KATA T Please no intended in their pr and proce relevant A Authorised ANA TUBULA ote this docume as a guide only roject documen edures for the s Australian Stan by Patented Fou BLAD AR STE ent has been p y for checking a ntation. This sp supply and inst dards. undations Pty Ltd DE PI EEL – K repared by Pat and inclusion b pecification out tallation of the d Copyright LE – KATAN Prepared b tented Foundat by a practising c tlines a minimu Katana Blade P 80kN SPECI A PILE y Patented Fou tions Pty Ltd. It consulting engi um set of stand Pile in accordan Pag N SWL FICATION ES undations Pty L ts use is ineer dards nce with the ISSUE 2.0 DATE: Novem ge 1 of 43 L td mber 2013

KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

KATA

T

Please no intended in their pr and proce relevant A

Authorised

ANA

TUBULA

ote this documeas a guide only

roject documenedures for the sAustralian Stan

by Patented Fou

BLAD

AR STE

ent has been py for checking antation. This spsupply and instdards.

undations Pty Ltd

DE PI

EEL – K

repared by Patand inclusion b

pecification outtallation of the

d Copyright

LE –

KATAN Prepared b

tented Foundatby a practising ctlines a minimuKatana Blade P

80kN

SPECI

A PILEy Patented Fou

tions Pty Ltd. Itconsulting engium set of standPile in accordan

Pag

N SWL

FICATION

ES undations Pty L

ts use is ineer

dards nce with the

ISSUE 2.0 DATE: Novem

ge 1 of 43

L

td

mber 2013

justin
Rectangle
justin
Rectangle
justin
Rectangle
justin
Rectangle
justin
Rectangle
justin
Rectangle
Page 2: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

CONTE

Clause

GENERAL

1. 2.

MATERIA

3. DESIGN ..

4. INSTALLAT

5. CERTIFICA

6.

• • • • •

ENTS

Page

.......................

SCOPE ............REFERENCES ..

LS ....................STEEL KATANA

........................DESIGN OF STE

TION ...............KATANA PILE IN

ATION ..............KATANA PILE C

Appendix A –Appendix B –Appendix C –Appendix D Appendix E –

Authorised

........................

........................

........................

........................A PILES .............

........................EEL KATANA PI

........................NSTALLATION .

........................CERTIFICATION

– Katana Pile– Product Co– Product Ge– Lateral Loa– Lateral Cap

by Patented Fou

........................

........................

........................

........................

........................

.........................LES ..................

........................

........................

........................

........................

e Specificatioorrosion Repeotechnical Tad Testing wpacity Graph

undations Pty Ltd

........................

........................

........................

.................................................

................................................

.........................

........................

.........................

........................

on port Testing Repo

with Bracing Ph’s

d Copyright

........................

........................

........................

........................

........................

................................................

........................

........................

........................

........................

ort Plate

........................

........................

........................

........................

........................

................................................

........................

........................

........................

........................

Pag

....... 1

.......... 1

......... 1

....... 2 ........... 2

........ 2 . 2

..... 3

.......... 3

.... 4

.......... 4

ge 2 of 43

Page 3: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

1

The work •

2

AS 1579 AS 2159 AS 2177 AS 2203.1AS 2207 AS 1163 AS 4100

AS/NZS 15

AS/NZS 15AS/NZS 36

Appendix Appendix Appendix Appendix

SCOPE

to be executed

Supply of steelInstallation of sDesign and cer

REFERENCES

Aust

1

Aust

553.1

554.1 678

Supp

A WeldB CorroC GeotD Braci

Authorised

TUBU

d under this Spe

Katana piles steel Katana pilrtification of Ka

ralian Standard

Arc Welded St Piling Design a Non Destructi Cored Electro Non Destructi Structural stee Steel structure

tralian/New Ze

Low Carbon StManganese St Welding of Ste Structural Stee

porting Docume

d Specificationsosion technical Test Ring Plate (Optio

by Patented Fou

ULAR ST

G

ecification cons

les tana piles.

ds

teel Pipes and Fand Installationve Testing – Rades for Arc-Weve Testing – Ultel hollow sectioes

ealand Standard

teel Electrodes teels eel Structures el - Hot-rolled P

entation

Results onal)

undations Pty Ltd

TEEL - K

GENERA

sists of:-

Fittings for Watn adiography of Welding trasonic Testin

ons

ds

for Manual Me

Plates, Floor pla

d Copyright

KATANA

L

ter and Waste W

Welded Butt Joi

g of Fusion We

etal-arc Weldin

ates and Slabs

A PILE

Water

nts in Metal

lded Joints in C

g of Carbon Ste

Pag

Carbon & Low A

eels & Carbon –

ge 3 of 43

Alloy Steel

Page 4: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

3 STE STEEL BLA

a) T

b) T

c)

d)

e)

f) T

g)

CORROSIO

Ston*A

4.

a)

b)

c)

d)

e)

f)

EEL KATANA

ADE PILES REQU

The steel Katanstrength of 4631554.1

The steel Katanmanufactured

Certification ofmanufacture ocompliance wit

Dimensions anin AS 1163-199 Weld specificatand developme

The use of unid

Once manufact

ON PROTECTION

eel Katana pilen the site corrosA division of Gil

DESIGN OF STE

The Katana pilestructural engi

The steel Katanalong with anySuitable geotec

Katana pile desof the Katana p

Katana pile deslength for the p

The maximum unless noted o

The Katana piledesign enginee

Authorised

PILES

UIREMENTS for

na pile shaft sha3MPa and a ten

na Pile bearing in accordance w

f materials - Tesof in accordanceth the Standard

d Tolerances – 91.

tions are to coment. Attached (

dentified or sec

tured Katana p

N TO BLADE PIL

s to be designesion classificatimore Engineer

EEL BLADE PILES

es when incorpneer with prev

na piles shall bey additional loadchnical informa

sign calculationpiles.

sign calculationparticular soil c

settlement of ttherwise on th

e connection toer.

by Patented Fou

M

r the 80kN KATA

all be made fronsile strength o

plates shall be with AS/NZS 15

st certificates se with AS/NZS 3d.

The steel hollo

mply with reporAppendix A)

cond hand steel

iles are to be vi

LES

ed in accordancon and design s Pty Ltd, resea

S

orated within aious experience

e designed in acds due to instalation will be sup

ns shall be supp

ns shall include conditions

the Katana pilee engineered d

o the footing or

undations Pty Ltd

MATERIA

ANA BLADE PIL

om “Orrocon Steof 490MPa, to A

made from stru554.1

hall be issued w3679.1 relating

ow sections sha

rt by e3K Globa

l is not to be us

isually inspecte

ce with AS 2159life. Refer “Kata

arch and develo

DESIG

a foundation sye in the use and

ccordance withllation misalignpplied and used

plied to project

a load eccentri

s under design drawings.

r structure over

d Copyright

LS

E

eel” circular hoAS 1163 manufa

uctural steel Gr

with the Katanato tests perfor

ll conform to th

al *A division of

sed. All steel sh

ed and approve

9 Section 6.3 wiana Blade Pile”opment. Attach

N

ystem must be dd design of stee

h AS 4100 and Ament, soil movd for design pu

engineers for t

city of 25mm a

working load s

r shall be part o

llow section stractured in accor

rade 400 or hig

a piles for the stmed by the ma

he manufacturi

f Gilmore Engin

all comply with

d.

th an allowancecorrosion maned (Appendix B

designed by a pel blade piles.

