25
November 13, 2012 Kiel Tschumperlin

Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

November 13, 2012 Kiel Tschumperlin

Page 2: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

TMDL Implementation Project

û Welcome and introductions û Watershed Coordinator background û Project overview and progress to

date û Questions

Page 3: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

My Background

û From Watkins, MN ó 25 miles SW of St. Cloud

û Avid hunter and fisherman

û Gustavus Adolphus College ó BA - Environmental Studies ó May 27, 2012

û Heron Lake Watershed District ó June 4, 2012

Page 4: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

TMDL Implementation Project

û EPA 319 grant û Administered by MPCA û HLWD – Project Sponsor ó HLWD employee ó Office space and equipment ó Reporting ó No enforcement, just inventory

Page 5: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Project Partners

û Input and direction û Project promotion ó Awareness ó Influence

Page 6: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

TMDL Implementation Project Goals û Goal #1: Conduct an onsite feedlot

inventory and strengthen partnerships with the four core counties and the HLWD

û Level III feedlot inventory ó 80% of the feedlots in the watershed ó Four years ó Inspections conducted by:

○ County feedlot officers ○ Watershed coordinator

Presenter
Presentation Notes
The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a Level III Feedlot Inventory should be completed in the WFDMR within the first five years after Plan approval. The grant is for doing 80% of them in a three-year period. The county feedlot officers’ time is being used as match for employing a full-time watershed coordinator to assist with the inventory and to carry out the other tasks in the work plan.
Page 7: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

TMDL Implementation Project Goals

û Goal #2: Increase the knowledge of 50 feedlot operators through a one-day workshop ó Manure management workshop

Page 8: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

TMDL Implementation Project Goals

û Goal #3: Increase public awareness of the project by developing a brochure and website ó Brochure has been developed ó Website has been developed

○ Updated periodically ○ http://www.hlwdonline.org/hlwd/ ó Click on WFDMR TMDL tab

Page 9: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

TMDL Implementation Project Goals

û Goal #4: Provide project updates and receive input and direction during semi-annual meetings with the advisory and technical committees

Page 10: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Feedlot Overview

û Total registered feedlots in WFDMR Watershed ó 742 Feedlots

û 80% of 742 = 592 Inspections to be conducted ó Murray County – 216 sites ó Jackson County – 190 sites ó Nobles County – 142 sites ó Cottonwood County – 44 sites

WFDMR Watershed Map

Page 11: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Project Significance

û Inform farmers/landowners û 85.5% - row crop agriculture û 15 out of 32 impairments ó 10-86% reduction

û WFDMR CWP diagnostic study ó 58,000 tons of TSS ó 10 million pounds of nitrogen ó 485,000 pounds of phosphorus

Page 12: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Inspection Process

û Monday prior to inspection week ó Meet with county feedlot officer ○ Review MinnFARMs ○ Delta detail reports ○ Aerial Imagery ○ Producer letter ó Set inspection date and time

○ Mail out letters ○ Preliminary drive-by in some cases (Not always on Mondays, depends on schedules)

Page 13: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Summary of a Delta Detail Report

Page 14: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Inspection Protocol

Task Person(s) Responsible

Prepare customizable inspection form Coordinator Gather files CFO

Site inspection Coordinator, CFO

Update registration (As needed) CFO

Investigate issues Coordinator, CFO Discuss what was observed Coordinator, CFO Measurements for MinnFARM Coordinator, CFO Run MinnFARM Coordinator Compare results Coordinator, CFO Assist in fixes (case-by-case basis) Coordinator, CFO Follow up letter CFO Any enforcement action CFO

Page 15: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Progress as of October 16, 2012

û 79 feedlots inspected û 513 feedlots remaining û Of the 79 feedlots inspected: ó 59 - open lots ó 12 - total confinements or no discharge

sites ó 8 – deactivated, no lots, or under 10 AU

Page 16: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Progress Continued

û Inspection breakdown ó 71 active sites

○ 52 compliant (73.2%) ○ 19 non-compliant (26.8%)

ó Of the 71 active sites ○ 23 – surface water within 1,000 feet ó 18 compliant (78.3%) ó 5 non-compliant (21.7%)

○ 10 – shoreland – (6.3) ó 8 compliant (80%) ó 2 non-compliant (20%)

Page 17: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Minnesota Feedlot Annualized Runoff Model (MinnFARM) Index

û Highest index as of October 16, 2012 ó 28 ó 26 (2nd Highest) ó Neither are in shoreland

û Lowest index ó 0

○ On several sites with open lots û Average index ó 6.1

Page 18: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Sample MinnFARM Form

Page 19: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Site Inspection

Site: 250 Beef Steers on three lots

Shoreland – See below (Jack Creek) Permanent meadow buffer

Jack Creek

Page 20: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Site Inspection

Above: 25 Sheep on lot Low animal density

Below: 30 Beef Cows on lot Predominately on pasture during summer

Page 21: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Site Inspection

Bottom Photos: 15 Beef Steers Potential groundwater contamination Depth to water table – 29.5 inches

Right: 125 Beef Steers on Lot, road ditch is at the base of the fence.

Page 22: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Challenges û Drought û High commodity prices ó Reduction in feedlots ó Reduced animal numbers

û Loss of Jackson County Feedlot Officer

Page 23: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

What’s Next? û Apply for funding ó Implement fixes ó Provide cost share ó Prioritize based on needs

û Work with willing landowners

Page 24: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Questions?

Page 25: Kiel Tschumperlin November 13, 2012The major activity in the grant is the Level III Feedlot Inventory. In the TMDL Implementation Plan it was determined that a L 攀瘀攀氀 䤀䤀䤀

Thank You!