Upload
vonguyet
View
271
Download
6
Embed Size (px)
Citation preview
KARNATAKA POWER CORPORATION LIMITED.
( Raichur Thermal Power Station ) LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE : CQE(T) Ref : ED(CA) & CS Ltr.No.A1R5A (R1A) Dated. 07.05.14
ADDRESS : RTPS – KPCL, SHAKTINAGAR.
Sl.No. File No. Subject Opening date of
File
Closing Date of
file/Running File.
Date of Transformer
file Authority
whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
1 CQET/P1A/ General File 01.10.1999 Running -
permanent 2 CQET/P1B Deputation/Representation 22.03.2005 Running. - permanent
3 CQET/P1C Recruitment 23.09.2005 Running. - permanent
4 CQET/P1D Promotions 20.08.2005 Running. - permanent
5 CQET/P1E Transfers. 18.12.199 Running. - permanent
6 CQET/P1F Leave 14.10.2006 Running. - permanent
7 CQET/P1G Increments. 28.09.1998 Running. - permanent
8 CQET/P1H Advances. 19.08.2003 Running. - permanent
9 CQET/P1I Compensation. 17.01.2000 Running. - permanent
10 CQET/P1J Overtime. 04.10.2007 Running. - permanent
11 CQET/P1K Other benefits. - Running.- - permanent
12 CQET/P2B Training. 22.03.2005 Running. - permanent
13 CQET/P2C Welfare. - - - -
14 CQET/P2D Discipline. 16.11.2003 Running. - permanent
15 CQET/P2E Retirement 19.04.2006 Running. - permanent
16 CQET/P1B Power 29.03.1980 Running. - permanent
17 CQET/P1C2 Water. 29.03.1980 Running. - permanent
18 CQET/P1D2A Telephone 10.04.1997 Running. - permanent
19 CQET/P1A2B Vehicle. 15.11.2007 Running. - permanent
20 CQET/B2T Railway. Running. - permanent
21 CQET/A2D Hiring. Running. - permanent
22 CQET/A3B Rents. Running. - permanent
23 CQET/A3C Taxes Running. - permanent
24 CQET/A3D Repairs - Maintenance Running. - permanent
25 CQET/A4B Municipal services. Running. - permanent
26 CQET/A4C Dispensaries. 05.09.2005 Running. - permanent
27 CQET/A5B Stationery. 10.07.1981 Running. - permanent
28 CQET/A5C Printing. -
29 CQET/A5D Furniture. 24.09.1980 Running. - permanent
30 CQET/A5E Office equipments. 24.03.1980
31 CQET/A5F Book & Periodicals. Running. - permanent
32 CQET/A5G Petty purchases. 24.09.1981 Running. - permanent
33 CQET/A6B Tour Programmers. 08.09.1982 Running. - permanent
34 CQET/A6C Noties/ compliance. Running. - permanent
35 CQET/A7A Security. Running. - permanent
36 CQET/A7B Police. Running. - permanent
37 CQET/A7C Watch & Ward. Running. - permanent
38 CQET/A7D Civil Defences. Running. - permanent
39 CQET/A7E Safety of employees. 27.03.2008 Running. - permanent
40 CQET/A7F Thefts. Running. - permanent
41 CQET/Q2D Travelling allowance. Running. - permanent
42 CQET/Q2E Pension. 16.03.1983 Running. - permanent
43 CQET/Q3E Motor car/Cycle advance. 19.08.2003 Running. - permanent
44 CQET/Q3F Providient fund recoveries.
19.08.2003 Running. - permanent
45 CQET/Q3G Insurance recoveries. 29.11.1982 Running. - permanent
46 CQET/Q3I Income tax recoveries. 11.11.1979 Running. - permanent
47 CQET/Q3J H.B.A , H.P.A / Rent Running. - permanent
48 CQET/Q6A Audit recoveries (Internal) 19.08.1979 Running. - permanent.
MISCELLANEOUS FILES.
1 2 3 4 5 6 7
1 CQET/Q2A Uniform 10.11.1980 Running. -
2 Canteen Coupon. 09.07.1992 Running. -
3 CQET/A7A Sub-Stores account 18.07.1994 Running. -
4 - Accounts correspondence 21.08.1981 Running. -
5 - Medical Attendance - Running. -
6 - Festival Advance 24.04.2009 Running. -
7 - Incentive. 26.10.2002 Running. -
8 CQET/A3A Casual and 26.11.1979 Running. -
9 CQET/Q2D DA file (Dearness allowance_ 24.06.1993 Running. -
10 - Quarters. 19.11.1979 Running. -
11 - Type writer. 02.04.1981 Running. -
12 - Stationery code No file. - Running. -
13 - Assets and Liabilities. 06.05.1989 Running. -
14 - S.R. (Standing regulation) 10.12.1990 Running. -
15 - T.A bill file. 27.05.2003 Running. -
16 - Materials Gate pass file. 15.09.2004 Running. -
17 - Computer file. 29.09.2003 Running. -
18 - T & P file. 05.02.1993. Running. -
19 - Attendance file. 18.10.2005 Running. -
20 - Circular file. 31.03.2005 Running. - permanent
21 - EL/Commuted leave file. 05.02.2003 Running. - permanent
22 - Confidential file. 12.10.199 Running. - permanent
23 - Disciplinary case file. Running. - permanent
24 - Imp rest Account file. 15.03.2004 Running. - permanent
25 - Temporary Advance file. 21.03.2003 Running. - permanent
26 CQE(T) Legal- Head legal service. 17.07.2010 Running. - permanent
25 CQET-RTA RTA Act U/S 4(1) (a) of RTA- 2005 09.04.2010 Running. - permanent
KARNATAKA POWER CORPORATION LIMITED.
( Raichur Thermal Power Station )
LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE: CQE(T) Ref : ED(CA) & CS Ltr.No.A1R5A (R1A) Dated. 07.05.14
ADDRESS: RTPS – KPCL – SHAKTINAGAR.
Sl. No.
File No. Subject Opening
date of File Closing Date of
file/Running File.
