141
Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations 1 KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY, INSTALLATION, TEST AND COMMISSIONING OF DELUGE FIRE PROTECTION SYSTEMS FOR GENERATOR TRANSFORMERS AND STATION TRANSFORMERS IN 7 FORKS POWER STATIONS Kenya Electricity Generating Company Limited Stima Plaza Phase III, Kolobot Road, Parklands P.O. BOX 47936-00100 NAIROBI. Website: www.kengen.co.ke OCTOBER 2016

KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

  • Upload
    hadieu

  • View
    219

  • Download
    3

Embed Size (px)

Citation preview

Page 1: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

1

KENYA ELECTRICITY GENERATING COMPANY LIMITED

KGN-HYD-029-2016

TENDER FOR DESIGN, SUPPLY, INSTALLATION,

TEST AND COMMISSIONING OF DELUGE FIRE

PROTECTION SYSTEMS FOR GENERATOR

TRANSFORMERS AND STATION TRANSFORMERS IN

7 FORKS POWER STATIONS

Kenya Electricity Generating Company Limited

Stima Plaza Phase III, Kolobot Road, Parklands

P.O. BOX 47936-00100

NAIROBI.

Website: www.kengen.co.ke

OCTOBER 2016

Page 2: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

2

TABLE OF CONTENTS

Section I Invitation for Tenders

Section II Instructions to Tenderers

Section III Tender Data Sheet

Section IV General Conditions of Contract

Section V Particular Conditions of Contract

Section VI Specifications

Section VII Drawings

Section VII Bill of Quantities

Section IX Standard Forms

Form of Tender

Appendix to Tender

Confidential Business Questionnaire

Integrity Declaration

Form of Contract Agreement

Section X Forms of Security

Tender Securing Declaration Form

Performance Bank or Insurance Guarantee

Advance Payment Guarantee

Page 3: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

3

SECTION I: INVITATION FOR TENDERS (IFT)

The Company invites sealed tenders from eligible candidates for Design, Manufacture, Supply,

Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator

Transformers and Station Transformers in 7 Forks Power Stations whose specifications are

detailed in the Tender Documents.

Interested eligible candidates may obtain further information from, and inspect the Tender

Documents at the office of:

Supply Chain Director

Tel: (254) (020) 3666000

Email: [email protected];

A complete set of Tender Documents may be obtained by interested tenderers upon payment of a

non-refundable fee of KSHS. 1,000.00 (One Thousand Kenyan Shillings) and can also be

viewed and downloaded from the Company’s website http://www.kengen.co.ke. Tenderers who

download the document are not required to pay any charges but are advised to immediately

submit their details to the Supply Chain Manager for records.

They are also advised to be keen on the information the appendix to ITT and the special

conditions of the contract.

Tenders must be accompanied by a security of KSHS. 1,000,000.00 (One Million Kenyan

Shillings) as specified in the tender documents, and must be submitted in a plain sealed envelope

marked “Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire

Protection Systems for Generator Transformers and Station Transformers in 7 Forks

Power Stations” and delivered to:

Company Secretary & Legal Affairs Director

Kenya Electricity Generating Company Limited

10th Floor, KenGen Pension Plaza 2,

P O Box 47936 - 00100

NAIROBI, KENYA

Or be deposited in the tender box situated in the supply chain office on the ground floor, Stima

plaza, on or before: 1st December 2016 at 2.00 p.m.

Mandatory Site Visit: There will be a mandatory site visit on 17th November 2016 time 9.00

a.m. at Masinga Power Station and thereafter a Pre-bid conference.

Tenders will be opened on 1st December 2016 at 2.30 p.m. in the presence of the candidates’

representatives who choose to attend at Stima Plaza III, Executive Committee Room, 7th Floor.

The company reserves the right to vary the quantities.

SUPPLY CHAIN DIRECTOR

Page 4: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

4

SECTION II

A. Introduction: INSTRUCTION TO TENDERERS

1. Scope of tender

1.1 The Procuring Entity indicated in the Tender Data

Sheet (TDS) invites Tenders for the construction of

works as specified in the Tender Data Sheet

1.2 The successful Tenderer will be expected to complete

the works by the completion date he/she has indicated.

1.3 The objectives of the works are listed in the

(Technical Specifications)

2. Eligible Tenderers 2.1 A Tenderer may be a natural person, private or public

company, government-owned institution, subject to

sub-Clause 3.4 or any combination of them with a

formal intent to enter into an agreement or under an

existing agreement in the form of a joint venture,

consortium, or association. In the case of a joint

venture, consortium, or association, all parties shall be

jointly and severally liable.

2.2 The Invitation for Tenders is open to all Contractors as

defined in the Public Procurement and Disposal Act,

2005 and the Public Procurement and Disposal

Regulations, 2006 except as provided hereinafter.

2.3 National Tenderers shall satisfy all relevant licensing

and/or registration with the appropriate statutory bodies

in Kenya, such as the Ministry of Public Works,

National Construction Authority or the Energy

Regulatory Commission.

2.4 A Tenderer shall not have a conflict of interest. All

Tenderers found to have a conflict of interest shall be

disqualified. A Tenderer may be considered to have a

conflict of interest with one or more parties in this

Tendering process, if they:

a) Are associated or have been associated in the past

directly or indirectly with employees or agents of

the Procuring Entity or a member of a board or

committee of the Procuring Entity;

Page 5: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

5

b) Are associated or have been associated in the past,

directly or indirectly with a firm or any of its

affiliates which have been engaged by the

Procuring Entity to provide consulting services for

the preparation of the design, specifications and

other documents to be used for the procurement of

the works under this Invitation for Tenders;

c) Have controlling shareholders in common; or

d) Receive or have received any direct or indirect

subsidy from any of them; or

e) Have the same legal representative for purposes of

this Tender; or

f) Have a relationship with each other, directly or

through common third parties, that puts them in a

position to have access to information about or

influence on the Tender of another Tenderer, or

influence the decisions of the Procuring Entity

regarding this Tendering process; or

g) Submit more than one Tender in this Tendering

process. However, this does not limit the

participation of subcontractors in more than one

Tender, or as Tenderer and subcontractor

simultaneously.

2.5 A Tenderer will be considered to have a conflict of

interest if they participated as a consultant in the

preparation of the design or technical specification of

the project and related services that are the subject of

the Tender.

2.6 Tenderers shall not be under a declaration of

ineligibility for corrupt and fraudulent practices issued

by the Government of Kenya in accordance with TDS

and GCC

2.7 Government owned enterprises in Kenya may

participate only if they are legally and financially

autonomous, if they operate under commercial law, are

registered by the relevant registration board or

Page 6: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

6

authorities and if they are not a dependent agency of

the Government.

2.7 Tenderers shall provide such evidence of their

continued eligibility satisfactory to the Procuring

Entity, as the Procuring Entity shall reasonably request.

3. One Tender per

Tenderer

3.1 A firm shall submit only one Tender, in the same

Tendering process, either individually as a Tenderer or

as a partner in a joint venture pursuant to ITT Clause 5.

3.2 No firm can be a subcontractor while submitting a

Tender individually or as a partner of a joint venture in

the same Tendering process.

3.3 A firm, if acting in the capacity of subcontractor in any

Tender, may participate in more than one Tender but

only in that capacity.

3.4 f

4. Alternative Tenders

by Tenderers

4.1 Tenderers shall submit offers that comply with the

requirements of the Tendering documents, including

the basic Tenderer’s technical design as indicated in

the specifications and Drawings and Bill of Quantities.

Alternatives will not be considered, unless specifically

allowed for in the Tender Data Sheet. If so allowed,

sub-Clause 4.2 and 4.3 shall govern.

4.2 When alternative times for completion are explicitly

invited, a statement to that effect will be included in the

Tender Data Sheet as will the method of evaluating

different times for completion.

4.3 If so allowed in the Tender Data Sheet, Tenderers

wishing to offer technical alternatives to the

requirements of the Tendering documents must also

submit a Tender that complies with the requirements of

the Tendering documents, including the basic technical

design as indicated in the specifications. In addition to

submitting the basic Tender, the Tenderer shall provide

all information necessary for a complete evaluation of

the alternative by the Procuring Entity, including

technical specifications, breakdown of prices, and other

relevant details. Only the technical alternatives, if any,

Page 7: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

7

of the lowest evaluated Tenderer conforming to the

basic technical requirements shall be considered by the

Procuring Entity.

5. Cost of Tendering 5.1 The Tenderer shall bear all costs associated with the

preparation and submission of its Tender, and the

Procuring Entity shall in no case be responsible or

liable for those costs, regardless of the conduct or

outcome of the Tendering process.

6. Site Visit and Pre-

Tender Meeting

6.1 The Tenderer, at the Tenderer’s own responsibility and

risk, is advised to visit and examine the Site of Works

and its surroundings and obtain all information that

may be necessary for preparing the Tender and

entering into a contract for construction of the Works.

The costs of visiting the Site shall be at the Tenderer’s

own expense.

6.2 The Procuring Entity may conduct a site visit and a

pre-Tender meeting. The purpose of the pre-Tender

meeting will be to clarify issues and to answer

questions on any matter that may be raised at that

stage.

6.3 The Tenderer’s designated representative is invited to

attend a site visit and pre-Tender meeting which, if

convened, will take place at the venue and time

stipulated in the Tender Data Sheet.

7.4 The Tenderer is requested as far as possible, to submit

any questions in writing or by electronic means to

reach the procuring Entity before the pre-Tender

meeting. It may not be practicable at the meeting to

answer all questions, but questions and responses will

be transmitted in accordance with sub-Clause 6.5.

6.5 Minutes of the pre-Tender meeting, including the text

of the questions raised and the responses given together

with any responses prepared after the pre-Tender

meeting will be transmitted within the time stated in

the Tender Data Sheet to all purchasers of the

Tendering documents. Any modification of the

Tendering documents listed in sub-Clause 8.1 that may

become necessary as a result of the pre-Tender meeting

Page 8: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

8

shall be made by the Procuring Entity exclusively

through the issue of an Addendum pursuant to ITT sub

Clause 10.2 and not through the minutes of the pre-

Tender meeting.

6.6 Non-attendance during the site visit or pre-Tender

meeting will not be a cause for disqualification of a

Tenderer unless specified to the contrary in the Tender

Data Sheet.

B. Tendering Documents

7 Content of Tendering

Documents

7.1 The works required, Tendering procedures, and

contract terms are prescribed in the Tendering

Documents. In addition to the Section I Invitation for

Tenders, Tendering documents which should be read in

conjunction with any addenda issued in accordance

with ITT sub Clause 9.2 include:

Section II Instructions to Tenderers

Section III Tender Data Sheet

Section IV General Conditions of Contract

Section V Contract Data Sheet

Section VI Specifications

Section VII Drawings

Section VIII Bill of Quantities

Section IX Forms of Tender

Form of Tender

Appendix to Tender

Confidential Business Questionnaire

Integrity Declaration

Letter of Acceptance

Form of Contract Agreement

Section X Forms of Security

Tender Securing Form

Performance Bank or Insurance Guarantee

Advance Payment Guarantee

7.2 The number of copies to be completed and returned

with the Tender is specified in the Tender Data Sheet.

Page 9: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

9

7.3 The Invitation for Tenders (Section I) issued by the

Procuring Entity is not part of the Tendering

Documents and isr included for reference purposes

only. In case of discrepancies between the Invitation

for Tenders and the Tendering Documents listed in

sub-Clause 7.1 above, the said Tendering Documents

will take precedence.

7.4 The Procuring Entity is not responsible for the

completeness of the Tendering Documents and their

addenda, if they were not obtained directly from the

authorized staff of the Procuring Entity.

7.5 The Tenderer is expected to examine all instructions,

forms, terms and specifications in the Tendering

documents. Failure to furnish all information required

by the Tendering Documents or to submit a Tender

substantially responsive to the Tendering documents in

every respect will be at the Tenderer’s risk and may

result in the rejection of its Tender.

8. Clarification of

Tendering

Documents

8.1 A prospective Tenderer requiring any clarification of

the Tendering documents may notify the Procuring

Entity in writing, e-mail or facsimile at the Procuring

Entity's address indicated in the Tender Data Sheet.

8.2 The Procuring Entity will within the period stated in

the Tender Data Sheet respond in writing to any

request for clarification provided that such request is

received no later than the period indicated in the

Tender Data Sheet prior to the deadline for the

submission of Tenders prescribed in sub-Clause 21.1.

8.3 Copies of the procuring entity's response will be

forwarded to all Purchasers of the Tendering

documents, including a description of the inquiry, but

without identifying its source.

8.4 Should the Procuring Entity deem it necessary to

amend the Tendering documents as a result of a

clarification, it shall do so following the procedure

under ITT Clause 9

Page 10: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

10

9. Amendments of the

Tendering

Documents

9.1 Before the deadline for submission of Tenders, the

Procuring Entity may, for any reason, whether at its

own initiative or in response to a clarification requested

by a prospective Tenderer, modify the Tendering

documents by issuing addenda.

9.2 Any addendum issued shall be part of the Tender

documents pursuant to sub-Clause 7.1 and shall be

communicated in writing, by e-mail or facsimile to all

who have obtained the Tendering documents directly

from the Procuring Entity.

9.3 In order to allow prospective Tenderers reasonable

time in which to take an addendum into account in

preparing their Tenders, the Procuring Entity at its

discretion shall extend, as necessary, the deadline for

submission of Tenders, in accordance with sub-Clause

21.2

C. Preparation of Tenders

10. Language of

Tender

10.1 The Tender, and all correspondence and documents

related to the Tender exchanged by the Tenderer and

the Procuring Entity shall be written in the Tender

language stipulated in the Tender Data Sheet.

Supporting documents and printed literature furnished

by the Tenderer may be in another language provided

they are accompanied by an accurate translation of the

relevant passages in the above stated language, in

which case, for purposes of interpretation of the

Tender, the translation shall prevail.

11. Documents

Constituting the

Tender

11.1 The Tender submitted by the Tenderer shall consist of

the following components:

a) The Form of Tender (in the format indicated in

Section IX) completed in accordance with ITT

Clause 14, 15 and 16;

b) Information requested by Instructions to Tenderers

ITT sub-Clause 12.2; 12.3 and 12.4;

c) Tender Securing Declaration in accordance with

Instructions to Tenderers ITT Clause 18;

Page 11: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

11

d) Priced Bill of Quantities;

e) Qualification Information Form and Documents;

f) Alternative offers where invited in accordance with

Instructions to Tenderers ITT Clause 4;

g) Written confirmation authorizing the signatory of

the Tender to commit the Tenderer in accordance

with Instructions to Tenderers ITT sub Clause 18.2;

and

h) And any information or other materials required to

be completed and submitted by Tenderers, as

specified in the Tender Data Sheet.

12. Documents

Establishing

Eligibility and

Qualifications

of the

Tenderer

12.1 Pursuant to ITT Clause 12, the Tenderer shall furnish,

as part of its Tender, documents establishing the

Tenderer’s eligibility to Tender and its qualifications to

perform the contract if its Tender is accepted.

12.2 In the event that pre-qualification of potential

Tenderers has been undertaken, only Tenders from pre-

qualified Tenderers will be considered for award of

contract. These qualified Tenderers should submit their

Tenders with any information updating the original

pre-qualification applications or, alternatively, confirm

in their Tenders that the originally submitted pre-

qualification information remains essentially correct as

of the date of Tender submission. The update or

confirmation should be provided in Section IX.

12.3 If the Procuring Entity has not undertaken pre-

qualification of potential Tenderers, to qualify for

award of the contract, Tenderers shall meet the

minimum qualifying criteria specified in the Tender

Data Sheet:

12.4 Tenders submitted by a joint venture of two or more

firms as partners shall comply with the following

requirements, unless otherwise stated in the Tender

Data Sheet:

a) The Tender shall include all the information listed in

the Tender Data Sheet pursuant to sub-Clause 12.3

Page 12: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

12

above for each joint venture partner;

b) The Tender shall be signed so as to be legally

binding on all partners;

c) One of the partners will be nominated as being in

charge, and this authorization shall be evidenced by

submittying a power of attorney signed by legally

authorized signatories of all the partners;

d) The partner in charge shall be authorized to incur

liabilities and receive instructions for and on behalf

of any and all partners of a joint venture and the

entire execution of the Contract, including payment,

shall be done exclusively with the partner in charge;

e) All partners of the joint venture shall be liable

jointly and severally for the execution of the

contract in accordance with the contract terms and a

statement to this effect shall be included in the

authorization mentioned under (c) above as well as

in the Tender and in the Agreement (in case of a

successful Tender); and

f) A copy of the joint venture agreement entered into

by all partner shall be submitted with the Tender.

Alternatively, a Letter of Intent to execute a joint

venture agreement in the event of a successful

Tender shall be signed by all partners and submitted

with the Tender, together with a copy of the

proposed Agreement.

g) Tender Securing Declaration as stated in accordance

with ITT Clause 18, and in case of a successful

Tender, the Agreement, shall be signed so as to be

legally binding on all partners.

13. Lots Package 13.1 When Tendering for more than one contract under the

lots arrangements, the Tenderer must provide evidence

that it meets or exceeds the sum of all the individual

requirements for the lots being tendered in regard to:

a) Average annual turnover;

b) Particular experience including key production

rates;

Page 13: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

13

c) Financial means, etc;

d) Personnel capabilities; and

e) Equipment capabilities.

13.2 In case the Tenderer fail to fully meet any of these

criteria, it may be qualified only for those lots for

which the Tenderer meets the above requirement.

14. Form of

Tender

14.1 The Tenderer shall fill the Form of Tender furnished in

the Tendering Documents. The Form of Tender must

be completed without any alterations to its format and

no substitute shall be accepted.

15. Tender Prices 15.1 The Contract shall be for the whole Works, as

described in sub-Clause 1.1, based on the priced Bill of

Quantities submitted by the Tenderer.

15.2 The Tenderer shall fill in rates and prices for all items

of the Works described in the Bill of Quantities. Items

for which no rate or price is entered by the Tenderer

will not be paid for by the Procuring Entity when

executed and shall be deemed covered by the other

rates and prices in the Bill of quantities.

15.3 All duties, taxes and other levies payable by the

Contractor under the Contract, or for any other cause,

as of the date 15 days prior to the deadline for

submission of Tenders, shall be included in the rates,

prices and total Tender price submitted by the

Tenderer.

15.4 The rates and prices quoted by the Tenderer shall be

subject to adjustment during the performance of the

Contract if provided for in the Tender Data Sheet and

the provisions of the Conditions of Contract. The

Tenderer shall submit with the Tender all the

information required under the Contract Data Sheet.

16. Tender

Currencies

16.1 The unit rates and prices shall be quoted by the

Tenderer in the currency as specified in the Tender

Data Sheet.

16.2 Tenderers shall indicate details of their expected

foreign currency requirements in the Tender, if any.

Page 14: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

14

The rates of exchange to be used by the Tenderers in

arriving at the local currency equivalent shall be the

selling rates for similar transactions established by the

authority specified in the Tender Data Sheet

prevailing on the date 28 days prior to the latest

deadline for submission of Tenders. These exchange

rates shall apply for all payments so that no exchange

risk will be borne by the Tenderer. In any case,

payments will be computed using the rates quoted in

the Tender.

16.3 Tenderers may be required by the Procuring Entity to

clarify their foreign currency requirements and to

substantiate that the amounts included in the rates and

prices and in the Contract Data Sheet are reasonable

and responsive to sub-Clause 16.1.

17.Tender

Validity

Period

17.1 Tenders shall remain valid for the period specified in

the Tender Data Sheet after the Tender submission

deadline prescribed by the Procuring Entity, pursuant

to ITT Clause 21. A Tender valid for a shorter period

shall be rejected by the Procuring Entity as non

responsive.

17.2 In exceptional circumstances, prior to expiry of the

original Tender validity period, the Procuring Entity

may request that the Tenderers extend the period of

validity for a specified additional period. The request

and the Tenderers' responses shall be made in writing

or by cable. A Tenderer may refuse the request without

forfeiting its Tender Security or causing to be executed

its Tender Securing declaration. A Tenderer agreeing to

the request will not be required or permitted to

otherwise modify the Tender, but will be required to

extend the validity of its Tender Security or Tender

Securing declaration for the period of the extension,

and in compliance with ITT Clause 18 in all respects.

17.3 In the case of fixed price contracts, if the award is

delayed by a period exceeding sixty (60) days beyond

the expiry of the initial Tender validity period, the

contract price will be increased by a factor specified in

the request for extension. The Tender evaluation shall

be based on the Tender price without taking into

consideration on the above correction.

Page 15: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

15

18. Tender

Security

18.1 Pursuant to ITT Clause 11, where required in the

Tender Data Sheet, the Tenderer shall furnish as part

of its Tender, a Tender Security in original form and in

the amount and currency specified in the Tender Data

Sheet.

18.2 The Tender Security or Tender Securing Declaration is

required to protect the Procuring Entity against the risk

of Tenderer’s conduct which would warrant the

security’s forfeiture, pursuant to ITT sub-Clause 18.9.

18.3 The Tender Security shall be denominated in the

currency of the Tender and shall be in one of the

following forms:

a) Cash;

b) A Bank Guarantee;

c) An Insurance Bond issued by an insurance firm

approved by the PPOA located in Kenya;

d) An irrevocable letter of credit issued by a reputable

bank.

18.4 The Tender Security shall be in accordance with the

Form of the Tender Security included in Section X or

another form approved by the Procuring Entity prior to

the Tender submission.

18.5 The Tender Security shall be payable promptly upon

written demand by the Procuring Entity in case any of

the conditions listed in sub-Clause 18.8 are invoked.

18.6 Any Tender not accompanied by a Tender Security in

accordance with sub-Clauses 18.1 or 18.3 shall be

rejected by the Procuring Entity as non-responsive,

pursuant to ITT Clause 27.

18.7 The Procuring Entity shall immediately release any

Tender Security if:

a) The procuring proceedings are terminated;

Page 16: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

16

b) The Procuring Entity determines that none of the

submitted Tenders is responsive;

c) A contract for the procurement is entered into.

19.8 The Tender Security shall be forfeited if the Tenderer:

a) Withdraws its Tender after the deadline for

submitting Tenders but before the expiry of the

period during which Tenders must remain valid;

b) Rejects a correction of an arithmetic error pursuant

to sub-Clause 28.2;

c) Refuse to enter into a written contract in accordance

with ITT Clause 39;

d) Fails to furnish the Performance Security in

accordance with ITT Clause 40.

18.9 The Tender Security of a joint venture must be in the

name of the joint venture submitting the Tender.

