78
Uttar Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy Fin 24 KGBV Financial Provision perschool Non Recurring (One time grant) 24.01 Construction of Building New 292 18939.12 24.02 Construction of Building (Variation on account of change of unit cost) (old) 0 0.00 Sub Total 24.03 Boudary Wall New 0 0.00 24.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00 Sub Total 24.05 Boring/Handpump (New) 0 0.00 24.06 Boring/Handpump (minimum rates prescribed by State Drinking Water Department subject to a ceiling of Rs. 1.00 lakhs). 0 0.00 Sub Total 24.07 Electricity /Water charges(New) 0 0.00 24.08 Electricity/Water Charges (Variation on account of change of unit cost (old) 0 0.00 Sub Total 24.09 Furniture/Equipment(including Kitchen equipment) New 0 0.00 24.1 Furniture/Equipment For table &chair (Variation on account of change of unit cost 0 0.00 Sub Total 24.11 Teaching learning material and equipment including library books(New) 292 1022.00 24.12 Teaching learning material and equipment including library books 0 0.00 Sub Total 24.13 Bedding 0 0.00 24.14 Replacement of Bedding (once in 3 Year) 340 252.38 Sub Total TOTAL 0 20213.50 Recurring Costs per annum 24.17 Maintenance per girl student per month @ Rs. 900/- 746 7992.00 24.18 Stipend for girl student per month @ Rs. 50 746 444.00 24.19 Supplementary TLM, stationery and other educational material @RS 50per month 746 444.00 24.2 Examination fee 746 14.80 24.21 Salaries: 746 8952.00 24.22 Vocational training/specific skill training 746 370.60 24.23 Electricity/water charges 746 444.72 24.24 Medical care/contingencies @ Rs. 750 child 746 555.00 24.25 Maintenance 746 296.00 24.26 Miscellaneous (educational tour/ exposure visit/sports material etc) 746 296.00 24.27 Preparatory camps 746 111.30 24.28 PTAs/school functions 746 111.30 24.29 Provision of Rent (8 months) 146 700.80 Provision of Rent (6 months) 28 100.80 Provision of Rent (3 months) 0 0.00 Provision of Rent due of previous years (2007-08, 2008-09 & 2009-10) 0 0.00 24.3 Capacity building 746 222.00 TOTAL 0 21055.32 Grant Total 0 41268.82 Recommended 2011-12 Total of Year 2011-12 Model-I & II Sl. No. Activity KGBV2011-12Tarun(ForWebsite):KGBV Consolidate:21-07-11 1/78

KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

  • Upload
    vuhanh

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

KGBV State Consolidate : Uttar Pradesh

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 292 18939.12

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0 0.00

Sub Total

24.03 Boudary Wall New 0 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 0 0.00

Sub Total

24.05 Boring/Handpump (New) 0 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0 0.00

Sub Total

24.07 Electricity /Water charges(New) 0 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0 0.00

Sub Total

24.09Furniture/Equipment(including Kitchen equipment) New

0 0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0 0.00

Sub Total

24.11Teaching learning material and equipment including library

books(New)292 1022.00

24.12 Teaching learning material and equipment including library books 0 0.00

Sub Total

24.13 Bedding 0 0.00

24.14 Replacement of Bedding (once in 3 Year) 340 252.38

Sub Total

TOTAL 0 20213.50

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 746 7992.00

24.18 Stipend for girl student per month @ Rs. 50 746 444.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month746 444.00

24.2 Examination fee 746 14.80

24.21 Salaries: 746 8952.00

24.22 Vocational training/specific skill training 746 370.60

24.23 Electricity/water charges 746 444.72

24.24 Medical care/contingencies @ Rs. 750 child 746 555.00

24.25 Maintenance 746 296.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)746 296.00

24.27 Preparatory camps 746 111.30

24.28 PTAs/school functions 746 111.30

24.29 Provision of Rent (8 months) 146 700.80

Provision of Rent (6 months) 28 100.80

Provision of Rent (3 months) 0 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0 0.00

24.3 Capacity building 746 222.00

TOTAL 0 21055.32

Grant Total 0 41268.82

Recommended 2011-12

Total of Year 2011-12 Model-I & II

Sl. No. Activity

KGBV2011-12Tarun(ForWebsite):KGBV Consolidate:21-07-11 1/78

Page 2: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New8) Agra

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 8 518.88

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)3.500 8 28.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 549.13

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 8 38.40

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 392.910

Grant Total 942.04

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Agra:21-07-11 2/78

Page 3: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New9) Aligarh

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 9 583.74

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 9 31.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 617.49

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 9 43.20

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 397.710

Grant Total 1015.20

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Aligarh:21-07-11 3/78

Page 4: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New 15) Allahabad

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 15 972.90

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 15 52.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 1028.40

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 20 12.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 20 12.00

24.2 Examination fee 0.020 20 0.40

24.21 Salaries: 12.000 20 240.00

24.22 Vocational training/specific skill training 0.500 20 10.00

24.23 Electricity/water charges 0.600 20 12.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00

24.25 Maintenance 0.400 20 8.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 20 8.00

24.27 Preparatory camps 0.150 20 3.00

24.28 PTAs/school functions 0.150 20 3.00

24.29 Provision of Rent (8 months) 4.800 15 72.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 20 6.00

TOTAL 617.400

Grant Total 1645.80

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Allahabad:21-07-11 4/78

Page 5: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+New5) AmbedkarNagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 5 324.30

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 5 17.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 342.55

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 5 24.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 242.160

Grant Total 584.71

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):AmbedkarNagar:21-07-11 5/78

Page 6: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old6+New15) Azamgarh

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 15 972.90

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 15 52.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 1026.90

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 21 226.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 21 12.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 21 12.60

24.2 Examination fee 0.020 21 0.42

24.21 Salaries: 12.000 21 252.00

24.22 Vocational training/specific skill training 0.500 21 10.50

24.23 Electricity/water charges 0.600 21 12.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 21 15.75

24.25 Maintenance 0.400 21 8.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 21 8.40

24.27 Preparatory camps 0.150 21 3.15

24.28 PTAs/school functions 0.150 21 3.15

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 21 6.30

TOTAL 572.670

Grant Total 1599.57

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Azamgarh:21-07-11 6/78

Page 7: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old21) Badaun

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 21 15.75

Sub Total 0.00

TOTAL 15.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 21 226.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 21 12.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 21 12.60

24.2 Examination fee 0.020 21 0.42

24.21 Salaries: 12.000 21 252.00

24.22 Vocational training/specific skill training 0.500 21 10.50

24.23 Electricity/water charges 0.600 21 12.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 21 15.75

24.25 Maintenance 0.400 21 8.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 21 8.40

24.27 Preparatory camps 0.150 21 3.15

24.28 PTAs/school functions 0.150 21 3.15

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 21 6.30

TOTAL 572.670

Grant Total 588.42

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Badaun:21-07-11 7/78

Page 8: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old2) Baghpat

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 0.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 2 21.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 2 1.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 2 1.20

24.2 Examination fee 0.020 2 0.04

24.21 Salaries: 12.000 2 24.00

24.22 Vocational training/specific skill training 0.500 2 1.00

24.23 Electricity/water charges 0.600 2 1.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 2 1.50

24.25 Maintenance 0.400 2 0.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 2 0.80

24.27 Preparatory camps 0.150 2 0.30

24.28 PTAs/school functions 0.150 2 0.30

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 2 0.60

TOTAL 54.540

Grant Total 55.29

Sl. No. Activity Recommended 2011-12

Total of Year 2011-12 Model-I

KGBV2011-12Tarun(ForWebsite):Baghpat:21-07-11 8/78

Page 9: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old15) Bahraich

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 14 10.50

Sub Total 0.00

TOTAL 10.50

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 15 162.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 15 9.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 15 9.00

24.2 Examination fee 0.020 15 0.30

24.21 Salaries: 12.000 15 180.00

24.22 Vocational training/specific skill training 0.500 15 7.50

24.23 Electricity/water charges 0.600 15 9.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 15 11.25

24.25 Maintenance 0.400 15 6.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 15 6.00

24.27 Preparatory camps 0.150 15 2.25

24.28 PTAs/school functions 0.150 15 2.25

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 15 4.50

TOTAL 409.050

Grant Total 419.55

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Bahraich:21-07-11 9/78

Page 10: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old05+New11) Balia

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 11 713.46

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 11 38.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 753.46