Date of Transformer file Authority
whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
STATION BUILDING UNIT-8
1 CQET/Y1A FA OK Cards 27.07.2007 Running. - permanent
2 CQET/Y2A CA OK Cards 27.07.2007 Running. - permanent
3 CQET/Y3A Batch weights -1 27.07.2007 29.06.2009 - -
4 CQET/Y4A Batch weights-2 29.06.2009 Running. - permanent
5 CQET/Y5A BP calibration 06.09.2007 Running. - permanent
6 CQET/Y6A Back fill E-row ESP control
04.03.2008 Running. - permanent
7 CQET/Y7A HZ –row ,ESP control internal columns back filling
02.04.2008 Running. - permanent
8 CQET/Y8A ESP, PA Fan A & B pass back filling.
21.04.2008 Running. - permanent
9 CQET/Y9A FA & G-row , ESP control back filling
02.03.2008 Running. - permanent
10 CQET/Y10A A-row , BFP, FD Fan A pass back filling.
24.03.2008- Running. - permanent
11 CQET/Y11A Boiler , FD fan B-pass Air washer back filling.
09.04.2008 Running. - permanent
12 CQET/Y12A FA OK cards for mortar 09.04.2008 Running. - permanent
13 CQET/Y13A CTR invoice 13.09.2008 Running. - permanent
14 CQET/Y14A Test schedule cubes 04.05.2009 Running. - permanent
15 CQET/Y15A CTR Invoice 29.12.2007 Running. - permanent
16 CQET/16A Cement requisition. 23.07.2007 Running. - permanent
17 CQET/Y17A Cube test schedule 07.08.2007 Running. - permanent
18 CQET/Y18A Cement test reports 01.08.2007 Running. - permanent
19 CQET/Y19A Cement test reports 26.05.2009 Running. permanent
20 CQET/Y20A Cement test reports 22.10.2009 Running. permanent
21 CQET/Y21A SBC Correspondence 06.07.2007 Running. permanent
R.C.C. COOLING TOWER UNIT-8
22 CQET/Y22B Cooling tower correspondence
09.10.2007 Running.
permanent
23 CQET/Y23B CA OK Cards. 26.11.2007 Running. permanent
24 CQET/Y24B FA OK cards. 26.11.2007 Running. - permanent
25 CQET/Y25B Batch weights. 07.12.2007 Running. - permanent
26 CQET/Y26B Batching plant Calibration.
11.02.2008 19.10.2009 -
R.C.C.CHIMNEY UNIT-8
27 CQET/Y27C Chimney Correspondence 17.01.2008 Running. permanent
28 CQET/Y28C CA OK Cards. 19.01.2008 06.09.2009
29 CQET/Y29C FA OK cards. 19.01.2008 06.09.2009 -
30 CQET/Y30C Batch weights. 19.01.2008 06.09.2009 -
31 CQET/Y31 C Mix design 16.07.2007 Running. - Permanent
C.W . PUMP HOUSE UNIT-8
32 CQET/Y32D Correspondence 03.03.2008 Running. permanent
33 CQET/Y33D CA OK cards 04.04.2008 18.09.2009 ‘
34 CQET/Y34D FA OK cards 04.04.2008 18.09.2009 ‘-
35 CQET/Y35D Batch weights. 04.04.2008 18.09.2009 - -
36 CQET/Y36D Back filling. 12.10.2009 13.10.2009
ASH HANDLING SYSTEM UNIT-8 37 CQET.Y37E Correspondence 01.06.2009 Running. - permanent
38 CQET/Y38E CA OK cards 30.05.2009 Running. - permanent
39 CQET/Y39E FA OK cards 30.05.2009 Running. - permanent
40 CQET/Y40E Batch weights. 30.05.2009 Running. - permanent
ADDITIONAL CALIFIER UNIT-8 41 CQET/Y41F Correspondence 08.05.2009 Running. permanent
42 CQET/Y42F CA OK cards 26.05.2009 Running. - permanent
43 CQET/Y43F FA OK cards 26.05.2009 Running. - permanent
44 CQET/Y44F Batch weights. 26.05.2009 Running. - permanent
SWITCH YARD
45 CQET/Y45G Correspondence 06.09.2009 Running. - permanent
46 CQET/Y46G CA OK Cards. 25.06.2009 06.01.2010 - -
47 CQET/Y47G FA OK Cards. 25.06.2009 06.01.2010 - -
48 CQET/Y48G Batch weights. 25.06.2009 06.01.2010 - permanent
49 CQET/Y49G Back filling. 27.12.2009 Running. - permanent
50 CQET/Y50G Back filling. 14.09.2009 Running. - permanent
MILL REJECT COAL HANDLING SYSTEM. 51 CQET/Y50H Correspondence 16.10.2009 Running. - permanent
52 CQET/Y52H CA OK Cards. 16.10.2009 Running. - permanent
53 CQET/Y53H FA OK Cards. 16.10.2009 Running. - permanent
54 CQET/Y54H Batch weights. 09.10.2009 Running. - permanent
EXTENSION OF COAL HANDLING SYSTEM. 55 CQET/Y55I Correspondence 13.01.2009 Running. - permanent
56 CQET/Y56I CA OK Cards. 04.07.2009 Running. - permanent
57 CQET/Y57I FA OK Cards. 04.07.2009 Running. - permanent
58 CQET/Y58 I Batch weights. 04.07.2009 Running. - permanent
59 CQET/Y59 J Correspondence 06.05.2008 Running. - permanent
60 CQET/Y60 J CA OK Cards. 02.05.2008 Running. - permanent
61 CQET/Y61 J FA OK Cards. 09.05.2008 Running. - permanent
62 CQET/Y62 J Batch weights. 09.05.2008 Running. - permanent
63 CQET/Y63 J Chi: 1310 to 1490 29.11.2008 Running. - permanent
64 CQET/Y64 J Chi: 1160 to 1310 18.08.2008 Running. - permanent
65 CQET/Y65 J Chi: 1490 to 1570 02.12.2008 Running. - permanent
66 CQET/Y66 J Chi: 1010 to 1060 21.01.2008 Running. - permanent
67 CQET/Y67 J Chi: 800 to 1010 17.10.2008 Running. Permanent
ALMATTI DUMP POWR HOUSE.
68 CQET/ Y68 K CA , FA Correspondence & Batch weights.
26.10.2009 Running.
- permanent
OTHERS
69 CQET/Y69 L Compound wall Road works & Misc. works.
22.10.2008 Running.
- permanent
70 CQET/Y70 L Security compound wall 20.11.2008 Running. - permanent
71 CQET/Y71 L YTPS Mix design 28.04.2009 Running. Permanent
72 CQET/Y72 L Unit-8 Correspondence 04.07.2008 Running. Permanent
73 CQET/Y73 L Administration Unit-8 26.06.2008 Running. Permanent
74 CQET/Y 74L Mix design 09.04.2008 Running. - Permanent
75 CQET/Y75L Mix design 16.04.2005 Running. Permanent.
76 CQET/Y76 L YTPS Batch weights. 04.03.2010 Running. Permanent
77 CQET/Y77 L YTPS Correspondence 04.03.2010 Running. Permanent
78 CQET/Y 78 M Testing of materials from Private Agency.
25.03.2007 Running.
Permanent
79 CQET/Y 79 N MTR of All civil works. 06.03.2007 Running. Permanent
80 CQET/Y 80 O Budget 02.08.2006 Running. Permanent
81 CQET/Y 81 P Cement test report of ADPH
27.11.2008 Running.
Permanent
82
CQET/Y 82 Q OK Cards for CA Unit-8 25.02.2008 Running.
Permanent.
83 CQET/Y 83 R OK Cards for FA Unit-9 25.02.2008
Running.
Permanent.
84 CQET/ Y 84 S OK Cards for Back fill Unit-8 works.
07.03.2008 Running.
Permanent.
85 CQET/Y 85 T Cement test report of Unit-8 works
04.08.2007 Running.
Permanent
86 CQET/Y 86 U Procurement / General. 26.08.2008 Running.
Permanent
87 CQET/Y 87 V Requisition of Cement Unit-8
08.06.2006 Running.
Permanent
88 CQET/Y 88 W YTPS Drawings. 11.02.2010 Running. Permanent
89 CQET/Y 89 X ADPH Correspondence 23.07.2009 Running. Permanent
90 CQET/Y 90 Y Facilities Available at Laboratory
25.08.2007 Running.
Permanent
91 CQET/Y 91 Z Physical verification of Assets.
22.03.2002 Running.
Permanent
CQE(T)
NON OPERATED FILE.
Sl.No File Nos. Name of the file.
13 CQET P2C Welfare/
20 CQET A2J Railway
21 CQET P2D Hiring.
22 CQET/A3B Rents.
23 CQET/ A3C Taxes
24 CQET/A3D Repairs and Maintenance
25 CQET / A4B Municipal services
28 CQET A5C Printing.
31 CQET/ A5F Book and periodicals.
34 CQET/ A6C Notes compliance
35 CQET/ A7A Security.
36 CQET/ A7B Police.
37 CQET/A7C Watch and Ward
38 CQET/A7D Civil Defiance.
40 CQET/A7F Thefts.
41 CQET Q2D Traveling allowance
47 CQET/A3J HBA HPA / Rent Recoveries.
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4[1 )a OF THE RIGHT TO INFORMATION ACT 2005 Name of the Office : Chief Engineer (Civil Designs)
Address : O/o. CCED, # 22/23, Sudarshan Complex, Sheshadri Road, B’lore-560 009
LIST OF FILES PERTAINING TO GATES
SL. No.