AS 2159 to carryement or pile srposes.

heir approval p

nd a realistic a

hall be as detai

of the design pr

Pag

ructural steel wrdance with AS

her to AS/NZS

teel used in theanufacturer to e

ing tolerances s

neers Pty Ltd, re

h AS 4100.

e for sectional nual by e3k GloB)

practising profe

y 80kN safe wosettlement if ap

prior to the man

llowance for ef

iled in AS 2159

rocess undertak

ge 4 of 43

with a yield S/NZS

and

e establish

specified

esearch

loss based bal

essional

orking load, pplicable.

nufacture

ffective

Table 8.2

ken by the

Page 5: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

5. KATA

KATANA P

a)

b)

c)

d)

e)

KATANA

f)

g)

h)

ANA PILE INST

PILES INSTALLAT

The Katana pilemonitored and

The Katana pile

Details of the pproject engine

During the storKatana piles dasole expense o

The piling continstallation torconcrete found Note: Installersrequest.

PILE INSTALLA

The maximum

The Katana pile

The maximum

Authorised

TALLATION

TION REQUIREM

es shall be instad recorded duri

es shall be insta

proposed Kataners for approva

rage, transportamaged or distoof the Contracto

tractor shall subrques and pile ddation being co

s are required t

ATION TOLERA

variation shall

e shaft shall be

variation of the

by Patented Fou

INS

MENTS

alled using specng installation.

alled by an expe

na pile installatial.

ation, lifting anorted in excess or.

bmit for approvdepths achievedompleted.

to be accredited

ANCES

be no more tha

installed vertic

e cut-off level s

undations Pty Ltd

STALLATI

cialised equipm

erienced accred

ion equipment

nd installation tof the specifie

val a record of td. The engineer

d by “Stoddart

an ± 25mm from

cally with a vari

shall be ± 25mm

d Copyright

ION

ment correctly c

dited “Katana P

and operator p

he Katana pilesd tolerances in

the initial “Rapir is required to

Foundations”.

m the plan pos

iation of not mo

m from that sho

alibrated to allo

Pile” contractor

proficiency shal

s shall be correcAS 1163-1991

d Load Test” vesign off on the

An install manu

ition as shown

ore than 4% fro

own on the draw

Pag

ow torque read

r.

ll be submitted

ctly supported.shall be replace

erification with install prior to

ual is available

on the drawing

om the vertical.

wings.

ge 5 of 43

ding to be

to the

Any steel ed at the

the

on

gs.

.

Page 6: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

6

a)

b)

KATANA

At the complecertification t

Kat

Kat

Kat

Design certifidefined by thapproved by

Authorised

A PILE CERTIF

etion of the Kto the project

tana piles hav

tana piles hav

tana piles sati

cation is to behe building codthe project en

by Patented Fou

CER

FICATION

atana piling wengineer or p

ve been design

ve been install

sfy all the req

e issued by a pde of Australiangineers prior

undations Pty Ltd

RTIFICAT

works the pilinprinciple cont

ned to carry t

led in accorda

quirements of

practising proa and is compr to the install

d Copyright

ION

ng contractor ractor.

he design load

ance with the

f AS 4100 and

ofessional strupetent and explation of the K

shall issue the

ds as shown o

engineered d

AS 2159

ctural / geoteperienced in KKatana piles.

Pag

e following

on the Drawin

design.

echnical enginKatana pile de

ge 6 of 43

ngs.

neer as esign and

Page 7: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

App

pendWeld Spec

Authorised

ix A cifications

Katana P

by Patented Fou

Pile Specifica

undations Pty Ltd

ation

d Copyright Pagge 7 of 43

Page 8: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Authorised by Patented Fouundations Pty Ltdd Copyright Pagge 8 of 43

Page 9: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Authorised by Patented Fouundations Pty Ltdd Copyright Pagge 9 of 43

Page 10: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Authorised by Patented Fouundations Pty Ltdd Copyright Pagee 10 of 43

Page 11: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Authorised by Patented Fouundations Pty Ltdd Copyright Pagee 11 of 43

Page 12: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

App

pendCorrosion

Authorised

ix B

Product

by Patented Fou

Corrosion R

undations Pty Ltd

Report

d Copyright Pagee 12 of 43

Page 13: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

App

pend Pile Testin

Authorised

ix C ng

Product a. Pile b. Pile c. Late

by Patented Fou

Geotechnica

Static Load TUplift Test

eral Load Tes

undations Pty Ltd

al Testing Re

Test

st

d Copyright

eport

Pagee 13 of 43

Page 14: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

INTROD A seriesunderta2009 sp - To est- To det- To det These tassump These tmore pa PILE TE

1) Install twLocate measurApply thDesign indicate75 perc

2)

Apply loindicateless thawith sphplate. Uapplicatthe pile of maxiother isthe loadconstru Arrange 1. 2. 3.

4.

DUCTION

s of ten comaken to prespecifications

tablish loadtermine captermine loa

tests will coptions and t

tests relatesarticularly, t

EST LOAD

REACTION

wo or morethese react

red betweenhe load to ththe reactio

ed in the cocent of maxi

LOAD APP oad with theed in the coan 25 perceherical bear

Use an autotion. Use a design loadmum gage

s specified ind test. Loadction.

e and const

Provide a leTo distributsufficient thbetween thnot less thaPlace the loload cell) bload beam.Construct taxis, to ens

Authorised

mpressive tesent a repors requireme

-deflection pacity of thed distributio

onfirm desighe pile des

s, but is notto the load c

S AND LOA

N FRAME

e reaction pition piles non the axis ohe pile by on frame andntract docuimum trave

PLICATION

e jack(s), hantract docu

ent of the tesring plates, matic load-pressure-gd indicated pressure. Pn the contra

d cell shall b

truct the ele

evel load trate load overhickness (16e capped p

an the size ooad applicaetween the. he system s

sure applica

by Patented Fou

ests, six latert of results ents. These

relationshipe pile-soil syon in the pile

n assumptiign to be m

t limited to, capacity of

AD APPLIC

les for the rot less than of the test pione or mored reaction pments withol of the jack

N SYSTEM

aving a capaments. Usest pile's maxto bear firmmaintainingage for the in the contr