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 16 9.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 16 9.60

24.2 Examination fee 0.020 16 0.32

24.21 Salaries: 12.000 16 192.00

24.22 Vocational training/specific skill training 0.500 16 8.00

24.23 Electricity/water charges 0.600 16 9.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00

24.25 Maintenance 0.400 16 6.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 16 6.40

24.27 Preparatory camps 0.150 16 2.40

24.28 PTAs/school functions 0.150 16 2.40

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 16 4.80

TOTAL 436.320

Grant Total 1189.78

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Ballia:21-07-11 10/78

Page 11: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old11) Balrampur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 10 7.50

Sub Total 0.00

TOTAL 7.50

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 11 118.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 11 6.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 11 6.60

24.2 Examination fee 0.020 11 0.22

24.21 Salaries: 12.000 11 132.00

24.22 Vocational training/specific skill training 0.500 11 5.50

24.23 Electricity/water charges 0.600 11 6.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 11 8.25

24.25 Maintenance 0.400 11 4.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 11 4.40

24.27 Preparatory camps 0.150 11 1.65

24.28 PTAs/school functions 0.150 11 1.65

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months)3.600 3 10.80

Provision of Rent (3 months)0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 11 3.30

TOTAL 310.770

Grant Total 318.27

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Balrampur:21-07-11 11/78

Page 12: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New4) Banda

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 4 259.44

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 4 14.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 274.19

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 4 19.20

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 237.360

Grant Total 511.55

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Banda:21-07-11 12/78

Page 13: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old9+New6) Barabanki

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 6 389.16

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 6 21.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 8 6.00

Sub Total 0.00

TOTAL 416.16

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 15 162.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 15 9.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 15 9.00

24.2 Examination fee 0.020 15 0.30

24.21 Salaries: 12.000 15 180.00

24.22 Vocational training/specific skill training 0.500 15 7.50

24.23 Electricity/water charges 0.600 15 9.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 15 11.25

24.25 Maintenance 0.400 15 6.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 15 6.00

24.27 Preparatory camps 0.150 15 2.25

24.28 PTAs/school functions 0.150 15 2.25

24.29 Provision of Rent (8 months) 4.800 6 28.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 15 4.50

TOTAL 437.850

Grant Total 854.01

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Barabanki:21-07-11 13/78

Page 14: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old18) Bareilly

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 17 12.75

Sub Total 0.00

TOTAL 12.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 18 194.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 18 10.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 18 10.80

24.2 Examination fee 0.020 18 0.36

24.21 Salaries: 12.000 18 216.00

24.22 Vocational training/specific skill training 0.500 18 9.00

24.23 Electricity/water charges 0.600 18 10.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 18 13.50

24.25 Maintenance 0.400 18 7.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 18 7.20

24.27 Preparatory camps 0.150 18 2.70

24.28 PTAs/school functions 0.150 18 2.70

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 18 5.40

TOTAL 490.860

Grant Total 503.61

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Barelliy:21-07-11 14/78

Page 15: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+NEW8) Basti

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 8 518.88

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 8 28.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 549.13

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 8 38.40

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 392.910

Grant Total 942.04

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Basti:21-07-11 15/78

Page 16: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old2+NEW3) Bhadohi

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 3 194.58

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 3 10.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 206.58

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 5 3.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 5 3.00

24.2 Examination fee 0.020 5 0.10

24.21 Salaries: 12.000 5 60.00

24.22 Vocational training/specific skill training 0.500 5 2.50

24.23 Electricity/water charges 0.600 5 3.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75

24.25 Maintenance 0.400 5 2.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 5 2.00

24.27 Preparatory camps 0.150 5 0.75

24.28 PTAs/school functions 0.150 5 0.75

24.29 Provision of Rent (8 months) 4.800 3 14.40

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 5 1.50

TOTAL 150.750

Grant Total 357.33

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Bhadohi:21-07-11 16/78

Page 17: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old14) Bijnor

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 12 9.00

Sub Total 0.00

TOTAL 9.00

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 14 151.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 14 8.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 14 8.40

24.2 Examination fee 0.020 14 0.28

24.21 Salaries: 12.000 14 168.00

24.22 Vocational training/specific skill training 0.500 14 7.00

24.23 Electricity/water charges 0.600 14 8.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 14 10.50

24.25 Maintenance 0.400 14 5.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 14 5.60

24.27 Preparatory camps 0.150 14 2.10

24.28 PTAs/school functions 0.150 14 2.10

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 2 7.20

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 14 4.20

TOTAL 388.980

Grant Total 397.98

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Bijnor:21-07-11 17/78

Page 18: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old10+NEW6) Bulandshar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 6 389.16

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 6 21.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 8 6.00

Sub Total 0.00

TOTAL 416.16

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 16 9.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 16 9.60

24.2 Examination fee 0.020 16 0.32

24.21 Salaries: 12.000 16 192.00

24.22 Vocational training/specific skill training 0.500 16 8.00

24.23 Electricity/water charges 0.600 16 9.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00

24.25 Maintenance 0.400 16 6.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 16 6.40

24.27 Preparatory camps 0.150 16 2.40

24.28 PTAs/school functions 0.150 16 2.40

24.29 Provision of Rent (8 months) 4.800 6 28.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 16 4.80

TOTAL 465.120

Grant Total 881.28

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Bulandshar:21-07-11 18/78

Page 19: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New4) Chandauli

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 4 259.44

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 4 14.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 276.44

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 9 5.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 9 5.40

24.2 Examination fee 0.020 9 0.18

24.21 Salaries: 12.000 9 108.00

24.22 Vocational training/specific skill training 0.500 9 4.50

24.23 Electricity/water charges 0.600 9 5.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75

24.25 Maintenance 0.400 9 3.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 9 3.60

24.27 Preparatory camps 0.150 9 1.35

24.28 PTAs/school functions 0.150 9 1.35

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 4 14.40

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 9 2.70

TOTAL 259.830

Grant Total 536.27

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Chandauli:21-07-11 19/78

Page 20: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old11+New5) Chatrapati Sahu Ji Maharaj Nagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 5 324.30

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 5 17.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 344.80

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 16 9.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 16 9.60

24.2 Examination fee 0.020 16 0.32

24.21 Salaries: 12.000 16 192.00

24.22 Vocational training/specific skill training 0.500 16 8.00

24.23 Electricity/water charges 0.600 16 9.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00

24.25 Maintenance 0.400 16 6.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 16 6.40

24.27 Preparatory camps 0.150 16 2.40

24.28 PTAs/school functions 0.150 16 2.40

24.29 Provision of Rent (8 months) 4.800 5 24.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 16 4.80

TOTAL 460.320

Grant Total 805.12

Recommended 2011-12Sl. No. Activity

Total of Year 2011-12 Model-I

KGBV2011-12Tarun(ForWebsite):CSM:21-07-11 20/78

Page 21: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+New1) Chitrakoot

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 1 64.86

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 1 3.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 69.86

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 4 43.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 4 2.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 4 2.40

24.2 Examination fee 0.020 4 0.08

24.21 Salaries: 12.000 4 48.00

24.22 Vocational training/specific skill training 0.500 4 2.00

24.23 Electricity/water charges 0.600 4 2.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 4 3.00

24.25 Maintenance 0.400 4 1.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 4 1.60

24.27 Preparatory camps 0.150 4 0.60

24.28 PTAs/school functions 0.150 4 0.60

24.29 Provision of Rent (8 months) 4.800 1 4.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 4 1.20

TOTAL 113.880

Grant Total 183.74

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Chitrakoot:21-07-11 21/78

Page 22: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New9) Deoria

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 9 583.74

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 9 31.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 616.74

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 9 43.20

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 397.710

Grant Total 1014.45

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Deoria:21-07-11 22/78

Page 23: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old1+New7) Etah

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 7 454.02

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 7 24.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 0 0.00

Sub Total 0.00

TOTAL 478.520

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 218.160

Grant Total 696.68

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Etah:21-07-11 23/78

Page 24: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old2) Etawah

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 0.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 2 21.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 2 1.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 2 1.20