18.10 A Tenderer shall be suspended from being eligible for

Tendering in any contract with the Procuring Entity for

the period of time indicated

a) If the Tenderer withdraws its Tender, except as

provided in ITT sub-Clauses 17.2 and 28.2; or

b) In the case of a successful Tenderer, if the Tenderer

fails within the specified time limit to:

(i) Sign the contract; or

(ii) Furnish the required Performance Security.

19. Format and

Signing of

Tender

19.1 The Tenderer shall prepare one original of the

documents comprising the Tender as described in ITT

Clause 11 of these Instructions to Tenderers, with the

Form of Tender, and clearly marked “ORIGINAL”.

In addition, the Tenderer shall submit copies of the

Tender, in the number specified in the Tender Data

Sheet, and clearly marked as “COPIES”. In the event

of discrepancy between them, the original shall prevail.

Page 17: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

17

D. Submission of Tenders

20. Sealing

and Marking

of Tenders

20.1 The Tenderer shall seal the original and each copy of the Tender

in separate envelopes, duly marking the envelopes as

“ORIGINAL” and “COPY”. The envelopes shall then be

sealed in an outer envelope securely sealed in such a manner

that opening and resealing cannot be achieved undetected.

20.2 The inner and outer envelopes shall:

a) Be addressed to the Procuring Entity at the address given in

the Tender Data Sheet; and

b) Bear the Project name indicated in the Tender Data Sheet,

the Invitation for Tenders (IFT) title and number indicated in

the Tender Data Sheet, and a statement: “DO NOT OPEN

BEFORE,” to be completed with the time and the date

specified in the Tender Data Sheet, pursuant to ITT sub-

Clause 21.1.

20.3 In addition to the identification required in sub-Clause 20.2, the

19.2 The original and all copies of the Tenders shall be

typed or written in indelible ink and shall be signed by

a person or persons duly authorized to sign on behalf of

the Tenderer. This authorization shall consist of a

written confirmation as specified in the Tender Data

Sheet and shall be attached to the Tender. The name

and position held by each person signing the

authorization must be typed or printed below the

signature. All pages of the Tender, except for un-

amended printed literature, shall be initialled by the

person or persons signing the Tender.

19.3 Any interlineations, erasures, or overwriting shall be

valid only if they are initialled by the person or persons

signing the Tender.

19.4 The Tenderer shall furnish information as described in

the Form of Tender on commissions or gratuities, if

any, paid or to be paid to agents relating to this Tender

and to contract execution if the Tenderer is awarded the

contract

Page 18: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

18

inner envelopes shall also indicate the name and address of the

Tenderer to enable the Tender be returned unopened in case it is

declared late, pursuant to sub-Clause 21.1 and for matching

purpose under ITT Clause 22

20.4 If the outer envelope is not sealed and marked as required by

ITT sub clause 20.2, the Procuring Entity shall assume no

responsibility for misplacement or premature opening of the

Tender.

21. Deadline for

Submission

of Tenders

21.1 Tenders shall be received by the Procuring Entity at the address

specified under ITT sub-Clause 20.2 no later than the date and

time specified in the Tender Data Sheet.

21.2 The Procuring Entity may, in exceptional circumstances and at

its discretion, extend the deadline for the submission of Tenders

by amending the Tendering documents in accordance with ITT

Clause 8, in which case all rights and obligations of the

Procuring Entity and Tenderers previously subject to the

deadline will thereafter be subject to the new deadline.

21.3 The extension of the deadline for submission of Tenders shall

not be made later than the period specified in the Tender Data

Sheet before the expiry of the original deadline.

22. Late Tenders 22.1 The Procuring Entity shall not consider for evaluation any

Tender that arrives after the deadline for submission of Tenders,

in accordance with ITT Clause 21.

22.2 Any Tender received by the Procuring Entity after the deadline

for submission of Tenders shall be declared late, rejected and

returned unopened to the Tenderer

23. Modification,

Substitution

and

Withdrawal

of Tenders

23.1 A Tenderer may modify or substitute or withdraw its Tender

after it has been submitted, provided that written notice of the

modification, including substitution or withdrawal of the

Tender, is received by the Procuring Entity prior to the deadline

prescribed for submission of Tenders prescribed under ITT sub-

Clause 21.1.

23.2 The Tenderer’s modification or substitution or withdrawal

notice shall be prepared, sealed, marked, and dispatched in

accordance with the provisions of ITT Clauses 19 and 20 with

Page 19: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

19

the outer and inner envelopes additionally marked

“MODIFICATION” or SUBSTITUTION or

“WITHDRAWAL” as appropriate. The notice may also be sent

by electronic mail and facsimile, but followed by a signed

confirmation copy, postmarked not later than the deadline for

submission of Tenders.

23.3 No Tender may be withdrawn, replaced or modified in the

interval between the deadline for submission of Tenders and the

expiration of the period of Tender validity specified by the

Tenderer on the Tender Form. Withdrawal of a Tender during

this interval shall result in the Tenderer’s forfeiture of its Tender

Security or execution of Tender Securing Declaration, pursuant

to the ITT sub-Clause 18.9.

23.4 Withdrawal of a Tender between the deadline for submission of

Tenders and the expiration of the period of Tender validity

specified in the Tender Data Sheet or as extended pursuant to

sub-Clause 21.2 shall result in the forfeiture of the Tender

Security and execution of Tender Securing Declaration pursuant

to ITT sub-Clause 18.9.

23.5 Tenderers may only offer discounts to, or otherwise modify the

prices of their Tenders by submitting Tender modifications in

accordance with this Clause, or included in the original Tender

submission.

E. Opening and Evaluation of Tenders

24. Opening of

Tenders

24.1 The Procuring Entity will open all Tenders including

modifications, substitution or withdraw notices made

pursuant to ITT Clause 23, in public, in the presence of

Tenderers or their representatives who choose to attend

and other parties with legitimate interest and Tender

proceedings, at the place on the date and at time

specified in the Tender Data Sheet. The Tenderers’

representatives who are present shall sign a register as

proof of their attendance.

24.2 Envelopes marked “WITHDRAWAL” shall be

opened and read out first. Tenders for which an

acceptable notice of withdrawal has been submitted

pursuant to ITT Clause 23 shall not be opened but

returned to the Tenderer. If the withdrawal envelope

does not contain a copy of the “Power of Attorney”

Page 20: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

20

confirming the signature as a person duly authorized to

sign on behalfee of the Tenderer, the corresponding

Tender will be opened. Subsequently, all envelopes

marked "MODIFICATION" shall be opened and the

submissions therein read out in appropriate detail.

Thereafter all envelopes marked or

"SUBSTITUTION" opened and the submissions

therein read out in appropriate detail.

24.3 All other envelopes shall be opened one at a time. The

Tenderers' names, the Tender prices, the total amount

of each Tender and of any alternative Tender (if

alternatives have been requested or permitted), any

discounts, the presence or absence of Tender security,

and such other details as the appropriate tender opening

committee may consider appropriate, will be

announced by the Secretary of the Tender Opening

Committee at the opening.

24.4 Tenders or modifications that are not opened and not

read out at Tender opening shall not be considered

further for evaluation, irrespective of the

circumstances. In particular, any discount offered by a

Tenderer which is not read out at Tender opening shall

not be considered further.

24.5 Tenderers are advised to send in a representative with

the knowledge of the content of the Tender who shall

verify the information read out from the submitted

documents. Failure to send a representative or to point

out any un-read information by the sent Tenderer’s

representative shall indemnify the Procuring Entity

against any claim or failure to read out the correct

information contained in the Tenderer’s Tender.

24.6 No Tender will be rejected at Tender opening except

for late Tenders which will be returned unopened to the

Tenderer, pursuant to ITT Clause 22.

24.7 The Secretary of the appropriate tender opening

committee shall prepare minutes of the Tender

opening. The record of the Tender opening shall

include, as a minimum: the name of the Tenderers and

whether or not there is a withdrawal, substitution or

modification, the Tender price per Lot if applicable,

Page 21: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

21

including any discounts and alternative offers and the

presence or absence of a Tender Security

24.8 The Tenderers’ representatives who are present shall be

requested to sign the record. The omission of a

Tenderer’s signature on the record shall not invalidate

the contents and affect the record.

24.9 A copy of the minutes of the Tender opening shall be

furnished to individual Tenderers upon request.

25. Confidentiality 25.1 Information relating to the examination, clarification,

evaluation, and comparison of Tenders and

recommendations for the award of a Contract shall not

be disclosed to Tenderers or any other persons not

officially concerned with such process until the award

to the successful Tenderer has been announced.

25.2 Any effort by a Tenderer to influence the Procuring

Entity’s processing of Tenders or award decisions may

result in the rejection of his Tender.

25.3 Notwithstanding sub-Clause 25.2, from the time of

Tender opening to the time of Contract award, if any

Tenderer wishes to contact the Procuring Entity on any

matter related to the Tendering process, it should do so

in writing.

26. Clarification of

Tenders

26.1 To assist in the examination, evaluation, comparison of

Tenders and post-qualification of the Tenderer, the

Procuring Entity may, at its discretion, ask a Tenderer

for clarification of its Tender including breakdown of

prices. Any clarification submitted by a Tenderer that

is not in response to a request by the Procuring Entity

shall not be considered.

26.2 The request for clarification and the response shall be

in writing. No change in the prices or substance of the

Tender shall be sought, offered, or permitted except to

confirm the correction of arithmetic errors discovered

by the Procuring Entity in the evaluation of Tenders in

accordance with ITT Clause 27.

26.3 From the time of Tender opening to the time of

Contract award if any Tenderer wishes to contact the

Page 22: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

22

Procuring Entity on any matter related to the Tender it

should do so in writing.

27. Preliminary

Examination of

Tenders

27.1 Prior to the detailed evaluation of Tenders, the

Procuring Entity will determine whether:

a) The Tender has been submitted in the required

format;

b) Any Tender Security submitted is in the required

form, amount and validity period;

c) The Tender has been signed by the person lawfully

authorized to do so;

d) The required number of copies of the Tender have

been submitted;

e) The Tender is valid for the period required;

f) All required documents and information have been

submitted; and

g) Any required samples have been submitted.

27.2 The Procuring Entity will confirm that the documents

and information specified under ITT Clause 11 and ITT

Clause 12 have been provided in the Tender. If any of

these documents or information is missing, or is not

provided in accordance with the Instructions to

Tenderers, the Tender shall be rejected. The

evaluation shall be carried out in three phases

comprising compliance to preliminary or general

requirements, compliance to technical specifications

and financial evaluation. Tenderers deemed to be non-

compliant to preliminary or general requirements shall

be disqualified henceforth and their bid not subjected to

the second phase of evaluation of compliance to

Technical Specifications. Similarly, tenderers whose

bids shall be deemed to be non-compliant to Technical

Specifications shall be disqualified at that stage and

their bids not subjected to the final phase of financial

evaluation. Bids established to be compliant to both

Preliminary or General Requirements shall be

subjected to financial evaluation and tender awarded to

Page 23: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

23

the lowest evaluated bidder. Apart from the

requirements captured in Section 27.0, some of the

Preliminary or General Requirements are captured in

Sections IX (A-I) and Section X.

27.3 The Procuring Entity may waive any minor

informality, nonconformity, or irregularity in a Tender

which does not constitute a material deviation,

provided such waiver does not prejudice or affect the

relative ranking of any Tenderer.

27.4 A substantially responsive Tender is one which

conforms to all the terms, conditions, and

specifications of the Tendering documents, without

material deviation or reservation. A material deviation

or reservation is one that:

a) Affects in any substantial way the scope, quality, or

execution of the Works;

b) Limits in any substantial way, inconsistent with the

Tendering documents, the Procuring Entity's rights

or the Tenderer’s obligations under the Contract; or

c) If rectified, would affect unfairly the competitive

position of other Tenderers presenting substantially

responsive Tenders.

27.5 If a Tender is not substantially responsive, it will be

rejected by the Procuring Entity, and may not

subsequently be made responsive by correction or

withdrawal of the non-conforming deviation or

reservation.

28. Correction of

Errors

28.1 Tenders determined to be substantially responsive will

be checked by the Procuring Entity for any arithmetic

errors. Errors will be corrected by the Procuring Entity

as follows:

a) If there is a discrepancy between unit prices and the

total price that is obtained by multiplying the unit

price and quantity, the unit price shall prevail, and

the total price shall be corrected, unless in the

opinion of the Procuring Entity there is an obvious

misplacement of the decimal point in the unit price,

Page 24: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

24

in which the total price as quoted shall govern and

the unit price shall be corrected;

b) If there is an error in a total corresponding to the

addition or subtraction of subtotals, the subtotals

shall prevail and the total shall be corrected; and

c) Where there is a discrepancy between the amounts

in figures and in words, the amount in words will

govern.

28.2 The amount stated in the Tender will be adjusted by the

Procuring Entity in accordance with the above

procedure for the correction of errors and, with, the

concurrence of the Tenderer, shall be considered as

binding upon the Tenderer. If the Tenderer does not

accept the corrected amount, its Tender will then be

rejected, and the Tender Security may be forfeited and

the Tender Securing Declaration may be executed in

accordance with sub-Clause 18.9.

29. Conversion to

Single

Currency

29.1 To facilitate the evaluation and comparison, the

Procuring Entity will convert all Tender prices

expressed in the amounts in various currencies in

which the Tender prices are payable to Kenya Shillings

at the selling exchange rate established for similar

transactions by the Central Bank of Kenya ruling on

the date specified in the Tender Data Sheet.

30. Comparison of

Tenders

30.1 The Procuring Entity shall evaluate and compare only

the Tenders determined to be substantially responsive

in accordance with ITT Clause 27.

30.2 In evaluating the Tenders, the Procuring Entity will

determine for each Tender the evaluated Tender price

by adjusting the Tender price as follows:

Making any correction for errors pursuant to ITT

Clause 28;

Excluding provisional sums and the provision, if any

for contingencies in the Bill of Quantities, but

including Day work , where priced competitively ; and

Making appropriate adjustments to reflect discounts or

other price modifications offered in accordance with

Page 25: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

25

sub-Clause 23.5.

30.3 The Procuring Entity may waive any minor informality

or non-conformity, which does not constitute a material

deviation, provided such waiver does not prejudice or

affect the relative standing of any Tenderer.

Variations, deviations, and alternative offers and other

factors, which are in excess of the requirements of the

Tendering documents or otherwise result in unsolicited

benefits for the Procuring Entity will not be taken into

account in Tender evaluation.

31. National

Preference

31.1 In the evaluation of Tenders the Procuring Entity shall

apply exclusive preference to citizens of Kenya where:

a) The funding is 100% from the Government of

Kenya or a Kenyan body;

b) The amounts are below the prescribed threshold in

the Tender Data Sheet

31.2 To qualify for the preference the candidate shall

provide evidence of eligibility by:

a) Proving Kenyan citizenship by production of a

Kenyan Identity Card; or

b) Providing proof of being a “citizen contractor” in

terms of section 3(1) of the Act, i.e. being a natural

person or an incorporated company wholly owned

and controlled by persons who are citizens of

Kenya.

c) Foreign successful bidder must incorporate a mix of

local expertise either through subcontracting, or

technical expertise

31.3 The Minister of Finance may prescribe additional

preference and/or reservation schemes, for example for

procurements above these thresholds. If such

additional preference schemes apply, details will be

given in the Tender Data Sheet.

Page 26: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

26

32. Determination

of the Lowest

Evaluated

Tender

32.1 The Tender with the lowest evaluated price from

among those which are eligible, compliant and

substantially responsive shall be the lowest evaluated

Tender.

33. Post-

Qualification of

Tenderer

33.1 If specified in the Tender Data Sheet, post-

qualification shall be undertaken.

33.2 The Procuring Entity will determine to its satisfaction

whether the Tenderer that is selected as having

submitted the lowest evaluated responsive Tender is

qualified to perform the contract satisfactorily, in

accordance with the criteria listed in sub-Clause 12.3.

33.3 The determination will take into account the Tenderer’s

financial, technical, and production capabilities. It will

be based upon an examination of the documentary

evidence of the Tenderer’s qualifications submitted by

the Tenderer, pursuant to sub-Clause 12.3, as well as

such other information as the Procuring Entity deems

necessary and appropriate. Factors not included in

these Tendering documents shall not be used in the

evaluation of the Tenderer’s qualifications.

33..4 An affirmative determination will be a prerequisite for

award of the contract to the Tenderer. A negative

determination will result in rejection of the Tenderer’s

Tender, in which event the Procuring Entity will

proceed to the next lowest evaluated Tender to make a

similar determination of that Tenderer’s capabilities to

perform satisfactorily.

F. Award of Contract

34. Criteria of Award 34.1 Subject to ITT Clause 34 and 35, the Procuring Entity will

award the Contract to the Tenderer whose Tender has

been determined to be substantially responsive to the

Tendering documents and who has offered the lowest

Evaluated Tender Price, provided that such Tenderer has

been determined to be:

Page 27: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

27

a) Eligible in accordance with the provisions of ITT

Clause 2;

b) Is determined to be qualified to perform the Contract

satisfactorily;

c) Successful negotiations have been concluded.

35.2 If, pursuant to sub-Clause 13.1, this Contract is being

awarded on a “lot and package” basis, the lowest

evaluated Tender price will be determined when

evaluating this Contract in conjunction with other

Contracts to be awarded concurrently, taking into account

any discounts offered by the Tenderer for award of more

than one Contract.

35. Clarifications 35.1 Clarifications may be undertaken with the lowest

evaluated Tenderer relating to the following areas:

a) A minor alteration to the technical details of the

statement of requirements;

b) Reduction of quantities for budgetary reasons, where

the reduction is in excess of any provided for in the

Tendering documents;

c) A minor amendment to the Contract Data Sheet;

d) Finalizing payment arrangements;

e) Mobilization arrangements;

f) Agreeing final delivery or work schedule to

accommodate any changes required by the Procuring

Entity;

g) The methodology or staffing; or

h) Clarifying details that were not apparent or could not

be finalized at the time of Tendering.

35.2 Clarifications shall not change the substance of the tender.

36. Procuring Entity’s Right to

Accept any Tender and to

36.1 Notwithstanding ITT Clause 34, the Procuring Entity

reserves the right to accept or reject any Tender, and to

Page 28: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

28

Reject any or all Tenders cancel the Tendering process and reject all Tenders, at

any time prior to the award of Contract, without thereby

incurring any liability to the affected Tenderer or

Tenderers.

36.2 Notice of the rejection of all Tenders shall be given

promptly within 14 days to all Contractors that have

submitted Tenders.

36.3 The Procuring Entity shall upon request communicate to

any Tenderer the grounds for its rejection of its Tenders,

but is not required to justify those grounds.

37 Procuring Entities Right to

Vary Quantities at the Time

of Award

37.1 The Procuring Entity reserves the right at the time of

contract award to increase or decrease the quantity of

goods or related services originally specified in these

Tendering documents (schedule of requirements)

provided this does not exceed by the percentage indicated

in the Tender Data Sheet, without any change in unit

price or other terms and conditions of the Tender and

Tendering documents.

38. Notification of Award 38.1 The Tenderer whose Tender has been accepted will be

notified of the award by the Procuring Entity prior to

expiration of the Tender validity period by e-mail or

facsimile confirmed by registered letter. This letter

(hereinafter and in the Conditions of Contract called the

"Letter of Acceptance") will state the sum that the

Procuring Entity will pay the Contractor in consideration

of the provision and maintenance of the Work(s) as

prescribed by the Contract (hereinafter and in the Contract

called the “Contract Price”).

38.2 The notification of award will constitute the formation of

the Contract, subject to the Tenderer furnishing the

Performance Security in accordance with ITT Clause 39

and signing the Contract in accordance with sub-Clause

38.2

38.3 At the same time as the person submitting the successful

Tender is notified, the Procuring Entity will notify each

unsuccessful Tenderer, the name of the successful

Tenderer and the Contract amount and will discharge the

Tender Security and Tender Securing Declaration of the

Page 29: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

29

Tenderer pursuant to ITT sub Clause 18.7.

38.4 If, after notification of award, a Tenderer wishes to

ascertain the grounds on which it’s Tender or application

for pre-qualification was unsuccessful, it should address

its request to the secretary of the Tender Committee that

authorized the award of contract. The secretary of the

Tender Committee shall, within fourteen days after a

request, provide written reasons as to why the Tender,

proposal or application to be pre-qualified was

unsuccessful. However, failure to take this opportunity to

clarify the grounds for rejection does not affect the

Tenderer’s right to seek immediate review by the Public

Procurement Administrative Review Board under Clause

45.

39. Signing of Contract 39.1 Promptly, and in no case later than 14 days, after

notification, Procuring Entity shall send the successful

Tenderer the Agreement and Contract Data Sheet,

incorporating all agreements between the parties obtained

as a result of Contract negotiations.

39.2 Within the period specified in the notification or Tender

Data Sheet but not earlier than fourteen (14) days since

notification of award of contract, the successful Tenderer

shall sign and date the contract and return it to the

Procuring Entity.

40. Performance Security 40.1 Within fifteen (15) days but after 7days after receipt of

the Letter of Acceptance, the successful Tenderer shall

deliver to the Procuring Entity a Performance Security in

the amount and in the form stipulated in the Tender Data

Sheet and the Contract Data Sheet, denominated in the

type and proportions of currencies in the Letter of

Acceptance and in accordance with the Conditions of

Contract.

40.2 If the Performance Security is provided by the successful

Tenderer in the form of a Bank Guarantee or Insurance

Bond, it shall be issued either:

a) At the Tenderer’s option, by a bank or insurance firm

located in Kenya, or a foreign bank or insurance firm

through a correspondent bank or insurance firm located

in Kenya;

Page 30: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

30

b) With the consent of the Procuring entity, directly by a

foreign bank acceptable to the Procuring entity.

40.3 Failure of the successful Tenderer to comply with the

requirement of sub-Clause 40.1 shall constitute sufficient

grounds for the annulment of the award and forfeiture of

the Tender Security, in which event the Procuring Entity

may make the award to the next lowest evaluated

Tenderer or call for new Tenders.

41. Advance Payment 41.1 The Procuring Entity will provide an Advance Payment as

stipulated in the Conditions of Contract, subject to a

maximum amount, as stated in the Tender Data Sheet.

41.2 The Advance Payment request shall be accompanied by

an Advance Payment Security (Guarantee) in the form

provided in Section X. For the purpose of receiving the

Advance Payment, the Tenderer shall make an estimate

of, and include in its Tender, the expenses that will be

incurred in order to commence work. These expenses

will relate to the purchase of equipment, machinery,

materials, and on the engagement of labour during the

first month beginning with the date of the Procuring

Entity’s “Notice to Commence” as specified in the

Contract Data Sheet.

