrooms)andoccupiedareas(lab,toiletroomsetc)aresaturatedfromyearsofcondensationandcleanupoperations.Rotispresentinthewoodframing,andthelackofcurbshasallowedwatertorunintoadjacentareas.Thedrywallintheseareasshouldbereplacedwithnewmoistureresistantassemblies,suchasmoldresistantdrywallcoveredwithFRP,possiblyfactorylaminated,ongalvanizedmetalstuds.Curbsshouldbeprovidedunderallwallsatwetareas.Allsurfaces,(existingtoremainandnew),shouldbepainted,exceptwhereprefinished.

Ceilings:ceilingsaregypsumdrywallinstalledtotheundersideofthefloorframingatmezzanineabove.Atwetareasthedrywallceilingsareingoodconditionandwillneedtoberemovedandreinstalledonlyasrequiredtoaccomplishotherwork.Atwetareasgypsumdrywallshouldbereplacedwithamoldresistantdrywall.

InteriorDoors:Interiordoorsandframesarepasttheirusefullifeandshouldbereplacedinallareas.

IndividualAreas:Officeareas:CaseworkfurnitureandotherFFEitemsinthisareaarepasttheirusefullifeandshouldbereplaced.MostofthecircuitsinthisareaofthehatcheryarecomposedofsingleconductorsinEMT.ThereissomeNMcableformorerecentlyinstalledequipment.Thecontrolcircuitsutilizeopencablesthatareinpoorconditionandshouldbereplaced.Althoughconveniencereceptaclesarescatteredthroughmostoftherooms,manykeylocationsarewithoutsuchasevidencedbythenumberofextensioncordsroutedaroundroomsandplugstrips.Thesystemofreceptaclesandcorrespondingcircuitsisinpoorcondition.ThelightingincludeslinearfixtureswithT12lampsandwraparoundacryliclensesmountedtotheceilingsurface(someofthelensesaremissingorbroken.Somesmallareasareilluminatedwithopenincandescentlamps.Alllightingiscontrolledwithmanuallyoperatedwallswitches.Thelightingisinpoorcondition.

Office   Breakroom

BreakRoom:Breakroomispresentlyusedforavarietyofpurposes‐asaworkroom,smallenginestorageandelectronicrepair.Theconflictingusescreateconditionsdifficulttomanage.Itissuggestedthatthespacesbere‐programmedtosubdividethespacesandcreateamoredefinedbreakroom,possiblywithitsownentranceanddivestingarea.Onewaytoaccomplishthiswouldbetoconverttheadjacent,sockeyeincubationroomintoaworkroom.Breakroomfurnishingsarepasttheirusefullifeareunsanitaryandshouldbereplaced.Itissuggestedthatplumbingbeprovidedinthebreakroomforahandwashsink.

Page 23: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

20 KitoiBayHatcheryInspection2011

Laboratory:Thelaboratoryareaincludesfishfoodstorage,stainlesssteeldissectiontable,sinksshelves,countersandothercasework.Allisunsanitary,heavilywornandwellpastusefullife.Allfurnishingsinthisareashouldbereplaced.Itissuggestedthatsomesortofpalletizedstoragebeprovidedforthelarge,heavyfishfoodbagstoreducetheamountofhandlingrequired.Itisalsosuggestedthatwhenthelaboratorycaseworkisreplaced,thatconsiderationbegiventoincludingmoremodernequipmenttoreflectthecurrentstateofhatcherytechnologyandtomorereadilyprovideforfuturedevelopments.Somereceptaclesarescatteredthroughthesespaces,butthepresenceofextensioncordsindicatesaneedformore.ThecircuitinginthesespacesalsousessingleconductorsinEMT.Mostofitisinfairtogoodcondition.However,itshouldbeupgradedtosupportmorereceptacles.Thecontrolcircuitsutilizeopencablesthatareinpoorconditionandshouldbereplaced.Thelightinginthesespacesincludeshighpressuresodium(HPS),incandescent,andsomelinearindustrialstripfluorescent.TheHPSandfluorescentluminairesaremanuallycontrolledwithwallswitches.Theincandescentlightingintheincubationareasiscontrolledwithdimmers.Thelightingisinfairconditionwithlessthanfiveyearsofserviceliferemaining.TheapplicationofLEDlightingwithdimmingcontrolshouldbeconsideredwiththenextproject.Itwillprovidebettercontrolresponse,lowermaintenancecosts,andlowerenergyconsumption.

Lab Counter  Lab Counter

Toilet:Onlyonetoiletisprovidedinthehatcherybuildingandappearstobetheonlytoiletprovidedatthefacilityoutsideoftheresidences.Thetoiletiscollocatedwiththelaundryareaandjanitorspaceandseparatedonlybyametaltoiletpartition.Toiletarea,sinceitisusedbybothgenders,shouldbeaffordedmoreprivacy.Itshouldalsobelocatedincloserproximitytoanoutsidedoortomakeitmoreaccessibletoworkerswithoutforcingindividualstowalkthroughthemainhatcheryareainordertousethetoilet.Allsurfacesarepasttheirusefullifeandshouldbereplacedinthisarea,withseparateareasprovidedforlaundryandjanitorialfunctions.