Place a loadact documebe accurate

ements of th

ansfer plater the pile’s e6 mm minimpile and the of the pile btion systembearing pla

so that all cation of a co

undations Pty Ltd

eral tests anin accordan

e tests have

ps in the pileystem, and e-soil syste

ons or provodified.

a load capascrew piles

CATION SY

reaction fra3.0m from

ile and reace hydraulic jpiles to resisout undergo

k.

acity of at lee jacks with ximum cros

mly and cong pump withjack so tharact documd cell (eithents) to meato within 2%

he load-app

e perpendicentire crossmum) to pre

jack base. butt or less

m (including ate on the p

componentsoncentric ax

d Copyright

nd six pull nce with sta three prima

e-soil syste m.

vide informa

acity test fors supporting

YSTEMS

me after thethe test pile

ction piles. ack. st four timesoing a magn

east four tima minimum

ss-section dcentrically a

h manual suat the pressuents is betwr electric or

asure strains% of the ind

lication sys

cular to the ps-section, plevent bendinThe size ofthan the arehydraulic ja

pile and the

s are centrexial load.

out (tensionatic pile loadary objectiv

m,

ation to allow

r the footingg the footing

e installatione. These dis

s the pile denitude of de

mes the pilem travel of 15dimension. Eagainst the upplement toure reading ween one-fo

hydraulic, us for load mdicated load

tem as follo

pile axis. ace a solid ng as a beaf the solid stea covered ack, sphericcentre of th

d along the

Page

n) tests werd tests, AS ves:

w those

gs of buildings.

n of the tesstances are

esign load eflection exc

e design loa50 mm, butEquip the japile load trao control lo correspond

ourth and onunless one

monitoring dd and of sta

ows:

steel plate aring plate teel plate shby the jack

cal bearing he undersid

e pile's long

e 14 of 43

re 2159-

ngs, and

t pile. e

ceeding

ad t not ack(s) ansfer ad ding to ne-third or the uring ble

of

hall be k base. and

de of the

itudinal

Page 15: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

5.

PREPA

• •

• • • • •

Immediatelexists betwframe, test pile are illus

ARATION A

Clear the aProvide a the testing Constructiothe test arebe accurateAny excavaProvide cofrom wind, maintain a the durationProvide ade

Authorised

y before staween the loa

pile and apstrated in fig

AND MAINT

area surrounproperly deequipment

on plant thaea during thely monitoreations withinomplete pro

heavy raintemperatur

n of the testequate light

by Patented Fou

arting a loadad transfer ppparatus forgure 1. belo

TENANCE O

nding the teesigned levesafely and t may be ope course ofed in a safen the exclustection at ans, direct sre of not lest and providting for the

undations Pty Ltd

d test, verifyplate and lor testing theow

Figure 1.

OF TEST A

est pile, el platform with suitabl

perating elsf the pile tese environmesion zone aall times fosunlight, fross than 10°de a thermoduration of

d Copyright

y that at leaoad beam .Te load-bearin

AREA

of sufficienle access fo

sewhere on st so that thent, re prohibite

or the pile sost action, ° C and noometer to m

the test.

ast 25 mm oThe details ong capacity

nt plan dimor operativesite must be test pile's

ed, supports anand other t more thanonitor temp

Page

of clear spaof the react

y of the test

ensions to es, be excludeds performan

nd referencdisturbance

n 40° C thrperature,

e 15 of 43

ce tion screw

support

from nce can

ce beam es. Also oughout

Page 16: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

COMPR Load anspecifieperiod aload indpercentloading Cycle 1 2 Maintaireboundminimumay bereboundthe pile zero loa If the pidesigneremedia

RESSION T

nd unload thed in the conas physicalldicated in thtage of the cycles are

Pe1010

n each loadd from the pm period fo

e removed ad. When 15 has not faiad at the en

le fails befoer and the pal action, if

Authorised

TEST

he test pile ntract doculy possible. he contract pile design as follows:

ercent of Ma,20,30,40,5,20,30,40,5

d incrementprevious loaor maintaininafter having 50 percent oled, leave t

nd of Cycle

ore applicatpiling contraany.

by Patented Fou

incrementaments. AppThe maximdocumentsload. Magn

aximum Des50,60,70,8050,60,70,80

t until the dead incremenng a load inbeen main

of the desighis load in p2, maintain

ion of the 1actor should

undations Pty Ltd

ally in two cyply each loamum load ap

. The requirnitude and s

sign Load ,90,100,90,100,110

eflection ratnt, is less thncrement, htained for 2n load has place for 24 zero load a

50-percent d investigate

d Copyright

ycles, unlesd incremenpplied is at red load incsequence of

0,120,130,1

te under thehan 0.05 mmowever, is 3

2 hours, regbeen applie

4 hours. What least 1 ho

load, reboue the cause

ss an alternt to the pileleast 150% crements arf load incre

140,150

e applied loam in 10 min30 minutes ardless of r

ed during Cyhen the pile our.

und it to zers and unde

Page

ative procee in as short the pile dere expressements for th

ad, or rate outes. The and an incr

rate of defleycle 2, provhas reboun

ro load. Theertake appro

e 16 of 43

dure is t a sign

ed as a he two

of

rement ection or vided nded to

e pile opriate

Page 17: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

TENSIO

This tesperformreadingnomina

METHO

The Onmetres Rapid Lwas scrwith an hydraulensurineach teconside

GL

ON LOAD T

st has beenmance load cg obtained. Tated load be

ODOLOGY

n Site Rapidbelow grou

Load Test Drewed into tM36 lockinic jack. Loag pressure

est until suchered the fail

Authorised

Base Plate

Uplifting Testing S

Installed Scre

HolFixe

TEST

developedcapacity tesThe Katana

earing capac

d Load Test und surface.Device to bethe top of th

ng nut. Loadad was main

remained ch time load/ure point of

by Patented Fou

On Site

Load Stand

ew Pile

Pull RodThreaded High Tensile B

App

PulRod

Locking Nut

low Cylinder Jacked to Top Plate

to calibratests. The Kaa pile is thencity, as spe

consisted o. The pile to

e positionedhe test pile ed was then antained at econsistent fo/ pressure cf the test.

undations Pty Ltd

Rapid Load Test D

Bar

plied Load

ll Outd

LockinNut

CylinderAction

e individual tana pile is n tested to dcified by the

of a test pileop was 100

d over the toensuring fuapplied to th

each loadingor this periocould no lon

d Copyright

evice

10 mm Plate

Hollow HydraulicCylinder, Minimum 10 tload capacity

Hydraulic Coupling

ng

BracWeland

sites soil pinstalled to

determine we engineer.

e installed a0 mm clear op of the tesll embedmehe pile in ing incrementod of time. Tnger be mai

Hydraulic Hose Connectedto Hand Pump with Bar PressureGauge

cing Flange Plateded to Stand Leg Bottom Plate

Fig

roperties to a set depth

whether it ha

at a minimumof ground sst pile. The ent of threadcrements ut for a minimThe load wantained at w

Page

ure 2.

o actual h, with torquas maintain

m depth of surface enathreaded pd then locke

using a 20 tomum of 3 mas increasewhich point

e 17 of 43

ue ned the

2.0 bling ull rod ed off onne inutes d on is

Page 18: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

PROCE

1.