Page 31: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

31

SECTION III

TENDER DATA SHEET (TDS)

Instructions to Tenderers Clause Reference

TDS

Ref.

No

ITT

Clause

No

Amendments of, and Supplements to, Clauses in the Instruction to Tenderers

A. Introduction

1. The “Procuring Entity” also called Employer is The Kenya Electricity Generating

Company Limited (KenGen).

2. The works include Design, Manufacture, Supply, Installation, Test and

Commissioning of Deluge Fire Protection Systems for Generator Transformers

and Station Transformers in 7 Forks Power Stations

3. The duration of implementation from commencement date of the works to the date of

issue of the Taking Over Certificate shall be 104 weeks

4. The main objective of the project is completion as per Procuring entity instructions.

5. Corruption and ethical standards

The Government requires that Procuring Entities (including beneficiaries of

Government funded projects) as well as Tenderers/Suppliers/Contractors under

Government financed contracts, observe the highest standard of ethics during the

procurement and execution of such contracts. It is the responsibility of the Procuring

Entity to ensure that Tenderers, suppliers, and contractors and their subcontractors

observe the highest standard of ethics during the procurement and execution of such

contracts. In pursuance of this policy:

For the purpose of this provision, the following definitions are provided:

(i). “Corruption” has the meaning assigned to it in the Anti-Corruption

and Economic Crime Act 2003 and includes the offering, giving,

receiving or soliciting of anything of value to influence the action of a

public official in the procurement or disposal process or in contract

execution;

(ii). “Fraudulent Practice” includes a misrepresentation of fact in order to

Page 32: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

32

influence a procurement or disposal process or the execution of a

contract to the detriment of the Procuring Entity and includes collusive

practices amongst Tenderers prior to or after Tender submission

designed to establish Tender prices at artificial non-competitive levels

and deprive the Procuring Entity of the benefits of free and open

competition;

(iii). “Collusive Practice” means an arrangement between two or more

suppliers, contractors and subcontractors designed to achieve an

improper purpose, including to influence improperly the actions of the

Procuring Entity prior to or after Tender submission, designed to

establish Tender prices at artificial non-competitive levels and to

deprive the Procuring Entity of the benefit of free and open

competition;

(iv). “Coercive Practice” means impairing or harming, or threatening to

impair or harm, directly or indirectly a supplier, contractor or

subcontractor or the property of any of them to influence improperly

the actions of a Procuring Entity;

(v). “Obstructive Practice” means deliberately destroying, falsifying,

altering or concealing of evidence material to the investigation or

making false statements to investigators in order to materially impede

an investigation into allegations of a corrupt, fraudulent, coercive or

collusive practice; and /or threatening, harassing or intimidating any

party to prevent it from disclosing its knowledge of matters relevant to

the investigation or from pursuing the investigation.

A Procuring Entity has the right to require that Tenderers, suppliers, and

contractors and their subcontractors permit persons duly appointed by

KACC/PPOA/KNAO to inspect their accounts and records and other documents

relating to the Tender submission and contract performance;

The Procuring Entity will reject a proposal for award if it determines that the

Tenderer recommended for award has engaged in corrupt, fraudulent practices or

others stated under Clause 44.1.a in competing for the contract;

In pursuit of the policy defined in sub-Clause 44.1, the Procuring Entity will

cancel the portion of the funds allocated to a contract for goods, works, or services

if it at any time determines that corrupt or fraudulent practices were engaged in by

representatives of the Procuring Entity or Approving Authority or of a beneficiary

of the funds during the procurement or the execution of that contract;

In the event that the Procuring Entity or Approving Authority does not take timely

and appropriate action satisfactory to the Government of Kenya to remedy the

situation, then the Director-General may order an investigation of procurement

proceedings for the purpose of determining whether there has been a breach of the

Public Procurement and Asset Disposal Act, 2015.

Page 33: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

33

6.

Alternative offers are not allowed.

7.

Alternative times for completion are not allowed.

8.

Pre-tender meeting and site visit shall be held on 17th November 2016 at 9.00 a.m.

9. The minutes of the pre-Tender meeting will be made available

10. Non-attendance at the pre-tender meeting will result in disqualification. Bidders are

strongly advised to visit site and obtain for themselves information adequate for them

to prepare a responsive bid.

11. The minutes of the pre-Tender meeting will be made available

12. The number of copies to be completed and returned with the original Tender is one

(1)

13. Period to respond to request for clarification by the Procuring Entity: at most seven

(7) days prior to tender closure.

Period Prior to deadline for submission of Tenders for Tenderers to request

clarification shall be at least 7 days prior to deadline

14. Potential bidders are advised to regularly check KenGen website for any uploaded

information on this tender. Any issued Addenda/Clarification shall be uploaded by

Procuring entity on the website.

15. Language of Tender and all correspondence shall be English.

16. National Tenderers shall be required to provide evidence of their fulfilment of

requirements under Sub-Clause 3.3

12.1(h) Qualification Criteria:

To be qualified for award of Contract, the Tenderer shall be a

prime Contractor, a manufacturer or lead partner of a Joint

Venture, and shall meet the minimum qualification

requirements listed below. The Tenderer shall provide

evidence of his eligibility by filling in the Eligibility and

Qualification forms included in, Eligibility and Qualification

Data, Section IXofthese tender documents.

………………………………………………………..

17.

Page 34: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

34

a) "Taxes" means all present and future taxes, levies, duties, charges,

assessments, deductions or withholdings whatsoever, including any

interest thereon, and any penalties and fines with respect thereto,

wherever imposed, levied, collected, or withheld pursuant to any

regulation having the force of law and "Taxation" shall be construed

accordingly.

b) Local Taxation

i). Nothing in the Contract shall relieve the Contractor and/or his Sub-

Contractors from their responsibility to pay any taxes, statutory

contributions and levies that may be levied on them in Kenya in respect of

the Contract. The Contract Price shall include all applicable taxes and

shall not be adjusted for any of these taxes.

ii). The Contractor shall be deemed to be familiar with the tax laws in the

Employer's Country and satisfied themselves with the requirements for all

taxes, statutory contributions and duties to which they may be subjected

during the term of the Contract.

iii.) In instances where discussions are held between the Employer and the

Contractor regarding tax matters, this shall not be deemed to constitute

competent advice and hence does not absolve the Contractor of their

responsibility in relation to due diligence on the tax issue as per 3 .21 .2

above.

c) Tax Deduction

i). If the Employer is required to make a tax deduction by Law, then the

deduction shall be made from payment s due to the Contractor and

paid directly to the Kenya Revenue Authority. The Employer shall upon

remitting the tax to Kenya Revenue Authority furnish the Contractor with

the relevant tax deduction certificates.

ii). Where the Contractor is paid directly by the Financiers and the

Employer is not able to deduct tax, then the Contractor will be required

to pay the tax deduction to Kenya Revenue Authority in the name of the

Employer and furnish the Employer with an original receipt thereof as

Page 35: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

35

evidence of such payment. In absence of the said evidence, the Employer

will not process any subsequent payments to the Contractor.

d) Tax Indemnity

i). The Contractor shall indemnify and hold the Employer harmless from and

against any and all liabilities, which the Employer may incur for any

reason of failure by the Contractor to comply with any tax laws arising

from the execution of the Contract whether during the term of the

Contract or after its expiry.

ii) The Contractor warrants to pay the Employer (within fourteen (14) days

of demand by the Employer), an amount equal to the loss, liability or cost

which the Employer determines has been (directly or indirectly) suffered

by the Employer for or on account of the Contractor’s Tax liability arising

from the Contract.

iii). Where the amount in 3.21.8 above remains unpaid after the end of the

fourteen (14) days moratorium, the Employer shall be entitled to

compensation for financing charges.

The rates and prices quoted by the Tenderer shall be fixed during the performance of the

Contract.

18.

The currency in which the prices shall be quoted shall be: Kenya Shillings or in any

freely convertible currencies. However, the maximum number of currencies shall be

limited to two (2).

19.

The authority for establishing the rates of exchange shall be Central Bank of Kenya.

The applicable date for exchange rates for tendering and evaluation purposes is the

exchange rate at the closing date.

20.

The tender shall remain valid and open for acceptance for a period of one hundred and

twenty (120) calendar days from the specified date of tender opening or from the

extended date of tender opening (in accordance with clause 21) whichever is the later.

21. In addition to the original of the Tender, the Tenderer shall submit one (1) copy of the

Tender.

22.

Written confirmation of authorization shall be power of attorney, in cases of joint

venture/consortium.

Page 36: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

36

23. Tenders shall be deposited in the tender box situated in the supply chain office, ground

floor, Stima plaza.

24. The name and identification of the project is Design, Manufacture, Supply,

Installation, Test and Commissioning of Deluge Fire Protection Systems for

Generator Transformers and Station Transformers in 7 Forks Power Stations

The tender number is: KGN-HYD-029-2016

Date and Time for submission is 1st December 2016 at 2.00 p.m.

25. The deadline for Tender submission is: 1st December 2016 at 2.00 p.m.

D. Submission of Tenders 22.1 The extension of the deadline for submission of Tenders shall

be made not later than five (5) days before the expiry of the

tender deadline.

26. The tender shall remain valid and open for acceptance for a period of one hundred

and twenty (120) calendar days from the specified date of tender opening or from the

extended date of tender opening (in accordance with clause 21 here above) whichever

is the later.

27. The extension of the deadline for submission of Tenders shall be made not later than

seven (7) days before the expiry of the tender deadline.

28. The Tender opening shall take place at:

Company: Kenya Electricity Generating Company

Street address: Kolobot Road off Limuru Road

Building/Plot No: Stima Plaza

Floor/Room No: 7th Floor

City/Town: Nairobi

Country: Kenya

The amount on the Tender form shall be assumed to be inclusive of all offered

discounts and all applicable taxes.

Page 37: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

37

30.

The date applicable is the closing date of the tenders

31. Financial evaluation

The lowest compliant evaluated bidder will be considered for award.

E. Opening and Evaluation of Tender:

A Preliminary evaluation(mandatory)

a) Duly completed Bill of Quantities, Signed and Stamped with date on every

page.

b) Duly completed Tender Form, Signed and Stamped with date.

c) Copy of valid Tax Compliance Certificate issued by KRA.for local bidders

d) Copy of certificate of Registration / Incorporation or equivalent from country

of origin.

e) Completeness of Tender – submission of the required number of copies,

sequential organisation of the bid document, and serialization or pagination

of all pages in the tender document.

f) Duly filled, signed and completed Mandatory Business Questionnaire as

provided.

g) NCA (Class 4 minimum) & ERC (class A1) registration certificates for

Kenyan firms.

h) Warranty (Section C clause 1.6)

i) Bid bond/tender security of KES. 1M,valid for 150 days.

j) Evidence of site visit as scheduled.

k) Power of attorney (ONLY in cases of joint ventures)

Only tenders who meet the preliminary requirements shall be subjected to

technical evaluation

Technical Evaluation notes:

1. The qualification and experience of key personnel

1.1. Personnel Capabilities: The Applicant and the suppliers must have suitably qualified

personnel to fill the following listed positions. The Applicant will supply information on a

prime candidate and an alternate for each position, both of whom should meet the

31.2 No additional preference.

Page 38: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

38

experience requirements specified below:

Position Total experience

(years)

Experience In similar

works (years)

As manager of

similar works

Site project manager 10 5 3

Alternate 10 5 3

Mechanical/Civil works installation

and commissioning supervisor 10 5 0

Alternate 10 5 0

Mechanical craftsmen/artisans 5 5 0

Civil craftsmen/artisans 5 5 0

Electrical works installation and

commissioning supervisor 10 5 0

Alternate 10 5 0

Electrical craftsmen/artisans 5 5 0

Commissioning Engineers 10 5 0

Alternate 10 5 0

1.2. Site project manager and commissioning engineers MUST be registered engineers by a body

recognized by Engineers Board of Kenya.

2. The experience of the firm:

The Tenderer shall meet the following minimum criteria:

2.1. Bidder has undertaken design, supply, installation, testing and commissioning of at least three

similar projects.

Bidder MUST attach proof of these similar projects done e.g. copies of contracts with

their signed price schedules and signed completion certificates, etc.

2.2. The bidder MUST have designed, supplied, installed, tested and commissioned during the last

10 years at least 3 transformer deluge fire protection systems. One such project must have been

of value of more than KSHS 20 million.

Page 39: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

39

2.3. The bidder shall provide the names and addresses of the clients who have purchased these

systems, and the names, telephone, telefax numbers and e-mails of a senior manager employed

by each client from whom references can be obtained in English language.

Bidder MUST attach duly signed award and completion certificates for deluge fire

protection system design, supply, installation, testing and commissioning projects.

2.4. The bidder must have a Quality Assurance System implemented according to the requirements

in the ISO 9001 standard or equivalent. Suppliers that are not certified to the ISO 9001

standard must submit details of their Quality Assurance System demonstrating their substantive

compliance with this standard or equivalent.

3. Litigation History

3.1. Bidders shall provide accurate information on any litigation or arbitration resulting from

contracts completed or under execution by the bidder.

4. Project preliminary designs

The tenderer shall present in the tender document and submit drawings to show;-

4.1. How the various components are integrated in the proposal

4.2. The non-proprietary nature of all software components.

4.3. Modular design.

4.4. Automation & control philosophy

4.5. Fire Protection scheme drawings.

5. Implementation Plan/Method Statement

5.1. The tenderer shall clearly present a description covering the design, supply, installation,

testing, commissioning, training, methodology of integration into existing plant and an

implementation program.

6. Compliance to technical specifications:

The tenderer shall provide information that demonstrates compliance with all the technical

specifications as detailed in the specifications. The tenderer shall indicate make, type and attach

manufacturer catalogue of all equipment in the bid. More particularly the tenderer shall avail to the

Page 40: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

40

Employer the following:-

6.1. Specification of product to be used/ installed inclusive of functions offered.

6.2. Fire Protection Schemes

6.3. Spare parts offered (list spares in Bill of Quantities and itemize them)

6.4. Illustrative drawings/ sketches and schematics

6.5. Type test reports from a third party reputable testing laboratory (see Section E clause 3.5 part

ii)

7. Delivery schedule

7.1. The Tenderer shall indicate the delivery period from the time of award of contract to the time

of commissioning. Bidders should factor in time required for design approvals, installation,

commissioning and training.

7.2. The delivery period shall be used as a criteria in the technical evaluation.

7.3. Duration of power plant outage required to implement the project should be indicated and shall

also form part of technical evaluation.

8. Spare parts and after sales service facilities

8.1. Tenderers must offer items with service and spare parts back-up. Documentary evidence and

locations of such back-up must be given. Where a tenderer offers items without such back-up

in the country, he must give documentary evidence and assurance that he will establish

adequate back-up for items supplied.

9. Software and other necessary licenses

9.1. Bidder shall demonstrate that all software, licenses and application programs used by the

supplied equipment, required to interrogate supplied equipment or required for testing,

maintenance and commissioning of supplied equipment shall be handed over to the client.

9.2. Bidder shall demonstrate that all programs/applications developed specifically for the project

or required for the working of the products supplied e.g. PLC application etc. and the

intellectual property associated shall be handed over to the client after commissioning.

Page 41: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

41

Financial capacity

10. Financial Position:

This shall be evaluated against the following parameters:

10.1. Minimum average annual turnover of KSHS 100 million, calculated as total certified

payments received for contracts in progress or completed, within the last three (3) years.

10.2. The Bidder must demonstrate access to, or availability of, financial resources such as liquid

assets, unencumbered real assets, lines of credit (specific to the works being tendered for), and

other financial means, sufficient to meet the contracts cash flow other than any contractual

advance payments to meet the following cash-flow requirements :

(a) not less than KSHS 50 million (working capital) net of the applicants

commitments for other projects and

(b) The overall cash flow requirements for this contract and its current

commitments.

10.3. Submission of audited balance sheets or if not required by the law of the bidder’s country,

other financial statements acceptable to the Employer, for the last three [3] years to

demonstrate the current soundness of the bidders financial position and its prospective long

term profitability.

(a) Criteria 1 – Positive net worth

(b) Criteria 2 – Current ratio of at least 1.5

11. Audited accounts for the last three (3) years:

11.1. The annual audited financial statements for the last three years for the participating contractor

in the contracts shall be submitted and must demonstrate the soundness of the Applicant's

financial position, showing long-term profitability. Where necessary, the Employer will make

necessary inquiries, including with the Applicant's bankers.

Tender Evaluation Form

1.1. For ease of evaluation, bid offers shall be evaluated as per tables below, prospective

bidders should check to ensure they have availed all necessary requirements.

1.2. Bidders shall indicate the reference document and its location (page) in his bid.

1.3. Bidder MUST fully meet ALL the clauses below in order to qualify for further evaluation

Page 42: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

42

Clause Requirements

Qualification and

experience of

key personnel

Site project manager qualifications as per clause 1.1 of technical evaluation criteria

Mechanical/civil works installation and commissioning supervisor qualifications as

per clause 1.1 of technical evaluation criteria

Mechanical craftsmen/artisans qualifications as per clause 1.1 of technical evaluation

criteria

Civil craftsmen/artisans qualifications as per clause 1.1 of technical evaluation criteria

Electrical works installation and commissioning supervisor qualifications as per

clause 1.1 of technical evaluation criteria

Electrical craftsmen/artisans qualifications as per clause 1.1 of technical evaluation

criteria

Commissioning engineers qualifications as per clause 1.1 of technical evaluation

criteria

Experience of

the firm

Bidder MUST have designed, manufactured, installed and commissioned during the

last 10 years at least 3 transformer deluge protection systems as per clause 2.2 of

technical evaluation criteria.

Three duly signed completion certificates for the projects must be provided

Bidder Quality Assurance System as per clause 2.4 of technical evaluation criteria

Litigation

History

No consistent history of awards against the bidder as per clause 3 of technical

evaluation criteria

Bidder shall not have a Non-performing contract within the last Five (5) years as per

clause 3 of technical evaluation criteria

Project

preliminary

designs

Bidder has submitted preliminary designs

Openness of all components

Modular design

Implementation

plan

Bidder has submitted a clear implementation plan as per cause 5.1 of evaluation

criteria

Compliance to

technical

specifications

Bidder has submitted a duly filled technical schedule

Submit all type test certificates specified in the specifications

Software and

other necessary

licenses

Delivery of all required software and licenses as per specifications and intellectual

property/s related to all applications/programs designed specifically for the project

Financial

Position

Authentic and certified documents showing bidders compliance to clause 10 & 11 of

evaluation criteria

Bidders’ capability to carry out the project as per clause 13 & 14 of evaluation

criteria.

Bidder must have the financial ability to complete the project as detailed in clause 10

&11

1.1. Bidders technical offer shall be evaluated and graded as per table below

1.2. Pass mark will be 80%. Before financial evaluation

Page 43: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

43

Graded criteria of technical and financial capacity evaluation:

Evaluation Criteria Condition Max

score

Overall

Score

Bidder

Reference

document

Technical

Qualifications and

experience of key

personnel

Meets requirement of clause 1 10

80

Experience of the firm Meets requirement of clause 2 10

Litigation history Meets requirement of clause 3 5

Project preliminary

designs Meets requirement of clause 4 5

Implementation plan/

method statement Meets requirement of clause 5 5

Compliance to technical

specifications Meets requirement of clause 6 20

Delivery schedule Meets requirement of clause 7 5

Spare parts and after

sales service facilities Meets requirement of clause 8 10

Software and other

necessary licenses Meets requirement of clause 9 10

Financial

Financial position Meets requirement of clause

10 10

20

Audited accounts Meets requirement of clause

11 10

TOTAL SCORE 100

32. post qualification / due

diligence shall be under

taken

33.

Percentage for quantities increase or decrease is 15%.

34. Performance security to be furnished by successful

Contactor shall be 1% of the contract price. Only bank

Guarantee will be acceptable.

36. The Advance Payment shall not apply

Page 44: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

44

37. The Tenderer shall propose one Adjudicator from among

the list of Members or Fellows of the Chartered Institute

of Arbitrators (Kenya Branch) who shall be agreed

upon by the Procuring Entity.

The hourly fee for the Adjudicator shall be as

determined by the Chartered Institute of Arbitrators

(Kenya Branch).

If the parties fail to agree upon the name of the

Adjudicator, the appointment shall be made by the

Chartered Institute of Arbitrators (Kenya Branch)

at the request of either party.

43.1

Page 45: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

45

SECTION C:

GENERAL CONDITIONS OF CONTRACT

PART 1 – GENERAL CONDITIONS

1.1 GENERAL

The General Conditions of Contract shall be Part 1 of the Conditions of Contract recommended

by the Federation Internationale des Ingenieurs-Conseils (FIDIC) contained in its New Yellow

Book 1999 edition titled Conditions of Contract for Plant and Design/Build – design by

Contractor, with editorial amendments.

These Part I: General Conditions shall be incorporated in and form part of this Contract

subject to the following amendments and additions thereto as set out below in the Preamble and

in Part II: Special Conditions.

The following documents shall be deemed to form the Contract:-

a. The Letter of Award and Acceptance thereof.

b. The Preamble.

c. The Special Conditions of Contract – Part II.

d. The General Conditions of Contract – Part I.

e. The Specifications.

f. The Completed Form of Tender and Bill of Quantity-Price Schedules

g. The Completed Details of Offered Equipment-Technical Schedules

h. The Specification Drawings.

i. The Contractor’s Drawings.

j. The Contractor’s Tender.

Where there is a contradiction in any item in two of the above documents then the item in the

earlier positioned document in order above shall take precedence over the item in the lower

document, except where otherwise mutually agreed in writing.

1.2 PREAMBLE

The Preamble to the General Conditions of Contract shall be completed as follows referring to

completed schedules where appropriate:

Page 46: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

46

Sub-Clause 1.1.1 – Commencement Date

The date for commencement of the Works is the issue date of the letter of award of the tender,

and acceptance thereof, subject to the conditions precedent to commencement set out in Part II,

Special Conditions, having been completed. Sub-sub-clauses (ii), (iii), (iv) and (v) of Part I –

General Conditions are deleted.

Sub-Clause 1.1.12 – The Employer

The Employer is the Kenya Electricity Generating Company Limited [KenGen], P.O. Box

47936, Nairobi, Kenya, including its authorized representatives, successors and assigns.