Page 24: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

21 KitoiBayHatcheryInspection2011

Toilet Room  Non‐compliant Stair

Workshop:theworkshopisusedforavarietyofneedsthatariseinaremote,selfsufficientfacility.Itisahighbayspace.Thewallsharedwithadjacentspacesrequiresafireseparation.Penetrationsofthewallsshouldberepairedwithfiresafingmaterials.Again,mostofthecircuitsinthisareautilizesingleconductorsinEMT.Thecircuitsareinfaircondition,butshouldbereplacedwhenthespacesareremodeled.Thecontrolcircuitsutilizeopencablesthatareinpoorconditionandshouldbereplaced.Receptaclesarescatteredthroughoutthespaceswithseeminglygooddistributiontomeetthefacilitydemands.Thereceptaclesthemselvesareinfaircondition,butwillrequirereplacementwithintwoyears,orwhenthespacesareremodeled.ThelightingconsistsprimarilyoflinearindustrialstripswithT12fluorescentlampsandreflectors.Manyoftheluminairesarenotoperating,orareoperatingpoorly.Theyshouldbereplacedinthenearfuturetonotonlybetterilluminatethespaces,buttodosuchinanenergyefficientmanner

HatcheryArea:Thehatcheryareaisawetareatakenupwiththevarioustypesoffishincubatortanksandrelatedprocesswatersystems.Surfacesinthisareaarewetmostofthetimeandsubjecttocorrosion.Existingsteelshouldbepreppedandre‐painted,includingtheprimarysteelframes.Theexisting,exteriorlowerwallsshouldbedisassembledandsaturatedinsulationandwetsubstratematerialsremoved.Floorsandwallsshouldberepairedasdescribedelsewhere.Asdiscussedpreviously,considerationshouldbemadetoreconfigurecirculationanddoorlocationswithinthebuildingwhileotherworkisbeingaccomplishedtoreducetheamountofthroughtrafficthatoccursinthisbuildingtoreducethepotentialforcrosscontamination.

StorageMezzanine:Theceilingabovetheoccupiedareas(exceptthehighbayworkroom)isactuallyastructuralfloorforthestoragemezzanine.Onestairprovidesaccesstothemezzanine,locatedinthemainhatcheryarea.Thestairhas8.5”treadsand9”risers.Itshouldbereplacedwithagalvanizedstaircompliantwithcurrentcodes.

Structural:Thestructureisapre‐engineeredsteelbuilding.Thesteelcolumns,roofbeamsandroofpurlinsallappeartobeingoodcondition.

Thelateralloadresistingsystemconsistsofroofrodbracesintwobays,fourrigidframesinthetransversedirection,andonebayofrodcrossbracingineachlongitudinalwall.Thestructureappearstobetoolargeforasinglebayofrodcrossbraces,especiallywheretherearetwobaysof

Page 25: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

22 KitoiBayHatcheryInspection2011

roofcrossbracing.AlateralloadanalysisshouldbeperformedonthestructurebyaprofessionalengineerlicensedintheStateofAlaska.Theoriginalstructuraldrawings,ifavailable,wouldbeusefulforanalysis.

Thereisastoragemezzanineinapproximatelyhalfthestructure.Theframingiscoveredwithsheetrock,butappearstobetimber‐framed.Theas‐builtsofthestructurespecifyceilingjoists,2x10spaceda16”oncenterspanningupto20’‐0”,whichareinadequateforastorageliveload.Additionaljoistsorinteriorpostsshouldbeaddedorthespaceshouldnotbeusedforstorage.

Thereisasmallstoragemezzanineintheshopareawithapostedsignspecifyingamaximumloadof1000pounds.Themaximumpostedloadshouldbeverifiedwithaprofessionalengineer,ifithasnotbeenalready.

Thereisatimberframedcoveredshelteronthesideofthestructurethatisofquestionableconstruction.Theredoesnotappeartobealateralloadrestingsystem.Therealsoarenotanyconnectionsbetweenthetimberpostsandtheconcretefootings,andtwoofthepostshaveverylittlebearingonthefootings.Thesheltershouldeitherbedemolishedorupgraded.

Cooler:Roofinghasreachedendofusefullifeandisrustingthrough.Therefrigeratordoorwaynolongersecure,allowsheattoentercoolerarea.Thelatchisnolongerfunctional,andcouldleadtoapersonbeingtrappedinside.Therefrigerationequipmentdoesmaintainfreezingconditions,butcannotbeconsideredreliableoverthedurationofthisreport.Thecoolerisusedforlongtermstorageoffishfood,andwhileshortshutdownsarenotcritical,theexistinginstallationisnotservingitsoriginalpurpose.Itislocateddirectlyagainsttheslope,withdebris,vegetationandsedimentbuildingupagainstthenorthsideofthecooler.Itissuggestedthatthecoolerbereplaced.Onepossibleconfigurationwouldbetolocateanewcoolerunderthereplacementcanopysothatitisnolongerexposedtotheelements.

Non functional refrigerator door 

IncubationBuilding:Single‐story40’x42’steelstructurewithsteelroofingandsidingbuiltin1989.Thefoundationisareinforcedconcreteslabwiththickenedperimeterfootingandfoundationpadsundercolumns.InteriorspacesarefinishedwithFRPwallpanels.Buildingisinverypoorconditionandshouldbereplaced.

Page 26: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

23 KitoiBayHatcheryInspection2011

Structural:Thestructureisapre‐engineeredsteelbuilding.Thesteelcolumns,roofbeams,androofpurlinsallarecorroded.Thecorrosionissignificantenoughthatthestructureshouldbedemolishedandreplaced.

Incubation Building  Corroded columns 

 Structural corrosion 

Electrical:Thispartofthefacilityappearstobecontinuouslydamp.ThecircuitsincorporatetheuseofsingleconductorsinEMT.Inthisenvironment,theservicelifeofthesecircuitsisgreatlyreduced.Andalthoughitiscurrentlyingoodcondition,itwillneedtobereplacedwithinfiveyearswithatypemoresuitablefortheenvironment.Thecontrolcircuitsutilizeopencablesthatareinpoorconditionandshouldbereplaced.Receptaclesprotectedwithgroundfaulttypecircuitbreakersappeartobeadequatelyscatteredthroughoutthespace.Allincludeweatherproofcovers,buttheyarecommoncommercialgradedevices,susceptibletocorrosion.Theyshouldbereplacedinthenexttwoyearswithmarineornon‐corrosiongradedevices.ThelightingisaccomplishedwithlowbaytypeHPS.Thesefixturesarequiteclosetotheheadboxesfortheincubationtraysandprovideinappropriateillumination.ThesefixturesshouldbereplacedinthefuturewitheitherpendantLEDorenclosedlinearfluorescenttypessuitableforthisenvironment.Theilluminationwillbemoreuniformandbetterlightbothlevels.Itwillalsobeeasiertocontrol.