24.2 Examination fee 0.020 2 0.04

24.21 Salaries: 12.000 2 24.00

24.22 Vocational training/specific skill training 0.500 2 1.00

24.23 Electricity/water charges 0.600 2 1.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 2 1.50

24.25 Maintenance 0.400 2 0.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 2 0.80

24.27 Preparatory camps 0.150 2 0.30

24.28 PTAs/school functions 0.150 2 0.30

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 2 0.60

TOTAL 54.540

Grant Total 55.29

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Etawah:21-07-11 24/78

Page 25: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New5) Faizabad

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 5 324.30

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 5 17.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 5 3.75

Sub Total 0.00

TOTAL 345.55

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 10 6.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 10 6.00

24.2 Examination fee 0.020 10 0.20

24.21 Salaries: 12.000 10 120.00

24.22 Vocational training/specific skill training 0.500 10 5.00

24.23 Electricity/water charges 0.600 10 6.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50

24.25 Maintenance 0.400 10 4.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 10 4.00

24.27 Preparatory camps 0.150 10 1.50

24.28 PTAs/school functions 0.150 10 1.50

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 10 3.00

TOTAL 272.700

Grant Total 618.25

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Faizabad:21-07-11 25/78

Page 26: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+New2) Farukhabad

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 2 129.72

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 2 7.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 138.22

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 5 3.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 5 3.00

24.2 Examination fee 0.020 5 0.10

24.21 Salaries: 12.000 5 60.00

24.22 Vocational training/specific skill training 0.500 5 2.50

24.23 Electricity/water charges 0.600 5 3.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75

24.25 Maintenance 0.400 5 2.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 5 2.00

24.27 Preparatory camps 0.150 5 0.75

24.28 PTAs/school functions 0.150 5 0.75

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 5 1.50

TOTAL 136.350

Grant Total 274.57

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Farrukhabad:21-07-11 26/78

Page 27: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+New7) Fatehpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 7 454.02

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 7 24.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 479.27

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 10 6.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 10 6.00

24.2 Examination fee 0.020 10 0.20

24.21 Salaries: 12.000 10 120.00

24.22 Vocational training/specific skill training 0.500 10 5.00

24.23 Electricity/water charges 0.600 10 6.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50

24.25 Maintenance 0.400 10 4.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 10 4.00

24.27 Preparatory camps 0.150 10 1.50

24.28 PTAs/school functions 0.150 10 1.50

24.29 Provision of Rent (8 months) 4.800 5 24.00

Provision of Rent (6 months) 3.600 1 3.60

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 10 3.00

TOTAL 300.300

Grant Total 779.57

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Fatehpur:21-07-11 27/78

Page 28: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3) Firozabad

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 0.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 3 1.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 3 1.80

24.2 Examination fee 0.020 3 0.06

24.21 Salaries: 12.000 3 36.00

24.22 Vocational training/specific skill training 0.500 3 1.50

24.23 Electricity/water charges 0.600 3 1.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25

24.25 Maintenance 0.400 3 1.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 3 1.20

24.27 Preparatory camps 0.150 3 0.45

24.28 PTAs/school functions 0.150 3 0.45

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 3 0.90

TOTAL 81.810

Grant Total 82.56

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Firozabad:21-07-11 28/78

Page 29: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old1+NEW1) G.B.Nagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 1 64.86

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 1 3.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 69.11

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 2 21.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 2 1.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 2 1.20

24.2 Examination fee 0.020 2 0.04

24.21 Salaries: 12.000 2 24.00

24.22 Vocational training/specific skill training 0.500 2 1.00

24.23 Electricity/water charges 0.600 2 1.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 2 1.50

24.25 Maintenance 0.400 2 0.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 2 0.80

24.27 Preparatory camps 0.150 2 0.30

24.28 PTAs/school functions 0.150 2 0.30

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 2 0.60

TOTAL 54.540

Grant Total 123.65

ActivitySl. No.

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):G.B.Nagar:21-07-11 29/78

Page 30: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old8) Ghaziabad

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 7 5.25

Sub Total 0.00

TOTAL 5.25

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 218.160

Grant Total 223.41

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Ghaziabad:21-07-11 30/78

Page 31: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New10) Ghazipur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 10 648.60

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 10 35.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 684.35

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 14 151.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 14 8.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 14 8.40

24.2 Examination fee 0.020 14 0.28

24.21 Salaries: 12.000 14 168.00

24.22 Vocational training/specific skill training 0.500 14 7.00

24.23 Electricity/water charges 0.600 14 8.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 14 10.50

24.25 Maintenance 0.400 14 5.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 14 5.60

24.27 Preparatory camps 0.150 14 2.10

24.28 PTAs/school functions 0.150 14 2.10

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 14 4.20

TOTAL 381.780

Grant Total 1066.13

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Ghazipur:21-07-11 31/78

Page 32: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old16+New1) Gonda

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 1 64.86

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 1 3.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 13 9.75

Sub Total 0.00

TOTAL 78.11

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 17 183.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 17 10.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 17 10.20

24.2 Examination fee 0.020 17 0.34

24.21 Salaries: 12.000 17 204.00

24.22 Vocational training/specific skill training 0.500 17 8.50

24.23 Electricity/water charges 0.600 17 10.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 17 12.75

24.25 Maintenance 0.400 17 6.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 17 6.80

24.27 Preparatory camps 0.150 17 2.55

24.28 PTAs/school functions 0.150 17 2.55

24.29 Provision of Rent (8 months) 4.800 1 4.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 17 5.10

TOTAL 468.390

Grant Total 546.50

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Gonda:21-07-11 32/78

Page 33: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old7+New13) Gorakhpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 13 843.18

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 13 45.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 890.93

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 20 12.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 20 12.00

24.2 Examination fee 0.020 20 0.40

24.21 Salaries: 12.000 20 240.00

24.22 Vocational training/specific skill training 0.500 20 10.00

24.23 Electricity/water charges 0.600 20 12.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00

24.25 Maintenance 0.400 20 8.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 20 8.00

24.27 Preparatory camps 0.150 20 3.00

24.28 PTAs/school functions 0.150 20 3.00

24.29 Provision of Rent (8 months) 4.800 13 62.40

Provision of Rent (6 months) 3.600 2 7.20

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 20 6.00

TOTAL 615.000

Grant Total 1505.93

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Gorakhpur:21-07-11 33/78

Page 34: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+New4) Hamirpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 4 259.44

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 4 14.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 274.19

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 6 64.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 6 3.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 6 3.60

24.2 Examination fee 0.020 6 0.12

24.21 Salaries: 12.000 6 72.00

24.22 Vocational training/specific skill training 0.500 6 3.00

24.23 Electricity/water charges 0.600 6 3.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 6 4.50

24.25 Maintenance 0.400 6 2.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 6 2.40

24.27 Preparatory camps 0.150 6 0.90

24.28 PTAs/school functions 0.150 6 0.90

24.29 Provision of Rent (8 months) 4.800 1 4.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 6 1.80

TOTAL 168.420

Grant Total 442.61

Activity

Total of Year 2011-12 Model-I

Sl. No. Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Hamirpur:21-07-11 34/78

Page 35: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old7+New13) Hardoi

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 13 843.18

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 13 45.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 890.93

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 20 12.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 20 12.00

24.2 Examination fee 0.020 20 0.40

24.21 Salaries: 12.000 20 240.00

24.22 Vocational training/specific skill training 0.500 20 10.00

24.23 Electricity/water charges 0.600 20 12.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00

24.25 Maintenance 0.400 20 8.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 20 8.00

24.27 Preparatory camps 0.150 20 3.00

24.28 PTAs/school functions 0.150 20 3.00

24.29 Provision of Rent (8 months) 4.800 7 33.60

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 20 6.00

TOTAL 579.000

Grant Total 1469.93

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Hardoi:21-07-11 35/78

Page 36: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New2) Hathras

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 2 129.72

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 2 7.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 137.47

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 5 3.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 5 3.00

24.2 Examination fee 0.020 5 0.10

24.21 Salaries: 12.000 5 60.00

24.22 Vocational training/specific skill training 0.500 5 2.50

24.23 Electricity/water charges 0.600 5 3.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75

24.25 Maintenance 0.400 5 2.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 5 2.00

24.27 Preparatory camps 0.150 5 0.75

24.28 PTAs/school functions 0.150 5 0.75

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 5 1.50

TOTAL 136.350

Grant Total 273.82

Activity

Total of Year 2011-12 Model-I

Sl. No. Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Hathras:21-07-11 36/78