Sub-Clause 1.1.15 – The Engineer

The Engineer is Operations Manger, Eastern Hydros who has been appointed by the

Employer to act as the Engineer for the purpose of this Contract, or such other person or persons

who may be appointed by the Employer in place of the designated Engineer in accordance with

Clause 2.8 of the Conditions of Contract.

Sub-Clause 1.1.35 – Time for Completion

The Time for Completion shall be the time for completion entered by the Contractor in the

Schedule of works and in the Tender form.

Sub-Clause 5.1 – Ruling Language

The Ruling Language for this Contract is English and the English language version shall prevail

over any other language.

Sub-Clause 5.2 – Day to Day Communications

The language for day to day communications shall be English. Fluent English shall be spoken

by an adequate number of the staff of the Contractor.

Sub-Clause 12.1 – Programme to be furnished

The Programme must be submitted within one month of Contract Award, and before the

work commences, in the form set out in the Specification Part II, Clause 2.2

Page 47: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

47

Sub-Clause 14.3 - Electricity, Water, Gas and Other Services

The Employer will provide a limited three phase supply of electricity at 415V AC 50 Hz not

exceeding 50 kVA. The Contractor will provide his own distribution board with necessary

electrical protection and switchgear.

Treated water is available in the Power House.

The Contractor shall make his own arrangement to supply gas and other services required at his

own expense.

Sub-Clause 14.4 – Employer’s Equipment

The only items of the Employer’s equipment that are available for use by the Contractor are the

power station overhead travelling cranes. The Contractor should liaise with KenGen when they

require to use the cranes.

The Contractor shall be responsible for providing slingers for all his works.

Sub-Clause 18.3 – Working Hours

The normal working hours at the site are between 7.45 a.m. and 5.00 p.m. on weekdays (five

days per week). The Contractor may arrange to work any other periods he wishes between 7.00

a.m. and 7.00 p.m. to meet the contract Programme. Work outside this period and weekend or

public holiday working shall only be carried out where specifically approved by the Engineer.

Where the Contractor chooses to work in excess of eight hours a day or to work at weekends

there shall be no additional cost added to the contract price.

Sub-Clause 27.1 – Delay in Completion

Failure to meet the Time for Completion, or any extended Time for Completion granted in

accordance with Sub-Clause 26.1, entitles the Employer to a reduction in the Contract Price of

0.1% of the Contract Price per day of delay up to a maximum of 10%.

Sub-Clause 27.2 – Prolonged Delay

Page 48: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

48

If there is a Prolonged Delay in Completion and the Employer has become entitled to the

maximum reduction in Contract price under Sub-Clause 27.1 and the Employer terminates the

Contract under Sub-Clause 27.2, then the additional amount recoverable from the Contractor by

the Employer shall be that part of the Contract Price which is attributable to that part of the

Works which cannot by reason of the Contractor’s failure be to put to the intended use.

Sub-Clause 33.1 – Terms of Payment

In addition to the provisions under Clause 33, the Terms of Payment shall be as set out below:-

Payment will be made through an unconfirmed Letter of Credit. The Contractor shall be required

to meet the Letter of Credit charges in the Contractor’s country where applicable. Any

extensions/ amendment charges that may result due to the Contractor’s delays or mistakes shall

be to the Contractor’s account.

Should the Contractor require a confirmed letter of credit, then all confirmation charges both in

and outside Kenya shall be to the Contractor’s account.

(a) 60% of Contract Price on delivery of all materials.

(b) 30% of Contract Price upon successful erection and commissioning acceptable to the client

for which a Taking Over Certificate has been issued in relation to the works.

(c) 10% of Contract Price on successful completion of the Defects Liability Period and

submission of all Documentation and As Built drawings.

Sub-Clause 35.1 – Payment in Foreign Currency

As per Letter of Credit terms and conditions.

Sub-Clause 35.3 – Rates of Exchange

Rates on the Tender opening date as provided by the Central Bank of Kenya.

Page 49: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

49

Sub-Clause 42.2 – Maximum Liability

The maximum liability of the Contractor to the Employer shall be the Contract Price.

Sub-Clause 43.1 – Insurance

The contractor is required to comply with the latest FIDIC specifications for insurance namely:

General requirement for insurance

Insurance for Works and Contractor’s Equipment

Insurance against Injury to Persons and Damage to Property

Insurance for Contractor’s Personnel

Clause 47 – Changes in Cost and Legislation

Sub-Clause 47.1 – Labour, Materials and Transport

Not applicable.

Sub-Clause 49.2 – Notices to Employer and Engineers

The address of the Employer for notices is:-

The Company Secretary & Legal Affairs Director

Kenya Electricity Generating Company Limited

Stima Plaza Phase III

Kolobot Road, Parklands

P. O. Box 47936 - 00100

NAIROBI, KENYA

Sub-Clause 51.1 – Applicable Law

The applicable law for this Contract shall be the law of the Republic of Kenya.

Sub-Clause 51.2 – Procedural Law for Arbitration

Page 50: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

50

The procedural rules for arbitration for this Contract shall be governed by the Arbitration Act

Cap. 49 of the Laws of Kenya. Kenyan Courts shall have jurisdiction.

Sub-Clause 51.3 – Language and Place of Arbitration

The language of arbitration is the English language. The place of arbitration shall be Nairobi,

Kenya.

Page 51: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

51

1.3 GENERAL CONDITIONS

The General Conditions of Contract shall be Clauses 1 to 51 inclusive as published by FIDIC in

Part I – Third Edition 1987 Reprinted 1988 with amendments subject to the variations in the

Preamble above.

1.4 CONTRACTOR’S RESPONSIBILITIES

1.4.1 Responsibilities

a) Conforming to the requirements of KenGen and to deviations therefrom which are

specifically authorized and/or approved in writing by the Client Engineer.

b) Approval of deviations will only be given for individual cases and such approval

shall not be cited as a precedent for other cases.

c) Quality of material, workmanship and apparatus comprising the complete work,

shall be in accordance with the specifications and good practice.

d) Maintenance and updating of progress of the work in accordance with the

approved schedules.

e) The safety and protection of equipment and materials required for the work while

under its sole risk as described in sub-clause (ii) hereunder.

f) Bringing to the Client Engineer’s attention, subsequent to the award of contract,

new developments, which the Contractor considers, may result in improvements

to the work. Such developments will be considered by the Client Engineer and, if

adopted, mutually acceptable terms will be arranged accordingly.

g) The adaptability of all materials to the requirements.

h) Rigid adherence to the tender specifications unless deviations are specifically

authorized in writing by KenGen.

1.4.2 Sole risk

The work shall be at the sole risk of the Contractor against loss or damage thereto up

to and including the date of delivery to the delivery point. It shall in no way be

Page 52: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

52

implied or inferred that this arrangement limits the Contractor’s responsibility in

respect to the materials supplied, workmanship and performance of the work.

1.5 CRITERIA FOR EVALUATION

The following criteria will be used in Tender Evaluation

(i) Responsiveness to the Tender

(ii) Compliance with Technical Specification

(iii) Technical Details of Offered Equipment

(iv) Price

(v) Delivery and Completion Periods

(vi) Payment Terms.

1.6 WARRANTY

The Contractor warrants that goods supplied under the Contract are new, unused, of the most

recent or current models, and that they incorporate all recent improvements in design and

materials unless provided otherwise in the Contract. The Contractor further warrants that all

Goods supplied under this Contract shall have no defect arising from design, materials, or

workmanship (except when the design and/or material is required by the specifications) or from

any act or omission of the Contractor, that may develop under normal use of the supplied Goods

in the conditions prevailing in the country of final destination.

This warranty shall remain valid for twenty four (24) months after the Equipment, or any portion

thereof as the case may be, have been commissioned and take over certificate signed by both

parties, or for thirty (30) months after the date of shipment from the port or place of loading in

the source country, whichever period concludes earlier.

1.7 INSURANCE

The Contractor shall insure, and keep insured to its full insurable value, the equipment and every

part thereof against risk of fire, explosion, accident, or other damage until the work has been

completed to the satisfaction of KenGen.

Page 53: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

53

SECTION D:

SPECIAL CONDITIONS OF CONTRACT

The General Conditions of Contract in Part I shall be modified by the Special Conditions set out

below:-

Sub-Clause 1.1.1 – Conditions Precedent to Commencement

The following financial and administrative requirements are conditions precedent to

commencement:

The issue of the Letter of Award under the hand of the Company Secretary of Kenya

Electricity Generating Company Limited and the acceptance thereof by the Contractor.

The date for acceptance shall be not later than 14 calendar days from the date of the

Letter of Award.

Sub-Clause 1.1.11 – Defects Liability Period

The Defects Liability Period is twenty-four calendar months. In these Conditions the expression

“Defects Liability Period” shall mean a period of twenty-four months calculated from the date of

Taking-Over in accordance with Sub-Clause 29.1.

Sub-Clause 2.1 – Engineer’s Duties

The Employer will use his Engineer. The duties and actions of the Engineer will be:

(a) Certifying additional sums under Sub-Clause 5.4,

(b) Determining an extension of time under Sub-Clause 26.2,

(c) Varying any of the Works under Sub-Clause 31.1,

(d) Entering into any agreement on adjustment of Contract Price under Sub-Clause 31.1,

(e) Issuing of Taking-Over Certificates after commissioning under Sub-Clause 29.2.

Notwithstanding the obligation, as set out above, to obtain approval if, in the opinion of the

Engineer, an emergency occurs affecting the safety of life or of the works or of adjoining

property, he may, without relieving the Contract of any of his duties and responsibilities under

the contract, instruct the Contractor to execute all such work or to do all such things as may, in

the opinion of the Engineer, be necessary to abate or reduce the risk. The Contractor shall

forthwith comply, despite the absence of approval of the Employer, with any such instruction of

the Engineer.

Page 54: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

54

Clause 5.3 – Priority of Contract Documents

Delete the documents list 1-5 and substitute:

“The documents forming the Contract shall take precedence in the order in which they are set out

in Section B, Clause 1 – General, herein.”

Clause 6.6 – Operation and Maintenance Manuals

Operation and Maintenance Manuals shall be in the English Language.

Sub-Clause 6.7 – Employer’s Use of Contractor’s Drawings

The Contractor’s Drawings and Manuals may be used by the Employer for the purpose of

completing, operating, maintaining, adjusting and repairing the Works, for interconnecting the

Works with other plant and for training of personnel.

Sub-Clause 8.1 – General Obligations

Facilities will be provided by the Employer as set out in Clause 2.9 of the Specification, part II.

Electrical and water supplies as set out in Sub-Clause 14.3 of the Preamble herein.

Sub-Clause 10.1 – Performance Security

Within 28 days of issue of the Letter of Acceptance the Contractor shall at his own expense

obtain a Performance Security in the Form of Performance Bond given in the Tender.

Documents from a reputable Bank approved by the Employer to be bound with the Contractor to

the Employer for a sum equivalent to ten percent (10%) of the Contract Price for the due

Performance of the Contract. The Security shall be payable in the currency of the contract and

shall be denominated in the types and proportions of the currencies in which the Contract is

payable. The Employer may require an additional security if the value of the Contract is

increased appreciably. The Contractor shall ensure that the Performance Security Bond is kept

Page 55: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

55

valid up to the date of issue of the last Defect Liability Certificate, or warranty period as set out

in Clause 1.8 of the Specification Part I, or end of maintenance period as set out in Clause 2.16

of the Specification Part II, whichever period concludes later.

Clause 15.1 – Compliance with Statutes, Regulations

Add the following:

“Without limiting the generality of the foregoing the Contractor shall strictly abide by the

Kenyan regulations concerning safety on the site of the Works.”

Clause 18.1 – Engagement of Labour

Add the following:

“The Contractor is encouraged, to the extent practicable and reasonable, to employ staff and

labour with the required qualifications and experience from sources within Kenya.”

Sub-Clause 25.1 – Time for Completion

Time for Completion means the time for completing of the Works as tendered by the Contractor

in the Bill of quantity, price schedules and Guaranteed Times for Completion and included in the

Letter of Award. This period shall include up to the date of the Issue of the Taking-Over

Certificate.

Sub-Clause 27.1 – Delay in Completion

Delete the clause entirely and substitute the following:

“If the Contractor fails to comply with the Time for Completion in accordance with Clause 29.1,

the whole of the works or, if applicable, any Section within the relevant time prescribed by

Clause 25.1, then the Contractor shall pay to the Employer the relevant sum stated in Clause 27.1

of the Preamble as liquidated damages for such default and not as a penalty (which sum shall be

the only monies due from the Contractor for such default) for every day or part of a day which

shall elapse between the relevant Time for Completion and the date stated in a Taking-Over

Certificate of the whole of the works or the relevant Section, subject to the applicable limit stated

in the Clause 27.1 of the Preamble. The Employer may, without prejudice to any other method of

recovery, deduct the amount of such damages from any monies due or to become due to the

Page 56: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

56

Contractor. The payment or deduction of such damages shall not relieve the Contractor from his

obligations and liabilities under the contract.

If, before the Time for Completion of the Works or, if applicable, any Section, a Taking-Over

Certificate has been issued for any part of the Works or of that Section, shall, for any period of

delay after the date stated in such Taking-Over Certificate, and in the absence of alternative

provisions in the Contract, be reduced in the proportion which the value of the part so certified

bears to the value of the whole of the Works or Section, as applicable. The provisions of this

Sub-Clause shall only apply to the rate of liquidated damages and shall not affect the limit

thereof.”

Sub-Clause 28.1 – Tests on Completion

The Tests on Completion shall include the 120 Hours Reliability Run as detailed in the

Specification.

Sub-Clause 29.2 – Taking over Certificate

On satisfactory completion of the Tests on Completion and the Reliability Test Period, the

Engineer shall issue a Taking-Over Certificate. This shall show the effective date of Taking Over

which shall be the date of commencement of the successful Reliability Test Period. This shall be

the date of commencement of the Defects Liability Period.

Sub-Clause 29.3 – Use Before Taking Over

The Employer shall not use any part of the Works prior to the commencement of the Tests on

Completion. The Employer may use any part of the Works during its Tests to suit the Tests. Such

use shall not imply Taking Over unless all the tests on that part of the Works are successful.

Sub-Clause 33.2 – Method of Application for Payment

Applications for Payment may be made by the Contractor to the Engineer as set out below:

(a) The application in respect of the shipment shall identify the Equipment shipped, state the

amount claimed and be accompanied by such documentation as the Engineer may require

including:-

Original Invoice identifying the amount claimed against the appropriated subdivisions

of the Schedule of Prices.

Shipping Specification and Parking List.

Original Bill of Landing or Air Waybill.

Factory Inspection Certificate.

Page 57: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

57

Clean Report of Findings.

(c) The application in respect of work carried on site shall identify the work done, state the

amount claimed and be accompanied by such documentation as the Engineer may require

including:-

Original Invoice identifying the amount claimed against the appropriate subdivisions

of the Schedule of Prices.

Statement of Work showing the work done.

(d) Any other application for payment certificates shall identify the requirement for payment,

state the amount claimed and be accompanied by such documentation including:

Original Invoice identifying the amount claimed against the appropriate subdivisions

of the Schedule of Prices.

Supporting Documents such as copy Certificates where applicable.

Sub-Clause 33.5 – Payment

Second line, delete “28 days” and substitute “30 days”.

Sub-Clause 33.6 – Delayed Payment

The interest rate for delayed payment is simple interest at a rate of 3% above the Central Bank of

Kenya’s average rate for base lending prevailing as of the first day the payment becomes over

due.

Sub-Clause 43.1

Delete the first paragraph and substitute:

“The Contractor shall, prior to commencement of the Works, insure the Works in the joint names

of the Contractor and Employer to their full replacement value thereof plus 10% thereon to allow

for any additional costs and professional fees resulting from loss or damage with deductible

limits not exceeding those stated in the Preamble.”

Add the following sub-clause:

“(c) It shall be the responsibility of the Contractor to notify the insurer of any change in the

nature and extent of the works and to ensure the adequacy of the insurance cover at all

times in accordance with the provisions of this Clause.”

Add the following sub-clause:

“(d) Such insurance shall provide for compensation to be payable in the types and proportions

of currencies needed to cover the loss or damage incurred”.

Page 58: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

58

Sub-Clause 43.3 – Third Party Liability

In the second line after “personal injury” add the words “to any person including any employee

of the Employer and the Engineer.”

Add the following paragraph:

“The third party liability insurance should be in the joint names of the Employer and the

Contractor with an extension of a cross liability cover so that the insurance shall apply to the

Contractor and to the Employer as separate insured. The cover shall include the property of the

Employer other than the Works.”

Sub Clause 48.1 – Customs and Import Duties

For the purpose of this Contract, the Employer will clear and pay at port of entry all the Custom

Duty and taxes and deliver the Equipment to the site.

Sub Clause 50.2 – Arbitration

The rules of arbitration shall be those contained in the Arbitration Act of the Laws of Kenya.

Add New Clause 56 – Shipping Arrangements

Add New Sub-Clause 56.1 – Pre-Shipment Inspection

Kenyan regulations require that all imported goods be inspected prior to shipment to verify

quality and quantity.

The names of the Inspection Agencies appointed by the Kenyan authorities to act under this

Contract will be notified to the Contractor on the Import Declaration Form, which is obtained by

the Employer. The pre-shipment inspection authorizes the Contractor to ship the goods.

The Contractor should establish contact and liaise with the Inspection Agencies immediately

upon learning of their names.

Page 59: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

59

The cost of presentation of the Goods to the Inspection Agencies, unpacking, handling etc. shall

be paid for by the Contractor.

The Contractor shall give at least 21 days notice before shipment to the Inspection Agency

indicating the place where the Goods may be inspected and the expected time of shipment. When

requesting for pre-shipment inspection the Contractor shall provide the Inspection Agency with a

copy of the pro-forma invoice, Contract and any other document relevant to the execution of the

inspection. On completion of inspection the Inspecting Agency will issue a report of finding

which will be either:

A Clean Report of Findings if the inspection yields a satisfactory result, or a Non-negotiable

Report of Findings if the inspection reveals deficiencies.

In the case of a Clean Report of Findings the Contractor shall provide the Inspection Agency

immediately after shipment with a non-negotiable copy of the Bill of Landing or Air Waybill and

a copy of the final invoice covering the Goods. When these documents have been received, the

Clean Report of Findings will be issued. The Contractor is warned against the shipment of Goods

which have not been inspected, or goods for which a Non-negotiable Report of Findings has

been issued by the Inspection Agency.

The inspection of Goods does not relieve the Contractor of its contractual obligations to the

Employer, and may reject items if they fail to meet the requirements of the Contract even though

the Inspection Agency for shipment has cleared them.

Add New Sub-Clause 56.2 – Delivery and Documents

Upon shipment, the Contractor shall notify the Employer by cable, telex or facsimile the full

details of the shipment including description of Goods, quantity, the vessel, the bill of landing

number and date, port of loading, date of shipment, port of discharge, etc. The Contractor shall

mail or courier the following documents in two copies to the Employer Supplies Manager:

The Contractor’s invoice showing Goods description, quantity, unit price, total

amount;

Non-negotiable bill of landing;

Packing list identifying contents of each package;

Manufacturer’s/Contractor’s warranty certificate;

Inspection certificate (Clean Report of Findings) issued by the nominated inspection

agency;

Contractor’s factory inspection report; and

Certificate of Origin.

The above documents shall be received by the Employer at least two weeks before arrival

of Goods at the port and, if not received, the Contractor will be responsible for any

consequent expenses (including any demurrage). This is to provide time to obtain

exemption for shipment.

Page 60: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

60

ADDRESSES

The Equipment shall be marked with the following Shipping marks:-

KENYA ELECTRICITY GENERATING COMPANY LIMITED

ORDER No. ------- (GENERATOR TRASNFORMER AND STATION

TRANSFORMER DELUGE FIRE PROTECTION SYSTEMS FOR 7 FORKS POWER

STATIONS)

C/O KENGEN, NAIROBI - KENYA.

Packing lists, inspection reports, material reports, etc as indicated above shall be sent to:-

THE OPERATIONS MANAGER-EASTERN HYDROS

KENYA ELECTRICITY GENERATING COMPANY LIMITED

P.O. BOX 47936-00100

NAIROBI, KENYA

Tel: (254) (020) 3666000

Fax: (254) (020) 3666200

Email: [email protected]

Cc: [email protected];

Page 61: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

61

SECTION E:

TECHNICAL SPECIFICATIONS

3.1 GENERAL TECHNICAL CONDITIONS

The Deluge Fire Protection System shall be designed to ensure continuity of operation under all

working conditions and to facilitate inspection, maintenance and repairs. All reasonable

precautions shall be taken in the design of equipment to ensure safety of personnel concerned

with the operation and maintenance of the equipment.

All components shall be adequately rated/ sized for their most onerous duty and the specified

ambient temperature. Due account shall be taken of any heat generated by the equipment therein

and the components shall be appropriately selected, rated or derated as necessary to suit the most

onerous operating temperature within the equipment.

Hand railing and protective barriers shall be provided wherever necessary to protect operation or

maintenance personnel from hazards, and work shall comply with BS 6180 and Occupational

Safety and Health Act 2007 including its subsidiary legislations.

3.2 TENDER BID DOCUMENTATION BY TENDERER

The drawings and information to be submitted to the Client in accordance with the requirement

of this clause shall cover the complete scope of work as defined by the specification and shall

include, but not be limited, to the following:

General assembly drawings of the equipment to be supplied together with sufficient sub-

assembly drawings,

Details, control and wiring diagrams to demonstrate fully that all parts will conform to the

provisions and intent of the contract documents.

This documentation will be a guide to the client during the tender evaluation. They may not be

comprehensive at that stage.

3.3 PROJECT WORK PROGRAM

The Tenderer shall submit along with the tender bid a comprehensive work program, showing

all the activities and duration required, from tender award stage to full commissioning of the

Equipment.

Page 62: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

62

Upon approval of the work programme by the Client, it should thereafter be referred to as the

Approved Work Programme and shall become a part of the Contract.

In executing the Approved Work Programme of this Contract, the Contractor shall co-operate

with the Client in order to effect the timely completion of the works as a whole.

3.4 INSTRUCTIONS ON DRAWINGS AND DATA TO BE SUPPLIED BY THE

CONTRACTOR AFTER TENDER AWARD

All drawings and data supplied by the Contractor subsequent to the date of contract, which

cover changes in the work, extra work, or which supplement existing drawings and data shall,

upon approval by the Client Engineer, form part of the contract documents.

A copy of each drawing and item of data will be returned to the Contractor marked

“Approved”, or “Approved as Noted”, or “Not Approved”.