Egg‐takeBuilding:Single‐story36’x16’woodstructurewithsteelsiding,builtin2008.Thefoundationisareinforcedconcreteslabwiththickenedperimeterfooting.InteriorspacesarefinishedwithFRPwallpanels.

Page 27: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

24 KitoiBayHatcheryInspection2011

Thebuildingisingoodcondition.Tohelpsupportlongtermmaintenance,itissuggestedthatadditionalsealantbeappliedatwindowsillsandtransitionbetweensillandmetalsidingtopreventwaterfromenteringwallassembly.Itisalsosuggestedthatadditionalgradeadjustmenttakeplaceathighsideofbuildingtopreventwaterfromenteringatfloorslablevel.

Egg take building 

Structural:Thetimber‐framedstructurewasconstructedinhouse.Thestructuralframingwascoveredbysheetrock,siding,androofingandcouldnotbevisuallyinspected.ThestructureshouldbeinvestigatedandanalyzedbyaprofessionalengineerlicensedintheStateofAlaskaforcodecompliance.

Electrical:Theeggtakebuildingwasrecentlyconstructedusingnon‐metallic(TypeNM)cableforbranchcircuits.Thecablesareadequatelyprotectedtoallowthecircuitlifeexpectancytoexceedtwentyyears.Thereceptaclesarecommongradeinstalledwithweatherproofcovers.Theyarenotgroundfaultprotected,andalthoughpossiblynotrequiredbytheNEC,itwouldbeprudenttodosotoensuresafety.Iferroneouscircuittrippingoccursoncircuitsservinglargerportableequipment,itmaybenecessarytoutilizetwistlocktypereceptaclesforsuchequipment,protectedby30milliamperetypegroundfaultcircuitbreakers.TheinteriorisilluminatedwithlinearfixturesusingT8orT12fluorescentlampsenclosedinsidewraparoundacryliclensesmountedtotheceiling.Theyarecontrolledwithmanuallyoperatedwallswitches.Thelightingandcontrolsisingoodcondition.

Hangar/Warehouse:Single‐story30’x40’woodstructureopenonthefront,withexposedstructurewallsandceilings,woodsidingandsteelroofing,builtin1986.Thisbuildingisusedforgeneralstorageandtocoversalmonrearingraceways.Thefoundationisperimetergradebeams,andthefloorisgravel.

Thisbuildingisstructurallyunsound.Trussesarenotengineeredandexhibitdeformation.Rotisoccurringinwalls,siding.Thisbuildingisalifesafetyhazardandshouldbereplaced.

Page 28: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

25 KitoiBayHatcheryInspection2011

Hangar/Warehouse Building 

Structural:Thestructureistimber‐framedandappearstobeinpoorcondition.Thetimberwallframingshowssignsofdryrotinseverallocations.Thetimberrooftrussesappeartobeoverstressedandaredeflectingwithoutanysnowload.Thestructureshouldbedemolishedandreplaced.

SingleFamilyResidenceBuildings:Threesingle‐storybuildings,50’x24’,withthreebedrooms,kitchenandlaundryarea,builtin1983.Theyarewoodframedstructureswithaluminumsidingandsteelroofing.Reinforcedconcretespreadfootingwithpressuretreatedframedstemwalluptowallplates.Sheetrockwallsandceilings,carpetandvinylflooring.Thesinglefamilyresidencesaresimilarinconstructionandexhibitmostlysimilarconditions:

Single Family Residence  Typical Back Porch

Investigateforrotinbackporchfloorareasandrepair.

Metalroofingisneartheendofitsusefullifeandshouldbereplaced.

Allaluminumsidingshouldbepowerwashedandreplacedwheredamaged.

Page 29: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

26 KitoiBayHatcheryInspection2011

Damaged siding  Deteriorated Exterior Door

Exteriordoorsaredeterioratedandshouldbereplaced.

Windowsappeartobesatisfactory.

Kitchencaseworkshouldbereplaced.

Crawlspacesinbuilding2arewetduetowaterfromtheadjacenthillside,whichisleakingthroughthepressuretreatedwoodfoundationwall.Theareaoutsidethebuildingshouldbere‐gradedtoredirectsurfacedrainage.Thecrawlspacedrainshouldbereplaced,andadditionalcrawlspaceventsinstalled.Itisalsosuggestedthatthefiberglassinsulationontheallweatherfoundationsberemoved.Floorjoistspaceshouldbeinsulatedandthetreatedfoundationrepairedasrequired.

Moisture in crawl space 

Page 30: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

27 KitoiBayHatcheryInspection2011

Structure:Thetimber‐framedstructureshavepressuretreatedtimberfoundationwalls.Thecrawlspaceshavevaporbarriers.Thecrawlspacesofresidences1and3arefairlydry,butthecrawlspaceofresidence2hasasignificantamountofstandingwater.Thewaterappearstobecomingintothecrawlspaceatthebackofthefoundationwall.Afoundationdrainalongthebacksideofthebuildingwouldlikelyalleviatethesituation.Theexistingtimberstudsandsheathingshouldbeinvestigatedforroteventhoughtheyarepressuretreated.

Theroofframingwasnotinspectedastherewasnoaccess,buttheyhaven’tnotedanyleaksintheroofrecently.

Electrical:ThecircuitsutilizeTypeNMcableandappeartobeingoodcondition.Similarly,receptaclesareseeminglylocatedinaccordancetotheNECandalsoappeartobeingoodcondition.Thelightingisaccomplishedprimarilywithincandescenttypefixturesandalsoappearstobeingoodcondition.