Page 37: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New3) Jalaun

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 3 194.58

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 3 10.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 207.33

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 7 75.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 7 4.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 7 4.20

24.2 Examination fee 0.020 7 0.14

24.21 Salaries: 12.000 7 84.00

24.22 Vocational training/specific skill training 0.500 7 3.50

24.23 Electricity/water charges 0.600 7 4.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 7 5.25

24.25 Maintenance 0.400 7 2.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 7 2.80

24.27 Preparatory camps 0.150 7 1.05

24.28 PTAs/school functions 0.150 7 1.05

24.29 Provision of Rent (8 months) 4.800 3 14.40

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 7 2.10

TOTAL 205.290

Grant Total 412.62

Recommended 2011-12

Total of Year 2011-12 Model-I

Sl. No. Activity

KGBV2011-12Tarun(ForWebsite):Jalaun:21-07-11 37/78

Page 38: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old6+New13) Jaunpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 13 843.18

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 13 45.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 890.18

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 19 205.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 19 11.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 19 11.40

24.2 Examination fee 0.020 19 0.38

24.21 Salaries: 12.000 19 228.00

24.22 Vocational training/specific skill training 0.500 19 9.50

24.23 Electricity/water charges 0.600 19 11.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 19 14.25

24.25 Maintenance 0.400 19 7.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 19 7.60

24.27 Preparatory camps 0.150 19 2.85

24.28 PTAs/school functions 0.150 19 2.85

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 2 7.20

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 19 5.70

TOTAL 525.330

Grant Total 1415.51

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Jaunpur:21-07-11 38/78

Page 39: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New4) Jhansi

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 4 259.44

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 4 14.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 275.69

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 9 5.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 9 5.40

24.2 Examination fee 0.020 9 0.18

24.21 Salaries: 12.000 9 108.00

24.22 Vocational training/specific skill training 0.500 9 4.50

24.23 Electricity/water charges 0.600 9 5.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75

24.25 Maintenance 0.400 9 3.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 9 3.60

24.27 Preparatory camps 0.150 9 1.35

24.28 PTAs/school functions 0.150 9 1.35

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 9 2.70

TOTAL 245.430

Grant Total 521.12

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Jhansi:21-07-11 39/78

Page 40: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old8) J.P.Nagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 7 5.25

Sub Total 0.00

TOTAL 5.25

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 1 3.60

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 221.760

Grant Total 227.01

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):J.P.Nagar:21-07-11 40/78

Page 41: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5) Kannauj

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 3.00

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 5 3.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 5 3.00

24.2 Examination fee 0.020 5 0.10

24.21 Salaries: 12.000 5 60.00

24.22 Vocational training/specific skill training 0.500 5 2.50

24.23 Electricity/water charges 0.600 5 3.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75

24.25 Maintenance 0.400 5 2.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 5 2.00

24.27 Preparatory camps 0.150 5 0.75

24.28 PTAs/school functions 0.150 5 0.75

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 5 1.50

TOTAL 136.350

Grant Total 139.35

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Kannauj:21-07-11 41/78

Page 42: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old) Kanpur Dehat

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 0 0.00

Sub Total 0.00

TOTAL 0.00

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 1 10.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 1 0.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 1 0.60

24.2 Examination fee 0.020 1 0.02

24.21 Salaries: 12.000 1 12.00

24.22 Vocational training/specific skill training 0.500 1 0.50

24.23 Electricity/water charges 0.600 1 0.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 1 0.75

24.25 Maintenance 0.400 1 0.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 1 0.40

24.27 Preparatory camps 0.150 1 0.15

24.28 PTAs/school functions 0.150 1 0.15

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 1 0.30

TOTAL 27.270

Grant Total 27.27

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Kanpur Dehat:21-07-11 42/78

Page 43: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old6+New2) Kashiram Nagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 2 129.72

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 2 7.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 139.72

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 2 7.20

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 225.360

Grant Total 365.08

Sl. No. Activity Recommended 2011-12

Total of Year 2011-12 Model-I

KGBV2011-12Tarun(ForWebsite):Kashiram Nagar :21-07-11 43/78

Page 44: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New3) Kaushambi

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 3 194.58

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 3 10.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 207.33

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 218.160

Grant Total 425.49

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Kaushambi:21-07-11 44/78

Page 45: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old7+New7) Kushinagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 7 454.02

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 7 24.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 481.52

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 14 151.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 14 8.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 14 8.40

24.2 Examination fee 0.020 14 0.28

24.21 Salaries: 12.000 14 168.00

24.22 Vocational training/specific skill training 0.500 14 7.00

24.23 Electricity/water charges 0.600 14 8.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 14 10.50

24.25 Maintenance 0.400 14 5.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 14 5.60

24.27 Preparatory camps 0.150 14 2.10

24.28 PTAs/school functions 0.150 14 2.10

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 14 4.20

TOTAL 381.780

Grant Total 863.30

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Kushinagar:21-07-11 45/78

Page 46: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old11+New5) Lakhimpur Kheri

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 5 324.30

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 5 17.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 10 7.50

Sub Total 0.00

TOTAL 349.30

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 16 9.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 16 9.60

24.2 Examination fee 0.020 16 0.32

24.21 Salaries: 12.000 16 192.00

24.22 Vocational training/specific skill training 0.500 16 8.00

24.23 Electricity/water charges 0.600 16 9.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00

24.25 Maintenance 0.400 16 6.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 16 6.40

24.27 Preparatory camps 0.150 16 2.40

24.28 PTAs/school functions 0.150 16 2.40

24.29 Provision of Rent (8 months) 4.800 5 24.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 16 4.80

TOTAL 460.320

Grant Total 809.62

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Lakhimpur Kheri:21-07-11 46/78

Page 47: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New1) Lalitpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 1 64.86

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 1 3.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 71.36

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 6 64.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 6 3.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 6 3.60

24.2 Examination fee 0.020 6 0.12

24.21 Salaries: 12.000 6 72.00

24.22 Vocational training/specific skill training 0.500 6 3.00

24.23 Electricity/water charges 0.600 6 3.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 6 4.50

24.25 Maintenance 0.400 6 2.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 6 2.40

24.27 Preparatory camps 0.150 6 0.90

24.28 PTAs/school functions 0.150 6 0.90

24.29 Provision of Rent (8 months) 4.800 1 4.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 6 1.80

TOTAL 168.420

Grant Total 239.78

Sl. No.

Total of Year 2011-12 Model-I

Activity Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Lalitpur:21-07-11 47/78

Page 48: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+NEW5) Lucknow

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 5 324.30

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 5 17.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 343.30

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 8 86.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 8 4.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 8 4.80

24.2 Examination fee 0.020 8 0.16

24.21 Salaries: 12.000 8 96.00

24.22 Vocational training/specific skill training 0.500 8 4.00

24.23 Electricity/water charges 0.600 8 4.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 8 6.00

24.25 Maintenance 0.400 8 3.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 8 3.20

24.27 Preparatory camps 0.150 8 1.20

24.28 PTAs/school functions 0.150 8 1.20

24.29 Provision of Rent (8 months) 4.800 5 24.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 8 2.40

TOTAL 242.160

Grant Total 585.46

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Lucknow:21-07-11 48/78

Page 49: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old13) Maharajganj

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 11 8.25

Sub Total 0.00

TOTAL 8.25

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00 .30 for 12

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 354.510

Grant Total 362.76

Total of Year 2011-12 Model-I

Recommended 2011-12Sl. No. Activity

KGBV2011-12Tarun(ForWebsite):Maharajganj:21-07-11 49/78

Page 50: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old) Mahoba

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 1.50

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 3 1.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 3 1.80

24.2 Examination fee 0.020 3 0.06

24.21 Salaries: 12.000 3 36.00

24.22 Vocational training/specific skill training 0.500 3 1.50

24.23 Electricity/water charges 0.600 3 1.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25

24.25 Maintenance 0.400 3 1.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 3 1.20

24.27 Preparatory camps 0.150 3 0.45

24.28 PTAs/school functions 0.150 3 0.45

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 3 0.90

TOTAL 81.810

Grant Total 83.31

Total of Year 2011-12 Model-I

ActivitySl. No. Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Mahoba:21-07-11 50/78

