3
COMPACT COMPACT gov VAN 1 E3.1 2 E3.1 W W W W P1A-12 P1A-12 P1A-14 P1A-14 P1A-14 P1A-14 P1B-12 P1B-12 P1B-18 3 4 P1A-2 P1A-34 P1A-30 W P1B-12 14 8 16 17 SD ELECTRIC HEATER S 18 P1A-49 3 19 19 W W P1A-12 P1B-12 20 P1A-32 P1A-28 CR 12 12 7 7 7 P1A-38 23 23 23 23 21 22 P1A-17,19 21 22 25 P1A-21,23 25 4 EH-1 P1A-33,35,37 SP-1 P1B-25 30 29 CR D 31 23 23 23 23 23 23 23 23 F WP 32 gov P1A FACP ELEV DISCONNECT ELEV LIGHTS TEL RACK P1A-18 P1A-18 P1A-18 P1A-18 P1A-18 P1A-20 P1A-20 P1A-24 P1A-24 MDP ACP SEC INVERTER1 P1A-36 MDP-14,16,18 P1A-31 P1A-39 P1A-43 LIGHTING CONTACTOR P1A-45 36" AFF 36" AFF P1B P1B-20 P1B-20 P1B-20 36"AFF 36"AFF P1B-32 P1B-32 P1B-34 P1B-34 1875 N. LAKEWOOD DRIVE, #201 COEUR D'ALENE, IDAHO 83814 (209) 676-8001 (209) 676-0100 601 FRONT AVE. STE. 201 // COEUR D'ALENE, ID 83814 // PH 208+664-1773 SHEET NO. DRAWN BY: DESIGNED BY: PROJECT NO.: REV. DATE DESCRIPTION 0 8/25/ 2017 PERMIT SET 9/18/ 2017 BID SET 11/8/ 2017 PERMIT SET STATE OF IDAHO LICENSED ARCHITECT 1714 CL DT PARKING STRUCTURE PERMIT SET 11-08-17 \\CDA\project\2017\17176 CDA Parking Garage\01 Cad Thursday, August 24, 2017 214 N 3RD ST. COEUR D' ALENE, IDAHO MWM RICHARD M. STAUFFER AR-1376 11-08-17 SCALE : 3/32" = 1'-0" POWER PLAN - LEVEL 1 0 8' 16' 24' KEY NOTES MOTOR CONTROLLER DISCONNECT INTEGRAL TO ELEVATOR CONTROLLER. CAB LIGHT DISCONNECT INTEGRAL TO ELEVATOR CONTROLLER. STUB, CAP, AND LABEL 'FUTURE TENANT' PROVIDE (1)3" CONDUIT TO STUB UP WITHIN MDP. COORDINATE LOCATION OF EQIUPMENT WITH FINAL ELEVATOR SPECIFICATION. COORDINATE WITH MANUFACTURER'S REQUIREMENTS. AS PART OF A MACHINE ROOMLESS ELEVATOR. COORDINATE WITH ARCHITECTURA AND WITH MANUFACTURER'S REQUIREMENTS. REFERENCE DETAIL 5 ON SHEET E4.3 EQUIPMENT BY OTHERS. RFID SYSTEM PER CITY REQUIREMENTS COORDINATE FINAL POWER REQUIREMENTS WITH VENDOR CHOSEN BY CITY. COORDINATE PATHWAY WITH GENERAL CONTRACTOR. COORDINATE FINAL LOCATION WITH ARCHITECT PRIOR TO INSTALLATION. PROVIDE (3) 3"C WITH PULL STRING FROM STORAGE ROOM TO MECHANICAL ROOM. AND STUB-UP INTO ROOM. CONTINUE PATHWAY TO STUB-UP IN FUTURE TENANT AREAS INDICATED ON PLANS. CONTINUE PATHWAY TO GATE CONTROLLER AS INDICATED ON PLANS. CONTINUE PATHWAY TO STORAGE ROOM AS INDICATED ON PLANS. (1)2" CONDUIT. PROVIDE 120/208V 2KVA INVERTER WITH OUTPUT BREAKERS AS REQUIRED. REFERENCE ONE LINE DIAGRAM AND INVERTER PANEL SCHEDULE FOR MORE INFORMATION. MYERS POWER PRODUCTS EM-3 SERIES OR APPROVED EQUIVALENT. PROVIDE (2)2" CONDUITS FROM ELEVATOR CONTROLLER TO TOP OF HOISTWAY TO ELEVATOR MOTOR. COORDINATE FINAL ROUTING AND LOCATIONS WITH ELEVATOR VENDOR. PROVIDE 19” 2-POST RACK X 84” HIGH. CHATSWORTH UNIVERSAL 19”W SERIES OR APPROVED EQUAL REFERENCE ONE-LINE DIAGRAM FOR FEEDER TO PANEL MDP. PROVIDE AND INSTALL 8' X 4' X 3/4" FIRE RATED