DuplexResidenceBuilding:Twostorybuilding,24’x36’,dividedintotwoidenticalresidences,eachwithtwobedroomsandrestroomupstairsandopenlivingkitchenareadownstairs,with6’x10’covereddeckand6’x8’enclosed“mud‐room”entrywaysinfrontandacommon4’x10’enclosedmechanicalroominback,builtin2010.Woodstructurewithvinylsidingandmetalroofing.Reinforcedconcreteperimeterfootingwithpressuretreatedframedstemwalluptowallplates.Sheetrockwallsandceilings,carpetandvinylflooring.

Waterleaksintotheexistingcrawlspaceduetogroundwateroozingintotheloweredspacefromtheuphillslope.

Duplex Residence 

Suggestfollowingproceduretoreducemoistureintrusion:

Re‐gradesurfacessurroundingthebuildingtoensurethatsurfacewaterisredirectedawayfromthebuilding;

Excavatearoundthefoundation,installnewwaterproofingatpressuretreatedwoodfoundationpanels,installfoundationdrains,daylighttograde.

Removeinsulationfromwallpanels,addinsulationtofloorjoistspace,provideadditionalcrawlspacevents,andonethewoodframingisdry,suggestfitting2”rigidinsulationintothevoidsbetweenpressuretreatedfoundationframing.

Page 31: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

28 KitoiBayHatcheryInspection2011

Structural:Thetimber‐framedstructurehaspressuretreatedtimberfoundationwalls.Thecrawlspacehasavaporbarrier.Itappearsthatwaterisseepingthroughthebackfoundationwallatthesillplate.Afoundationdrainalongthebacksideofthebuildingwouldlikelyalleviatethesituation.

Theroofframingwasnotinspectedduetotheageofthestructure,butitshouldbeconfirmedthatthestructurewasdesignedbyaprofessionalengineerlicensedintheStateofAlaska.

Electrical:ThecircuitsutilizeTypeNMcableandappeartobeingoodcondition.Similarly,receptaclesareseeminglylocatedinaccordancetotheNECandalsoappeartobeingoodcondition.Thelightingisaccomplishedprimarilywithincandescenttypefixturesandalsoappearstobeingoodcondition.

OTHERBUILDINGS:NetStorageBuilding(2008),25’x25’woodstructurewithsteelsidingandroof,concreteslabfoundation,paintedplywoodnailsandceiling,withloft;240/120velectricfeedfromhatcherybuildingpowersoutlets,lightsandelectricunitheater.Conditionofthisbuildingisgood.

Buildingwasplacedonaformercontainmentdikefoundationwalls‐Itisassumedstrongenoughtosupportthebuilding.Itconsistsofanopenlowerlevelandamezzanine.

Net Storage Building  Mezzanine Storage

Mezzaninestorageareareachedbyladder.Ifthemezzanineisconsideredanoccupiedspace,itmusthaveastair.Openingthroughfloorforladderisnotguardedbyanoperableguardrail.Suggestinstallinganoperableguardrailatthestairopening.

Structural:Thetimber‐framedstructurewasconstructedinhouse.Themajorityofthestructuralframingiscoveredbysheetrock,siding,androofingandcouldnotbevisuallyinspected.

Theroofjoistsappearadequateifthewallneartheirmidspanisconsideredabearingwall.Unfortunatelythiswalldoesnotextendbelowtheloftfloor,whichwouldrequiretheloftfloorjoistscarrytheweightoftheroofaswellasthestorageliveload.ThestructureshouldbeinvestigatedandanalyzedbyaprofessionalengineerlicensedintheStateofAlaskaforcodecompliance.

Electrical:Thecircuitsinthenetshedarerathernewandincondition,consistingofsingleconductorsinEMT.Thelightinginthisbuildingutilizesindustriallinearfluorescent.Thesefixturesareinfairconditionwithalifeexpectancyoffiveyears.

Page 32: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

29 KitoiBayHatcheryInspection2011

StorageBuilding(originalconstruction1954,movedtothislocation1980’s),32’x20’woodstructurewithwoodsidingandsteelroof,concreteblockfoundation,exposedwoodenstructurewallsandceilingwithgravelfloor.

Thehighbaystoragebuildingusedforstorageoffloatsandotherinwaterrelatedequipmentaswellasuplandsequipment,locatedontheeastendofthesite.Ithasnofoundations,insulation,structuralconnections,lateralorseismictiedowns.Thereisdryrotanddeteriorationpresentinsidingandstructure.Theexistingstructureisunsafe‐lacksanysortofstructuralintegrity,noseismicstability.Itshouldbedemolishedandreplacedasalifesafetyrisk.Itshouldbereplacedwithanewstoragestructure,perhapsinconjunctionwithotherplannedbuildingprojectsonthesitewhichcouldleadtogreaterefficiencywhileprovidingthenecessarydrystorage.

Storage Building  Storage Building interior‐ no structural support

Structural:Thetimber‐framedstructuredoesnothavewallstuds,afoundation,oralateralloadresistingsystem.Thestructureshouldbedemolishedandreplaced.

Barn(2008)40’x30’twostorywoodstructurewithsteelsidingandroofing,concreteslabfoundation,paintedplywoodwallsandceilings.

Thisbuildingconsistsofstorage/workareadownstairswithopenalcoveforheatplant,withactivityroomupstairsusedasrecreationroomforstaffandasoverflowsleepingquarters.

Page 33: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

30 KitoiBayHatcheryInspection2011

Barn  Stairs

Stairsare11”treads,9”risers,railingsconsistoftworails.Floortoflooris13’‐6”,stairsareasinglerungreaterthan11’high.Becausethespaceupstairsisusedasarecreationoccupancyandoverflowbunkhouse,itneedstwoexitsandacodecompliantstair.Itmayremainas‐isifusedonlyasnon‐occupiedstoragespace.

Insulationlevelsarenotstandard:wallsr‐19,ceilingsareR‐11.Novaporbarrierevident.Ifthebuildingisusedsubstantiallyinthecoldmonths,considerationshouldbegiventoaddingadditionalinsulationintheceilingandwallsoftheupperlevel.Itappearsthattheseareascanbeeasilyreachedtoaddinsulationwithoutdemolitionofexistingstructure.