Drawings and data requiring revision shall be promptly dealt with and resubmitted as

aforementioned. Thereafter, changes shall NOT be made in the Contractor’s drawing without

written permission of the Client Engineer. The above procedure shall be repeated for all

authorized changes.

All drawings are to be dimensioned using SI units. All documentation shall be provided in

English language.

To expedite the delivery and return of the required drawings, scanned drawings shall be used

and sent to the following KenGen E-mail addresses –

[email protected]

[email protected]

The work shall be done in accordance with the approved drawings and data, and shall not be

commenced until such approval has been obtained. Subsequent changes contemplated by the

Contractor shall be indicated on revised drawings and data resubmitted for approval. The

Contractor shall make any changes in the design, which are considered necessary to make the

Page 63: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

63

work conform to the provisions and intent of the specification without additional cost to

KenGen.

Before supply and installation of the equipment, dimensioned drawings and data showing all

significant details of the equipment and materials to be used shall be submitted

simultaneously to the Client for approval.

Approval of the Contractor’s drawings and data shall in no way construe or imply relief of the

Contractor from responsibility for any error or omission therein or from any obligation under

the Contract.

When the Contractor prepares his work programme, as required herein, he shall make

allowance for the drawing approval time and indicate it on the programme. A period of at

least one week should be allowed for such approval. Claims or extensions of time will not be

approved if they are related to the late submission of drawings to the Client, or if they involve

delays caused by drawings not being approved by the Client.

The Contractor shall supply 1 copy of Drawings for approval and 1 copy of the approved

drawings to the Client.

All drawing submitted for approval or sent to the Client for any other reason shall be sent by

courier or e-mailed in pdf format.

After all items of the work have been manufactured and erected, sets of prints and softcopies

of the AS BUILT drawings shall be furnished as indicated below:

Complete set of soft copies in pdf format and AutoCAD - 1 set of each

Complete set of bound prints (A2) - 3 sets.

3.5 STANDARDS, CODES AND QUALITY ASSURANCE

The work shall conform to the applicable standards and codes of the authorities and technical

organizations listed hereunder in their full and abbreviated titles, and of any that may be listed

or referred to elsewhere in this document.

(i)

(a) National Fire Protection Association (NFPA)

Page 64: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

64

(b) American National Standards Institute (ANSI will also be used as the

reference for standards issued formerly under USA and USAS) – ANSI.

(c) American Society of Mechanical Engineers Relevant Test Codes and

Appendices – ASME.

(d) American Society for Testing and Materials (ASTM).

(e) National Standards and Testing Authority (NSTA).

(f) Underwriters Laboratories

(g) Factory Mutual Insurance Co.

(ii)

(a) International Organization for Standardization- ISO.

(b) International Electro-technical Commission IEC.

(c) Japanese Industrial Standards – JIS.

(d) Japanese Electro-technical Commission – JEC.

(e) German DIN

(f) European standards – AEN

(g) British Standards Institution

(h) Loss Prevention Council (UK)

(i) British standards

(j) Equivalent standards in other jurisdictions may be quoted.

The Contractor shall base the Tender on the applicable standards and codes, which are in effect

at the time of submission of the Tender.

3.6 TEST PROCEDURE AND INSTRUCTIONS

3.6.1 Site test programmes and procedures

During the construction and after the installation of the Fire Protection Systems, tests

shall be performed, as necessary, to establish the accuracy of the installation, to prove

the adequacy of the materials,the workmanship and that specified requirements have

been met.

The Contractor shall submit to the Client, during or immediately following the

submission of drawings, testing programmes describing each test to be performed during

commissioning and the performance tests. The programme shall establish the sequence

of the tests, the equipment preparation, operation procedures to be followed, and the

detailed procedure for conducting each test. The programme shall also contain

performance guarantees, design values, technical particulars, or other criteria for the

evaluation of each test. These programmes shall be submitted for approval and

distributed in the same manner as the drawings.

Page 65: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

65

All tests and test procedures with test recording sheets shall be submitted to the Client’s

Engineer 3 days to the execution of the Tests. The Client’s Engineer may review and

incorporate amendments to the procedures and tests.

3.6.2 Performance tests

After the Fire Protection Systems have been installed and tested successfully the

Contractor shall carry out the performance tests in the presence of the Client Engineer

to demonstrate that all guarantees and technical particulars as listed in the Tender and

Contract Documents have been satisfied and that the entire Equipment is properly

installed, free from objectionable defects and correctly adjusted to operate as specified.

3.7 INSTALLATION AND COMMISSIONING SERVICES

Lump-sum charges for installation & commissioning of the Equipment into operation under the

following conditions shall be indicated in the tender:

The installation of all the equipment parts and commissioning shall be done by the

Contractor.

The Contractor will avail all materials, labour, tools and equipment necessary for /installation

and commissioning works.

The Client will be responsible for clearing and bonding [with Kenya Customs Department]

of the erection and commissioning tools & equipment on receipt of Airway bill or Bill of

Landing, list of tools & equipment with serial numbers, PFI (proforma invoice) clearly

marked ‘Value for Customs Purposes Only’ and must show the price of each tool &

equipment and extension thereof. The Contractor shall meet the cost of shipment.

The tests and commissioning will be performed according to standard test procedures.

Two Client’s Engineers will be available during the commissioning period.

3.8 ACCOMMODATION & TRANSPORT FOR CONTRACTOR’S EMPLOYEE

Accommodation during the installation and commissioning work for the contractor’s employees

shall be the responsibility of the Contractor.

Transport (including local airport connection) at the site during the works will be the

responsibility of the Contractor.

Page 66: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

66

3.9 EQUIPMENT APPROVAL

All equipment proposed and planned for use in this project must be formally approved by at least

one of the following internationally recognized product certification organizations or

equivalents:

UL - Underwriters Laboratories - USA

FM - Factory Mutual Insurance Co. - USA

BS - British Standards Institution - UK

LPC - Loss Prevention Council - UK

Equipment and materials not complying with the required standards shall not be

acceptable and shall result in rejection of the tender.

Tenderers are required to submit a Certificate of Inspection together with their bids as

documentary evidence that the equipment and controls to be used in this Contract complies with

the mentioned standards.

3.10 SPARES

It is a condition of this contract that the Defect Liability Period is 12 months. All spares and

malfunctioning items during this period shall be replaced by the Contractor at his own cost.

3.11 TRAINING

The contractor shall after the completion of the Contract, and before the Handing-Over

Certificate is issued, provide a trainer to instruct the system operators and maintenance

personnel. The trainer must be competent in the English language and conduct the training in

English. During the training s/he shall go through all the problems that are likely to occur during

the System operation including the steps to be taken to reduce damage in case the system

malfunctions. Live demonstration will be conducted to the trainees, including simulation of fire

situation.

All the costs pertaining to the training and demonstrations shall be borne by the Contractor.

3.12 DOCUMENTS

The following documents shall be provided with the tenderer’s offer:

References

Brochures.

Page 67: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

67

Test Reports

3.13 INSTALLATION AND COMMISSIONING

The tenderer shall provide all the necessary staff, tools and materials to complete the installation,

test and commissioning. As-built drawings shall be provided immediately after commissioning.

3.14 SITE VISIT

Site visit is mandatory and shall be held on site on 17th November 2016 at 10.00 a.m. It is

important that tenderers visit the site before submitting their bids to ascertain the specific project

requirements.

Failure to visit the site will result in rejection of tender.

Page 68: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

68

SECTION F:

TECHNICAL SCHEDULE OF REQUIREMENTS

GENERAL INFORMATION

Seven Forks (Lower Tana) is an area of KenGen operations located in Embu, Machakos and

Kitui counties. It has five hydro power stations: Masinga, Kamburu, Gitaru, Kindaruma and

Kiambere. The total installed capacity by the five stations is 595 MW.

The existing transformers in the five power stations do not have fire protection. Thus there is

need for Deluge Fire Protection and Suppression Systems to be installed to guard against fire.

Here is a table containing some information about the Generator Transformers and Station

Transformers in the five stations.

Station Generator Transformer Station Transformer

Manufacturer MVA

Rating

kV Ratio Manufacturer kVA

Rating

kV Ratio

Masinga EMCO 25 11/132 GEC 630 11/0.415

GEC 23.5 11/132 GEC 630 11/0.415

Kamburu EMCO 40 11/132 KHCK 750 11/0.415

Hack Bridge 37 11/132 Transformer

and

Switchgear,

Madras

500 11/0.415

LEEEC 40 11/132

Gitaru Hyundai 65/95 15/220 Italtrafo 750 15/0.415

JSP 85 15/132 Italtrafo 750 15/0.415

Jeumont

Schneider

85 15/132

Kindaruma IEEEC 30 11/132 IEEEC 500 11/0.415

IEEEC 30 11/132 IEEEC 500 11/0.415

IEEEC 30 11/132 IEEEC 500 11/0.415

Kiambere G 100 11/220 Federal

Pioneer

630 11/0.415

EMCO 100 11/220 Federal

Pioneer

630 11/0.415

Page 69: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

69

TECHNICAL SPECIFICATIONS

I. MAIN TRANSFORMERS FIRE DETECTION AND SUPPRESSION SYSTEM:

REQUIREMENTS

1.1 Facilities design

The fire protection facilities shall be designed, installed and tested in accordance with the

American National Fire Protection Association (NFPA) requirements and recommendations. In

particular, the requirements of NFPA 850 and NFPA 15 shall apply to the design of the system.

The Transformer Fire Suppression System shall comply in all respects with all local

requirements and standards.

1.2 Fire detection and alarm

An automatic and manually activated fire alarm system with international approvals shall

be provided to protect the installed generator transformers and station transformers in

each power station including the equipment within their vicinity. The system shall

include smoke/heat detectors, manual call points/pull stations, fire alarm

horns/bells/strobes, cabling and a fire alarm control and indicating panel situated in the

station control room. All system fire alarm and fault conditions shall be clearly reported

at the central control panel. Repeater panels shall be located at convenient locations as

per the schedules.

The smoke/heat detectors, manual call points/pull stations and fire alarm horns/bells shall

be of the addressable type and suitable for the specific areas where they are installed. The

health of the detectors, panels and other field devices shall be automatically checked at

regular intervals. The design of the system shall be such that a malfunction in any of the

zones or loops does not affect the normal operation of the rest of the system.

The fire detection and alarm system shall be interfaced to the existing SCADA system in

the power station to enable the summary alarms and system status information to be

displayed on the operator workstations. Operation of a manual alarm call point or

activation of an automatic detector shall cause an alarm in the control building to notify

the operator of any fire emergency in the substation.

The fire suppression system control panel shall be powered by an Uninterrupted Power

Supply source. A dedicated battery with charger shall also be provided as part of the

system for stand-by power.

1.3 Fire water pumping system

Page 70: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

70

The fire water pumping system shall provide the source of water to the site fire ring main

system, from which all fire fighting water supplies shall be derived.

The water supply to the fire suppression system shall be maintained at a constant pressure

defined by the design requirements. The water discharge during system operation should

be maintained at a constant flow rate. This shall be achieved by use of suitably rated

booster pumps that meet the hydraulic requirements of the fire suppression system.

The fire water pumping system shall contain two electrically driven pumps (main and

jockey). Each pump shall be complete with an automatic starting system and shall be

capable of providing the design hydraulic demand of the system. The jockey pump shall

maintain pressure within the ring main system.

The pumps control panel suitably located shall be provided to facilitate maintenance, and

to allow the pumps to be controlled both manually and automatically.

1.4 Cabling, wiring, terminations and panel construction

Permanent identification of all terminals and wires shall be provided.

A consistent system of wiring and numbering shall be used throughout the equipment.

All cables used shall be neatly arranged, well supported and labeled at the glanding and

terminating point.

Wherever possible, long-radius cable bends shall be used.

Adequate cable supports shall be provided to prevent vibration and movement in the line

due to vibrations. All necessary studs, bolts, nuts, washers, gaskets and packing, cable

supports, copper flexes and hangers required on site assembly of the cable system shall

be provided by the contractor.

The Contractor shall provide a system to support cabling under primary concrete/metallic

pillars; e.g., ceilings, walls and floors. The Contractor may provide his own anchorage

system, but such a system shall be subject to the Client Engineer’s approval.

1.5 Pipes and Fittings

Pipe, tube, and fittings used in water spray systems must meet the requirements

provided in NFPA 15. All piping and pipe supports used outdoors must be shop

galvanized inside and out to protect against pipe corrosion and blockage of nozzles

from loosened pipe corrosion. Malleable iron screwed fittings should be used on

water spray systems to prevent damage resulting from the shock of the water hitting

the empty fittings and the movement of the system upon system actuation.

Page 71: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

71

All water spray system piping and fittings must be installed so that the system can be

drained on either side of the deluge valve, with a means for verifying water flow

through the drain. Each system is required to have drain connections sized in

accordance with NFPA 15 for system risers, mains, and actuation valves. Auxiliary

drains must be provided where a change in piping direction prevents drainage of

system piping through either the main drain valve or open water spray nozzles.

1.6 Valves

System actuation valves and accessories used to operate the valve must be listed and

compatible. Most water spray systems are required to operate automatically, and are

also required to have a means of supplemental manual actuation that is independent

of the automatic release system and detection devices.

System actuation valves are required to be as close to the hazard protected as

possible, taking into account the following:

Radiant heat from exposing fire

Potential for explosions

Location and arrangement of drainage facilities including dikes,

trenches, and impounding basins

Potential for freezing and mechanical damage

System discharge time

Accessibility

1.7 Detection and control

1. Analogue addressable optical and manual call points, sounders, etc. shall be supplied

and installed locally to the transformers.

2. All the sounders should be such that they are activated by detector/call point in the

area of location only.

3. Existing conduit and trunking system for cabling shall be maintained where

necessary. Any additional conduiting and associated civil works will be done by the

contractor. Manual call points shall protrude on the wall surface local to the installed

transformer.

4. Contractor shall be responsible for the supply and installation of all the interface

cables necessary between the deluge fire suppression system, fire detection control

unit (FDCU) and interface to existing SCADA system.

5. The detection panel in the control room shall indicate the exact location of the

operated fire detector and operation of any of the installed deluge valves in the event

that any of the valves operates.

Page 72: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

72

6. All the events of the deluge fire protection systems in a power station shall be

captured and annunciated in FDCU located in control room. Information captured

shall be displayed and logged on the event list of the existing SCADA system.

1.8 Other information

(a) Once detection has been done at transformer, this information should be relayed to an

intelligent module displaying the addressable location of the fire at control room

manned by operators. Indication at Fire detection control unit (FDCU) should be

through an audible alarm/ warning sound (103 dB at 1 m) and a flashing signal

appropriately displayed.

(b) Alarm indications and signals relayed to the FDCU shall be made available to the

existing SCADA system for information purposes to the control room operator.

Voltage-free contacts in the FDCU shall be provided for this.

(c) Required electrical clearances: all piping and accessories to be supplied and installed

for the deluge fire protection system shall maintain safe electrical clearances from the

energized components of the transformer (low voltage and high voltage bushings),

busbar and cables.

(d) The installed deluge fire protection systems shall have the required number of

nozzles, nozzle grid rings and heat detectors all suitably spaced as per the

recommended NFPA standard taking into consideration the different types and sizes

of transformers:

For Generator Transformer: two nozzle rings; bottom ring with 10 nozzles; top ring

with 12 nozzles, 2 of which are pointed at the conservator; 6 heat detectors, 2 on each

wider side and 1 on each narrower side.

For Station Transformer: one nozzle ring; 5 nozzles, one pointed at the conservator; 2

heat detectors on opposite sides.

(e) The contractor shall supply necessary materials including but not limited to interface

cables, panels, terminal blocks, tags, ferrules and wire markers for installation of the

fire suppression systems.

(f) Device Compatibility: All components of hydraulic or electrical systems shall be

compatible to ensure that all system components function as an integrated unit.

1.9 Deluge system requirements

The deluge system will be as per NFPA standards. The system’s area of operation will be

the entire external surfaces of the installed Generator Transformers and Station

Transformers of each station.

1.9.1 Detection Devices

Page 73: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

73

The deluge system detection device itself will be thermostatic (fixed-temperature) and

electrically operated. The heat detectors shall be of manufactured standard BS5445,

operate at a voltage of 24 V DC, and have ingress protection IP44.

The detection devices or systems will be automatically supervised. Warning devices-

both audible and visible alarms- will be installed.

1.9.2 Manually-Operated Release System

The system should be manually operable. The manual operation will be a stand-alone

arrangement as per NFPA 13 to ensure operation, regardless of the potential failure of the

associated detection system. The system will incorporate a manual release at the deluge

valve, and at the control room to operate the system during a fire emergency.

1.9.3 Deluge System Control Panel

A common control panel will be provided for the deluge fire protection system operation

in each power station. This panel should have the following characteristics: manufactured

standard EN54 & LPCB; input voltage 230 V AC; output voltage 24 V DC; output

current approx. 500 mA for solenoid valve; ingress protection IP54; temperature rating

maximum 50 ºC.

1.9.4 Devices for Test Purposes and Testing Apparatus

Detection devices will be provided on each circuit for test purposes at an accessible lo-

cation. The device shall be connected to the circuit at a point that will ensure a proper test

of the circuit. A means of producing the heat or impulse used to operate the detection

device shall be available at the location.

1.9.5 Pressure Gauges

Pressure gauges will be installed on either side of the deluge valve. The pressure switch

having a contact of type single pole double throw (SPDT) and rating 2.5A max. and IP

55.

1.9.6 Water Supply

Water supply will vary across the power stations as follows:

Masinga, Kamburu and Kindaruma Power Stations will each have a dedicated

cylindrical concrete water tank constructed with adequate capacity of 40,000litres

(see Appendix 8)

Gitaru and Kiambere Power Stations will use existing fire hydrant tanks.

1.9.7 Deluge Valve and Spray Nozzles

Page 74: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

74

The deluge valve used for the deluge fire protection system shall have the following

characteristics:

Model – E-1; connection – flange, ANSI B16.42 (inlet and outlet are perpendicular to

each other); rating – 150 lb; nominal diameter – DN 100; face – RF; water flow rate –

2,000litres per minute; working pressure – 10 bars; CV factor – 470; actuation – by

electric solenoid valve, voltage 24 V DC, current 0.5 A max., normally closed, coil

insulation class F, IP 55; body and cover – ductile iron; internal trim – bronze, with

ethylene chlorotrifluoroethylene (ECTFE) coating (for corrosion protection); disk and

diaphragm – clapper, ductile iron; pressure gauges to be put on both inlet and outlet sides

of the valve; a pressure switch having a contact of type single pole double throw (SPDT)

and rating 2.5A max. and IP 55.

The spray nozzles shall have the following characteristics:

Model –E; Type – dry; working pressure – 3 bars; flow rate – 100 litres per minute;

nominal diameter – 15 mm; type – thread; material – brass, with corrosion-resistant

nickel-plated finish; spray angle – 90 degrees; spray pattern – solid cone.

The spray nozzles will be adequately spaced.

The actuation of the fire suppression system of one transformer should not affect the

operation of adjacent transformers, whether or not there is a blast wall separating the

transformers.

1.9.8 Fire Hose Cabinet

There shall be a fire hose cabinet with the following characteristics:

Cabinet location – near the deluge valves; cabinet material – 2 mm thick carbon steel,

painted with three coats of epoxy fire red paint (RAL 3000, two primer coats and one

final coat); cabinet door – lockable with key enclosure and can swing 180 degrees.

A fire hose and nozzle shall be supplied and stored in the cabinet: fire hose – size DN 40,

length 40metres, synthetic single jacket material, red colour, working pressure of 10 bars,

coupling size DN 40; hose nozzle – brass material, size DN 40, adjustable (stream-fog-

shut).

An additional fire hydrant landing valve connected to the main line supplying the deluge

system shall be provided.

See Appendix 7 for cabinet dimensions.

1.9.9 Pressure System

The water in the deluge fire protection system shall be maintained at a fixed preset

pressure of 10 bars by a Jockey Pump. An Electric Duty Pump will maintain the pressure

in the system when the deluge valve is activated. The Jockey Pump and the Electric Duty

Pump shall be powered by the power station’s 415 V auxiliary supply.

Page 75: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

75

a) Jockey Pump

The operation of the Jockey Pump shall be fully automatic. In the event of a small

pressure drop in the system main piping the Jockey Pump shall start automatically.

Once the pressure has built up to the correct set value, the Jockey Pump will stop. The

Jockey Pump shall operate for small pressure difference values.

b) Electric Duty Pump

The Electric Duty Pump shall support a flow rate of 2,000litres per minute at a

pressure of 10 bars. The pump’s operation shall be fully automatic. In the event of a

small pressure drop in the system main piping due to the operation of the deluge

system, the pump shall start automatically. This ensures continuous water

flow/pressure in the event of a fire and also compensates for the pressure difference

the jockey pump cannot compensate.

IMPORTANT:

To enable the client undertake conclusive evaluation of the tenders, detailed

technical description, drawings and brochures of each and every equipment for this

project must be appended to the tender. The brochures must state all the technical

specifications and standards, all specifically highlighted for evaluation.

Tenderers who fail to comply with this requirement fully shall have their tenders

rejected.

1. SCHEDULE 1

MASINGA POWER STATION GENERATOR TRANSFORMER AND STATION

TRANSFORMERS FIRE SUPPRESSION SYSTEM TECHNICAL

SPECIFICATIONS

INTRODUCTION

Masinga Power Station is situated in Machakos county about 150 kilometres North-East

of Nairobi and 70 kilometres from Embu town. It is located about 12 kilometres from the

Embu-Kanyonyo/Kang’onde road that joins the Thika-Garissa road.

The power station has two Generating Units each producing 20 MW of power at 11 kV.

The Generators are connected to 23.5 MVA and 25 MVA 11/135 kV step-up Generator

Transformers and 0.63 MVA 11/0.433 kV step-down Station Transformers.

The step-up transformers are located in the 11/132 kV substation and are connected via

electrical protection and isolation equipment to a common 132 kV bus. From this bus

Page 76: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

76

power is evacuated via high voltage transmission lines to Kamburu Power Station and the

Mount Kenya region.

The step-down transformers are located in the control building and are connected to a

common 415 V bus that supplies the power station auxiliaries.