PLYWOOD WITH BOTTOM AT 18" AFF. PAINT WHITE. EXPOSE ONE SMALL PORTION OF PLYWOOD INDICATING FIRE RATING FOR INSPECTIONS. PROVIDE WALL MOUNTED 1KW WALL MOUNT UNIT HEATER FOR ELEVATOR PIT. INDEECO WLI SERIES OR APPROVED EQUAL. PROVIDE (3) 2" CONDUIT BACK TO IT RACK IN MECHANICAL ROOM. PROVIDE (4)2" CONDUITS FROM P1A TO LOCATIONS SHOWN. STUB 6"AFF, CAP AND LABEL FOR FUTURE EV STATIONS. SECURE PULL STRINGS APPROPRIATELY FOR FUTURE USE. OFCI PARKING TICKET KIOSK. PROVIDE (1) 1" CONDUIT WITH (2)#10 AND (1)#10 FOR POWER PER CIRCUIT DESIGNATION. COORDINATE WITH FINAL POWER REQUIREMENTS OF EQIUPMENT SELECTED PRIOR TO INSTALLATION. COORDINATE FINAL LOCATION OF EQIUPMENT WITH ARCHITECT. OFCI PARKING TICKET KIOSK. PROVIDE (1) 1" CONDUIT WITH PULL STRING BACK TO IT RACK. OFOI SURVEILLANCE CAMERA. BASIS OF DESIGN IS POE. PROVIDE (1) 1" CONDUIT BACK TO IT CABINET IN MAIN ELECTRICAL ROOM. COORDINATE FINAL LOCATIONS WITH CITY PRIOR TO INSTALLATION. CONDUITS TO PARKING KIOSK, REFERENCE E3.1. DOOR OPENER PHOTO-EYES INSTALLED PER THE MANUFACTURES RECOMMENDATION, TYPICALLY 12"-18" AFF. CONDUIT AND WIRE ROUTING TO BE DETERMINED IN FIELD AND COORDINATED WITH OTHER TRADES. PROVIDE (1) 4" CONDUIT FOR CHARTER AND (1) CONDUIT FOR FRONTIER FROM THE MAIN ELECTRICAL ROOM TO UTILITY HAND-HOLE AS SHOWN. REFERENCE E1.1 FOR CONTINUATION. PROVIDE (1) 2"C WITH PULL STRING FOR COMMUNICATIONS FROM ELECTRICAL ROOM TO EXISTING CDA FIBER VAULT. COORDINATE EXACT LOCATION AND INSTALLATION WITH CITY PRIOR TO INSTALLATION. REFERENCE E1.1 FOR CONTINUATION. PROVIDE 24" WALL MOUNTED LADDER RACK FOR CABLE MANAGMENT FROM 12" AFF OR EQUIPMENT RACK TO 6" BELOW VERTICAL CONDUIT SLEEVE. TPYPICAL FOR ALL STRORAGE/UTILITY ROOMS WITH VERTICAL SLEEVES AS SHOWN. INDUCTION LOOP PER RFID SYSTEM. COORDINATE FINAL REQUIREMENTS WITH CITY CHOSEN VENDOR. PROVIDE (3) 2" CONDUIT WITH PULL STRINGS BACK TO MECHANICAL ROOM FOR FUTURE GATES. STUB, CAP AND LABEL FOR 'FUTURE GATES' PROVIDE BRIVO ALLIED CONTROL SYSTEM AS SELECTED BY OWNER. COORDINATE FINAL POWER REQUIREMENTS FOR CHOSEN VENDOR. PROVIDE PROTECTIVE COVER. 1 SHEET NOTES 1. SEE ARCHITECTURAL PLANS, SECTIONS AND ELEVATIONS FOR EXACT EQUIPMENT AND DEVICE LOCATIONS. 2. SEE ARCHITECTURAL PLANS FOR LOCATIONS OF SOUND, SMOKE AND FIRE RATED WALLS. 3. COORDINATE ALL INSLAB CONDUITS AND ROUTING WITH STRUCTURAL CONTRACTOR PRIOR TO INSTALLATION 4. COORDINATE CEILING MOUNTED DEVICES WITH ARCHITECTURAL AND REFLECTED CEILING PLANS. SCALE : 1/2" = 1'-0" ENLARGED MECHANICAL LEVEL 1 0 1' 2' 4' SCALE : 1/2" = 1'-0" ENLARGED STORAGE LEVEL 1 0 1' 2' 4' 1 E3.1 2 E3.1 2 2 1 3 4 5 6 7 8 9 10 11 5 5 5 9 10 11 6 6 12 13 13 14 14 15 15 16 8 16 17 18 19 20 20 9 21 22 23 10 24 24 25 8 17 E3.1 POWER PLAN - LEVEL 1 26 26 27 28 27 28 17 28 15 29 30 31 32