Nofireseparationbetweenfloors‐floorlouvers(4‐9”x4”)allowheatfromdownstairstoraisetoupperlevel‐opentoboilerroom.Ifthebuildingisassumedtobealloneoccupancytypethisisallowable.

Floor louver 

Wedidnotobserveacompliantsmokedetectorinthesecondfloor.Thereshouldalsobeacarbonmonoxidedetector.

WindowsPVCinsulatedwindows,3’10x2’10,sliders.Theymeetegressrequirements.

Structureisunusual,withplywoodsearpanelsprovidedonlowerwallsandfloorandceiling,butnotatroof.Recommendadditionalevaluation.

Page 34: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

31 KitoiBayHatcheryInspection2011

Structural:Thetimber‐framedstructurewasconstructedinhouse.Themajorityofthestructuralframingiscoveredbysheetrock,siding,androofingandcouldnotbevisuallyinspected.

Theroofisnotsheathedandthereforecannotbeconsideredadiaphragm.Thekneebracesthatsupporttheloftfloorbeamsinducealargeoutwardthrustonthesupportingmemberinthewall,whichcouldnotbevisuallyinspected.ThestructureshouldbeinvestigatedandanalyzedbyaprofessionalengineerlicensedintheStateofAlaska.

Electrical:Thisisanewfacility.ThecircuitsinthebuildingutilizeTypeNMcables.Receptaclesareseeminglyadequatefortheuseofthespace.Thelightingiscomposedprimarilyofindustriallinearfluorescentwithalifeexpectancyoftenyears.

SaltwaterPumphouse:Thebuildinghousesadiesel‐drivenpumpforintermittentuseduringeggtreatments.Whenthepumpisbeingused,itistheonlysupplyofwatertoportionsoftheincubationrooms,andthereforeitscontinuousoperationiscriticaltopreventeggmortality.Itincludesanumberofelectroniccontrolsandoperatingsystems.

Saltwater Pump House  Saltwater Pump

Therecessedconcreteslabfloorisbelowlevelofadjacentgrade,whichcouldallowseasonalleakstodamagesensitiveelectronicsforthepumpandenginecontrols.Noinsulationisprovidedinthestructure,andwhileitisnotnecessarytoheatthebuilding,itwouldbepreferredtoinsulatethebuildingtoreducepotentialtemperatureswingsthatcancausecondensation.Thestructureisindeterminate,noseismicprovisionsorholddownsprovided.Thedoubledoorsprovidingentrytothebuildingarewornoutanddonotcloseproperly.Thebearsatthesitecouldeasilyenterthebuilding,anddamagethecontents.

Dryrotisoccurringatframingandsidingatthebaseofwalls.Roofingisattheendofitsusefullife.Giventhenumberofconcernswiththisbuilding,itissuggestedthattheexistingwoodframedstructurebereplacedwithalowmaintenance,galvanizedstoragestructure.

Whetherornotthebuildingisreplaced,thefuelsystemshouldbeimprovedasdescribedinprecedingsections,andtheengineexhaustsystemshouldbeupgraded.Specifically,theexhaustpipewallpenetrationshouldbereplacedwithaninsulatedthimbleandtheexhaustpipehangars

Page 35: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

32 KitoiBayHatcheryInspection2011

shouldbereplacedwiththermally‐insulatedmaterialthatpreventsconductionofheattocombustiblematerials.

OTHERFACILITIES(DOCKS,ETC.):CohoSilosStructural:Therearefourfiberglasssilosfilledwithwater;twoolder7’‐6”diameterby17’‐6”tallsilosandtwonewer8’‐0”diameterby15’‐6”tallsilos.Thesilosbearontreatedtimbersleepers,butarenotanchoreddown.Theoldersiloshaveeyeletsaroundtheperimeterthatcouldbeusedtoanchorthesilodown.Thenewersiloshaveabottomflangethatcouldbeusedtoanchorthesilodown.AseismicanalysisshouldbeperformedonthestructuresbyanprofessionalengineerlicensedintheStateofAlaska.

SmallVesselFloat:Structural:Thefloatisaccessedbya4’wideby30’longaluminumgangway.Thegangwaybearsonan8’wideby12’longlandingfloat,whichisconnectedtothe5’‐6”wideby30’‐6”longmainfloat.Thetimbermainfloatissupportedbyfoamandhasapproximately12”offreeboard.Thefrontofthemainfloatissecuredbya500poundconcreteanchor.Thebackofthelandingfloatisattachedtotworopesthatareattachedtorockanchorsnearthetopofthegangway.Thefloatsareinfaircondition,butareslightlywobbly.

MainDock:(1965),approximately90’x18’,treatedwoodpilingsand4”x12”x18”treateddeckplanks.Conditionfair.Severalpilingsandhalfofdeckboardsneedreplacement.Hydrauliccrane(1992)ondock,pinnedtoextendapproximately10’with2,960lbcapacity(2,500lbcapacityatmaximumextensionof15’).

Structural:Thecreosotetreatedtimberdockisapproximately16’longby105’widewithanadditional16’longby45’wideextensionontheback.Thedockisframedwith4x12decking,andissupportedby7”x16”stringers,12”x12”pilecaps,and12”diameterpiles.Thedeckingofthemaindockisfairlynew,butthedeckinginthebackextensionneedstobereplaced.Thebullrailwasalsorecentlyreplaced.Thestringersandpilecapsappeartobeingoodcondition.

Thepileswerebrieflyinspected,althoughthebasesofseveralofthepileswerenotaccessibleduetothetide.Acoupleofthepileshavesoftspotsnearthebase,andallfiveofthefenderpilesneedtobereplaced.Thetimberbackwallhascollapsedunderalargeportionofthedock.Steelsheetpileshavebeeninstalledtopreventfurthererosion.

AthoroughinspectionandanalysisofthedockshouldbeperformedbyaprofessionalengineerlicensedintheStateofAlaskaduringlowtide.