Page 51: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3) Mainpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 1.50

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 3 32.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 3 1.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 3 1.80

24.2 Examination fee 0.020 3 0.06

24.21 Salaries: 12.000 3 36.00

24.22 Vocational training/specific skill training 0.500 3 1.50

24.23 Electricity/water charges 0.600 3 1.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 3 2.25

24.25 Maintenance 0.400 3 1.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 3 1.20

24.27 Preparatory camps 0.150 3 0.45

24.28 PTAs/school functions 0.150 3 0.45

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 3 0.90

TOTAL 81.810

Grant Total 83.31

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Mainpur:21-07-11 51/78

Page 52: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New6) Mathura

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 6 389.16

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 6 21.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 411.66

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 10 6.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 10 6.00

24.2 Examination fee 0.020 10 0.20

24.21 Salaries: 12.000 10 120.00

24.22 Vocational training/specific skill training 0.500 10 5.00

24.23 Electricity/water charges 0.600 10 6.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50

24.25 Maintenance 0.400 10 4.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 10 4.00

24.27 Preparatory camps 0.150 10 1.50

24.28 PTAs/school functions 0.150 10 1.50

24.29 Provision of Rent (8 months) 4.800 6 28.80

Provision of Rent (6 months) 3.600 2 7.20

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 10 3.00

TOTAL 308.700

Grant Total 720.36

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Mathura:21-07-11 52/78

Page 53: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+New2) Mau

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 2 129.72

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 2 7.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 137.47

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 5 3.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 5 3.00

24.2 Examination fee 0.020 5 0.10

24.21 Salaries: 12.000 5 60.00

24.22 Vocational training/specific skill training 0.500 5 2.50

24.23 Electricity/water charges 0.600 5 3.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75

24.25 Maintenance 0.400 5 2.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 5 2.00

24.27 Preparatory camps 0.150 5 0.75

24.28 PTAs/school functions 0.150 5 0.75

24.29 Provision of Rent (8 months) 4.800 1 4.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 5 1.50

TOTAL 141.150

Grant Total 278.62

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Mau:21-07-11 53/78

Page 54: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+New1) Meerut

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 1 64.86

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 1 3.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 69.86

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 5 3.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 5 3.00

24.2 Examination fee 0.020 5 0.10

24.21 Salaries: 12.000 5 60.00

24.22 Vocational training/specific skill training 0.500 5 2.50

24.23 Electricity/water charges 0.600 5 3.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75

24.25 Maintenance 0.400 5 2.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 5 2.00

24.27 Preparatory camps 0.150 5 0.75

24.28 PTAs/school functions 0.150 5 0.75

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 5 1.50

TOTAL 136.350

Grant Total 206.21

ActivitySl. No.

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Meerut:21-07-11 54/78

Page 55: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New5) Mirzapur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 5 324.30

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 5 17.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 5 3.75

Sub Total 0.00

TOTAL 345.55

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 10 6.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 10 6.00

24.2 Examination fee 0.020 10 0.20

24.21 Salaries: 12.000 10 120.00

24.22 Vocational training/specific skill training 0.500 10 5.00

24.23 Electricity/water charges 0.600 10 6.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50

24.25 Maintenance 0.400 10 4.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 10 4.00

24.27 Preparatory camps 0.150 10 1.50

24.28 PTAs/school functions 0.150 10 1.50

24.29 Provision of Rent (8 months) 4.800 1 4.80

Provision of Rent (6 months) 3.600 1 3.60

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 10 3.00

TOTAL 281.100

Grant Total 626.65

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Mirzapur:21-07-11 55/78

Page 56: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old16) Moradabad

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 16 12.00

Sub Total 0.00

TOTAL 12.00

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 16 9.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 16 9.60

24.2 Examination fee 0.020 16 0.32

24.21 Salaries: 12.000 16 192.00

24.22 Vocational training/specific skill training 0.500 16 8.00

24.23 Electricity/water charges 0.600 16 9.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00

24.25 Maintenance 0.400 16 6.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 16 6.40

24.27 Preparatory camps 0.150 16 2.40

24.28 PTAs/school functions 0.150 16 2.40

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 1 3.60

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 16 4.80

TOTAL 439.920

Grant Total 451.92

Total of Year 2011-12 Model-I

Sl. No. Activity Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Moradabad:21-07-11 56/78

Page 57: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old7) Muzaffar Nagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 5 3.75

Sub Total 0.00

TOTAL 3.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 7 75.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 7 4.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 7 4.20

24.2 Examination fee 0.020 7 0.14

24.21 Salaries: 12.000 7 84.00

24.22 Vocational training/specific skill training 0.500 7 3.50

24.23 Electricity/water charges 0.600 7 4.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 7 5.25

24.25 Maintenance 0.400 7 2.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 7 2.80

24.27 Preparatory camps 0.150 7 1.05

24.28 PTAs/school functions 0.150 7 1.05

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 7 2.10

TOTAL 190.890

Grant Total 194.64

Sl. No.

Total of Year 2011-12 Model-I

Activity Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Muzaffarnagar:21-07-11 57/78

Page 58: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old6+New3) Pilibhit

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 3 194.58

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 3 10.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 5 3.75

Sub Total 0.00

TOTAL 208.83

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 9 5.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 9 5.40

24.2 Examination fee 0.020 9 0.18

24.21 Salaries: 12.000 9 108.00

24.22 Vocational training/specific skill training 0.500 9 4.50

24.23 Electricity/water charges 0.600 9 5.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75

24.25 Maintenance 0.400 9 3.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 9 3.60

24.27 Preparatory camps 0.150 9 1.35

24.28 PTAs/school functions 0.150 9 1.35

24.29 Provision of Rent (8 months) 4.800 1 4.80

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 9 2.70

TOTAL 250.230

Grant Total 459.06

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Pilibhit:21-07-11 58/78

Page 59: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5+New10) Pratapgarh

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 10 648.60

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 10 35.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 685.10

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 15 162.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 15 9.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 15 9.00

24.2 Examination fee 0.020 15 0.30

24.21 Salaries: 12.000 15 180.00

24.22 Vocational training/specific skill training 0.500 15 7.50

24.23 Electricity/water charges 0.600 15 9.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 15 11.25

24.25 Maintenance 0.400 15 6.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 15 6.00

24.27 Preparatory camps 0.150 15 2.25

24.28 PTAs/school functions 0.150 15 2.25

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 15 4.50

TOTAL 409.050

Grant Total 1094.15

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Pratapgarh:21-07-11 59/78

Page 60: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old1+New12) Rai Bareilly

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 12 778.32

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 12 42.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 1 0.75

Sub Total 0.00

TOTAL 821.07

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 354.510

Grant Total 1175.58

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Rae Barelliy:21-07-11 60/78

Page 61: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old) Rampur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 7 5.25

Sub Total 0.00

TOTAL 5.25

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 7 75.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 7 4.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 7 4.20

24.2 Examination fee 0.020 7 0.14

24.21 Salaries: 12.000 7 84.00

24.22 Vocational training/specific skill training 0.500 7 3.50

24.23 Electricity/water charges 0.600 7 4.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 7 5.25

24.25 Maintenance 0.400 7 2.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 7 2.80

24.27 Preparatory camps 0.150 7 1.05

24.28 PTAs/school functions 0.150 7 1.05

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 7 2.10

TOTAL 190.890

Grant Total 196.14

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Rampur:21-07-11 61/78

Page 62: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old) Saharnpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 7 5.25

Sub Total 0.00

TOTAL 5.25

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 9 5.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 9 5.40

24.2 Examination fee 0.020 9 0.18

24.21 Salaries: 12.000 9 108.00

24.22 Vocational training/specific skill training 0.500 9 4.50

24.23 Electricity/water charges 0.600 9 5.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75

24.25 Maintenance 0.400 9 3.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 9 3.60

24.27 Preparatory camps 0.150 9 1.35

24.28 PTAs/school functions 0.150 9 1.35

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 9 2.70

TOTAL 245.430

Grant Total 250.68

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Saharanpur:21-07-11 62/78

Page 63: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

6+NEW1) Sant Kabir Nagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 1 64.86

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 1 3.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 4 3.00