File No. SUBJECT
Opening Date
of File
Closing Date of File /
Running File
Date of Transfer
of File and Authority
whom Transferred
Nature of File
Permanent/
Temporary
REMARKS
ALAMATTI DAM POWER HOUSE HYDRO-MECHANICAL WORK
1. CD/ADPH/HM/ TENDER
Tender Correspondence Vol - I P Closed/ Bounded
2. CD/ADPH/HM/ TENDER
Tender Correspondence Vol - II P Closed/ Bounded
3. CD/ADPH/HM/ TENDER
Tender Correspondence Vol -III P Closed/ Bounded
4. CD/ADPH/HM/ TENDER
Tender Correspondence Vol -IV P Closed/ Bounded
5. CD/ADPH/HM/ DTG
Drawing of draft tube gates Aug.2002 Oct. 2002 P Closed/ Bounded
6. CD/ADPH/HM/ PSG
Drawings of penstock gates
Oct. 2002 Jan.2003 P Closed/ Bounded
7. CD/ADPH/HM/ TRP
Drawings of trash rack panels Nov.2002 Jan.2003 P Closed/ Bounded
8. CD/ADPH/HM/ TRP
Drawings of trash rack panels Jan.2003 Feb.2003 P Closed/ Bounded
9. CD/ADPH/HM/ DTGC
Drawings of draft tube gantry crane
Feb.2003 Apr. 2003 P Closed/ Bounded
10. CD/ADPH/HM/ Drawings of penstock stoplogs Apr. 2003 May2003 P Closed/
PGSL Bounded
11. CD/ADPH/HM/ PSGC
Drawings of penstock stoplog gantry crane
June2003 July2003 P Closed/ Bounded
12. CD/ADPH/HM/ PSGH
Designs & drawings of penstock gate hydraulic hoist
July2003 Aug.2003 P Closed/ Bounded
13. CD/ADPH/HM/ PSGH
Designs & drawings of penstock gate hydraulic hoist
Sep .2003 Nov.2003 P Closed/ Bounded
14. CD/ADPH/HM/ PSGH
Penstock gate hydraulic hoist Nov.2003 Aug.2004 P Closed/ Bounded
15. CD/ADPH/HM/ PSG
Correspondence Nov.2004 - P Current
16. CD/ADPH/HM/ PSGH
Essentiality certificate Apr.2003 July2003 P Closed / File
KADRA & KODASALI DAMS
HYDRO -MECHANICALWORKS
17. CD/C4 K II -2&3 General correspondence Vol- I Mar.1989 P Closed/ Bounded
18. CD/C4 K II -2&3 General correspondence Vol- II Sep.1989 Closed/ Bounded
19. CD/C4 K II -3G Designs & drawings of radial crest gates of Kadra dam Vol - I
Oct.1990 Mar.1991 P Closed/ Bounded
20. CD/C4 K II -3G Designs & drawings of radial crest gates with flap & gantry crane of Kadra dam Vol II
Apr. 1991 May1991 P Closed/ Bounded
21. CD/C4 K II -3G Designs & drawings of cat walk at TL. for radial crest gates of Kadra dam Vol – III
June1991 Feb.1992 P Closed/ Bounded
22. CD/C4 K II -3G Designs & drawings of hydraulic hoist for radial crest gates with flap of Kadra dam Vol – III
Aug.1993 May1994 P Closed/ Bounded
23. CD/C4 K II -3G Designs & drawings of radial crest gates of Kadra dam Vol –IV
Deleted
24. CD/C4 K II -3G Progress reports Mar.1992 Mar.1993 Y Closed/ Bounded
25. CD/C4 K II -3G Progress reports July1994 May1998 Y Closed/ Bounded
26. CD/C4 K II -3G Correspondence Dec.1996 Feb.2003 P Closed/ Bounded
27. CD/C4 K II -3G River sluice gates of Kadra dam Vol – I
Apr.1990 Jun.1990 P Closed/ Bounded
28. CD/C4 K II -3G River sluice gates of Kadra dam Vol – II
Jul.1990 Mar.1995 P Closed/ Bounded
29. CD/C4 K II -2G Designs & drawings of radial crest gates of Kodasalli dam Vol - I
Sep.1990 Oct.1990 P Closed/ Bounded
30. CD/C4 K II -2G Designs & drawings of rope drum hoist of radial crest gates of Kodasalli dam Vol - II
Nov.1990 Mar.1991 P Closed/ Bounded
31. CD/C4 K II -2G Designs & drawings of Gantry crane for crest stoplogs of Kodasalli dam
Mar.1991 Mar.1991 P Closed/ Bounded
32. CD/C4 K II -2G River sluice gates of Kodasalli dam Vol – I
Mar.1990 Jun.1990 P Closed/ Bounded
33. CD/C4 K II -2G River sluice gates of Kodasalli dam Vol – II
May 1990 Mar.1995 P Closed/ Bounded
GERUSOPPA DAM AND POWER
HOUSE- HYDROMECHANICAL
WORK
34. CD/C4/STR D1 General correspondence
Vol- I
Jan.1992 Feb.1994 P Closed/ Bounded
35. CD/C4/STR D1 General correspondence Vol- II
Mar.1994 Feb.1999 P Closed/ Bounded
36. CD/C4/STR D1 Designs & drawings of radial crest gates Vol – I
July 1995 Apr.1996 P Closed/ Bounded
37. CD/C4/STR D1 Designs & Drawings of rope drum hoist of radial crest gates Vol – II
June1996 Feb.1999 P Closed/ Bounded
38. CD/C4/STR D1 Design & drawings of Gantry crane for Crest stoplog gate Vol- I
June1995 Oct.1996 P Closed/ Bounded
39. CD/C4/STR D1 Design & drawings of Gantry crane for Crest stoplog gate Vol- II
Dec.1996 Dec.1998 P Closed/ Bounded
40. CD/C4/STR D1 Designs & drawings of river sluice gates Vol – I
Feb.1996 Jul.2003 P Closed/ Bounded
41. CD/HM/STR/ RSG
River sluice gate – non closure Apr.2002 Sep.2006 Closed/ File
42. CD/C4/STR D1 Designs & drawings of river sluice gates Vol – II
Mar.1995 Jan.1996 P Closed/ Bounded
43. CD/C3/STR/PSG Design & drawings of Penstock
gates Vol – I
Feb.1995 Jan.1996 P Closed/ file
44. CD/C3/STR/PSG Design & drawings of Penstock
gates Vol – II
Feb.1996 Aug.1997 P Closed/ file
45. CD/C3/STR/ PSG(ECD)
Electrical circuit diagrams for
Penstock gates hyd. Hoists
Aug.1999 May2000 P Closed/ file
46. CD/C3/STR/ PSLG(ECD)
Electrical circuit diagrams for
gates & gantry,
Jan.1999 Dec.2000
P Closed/ file
47. CD/C3/STR/ PSGH
Designs & drawing of penstock gate hydraulic hoist
Sept.1997 July1999 P Closed/ file
48. CD/C3/STR/ SLG
Designs & drawings of Penstock Stoplogs Vol – I
Apr. 1995 July 1996 P Closed/ file
49. CD/C3/STR/ SLG
Design & drawings of Penstock Stoplogs gantry crane Vol n-II
Mar. 1996 Aug. 1998 P Closed/ file
50. CD/C3/STR/ PSGH
Penstock Stoplogs Vol – III Deleted
51. CD/C3/STR/ DTG
Design & drawing of draft tube gates Vol –I
Dec.1994 Jan.1996 P Closed/ file
52. CD/C3/STR/ DTGG
Design & drawings of draft tube gantry Vol –II
Feb.1996 Aug.1999 P Closed/ file
53. CD/C3/STR/ INT-TRA
Trashracks Feb. 1995 Mar. 1999 P Closed/ file
LINGANAMAKKI DAM POWER HOUSE HYDRO-MECHANICAL WORK
54. ̀ C4 X4 A3D Designs & drawings of stoplogs for controlling arrangement between stilling basin of PS and tail race of Linganamakki dam - correspondence
Jul.1981 Sep.1982 P Closed/ Bounded
55. C4 X4 A3D Designs & drawings of stoplogs for controlling arrangement between stilling basin of PS and tail race of Linganamakki dam
July1983 Jan.1984 P Closed/ Bounded
56.
