Upcoming 2021 WorkKATS Policy Committee 9/30/2020

Page 2: KATS MDOT Project Presentation - WordPress.com

M-343 @ G AvenueRoundabout

Page 3: KATS MDOT Project Presentation - WordPress.com

Existing M-343/G Ave Intersection

Page 4: KATS MDOT Project Presentation - WordPress.com

Proposed M-343/G Ave Intersection

Page 5: KATS MDOT Project Presentation - WordPress.com
Page 6: KATS MDOT Project Presentation - WordPress.com

Project Overview

• Cost: $3.6 Million

• Construction June 2021-October 2021

• Maintaining Traffic Plan• M-343 will remain open (One lane in each direction)

• G Ave and 27th Street will be detoured.

• Reconstruction of M-343 & 28th Street Intersection• Cost $1.25 Million

• Construction April 2021-June 2021

Page 7: KATS MDOT Project Presentation - WordPress.com

I-94: Lovers Lane to Sprinkle RdReconstruction & Widening

Page 8: KATS MDOT Project Presentation - WordPress.com

Project Overview

• Cost: $77 Million

• Construction April 2021-October 2022

• I-94 widening 4 to 6 lanes

• Replacement of 5 structures

• Box Culvert replacement at Davis Creek

• Noise wall replacement

• Removal of Kilgore Road Bridge

• New interchange design at Portage Road

Page 9: KATS MDOT Project Presentation - WordPress.com

Existing I-94/Portage Road Interchange

Page 10: KATS MDOT Project Presentation - WordPress.com

Proposed I-94/Portage Road Interchange

Page 11: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – 2021 Stage 1A

Page 12: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – 2021 Stage 1A

WB I-94• Maintain 2 lanes on WB side

• Close entrance loop ramp from NB Portage Rd

EB I-94• Maintain 2 lanes crossed over on WB side

• EB crossed over from east of Lovers Lane to East of Sprinkle Rd

• Close both entrance ramps from Portage Rd

• Close exit ramp to Sprinkle Rd

Local Roads• Begin work on Kilgore Service Dr relocation

Page 13: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – 2021 Stage 1B

Page 14: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – 2021 Stage 1B

WB I-94

• Maintain 2 lanes on WB side

• Permanent closure of entrance loop ramp from NB Portage Rd

EB I-94

• Maintain 2 lanes crossed over on WB side

• Continue closure of both entrance ramps from Portage Rd

• Close exit ramp to Portage Rd

• Open exit ramp to Sprinkle Rd

Page 15: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – 2021 Stage 1B

Local Roads

• Continue work on Kilgore Service Dr relocation

• EB Kilgore, west of Portage, one lane open to crossover

• Total PERMANENT closure of Kilgore Rd from crossover easterly to Kilgore Service Drive

• Removal of Kilgore Rd bridge over I-94

Page 16: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – 2021 Stage 1C

Page 17: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – 2021 Stage 1C

WB I-94• Maintain 2 lanes on WB side

• Permanent closure of entrance loop ramp from NB Portage Rd

EB I-94• Maintain 2 lanes on EB side

• Open exit ramp to Portage Rd

• Continue closure of both entrance ramps from Portage Rd

Local Roads• Finish work on Kilgore Service Dr relocation

Page 18: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – Winter 2021/22

Page 19: KATS MDOT Project Presentation - WordPress.com

Maintaining Traffic Plan – Winter 2021/22

WB I-94

• Maintain 2 lanes on WB side

• Permanent closure of entrance loop ramp from NB Portage Rd

EB I-94

• Maintain 2 lanes on EB side

• Continue closure of entrance ramps from Portage Rd

Local Roads

• No closures

Page 20: KATS MDOT Project Presentation - WordPress.com

I-94: Lovers Lane to Sprinkle RdPosted Detour Routes

Page 21: KATS MDOT Project Presentation - WordPress.com

Posted detour route for NB Portage Rd access to WB I-94

Page 22: KATS MDOT Project Presentation - WordPress.com

Posted detour route for SB Portage Rd access to EB I-94

Posted detour route for NB Portage Rd access to EB I-94

Page 23: KATS MDOT Project Presentation - WordPress.com

Posted detour route for EB I-94 access to Portage Rd

Page 24: KATS MDOT Project Presentation - WordPress.com

I-94: Van Buren County Variable Speed Limits

Page 25: KATS MDOT Project Presentation - WordPress.com

Project Overview• Advises motorists of safe travel speeds due to changing

weather and road conditions• Anticipated launch winter 2021-2022

• Highest snowfall totals in Region• Highest percentage of commercial vehicles in Region• Crash rate 24 percent higher in winter than other 70 mph

routes• Speed differentials ranging from 20 to 45 mph before impact• 65 percent of crashes occurred when driving too fast for road

conditions

Page 26: KATS MDOT Project Presentation - WordPress.com

DMS Examples

• Dynamic Message Signs (DMS) can post a speed advisory, using text or an image, along with the reason why

• weather, congestion, incident, construction, etc.

Page 27: KATS MDOT Project Presentation - WordPress.com

Questions