Sub Total 0.00

TOTAL 71.36

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 7 75.60

24.18 Stipend for girl student per month @ Rs. 50 0.600 7 4.20

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 7 4.20

24.2 Examination fee 0.020 7 0.14

24.21 Salaries: 12.000 7 84.00

24.22 Vocational training/specific skill training 0.500 7 3.50

24.23 Electricity/water charges 0.600 7 4.20

24.24 Medical care/contingencies @ Rs. 750 child 0.750 7 5.25

24.25 Maintenance 0.400 7 2.80

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 7 2.80

24.27 Preparatory camps 0.150 7 1.05

24.28 PTAs/school functions 0.150 7 1.05

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 7 2.10

TOTAL 190.890

Grant Total 262.25

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Sant Kabir Nagar:21-07-11 63/78

Page 64: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old10+New6) Shajahanpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 6 389.16

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 6 21.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 9 6.75

Sub Total 0.00

TOTAL 416.91

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 16 172.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 16 9.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 16 9.60

24.2 Examination fee 0.020 16 0.32

24.21 Salaries: 12.000 16 192.00

24.22 Vocational training/specific skill training 0.500 16 8.00

24.23 Electricity/water charges 0.600 16 9.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 16 12.00

24.25 Maintenance 0.400 16 6.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 16 6.40

24.27 Preparatory camps 0.150 16 2.40

24.28 PTAs/school functions 0.150 16 2.40

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 1 3.60

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 16 4.80

TOTAL 439.920

Grant Total 856.83

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Shajahanpur:21-07-11 64/78

Page 65: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old13) Sidarth Nagar

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 12 9.00

Sub Total 0.00

TOTAL 9.00

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 354.510

Grant Total 363.51

Recommended 2011-12

Total of Year 2011-12 Model-I

Sl. No. Activity

KGBV2011-12Tarun(ForWebsite):Sidarth Nagar:21-07-11 65/78

Page 66: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old11+New9) Sitapur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 9 583.74

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 9 31.50

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 10 7.50

Sub Total 0.00

TOTAL 622.74

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 20 216.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 20 12.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 20 12.00

24.2 Examination fee 0.020 20 0.40

24.21 Salaries: 12.000 20 240.00

24.22 Vocational training/specific skill training 0.500 20 10.00

24.23 Electricity/water charges 0.600 20 12.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 20 15.00

24.25 Maintenance 0.400 20 8.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 20 8.00

24.27 Preparatory camps 0.150 20 3.00

24.28 PTAs/school functions 0.150 20 3.00

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 20 6.00

TOTAL 545.400

Grant Total 1168.14

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Sitapur:21-07-11 66/78

Page 67: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old8) Sonebhadra

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 8 6.00

Sub Total 0.00

TOTAL 6.00

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 9 97.20

24.18 Stipend for girl student per month @ Rs. 50 0.600 9 5.40

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 9 5.40

24.2 Examination fee 0.020 9 0.18

24.21 Salaries: 12.000 9 108.00

24.22 Vocational training/specific skill training 0.500 9 4.50

24.23 Electricity/water charges 0.600 9 5.40

24.24 Medical care/contingencies @ Rs. 750 child 0.750 9 6.75

24.25 Maintenance 0.400 9 3.60

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 9 3.60

24.27 Preparatory camps 0.150 9 1.35

24.28 PTAs/school functions 0.150 9 1.35

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 1 3.60

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 9 2.70

TOTAL 249.030

Grant Total 255.03

Recommended 2011-12Activity

Total of Year 2011-12 Model-I

Sl. No.

KGBV2011-12Tarun(ForWebsite):Sonebhadra:21-07-11 67/78

Page 68: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old5) Srawasti

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 0 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 0 0.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 5 3.75

Sub Total 0.00

TOTAL 3.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 5 54.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 5 3.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 5 3.00

24.2 Examination fee 0.020 5 0.10

24.21 Salaries: 12.000 5 60.00

24.22 Vocational training/specific skill training 0.500 5 2.50

24.23 Electricity/water charges 0.600 5 3.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 5 3.75

24.25 Maintenance 0.400 5 2.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 5 2.00

24.27 Preparatory camps 0.150 5 0.75

24.28 PTAs/school functions 0.150 5 0.75

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 5 1.50

TOTAL 136.350

Grant Total 140.10

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Srawasti:21-07-11 68/78

Page 69: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old 2+New 8) Sultanpur

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 8 518.88

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 8 28.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 548.38

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 10 108.00

24.18 Stipend for girl student per month @ Rs. 50 0.600 10 6.00

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 10 6.00

24.2 Examination fee 0.020 10 0.20

24.21 Salaries: 12.000 10 120.00

24.22 Vocational training/specific skill training 0.500 10 5.00

24.23 Electricity/water charges 0.600 10 6.00

24.24 Medical care/contingencies @ Rs. 750 child 0.750 10 7.50

24.25 Maintenance 0.400 10 4.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 10 4.00

24.27 Preparatory camps 0.150 10 1.50

24.28 PTAs/school functions 0.150 10 1.50

24.29 Provision of Rent (8 months) 4.800 8 38.40

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 10 3.00

TOTAL 311.100

Grant Total 859.48

ActivitySl. No.

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Sultanpur:21-07-11 69/78

Page 70: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old3+New10) Unnao

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 10 648.60

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11 Teaching learning material and equipment including library

books(New)

3.500 10 35.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 2 1.50

Sub Total 0.00

TOTAL 685.10

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 13 140.40

24.18 Stipend for girl student per month @ Rs. 50 0.600 13 7.80

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 13 7.80

24.2 Examination fee 0.020 13 0.26

24.21 Salaries: 12.000 13 156.00

24.22 Vocational training/specific skill training 0.500 13 6.50

24.23 Electricity/water charges 0.600 13 7.80

24.24 Medical care/contingencies @ Rs. 750 child 0.750 13 9.75

24.25 Maintenance 0.400 13 5.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 13 5.20

24.27 Preparatory camps 0.150 13 1.95

24.28 PTAs/school functions 0.150 13 1.95

24.29 Provision of Rent (8 months) 4.800 9 43.20

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 13 3.90

TOTAL 397.710

Grant Total 1082.81

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Unnao:21-07-11 70/78

Page 71: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Model-I (Old4+NEW2) Varanasi

Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 64.860 2 129.72

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00

Sub Total 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)0.00

Sub Total 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

0.00

Sub Total 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00

Sub Total 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.00

Sub Total 0.00

24.11Teaching learning material and equipment including library

books(New) 3.500 2 7.00

24.12Teaching learning material and equipment including library

books0.00

Sub Total 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.750 3 2.25

Sub Total 0.00

TOTAL 138.97

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 10.800 6 64.80

24.18 Stipend for girl student per month @ Rs. 50 0.600 6 3.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month0.600 6 3.60

24.2 Examination fee 0.020 6 0.12

24.21 Salaries: 12.000 6 72.00

24.22 Vocational training/specific skill training 0.500 6 3.00

24.23 Electricity/water charges 0.600 6 3.60

24.24 Medical care/contingencies @ Rs. 750 child 0.750 6 4.50

24.25 Maintenance 0.400 6 2.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)0.400 6 2.40

24.27 Preparatory camps 0.150 6 0.90

24.28 PTAs/school functions 0.150 6 0.90

24.29 Provision of Rent (8 months) 4.800 0 0.00

Provision of Rent (6 months) 3.600 0 0.00

Provision of Rent (3 months) 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00

24.3 Capacity building 0.300 6 1.80

TOTAL 163.620

Grant Total 302.59

Sl. No. Activity

Total of Year 2011-12 Model-I

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Varanasi:21-07-11 71/78

Page 72: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Phy Fin Phy Fin Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 0.00 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00 0.00

Sub Total 0.00 0.00 0.00

24.03 Boudary Wall New 0.00

24.04Boundary Wall (Variation on account of change of unit cost)

(old)1 1.50 0.00

Sub Total 1.50 0.00 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

1 1.00 0.00

Sub Total 1.00 0.00 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of

unit cost (old)0.00 0.00

Sub Total 0.00 0.00 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.05 0.00

Sub Total 0.05 0.00 0.00

24.11 Teaching learning material and equipment including library

books(New)

0.00

24.12Teaching learning material and equipment including library

books0.72 0.00

Sub Total 0.72 0.00 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.10 0.375 1 0.38