C4 X4 A3D Designs & drawings of gantry crane for operating stoplogs for controlling arrangement between stilling basin of PS and tail race of Linganamakki dam -
Jan.1984 Apr.1984 P Closed/ Bounded
57. C4 X4 A3 D Design &drawings of stoplogs across power channel
Jan.1984 - P Closed/ Bounded
MANI DAM HYDRO-MECHANICAL WORK
58. CD/C4 V C1 D Tender Specifications May1980 May1981 P Closed/ Bounded
59. CD/C4 V C1 D Correspondence Aug.1981 Sep.1982 P Closed/ Bounded
60. CD/C4 V C1 D Tender correspondence Aug.1983 June1986 P Closed/ Bounded
61. CD/C4 V C1 D Tender correspondence July1982 Apr.1986 P Closed/ Bounded
62. CD/C4 V C1 D Designs & drawings of radial crest gates Vol –I
Sep.1986 Dec.1986 P Closed/ Bounded
63. CD/C4 V C1 D Designs & drawings of rope drum hoists of radial crest gates Vol –II
Jan.1987 Apr. 1988 P Closed/ Bounded
64. CD/C4 V C1 D River sluice gates - correspondence
Aug.1980 May1984 Closed/ Bounded
65. CD/C4 V C1 D Hydraulic model studies CWPRS correspondence vol - I
Feb.1983 Aug.1986 P Closed/ Bounded
66. CD/C4 V C1 D Hydraulic model studies CWPRS correspondence vol - II
Sep. 1982 Dec.1992 P Closed/ Bounded
67. CD/C4 V C1 D Designs & drawings of river sluice gates
July1986 Sep.1986 P Closed/ Bounded
68. CD/C4 V C1 D Designs & drawings of river sluice
bulk head gate Vol -I
Oct.1986 Dec.1986 P Closed/ Bounded
69. CD/C4 V C1 D Designs & drawings of river Jan.1987 June1987 P Closed/ Bounded
Bulkhead gate Vol -II
70. CD/C4 V C1 D Designs & drawings Hydraulic
hoist of river sluice gates
June1987 Jan.1989 P Closed/ Bounded
SHIMSHA AND SIVA HYDRO
ELECTRIC PROJECT
HYDRO-MECHANICAL WORK
71. CD3VVNL/ Consul
Designs & drawings of stoplog
gates
Apr.2005 June 2006 P Closed/ File
72. Schedule of rates for gates, hoist
and other allied works (WRD)2004
P Closed/
Bounded
SARAPADI BARRAGE HYDROMECHANICAL WORK
73. CD/C4 SB(G) General correspondence Vol -I Oct.1991 Feb.1999 P Closed
74. CD/C4 SB(G) General correspondence Vol -II Mar.1999 Oct.1999 P Closed
75. CD/C4 SB(G) General correspondence Vol -III Oct.1999 Jan.2000 P Closed
THATIHALLA DAM HYDROMECHANICAL WORK
76. CD/C4 T6 C2 Correspondence Feb.1975 Nov.1977 P Closed/
Bounded
77. CD/C4 T6 C2 Drawings of radial gate & spillway stoplogs
June1976 July 1979 P Closed/ file
78. CD/C4 T6 C2 Designs & drawings of radial crest gates & rope drum hoist
Jan.1978 Aug.1979 P Closed / file
79. CD/C4 T6 C2 Designs & drawings of Spillway stoplog & gantry crane
Jul. 1979 June 1984 P Closed/ file
80. CD/C4 T6 C2 Designs & drawings of river sluice gates
Jan.1979 May1979 P Closed/
Bounded
81. CD/C4 T6 C2 Designs & drawing of lifting beam for operating river sluice gates
May1979 Nov.1981 P Closed/
Bounded
VARAHI PICKUP DAM
HYDROMECHANICAL WORK
82. CD/C4/ V C3 D Designs & drawings of Radial
crest gates
Apr.1982 - P Closed/ Bounded
83. CD/C4/ V C3 D Designs & drawings of rope drum
hoist of radial crest gates Vol – I
Sep.1982 Apr.1983 P Closed/ Bounded
84. CD/C4/ V C3 D Designs & drawings of rope drum
hoist of radial crest gates Vol – II
Dec.1983 May1984 P Closed/ Bounded
85. CD/C4/ V C3 D Designs & drawings of spillway
stoplog
Apr.1983 Dec.1983 P Closed/ Bounded
86. Designs & drawings of gantry
crane for operating crest stoplogs
May1984 July1985 P Closed/ Bounded
87. CD/C4/ V C3 D Electrical circuit diagrams for
gantry crane
Aug.1985 June 2000 P Closed/ Bounded
88. CD/C4/ V C3 D Designs & drawings of river sluice
gate Vol - I
Apr.1982 Dec. 1983 P Closed/ Bounded
CURRENT FILES
1. Miscellaneous Feb.1999 July2007
2. Miscellaneous May2008 -
3. CD/SE1/HM Maintenance of Hydro mechanical
equipment of KPCL
Dec.2005 Sep.2008
4. CD/SE1/HM Maintenance of Hydro mechanical
equipment of KPCL
Oct..2008 Oct. 2012
5. CD/SE1/HM Maintenance of Hydro mechanical
equipment of KPCL
Dec-13 Running
6. CD/ SE1/HM/ Supa - seal kits
Supply of seal kits for hydraulic
hoist of sluice gates of supa dam
Aug.2000 Aug.2007
7. CD/SE1/ Lingannamakki gates
Estimate for the work of arresting
leakages between first and
second stage concreting at sides
and bottom of radial gates of
Lingannnamakki dam
Jan.2009 -
8. CD/SE1/ HM/AMC/SUPA
Operation & Maintenance of
Electrical & HM components of
Supa and upper kaneri dams
Mar.2008 -
9 CD/SE(CD1)/DS/HMW
Inspection of trash racks of
penstock gates 1&2 of supa dam
Sep-2009 Running
CONSULTANCY WORKS
KUTTIYADI HYDRO ELECTRIC PROJECT
1. CD3/ Kuttiyadi/ Int
Correspondence June2004 Apr.2006
RAMMAM HYDRO ELECTRIC PROJECT –III (NTPC)
2. CD/Consultancy/ Rammam stage -III
Correspondence Feb.2007 Nov.2008
3. CD/Consultancy/ Rammam stage -III
Correspondence Dec.2008 -
ADDITIONAL FILES
VARAHI PICKUP DAM HYDROMECHANICAL WORK
88A. CD/C4/VC3D Designs & drawings of river sluice gate Vol - II
Dec.1982 May 1987
UPPER KANERI DAM HYDROMECHANICAL WORK
89 Designs & drawings of Radial crest gate
- - P Closed/
Bounded
90 Designs & drawings of Radial crest gate
- - P Closed/
Bounded
KADRA & KODASALI DAMS HYDRO -MECHANICALWORKS
33A CD/C4 K11-2G Design of Radial Crest gate with flap- Kodasalli Dam
Apr. 1991 Aug. 1993 P Closed/
Bounded
33B CD/C4 K11-2G Miscellaneous Feb. 1993 Sep. 1993 P Closed/
Bounded
ALAMATTI DAM POWER HOUSE HYDRO-MECHANICAL WORK
16A CD/ADPH/HM/PSGH/2003-04
Hydraulic Power Packs Penstock service gates – 50T / 100T capacity hoists
Oct. 2003 Apr. 2007 P File
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4[1 )a OF THE RIGHT TO INFORMATION ACT 2005 Name of the Office : CCED
Address : O/o. CCED, # 22/23, Sudarshan Complex, Sheshadri Road, B’lore-560 009
Name of Work: List of files pertaining to Dam Safety wing.
I. FILES PERTAINING TO DAM SAFETY AND MANI PICKUP, CHAKRA, SAVEHAKLU DAMS OF VHEP
SL. No.