KEY NOTES - City of Coeur d'Alene - Home Page · \\cda\project\2017\17176 cda parking garage\01 cad thursday, august 24, 2017 214 n 3rd st. coeur d' alene, idaho mwm richard m. stauffer

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KEY NOTES - City of Coeur d'Alene - Home Page · \\cda\project\2017\17176 cda parking garage\01 cad thursday, august 24, 2017 214 n 3rd st. coeur d' alene, idaho mwm richard m. stauffer

Xref .\Grid_R.dwg

COMPACTCOMPACT

gov

VAN

05S4.3

08A6.7

1

E3.1

2

E3.1

W

W

W

W

P1A-12

P1A-12

P1A-14

P1A-14

P1A-14

P1A-14

P1B-12

P1B-12

P1B-18

3

4

P1A-2

P1A-34

P1A-30

W

P1B-12

14

8

16

17

SD

ELECTRIC HEATER

S

18

P1A-49

3

19

19

W

W

P1A-12

P1B-12

20

P1A-32

P1A-28

CR 12

12

7

7

7

P1A-38

23

23

23

23

21

22

P1A-17,19

21

22

25

P1A-21,23

25

4

EH-1

P1A-33,35,37

SP-1

P1B-25

30

29

CR

D

31

23

23

23

23

23

23

23

23

F

WP

32

gov

P1A

FA

CP

ELEV DISCONNECT

ELEV LIGHTS

TEL

RACK

P1A-18

P1A-18

P1A-18

P1A-18

P1A-18

P1

A-2

0

P1

A-2

0

P1A-24

P1A-24

MDP

ACP

SEC

INVERTER1

P1A-36

MDP-14,16,18

P1A-31

P1A-39

P1A-43

LIGHTING CONTACTOR

P1A-45

36" AFF

36" AFF

P1B

P1B-20

P1B-20

P1B-20

36"AFF

36"AFF

P1B-32

P1B-32

P1B-34

P1B-34

1875 N. LAKEWOOD DRIVE, #201

COEUR D'ALENE, IDAHO 83814

(209) 676-8001 (209) 676-0100

601

FRO

NT

AVE.

STE

. 201

// C

OEU

R D

'ALE

NE,

ID 8

3814

// P

H 2

08+

664-

1773

SHEET NO.DRAWN BY:DESIGNED BY:PROJECT NO.:

REV. DATE DESCRIPTION0 8/25/

2017PERMIT SET

9/18/2017

BID SET

11/8/2017

PERMIT SET

STA

TE O

F ID

AHO

LIC

ENSED

ARC

HIT

ECT

1714

CL

DT

PARKI

NG

STR

UCTU

RE

PERM

IT S

ET11-0

8-1

7

\\CD

A\p

roje

ct\2

01

7\1

71

76

CD

A P

arking

Gar

age\

01

Cad

Thur

sday

, Aug

ust

24

, 2

01

7

214 N

3RD

ST.