Sub Total 0.10 0.00 0.00

TOTAL 3.37 0.00 0.38

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 1 5.40 5.400 1 5.40

24.18 Stipend for girl student per month @ Rs. 50 1 0.30 0.300 1 0.30

24.19Supplementary TLM, stationery and other educational material

@RS 50per month1 0.30 0.300 1 0.30

24.2 Examination fee 1 0.01 0.010 1 0.01

24.21 Salaries: 1 12.00 12.000 1 12.00

24.22 Vocational training/specific skill training 1 0.30 0.300 1 0.30

24.23 Electricity/water charges 1 0.36 0.360 1 0.36

24.24 Medical care/contingencies @ Rs. 750 child 1 0.38 0.375 1 0.38

24.25 Maintenance 1 0.20 0.200 1 0.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)1 0.20 0.200 1 0.20

24.27 Preparatory camps 1 0.10 0.100 1 0.10

24.28 PTAs/school functions 1 0.10 0.100 1 0.10

24.29 Provision of Rent (8 months) 0.00

Provision of Rent (6 months) 0.00 3.600 0 0.00

Provision of Rent (3 months) 0.00 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00 0.00

24.3 Capacity building 1 0.30 0.150 1 0.15

TOTAL 19.95 0.00 19.795

Grant Total 23.32 0.00 20.17

Model-II G.B. Nagar

Recommended 2011-12

Total of Year 2011-12 Model-II

Activity

Total of Year 2010-11 Model-I & II

Regular Out lay

approved by PAB

(including spillover)

Supplementary

Outlay approved by

PAB

KGBV2011-12Tarun(ForWebsite):G.B.Nagar (3):21-07-11 72/78

Page 73: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Phy Fin Phy Fin Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 0.00 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00 0.00

Sub Total 0.00 0.00 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 1 1.50 0.00

Sub Total 1.50 0.00 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

1 1.00 0.00

Sub Total 1.00 0.00 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00 0.00

Sub Total 0.00 0.00 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost1.27 0.00

Sub Total 1.27 0.00 0.00

24.11 Teaching learning material and equipment including library

books(New)

0.00

24.12Teaching learning material and equipment including library

books1.59 0.00

Sub Total 1.59 0.00 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.45 0.375 1 0.38

Sub Total 0.45 0.00 0.00

TOTAL 5.80 0.00 0.38

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 1 5.40 5.400 1 5.40

24.18 Stipend for girl student per month @ Rs. 50 1 0.30 0.300 1 0.30

24.19Supplementary TLM, stationery and other educational material

@RS 50per month1 0.30 0.300 1 0.30

24.2 Examination fee 1 0.01 0.010 1 0.01

24.21 Salaries: 1 12.00 12.000 1 12.00

24.22 Vocational training/specific skill training 1 0.30 0.300 1 0.30

24.23 Electricity/water charges 1 0.36 0.360 1 0.36

24.24 Medical care/contingencies @ Rs. 750 child 1 0.38 0.375 1 0.38

24.25 Maintenance 1 0.20 0.200 1 0.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)1 0.20 0.200 1 0.20

24.27 Preparatory camps 1 0.10 0.100 1 0.10

24.28 PTAs/school functions 1 0.10 0.100 1 0.10

24.29 Provision of Rent (8 months) 0.00

Provision of Rent (6 months) 0.00 3.600 0 0.00

Provision of Rent (3 months) 0.00 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00 0.00

24.3 Capacity building 1 0.30 0.150 1 0.15

TOTAL 19.95 0.00 19.795

Grant Total 25.75 0.00 20.17

Model-II Hamirpur

Recommended 2011-12Sl. No.

Total of Year 2010-11 Model-I &

II

Activity

Total of Year 2011-12 Model-II

Regular Out lay

approved by PAB

(including spillover)

Supplementary

Outlay approved by

PAB

KGBV2011-12Tarun(ForWebsite):Hamirpur (3):21-07-11 73/78

Page 74: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Phy Fin Phy Fin Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 0.00 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 16.50 0.00

Sub Total 16.50 0.00 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 1 1.50 0.00

Sub Total 1.50 0.00 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

1 1.00 0.00

Sub Total 1.00 0.00 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00 0.00

Sub Total 0.00 0.00 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.54 0.00

Sub Total 0.54 0.00 0.00

24.11 Teaching learning material and equipment including library

books(New)

0.00

24.12Teaching learning material and equipment including library

books0.78 0.00

Sub Total 0.78 0.00 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.00 0.375 1 0.38

Sub Total 0.00 0.00 0.00

TOTAL 20.31 0.00 0.38

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 1 5.40 5.400 1 5.40

24.18 Stipend for girl student per month @ Rs. 50 1 0.30 0.300 1 0.30

24.19Supplementary TLM, stationery and other educational material

@RS 50per month1 0.30 0.300 1 0.30

24.2 Examination fee 1 0.01 0.010 1 0.01

24.21 Salaries: 1 12.00 12.000 1 12.00

24.22 Vocational training/specific skill training 1 0.30 0.300 1 0.30

24.23 Electricity/water charges 1 0.36 0.360 1 0.36

24.24 Medical care/contingencies @ Rs. 750 child 1 0.38 0.375 1 0.38

24.25 Maintenance 1 0.20 0.200 1 0.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)1 0.20 0.200 1 0.20

24.27 Preparatory camps 1 0.10 0.100 1 0.10

24.28 PTAs/school functions 1 0.10 0.100 1 0.10

24.29 Provision of Rent (8 months) 0.00

Provision of Rent (6 months) 0.00 3.600 0 0.00

Provision of Rent (3 months) 0.00 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0 0.00 0.00

24.3 Capacity building 1 0.30 0.150 1 0.15

TOTAL 19.95 0.00 19.795

Grant Total 40.26 0.00 20.17

Model-II Hathras

Recommended 2011-12Sl. No.

Total of Year 2010-11 Model-I &

II

Activity

Total of Year 2011-12 Model-II

Regular Out lay

approved by PAB

(including spillover)

Supplementary

Outlay approved by

PAB

KGBV2011-12Tarun(ForWebsite):Hathras (3):21-07-11 74/78

Page 75: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Phy Fin Phy Fin Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 0.00 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 27.30 0.00

Sub Total 27.30 0.00 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 1 1.50 0.00

Sub Total 1.50 0.00 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

1 1.00 0.00

Sub Total 1.00 0.00 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00 0.00

Sub Total 0.00 0.00 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.04 0.00

Sub Total 0.04 0.00 0.00

24.11 Teaching learning material and equipment including library

books(New)

0.00

24.12Teaching learning material and equipment including library

books2.70 0.00

Sub Total 2.70 0.00 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.23 0.375 1 0.38

Sub Total 0.23 0.00 0.00

TOTAL 32.78 0.00 0.38

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 1 5.40 5.400 1 5.40

24.18 Stipend for girl student per month @ Rs. 50 1 0.30 0.300 1 0.30

24.19Supplementary TLM, stationery and other educational material

@RS 50per month1 0.30 0.300 1 0.30

24.2 Examination fee 1 0.01 0.010 1 0.01

24.21 Salaries: 1 12.00 12.000 1 12.00

24.22 Vocational training/specific skill training 1 0.30 0.300 1 0.30

24.23 Electricity/water charges 1 0.36 0.360 1 0.36

24.24 Medical care/contingencies @ Rs. 750 child 1 0.38 0.375 1 0.38

24.25 Maintenance 1 0.20 0.200 1 0.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)1 0.20 0.200 1 0.20

24.27 Preparatory camps 1 0.10 0.100 1 0.10

24.28 PTAs/school functions 1 0.10 0.100 1 0.10

24.29 Provision of Rent (8 months) 0.00

Provision of Rent (6 months) 1 3.60 3.600 0 0.00

Provision of Rent (3 months) 0.00 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)12.97 0.00

24.3 Capacity building 1 0.30 0.150 1 0.15

TOTAL 36.52 0.00 19.795

Grant Total 69.30 0.00 20.17

Recommended 2011-12

Model-II Jalaun

ActivitySl. No.Supplementary

Outlay approved by

PAB

Regular Out lay

approved by PAB

(including spillover)