File No.
SUBJECT
Opening Date
of File
Closing Date of File / Running File
Date of Transfer
of File and Authority
whom Transferred
Nature of File
Permanent/
Temporary
Remarks
SL. No.
File No.
SUBJECT
Opening Date
of File
Closing Date of File / Running File
Date of Transfer
of File and Authority
whom Transferred
Nature of File
Permanent/
Temporary
Remarks
1 CD/SE(CD1)/MD & PD/ Instrumentation
Mani Dam & pick up Dam instrumentation reading (Year-2005)
April.2005 Dec.2005 P
2 CD/SE(CD1)/MD & PD/ Instrumentation
Mani Dam & pick up Dam instrumentation reading (Year-2006)
Jan-2006 Nov.2006 P
3 CD/SE(CD1)/MD & PD/ Instrumentation
Mani Dam & pick up Dam instrumentation reading (Year-2007)
Jan.2007 Dec.2007 P
4 CD/SE(CD1)/VHEP/ Instrumentation
Mani Dam & Pickup Dam Instrumentation Reading
Jan.2008 Dec.2009 P
5 CD/SE(CD1/VHEP/ Instrumentation
Mani Dam & Pickup Dam Instrumentation Readings
Jan.2010 Dec.2011 P
6 CD/CE(CD1)/VHEP/MD/ Gen Mani Dam General Correspondence (Geological Core)
Oct.2008 May.2009 T
7 CD/SE(CD1)/VHEP/DS VHEP-Mani Dam – Seismic Instrumentation
Feb’2009 Feb’2009 T
8 CD/SE(CD1)/VEHP/ Instrumentation
Mani Dam & Pickup Dam Instrumentation Readings
July-2012 Running P
9 CD/SE(CD1)/VHEP/Seepage VHEP – Mani Dam Seepage Jan.2009 April.2010 P
10 CD/SE(CD1)/VHEP/ Seepage
VHEP – Seepage details of pickup Dam
March.2009 August.2009 p
11 CD/SE(CD1)/VHEP/FD VHEP-Flood Zone marking Nov.2006 Running P
12 CD/SE(CD1)/VHEP/MD VHEP- Meteorological details of Mani Dam
Feb.2006 Running P
13 CD/SE(CD1)/VHEP/MD/ Drilling VHEP – Mani Dam Drilling of Blocked drainage holes
Oct.2007 Oct.2007 T
14 CD/SE(CD1)/VHEP/MD/ Permeability
VHEP-Mani Dam permeability test of blocked zones
Jan.2006 Running P
15 CD/SE(CD1)/VHEP/MD & PD VHEP – Non destructive test on piers and abutments of Mani Dam & pickup dam
May.2011 August.2011 P
16 CD/SE(CD1)/Chakra/ Rain fall
VHEP – Rainfall data of Chakra division scheme
Jan.2011 June.2012 P
17 CD/SE(CD1)/VHEP/AC VHEP-Area Capacity table for VHEP dams
Jan.99 Dec’2011 P
18 CD/SE(CD1)/DSRP VHEP-Mani Dam Brief note for DSRP inspection
Oct.2012 Oct.2012 P
SL. No.
File No.
SUBJECT
Opening Date
of File
Closing Date of File / Running File
Date of Transfer
of File and Authority
whom Transferred
Nature of File
Permanent/
Temporary
Remarks
19 CD/SE(CD1)/DS VHEP-Dam safety file May.2003 May.2003 T
20 CD/SE(CD1)/VHEP/MDDL VHEP-MDDL & Surface settlement correspondence of Dams
Aug.2009 Running P
21 CD/SE(CD1)/VHEP/Chakra VHEP- Surface settlement of Mani & Chakra dam
Oct.2010 Running P
22 CD/SE(CD1)/VHEP/MD VHEP- Mani dam drawings Jan.2007 Feb.2007 P
23 CD/SE(CD1)/VHEP/PD/ Seepage
VHEP – Seepage details of pickup dam
Feb.2006 May.2007 P
24 CD/SE(CD1)/VHEP/Chakra VHEP – Piezometer leadings of Chakra & Savehaklu dam
Jan.2010 Jan.2010 P
25 CD/SE(CD1)/VHEP/Chakra/ Piezo
Chakra scheme – piezometer reading of Chakra, Savehaklu, Hulical Dams
May.2010 Running P
26 CD/SE(CD1)/VHEP/MD & PD/Piezo
VHEP – Instrumentation reading (Mani & Pickup) from July.2012
March.2012 Running P
27 CD/SE(CD1)/VHEP/RF VHEP – Rainfall data May.2010 Running P
28 CD/SE(CD)/VHEP/PD VHEP – Daily inflow data of pickup dam
June.2013 Running P
29 CD/SE(CD1)/VHEP/MD VHEP – Daily inflow data of Mani dam
June.2013 Running P
30 CD/SE(CD1)/Chakra Inflow Chakra scheme – Daily inflow details of Savehaklu Dam
July.2013 Running P
31 CD/SE(CD1)/Chakra Inflow Chakra scheme – Daily inflow details of Chakra Dam
July.2011 Running P
32 CD/SE(CD1)/VHEP/FN VHEP – Flood Notice Correspondence [from 7.8.2011]
August.2011 Running P
33 CD/SE(CD1)/VHEP/DS VHEP Dam safety (Pre & Post monsoon Correspondences
June.2010 Running P
34 CD/SE(CD1)/VHEP/DS VHEP – Dam safety Vol.I April.2008 July.2010 P
35 CD/SE(CD1)/VHEP/DS VHEP-Dam Safety Vol.II May.2010 Dec.2012 P
36 CD/SE(CD1)VHEP/Gen VHEP- General Correspondence March.2011 Running P
37 CD/SE(CD1)/VHEP/MD/DF VHEP – Daily inflow details of Mani Dam
Nov.2011 May.2013 P
SL. No.
File No.
SUBJECT
Opening Date
of File
Closing Date of File / Running File
Date of Transfer
of File and Authority
whom Transferred
Nature of File
Permanent/
Temporary
Remarks
38 CD/SE(CD1)/VHEP/PD/DF VHEP – Daily inflow details of pickup dam
Nov.2011 March.2013 P
39 CD/SE(CD1)/RDCL/Chakra Chakra Scheme – Road from Sampekatte to Kodachadri
June.2008 Running P
40 CD/SE(CD1)/CS/Drawings Chakra Scheme – Construction drawings
Apri.1979 April.1979
41 CD/SE(CD1)/VHEP/Chemical analysis
VHEP – Mani & pickup dam chemical analysis
Nov.2007 Nov.2010 P
42 CD/SE(CD1)/VHEP/Pd/Supa VHEP – Seepage details of pickup dam from Jan.2009
March.2009 Running P
43 CD/SE(CD1)/MD & PD/Gates VHEP – Arresting leakage through radial gates of Mani Dam & pickup dam
Jan.2013 Running P
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4[1 )a OF THE RIGHT TO INFORMATION ACT 2005 Name of the Office : CCED
Address : O/o. CCED, # 22/23, Sudarshan Complex, Sheshadri Road, B’lore-560 009
Name of Work: List of files pertaining to Dam Safety wing as on June 2014
I. FILES PERTAINING TO DAM SAFETY AND LINGANAMAKKI & TALAKALALE DAMS OF SVP
SL. No.