CO

EUR D

' ALE

NE,

IDAHO

MWM

RICHA

RD M.

STAU

FFER

AR-13

76

11

-08

-17

SCALE : 3/32" = 1'-0"

POWER PLAN - LEVEL 1

0 8' 16' 24'

KEY NOTESMOTOR CONTROLLER DISCONNECT INTEGRAL TO

ELEVATOR CONTROLLER.

CAB LIGHT DISCONNECT INTEGRAL TO ELEVATOR

CONTROLLER.

STUB, CAP, AND LABEL 'FUTURE TENANT'

PROVIDE (1)3" CONDUIT TO STUB UP WITHIN MDP.

COORDINATE LOCATION OF EQIUPMENT WITH FINAL

ELEVATOR SPECIFICATION. COORDINATE WITH

MANUFACTURER'S REQUIREMENTS. AS PART OF A

MACHINE ROOMLESS ELEVATOR. COORDINATE WITH

ARCHITECTURA AND WITH MANUFACTURER'S

REQUIREMENTS. REFERENCE DETAIL 5 ON SHEET

E4.3

EQUIPMENT BY OTHERS.

RFID SYSTEM PER CITY REQUIREMENTS

COORDINATE FINAL POWER REQUIREMENTS WITH

VENDOR CHOSEN BY CITY. COORDINATE PATHWAY

WITH GENERAL CONTRACTOR. COORDINATE FINAL

LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.

PROVIDE (3) 3"C WITH PULL STRING FROM STORAGE

ROOM TO MECHANICAL ROOM. AND STUB-UP INTO

ROOM.

CONTINUE PATHWAY TO STUB-UP IN FUTURE TENANT

AREAS INDICATED ON PLANS.

CONTINUE PATHWAY TO GATE CONTROLLER AS

INDICATED ON PLANS.

CONTINUE PATHWAY TO STORAGE ROOM AS

INDICATED ON PLANS.

(1)2" CONDUIT.

PROVIDE 120/208V 2KVA INVERTER WITH OUTPUT

BREAKERS AS REQUIRED. REFERENCE ONE LINE

DIAGRAM AND INVERTER PANEL SCHEDULE FOR

MORE INFORMATION. MYERS POWER PRODUCTS

EM-3 SERIES OR APPROVED EQUIVALENT.

PROVIDE (2)2" CONDUITS FROM ELEVATOR

CONTROLLER TO TOP OF HOISTWAY TO ELEVATOR

MOTOR. COORDINATE FINAL ROUTING AND

LOCATIONS WITH ELEVATOR VENDOR.

PROVIDE 19” 2-POST RACK X 84” HIGH. CHATSWORTH

UNIVERSAL 19”W SERIES OR APPROVED EQUAL

REFERENCE ONE-LINE DIAGRAM FOR FEEDER TO

PANEL MDP.

PROVIDE AND INSTALL 8' X 4' X 3/4" FIRE RATED

PLYWOOD WITH BOTTOM AT 18" AFF. PAINT WHITE.

EXPOSE ONE SMALL PORTION OF PLYWOOD

INDICATING FIRE RATING FOR INSPECTIONS.

PROVIDE WALL MOUNTED 1KW WALL MOUNT UNIT

HEATER FOR ELEVATOR PIT. INDEECO WLI SERIES

OR APPROVED EQUAL.

PROVIDE (3) 2" CONDUIT BACK TO IT RACK IN

MECHANICAL ROOM.

PROVIDE (4)2" CONDUITS FROM P1A TO LOCATIONS

SHOWN. STUB 6"AFF, CAP AND LABEL FOR FUTURE

EV STATIONS. SECURE PULL STRINGS

APPROPRIATELY FOR FUTURE USE.

OFCI PARKING TICKET KIOSK. PROVIDE (1) 1"

CONDUIT WITH (2)#10 AND (1)#10 FOR POWER PER

CIRCUIT DESIGNATION. COORDINATE WITH FINAL

POWER REQUIREMENTS OF EQIUPMENT SELECTED

PRIOR TO INSTALLATION. COORDINATE FINAL

LOCATION OF EQIUPMENT WITH ARCHITECT.