AreaLighting:“Barnyard”typefixtureswithmercuryvaporlampsareinstalledonsteelpipesinseverallocationsilluminatingsomeofthepathwaysbetweenbuildings.Thesefixturesareinpoorconditionandshouldbereplacedsoon.Thelightingshouldbeevaluatedandrepositionedtobetterilluminatethepathwaysforsafety.Theilluminationmaybelimitedtolowlevels,buttheuniformityneedstobegreatlyimproved.FixturesutilizingLEDsourcesshouldbeconsideredforthebestenergyeconomy.Controlsincreasingtheilluminationlevelsfromlowtobrightwhenmotionissensedmaybeincluded.Thereplacementofthearealightingshouldalsoincludereplacementofallofthecircuitsutilizingnewundergroundcables.

Page 36: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

33 KitoiBayHatcheryInspection2011

 Shop Lighting 

 

CommunicationsSystem:ThecommunicationssystemconsistsofaGCIsupportedsatellitesystemusinga1.2meterdishantennafortelephoneandinternet.Thetelephonesystemconsistsofanetworkofinstrumentslocatedinthebunkhouse,residences,andthemainhatcherybuildingwithintercomcapabilitybetweenlocations.ThesystemwasmanufacturedbyComdialwithcapacityfortwooutsidelines.Theinternetsystemhaslimitedbandwidth,limitingcapacityandspeed.Thesystemisinfaircondition.

Thereislimitednetworkinfrastructurewithinthebuildings,andfrombuildingtobuilding.ThisshouldbeupgradedwithanewnetworksystemincludingsmallrackswithpatchpanelsandswitchessupportingEthernethorizontalcircuits,andafiberopticsystemintegratingthebuildingsandrackstogetherasabackbonestructure.Thissystemcanfacilitatebothinternetandimprovedfacilitycommunications.

AlarmSystem:Thealarmsystemutilizesanaddressablefirealarmpanelwithsupportfor72addressabledevices.Theequipmentisrelativelymodernwithcontinuedsupportforcomponentsandservice.Thesystemprimarilymonitorsracewayandheadboxwaterlevelswithdiscretedevices.Thesedevicesintegratetothesystemthroughaddressablemodulesallowingseveraldevicestocommunicatetothecontrolpanelthroughasinglecable.Thedevicesaremountedinjunctionboxesneartothefloatswitchesandmiscellaneousdiscretedevices.Theboxesaretoosmallforthedevicesandretainmoistureaffectingtheirperformance.Thissystemwillperformwellforthenexttenyearsormorewithupgradesasnoted.

Page 37: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

HATCHERY CONDITIONS SURVEYSBudget Estimate for Corrective WorkKitoi Hatchery

Element Item Quantity Unit Unit Cost Subtotal Total Total

3 22 12

Element Item Quantity Unit Unit Cost Subtotal Total Total

GeneralBig Kitoi Dam

Perform inspection by qualified dam inspector 1 LS $20,000 $20,000

Big Kitoi Creek BridgeDemolish and Replace Bridge 240 SF $150 $36,000

Coho SilosPerform Lateral Analysis and Add Overturning 

h $ $Anchors 1 LS $15,000 $15,000

Main DockReplace Decking at Extension 2500 BF $5 $12,500

Replace Fender Piles 5 EA $8,000 $40,000

Replace Rotten Piles 5 EA $8,000 $40,000

Replace Timber Backwall 3000 BF $5 $15,000

ElectricalSite Lighting 1 ls $40,000.00 $40,000Communications

New network including hatchery & residences 1 ls $75,000.00 $75,000New telephone system 1 ls $35,000.00 $35,000

Subtotal $328,500

Subtotal $328,500

Generator BuildingArchitectural

Replace existing buidlng with new, heated, insulated modular building . 1 ls $50,000 $50,000 heated, insulated modular building . 1 ls $50,000 $50,000

Subtotal $50,000ElectricalGenerators

New generator sets (excluding radiators) with ancillary equipment 3 ea $90,000.00 $270,000New exterior type radiators 2 ea $15,000.00 $30,000New heat exchangers and manifold 2 ea $15,000.00 $30,000New controls with paralleling 1 set $60,000.00 $60,000

DistributionDistributionNew Switchgear/MDP 1 ea $30,000.00 $30,000Reconfigure feeders to residences, hatchery, egg take building, etc. 1 ls $50,000.00 $50,000

Station PowerPanels 2 ea $3,000.00 $6,000Transformer 1 ea $3,000.00 $3,000Devices 1 ls $2,000.00 $2,000Circuits 1 ls $5,000.00 $5,000

LightingLightingFixtures, controls, and circuits 1 ls $5,000.00 $5,000

Remote monitoring & alarmRemote equipment & circuits 1 ls $20,000.00 $20,000

Subtotal $511,000

Subtotal $561,000

Page 38: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

Element Item Quantity Unit Unit Cost Subtotal Total Total

Main Hatchery BuidlingSite Improve drainage at north side of buidling 1 ls $4,000.00 $4,000Exterior Closure

Install metal furring, insulation and metal roof panels over existing roof. 6,000 sf $16.00 $96,000Repair fireproofing 1 ls $1,000.00 $1,000Install metal furring, insulation and metal wall panels over existing wall panels. 4,000 sf $16.00 $64,000p g p , $ $ ,Misc roof and wall flashing 1 ls $10,000.00 $10,000Modify wall mounted elect and plumbing as required to install new panels. 1 ls $30,000.00 $30,000Replace ext doors, frames and hardware 6 ea $1,200.00 $7,200Replace ex windows with thermal windows and trim. 15 ea 1000 $15,000Replace existing canopy at north side of building. 500 sf $150.00 $75,000