SCOPE

Schedule 1 of this tender is the design, supply, installation, testing and commissioning of

Deluge Fire Protection Systems for the generator transformers and station transformers of

Masinga Power Station. The schedule covers the following:

a. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the 23.5 and 25 MVA

step-up Generator Transformers. Each transformer should have a dedicated system

complete with accessories for fire detection, warning (audible and visible) and

mitigation to suppress the fire to avoid or minimize risk and should not in any way

interrupt operation of the other healthy transformer.

b. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the two 0.63 MVA

step-down Station Transformers. Each transformer should have a dedicated system

complete with accessories for fire detection, warning (audible and visible) and

mitigation to suppress the fire to avoid or minimize risk and should not in any way

interrupt operation of the other healthy transformer.

c. Design, supply, installation, testing and commissioning of a common control and

annunciation (both audio and visual) system located in the surface control building

and its environs.

LAYOUT

See Appendix 1 and 2.

2. SCHEDULE 2

KAMBURU POWER STATION GENERATOR TRANSFORMER AND

STATION TRANSFORMERS FIRE SUPPRESSION SYSTEM TECHNICAL

SPECIFICATIONS

INTRODUCTION

Kamburu Power Station is situated at the border between Machakos and Embu counties,

around 160 kilometres from Nairobi and 55 kilometres from Embu town, along the

Embu-Kanyonyo/Kang’onde road that joins the Thika-Garissa road.

Page 77: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

77

The power station has three Generating Units each producing 30 MW of power at 11 kV.

The Generators are connected to 40 MVA, 37 MVA and 40 MVA 11/132 kV step-up

Generator Transformers. Two Generators are connected to 0.75 and 0.5 MVA 11/0.415

kV step-down Station Transformers.

The three step-up transformers are located in the 11/132 kV substation and are connected

via electrical protection and isolation equipment to two parallel 132 kV bus. From this

bus power is evacuated via high voltage transmission lines to Kenya Power Kamburu 220

kV substation, from where the power is stepped up from 132 kV to 220 kV and then

evacuated to Nairobi.

The two step-down transformers are located in the 11/132 kV substation, get their power

from Generators 1 and 2, and are connected to a common 415 V bus that supplies the

power station auxiliaries.

SCOPE

Schedule 2 of this tender is the design, supply, installation, testing and commissioning of

Deluge Fire Protection Systems for the Generator Transformers and Station Transformers

of Kamburu Power Station. The schedule covers the following:

a. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the 37 MVA and two

40 MVA step-up Generator Transformers. Each transformer should have a dedicated

system complete with accessories for fire detection, warning (audible and visible) and

mitigation to suppress the fire to avoid or minimize risk and should not in any way

interrupt operation of the other healthy transformers.

b. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the 0.75 MVA and 0.5

MVA step-down Station Transformers. Each transformer should have a dedicated

system complete with accessories for fire detection, warning (audible and visible) and

mitigation to suppress the fire to avoid or minimize risk and should not in any way

interrupt operation of the other healthy transformer.

c. Design, supply, installation, testing and commissioning of a common fire detection

annunciation and warning (both audio and visual) system located on the surface

control building and its environs.

LAYOUT

See Appendix 3.

3. SCHEDULE 3

GITARU POWER STATION GENERATOR TRANSFORMER AND STATION

TRANSFORMERS FIRE SUPPRESSION SYSTEM TECHNICAL

SPECIFICATIONS

Page 78: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

78

INTRODUCTION

Gitaru Power Station is situated on the border between Machakos and Embu counties,

about 55 kilometres from Embu town, along the Embu-Kanyonyo road that joins the

Thika-Garissa road.

The power station has three Generating Units with a total capacity of 225 MW generated

at 15 kV; one unit is rated at 81.5 MW and the other two units are each rated at 72.5 MW.

One Generator is connected to a 65/95 MVA 15/220 kV step-up Generator Transformer,

while the other two are each connected to 85 MVA 15/132 kV step-up Generator

Transformers. Generators 1 and 3 power two 0.75 MVA 15/0.415 kV step-down Station

Transformers.

The step-up transformers are located in the 15/132/220 kV substation, and are connected

via electrical protection and isolation equipment to 220 kV and 132 kV transmission lines

which evacuate their power directly to the 132/220 kV ring busbar in Kamburu Power

Station. From this bus power is evacuated via transmission lines to Kenya Power

Kamburu 220 kV substation from where it is evacuated to Nairobi.

The step-down transformers are located in the 15/132/220 kV substation and are

connected to a common 415 V bus that supplies the power station auxiliaries.

SCOPE

Schedule 3 of this tender is the design, supply, installation, testing and commissioning of

Deluge Fire Protection Systems for the Generator Transformers and Station Transformers

of Gitaru Power Station. The schedule covers the following:

a. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the three (one 65/95

MVA and two 85 MVA) step-up Generator Transformers. Each transformer should

have a dedicated system complete with accessories for fire detection, warning (audible

and visible) and mitigation to suppress the fire to avoid or minimize risk and should

not in any way interrupt operation of the other healthy transformers.

b. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the two 0.75 MVA step-

down Station Transformers. Each transformer should have a dedicated system

complete with accessories for fire detection, warning (audible and visible) and

mitigation to suppress the fire to avoid or minimize risk and should not in any way

interrupt operation of the other healthy transformer.

c. Design, supply, installation, testing and commissioning of a common fire detection,

warning and annunciation (both audio and visual) system in the surface control

building and its environs.

Page 79: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

79

LAYOUT

See Appendix 4.

4. SCHEDULE 4

KINDARUMA POWER STATION GENERATOR TRANSFORMER AND

STATION TRANSFORMERS FIRE SUPPRESSION SYSTEM TECHNICAL

SPECIFICATIONS

INTRODUCTION

Kindaruma Power Station is situated in Machakos county about 170 kilometres North-

East of Nairobi. It is located about 14 kilometres from the Embu-Kang’onde road that

joins the Thika-Garissa road.

The power station has three Generating Units with a total rated capacity of 72 MW

generated at 11 kV, each unit rated at 24 MW. Each Generator is connected to a 30 MVA

11/132 kV step-up Generator Transformer and a 0.5 MVA 11/0.415 kV step-down

Station Transformer.

The step-up transformers are located in the 11/132 kV substation and are connected via

electrical protection and isolation equipment to a common 132 kV bus. From this bus

power is evacuated via high voltage transmission lines to Kamburu Power Station, Juja

town in Kiambu County, and Mwingi town in Kitui County.

The step-down transformers are located in the 11/132 kV substation and are connected to

a common 415 V bus that supplies the power station auxiliaries.

SCOPE

Schedule 4 of this tender is the design, supply, installation, testing and commissioning of

Deluge Fire Protection Systems for the Generator Transformers and Station Transformers

of Kindaruma Power Station. The schedule covers the following:

a. Design, supply, installation, testing and commissioning of new deluge fire

detection, warning (both audio and visual), and suppression systems for the three

30 MVA step-up Generator Transformers. Each transformer should have a

dedicated system complete with accessories for fire detection, warning (audible

and visible) and mitigation to suppress the fire to avoid or minimize risk and

should not in any way interrupt operation of the other healthy transformers.

b. Design, supply, installation, testing and commissioning of new deluge fire

detection, warning (both audio and visual), and suppression systems for the two

0.5 MVA step-down Station Transformers. Each transformer should have a

dedicated system complete with accessories for fire detection, warning (audible

and visible) and mitigation to suppress the fire to avoid or minimize risk and

should not in any way interrupt operation of the other healthy transformers.

Page 80: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

80

c. Design, supply, installation, testing and commissioning of a common fire

detection, annunciation and warning (both audio and visual) system in the surface

control building and its environs.

LAYOUT

See Appendix 5.

Page 81: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

81

SCHEDULE 5

KIAMBERE POWER STATION GENERATOR TRANSFORMER AND

STATION TRANSFORMERS FIRE SUPPRESSION SYSTEM TECHNICAL

SPECIFICATIONS

INTRODUCTION

Kiambere Power Station is situated along the border of Embu and Kitui counties, and is

about 100 kilometres from Embu town.

The power station has two Generating Units with a total rated capacity of 168 MW

generated at 11 kV, with each unit rated at 84 MW. Each Generator is connected to a 100

MVA 11/220 kV step-up Generator Transformer and a 0.63 MVA 11/0.433 kV step-

down Station Transformer.

The step-up transformers are located in the 11/220 kV substation and are connected via

electrical protection and isolation equipment to a 220 kV ring bus. From this bus power is

evacuated via high voltage transmission lines to Kamburu Power Station, Embakasi in

Nairobi county and Rabai in Mombasa county.

The step-down transformers are located in the 11/220 kV substation and are connected to

a common 415 V bus that supplies the power station auxiliaries.

SCOPE

Schedule 5 of this tender is the design, supply, installation, testing and commissioning of

Deluge Fire Protection Systems for the Generator Transformers and Station Transformers

of Kiambere Power Station. The schedule covers the following:

a. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the two 100 MVA step-

up Generator Transformers. Each transformer should have a dedicated system

complete with accessories for fire detection, warning (audible and visible) and

mitigation to suppress the fire to avoid or minimize risk and should not in any way

interrupt operation of the other healthy transformer.

b. Design, supply, installation, testing and commissioning of new deluge fire detection,

warning (both audio and visual), and suppression systems for the two 0.63 MVA

step-down Station Transformers. Each transformer should have a dedicated system

complete with accessories for fire detection, warning (audible and visible) and

mitigation to suppress the fire to avoid or minimize risk and should not in any way

interrupt operation of the other healthy transformer.

c. Design, supply, installation, testing and commissioning of a common fire detection,

annunciation and warning (both audio and visual) system in the surface control

building and its environs.

Page 82: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

82

LAYOUT

See Appendix 6.

Note : Appendices will be provided on the site visit day

Page 83: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

83

SECTION G:

BILL OF QUANTITIES – PRICE SCHEDULES

1.1 PREAMBLE TO THE BILL OF QUANTITIES

These Bills of Quantities are to be read in conjunction with the Conditions of Contract,

Specifications and site plan drawings to be viewed on site visit.

The quantities set forth in the Bills of Quantities are intended to represent the character of

the work to be carried out. There is no guarantee to the Contractor that he will be

required to carry out the quantities of work indicated under one particular item or group

of items in the Bills of Quantities, though on the contract as a whole, the quantities are

believed to represent the overall value of the works to be carried out.

The prices and rates inserted in the Bills of Quantities are to include costs of the works

described under the items, complete in place and accordance with the specifications,

including costs and expenses which may be required in and for the construction of the

works described, together with any temporary works and installations which may be

necessary, and all general risks, liabilities and obligations set forth or implied in the

documents on which the contract is based. Where risks, liabilities and obligations cannot

be dealt with as above, then the price thereof is to be separately stated by the Contractor

under Exception Report at the end of Bill of Quantities.

The brief description of the items given in the Bills of Quantities are purely for the

purpose of identification and shall in no way supersede the detailed descriptions given in

the Conditions of Contract and Standard Specifications for the full directions and

description of work and materials.

A price of unit rate shall be inserted in ink against each item in the Bill of Quantities

whether quantities are stated or not. If a tenderer omits to insert a price or unit rate

for any item, his tender may be treated as nonresponsive and not progress to

proceeding evaluation stages.

No alteration shall be made to the Bill of Quantities and no extra item shall be inserted.

The Tenderer shall satisfy himself that the Contract sum arrived at by pricing the

quantities and the items given is sufficient compensation for constructing and

maintaining the whole of the work in accordance with these Contract Documents.

Page 84: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

84

The abbreviations used in the Bill of Quantities are as follows:-

1) l - litre

2) m - metre

3) PC - piece

4) No. - Number

5) UOM - Unit of Measure

6) QTY - Quantity

The numbering of the Bills is not consecutive, but is arranged to correspond to the

sections in the Standard Specifications.

These Bills of Quantities have been prepared in accordance with the Conditions of

Contractor for works of Civil Engineering construction (Second edition) and the Standard

methods of Measurements of Building Works (Second edition metric).

1.2 BILL OF QUANTITIES FOR MASINGA POWER STATION

PRICE SCHEDULE FOR DESIGN, SUPPLY, INSTALLATION, TEST AND

COMMISSIONING OF TRANSFORMERS DELUGE FIRE PROTECTION SYSTEM FOR

MASINGA POWER STATION

N

o.

Ref. Clause

(Section F)

Description QTY UOM Type/

Model

Unit

Price

Cost

A. 1.9 TRANSFORMER DELUGE SYSTEM COMPONENTS

1. 1.9.1;

1.8(d); 1.2

Heat detectors (fixed-temperature) 1 LOT

2. 1.2 Warning devices both audible (with flashing

lights) and visible alarms

1 LOT

3. 1.6; 1.8(d);

1.9.7;

Deluge valves (VIKING or equivalent model)

with conventional trim, ethylene chlorotrifluo-

roethylene (ECTFE) coating complete with

pressure gauge, priming line, emergency

release, strainer, check valve etc.

4 LOT

4. 1.9.3 Deluge System Control Panel to

accommodate systems for the four

transformers

1 PC

5. 1.5; 1.6 Water headers (GI pipe) supplying fixed

piping networks with reductions and bends

round the transformers at different levels,

including gate valves

1 LOT

6. 1.9.7 Water spray nozzles of conventional pattern

to accommodate supply pressure and flow rate

for all transformers

4 LOT

7. 1.9.5; 1.9.7 Pressure control devices 8 PC

8. 1.9.7; 1.9.11 Flow meter, QC approved 4 PC

Page 85: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

85

9. Water meter for the main water supply line 1 PC

SUB TOTAL

B. 1.9.8 FIRE HOSE CABINET & ACCESSORIES 1 SET

C. 1.3; 1.9.9 PRESSURE SYSTEM 1 LOT

D. 1.9.6 CYLINDRICAL CONCRETE WATER

STORAGE TANK (40,000 l)

1 PC

E. Refer to

Appendix 2

SYSTEM PIPEWORK (390 m) G.I.

CLASS

C

F. INSTALLATION AND COMMISSIONING

CHARGES

G. ALL OTHER ITEMS NOT SPECIFIED BUT

NECESSARY TO COMPLETE THE

INSTALLATION (ATTACH LIST)

H. Section E:

3.4; 3.5

WORKING DRAWINGS,OPERATION

AND MAINTENANCE MANUALS

I. Section E:

3.11

TRAINING

Sub-Total

16% VAT

TOTAL

CURRENCY

For local Suppliers

Total Cost

Discount (%) if any

Local Taxes, e.g. Duty, VAT, GoK, etc

Other Charges e.g. transport, handling

Total Cost to Masinga Power Station

Country of Origin

Currency of Tender

Delivery Period

For Overseas Suppliers

Total Cost

Discount (%) if any

Air / Sea freight charges to Nairobi / Mombasa Port

Other Charges (if any)

Total Cost & Freight (CFR) Port of entry.

Country of Origin

Currency of Tender

Delivery Period

Manufacturer

Tenderer’s Name

Page 86: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

86

Tenderer’s Signature

Date

1.3 BILL OF QUANTITIES FOR KAMBURU POWER STATION

PRICE SCHEDULE FOR DESIGN, SUPPLY, INSTALLATION, TEST AND

COMMISSIONING OF TRANSFORMERS DELUGE FIRE PROTECTION SYSTEM FOR

KAMBURU POWER STATION

N

o.

Ref.

Clause

(Section F)

Description QT

Y

UOM Type/

Model

Unit

Pric

e

Cost

A. 1.9 TRANSFORMER DELUGE SYSTEM COMPONENTS

1. 1.9.1;

1.8(d); 1.2

Heat detectors (fixed-temperature) 1 LOT

2. 1.2 Warning devices both audible (with flashing

lights) and visible alarms

1 LOT

3. 1.6; 1.8(d);

1.9.7;

Deluge valves (VIKING or equivalent model)

with conventional trim, ethylene chlorotrifluo-

roethylene (ECTFE) coating complete with

pressure gauge, priming line, emergency

release, strainer, check valve etc.

4 LOT

4. 1.9.3 Deluge System Control Panel to

accommodate systems for the four

transformers

1 PC

5. 1.5; 1.6 Water headers (GI pipe) supplying fixed

piping networks with reductions and bends

round the transformers at different levels,

including gate valves

1 LOT

6. 1.9.7 Water spray nozzles of conventional pattern

to accommodate supply pressure and flow rate

for all transformers

4 LOT

7. 1.9.5; 1.9.7 Pressure control devices 8 PC

8. 1.9.7; 1.9.11 Flow meter, QC approved 4 PC

9. Water meter for the main water supply line 1 PC

SUB TOTAL

A. 1.9.8 FIRE HOSE CABINET AND

ACCESSORIES

1 SET

B. 1.3; 1.9.9 PRESSURE SYSTEM 1 LOT

C. Refer to

Appendix 3

SYSTEM PIPEWORK (350 m) G.I.

CLASS

C

D. INSTALLATION AND COMMISSIONING

CHARGES

E. ALL OTHER ITEMS NOT SPECIFIED BUT

Page 87: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

87

NECESSARY TO COMPLETE THE

INSTALLATION (ATTACH LIST)

F. Section E:

3.4; 3.5

WORKING DRAWINGS,OPERATION

AND MAINTENANCE MANUALS

G. Section E:

3.11

TRAINING

Sub-Total

16% VAT

TOTAL

CURRENCY

For local Suppliers

Total Cost

Discount (%) if any

Local Taxes, e.g. Duty, VAT, GoK, etc

Other Charges e.g. transport, handling

Total Cost to Kamburu Power Station

Country of Origin

Currency of Tender

Delivery Period

For Overseas Suppliers

Total Cost

Discount (%) if any

Air / Sea freight charges to Nairobi / Mombasa Port

Other Charges (if any)

Total Cost & Freight (CFR) Port of entry.

Country of Origin

Currency of Tender

Delivery Period

Manufacturer

Tenderer’s Name

Tenderer’s Signature

Date

1.4 BILL OF QUANTITIES FOR GITARU POWER STATION

PRICE SCHEDULE FOR DESIGN, SUPPLY, INSTALLATION, TEST AND

COMMISSIONING OF TRANSFORMERS DELUGE FIRE PROTECTION SYSTEM FOR

GITARU POWER STATION

Page 88: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

88

No. Ref. Clause

(Section F)

Description QTY UOM Type/

Model

Unit

Price

Cost

A. 1.9 TRANSFORMER DELUGE SYSTEM COMPONENTS

1. 1.9.1; 1.8(d);

1.2

Heat detectors (fixed-temperature) 1 LOT

2. 1.2 Warning devices both audible (with flashing

lights) and visible alarms

1 LOT

3. 1.6; 1.8(d);

1.9.7;

Deluge valves (VIKING or equivalent

model) with conventional trim, ethylene

chlorotrifluoroethylene (ECTFE) coating

complete with pressure gauge, priming line,

emergency release, strainer, check valve etc.

4 LOT

4. 1.9.3 Deluge System Control Panel to

accommodate systems for the four

transformers

1 PC

5. 1.5; 1.6 Water headers (GI pipe) supplying fixed

piping networks with reductions and bends

round the transformers at different levels,

including gate valves

1 LOT

6. 1.9.7 Water spray nozzles of conventional pattern

to accommodate supply pressure and flow

rate for all transformers

4 LOT

7. 1.9.5; 1.9.7 Pressure control devices 8 PC

8. 1.9.7; 1.9.11 Flow meter, QC approved 4 PC

9. Water meter for the main water supply line 1 PC

SUB TOTAL

B. 1.9.8 FIRE HOSE CABINET AND

ACCESSORIES

1 SET

C. 1.3; 1.9.9 PRESSURE SYSTEM 1 LOT

D. Refer to

Appendix 4

SYSTEM PIPEWORK (300m) G.I. CLASS C

E. INSTALLATION AND

COMMISSIONING CHARGES

F. ALL OTHER ITEMS NOT SPECIFIED

BUT NECESSARY TO COMPLETE THE

INSTALLATION (ATTACH LIST)

G. Section E:

3.4; 3.5

WORKING DRAWINGS,OPERATION

AND MAINTENANCE MANUALS

H. Section E:

3.11

TRAINING

Sub-Total

16% VAT

Page 89: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

89

TOTAL

CURRENCY

For local Suppliers

Total Cost

Discount (%) if any

Local Taxes, e.g. Duty, VAT, GoK, etc

Other Charges e.g. transport, handling

Total Cost to Gitaru Power Station

Country of Origin

Currency of Tender

Delivery Period

For Overseas Suppliers

Total Cost

Discount (%) if any

Air / Sea freight charges to Nairobi / Mombasa Port

Other Charges (if any)

Total Cost & Freight (CFR) Port of entry.

Country of Origin

Currency of Tender

Delivery Period

Manufacturer

Tenderer’s Name

Tenderer’s Signature

Date

Page 90: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

90

1.5 BILL OF QUANTITIES FOR KINDARUMA POWER STATION

PRICE SCHEDULE FOR DESIGN, SUPPLY, INSTALLATION, TEST AND

COMMISSIONING OF TRANSFORMERS DELUGE FIRE PROTECTION SYSTEM FOR

KINDARUMA POWER STATION

No. Ref. Clause

(Section F)

Description QTY UOM Type/

Model

Unit

Price

Cost

A. 1.9 TRANSFORMER DELUGE SYSTEM COMPONENTS

1. 1.9.1;

1.8(d); 1.2

Heat detectors (fixed-temperature) 1 LOT

2. 1.2 Warning devices both audible (with flashing

lights) and visible alarms

1 LOT

3. 1.6; 1.8(d);

1.9.7;

Deluge valves (VIKING or equivalent

model) with conventional trim, ethylene

chlorotrifluoroethylene (ECTFE) coating

complete with pressure gauge, priming line,

emergency release, strainer, check valve etc.

4 LOT

4. 1.9.3 Deluge System Control Panel to

accommodate systems for the four

transformers

1 PC

5. 1.5; 1.6 Water headers (GI pipe) supplying fixed

piping networks with reductions and bends

round the transformers at different levels,

including gate valves

1 LOT

6. 1.9.7 Water spray nozzles of conventional pattern

to accommodate supply pressure and flow

rate for all transformers

4 LOT

7. 1.9.5; 1.9.7 Pressure control devices 8 PC

8. 1.9.7; 1.9.11 Flow meter, QC approved 4 PC

9. Water meter for the main water supply line 1 PC

SUB TOTAL

B. 1.9.8 FIRE HOSE CABINET AND

ACCESSORIES

1 SET

C. 1.3; 1.9.9 PRESSURE SYSTEM 1 LOT

D. 1.9.6 CYLINDRICAL CONCRETE WATER 1 PC

Page 91: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

91

STORAGE TANK (40,000 l)

E. Refer to

Appendix 5

SYSTEM PIPEWORK (170 m) G.I. CLASS C

F. INSTALLATION AND

COMMISSIONING CHARGES

G. ALL OTHER ITEMS NOT SPECIFIED

BUT NECESSARY TO COMPLETE THE

INSTALLATION (ATTACH LIST)

H. Section E:

3.4; 3.5

WORKING DRAWINGS,OPERATION

AND MAINTENANCE MANUALS

I. Section E:

3.11

TRAINING

Sub-Total

16% VAT

TOTAL

CURRENCY

For local Suppliers

Total Cost

Discount (%) if any

Local Taxes, e.g. Duty, VAT, GoK, etc

Other Charges e.g. transport, handling

Total Cost to Kindaruma Power Station

Country of Origin

Currency of Tender

Delivery Period

For Overseas Suppliers

Total Cost

Discount (%) if any

Air / Sea freight charges to Nairobi / Mombasa Port

Other Charges (if any)

Total Cost & Freight (CFR) Port of entry.