Total of Year 2010-11 Model-I &

II Total of Year 2011-12 Model-II

KGBV2011-12Tarun(ForWebsite):Jalaun (3):21-07-11 75/78

Page 76: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Phy Fin Phy Fin Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 0.00 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 0.00 0.00

Sub Total 0.00 0.00 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 1 1.50 0.00

Sub Total 1.50 0.00 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

1 1.00 0.00

Sub Total 1.00 0.00 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00 0.00

Sub Total 0.00 0.00 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.71 0.00

Sub Total 0.71 0.00 0.00

24.11 Teaching learning material and equipment including library

books(New)

0.00

24.12Teaching learning material and equipment including library

books0.78 0.00

Sub Total 0.78 0.00 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.20 0.375 1 0.38

Sub Total 0.20 0.00 0.00

TOTAL 4.20 0.00 0.38

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 1 5.40 5.400 1 5.40

24.18 Stipend for girl student per month @ Rs. 50 1 0.30 0.300 1 0.30

24.19Supplementary TLM, stationery and other educational material

@RS 50per month1 0.30 0.300 1 0.30

24.2 Examination fee 1 0.01 0.010 1 0.01

24.21 Salaries: 1 12.00 12.000 1 12.00

24.22 Vocational training/specific skill training 1 0.30 0.300 1 0.30

24.23 Electricity/water charges 1 0.36 0.360 1 0.36

24.24 Medical care/contingencies @ Rs. 750 child 1 0.38 0.375 1 0.38

24.25 Maintenance 1 0.20 0.200 1 0.20

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)1 0.20 0.200 1 0.20

24.27 Preparatory camps 1 0.10 0.100 1 0.10

24.28 PTAs/school functions 1 0.10 0.100 1 0.10

24.29 Provision of Rent (8 months) 0.00

Provision of Rent (6 months) 0.00 3.600 0 0.00

Provision of Rent (3 months) 0.00 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0.00 0.00

24.3 Capacity building 1 0.30 0.150 1 0.15

TOTAL 19.95 0.00 19.795

Grant Total 24.15 0.00 20.17

Model-II Mahoba

Sl. No. Activity

Total of Year 2011-12 Model-IITotal of Year 2010-11 Model-

I & IISupplementary

Outlay approved by

PAB

Regular Out lay

approved by PAB

(including

Recommended 2011-12

KGBV2011-12Tarun(ForWebsite):Mahoba (3):21-07-11 76/78

Page 77: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Phy Fin Phy Fin Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 0.00 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 15.65 0.00

Sub Total 15.65 0.00 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 5 7.50 0.00

Sub Total 7.50 0.00 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

5 5.00 0.00

Sub Total 5.00 0.00 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00 0.00

Sub Total 0.00 0.00 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost0.19 0.00

Sub Total 0.19 0.00 0.00

24.11 Teaching learning material and equipment including library

books(New)

0.00

24.12Teaching learning material and equipment including library

books2.84 0.00

Sub Total 2.84 0.00 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 5 3.16 0.375 0 0.00

Sub Total 3.16 0.00 0.00

TOTAL 34.34 0.00 0.00

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 5 27.00 5.400 5 27.00

24.18 Stipend for girl student per month @ Rs. 50 5 1.50 0.300 5 1.50

24.19Supplementary TLM, stationery and other educational material

@RS 50per month5 1.50 0.300 5 1.50

24.2 Examination fee 5 0.05 0.010 5 0.05

24.21 Salaries: 5 60.00 12.000 5 60.00

24.22 Vocational training/specific skill training 5 1.50 0.300 5 1.50

24.23 Electricity/water charges 5 1.80 0.360 5 1.80

24.24 Medical care/contingencies @ Rs. 750 child 5 1.90 0.375 5 1.88

24.25 Maintenance 5 1.00 0.200 5 1.00

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)5 1.00 0.200 5 1.00

24.27 Preparatory camps 5 0.50 0.100 5 0.50

24.28 PTAs/school functions 5 0.50 0.100 5 0.50

24.29 Provision of Rent (8 months) 0.00

Provision of Rent (6 months) 5 18.00 3.600 5 18.00

Provision of Rent (3 months) 0.00 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)4.07 0.00

24.3 Capacity building 5 1.50 0.150 5 0.75

TOTAL 121.82 0.00 116.975

Grant Total 156.16 0.00 116.98

Activity

Total of Year 2010-11 Model-I & II

Model-II Muzaffarnagar

Sl. No.

Total of Year 2011-12 Model-II

Recommended 2011-12

Regular Out lay approved

by PAB (including

spillover)

Supplementary Outlay

approved by PAB

KGBV2011-12Tarun(ForWebsite):Muzaffarnagar (3):21-07-11 77/78

Page 78: KGBV State Consolidate : Uttar Pradesh - UPEFA Pradesh Kasturba Gandhi Balika Vidyalaya (KGBV) AWP&B for 2011-12 (Rs in lakhs) KGBV State Consolidate : Uttar Pradesh Unit Cost Phy

Uttar Pradesh

Kasturba Gandhi Balika Vidyalaya (KGBV)

AWP&B for 2011-12

(Rs in lakhs)

Phy Fin Phy Fin Unit Cost Phy Fin

24 KGBV Financial Provision perschool

Non Recurring (One time grant)

24.01 Construction of Building New 0.00 0.00

24.02Construction of Building (Variation on account of change of unit

cost) (old) 27.30 0.00

Sub Total 27.30 0.00 0.00

24.03 Boudary Wall New 0.00

24.04 Boundary Wall (Variation on account of change of unit cost) (old) 2 3.00 0.00

Sub Total 3.00 0.00 0.00

24.05 Boring/Handpump (New) 0.00

24.06 Boring/Handpump (minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs. 1.00 lakhs).

2 2.00 0.00

Sub Total 2.00 0.00 0.00

24.07 Electricity /Water charges(New) 0.00

24.08Electricity/Water Charges (Variation on account of change of unit

cost (old)0.00 0.00

Sub Total 0.00 0.00 0.00

24.09Furniture/Equipment(including Kitchen equipment) New

0.00

24.1Furniture/Equipment For table &chair (Variation on account of

change of unit cost1.22 0.00

Sub Total 1.22 0.00 0.00

24.11 Teaching learning material and equipment including library

books(New)

0.00

24.12Teaching learning material and equipment including library

books0.09 0.00

Sub Total 0.09 0.00 0.00

24.13 Bedding 0.00

24.14 Replacement of Bedding (once in 3 Year) 0.01 0.375 2 0.75

Sub Total 0.01 0.00 0.00

TOTAL 33.62 0.00 0.75

Recurring Costs per annum

24.17 Maintenance per girl student per month @ Rs. 900/- 2 10.80 5.400 2 10.80

24.18 Stipend for girl student per month @ Rs. 50 2 0.60 0.300 2 0.60

24.19Supplementary TLM, stationery and other educational material

@RS 50per month2 0.60 0.300 2 0.60

24.2 Examination fee 2 0.02 0.010 2 0.02

24.21 Salaries: 2 24.00 12.000 2 24.00

24.22 Vocational training/specific skill training 2 0.60 0.300 2 0.60

24.23 Electricity/water charges 2 0.72 0.360 2 0.72

24.24 Medical care/contingencies @ Rs. 750 child 2 0.76 0.375 2 0.75

24.25 Maintenance 2 0.40 0.200 2 0.40

24.26Miscellaneous (educational tour/ exposure visit/sports material

etc)2 0.40 0.200 2 0.40

24.27 Preparatory camps 2 0.20 0.100 2 0.20

24.28 PTAs/school functions 2 0.20 0.100 2 0.20

24.29 Provision of Rent (8 months) 0.00

Provision of Rent (6 months) 0.00 3.600 0 0.00

Provision of Rent (3 months) 0.00 0.00

Provision of Rent due of previous years (2007-08, 2008-09 &

2009-10)0 0.00 0.00

24.3 Capacity building 2 0.60 0.150 2 0.30

TOTAL 39.90 0.00 39.590

Grant Total 73.52 0.00 40.34

Model-II Sultanpur

Recommended 2011-12Sl. No.

Total of Year 2010-11 Model-I & II

Activity

Total of Year 2011-12 Model-II

Regular Out lay approved

by PAB (including

spillover)

Supplementary

Outlay approved by

PAB

KGBV2011-12Tarun(ForWebsite):Sultanpur (3):21-07-11 78/78