Interior $ $Install sloping concrete floors over ex 3,800 sf $10.00 $38,000

concrete slabs in wet areas.replace formalin storage room 1 ls $10,000.00 $10,000Provide curb under wall between wet and dry areas. 60 lf $20.00 $1,200Replace water damage drywall and framing and repaint at walls and ceilings 1 ls $30,000.00 $30,000Replace interior doors, frames and hardware. 10 ea $1,200.00 $12,000Replace office casework and furnishings 1 ls $6 000 00 $6 000Replace office casework and furnishings 1 ls $6,000.00 $6,000Reconfigure breakroom to include separate work room and break room with dish sink and handwash sinks. 1 ls $10,000.00 $10,000Replace laboratory casework, counters 1 ls $10,000.00 $10,000 and sinks.reconfigure toilet/laundry/janitorial area and replace all fixtures, furnishings and equipment. 1 ls $10,000.00 $10,000Paint exposed steel in hatchery area 1 ls $15 000 00 $15 000Paint exposed steel in hatchery area 1 ls $15,000.00 $15,000Provide galvanized stell stair to mezanine 1 ls $12,000.00 $12,000

Subtotal $456,400CivilHatchery Water Supply

Repair main pipelines and dam structure 1 ls $50,000.00 $50,000Upgrade site piping 1 ls $50,000.00 $50,000

Domestic Wastewater UpgradesReplace outfall 1 ls $20,000.00 $20,000Install secondary treatment system 1 ls $50,000.00 $50,000Install secondary treatment system 1 ls $50,000.00 $50,000Expand collection system 1 ls $10,000.00 $10,000

Fuel SystemInspect all fuel tanks 1 ls $10,000.00 $10,000Relocate main fuel oil and gasoline tanks 1 ls $50,000.00 $50,000

Subtotal $240,000Structural

Lateral Analysis and Improvements 1 LS $20,000 $20,000Add Mezzanine Floor Joists 2000 SF $10 $20,000

Demolish and Replace Covered Shelter 240 SF $60 $14,400Subtotal $54,400

Page 39: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

Element Item Quantity Unit Unit Cost Subtotal Total Total

ElectricalDistribution

Replace 480Y/277 volt MDP circuit breakers 1 ls $5,000.00 $5,000Replace 208Y/120 volt MDP 1 ea $10,000.00 $10,000Replace feeder to New Hatchery 1 ls $7,000.00 $7,000Upgrade the grounding system 1 ls $2,000.00 $2,000Replace Panels A & C 2 ea $5,000.00 $10,000Replace Panel B circuit breakers 1 ls $2,000.00 $2,000

Power Appliances and LightingCircuit upgrades 1 ls $45,000.00 $45,000Device replacement 1 ls $5,000.00 $5,000Replace lighting 1 ls $60,000.00 $60,000

CommunicationsNew telephone and computer circuits 1 ls $5,000.00 $5,000

AlarmsReplace sensor device boxes 1 ls $8,000.00 $8,000

S bt t l $159 000Subtotal $159,000

Subtotal $909,800

CoolerReplace existing walk in cooler with new, modular . 1 ls $20,000 $20,000

Subtotal $20,000

Subtotal $20,000

Incubation BuildingReplace existing pre-engineered incubation Replace existing pre engineered incubation building with new, pre-engineerd building,approx 40x42, reinstall existing equipment 1,680 ls $200 $336,000

Subtotal $336,000Electrical

Panel, devices & circuits 1 ls $35,000 $35,000Lighting 1 ls $15,000 $15,000Alarm 1 ls $30,000 $30,000

Subtotal $80,000

Subtotal $416 000Subtotal $416,000

Egg Take BuildingRe-seal existing windows 1 ls $500 $500Re-grade north side of building 1 ls $1,000 $1,000

Struct Code Analysis and Improvements 1 LS $30,000 $30,000Subtotal $31,500

Subtotal $31,500

H /W hHanger/WarehouseReplace exsting building with pre-engineered metal building 1,200 sf $200 $240,000

Subtotal $240,000

Subtotal $240,000

Residences (three identical buildings)Exterior

Replace deteriorated decks 3 ea $4,000 $12,000Replace metal roofing 4,000 sf $12 $48,000p g , $ $ ,Clean and repair existing metal siding 3 ea $2,000 $6,000Replace exterior doors 6 ea $1,200 $7,200Insulate floor joist space 3600 sf $6 $21,600replace crawl space drain 1 ls $2,000 $2,000

InteriorReplace kitchen equipment and casework 3 ea $15,000 $45,000

Subtotal $141,800

Page 40: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

Element Item Quantity Unit Unit Cost Subtotal Total Total

StructuralInstall Foundation Drains 225 LF $60 $13,500

Replace Rotten Timber Foundation Wall  250 SF $15 $3,750

studs and sheathing

Subtotal $17,250Electrical

Replace meters, main disconnects, & transformers 3 ea $7,000 $21,000transformers 3 ea $7,000 $21,000

Subtotal $21,000

Subtotal $180,050

DuplexRe-grade around building to prevent water from entering crawl space. 1 ls $4,000 $4,000Provide perimeter wall waterproofing 150 ls $20 $3,000Insulate floor joist space 1,100 sf $6 $6,600Install Foundation Drain 150 lf $60 $9,000

Subtotal $22,600Subtotal $22,600

Subtotal $22,600

Net Storage BuildingProvide guardrail at 2nd floor opening 1 ls $500.00 $500

Struct Code Analysis and Improvements 1 ls $30,000 $35,000Subtotal $35,500

Subtotal $35,500

Emergency Generator BuildingExterior Closure:Exterior Closure:

Replace exterior door and frame 1 ea $1,200.00 $1,200Lower grade around building and slopeto drain away from building. 1 ls $1,000.00 $1,000Repair siding and re-paint 1 ls $500.00 $500

Interior:Insulate wall cavities, install drywall 260 sf $8.00 $2,080for interior finish

Subtotal $4,780$ ,Subtotal $4,780

Storage BuildingDemolish existing wood framed storagebuilding with pre-engineered metal storage building 650 sf $200.00 $130,000