Country of Origin

Currency of Tender

Delivery Period

Manufacturer

Tenderer’s Name

Tenderer’s Signature

Date

Page 92: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

92

1.6 BILL OF QUANTITIES FOR KIAMBERE POWER STATION

PRICE SCHEDULE FOR DESIGN, SUPPLY, INSTALLATION, TEST AND

COMMISSIONING OF TRANSFORMERS DELUGE FIRE PROTECTION SYSTEM FOR

KIAMBERE POWER STATION

No. Ref. Clause

(Section F)

Description QTY UOM Type/

Model

Unit

Price

Cost

A. TRANSFORMER DELUGE SYSTEM COMPONENTS

1. 1.9.1;

1.8(d); 1.2

Heat detectors (fixed-temperature) 1 LOT

2. 1.2 Warning devices both audible (with

flashing lights) and visible alarms

1 LOT

3. 1.6; 1.8(d);

1.9.7;

Deluge valves (VIKING or equivalent

model) with conventional trim, ethylene

chlorotrifluoroethylene (ECTFE) coating

complete with pressure gauge, priming

line, emergency release, strainer, check

valve etc.

4 LOT

4. 1.9.3 Deluge System Control Panel to

accommodate systems for the four

transformers

1 PC

5. 1.5; 1.6 Water headers (GI pipe) supplying fixed

piping networks with reductions and bends

round the transformers at different levels,

including gate valves

1 LOT

6. 1.9.7 Water spray nozzles of conventional

pattern to accommodate supply pressure

and flow rate for all transformers

4 LOT

7. 1.9.5; 1.9.7 Pressure control devices 8 PC

8. 1.9.7; 1.9.11 Flow meter, QC approved 4 PC

9. Water meter for the main water supply line 1 PC

SUB TOTAL

B. 1.9.8 FIRE HOSE CABINET AND 1 SET

Page 93: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

93

ACCESSORIES

C. 1.3; 1.9.9 PRESSURE SYSTEM 1 LOT

D. Refer to

Appendix 6

SYSTEM PIPEWORK (150m) G.I.

CLASS

C

E. INSTALLATION AND

COMMISSIONING CHARGES

F. ALL OTHER ITEMS NOT SPECIFIED

BUT NECESSARY TO COMPLETE

THE INSTALLATION (ATTACH LIST)

G. Section E:

3.4; 3.5

WORKING DRAWINGS,OPERATION

AND MAINTENANCE MANUALS

H. Section E:

3.11

TRAINING

Sub-Total

16% VAT

TOTAL

CURRENCY

For local Suppliers

Total Cost

Discount (%) if any

Local Taxes, e.g. Duty, VAT, GoK, etc

Other Charges e.g. transport, handling

Total Cost to Kiambere Power Station

Country of Origin

Currency of Tender

Delivery Period

For Overseas Suppliers

Total Cost

Discount (%) if any

Air / Sea freight charges to Nairobi / Mombasa Port

Other Charges (if any)

Total Cost & Freight (CFR) Port of entry.

Country of Origin

Currency of Tender

Delivery Period

Manufacturer

Tenderer’s Name

Tenderer’s Signature

Page 94: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

94

Date

1.7 SPARES

No. Description QTY UOM Type/

Model

Unit

Price

Cost

1. Deluge Valve Pressure Switch 5 PC

2. Deluge Valve Solenoid Valve 3 PC

3. Deluge Valve 1 SET

4. Addressable Heat Detectors (fixed-temperature) 10 PC

5. Addressable Fire Alarm Sirens (103 dB at 1 m) 3 PC

6. Addressable Fire Alarm Strobe Lights 3 PC

7. Input Electrical Interface Control Modules 3 PC

8. Output Electrical Interface Control Modules 3 PC

9. Electrical pump 1 PC

10. Jockey Pump 1 PC

11. Pressure Gauges 5 PC

12. Any other critical system component (Itemize)

a)

b)

c)

d)

TOTAL COST

SUMMARY OF TOTALS

No. Schedule Total Cost (Currency)

1) MASINGA POWER STATION

2) KAMBURU POWER STATION

3) GITARU POWER STATION

4) KINDARUMA POWER STATION

5) KIAMBERE POWER STATION

6) SPARES

Grand Total Transferred to Tender Form

Authorized Signature: …………………………………….

Date: ………………………………………………………

Company Rubber Stamp: ………………………………..

Page 95: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

95

Page 96: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

96

PROPOSED LAYOUT

Proposed layouts for the works are attached as Appendices I and II together with respective

cabinets and kitchen low level cabinets.

Page 97: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

97

SECTION IX:

STANDARD FORMS

A. FORM OF TENDER

NAME OF CONTRACT:

TO: The Company Secretary & Legal Affairs Director

The Kenya Electricity Generating Company Ltd

P.O. Box 47936-00100

Nairobi00100, Kenya

We have examined the Conditions of Contract, Employer’s Requirements, Schedules, Technical

Specifications, Tender Drawings, the attached Addenda Nos _____________________ for the

above-named Works. We have examined, understood and checked these documents and have

ascertained that they contain no errors or other defects. We accordingly offer to design, execute

and complete the Works and remedy any defects therein, in conformity with this Tender which

includes all these documents and the enclosed Proposal, for the lump sum of (in currencies of

payment) ______________________________________exclusive of taxes.

We agree to abide by this Tender until _________________ and it shall remain binding upon us

and may be accepted at any time before that date.

If this offer is accepted, we will provide the specified Performance Security, commence the

Works as soon as is reasonably practicable after the Commencement Date, and complete the

Works in accordance with the above-named documents within the Time for Completion. We

guarantee that the Works will then conform with the Schedule of Guarantees.

Unless and until a formal Agreement is prepared and executed this Letter of Tender, together

with your written acceptance thereof, shall constitute a binding Contract between us.

We understand that you are not bound to accept the lowest or any tender you may receive.

Signature _____________________ in the capacity of ___________________________

duly authorised to sign tenders for and on behalf of ___________________________

Address: ____________________________________________________________________

____________________________________________________________________________

Date: _______________________________

Page 98: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

98

B. ELIGIBILITY & QUALIFICATION DATA

Tender Questionnaire

Please fill in block letters.

1. Full names of Tenderer

………………………………………………………………………………………

2. Full address of Tenderer to which tender correspondence is to be sent (unless an agent

has been appointed below)

………………………………………………………………………………………

3. Telephone number (s) of Tenderer

………………………………………………………………………………………

4. E-mail and Fax address of Tenderer

………………………………………………………………………………………

5. Name of Tenderer’s representative to be contacted on matters of the tender during the

tender period

………………………………………………………………………………………

6. Details of Tenderer’s nominated agent (if any) to receive tender notices. This is

essential if the Tenderer does not have his registered address in Kenya (name, address,

telephone, e-mail)

………………………………………………………………………………………

………………………………………………………………………………………

_________________

Signature of Tenderer

Make copy and deliver to: ___________________________ (Name of Employer

Page 99: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

99

SECTION H:

STANDARD FORMS

CONTENTS

Description

Page

1. Introduction………………………………………………………………………70

2. Form of

Tender…………………………….……………………………………...............71

3. Tender Security Form……………………………………………………. ……..73

4. Contract Form……………………………………………………………………74

5. Performance Security……………………………………………………………76

6. Bank Guarantee for Advance Payment…………………………………….........77

7. Manufacturer’s Authorization Form…………………………………………….78

8. Tender Questionnaire……………………………………………………………79

9. Confidential Business Questionnaire…………………………………………....80

10. Financial

Situation…………………………………………………………………….…...83

11. Average Annual

Turnover…………………………………………………………………………84

12. Financial

Resources………………………………………………………………………...85

13. General

Experience……………………………………………………………….,,……...86

Page 100: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

100

14. Joint Venture

Summary…………………………………………………………….87

15. Details of Contracts of Similar

Complexity………………………………………..88

16. Key Personnel

Capabilities…………………………………………………………90

17. CVs of Key

Personnel………………………………………….…………………...91

18. Schedule of Ongoing

Projects………………………………………………………92

19. Litigation History

…………………………………………………………………...93

20. Deviation from Specifications

………………………………………………………94

Page 101: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

101

INTRODUCTION

The following schedules form the Contract Schedules and must be completed in their entirety by

the Tenderer at the time of tendering. The technical details requested in Section C, part II, Clause

2.1 of this document shall also be submitted with the tender.

The Performance Security and Bank Guarantee for Advance Payment forms are samples and

shall be only completed by the Approved Tenderer.

The Tenderer shall enter in the spaces on the tender form and bill of Quantity, price schedules

the appropriate unit of currency to which he has tendered.

TENDER FORM

DESIGN, SUPPLY, INSTALLATION, TEST AND COMMISSIONING OF DELUGE

FIRE PROTECTION SYSTEMS FOR GENERATOR TRANSFORMERS AND

STATION TRANSFORMERS IN 7 FORKS POWER STATIONS

The Company Secretary

The Kenya Electricity Generating Company Ltd

P. O. Box 47936 - 00100

NAIROBI

KENYA

Gentlemen and/or Ladies:

1. Having examined the Tender Documents including the Specification Drawings, Conditions

of Contract & Requirements, Specifications and Bill of Quantity Price Schedules for the

execution of the above named contract, the receipt of which is hereby duly acknowledged,

we, the undersigned, hereby offer to execute, complete and remedy defects in the whole of

the works in conformity with the said document for the sum

Page 102: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

102

[amount in figures]

___________________________________________________________________________

[state currency]

[amount in words]

2. We undertake, if our Tender is accepted, to complete the whole of the Works comprised in

the contract within a period of ___________________ calendar months, subject to the said

Conditions.

3. We agree to abide by this Tender for a period of 180 days from the date fixed for receiving

the same and it shall remain binding upon us and may be accepted by you at any time before

the expiration of that period.

4. This Tender is submitted under our covering letter reference___________________ dated

_____________________ and the complete tender documents and other information,

required by the instructions to Tenderers, which are enclosed therewith all of which shall be

read and construed as forming a part hereof.

5. Unless and until an agreement is prepared and executed, this Tender, your Letter of

Intent/Award, together with our written acceptance thereof, shall constitute a binding

Contract between us.

6. If our Tender is accepted we will furnish a Performance Security issued by a Bank (to be

approved by you) to be jointly and severally bound with us in an amount of 10% of the above

named sum in accordance with the Conditions of Contract.

7. Commissions of gratuities, if any, paid or to be paid by us to agents relating to this Bid, and

to contract execution if we are awarded this Bid, and to contract execution if we are awarded

the contract, are listed below:

Name and Amount and Purpose of

address of agent Currency Commission gratuity

___________________ __________________ _________________

___________________ __________________ _________________

___________________ __________________ _________________

___________________ __________________ _________________

___________________ __________________ _________________

(if none, state “none”)

Page 103: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

103

8. We understand that you are not bound to accept the lowest or any Tender you may receive.

Dated this………………………..day of…………………………..20…..

Signature…………………………in the capacity of ………………………………..

…………………………………………………………………………………………………..

duly authorised to sign Bid for and on behalf of:………………………

…………………………………………………………………………………………………

(in capital letters)

Witness……………………………………………………………………

Address ………………………………………………………………….

…………………………………………………………………

Occupation ………………………………………………………………...

Page 104: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

104

TENDER SECURITY FORM [Must be on the letter head of the Bank]

Whereas ____________________________________________(hereinafter

Called “the Bidder”) has submitted its bid dated ___________________________ for the design,

supply, installation, test and commissioning of Fire Protection systems for Generator

Transformers and Station Transformers in 7 Forks Power stations as per given specifications

(hereinafter called “the Bid”).

KNOW ALL PEOPLE by these presents that WE _______________________________

______________________of_______________________________________(hereinafter

called “the Bank”), are bound unto Kenya Electricity Generating Company Limited (hereinafter

called “KenGen”) in the sum for which payment will and truly to be made to the said KenGen,

the Bank binds itself, its successors, and assigns by these presents. Sealed with the Common Seal

of the said Bank this _________________________day of 2016_____

THE CONDITIONS of this obligation are:

1. If the Bidder withdraws its Bid during the period of bid validity specified by the Bidder

on the Bid Form; or

2. If the Bidder, having been notified of the acceptance of its Bid by KenGen during the

period of bid validity:

a) Fails or refuses to execute the Contract Form, if required; or

b) Fails or refuses to furnish the Performance Security, in accordance with the

Instructions to Bidders;

We undertake to pay to KenGen up to the above amount upon receipt of its first written demand,

without KenGen having to substantiate its demand, provided that in its demand KenGen will

note that the amount claimed by it is due to it, owing to the occurrence of one or both of the two

conditions, specifying the occurred condition or conditions. This guarantee will remain in force

up to and including thirty (30) days after the period of bid validity, and any demand in respect

thereof should reach the Bank not later than the above date.

_____________________________

(Signature and seal of the Bank)

Page 105: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

105

CONTRACT FORM

THIS AGREEMENT, made the _________________ day of ________ 20 ______ between

________________________________________________of [or whose registered office is

situated at] __________________________________________ (hereinafter called “the

Employer”) of the one part AND

________________________________________________________of [or whose registered

office is situated at] _________________________________________ (hereinafter called “the

Contractor”) of the other part.

WHEREAS THE Employer is desirous that the Contractor executes

________________________________________________________________________ (name

and identification number of Contract ) (hereinafter called “the Works”) located

at______________________________[Place/location of the Works] and the Employer has

appointed ________________________

___________________________ of/or whose registered office is situated at

__________________________________ as the Engineer for the purposes thereof and has

accepted the tender submitted by the Contractor for the execution and completion of the said

Works and the remedying of any defects therein in the sum of _________________ (amount in

figures)

______________________________________ (amount in words) (hereinafter called the

“Contract Price”).

NOW THIS AGREEMENT WITNESSETH as follows:

1. In this Agreement, words and expressions shall have the same meanings as are respectively

assigned to them in the Conditions of Contract hereinafter referred to.

2. The following documents shall be deemed to form and shall be read and construed as part of

this Agreement i.e.

(a) The Letter of Award and Acceptance thereof.

(b) The Preamble.

Page 106: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

106

(c) The Special Conditions of Contract – Part II.

(d) The General Conditions of Contract – Part I.

(e) The Specifications.

(f) The Completed Form of Tender and Bill of Quantity-Price Schedules

(g) The Completed Details of Offered Equipment-Technical Schedules A and B

(h) The Specification Drawings.

(i) The Contractor’s Drawings.

(j) The Contractor’s Tender.

3. In consideration of the payments to be made by the Employer to the Contractor as hereinafter

mentioned, the Contractor hereby covenants with the Employer to execute and complete the

Works and remedy any defects therein in conformity in all respects with the provisions of the

Contract.

4. The Employer hereby covenants to pay the Contractor in consideration of the execution and

completion of the Works and the remedying of defects therein, the Contract Price or such

other sum as may become payable under the provisions of the Contract at the times and in the

manner prescribed by the Contract.

IN WITNESS whereof the Parties thereto have caused this Agreement to be executed the day

and year first before written.

The common Seal of _________________________________________________

Was hereunto affixed in the presence of ________________________________

Signed Sealed, and Delivered by the said ______________________________

Binding Signature of Employer _______________________________________

Binding Signature of Contractor _______________________________________

In the presence of (i) Name_______________________________________

Address_____________________________________

Signature___________________________________

Date _______________________________________

(ii) Name _______________________________________

Address_____________________________________

Page 107: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

107

Signature____________________________________

Date _______________________________________

Page 108: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

108

PERFORMANCE SECURITY [Must be on the letter head of the Bank]

To: Kenya Electricity Generating Company Limited,

Stima Plaza Phase III, Kolobot Road, Parklands,

P.O. Box 47936 - 00100,

NAIROBI, KENYA.

WHEREAS ______________________ [name of Supplier] (hereinafter called “the Contractor”)

has undertaken, in pursuance of Contract No. __________________________ dated

______________________________ 20___ to_____________________________

____________________________________________ (hereinafter called “the Contract”).

AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall

furnish you with a bank guarantee by a reputable bank for the sum specified therein as security

for compliance with the Contractor’s performance obligations in accordance with the Contract.

AND WHEREAS we have agreed to give the Contractor a guarantee:

THEREFORE WE hereby affirm that we are Guarantors and responsible to you, on behalf of the

Supplier, up to a total of

_______________________________________________________________

______________________________________ (words) ___________________ (figures), and

we undertake to pay you, upon your first written demand declaring the Contractor to be in

default under the Contract and without cavil or argument, any sum or sums within the limits of

_______________________________________________________ as aforesaid, without your

needing to prove or to show grounds or reasons for your demand or the sum specified therein.

This guarantee is valid until the ________________ day of ___________ 201 _________.

SIGNATURE AND SEAL OF THE

GUARANTORS______________________________________

[name of bank or financial institution]

________________________________________________________________________

[address]

________________________________________________________________________

[date]

Page 109: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

109

BANK GUARANTEE FOR ADVANCE PAYMENT

To: Kenya Electricity Generating Company Limited,

Stima Plaza Phase III, Kolobot road, Parklands,

P.O. Box 47936 - 00100,

NAIROBI, KENYA.

TENDER FOR DESIGN, MANUFACTURE, SUPPLY, DELIVERY, INSTALLATION AND

COMMISSION OF DELUGE FIRE PROTECTION SYSTEMS FOR GENERATOR

TRANSFORMERS AND STATION TRANSFORMERS IN 7 FORKS POWER

STATIONS

Gentlemen and/or Ladies:

In accordance with the provision Conditions of Contract of the above mentioned Contract,

_________________________(hereinafter called “the Contractor”) shall deposit with KenGen a

bank guarantee, its proper and faithful performance under the said Clause of the Contract in an

amount of

______________ (figures)__________________________________________________(words)

We, the [bank or financial institution], as instructed by the Contractor, agree unconditionally and

irrevocably to guarantee as primary obligator and not as security merely, the payment to KenGen

on its first demand without whatsoever right of objection on our part and without its first claim to

the Contractor, in the amount not exceeding _________________________________( figures)

_______________________________________________________________________ (words)

We further agree that no change or addition to or other modification of the terms of the Contract

to be performed thereunder or of any of the Contract documents which may be made between

KenGen and the Contractor, shall in any way release us from any liability under this guarantee,

and we hereby waive notice of any such change, addition, or modification.

This guarantee shall remain valid and in full effect from the date of the advance payment

received by the Contractor under the Contract until _________________ (date).

Yours truly,

Signature and seal of the Guarantors

______________________________________________

[name of bank or financial institution]

_____________________________

[address]

________________________________________

[date]

Page 110: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

110

Page 111: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

111

MANUFACTURER’S AUTHORIZATION FORM

To: Kenya Electricity Generating Company Limited

Stima Plaza Phase III, Kolobot Road, Parklands

P.O. Box 47936-00100

NAIROBI, KENYA

WHEREAS ………………………………………………………………………………….

[name of the Manufacturer]

who are established and reputable manufacturers of Deluge Fire Protection Systems having

factories at…………………………………………………………………

[address of factory]

do hereby authorize…………………………………………………………………………….

[name and address of Agent]

to submit a tender, and subsequently negotiate and sign the Contract with you against tender

No………….. ……………………………………………………

[reference of the Tender]

for the above goods manufactured by us.

We hereby extend our full guarantee and warranty as per the General Conditions of Contract for

the Deluge Fire Protection Systems offered for supply by the above firm against this Invitation

for Tenders.

[Signature for and on behalf of Manufacturer]

Note: This letter of authority should be on the letterhead of the Manufacturer and should be

signed by a person competent.

Page 112: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

112

TENDER QUESTIONNAIRE

Please fill in block letters.

1. Full names of tenderer

………………………………………………………………………………………

2. Full address of tenderer to which tender correspondence is to be sent (unless an agent has

been appointed below)

………………………………………………………………………………………

3. Telephone number (s) of tenderer

………………………………………………………………………………………

4. E-Mail and Telex address of tenderer

………………………………………………………………………………………

5. Name of tenderer’s representative to be contacted on matters of the tender during the

tender period

………………………………………………………………………………………

6. Details of tenderer’s nominated agent (if any) to receive tender notices. This is essential

if the tenderer does not have his registered address in Kenya (name, address, telephone,

telex)

………………………………………………………………………………………

………………………………………………………………………………………

_______________________

Signature of Tenderer

Make copy and deliver to: _____________________ (Name of Employer)

Page 113: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

113

H: MANDATORY CONFIDENTIAL BUSINESS QUESTIONNAIRE

(Must be filled by all applicants or Tenderers’ who choose to participate in this tender)

Name of Applicant(s)..........................................................................................

You are requested to give the particulars in Part 1 and either Part 2 (a), 2 (b) or 2 (c), whichever applies to

your type of business. Part 2 (d) to part 2 (i / j) must be filled. You are advised that giving wrong or false

information on this Form will lead to automatic disqualification/termination of your business proposal at

your cost.

Part 1 – General Business Name:……………………………………………………………Certificate of Incorporation / Registration

No. ………………………………………..…Location of business premises:

Country …………………………………..…Physical address …………………….……………….

Town ………………………………….……………………….Building………………………………

Floor…………………………………………………………….Plot No. ……..……………………….

Street / Road ……..………………….……………………Postal Address ………..………………

Postal / Country Code…………………………………….Telephone No’s…...…………………

Fax No’s. ……………………….………………E-mail address ………………….…………………

Website ……………………………………………………………………………………….…………

Contact Person (Full Names) …………………………… Direct / Mobile No’s.…………….…

Title ……………………………………… Power of Attorney (Yes / No)

If Yes, attach written document.

Nature of Business (Indicate whether manufacturer, distributor, etc) ………………..……….………..

