KERETA API R INGAN / L IGHT RAIL TRANSIT
TERINTEGRASI DI WILAYAH JAKARTA, BOGOR, DEPOK DAN BEKASIMINISTRY OF TRANSPORTATION PT ADHI KARYA (Persero) Tbk.
KUNJUNGAN BANK INDONESIA2 3 M A R E T 2 0 1 7
LRT JABODEBEK G E N E R A L OV E R V I E W
C H A N G E SP E R P R E S 9 8 TA H U N 2 0 1 5 P E R P R E S 6 5 TA H U N 2 0 1 6
SUBSECTION 2
• 1st sentence: Aditional scope of work for Depo
• 2nd sentence: The use of rail road width of 1.435 mm
• 5th sentence: The construction work of Jabodebek LRT is constructed since signed PERPRESS
SUBSECTION 3
• The change of flow and process of contractual timeline in LRT JABODEBEK
SUBSECTION 7
• The payment will be done in every service lines. PT Adhi Karya(Persero) Tbk will be paid after finishing and constructing every service lines.
• The fund will be allocated from Anggaran Belanja KementerianPerhubungan
• The contract agreement is done by the ministry of finance
SUBSECTION 8
• The price includes the bank interest in construction period (during construction) and the payment period
SUBSECTION 14
• Having License from the related area that is passed by LRT JABODEBEK routes
SUBSECTION 16
• PT KAI have been assigned as means organizer, operator, and sustainers
COORDINATIONCHART
Menteri Perhubungan
PT. Adhi Karya (Persero),TbkPembangunan Prasarana LRT
Badan Usaha Penyelenggara LRT
*)TenderPasal 16
Konsultan Pengawas
Pasal 5
Badan Pengawas Keuangan
PembangunanPasal 8
Oversight Committee
Pasal 15
Kemen. BUMNPasal 10
Kemen Agraria & Tata Ruang
Pasal 12
Pemprov DKI, JabarPemkot
Bekasi,Bogor, Depok
Pasal 13,14
Kemen. PUPERAPasal 11
PERPRES 98/2015Percepatan Penyelenggaraan Kereta Api Ringan/ Light Rail Transit
Terintegrasi di Wilayah Jakarta, Bogor, Depok dan Bekasi
Oversight Committee
Subsection 15
The Ministry of BUMN
Subsection 10
The Ministry of PUPERA
Subsection 11
The Ministry of Agrarian &
SpatialSubsection 12
The Government of DKI, Jabar,
Pemkot Bekasi, Bogor, DepokSubsection 13,14
Konsultan Pengawas
Pasal 5
Project-Government Auditor
Subsection 8
PT. Adhi Karya (Persero),Tbk
Design & Build Contractor
PT. Kereta Api IndonesiaOperator
Keputusan Menteri Perhubungan RI
No. KP 408/2015
The Ministry of Transportation
DecisionNo. KP 408/ 2015
The ministry of Transporation
Supervising ConsultantSubsection 5
Accelerating the Implementation of Integrated Light Rail Transit (LRT) in Jakarta, Depok, and Bekasi Project
(Jabodebek LRT)
LRT JABODEBEK G E N E R A L OV E R V I E W
KABUPATEN BEKASI
KOTA BOGOR
KOTA DEPOK
KABUPATEN TANGERANG
KOTA TANGERANG
KOTA
TANGERANG
SELATAN
KABUPATEN BOGOR
PROVINSI DKI JAKARTA
KOTA BEKASI
Sta. Tanah Baru
Sta. Sentul Sirkuit
Sta. Cibinong
Sta. Ciracas
Sta. Kp. Rambutan
Sta. Taman Mini
14,3 km
18,3 km
10,5 km
7,8 km
25,0 km
Sta. Cibubur
LRT JABODEBEK G E N E R A L OV E R V I E W
TOTAL LENGTH - LRT : 81,6 KM
6 SERVICE LINE LRT Jabodebek1. Cawang - Cibubur: 14,3 km2. Cawang - Kuningan - D.Atas: 10,5 km3. Cawang – Bekasi Timur: 18,3 km4. D.Atas - Palmerah - Senayan: 7,8 km5. Cibubur - Bogor: 25,0 km6. Palmerah - Grogol: 5,7 km
SERVICE LINE 2016 2017 2018 2019
Cawang – Cibubur (SERVICE LINE 1)
Cawang – D. Atas (SERVICE LINE 2)
Cawang – Bekasi Timur (SERVICE LINE 3)
S C H E D U L E
1 s t P h a s e
2 n d P h a s e
Total of Stations : 16
Depo
1
Sta. TAMAN MINI
KM. 05+732
Sta. KP.RAMBUTAN
KM. 07+150
Sta. CIRACAS
KM. 08+770
Sta. CIBUBUR
KM. 14+230
TOTAL LENGTH
14,5 KM
NUMBER OF
STATION 4
LRT JABODEBEK S E R V I C E L I N E 1
2
Ciliwung
Sta. 01+407
Pancoran
Sta. 04+296
Kuningan
Sta. 06+048
Rasuna Said
Sta. 07+645
Setiabudi
Sta. 08+537
Dukuh Atas
Sta. 10+057
TOTAL LENGTH
10,5 KM
NUMBER OF
STATION 7
Cawang
Sta. 00+500
Cikoko
Sta. 02+100
LRT JABODEBEK S E R V I C E L I N E 2
3
Sta.