2. 3. 4. 5. 6. j7.

8. 9. 10. ACCEP

The “Rathe Katunder tcapacity

EDURE

Install the foundation Record therequired taPlace the base undermetres. Screw in thof the pile. Connect thJack ram, ptesting unitpersons shjacking. Once pre lotesting uninominated is ~ 100 % Maintain mminimum oRecord bardocument uWhere the displacemepassed the

PTANCE CR

apid Load Ctana piles lthe “Piling y in the nom

Authorised

first Katanadesign repo

e bar pressurget depth. Rapid Loadr the test un

he connectinFix in placee hand pumpre loading. This may ould be loc

oading is ct. Continueby the engof the calcuinimum con

of 5 minutesr pressuresusing phototested pile

ent for the me load requir

RITERIA

Capacity Teoad capaciCode” AS2

minated soil

by Patented Fou

a Pile to thort. ure achieve

d Testing Dnit. Note - T

ng threadede with lockinmp unit with the test devary depenated a mini

ompleted, te jacking raineer has bulated load-nstant press ensuring p

s achieved ographs andcontinues to

minimum timrements nom

est” enablety has bee

2159, has al strata, is 7

undations Pty Ltd

he minimum

ed on the m

Device oveTest is not s

d rod to theng nut as sh a calibrate

evice allowinding on themum of 3 m

that is no fuam until su

been achiev-bearing casure on pilepile does noon the sup

d video evido hold the r

me specifiedminated.

s the enginen met. It ma 1.3 facto

70% of the e

d Copyright

m target de

machine use

r the Katansuitable on

e full depth ohown in fig.1d bar pressng for pote

e extent of smetres clear

urther settleuch time thved. Typicapacity of the

e at load capot displace.plied record

dence. required load, it can be

neer / instalmust also beor of safetyend bearing

epth as no

ed for insta

na Pile, enpiles install

of the threa1 below. sure gauge. ntial settlem

soils beneatr of the test

ement can he requiredlly the mease pile. pacity requi

d sheets (re

ad capacity wconfirmed t

ller to satisfe noted tha

y. In other wg capacity.

Page

minated wi

allation whe

nsuring a leled at less t

aded slug in

ment at basth test unit. ing unit prio

be observed pier capasured uplift

rement for

efer append

with no the screw h

fy themselvat the pull owords the

e 18 of 43

ithin the

en at the

evel firm than 2.0

n the top

se of the All

or to

ed within acity as ting load

a

dix) and

as

ves, that out test, pull out

Page 19: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

LATER

This tescapacityon the b

METHO

The latapproximinimuapproxitonne wwas retmovemthe groumovemdial gaapplied

RAL LOAD T

st has beeny of verticalbasis of soi

ODOLOGY

teral load mately 2.0m of 1.0 mmately 100

winch in lineracted. Theents were mund surfaceent was meuge readin.

Authorised

TEST

developedl single pilesl failure, str

test setup 0 metres awmetre below0 mm above with a calie winch actemonitored ae to measureasured usgs were re

by Patented Fou

to determins has been uctural capa

seen in fway from aw the final e ground lebrated 5 to

ed by pullingat two pointre lateral deing dial gauecorded at

undations Pty Ltd

ne the laterdeterminedacity of the

figure 3. ba reaction depth of t

evel, wherenne scale mg the test pts at the teseflections auges with 0the same

d Copyright

ral capacity d from the lepile and de

elow conspile. The

the test pilee applied lomeasuring tile head tow

st pile top at the point o.01 mm acctime at ea

of the Kataeast of the veflection of t

isted of a reaction pie. Pile topsoads were ithe applied wards the ret a distanceof load appcuracy and

ach point a

Page

ana Pile. Thvalues calcthe pile hea

test pile le was inss were maimposed usloads as th

eaction pilee of 100 mm

plication. Th 150 mm tr

additional lo

e 19 of 43

e lateral culated ad.

installed stalled a aintained sing a 5 he winch . Lateral m above e lateral

ravel. All oad was

Page 20: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Te

PROCE

1. 2. 3.

4. 5. 6.

7.

8.

9. 10.

ACCEP The enconstruthis is th

SUMMA Test resLateral 20mm m Table 1

est No.

1 2 3 B4 5 F6 7 8 9

10 Note: T“TensioIn a reoverall

EDURE

Install test pRecord torqInstall a sin piles not le the axis of Screw in hiMount in linInstall dial point of loaBegin to ap scale. Main throughout Where requ removing aRecord rebResults of curve as pr

PTANCE CR

ngineer muction do nohe case a re

ARY OF TE

sults for Coloads are n

mark was th

A LocationSuburb

Jimboomba“

Browns Plai“

Flinders Vie“

Second Sit‘

Redbank

Test No.5 &on Test” theeal world seembedmen

Authorised

pile to requque readingngle reactioess than 2.0the test pilegh capacity

ne scale andgauges at

ad applicatiopply load byntain each test duratio

uired applieall applied lobound of tes

the lateral resented in

RITERIA

ust satisfy ot exceed teview of bra

EST RESUL

ompression nominated ahe point wh

Pile

a

ns

ew

te

& 9, did noten verified thetting a on

nt of 3 metre

by Patented Fou

ired target dg and documon pile after0m from thee and reactiy eye bolts td winch to pbase of tes

on. y retractingapplied loa

on. ed loads havoad from tesst pile on diaload test athe followin

themselveshe lateral loacing meas

LTS

and Tensileat a point where we still

e Depth(m) 2 2 2 2 2 3 2 3 2 3

t achieve rehe geotechne metre ex

es, which te

undations Pty Ltd

depth. ment at finar the installae test pile. on piles. to top of tespile tops best pile, with

winch, docad until sta

ve been reast pile. al gauge aftare to be prng field test

s, that the oading cap

sures must b

e give a “Ulthere we haachieve tot

Comprk141414127

1510141116

equire “Ultimnical failurextension wo

ested up to t

d Copyright

l depth instation of theThese dista

st pile and rtween test

h gauges m

cumenting tble, record

ached, relea

ter applied lresented inresults.

bracing repacity of thebe undertak

timate Geotd a 20mm dtal rebound

ressionN40404028

765302401569

mate Compe of the screould have the required

alled. e test pile. Lances are m

eaction pilepile and reaeasuring th

the applied ing deflecti

ase pressur

load removethe form o

equiremente installed sken.

technical Lodeflection wwhen load

LaterakN 3.2

3.3

2.9 3.5 3.8 4.8

pressive Loew pile at a been insta

d load, or be

Page

Locate the measured b

e. action pile. he deflectio

load on thion on dial

re from winc

ed. of a load de

ts of the iscrew piles

oad Capaciwithin the pip

was releas

al

oad” of 120a depth of 2 alled achievetter.

e 20 of 43

reaction between

on at the

e in line gauges

ch

eflection

ntended . Where

ty”. pe. The ed.