OFCI PARKING TICKET KIOSK. PROVIDE (1) 1"

CONDUIT WITH PULL STRING BACK TO IT RACK.

OFOI SURVEILLANCE CAMERA. BASIS OF DESIGN IS

POE. PROVIDE (1) 1" CONDUIT BACK TO IT CABINET IN

MAIN ELECTRICAL ROOM. COORDINATE FINAL

LOCATIONS WITH CITY PRIOR TO INSTALLATION.

CONDUITS TO PARKING KIOSK, REFERENCE E3.1.

DOOR OPENER PHOTO-EYES INSTALLED PER THE

MANUFACTURES RECOMMENDATION, TYPICALLY

12"-18" AFF. CONDUIT AND WIRE ROUTING TO BE

DETERMINED IN FIELD AND COORDINATED WITH

OTHER TRADES.

PROVIDE (1) 4" CONDUIT FOR CHARTER AND (1)

CONDUIT FOR FRONTIER FROM THE MAIN

ELECTRICAL ROOM TO UTILITY HAND-HOLE AS

SHOWN. REFERENCE E1.1 FOR CONTINUATION.

PROVIDE (1) 2"C WITH PULL STRING FOR

COMMUNICATIONS FROM ELECTRICAL ROOM TO

EXISTING CDA FIBER VAULT. COORDINATE EXACT

LOCATION AND INSTALLATION WITH CITY PRIOR TO

INSTALLATION. REFERENCE E1.1 FOR

CONTINUATION.

PROVIDE 24" WALL MOUNTED LADDER RACK FOR

CABLE MANAGMENT FROM 12" AFF OR EQUIPMENT

RACK TO 6" BELOW VERTICAL CONDUIT SLEEVE.

TPYPICAL FOR ALL STRORAGE/UTILITY ROOMS WITH

VERTICAL SLEEVES AS SHOWN.

INDUCTION LOOP PER RFID SYSTEM. COORDINATE

FINAL REQUIREMENTS WITH CITY CHOSEN VENDOR.

PROVIDE (3) 2" CONDUIT WITH PULL STRINGS BACK

TO MECHANICAL ROOM FOR FUTURE GATES. STUB,

CAP AND LABEL FOR 'FUTURE GATES'

PROVIDE BRIVO ALLIED CONTROL SYSTEM AS

SELECTED BY OWNER. COORDINATE FINAL POWER

REQUIREMENTS FOR CHOSEN VENDOR.

PROVIDE PROTECTIVE COVER.1

SHEET NOTES

1. SEE ARCHITECTURAL PLANS, SECTIONS AND

ELEVATIONS FOR EXACT EQUIPMENT AND DEVICE

LOCATIONS.

2. SEE ARCHITECTURAL PLANS FOR LOCATIONS OF

SOUND, SMOKE AND FIRE RATED WALLS.

3. COORDINATE ALL INSLAB CONDUITS AND ROUTING

WITH STRUCTURAL CONTRACTOR PRIOR TO

INSTALLATION

4. COORDINATE CEILING MOUNTED DEVICES WITH

ARCHITECTURAL AND REFLECTED CEILING PLANS.

SCALE : 1/2" = 1'-0"

ENLARGED MECHANICAL

LEVEL 10 1' 2' 4'

SCALE : 1/2" = 1'-0"

ENLARGED STORAGE

LEVEL 10 1' 2' 4'

1

E3.1

2

E3.1

2

2

1

3

4

5

6

7

8

9

10

11

5

5

5

9

10

11

6

6

12

13

13

14

14

15

15

16

8

16

17

18

19

20

20

9

21

22

23

10

24

24

25

8

17

E3.1

POW

ER P

LAN

- LEV

EL 1

26

26

27

28

27

28

17

28

15

29

30

31

32

Page 2: KEY NOTES - City of Coeur d'Alene - Home Page · \\cda\project\2017\17176 cda parking garage\01 cad thursday, august 24, 2017 214 n 3rd st. coeur d' alene, idaho mwm richard m. stauffer