JATICEMPAKA
KM. 06+500
Sta. CIKUNIR 1
KM. 09+820
Sta. BEKASI BARAT
KM. 13+845
Sta. BEKASI TIMUR
KM. 18+000
Sta. CIKUNIR 2
KM. 11+081
NUMBER OF
STATION 5
TOTAL LENGTH
18,5 KM
LRT JABODEBEK S E R V I C E L I N E 3
SCOPE OFWORK
• Detail Design• System Integration• Civil Construction• Railway System
Manufacturing & Installation
• Study Demand• Alignment• Station Location• System Operation• Rolling Stock• Infrastructure (Civil &
Station)• Operation Facility • Depot
• Installation Test• Partial Acceptance Test• System Acceptance Test
• Technical Performance Test• Functional Performance
Test
DESIGN IMPLEMENTATION TESTING TRIAL RUNNING
“ADHI” as a Design & Bui ld Contractor
3LRT JABODEBEK S C O P E O F W O R K
\
Concrete Plinth for ballastless system
Evacuation lane Anti- derailment wall
LRT JABODEBEK T E C H N O L O G Y T R A C K W O R K
STATION VIEW
CAWANG STATIONTYPICAL STATION
• The minimum height for the building is 2700mm(PERMEN PU No.19/PRT/M/2011 )
• If there is an obstacle such as advertisement’ pole, the minimum distance is 2400 mm(PERMEN PU No.19/PRT/M/2011 )
• The distance to the main road is 5.1 m (PERMEN PU No.19/PRT/M/2011 )
LRT JABODEBEK T E C H N I C A L V I E WLRT JABODEBEK STATION
T E H C N I C A L D ATALRT JABODEBEK S TAT I O N
The shape of building is curve and futuristic to give
a modern look but it is going to be simple and
light as well. The surface of the building will be using a sandwich panel sticking to
the building frame. It will make an efficiency in
function and the use of material.
T E C H N I C A L V I E WLRT JABODEBEK STATION
RUTE 1: CIBUBUR – DUKUH ATAS
RUTE 2: BEKASI TIMUR – DUKUH ATAS
Bekasi Barat
Preliminary Operation PlanConcept of LRT Jabodebek Operation Plan
Bekasi Timur
LRT JABODEBEKPRELIMINARY OPERATION PLANCONCEPT OF LRT JABODEBEK OPERATION PLAN
Titik Integrasi
2. KAMPUNG RAMBUTAN STATION
1. DUKUH ATAS STATION
Keterangan:
Sky Bridge connects ST. Kampung Rambutan to Kp.
Rambutan terminal.
EXAMPLE
Note:
ST. Dukuh Atas is integrated with other mode of
transportation such as busway, krl, mrt, and so on.
LRT JABODEBEK INTEGRATION
THE PLAZA CONCEPT FOR MANAGING PASSENGERS
1. Stasiun Ciracas CIRACAS STATION
An access from the station to the plaza
B. Plaza As A Managing Area for Passengers
Plaza is used for a passenger transition area before or after going to the station building
A. A Connected Bridge by LRT
KUNINGAN STATION
A
B
PLAZA CONCEPT
A
BAn access from the station to the plaza
B. Plaza As A Managing Area for Passengers
Plaza is used for a passenger transition area before or after going to the station building
A. A Connected Bridge by LRT
LRT JABODEBEK STASION PLAZA
PLAZA CONCEPT
LRT JABODEBEK R E G U L A S I YA N G B E R L A K UPT ADHI KARYA (Persero) Tbk.
PT Adhi Karya (Persero) Tbk.
THANK YOUVisit us at www.adhi.co.id
For further information please contact:Ki Syahgolang Permata, Corporate Secretary
P. +62 21 797 5312 F. +62 21 797 5311 E. [email protected]
Disclaimer:Important Notice This document was prepared solely and exclusively for the parties presently being invited for the purpose of discussion. Neither this document nor any of its content may be reproduced, disclosed
or used without the prior written consent of PT Adhi Karya (Persero) Tbk.
This document may contain statements that convey future oriented expectations which represent the Company’s present views on the probable future events and financial plans. Such views arepresented on the basis of current assumptions, are exposed to various risks and are subject to considerable changes at any time. Presented assumptions are presumed correct, and based on thedata available on the date, which this document is assembled. The company warrants no assurance that such outlook will, in part of as a whole, eventually be materialized. Actual results maydiverge significantly from those projected. The information in this document is subject to change without notice, its accuracy is not verified or guaranteed, it may be incomplete or condensed andit may not contain all material information concerning the Company.
None of the Company, PT Adhi Karya (Persero) Tbk. or any person connected with any of them accepts any liability whatsoever for any loss howsoever arising from any use of this document or itscontents or otherwise arising in connection therewith.