TensionkN

102

8951

115

76115

kN. The metres.

ving and

Page 21: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

LIMITA STA Coand thoSystemtime it wadvice

ATIONS

onsulting Enoroughness

ms Pty Ltd scwas prepareincluded in

Authorised

ngineers (Sof the cons

crew pile. Ited. No othethis report.

by Patented Fou

TA) has presulting profet is based o

er warranty e

undations Pty Ltd

epared this essional for n generallyexpresses o

d Copyright

report in acthe use of t

y accepted por implied, i

ccordance wthe Stoddarpractices ans made as

Page

with the usurt Foundationd standardto the profe

e 21 of 43

ual care on

ds at the essional

Page 22: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

D.C.PN'q:- PP:- U.T.P:

Terms

Sectio

.:- Dynamic C Allowable B Pocket Pe

:- Unable to Slope Dire

s :-

on 3 - Bore L

Bo

De

pth

(m

)

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Authorised

Cone PenetrometeBearing Capacity enetrometer StrenPenetrateection

Logs

ore Log S

Project Job N

Client: Stodda

De

pth

(m

)

Sam

ple

Lo

cati

on

Gro

un

dw

ate

r

Gra

ph

ic L

og

by Patented Fou

Notewithby M

er(kPa)

ngth (kPa)

heet

T

o. Testing

art Screw Pile

Sym

bo

ls

Exte

nt

of

Fill

END

SANSAN

SILT

SILT

(LigFria

Moi

(Gre

(Gre

Fine

SILTJus

SANDry

(GreDry

undations Pty Ltd

e : kPa value is h paper 'DetermM.J Stockwell (J

Test Loca

SO

Date

Dril

Bore Hole Te

D

NDY SILT (ML) (GreyNDY SILTY CLAY

TY CLAY

TY SANDY CLAY

ght Grey/Grey) Justable

st & Very Stiff

ey/ Yellow Brown)

ey/ Yellow Brown)

e Sands

TY CLAY (CH) (Gret Moist & Very Stiff

NDY SILTY CLAY (CIto Moist & Very St

ey/ Yellow)to Moist & Very St

d Copyright

allowable beariination of allowaune 1977)

ation # 1 -

OIL DESCRIP

e Drilled: 13th

l Method: Powe

erminated - 3.0m

y Brown)

t Moist & Stiff to Ve

Moist & Very Stiff

y Mottled Yellow)f

I) (Brown/ Grey)iff

iff

ng pressure cacable bearing pre

Pile # 1

PTION

November, 201

er Auger

ery Stiff

to Hard

Page

culated in accordessure under sm

12

D.C

.P b

low

s/ 1

00 m

m

PP

Val

ue

N'q

(kP

a)

280

300+

300+

300+

300+

e 22 of 43

danceall structures'

Nq

(k

Pa

)

Page 23: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

0

20

40

60

80

100

120

140

160

kN (Lo

kN (Lo

0

25

0

0

0

0

0

0

0

0

0

0 1

oad)

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

0

oad)

38

51

2 3

00.48

1

Authorised

64

76

4 5 6

Screw

2 3

S

by Patented Fou

89

6 7 8

mm

w Pile -

1.41.

4 5

Screw P

undations Pty Ltd

102

9 10

m (Displacem

- Comp

.762.04

5 6mm (Displ

Pile - Lat

d Copyright

115

11 12

ment)

pression

2.32.5

7 8acement)

teral Te

128

13 14 1

n Test

52

9

est

Page

15 16 17

2.722.9

10 11

Rebou(No

e 23 of 43

140

7 18 19

98

3.22

12

und = 11.64Change)

13

Page 24: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

S

D.C.P.:- DynN'q:- AlloPP:- PoU.T.P:- Un Slo

Terms :-

Section 3 - B

namic Cone Peneowable Bearing Caocket Penetrometeable to Penetrateope Direction

Bore Logs

Bore Lo

Project

Client: S

De

pth

(m

)

Sam

ple

Lo

cati

on

Gro

un

dw

ate

r

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Authorised

etrometerapacity (kPa)er Strength (kPa)

og Sheet

Job No. Testin

Stoddart ScrewG

rou

nd

wat

er

Sym

bo

ls

Exte

nt

of

Fill

Gra

ph

ic L

og

by Patented Fou

Note : kPa vawith paper 'Dby M.J Stock

Test L

ng

w Pile

Bore

y

END

SANDY SILT (MSANDY SILTY C

SILTY CLAY

SILTY SANDY C

(Light Grey/GrFriable

Moist & Very S

(Grey/ Yellow B

(Grey/ Yellow B

Fine Sands

SILTY CLAY (CJust Moist & V

SANDY SILTY CDry to Moist &

(Grey/ Yellow)Dry to Moist &

undations Pty Ltd

alue is allowableDetermination ofkwell (June 1977)

Location #

SOIL DES

Date Drilled

Drill Method

e Hole Terminated

ML) (Grey Brown)CLAY

CLAY

ey) Just Moist & St

Stiff

Moist & VeBrown)

Brown)

CH) (Grey Mottled YVery Stiff

CLAY (CI) (Brown/ Very Stiff

Very Stiff

d Copyright

e bearing pressuf allowable bear)

# 1 - Pile #

SCRIPTION

: 13th Novemb

d: Power Auger

- 3.0m

tiff to Very Stiff

ery Stiff to Hard

Yellow)

Grey)

ure caculated in ring pressure un

# 2

er, 2012

r

PP

Val

ue

280

300+

300+

300+

300+

Page

accordanceder small structu

D.C

.P b

low

s/ 1

00 m

m

N'q

(k

Pa

)

e 24 of 43

ures'

Page 25: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

1

1

1

1

kN (Lo

0

25

38

51

0

20

40

60

80

00

20

40

60

0

oad)

1

64

5

Authorised

76

8

10

Scre

by Patented Fou

9

1

15m

ew Pile

undations Pty Ltd

102

20mm (Displace

- Comp

d Copyright

115

25ement)

pression

12

30

n Test

Page

8

35

e 25 of 43

140

40

kN253851647689102115

Tension Te

45

HoldYesYesYesYesYesYesYesNo

est

Page 26: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

S

D.C.P.:- DynN'q:- AlloPP:- PoU.T.P:- Un Slo

Terms :-

Section 3 - B

namic Cone Peneowable Bearing Caocket Penetrometeable to Penetrateope Direction

Bore Logs

Bore Lo

Project

Client: S

De

pth

(m

)