Subtotal $130,000

Subtotal $130,000

BarnBarnAdd second floor stair 1 ls 5000 $5,000Add insulation to second floor ceiling and walls. 650 sf $200.00 $130,000Add smoke and carbon monoxide sensor 1 ls $500.00 $500

Struct Code Analysis and Improvements 1 ls $65,000 $65,000Subtotal $200,500

Subtotal $200,500

Salt Water PumphouseSalt Water PumphouseDemolish existign pumphouse and reinstall pump system in new, modularpumphouse 1 ls $25,000.00 $25,000

Subtotal $25,000

Subtotal $25,000

Page 41: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

Element Item Quantity Unit Unit Cost Subtotal Total Total

General ConditionsMobilization/demobilization 1 ls $10,000 $10,000Freight 1 ls $15,000 $15,000

Supervision 6 mos $12,000 $72,000Clerical/Expediting/Admin 6 mos $2,000 $12,000Temporary Facilities (tenting, etc) 6 mos $5,000 $30,000Miscellaneous motorized equipment 6 mos $2,500 $15,000Miscellaneous motorized equipment 6 mos $2,500 $15,000Tools 6 mos $1,700 $10,200Consumables, fuel etc 6 mos $1,000 $6,000Disposal 6 mos $2,000 $12,000Home Office Expenses 6 mos $2,500 $15,000

Subtotal $197,200

Total Materials, Labor and General Conditions $3,302,430

Mark UpsContractors Overhead/Profit 10.00% $330,243Bonding 1 50% $49 536Bonding 1.50% $49,536Insurance 1.50% $49,536Remote Site Conditions 25.00% $825,608Estimating Contingency 10% $330,243

Subtotal $1,585,166

Total Construction Costs $4,887,596

Project Cost Design 10% $488,760Administration 20% $977,519

Subtotal $1,466,279

T t l P j t C t $6 353 875Total Project Cost $6,353,875

Page 42: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

 

1100  West  Ewing  Street  Seattle,  WA  98119    December  26,  2012    The  Honorable  Sean  Parnell  Governor  of  Alaska  P.O.  Box  110001    Juneau,  AK  99811-­‐001    Dear  Governor  Parnell:    I  am  writing  you  today  to  express  my  support  for  the  funding  of  Deferred  Maintenance  and  Upgrades  for  Kodiak  Regional  Aquaculture  Association’s  two  hatcheries.  The  funding  of  the  necessary  maintenance  and  upgrades  will  assist  the  hatchery  in  creating  a  more  stable  annual  production  of  Pink  Salmon  in  addition  to  increasing  production  by  30%.    

KRAA’s  hatcheries  are  dedicated  to  increasing  salmon  production  through  producing  salmon  juveniles.  The  Kitoi  Bay  Hatchery  is  one  of  the  oldest  State-­‐owned  hatcheries  operating  in  Alaska.  The  hatchery  operates  on  a  large  scale  with  a  great  deal  of  responsibility  in  the  community  but  its  structures  have  surpassed  their  intended  lifespan  decreasing  its  intended  ability.  The  Pillar  Creek  Hatchery  has  had  a  great  deal  of  success  as  well  but  the  hatchery  is  not  able  to  live  up  to  its  full  potential  due  to  deferred  equipment  upgrades  and  maintenance.  KRAA’s  salmon  enhancement  projects  at  these  hatcheries  contribute  approximately  $17million  to  the  state  on  an  annual  basis  and  with  your  support;  this  number  can  continue  to  grow.      

Ocean  Beauty  Seafoods  depends  on  organizations  like  KRAA.  The  hatcheries  increased  output  allows  Ocean  Beauty  to  employ  more  community  members  at  our  six  production  facilities  throughout  Alaska.  Currently,  we  employ  about  200  people  year  round  at  our  Kodiak  facility  and  we  would  like  to  see  this  number  grow.  This  goal  can  be  accomplished  through  a  higher  and  more  stable  annual  production  of  salmon.  

KRAA's  contribution  to  the  Kodiak  area  salmon  harvest  continues  to  expand.  Annually,  KRAA  has  provided  an  average  of  over  $5  million  increased  value  to  Kodiak's  commercial  fleet  and  more  than  7.5  million  adult  salmon  to  the  Kodiak  area.  These  contributions  can  increase  with  the  required  upgrades  and  positively  impact  Kodiak  with  increased  jobs  and  much  needed  economic  growth.  

A  large  amount  of  construction  and  equipment  upgrades  are  required  at  both  the  Kitoi  Bay  Hatchery  and  Pillar  Creek  Hatchery.  KRAA  is  grateful  for  past  assistance  received  from  the  State  of  Alaska,  yet  the  funds  have  not  met  the  needs  of  the  aging  hatcheries.  Your  support  of  this  budget  item  will  decrease  the  time  it  takes  to  see  quantitative  improvements  of  pink  production  at  Kitoi  as  well  as  increased  sockeye  and  coho  salmon  production  at  the  Pillar  Creek  Hatchery.  The  opportunity  to  accelerate  the  production  

Page 43: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping

of  salmon  will  continue  to  keep  Alaska  seafood  competitive  and  gaining  new  consumers  around  the  world.  

Ocean  Beauty  Seafoods  supports  Kodiak  Regional  Aquaculture  Association’s  request  for  $7.921million  for  Deferred  Maintenance  and  Upgrade  funding  for  the  hatcheries.  I  hope  you  can  lend  your  support  for  this  request  and  help  push  Alaska’s  fishing  industry  forward  as  Alaska’s  vital  economic  engine.    

Best  Regards,  

 

Mark  Palmer  

President  –  CEO  Ocean  Beauty  Seafoods  

 

Page 44: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping
Page 45: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping
Page 46: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping
Page 47: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping
Page 48: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping
Page 49: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping
Page 50: Kodiak Regional Aquaculture Association - Kitoi Bay ...€¦ · Water Supply Piping at Dam, Big Kitoi Lake Site Piping, Degassing Tower Site Piping: Process water distribution piping