Xref .\Grid_R.dwg

CO

MP

AC

T

gov

VA

N

05S4.3

08A6.7

EV CHARGING STATION

EV CHARGING STATION

EV CHARGING STATION

W

W

P1A-12

P1B-26

P1B-30

P1B-30

P1B-30

P1A-2

P1A-26

P1B-18

1

1

1

3

4

SD

P1B-13,15

P1B-17,19

P1B-21,23

W W

P1A-12

P1B-12

EXIT GATE

KIOSK

ENTRY GATE

P1B-10

P1B-14

P1B-16

2

2

2

5

5

5

5

6

7

P1A-21,23

6

7

KIOSK

P3B-10,12

HH

HH

6

E4.1

6

E4.1

8

9

5

5

5

5

5

5

5

5

F

10

WP

2-WAY COMM

11

1875 N. LAKEWOOD DRIVE, #201

COEUR D'ALENE, IDAHO 83814

(209) 676-8001 (209) 676-0100

601

FRO

NT

AVE.

STE

. 201

// C

OEU

R D

'ALE

NE,

ID 8

3814

// P

H 2

08+

664-

1773

SHEET NO.DRAWN BY:DESIGNED BY:PROJECT NO.:

REV. DATE DESCRIPTION0 8/25/

2017PERMIT SET

9/18/2017

BID SET

11/8/2017

PERMIT SET

STA

TE O

F ID

AHO

LIC

ENSED

ARC

HIT

ECT

1714

CL

DT

PARKI

NG

STR

UCTU

RE

PERM

IT S

ET11-0

8-1

7

\\CD

A\p

roje

ct\2

01

7\1

71

76

CD

A P

arking

Gar

age\

01

Cad

Thur

sday

, Aug

ust

24

, 2

01

7

214 N

3RD

ST.

CO

EUR D

' ALE

NE,

IDAHO

MWM

RICHA

RD M.

STAU

FFER

AR-13

76

11

-08

-17

SCALE :

POWER PLAN - LEVEL 2

0 8' 16' 24'

3/32" = 1'-0"

KEY NOTES

1

SHEET NOTES

1. SEE ARCHITECTURAL PLANS, SECTIONS AND

ELEVATIONS FOR EXACT EQUIPMENT AND DEVICE

LOCATIONS.

2. SEE ARCHITECTURAL PLANS FOR LOCATIONS OF

SOUND, SMOKE AND FIRE RATED WALLS.

3. COORDINATE ALL INSLAB CONDUITS AND ROUTING

WITH STRUCTURAL CONTRACTOR PRIOR TO

INSTALLATION

4. COORDINATE CEILING MOUNTED DEVICES WITH

ARCHITECTURAL AND REFLECTED CEILING PLANS.

2

3

4

5

6

7

8

E3.2

POW

ER P

LAN

- LEV

EL 2

OFCI ELECTRICAL VEHICLE CHARGING STATION.

SINGLE PORT CHARGING STATION WITH SAE

J1772-EV CONNECTORS ON 12' MINIMUM

SELF-RETRACTING CORDS. PROVIDE CONCRETE

BASE PER MANUFACTURER'S SPECIFICATIONS.

COORDINATE FINAL LOCATION WITH CIVIL. SIGN ON

CHARGING STATION TO READ: NO PARKING

ELECTRIC VEHICLE CHARGING ONLY. CHARGING

STATION TO CONTAIN INTEGRAL LOCKABLE

DISCONNECTS, PER NEC 625.42. COORDINATE

CHARGING STATION FEATURES WITH OWNER.

PROVIDE ADDITIONAL 1" CONDUIT FROM ELECTRIC

VEHICLE CHARGING STATION TO IT/PHONE ROOM

FOR CAT5E DATA CABLE. BASIS OF DESIGN: SQUARE

D EV230WSRR. COORDINATE FINAL LOCATION WITH

STRUCTURAL. PROVIDE (2) #8, (1)#10G UNLESS

OTHERWISE NOTED BY MANUFACTURER'S

SPECIFICATIONS

COORDINATE FINAL POWER REQUIREMENTS WITH

VENDOR CHOSEN. COORDINATE PATHWAY WITH

GENERAL CONTRACTOR. COORDINATE FINAL

LOCATION WITH ARCHITECT PRIOR TO INSTALLATION.