Sam

ple

Lo

cati

on

Gro

un

dw

ate

r

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Authorised

etrometerapacity (kPa)er Strength (kPa)

og Sheet

Job No. Testin

Stoddart Screw

Gro

un

dw

ate

r

Sym

bo

ls

Exte

nt

of

Fill

Gra

ph

ic L

og

by Patented Fou

Note : kPa vawith paper 'Dby M.J Stock

Test L

ng

w Pile

Bore

y

END

SANDY SILT (Y

SANDY SILTY C(Yellow Brown

Dry to Moist an

EXTREMELY W(Yellow/ Light Moderately St

Moist and stiff

Moist and MedFine to Medium

Moist and stiff

undations Pty Ltd

alue is allowableDetermination ofkwell (June 1977)

Location #

SOIL DES

Date Drilled

Drill Method

e Hole Terminated

Yellow/ Brown Grey

CLAYn/ Red Grey)

nd stiff to Very Stif

WEATHERED ROCKBrown) Dry to Morong

f

dium Densem Sands Some C

f Some fine to me

d Copyright

e bearing pressuf allowable bear)

# 2 - Pile #

SCRIPTION

: 13th Novemb

d: Power Auger

- 2.0m

y)

ff

ist and Weak to

Clay Fines

edium gravels thro

ure caculated in ring pressure un

# 3

er, 2012

r

PP

Val

ue

oughout 180

220

220

Page

accordanceder small structu

D.C

.P b

low

s/ 1

00 m

m

N'q

(k

Pa

)

33344543443454454

90

120

100

100

110

e 26 of 43

ures'

Page 27: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

2

4

6

8

10

12

14

16

kN (Lo

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

kN (Lo

0

25

3

0

20

40

60

80

00

20

40

60

0 1

oad)

0

0.5

00

50

00

50

00

50

00

50

00

50

0 1 2

ad)

8

51

64

2

1.08

2 3 4 5

Authorised

76

3 4

Screw

1.54

1

6 7 8

Sc

by Patented Fou

89

102

5

m

w Pile -

1.98

9 10 11mm

crew P

undations Pty Ltd

2

11

6 7

mm (Displace

- Comp

2.44

12 13 14 1(Displaceme

ile - Lat

d Copyright

15

1

8 9

ment)

ression

42.9

15 16 17 1ent)

teral Te

28

9 10

n Test

3.5

18 19 20 21

est

Reb

Page

11 12

54

1 22 23 24

bound = 20.

e 27 of 43

140

13

4.06

4 25 26

5mm

14

Page 28: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

S

D.C.P.:- DynN'q:- AlloPP:- PoU.T.P:- Un Sl

Terms :-

Section 3 - B

namic Cone Peneowable Bearing Caocket Penetrometenable to Penetrateope Direction

Bore Logs

Bore Lo

Project

Client: S

De

pth

(m

)

Sam

ple

Lo

cati

on

Gro

un

dw

ate

r

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Authorised

etrometerapacity (kPa)er Strength (kPa)

og Sheet

Job No. Testin

Stoddart Screw

Gro

un

dw

ate

r

Sym

bo

ls

Exte

nt

of

Fill

Gra

ph

ic L

og

by Patented Fou

Note : kPa vawith paper 'Dby M.J Stock

Test L

ng

w Pile

Bore

y

END

SANDY SILT (Y

SANDY SILTY C(Yellow Brown

Dry to Moist an

EXTREMELY W(Yellow/ Light Moderately St

Moist and stiff

Moist and MedFine to Medium

Moist and stiff

undations Pty Ltd

alue is allowableDetermination ofkwell (June 1977)

Location #

SOIL DES

Date Drilled

Drill Method

e Hole Terminated

Yellow/ Brown Grey

CLAYn/ Red Grey)

nd stiff to Very Stif

WEATHERED ROCKBrown) Dry to Morong

f

dium Densem Sands Some C

f Some fine to me

d Copyright

e bearing pressuf allowable bear)

# 2 - Pile #

SCRIPTION

: 13th Novemb

d: Power Auger

- 2.0m

y)

ff

ist and Weak to

Clay Fines

edium gravels thro

ure caculated in ring pressure un

# 4

er, 2012

r

PP

Val

ue

oughout 180

220

220

Page

accordanceder small structu

D.C

.P b

low

s/ 1

00 m

m

N'q

(k

Pa

)

33344543443454454

90

120

100

100

110

e 28 of 43

ures'

Page 29: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

2

4

6

8

10

12

14

16

kN (Lo

00

20

40

60

80

00

20

40

60

0 1

ad)

25

38

1 2

Authorised

51

6

3

Scre

by Patented Fou

64

76

4 5m

ew Pile

undations Pty Ltd

6

89

6mm (Displace

- Comp

d Copyright

102

7 8ement)

pression

115

9

n Test

Page

5

10 11

e 29 of 43

128

12

kN253851647689102

Tension T

13

HoldYesYesYesYesYesYesNo

Test

Page 30: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

DN

PU

T

Se

D.C.P.:- DynaN'q:- Allow

PP:- PockU.T.P:- Unab

Slop

Terms :-

ection 3 - Bo

amic Cone Penetwable Bearing Ca

ket Penetrometeble to Penetratepe Direction

ore Logs

Bore Lo

Project

Client:

De

pth

(m

)

Sam

ple

Lo

cati

on

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Authorised

rometerapacity (kPa)

r Strength (kPa)

og Sheet

t Job No. Test

Stoddart Scre

Gro

un

dw

ate

r

Ex

ten

t o

f F

ill

Gra

ph

ic L

og

by Patented Fou

Note : kPwith papby M.J St

t

Tes

ting

ew Pile

Sy

mb

ols

END

SILTY CL

Dry to Mo

Moist &

(Brown)Moist &

SEEPAG

undations Pty Ltd

Pa value is alloper 'Determinattockwell (June 1

st Locatio

SOIL D

Date D

Drill Me

Bore Hole Termi

LAY

oist & Stiff

Firm

Firm

E ENCOUNTERE

d Copyright

owable bearingtion of allowab1977)

on # 3 - Te

DESCRIPTI

rilled: 13th No

ethod: Power

inated - 3.0m

ED

g pressure cacble bearing pre

est Pilse

ION

ovember, 2012

Auger

Page

culated in accoessure under s

# 5 & #6

2

D.C

.P b

low

s/ 1

00 m

m

PP

Val

ue

()

0110011112112

e 30 of 43

ordancesmall structure

N'q

(kP

a )

10

20

30

es'

Page 31: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

kN

000

20

40

60

80

100

120

140

160

180

0

N (Load)