File No. SUBJECT
Opening Date
of File
Closing Date of File
/ Running
File
Date of Transfer of File
and Authority whom Transfer
red
Nature of File Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
1 CD/SE(CD1)/SVP/LD Providing deep pointing to the balance Sep.05 Jan.07 P
area of upstream face masonry portion of Linganamakki dam for Reach-I from ch.160’to 3700’ and Reach-II from ch.3700’ to 5660’
2 CD/SE(CD1)/SVP/LD --do-- Jan.07 May 07 P 3 CD/SE(CD1)/SVP/LD --do-- Jul.07 Feb.08 P 4 CD/SE(CD1)/SVP/LD --do-- Feb.08 Aug.08 P 5 CD/SE(CD1)/SVP/LD --do-- Sep.08 Feb.09 P 6 CD/SE(CD1)/SVP/LD --do-- Mar.09 May 11 P 7 CD/SECD1/DS Draft Dam Safety Act- Technical
preparedness of the organization. Apr.01 Sep.04 P
8 CD/SECD1/DS Draft Dam Safety Act- Technical
preparedness of the organization. Aug.04 Dec.05 P
9 CD/SECD1/DS Draft Dam Safety Act- Technical
preparedness of the organization. Jan.06 Running P
10 CD/SE(CD1)/NCDS National Committee On Dam Safety. Sep.01 Jul.07 P 11 CD/SE(CD1)/NCDS National Committee On Dam Safety. Jul.07 Running P 12 CD/SE(CD1)/DS Correspondence-dam Safety
Procedure. Jan.03 Mar.10 T
13 CD/SE(CD1)/LD Reservoir sedimentation. May 01 Running T
14 CD/SE(CD1)/DS/IM Inundation Maps. May 02 Running T
15 CD/SE(CD1)/SVP Repairs to 3 vent regulator. Oct.05 Aug.11 T
16 CD/SE(CD1)/DS Operation and maintenance Manual and Emergency Action Plan.
Feb.01 Mar.06 T
17 CD/SE(CD1)/DS/POE Panel of Experts. Feb.02 Aug.05 P
18 CD/SE(CD1)/DS/EQ Report on Expert Committee on Earth quake activity in Karnataka,Kerala and Tamil nadu.
May 01 Aug.07 P
19 CD/SE(CD1)/DS/POE Panel of Experts. Aug.05 Aug.06 P
20 CD/SE(CD1)/DS/DSRP Dam Safety Review Panel. Sep.05 Dec.08 P
21 CD/SE(CD1)/DS/DSRP Dam Safety Review Panel. Jan.09 Dec.11 P
21a CD/SE(CD1)/DS/DSRP Dam Safety Review Panel. Jan.12 Running P
22 CD/SE(CD1)/DS/SLDSC Correspondence pertaining to State Level Dam Safety Committee.
Jul.04 Dec.11 P
22a CD/SE(CD1)/DS/SLDSC Correspondence pertaining to State Level Dam Safety Committee.
Nov.11 Running P
23 CD/SE(CD1)/DS/Gates O&M manual for hydro mechanical works.
Sep.04 Nov.07 T
24 CD/SE(CD1)/DS/NWP National Water Policy-2002. Mar.03 Running P
25 CD/SE(CD1)/HR Hydrological review of large dams. Apr.04 Running P
26 CD/SE(CD1)/SVP Repairs to damaged portion of Power channel at Ch.4500 m of Linganamakki.
Sep.05 Jun.06 T
27 CD/SE(CD1)/SVP/PC Repairs to power channel from Linganamakki dam to Talakalale reservoir. Vol-I
Nov.01 Jun.07 T
28 CD/SE(CD1)/SVP/PC Repairs to power channel from Linganamakki dam to Talakalale reservoir. Vol-II
Jul.07 Mar.08 P
29 CD/SE(CD1)/SVP/PC Repairs to power channel from Linganamakki dam to Talakalale reservoir. Vol-III
Jun.08 Jul.10 P
CD/SE(CD1)/SVP/PC Repairs to power channel from Linganamakki dam to Talakalale reservoir. Vol-IV
Jul.10 Apr.11 P
CD/SE(CD1)/SVP/PC Repairs to power channel from Linganamakki dam to Talakalale reservoir. Vol-V
May 11 Jun.12 P
CD/SE(CD1)/SVP/PC Repairs to power channel from Linganamakki dam to Talakalale reservoir. Vol-VI (EIRL and Workslip)
Jan.12 Jan. 13 P
30 CD/SE(CD1)/SVP/AWCS
Removal of all obstruction including rock ledge/masonry/natural mound at the exit
Oct.01 Feb.04 T
31 CD/SE(CD1)/SVP Repairs to 3 vent regulator. Mar.99 Jul.2000 T
32 CD/SE(CD1)/DS/MIS Management information system under NPDP.
May 03 Running P
33 CD/SE(CD1)/DS Publication of National Register of Large dams.
Apr.2000 running P
34 CD/SE(CD1)/SVP/LD Providing deep pointing at Linganamakki dam .
Apr.01 Jun.05 T
35 CD/SE(CD1)/SVP/LD Providing deep pointing to the balance Apr.09 May 11 T
area of upstream face masonry portion of Linganamakki dam for Reach-I from ch.160’to 3700’ and Reach-II from ch.3700’ to 5660’-WEEKLY PROGRESS REPORT.
36 CD/SE(CD1)/DS Draft Dam Safety Act-Technical preparedness of the organization.
Jan.06 Running P
37 CD/SE(CD1)/DS/COE Committee Of Experts-Correspondence and minutes. Vol-I
Sep.08 Jul.12 P
CD/SE(CD1)/DS/COE Committee Of Experts-Correspondence and minutes. Vol-II
Jul.12 Oct.13 P
CD/SE(CD1)/DS/COE Committee Of Experts-Correspondence and minutes. Vol-III
Nov.13 Mar.14 P
CD/SE(CD1)/DS/COE Committee Of Experts-Correspondence and minutes. Vol-IV
Apr.14 Running P
38 CD/SE(CD1)/Misc. General file- Memos and circulars. Apr.07 Jul.12 P
39 CD/SE(CD1)/DS/HW History writing of KPCL dams. Apr.07 Running P
40 CD/SE(CD1)/DS/R&D R&D context of dam safety. Sep.03 Nov.04 P
41 CD/SE(CD1)/SVP Collapsed hill slope road leading to AB site near M/s.Ambuthirtha Power Pvt.Ltd.
Jun.04 Nov.07 T
42 CD/SE(CD1)/DS/DSRP Prioritization of Large dams in Karnataka State which have completed 10 years of service to take up safety review of dams by the Dam safety Review Panel.
Jul.02 Jul.04 T
43 CD/SE(CD1)/DS/LD Correspondence pertaining to comprehensive report on Linganamakki dam. Various problems faced in Linganamakki dam & d/s and remedial measures taken/proposed to rectify the problem.
Mar.99 Jan.02 T
44 CD/SE(CD1)/CS&SS Linganamakki dam- Capacity survey & Sedimentation survey of the reservoir.
May 2000 Jul.01 T
45 CD/SE(CD1)/DS Assurance given in the Lokasabha in reply to unstirred question No.2281 replied on 15.12.08.
Jun.09 Jul.09 T
46 CD/SE(CD1)/DS/SLDSC First Special meeting of State Level Apr.01 Dec.03 P
Dam Safety Committee on draft Dam Safety act-2000.
47 CD/SE(CD1)/DS/Gates Performance of gates of KPCL. May 03 Jun.08 P
48 CD/SE(CD1)/DS/Instru. Meteorological instruments at dam site and in catchment & its performance.
Nov.03 Jan.05 P
49 CD/SE(CD1)/Misc. Brindavan Mini Hydel Scheme at KRS.Collapse of power house wall-Rejoinder on press Report.
Aug.06 Aug.06 T
50 CD/SE(CD1)/DS Providing training to the Engineers of various departments namely water resources,MIE,KUWS&DB, BWWSB etc.,
Jul.07 Jul.07 T
51 CD/SE(CD1)/DS Supply, testing and commissioning of water level receiver display inter face unit in the chambers Chief Engineer (Civil-Designs) KPCL,Bangalore.