(1)2" CONDUIT.

PROVIDE (2)2" CONDUITS FROM ELEVATOR

CONTROLLER TO TOP OF HOISTWAY TO ELEVATOR

MOTOR.

OFOI SURVEILLANCE CAMERA. BASIS OF DESIGN IS

POE. PROVIDE (1) 1" CONDUIT BACK TO IT CABINET IN

MAIN ELECTRICAL ROOM. COORDINATE FINAL

LOCATIONS WITH CITY PRIOR TO INSTALLATION.

OFCI PARKING TICKET KIOSK. PROVIDE (1) 1"

CONDUIT WITH (2)#10 AND (1)#10 FOR POWER PER

CIRCUIT DESIGNATION. COORDINATE WITH FINAL

POWER REQUIREMENTS OF EQUIPMENT SELECTED

PRIOR TO INSTALLATION. COORDINATE FINAL

LOCATION OF EQUIPMENT WITH ARCHITECT.

OFCI PARKING TICKET KIOSK. PROVIDE (1) 1"

CONDUIT WITH PULL STRING BACK TO IT RACK.

PROVIDE (4) 4" CONDUIT SLEEVES TO MECHANICAL

ROOM BELOW OVER IT RACK. FIELD COORDINATE

FINAL LOCATION OF IT RACK PRIOR INSTALLATION.

PROVIDE 24" WALL MOUNTED LADDER RACK FOR

CABLE MANAGEMENT FROM 12" AFF OR EQUIPMENT

RACK TO 6" BELOW VERTICAL CONDUIT SLEEVE.

TYPICAL FOR ALL STORAGE/UTILITY ROOMS WITH

VERTICAL SLEEVES AS SHOWN.

PROVIDE PROTECTIVE COVER.

PROVIDE 1" CONDUIT AND BOX FOR 2-WAY

COMMUNICTIONS BACK TO MAIN IDF. PROVIDE 1"C

FROM MAIN COMMUNICATOR TO COMMUNICATOR ON

ABOVE LEVEL. POWER FOR MAIN COMMUNICATOR.

POWER FOR MAIN COMMUNICATOR TO SUPPLY 24

POWER TO SLAVE COMMUNICATORS ON FLOORS

ABOVE.

9

10

11

Page 3: KEY NOTES - City of Coeur d'Alene - Home Page · \\cda\project\2017\17176 cda parking garage\01 cad thursday, august 24, 2017 214 n 3rd st. coeur d' alene, idaho mwm richard m. stauffer

Xref .\Grid_R.dwg

CO

MP

AC

T

gov

VA

N

1

E3.3

2

E3.3

W

W

P3A-4

P3A-8

P3B-16

P3B-7

2

SD

WW

W W

P1A-12

P1A-12

P1B-12

P1B-12

9

9

9

9

4

3

P3A-11,13

3

4

P3B-18,20

7

9

9

2-WAY COMM

10

P3A

P3A-2

P3A-2

P3B

P3B-8

P3B-8

INVERTER2

1875 N. LAKEWOOD DRIVE, #201

COEUR D'ALENE, IDAHO 83814

(209) 676-8001 (209) 676-0100

601

FRO

NT

AVE.

STE

. 201

// C

OEU

R D

'ALE

NE,

ID 8

3814

// P

H 2

08+

664-

1773

SHEET NO.DRAWN BY:DESIGNED BY:PROJECT NO.:

REV. DATE DESCRIPTION0 8/25/

2017PERMIT SET

9/18/2017

BID SET

11/8/2017

PERMIT SET

STA

TE O

F ID

AHO

LIC

ENSED

ARC

HIT

ECT

1714

CL

DT

PARKI

NG

STR

UCTU

RE

PERM

IT S

ET11-0

8-1

7

\\CD

A\p

roje

ct\2

01

7\1

71

76

CD

A P

arking

Gar

age\

01

Cad

Thur

sday

, Aug

ust

24

, 2

01

7

214 N

3RD

ST.