(Applicable to Local suppliers only)

Local Authority Trading License No. …………………… Expiry Date ………………………..

Value Added Tax No.…………………………………………….……………………………………………….

Value of the largest single assignment you have undertaken to date (US D/KShs)

…………………………………….……

Was this successfully undertaken? Yes / No. ………………………….(If Yes, attach reference)

Name (s) of your banker (s)

………………………………………………………………………..…………………………………..

Branches ………………………………………………… Tel. No’s. …….………………………….

Part 2 (a) – Sole Proprietor (if applicable) Full names ……..………………………………………..…………………………………………………….

Nationality……………………………………………….. Country of Origin……....………………

……………………………………………………………………..……..……………

Company Profile ………………………. (Attach brochures or annual reports in case of public company)

Part 2 (b) – Partnerships (if applicable) Give details of partners as follows:

Full Names Nationality Citizenship Details Shares 1. ……………………………………………………………………………………………………….

2. ……………………………………………………………………………………………………….

Company Profile ……………………….(Attach brochures)

Part 2 (c) – Registered Company (if applicable)

Page 114: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

114

Private or public …………………………………………….

Company Profile ……………………….(Attach brochures or annual reports in case of public companies)

State the nominal and issued capital of the Company

Nominal KShs ……………………..………………………….

Issued KShs ………………………..………………………….

List of top ten (10) shareholders and distribution of shareholding in the company. Give details of all directors as

follows:-

Full Names Nationality Citizenship Details Shares 1.…………………………. ……………… …………………… ……….…….

2………………………… ………………… ………………… .……..…..…..

Part 2 (d) – Debarment I/We declare that I/We have not been debarred from any procurement process and shall not engage in any

fraudulent, corrupt, coercive and obstructive acts with regard to this or any other tender by the KENGEN and any

other public or private institutions.

Full Names ……………………………………………………………………………………………………………

Signature ………………………………………………………………………………………………………….

Dated this …………………………………….……………day of ……………………………2016.

In the capacity of ………………………………………………………………………………………………………

Duly authorized to sign Tender for and on behalf of …………………………………………………

Part 2 (e) – Bankruptcy / Insolvency / receivership. I/We declare that I/We have not been declared bankrupt or insolvent by the competent Authorities in Kenya and

neither are we under receivership:

Full Names ……………………………………………………………………………………………………………

Signature ………………………………………………………………………………………………………….

Dated this …………………………………….……………day of ……………………………2016.

In the capacity of ………………………………………………………………………………………………………

Duly authorized to sign Tender for and on behalf of …………………………………………………

Part 2 (f) – Criminal Offence I/We, (Name (s) of Director (s)):-

a) ……………………………………………………………………….………..……………

b) …………………………………………………………………………..….……….………

Have not been convicted of any criminal offence relating to professional conduct or the making of false statements

or misrepresentations as to its qualifications to enter into a procurement contract within a period of three (3) years

preceding the commencement of procurement proceedings.

Signed …………………………………………………………………………………………………………….

For and on behalf of M/s

………………………………………...…………………………………………………………………..

In the capacity of

……………………………………….……………………………………………………………………

Dated this ……………………………………………day of ………………………………….2016.

Suppliers’ / Company’s Official Rubber Stamp

………………………………………………………….

Part 2 (g) – Conflict of Interest I/We, the undersigned state that I / We have no conflict of interest in relation to this procurement:

a) ………………………………………………………………………………………………

b) ………………………………………………………………………………………………

Page 115: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

115

For and on behalf of M/s …………………………………………………………………………………..

In the capacity of ………………………………………………………………………………………

Dated this ………………………………………day of ……………………………………….2016

Suppliers’ / Company’s Official Rubber Stamp

………………………………………………………

Part 2 (h) – Interest in the Firm: Is there any person/persons in KENGEN or any other public institution who has interest in the Firm? Yes/No

……………………….. (Delete as necessary) Institution ………………………….

……………………………………. ……………………………… ………………………

(Title) (Signature) (Date)

Part 2(i) – Declaration

I / We, the undersigned state and declare that the above information is correct and that I / We give KENGEN

authority to seek any other references concerning my / our company from whatever sources deemed relevant, e.g.

Office of the Registrar of Companies, Bankers, etc.

Full names

…………………………………………………………………………………………………………..

Signature………………………………………………………………………………………………

For and on behalf of M/s …………………………………………………………………………………………..

In the capacity of

………………………………………………………………………………………………

Dated this ……………………………………………day of ………………………………….2016.

Suppliers’ / Company’s Official Rubber Stamp

…………………………………………………………

Page 116: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

116

TECHNICAL CAPABILITY REQUIREMNTS

Financial Situation - (FORM FIN-1)

Historical Financial Performance Bidder’s Legal Name: _______________________ Date: _____________________

JV Partner Legal Name: _______________________ Tender No.: __________________

To be completed by the Bidder and, if JV, by each partner

Financial

information in

US$ equivalent

Historic information for previous ________ years

(US$ equivalent in )

Year 1 Year 2 Year 3 Year … Year n Avg. Avg. Ratio

Information from Balance Sheet

Total Assets

(TA)

Total

Liabilities (TL)

Net Worth

(NW)

Current Assets

(CA)

Current

Liabilities (CL)

Information from Income Statement

Total Revenue

(TR)

Profits Before

Taxes (PBT)

Attached are copies of financial statements (balance sheets, including all related notes, and income

statements) for the years required above complying with the following conditions:

Must reflect the financial situation of the Bidder or partner to a JV, and not sister or parent

companies

Historic financial statements must be audited by a certified accountant

Page 117: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

117

Historic financial statements must be complete, including all notes to the financial statements

Historic financial statements must correspond to accounting periods already completed and

audited (no statements for partial periods shall be requested or accepted)

Name, address, telephone, telex, fax numbers of the Tenderer’s Bankers who may provide

reference if contacted by the Employer.

AVERAGE ANNUAL TURNOVER (FORM FIN-2)

Bidder’s Legal Name: ___________________________ Date:

_____________________

JV Partner Legal Name: ____________________________ Tender No.:

______________

All individual firms and all partners of a joint venture are requested to complete the

information in this form. The information supplied should be the annual turnover of

the Tenderer (or each member of a joint venture), in terms of the amounts billed to

clients for each year for work in progress or completed, converted to US dollars at

the rate of exchange at the end of the period reported.

Annual turnover data

Year Turnover US$ equivalent

1

2

3

4

*Average Annual Turnover

Use a separated sheet for each partner of a joint venture.

This information is declared to be correct by (Tenderer’s authorised representative)

Name…………………………………………

Signature………………

Position in the Firm……………………………………

Date………………………

Page 118: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

118

*Average annual turnover calculated as total certified payments received for work in

progress or completed over the number of years specified in the tender documents

divided by that same number of years.

Page 119: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

119

Financial Resources (FORM FIN-1))

Specify proposed sources of financing, such as liquid assets, unencumbered real assets, lines of credit, and other financial means, net of current commitments, available to meet the total construction cash flow demands of the subject contract or contracts as indicated Evaluation and Qualification Criteria

Source of financing Amount (US$ equivalent)

1.

2.

3.

4.

General Experience (FORM: EXP-1)

Bidder’s Legal Name: ____________________________ Date: _____________________

JV Partner Legal Name: ____________________________ Tender No.: ________________

Page 120: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

120

Starting Month /

Year

Ending Month /

Year

Years

*

Contract Identification Role of Bidder

Attach Letter of Award and completion

certificate for each contract

______

______

Contract name:

Brief Description of the Works performed by the Bidder:

Name of Employer:

Address:

_________

______

______

Contract name:

Brief Description of the Works performed by the Bidder:

Name of Employer:

Address:

_________

______

______

Contract name:

Brief Description of the Works performed by the Bidder:

Name of Employer:

Address:

_________

______

______

Contract name:

Brief Description of the Works performed by the Bidder:

Name of Employer:

Address:

_________

Page 121: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

121

Starting Month /

Year

Ending Month /

Year

Years

*

Contract Identification Role of Bidder

Attach Letter of Award and completion

certificate for each contract

______

______

Contract name:

Brief Description of the Works performed by the Bidder:

Name of Employer:

Address:

_________

______

______

Contract name:

Brief Description of the Works performed by the Bidder:

Name of Employer:

Address:

_________

*List calendar year for years with contracts with at least Five (5) months activity per year starting with the earliest year

JOINT VENTURE SUMMARY (FORM: EXP-2)

Names of all partners of a joint venture

1. Lead partner:

2. Partner:

3. Partner:

4. Partner:

5. Partner:

6. Partner:

Page 122: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

122

Total value of annual turnover, in terms of work billed to clients, in US$ equivalent, converted at

the rate of exchange at the end of the period reported:

Annual turnover date (Installations and commission only; US$ equivalent)

Partner Year 1 Year 2 Year 3 Year 4 Year 5

1. Lead partner:

2. Partner:

3. Partner:

4. Partner:

5. Partner:

6. Partner:

Totals

This information is declared to be correct by Lead Partner

Name………………………………………… Signature………………

Position in the Firm…………………………………… Date………………………

Page 123: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

123

DETAILS OF CONTRACTS OF SIMILAR NATURE AND COMPLEXITY

(FORM: EXP-3)

Name of Tenderer or partner of a joint venture

Use a separate sheet for each contract.

1. Number of contract

Name of contract

Country

2. Name of employer

3. Employer address

4. Nature of works and special features relevant to the contract for which the tenderer wishes to bid

5. Contract role (check one)• Sole contractor • Subcontractor

• Partner in a joint venture

6. Value of the total contract (in specified currencies at completion, or at date of award for current

contracts)

Currency Currency Currency

7. Equivalent value US$

8. Date of award

9. Date of completion

10 Contract duration (years and months)

______years ______months

11. Specified requirements1

1Insert any specific criteria required for the execution of the contract.

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………………

Position in the Firm…………………………………… Date………………………

Page 124: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

124

KEY PERSONNEL CAPABILITIES (FORM: EXP-4)

Name of tenderer

For specific positions essential to contract implementation, applicants should provide the names

of at least two candidates qualified to meet the specified requirements stated for each position set

out in Capabilities in the Instructions to Tender.

The date on their experience should be supplied in separate sheets using one Form for each

candidate.

1. Title of position: Head Office Project Manager

Name of prime candidate:

Name of alternate candidate:

2. Title of position: Installation Supervisor Fire Protection System

Name of prime candidate:

Name of alternate candidate:

3. Title of position: Installation Supervisor Associated with power generating facilities

Name of prime candidate:

Name of alternate candidate:

4. Title of position: Commissioning Engineer – Electrical or Equivalent

Name of prime candidate:

Name of alternate candidate:

Page 125: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

125

CVS OF KEY PERSONNEL (FORM: EXP-5)

Name of Tenderer:

Position Candidate

• Prime • Alternate

Candidate

information

1. Name of candidate 2. Date of birth

3. Professional qualifications

Present

employment

4. Name of employer

Address of employer

Telephone Contract (manager/personnel officer)

Fax Telex

Job title of candidate Years with present employer

Summarise professional experience over the last 15 years, in reverse chronological order.

Indicate particular technical and managerial experience relevant to the Project.

From To Company/Project/Position/ Relevant technical and management

experience

I certify that the above information is correct.

………………………… …………………… ………………..

(Title) (Signature) (Date)

Page 126: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

126

SCHEDULE OF ONGOING PROJECTS (FORM –EXP 6)

Current Contract Commitments / Works in Progress

Name of Applicant or partner of a joint venture

Tenderers and each partner to a tender should provide information on their current commitments

on all contracts that have been awarded, or for which a letter of intent or acceptance has been

received, or for contracts approaching completion, but for which an unqualified, full completion

certificate has yet to be issued.

Name of contract Name of Client Total value in

US Dollars

Value of

outstanding

work (current

US$ equivalent)

Estimated

completion

date

1.

2.

3.

4.

5.

6.

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………………

Position in the Firm…………………………………… Date………………………

Page 127: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

127

LITIGATION HISTORY (FORM –EXP7)

Name of tenderer or partner of a joint venture

Tenderers, including each of the partners of a joint venture, should provide information on any

history of litigation or arbitration resulting from contracts executed in the last five years or

currently under execution. A separate sheet should be used for each partner of a joint venture.

Year Award For Or

Against

Applicant

Name of client, cause of litigation, and

matter in dispute

Disputed amount (current value,

US$ equivalent)

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………………

Position in the Firm…………………………………… Date………………………

I certify that the above information is correct.

…………………… ……………………… ………………………

Title Signature Date

Page 128: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

128

DEVIATION FROM SPECIFICATIONS

Any deviations from specifications shall be clearly indicated and reasons given.

Details of Subcontractors

Name of Applicant or partner of a joint venture

The Tenderer shall indicate in this schedule, the proposals for subcontracting elements of the

Works together with the names and addresses of the subcontractors he proposes to employ (if

any).

A statement of similar works executed by each of the proposed subcontractors shall be provided,

which shall include details of the work executed, year of completion, value of the works and the

name and address of the client.

Work to be Subcontracted Name and Address of

Subcontractor

Similar works previously

executed

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………...………

Position in the Firm…………………………………… Date………………………

Page 129: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

129

Key Personnel Capabilities

Name of Tenderer

For specific positions essential to Contract implementation, applicants should provide the names

of candidates qualified to meet the specified requirements stated for each position set out in

Instructions to Tenderers Sub-Clause 13.3 part 2.

The data on their experience should be supplied in separate sheets using one Form (B5) for each

candidate.

1. Title of position: Project Manager

Name of candidate:

2. Title of position: Transformer Engineer

Name of candidate:

3. Title of position: Manufacturing Engineer

Name of candidate:

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………...………

Position in the Firm…………………………………… Date………………………

Page 130: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

130

CVs of Key Personnel

Name of Tenderer:

Position

Candidate information 1. Name of candidate

2. Date of birth

3. Professional qualifications

Present employment 4. Name of employer

Address of employer

Telephone Contact (manager/personnel

officer)

Fax

E-mail

Job title of candidate

Years with present employer

Summarise professional experience over the last 10 years, in reverse chronological order.

Indicate particular technical and managerial experience relevant to the Project.

From To Company/Project/Position/ Relevant technical and management

experience

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………...………

Position in the Firm…………………………………… Date………………………

Page 131: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

131

Programme of Works

Name of Applicant or partner of a joint venture

Based on the specified completion periods given under Sub-Clause 1.2 of the Instructions To

Tenderers, the Tenderer shall provide a proposed programme of Works in a bar chart form

showing the sequence of work and time duration for each activity.

The proposed programme shall include activities such as design, schedule for the drawing

submittal, ordering and procurement of materials, manufacturing, fabrication, shop assembly and

testing, transportation, erection, site testing and commissioning of the Plant to be supplied under

the Contract.

We offer to complete all the works as required under tender within __________calendar days as

per the attached schedule.

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………...………

Position in the Firm…………………………………… Date………………………

Page 132: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

132

Contractors and Suppliers Quality Assurance Details

Name of Applicant or partner of a joint venture

The Tenderer shall provide copies of valid certificates issued by competent Quality Assurance

Agencies showing that the transformer manufacturer conforms to the Quality System Standard

ISO 9001 or its equivalent.

The Tenderer is required to list below the valid certificates submitted with his tender.

Name of Tenderer,

subcontractor or supplier

Equipment or service being

supplied

ISO 9001 or equivalent

certificate provided

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………...………

Position in the Firm…………………………………… Date………………………

Page 133: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

133

Deviations from Specifications

Name of Applicant or partner of a joint venture

Any deviations from the Conditions of Contract or the Technical Specifications shall be clearly

indicated in the table below and reasons given.

Clause

or

Section

No.

Deviation Reason for Deviation

1.Commercial / Contractual Deviations

2. Technical Deviations

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………...………

Position in the Firm…………………………………… Date………………………

Page 134: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

134

Drawings and Documentation to be submitted with Tender

Name of Applicant or partner of a joint venture

Pursuant to Clause 5of Instructions to Tenderers (ITT), the Tenderer is required to submit

drawings, brochures, technical data, type test certificates, etc. for the plant and equipment to be

incorporated in the Works, sufficient to demonstrate compliance with the technical

specifications. The Tenderer is required to list under each item in the table below, those

documents being submitted with the tender. The reference number of the document shall be

included so that the document can easily be identified.

Section Description Document Type Document

Reference

1.

2.

3.

4.

5.

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature………...………

Position in the Firm…………………………………… Date………………………

Page 135: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

135

Proposed Work Plan & Methodology

The Tenderer shall submit a write up on the proposed work plan and methodology for

performing the works covering design, supply, installation commissioning and training (overseas

and on site)

Page 136: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

136

Financial Information

Name of Tenderer or partner of a joint venture

Pursuant to Sub- Clause 13.3 part 4 of Instructions to Tenderers, the Tenderer, including each of

the partners of a joint venture, and the main suppliers should provide the financial information

requested below demonstrating the current soundness of their financial positions and long term

profitability as well as evidence of financial resources to meet the Contract cash flow. A separate

sheet should be used for each partner of a joint venture as well as for the principal suppliers.

1. Evidence of access to lines of credit and availability of other financial resources

sufficient to meet the Contract cash flow over one year, net of the Tenderer’s or

supplier’s commitments for other contracts. The cash flow should at least meet the

requirements of “Instructions to Tenderers” Clause 2.6. List the documents submitted

as evidence and attach copies.

.........................................................................................................................................................

.........................................................................................................................................................

3. Name, address, telephone, e-mail, fax numbers of the Tenderer’s Bankers who may

provide reference if contacted by the Employer.

.........................................................................................................................................................

.........................................................................................................................................................

This information is declared to be correct by (Tenderer’s authorised representative)

Name………………………………………… Signature……………..…

Position in the Firm…………………………………… Date………………………

Page 137: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

137

Contractor’s Equipment

Name of Tenderer or partner of a joint venture

The Tenderer should fill in major items of Contractor’s equipment proposed for carrying out the

Works.

Item of

Equipment

Description, Make

and Age(years)

Condition(new,

good, poor) and

Number available

Owned, Leased (from

whom?), or to be

purchased (from whom?)

Page 138: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

138

E: FORM OF CONTRACT AGREEMENT

This Agreement made the ....................day of .................................. 20 ..........................

Between

Kenya Electricity Generating Company Limited of [or whose registered office is situated at]

Stima Plaza Phase III, Kolobot Road, Parklands, P.O. Box 47936-00100, NAIROBI,

KENYA (hereinafter called “the Employer”) of the one part,

and

.............................................................................. of [or whose registered office is situated

at].............................................................................. ...................................................(hereinafter

called “the Contractor”) of the other part.

WHEREAS the Employer is desirous that the Contractor executes …………………….

(hereinafter called “the Works”) located at ………………………and the Employer has accepted

the Tender submitted by the Contractor for the execution and completion of such Works and the

remedying of any defects therein, for the Contract Price of .......[Amount in figures],

......................................... [Amount in words].

NOW THIS AGREEMENT WITNESSETH as follows:

1. In this Agreement words and expressions shall have the same meanings as are respectively

assigned to them in the Conditions of Contract hereinafter referred to.

2. The following documents shall be deemed to form and shall be read and construed as part of

this Agreement i.e.

a) The Letter of Acceptance dated ..................................

b) The Letter of Tender dated ...............................

c) The Addenda nos ..............................

d) The Conditions of Contract

e) The Employer’s Requirements

f) The completed Technical Schedules

g) The Completed Guarantee Schedules

h) The priced Schedule of Prices.

i) The Technical Specifications

j) The Contractor’s Tender.

3. In consideration of the payments to be made by the Employer to the Contractor as hereinafter

mentioned, the Contractor hereby covenants with the Employer to design, execute and

Page 139: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

139

complete the Works and remedy any defects therein, in conformity in all respects with the

provisions of the Contract.

4. The Employer hereby covenants to pay the Contractor, in consideration of the execution and

completion of the Works and the remedying of defects therein, the Contract Price or such

other sum as may become payable under the provisions of the Contract at the times and in the

manner prescribed by the Contract.

IN WITNESS whereof the parties thereto have caused this Agreement to be executed the day and

year first before written.

The common Seal of ............................................................................................................

Was hereunto affixed in the presence of .............................................................................

Signed Sealed, and Delivered by the said ............................................................................

Binding Signature of Employer .............................................................................................

Binding Signature of Contractor ............................................................................................

In the presence of

i). Name ..................................................................................................

Address ..............................................................................................

Signature ............................................................................................

ii). Name .................................................................................................

Address..............................................................................................

Signature............................................................................................

Page 140: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

140

SECTION X

FORMS OF SECURITY

C. PERFORMANCE BANK OR INSURANCE GUARANTEE [UNCONDITIONAL]

(On Letterhead Of Bank/Insurance Company)

[The Bank or Insurance Company/successful Tenderer providing the Guarantee shall fill in

this form in accordance with the instructions indicated in brackets, if the Procuring Entity

requires this type of security.]

[insert bank’s or insurance company’s name, and address of issuing branch or office]

Beneficiary: [insert name and address of Procuring Entity]

Date: [insert date]

Page 141: KGN-HYD-029-2016 TENDER FOR DESIGN, SUPPLY ... for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers

Tender for Design, Supply, Installation, Test and Commissioning of Deluge Fire Protection Systems for Generator Transformers and Station Transformers in 7 Forks Power Stations

141

PERFORMANCE GUARANTEE No.: [insert Performance Guarantee number]

We have been informed that [insert name of Contractor] (hereinafter called "the Contractor")

has entered into Contract No. [insert reference number of the Contract] dated with you, for the

execution of [insert name of Contract and brief description of Works] (hereinafter called "the

Contract").

Furthermore, we understand that, according to the conditions of the Contract, a Performance

Guarantee is required.

At the request of the Contractor, we [insert name of Bank or Insurance Company] hereby

irrevocably undertake to pay you any sum or sums not exceeding in total an amount of [insert

amount in figures] ([insert amount in words]), such sum being payable in the types and

proportions of currencies in which the Contract Price is payable, upon receipt by us of your first

demand in writing accompanied by a written statement stating that the Contractor is in breach of

its obligation(s) under the Contract, without your needing to prove or to show grounds for your

demand or the sum specified therein.

We hereby waive the necessity of your demanding the said debt from the Contractor before

presenting us with the demand.

We further agree that no change, addition or other modification of the terms of the Contract or of

the Works to be performed there under or of any of the Contract documents which may be made

between you and the Contractor shall in any way release us from any liability under this

Guarantee, and we hereby waive notice of any change, addition, or modification.

This guarantee shall expire not later than thirty days from the date of issuance of the Taking-

Over Certificate.