Feb.07 Nov.08 T
52 CD/SE(CD1)/DS/Instru. Revival of non functional instruments. Nov.04 Jan.06 T
53 CD/SE(CD1)/DS/O&M Operation & maintenance Manual and Emergency action Plan.
Apr.08 Running T
54 CD/SE(CD1)/General General correspondence. Vol-I Jul.03 Aug.11 T
CD/SE(CD1)/General General correspondence. Vol-II Aug.13 Running T
55 CD/SE(CD1)/ Publication on Directory of Tunnels in India.
Aug.08 Aug.08 P
56 CD/SE(CD1)/DS Hill slope protection at MGHE. Oct.03 Nov.03 T
57 CD/SE(CD1)/DS/POE Advice of POE on various issues raised in the report of DSRP.
Mar.03 Oct.03 P
58 CD/SE(CD1)/DS Initial filling of reservoir-Guidelines. Aug.98 Jul.04 P
59 CD/SE(CD1)/SVP Damages to the pier of bridge across Power channel exit of Linganamakki dam.
May 06 Dec,06 T
60 CD/SE(CD1)/SVP/LD Geophysical investigations at Linganamakki dam by TOJO Vikas
Aug.99 Aug.2000 P
Inter national Pvt.Ltd.
61 CD/SE(CD1)/ SVP/LD Geophysical investigations at Linganamakki dam by TOJO Vikas Inter national Pvt.Ltd.
Sep.2000 Jun.01 P
62 CD/SE(CD1)/ SVP/LD Geophysical investigations at Linganamakki dam by TOJO Vikas Inter national Pvt.Ltd.
Jun.01 Jan.05 P
63 CD/SE(CD1)/SVP/LD Reservoir operation Manual-S.N.Subramanya-correspondence.
Jan.02 Jul.06 T
64 CD/SE(CD1)/MRM Monthly progress review meeting. Aug.04 Jan.06 T
65 CD/SE(CD1)/SVP/LD Linganamakki dam-Power sluice gate operation details.
Oct.06 Feb.08 P
66 CD/SE(CD1)/SVP/LD/ Gates
Conversion of chain driven hoist to conventional wire rope driven hoists at Linganamakki dam.
Feb.08 Feb.08 T
67 CD/SE(CD1)/SVP/LD Determination of density & strength of masonry of Linganamakki & Talakalale dam.
Oct.02 Sep.03 P
68 CD/SE(CD1)/EQ Earth quake reports. Dec.2000 Mar.07 T
69 CD/SE(CD1)/DS/DSRP Dam Safety Review Panel. Apr.02 Aug.05 P
70 CD/SE(CD1)/DS/Checklists
Pre & Post monsoon inspection reports of KPCL dams.
May 03 Oct.07 P
71 CD/SE(CD1)/ DS/Checklists
Pre & Post monsoon inspection reports of KPCL dams.
Feb.07 Dec,13 P
71a CD/SE(CD1)/ DS/Checklists
Pre & Post monsoon inspection reports of KPCL dams.
Dec.13 Running P
72 CD/SE(CD1)/SVP/WS Test results of water samples of Linganamakki & Talakalale dams.
Jan.94 Dec.11 P
72a CD/SE(CD1)/SVP/WS Test results of water samples of Linganamakki & Talakalale dams.
Mar.06 May 11 P
73 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Dec.81 Nov.86 P
74 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jun.88 Nov.88 P
75 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jan.91 Apr.94 P
76 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
May 94 Jul.97 P
77 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jul.97 Nov.97 P
78 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station
Nov.97 Jun.98 P
79 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jun.98 Apr.99 P
80 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Apr.99 Sep.99 P
81 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Sep.99 Feb.2000 P
82 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Feb.2000 Jul.2000 P
83 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jun.2000 Oct.2000 P
84 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station
Oct.2000 Mar.01 P
85 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station
Apr.01 Jun.01 P
86 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jul.01 Dec.01 P
87 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jan.02 Aug.02 P
88 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Jul.02 Apr.03 P
89 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station
Apr.03 Mar.04 P
90 CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
May 04 Oct.12 P
90a CD/SE(CD1)/DS/KERS Correspondence with Karnataka Engineering Research Station.
Apr.13 Running P
91 CD/SE(CD1)/TD Seepage, Inflow and outflow details of Talakalale dam.
Jan. 04 Jun.05 P
92 CD/SE(CD1)/TD Seepage, Inflow and outflow details of Talakalale dam.
Jul.05 Jun.06 P
93 CD/SE(CD1)/TD Seepage, Inflow and outflow details of Talakalale dam.
Jul.06 May 07 P
94 CD/SE(CD1)/TD Seepage, Inflow and outflow details of Talakalale dam.
Jun.07 Dec.08 P
95 CD/SE(CD1)/TD Seepage, Inflow and outflow details of Talakalale dam.
Jan.09 Dec.09 P
96 CD/SE(CD1)/LD Daily flow datas of Linganamakki dam. Nov.02 Dec.03 P
97 CD/SE(CD1)/LD Daily flow datas of Linganamakki dam. Jan.04 Dec.05 P
98 CD/SE(CD1)/LD Daily flow datas of Linganamakki dam. Jan.06 May 08 P
99 CD/SE(CD1)/LD Daily flow datas of Linganamakki dam. Jun.08 Dec.09 P
99a CD/SE(CD1)/LD Daily flow datas of Linganamakki dam. Jan.09 Dec.09 p
100 CD/SE(CD1)/LD Daily flow datas of Linganamakki dam. Jan.10 Dec.10 P
101 CD/SE(CD1)/SVP/LD Linganamakki dam-EPT readings. Feb.97 Mar.07 P
102 CD/SE(CD1)/SVP/LD Linganamakki dam-EPT readings. Apr.07 Running P
103 CD/SE(CD1)/SVP Weekly seepage details of Linganmakki And Talakalale dam.
Feb.02 Dec.05 P
104 CD/SE(CD1)/SVP Weekly seepage details of Linganmakki and Talakalale dam.
Jan.06 May 08 P
105 CD/SE(CD1)/SVP Weekly seepage details of Linganmakki and Talakalale dam.
May 08 Dec.11 P
105
/a
CD/SE(CD1)/SVP Weekly seepage details of Linganmakki and Talakalale dam.