25

38

551

64

5

Authorised

51

64

76

89

10

Sc

by Patented Fou

9

102

15

crew Pil

2m

undations Pty Ltd

76

115

20

mm (Displa

e - Com

Screw Pile

d Copyright

128

0 2

acement)

pressio

2

140

5 3

n Test

3m

kN25385164

Tension Te2 Metre Screw

Page

153

30

m Screw Pile

HoldYesYesYesNo

estw Pile

e 31 of 43

3

35

kN253851647689102115

Tension 3 Metre Scre

40

HoldYesYesYesYesYesYesYesYes

Testew Pile

Page 32: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

S

D.C.P.:- DyN'q:- All

PP:- PoU.T.P:- Un S

Terms :-

Section 3 - B

ynamic Cone Peneowable Bearing C

ocket Penetrometnable to Penetratelope Direction

Bore Logs

Bore L

Proje

Clien

De

pth

(m

)

Sa

mp

le L

oca

tio

n

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Authorised

etrometerCapacity (kPa)

ter Strength (kPae

Log Shee

ect Job No. Tes

t: Stoddart Sc

Gro

un

dw

ate

r

Ex

ten

t o

f F

ill

Gra

ph

ic L

og

by Patented Fou

Note : kwith paby M.J Sa)

et

Tes

sting

crew Pile

Sy

mb

ols

END

SILTY C

EXTREM

(BrownDry to M

Silt & SaFriable

Friable

(BrownMoist &

undations Pty Ltd

kPa value is allper 'Determina

Stockwell (June

st Locatio

SOIL

Date D

Drill M

Bore Hole Term

CLAY

MELY WEATHER

n)Moist & Stiff

and Increase

n)& Weak

d Copyright

owable bearingation of allowab1977)

on # 4 - T

DESCRIPT

Drilled: 13th N

Method: Power

minated - 3.0m

RED ROCK

g pressure cacble bearing pre

est Piles

ION

ovember, 2012

r Auger

Page

culated in accoessure under s

# 7 & # 8

2

D.C

.P b

low

s/ 1

00 m

m

PP

Val

ue

N'q

(kP

a)

2333332233434

e 32 of 43

ordancemall structures

8

N'q

(kP

a )

70

80

60

90

s'

Page 33: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

1

1

1

1

kN (L

kN

0

25

38

0

51

64

0

20

40

60

80

100

120

140

160

0

Load)

0.66

0.6

0.761.

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

0

(Load)

51

76

89

5

1.021.28

241.56

5

Authorised

64

102

11

10

Scre

8

1.9

2.23

10

S

by Patented Fou

7

5

128

15

ew Pile

2.5

2.89

15mm

Screw P

undations Pty Ltd

76

140

20mm (Displace

- Comp

3

54

3.4

5m (Displaceme

Pile - La

d Copyright

89

25ement)

pression

m Screw Pil

3

44

20ent)

teral Te

9

30

n Test

le

25

est

Page

0 3

2m Scre

4.1

4.64

30

Rebo

Rebo

e 33 of 43

102

35

ew Pile

15

35

2m Scre

3m Scre

ound = 31.47

ound = 32.47

40

ew Pile

ew Pile

7

7

Page 34: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

D.C.P.:- N'q:- PP:- U.T.P:-

Terms :-

Section 3

Dynamic Cone PAllowable Bearin Pocket Penetro Unable to Penet Slope Direction

- Bore Logs

Bore

Pro

Cli

De

pth

(m

)

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Authorised

Penetrometerng Capacity (kPameter Strength (ktrate

s

e Log She

oject Job No.

ent: Stoddart

Sam

ple

Lo

cati

on

Gro

un

dw

ate

r

Gra

ph

ic L

og

by Patented Fou

Notewith by M

)kPa)

eet

T

Testing

Screw Pile

Sy

mb

ols

Ex

ten

t o

f F

ill

END

SILT

EXTR

(BroDry

Silt

Fria

(BroMois

undations Pty Ltd

e : kPa value ispaper 'Determ

M.J Stockwell (Ju

Test Loca

SO

Dat

Dri

Bore Hole T

D

TY CLAY

REMELY WEATH

own)to Moist & Stiff

& Sand Increase

ble

own)st & Weak

d Copyright

s allowable beamination of alloune 1977)

ation # 5 -

OIL DESCRI

te Drilled: 13th

ll Method: Pow

Terminated - 3.0m

HERED ROCK

e

aring pressure owable bearing

- Test Pile

PTION

h November, 2

wer Auger

m

Page

caculated in a pressure und

e # 9 & #

2012

D.C

.P b

low

s/ 1

00 m

m

PP

Val

ue

2343343234434

e 34 of 43

accordanceer small struct

10

N'q

(k

Pa

)

23433432

4434

80

90

70

100

tures'

Page 35: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

1

1

1

1

1

kN (L

kN

0

25

3

0

25

38

0

20

40

60

80

100

120

140

160

180

0

Load)

0

0.50

0.60.76

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

0

(Load)

38

51

51

64

76

5

0.66

1.0

1.24

Authorised

64

89

102

Scre

21

1.56

2

5

S

by Patented Fou

76

115

128

10m

ew Pile

1.28

1.9

.23

10

Screw P

undations Pty Ltd

89

140

15mm (Displace

- Comp

2.54

2.89

0mm (Displac

Pile - La

d Copyright

10

153

ment)

pression

4

3.44

15cement)

teral Te

2 02

169

20

n Test

3

est

kN H253851647689

Tension TeMetre Screw

Page

115

25

3

4.15

4.64

20

2

3

Rebound

Rebound

HoldYesYesYesYesYesNo

estw Pile

e 35 of 43

3

m Screw Pil

2m Screw P

5

2m Screw Pi

3m Screw Pi

d = 21.28

d = 19.56

kN253851647689102115

Tension T3 Metre Scre

30

e

Pile

25

ile

ile

HoldYesYesYesYesYesYesYesYes

Testew Pile

Page 36: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

App

pendBracing Pla

Authorised

ix D ate (Optional

Lateral L

by Patented Fou

l)

Load Testing

undations Pty Ltd

g with Bracin

d Copyright

g Plate

Pagee 36 of 43

Page 37: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

INTROD A serieswith, AS To These tfootings LATER

This tescapacityon the b

METHO

The lateapproximinimuapproxitonne wwas retmovemthe groumovemdial gauapplied

PROCE

1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

DUCTION

s of two lateS 2159-200

determine

tests relatess.

RAL LOAD T

st has beeny of verticalbasis of soi

ODOLOGY

eral load tesmately 2.0 m of 1.0 memately 100

winch in lineracted. Theents were mund surfaceent was me

uge reading.