CO

EUR D

' ALE

NE,

IDAHO

MWM

RICHA

RD M.

STAU

FFER

AR-13

76

11

-08

-17

SCALE :

POWER PLAN - LEVEL 3

0 8' 16' 24'

3/32" = 1'-0"

KEY NOTES

PROVIDE 120/208V 3KVA INVERTER WITH OUTPUT

BREAKERS AS REQUIRED. REFERENCE ONE LINE

DIAGRAM AND INVERTER PANEL SCHEDULE FOR

MORE INFORMATION. MYERS POWER PRODUCTS

EM-2 SERIES OR APPROVED EQUIVALENT.

PROVIDE (2)2" CONDUITS FROM ELEVATOR

CONTROLLER TO TOP OF HOISTWAY TO ELEVATOR

MOTOR.

OFCI PARKING TICKET KIOSK. PROVIDE (1) 1"

CONDUIT WITH (2)#10 AND (1)#10 FOR POWER PER

CIRCUIT DESIGNATION. COORDINATE WITH FINAL

POWER REQUIREMENTS OF EQIUPMENT SELECTED

PRIOR TO INSTALLATION. COORDINATE FINAL

LOCATION OF EQIUPMENT WITH ARCHITECT.

OFCI PARKING TICKET KIOSK. PROVIDE (1) 1"

CONDUIT WITH PULL STRING BACK TO IT RACK.

CONDUITS TO PARKING KIOSK,

PROVIDE (2) 4" CONDUIT SLEEVES TO MECHANICAL

ROOM BELOW OVER IT RACK. FIELD COORDINATE

FINAL LOCATION OF IT RACK PRIOR INSTALLATION

PROVIDE (2) 4" CONDUITS TO MECHANICAL ROOM.

CONDUITS TO PENETRATE THROUGH CEILING

BELOW FOR PATHWAY DOWN TO MAIN ELECT/IT

ROOM ON LEVEL-1.

PROVIDE 24" WALL MOUNTED LADDER RACK FOR

CABLE MANAGMENT FROM 12" AFF OR EQUIPMENT

RACK TO 6" BELOW VERTICAL CONDUIT SLEEVE.

TPYPICAL FOR ALL STRORAGE/UTILITY ROOMS WITH

VERTICAL SLEEVES AS SHOWN.

OFOI SURVEILLANCE CAMERA. BASIS OF DESIGN IS

POE. PROVIDE (1) 1" CONDUIT BACK TO IT CABINET

IN MAIN ELECTRICAL ROOM. COORDINATE FINAL

LOCATIONS WITH CITY PRIOR TO INSTALLATION.

PROVIDE 1" CONDUIT AND BOX FOR 2-WAY

COMMUNICTIONS BACK TO MAIN IDF.

PROVIDE 1"C FROM MAIN COMMUNICATOR TO

COMMUNICATOR ON ABOVE LEVEL. POWER FOR

MAIN COMMUNICATOR. POWER FOR MAIN

COMMUNICATOR TO SUPPLY 24 POWER TO SLAVE

COMMUNICATORS ON FLOORS ABOVE.

1

SHEET NOTES

1. SEE ARCHITECTURAL PLANS, SECTIONS AND

ELEVATIONS FOR EXACT EQUIPMENT AND DEVICE

LOCATIONS.

2. SEE ARCHITECTURAL PLANS FOR LOCATIONS OF

SOUND, SMOKE AND FIRE RATED WALLS.

3. COORDINATE ALL INSLAB CONDUITS AND ROUTING

WITH STRUCTURAL CONTRACTOR PRIOR TO

INSTALLATION

4. COORDINATE CEILING MOUNTED DEVICES WITH

ARCHITECTURAL AND REFLECTED CEILING PLANS.

SCALE : 1/2" = 1'-0"

ENLARGED MECHANICAL

LEVEL 30 1' 2' 4'

SCALE : 1/2" = 1'-0"

ENLARGED STORAGE

LEVEL 30 1' 2' 4'

1

2

1

E3.3

2

E3.3

7

3

4

5

5

E3.3

POW

ER P

LAN

- LEV

EL 3

6

7

7

6

8

8

8

9

10

4

5