EDURE

Install test Record torqInstall a sinpiles not lesthe axis of Screw in hiMount in linInstall dial gpoint of loaBegin to apscale. Mainthroughout Where requremoving aRecord rebResults of tcurve as pr

Authorised

eral tests we09 specificat

capacity of

s to the late

TEST

developedl single pilesl failure, str

st setup seemetres awaetre below t

0 mm abovee with a calibe winch actemonitored ae to measureasured usigs were reco

pile to requque readingngle reactionss than 2.0the test pilegh capacity

ne scale andgauges at b

ad applicatiopply load byntain each a

test duratiouired applie

all applied lobound of testhe lateral loresented in

by Patented Fou

ere undertations require

the bracing

eral load cap

to determins has been uctural capa

en in figure ay from a rethe final dep

e ground levbrated 5 toned by pullingat two pointsre lateral deng dial gauorded at the

ired target dg and documn pile after tm from the

e and reactiy eye bolts td winch to p

base of test on. y retracting wapplied loadon. ed loads havoad from tesst pile on diaoad test arethe followin

undations Pty Ltd

aken to presements. Th

g pile.

pacity of the

ne the laterdeterminedacity of the

3. below coeaction pile.pth of the tevel, where anne scale mg the test ps at the test

eflections atges with 0.0

e same time

depth. ment at finathe installattest pile. Thon piles. to top of tespile tops bepile, with g

winch, docud until stable

ve been reast pile. al gauge afte to be presng field test

d Copyright

sent a reporhe test objec

e bracing K

ral capacity d from the lepile and de

onsisted of . The reactiest pile. Pileapplied loadmeasuring thile head towt pile top at t the point o01 mm accue at each po

al depth insttion of the tehese distan

st pile and retween test gauges mea

umenting the, recording

ached, relea

ter applied sented in the

results.

rt of results ctives where

atana pile s

of the Kataeast of the veflection of t

a test pile inon pile was

e tops were ds were imphe applied lwards the rea distance f load appliuracy and 1oint addition

alled. est pile. Locces are me

eaction pilepile and rea

asuring the d

he applied log deflection

ase pressur

load remove form of a

Page

in accordae:

supporting t

ana Pile. Thvalues calcthe pile hea

nstalled s installed a

maintainedposed usingoads as the

eaction pileof 100 mm cation. The

150 mm travnal load was

cate the reaeasured betw

e. action pile. deflection a

oad on the on dial gau

re from winc

ved. load deflec

e 37 of 43

nce

the

e lateral culated ad.

d a 5 e winch . Lateral above

e lateral vel. All s

action ween

at the

in line uges

ch

ction

Page 38: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

ACCEP The engconstruthis is t

SUMMA Test resLaterial20mm m Table 1

Test N

1 2

PTANCE CR

gineer mustction do nothe case a

ARY OF TE

sults for Co loads are nmark was th

A No.

Br

Authorised

RITERIA

t satisfy theot exceed th review of

EST RESUL

ompression nominated ahe point wh

Location Suburb

rowns Plain“

by Patented Fou

emselves, the lateral loabracing m

LTS

and Tensileat a point were we still

ns

undations Pty Ltd

hat the bracading capaceasures m

e give a “Ultwhere we ha

achieve tot

Pile D(m22

d Copyright

cing requirecity of the in

must be und

timate Geotad a 20mm tal rebound

epthm)

ments of thnstalled scredertaken.

technical Lodeflection wwhen load

Page

e intended ew piles. W

oad Capaciwithin the piwas releas

LateralkN

8.35 8.61

e 38 of 43

Where

ty”. ipe. The ed.

Page 39: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

D.C.P.:- N'q:-

PP:- U.T.P:-

Terms :-

Section 3

LIMITA STA Coand thoSystemat the tiprofess

Dynamic Cone Pen Allowable Bearing

Pocket Penetrome Unable to Penetra Slope Direction

- Bore Logs

Bore L

Proje

Clien

De

pth

(m

)

Sa

mp

le L

oc

atio

n

0

1.0

1.5

0.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

ATIONS

onsulting Enoroughness

ms Pty Ltd ame it was p

sional advice

Authorised

netrometerCapacity (kPa)

eter Strength (kPa)te

Log Sheet

ect Job No. Test

nt: Stoddart Scre

p

Gro

un

dw

ate

r

Ex

ten

t o

f F

ill

Gra

ph

ic L

og

ngineers (Sof the consnd Katana P

prepared. Ne included i

by Patented Fou

Note : kPa with paper by M.J Stock

Test L

ting

ew Pile

Bo

Sy

mb

ols

END

SILTY CLAY

EXTREMELY

(Brown)Dry to Moist

Silt & Sand Friable

Friable

(Brown)Moist & We

TA) has presulting profePile. It is bao other warn this repor

undations Pty Ltd

value is allowabl'Determination okwell (June 1977)

Location #

SOIL DES

Date Drilled

Drill Method

re Hole Terminated

Y

Y WEATHERED RO

t & Stiff

Increase

eak

epared this essional for ased on genrranty exprert.

d Copyright

e bearing pressuof allowable beari

# 1 - Test P

CRIPTION

d: 13th Novembe

d: Power Auger

- 3.0m

OCK

report in acthe use of t

nerally acceesses or im

ure caculated in ang pressure und

Piles # 1 & #

er, 2012

D.C

.P b

low

s/ 1

00 m

m

PP

Val

ue

2333332233434

ccordance wthe Stoddar

epted practicplied, is ma

Page

accordanceer small structur

# 2

N'q

(k

Pa

)

2333332233434

70

80

60

90

with the usurt Foundatioces and sta

ade as to the

e 39 of 43

res'

ual care on andards e

Page 40: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Lateral Lo

TotaTotal D

Lo

oading - Test

al Rebound Displacement

--------

8.357.126.064.823.762.662.081.460.82

oad (kN)

Authorised

t Location #

No Rt

Disp

WITH

by Patented Fou

T

1 - Test Piles

Rebound obser20.18

--------

20.1817.5514.8111.849.26.444.071.96

-

placement (m

BRACING PL

undations Pty Ltd

Test Resul

s # 1 & # 2

rvedT

mm)

LATE

d Copyright

ts

Total RebouTotal Displace

8.617.917.426.886.365.685.144.623.983.543.042.662.241.921.61.31.020.34

Load (kN)

undement

W)

Page

No Rebound 19.5719.5718.5217.2816.0014.6413.2211.7710.388.987.606.254.913.632.401.180.000.00

-

DisplacemeWITH BRACIN

e 40 of 43

observed772804278805130800

ent (mm) NG PLATE

Page 41: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

App

pendLateral Cap

Authorised

ix E pacities

a) Clayb) Sand

by Patented Fou

Prod

y d

undations Pty Ltd

duct Lateral

d Copyright

Capacities

Pagee 41 of 43

Page 42: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Authorised by Patented Fouundations Pty Ltdd Copyright Pagee 42 of 43

Page 43: KATANA BLADE PI LE – 80kN SWL€¦ · pile-soil sy n in the pile n assumpti ign to be m limited to, apacity of D APPLIC les for the r t less than f the test pi ne or more reaction

Authorised by Patented Fouundations Pty Ltdd Copyright Pagee 43 of 43