Jan.12 Running P
106 CD/SE(CD1)/SVP Temperature/humidity recorded at Kargal laboratory.
Oct.2000 Jan.10 P
107 CD/SE(CD1)/SVP/TD Settlement gauge readings of Talakalale dam.
Jan.2000 Dec.05 P
108 CD/SE(CD1)/SVP/LD Fortnightly seepage observation of Linganamakki dam.
Jan.02 Dec.05 P
109 CD/SE(CD1)/SVP/LD Fortnightly seepage observation of Linganamakki dam.
Jan.06 May 09 P
110 CD/SE(CD1)/SVP/LD Monthly flow data of Linganamakki dam.
Jan.04 Dec.08 P
111 CD/SE(CD1)/SVP Rainfall data of Sharavathy valley Project.
2000 Nov.08 P
112 CD/SE(CD1)/SVP/PC Stand pipe Piezometer reading embedded along the Power channel.
Aug.01 Aug.09 P
113 CD/SE(CD1)/SVP/LD Seepage details through 900 V notch at down stream of Linganamakki dam
Sep.95 Dec.03 P
114 CD/SE(CD1)/SVP/LD Seepage details through 900 V notch at down stream of Linganamakki dam.
Jan.04 Feb.09 P
115 CD/SE(CD1)/SVP/TD Talakalale dam-Stand pipe piezometer readings.
Jan.02 Running P
116 CD/SE(CD1)/SVP/TD Talakalale dam-Earth backing-EPT readings
Jan.01 Sep.12 P
117 CD/SE(CD1)/SVP/TD Talakalale dam-Relief well water level reading.
Nov.2000 Jul.13 P
118 CD/SE(CD1)/SVP/LD Linganamakki dam-Strengthening of RT walls and walk way to spillway bucket.
Apr.09 Running T
119 CD/SE(CD1)/SVP/LD Linganamakki dam-Reservoir operation and monitoring of Floods for monsoon at Linganamakki dam.
Jun.08 Running T
120 CD/SE(CD1)/TD Seepage, Inflow and outflow details of Talakalale dam.
Jan.10 Dec 10 P
121 CD/SE(CD1)/TD Daily seepage,inflow and out flow details of Talakalale dam.
Jan.11 Dec.11 P
122 CD/SE(CD1)/TD Daily seepage,inflow and out flow details of Talakalale dam.
Jan.12 Feb.13 P
123 CD/SE(CD1)/TD Daily seepage,inflow and out flow details of Talakalale dam.
Mar.13 Dec.13 P
124 CD/SE(CD1)/TD Daily seepage,inflow and out flow details of Talakalale dam.
Jan.14 Running P
125 CD/SE(CD1)/LD Daily flow details of Linganamakki dam.
Jan.11 Dec.11 P
126 CD/SE(CD1)/LD Daily flow details of Linganamakki dam.
Jan.12 Feb.13 P
127 CD/SE(CD1)/LD Daily flow details of Linganamakki dam.
Mar.13 Feb.14 P
128 CD/SE(CD1)/LD Daily flow details of Linganamakki dam.
Mar.14 Running P
129 CD/SE(CD1)/TD Talakalale dam-Weekly seepage details of Talakalale dam
Jan.12 Running P
130 CD/SE(CD1)/TD Talakalale dam-Weekly seepage details of Linganamakki dam
Jan.12 Running P
131 CD/SE(CD1)/CBIP Updation of CBIP & CWC publication on Hydro scheme
March 12 Jul.12 T
132 CD/SE(CD1)/MGHE Land slide on approach road to MGHE power house
Sep.13 Running T
133 CD/SE(CD1)/COE Minutes of Committee of Experts Oct 2008 Running P
134 CD/SE(CD1)/LD Slip on downstream of central mound of Linganamakki dam
Jul.2009 Running T
135 CD/SE(CD1)/SLDSC Constitution of Technical Committee of State Level Dam Safety Committee
Aug.10 Running T
136 CD/SE(CD1)/MGHE Providing protective works to slipped hill mass on the right bank of MGHE power channel
Aug.08 Running T
137 CD/SE(CD1)/COE Action taken report on Recommendations of COE
Ape.14 Running T
II. FILES PERTAINING TO GERUSOPPA DAM
SL. No.
File No. SUBJECT
Opening Date
of File
Closing Date of File
/ Running
File
Date of Transfer of File
and Authority whom Transfer
red
Nature of File Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
1 CD/SE(CD1)/STR
Gerusoppa dam-Instrumentaion. Mar.99 Apr.08 P
2 CD/SE(CD1)/STR
Gerusoppa dam- Model studies. Mar.87 Mar.93 P
3 CD/SE(CD1)/STR
Gerusoppa dam- Model studies. Jun.93 Oct.05 P
4 CD/SE(CD1)/STR
Drilling and Grouting at left bank of Gerusoppa dam.
Mar.01 Mar.06 P
5 CD/SE(CD1)/STR/GD
Construction of Gerusoppa dam-Drilling and grouting.
Nov.99 Aug.08 P
6 CD/SE(CD1)/STR
Air,water temperature and test results of water samples of Gerusoppa dam.
May 02 Running P
7 CD/SE(CD1)/STR/GD
Gerusoppa dam-Preparation of data book.
Oct.08 Running T
8 CD/SE(CD1)/STR Gerusoppa dam- Details of Seepage in Mar.01 Dec.07 P
Drainage gallery.
9 CD/SE(CD1)/STR
Gerusoppa dam- Details of Seepage in Drainage gallery.
Jan.08 Nov.13 P
9a CD/SE(CD1)/STR
Gerusoppa dam- Details of Seepage in Drainage gallery.
Jan.14 Running P
10 CD/SE(CD1)/STR/GP
Gerusoppa dam-Details of instrumentation readings at block No.2&4.
Jun.01 Feb.10 P
10a CD/SE(CD1)/STR/GP
Gerusoppa dam-Details of instrumentation readings at block No.2&4.
Jan.11 Running P
11 CD/SE(CD1)/STR/GP
Gerusoppa dam- Details of instrumentation readings at block No.6&11.
Jun.02 Dec.05 P
11a CD/SE(CD1)/STR/GP
Gerusoppa dam- Details of instrumentation readings at block No.6&11.
Jan.06 Dec.07 P
11b CD/SE(CD1)/STR/GP
Gerusoppa dam- Details of instrumentation readings at block No.6&11.
Jan.08 Dec.10 P
11c CD/SE(CD1)/STR/GP
Gerusoppa dam- Details of instrumentation readings at block No.6&11.
Jan.11 Running P
12 CD/SE(CD1)/STR/GP
Gerusoppa saddle dam- Foundation and Embankment piezometers readings.
Jun.01 Dec.09 P
12a CD/SE(CD1)/STR/GP
Gerusoppa saddle dam- Foundation and Embankment Piezometers readings.
Jan.10 Running P
13 CD/SE(CD1)/STR/GP
Gerusoppa dam-Uplift pressure pipe readings.
Oct.03 Running P
14 CD/SE(CD1)/STR/GP
Gerusoppa dam-Upright/Inverse pendulum readings.
Oct.03 Running P
15 CD/SE(CD1)/STR/GP
Gerusoppa saddle dam- Water levels in open type Piezometers.
Dec.03 May 12 P
16 CD/SE(CD1)/STR/GP Monthly concise report of weather Jan.05 Sep.08 P
station at Gerusoppa dam.
17 CD/SE(CD1)/STR/GP
Gerusoppa saddle dam- seepage details.
Nov.01 Running P
18 CD/SE(CD1)/STR/GP
Seepage measured through V-Notch at Drainage Gallery
Jan.08 Running P
III. FILES PERTAINING TO KALI HYDRO ELECTRIC PROJECT,STAGE-I & II.
SL. No.
File No. SUBJECT
Opening Date
of File
Closing Date of File
/ Running
File
Date of Transfer of File
and Authority whom Transfer
Nature of File Permanent/
Temporary
Remarks
red 1 2 3 4 5 6 7 8
1 CD/SE(CD1)/KHEP/DSRP Dam Safety Review Panel and Panel of experts.
Aug.05 Apr.07 P
2 CD/SE(CD1)/KHEP/SD Supa dam-Drilling and grouting with quick setting grout on left and right abutment.
Ct.05 Aug.06 P
3 CD/SE(CD1)/KHEP Flood Zone marking at Kali nadi basin. Aug.04 Sep.08 P
4 CD/SE(CD1)/KHEP Flood Zone studies in Kali nadi basin. Apr.07 May.07 T
5 CD/SE(CD1)/KHEP/KD Kadra dam Power house-Unit 3-repairs to DT liner.
Sep.07 Feb.09 T
6 CD/SE(CD1)/KHEP/BPD Leakage/seepage on the down stream of Bommanahalli Pick up dam.
Jul.06 Nov.07 T
7 CD/SE(CD1)/KHEP/BPD Bommanahalli Pick up dam-Intake structure and HRT-Repairs to cracks.
Nov.02 Apr.06 T
8 CD/SE(CD1)/KHEP/SD Supa dam-cracks in Training wall- repairs.
Nov.05 May 07 T
9 CD/SE(CD1)/KHEP/KOPH Kodasalli power house-Seepage in unit DT of units 1,2&3.
Feb.06 Nov.07 T
10 CD/SE(CD1)/KHEP/SD Supa dam- Collapse of gabion on right bank at down stream of supa dam Tail race pond.
Apr.08 Oct.08 T
11 CD/SE(CD1)/KHEP/SD Supa dam-Formation of cavity below Gabion on left bank down stream near Flip.
Aug.08 Running T
12 CD/SE(CD1)/KHEP/BPD Supa dam- Plugging of investigation Drift No.1 at RL-544.00m.
Feb.06 Feb.06 T
13 CD/SE(CD1)/KHEP/SPH Treatment to leakage in Draft tube concrete in unit 2 of Supa dam power house.
Feb.08 Feb.08 T
14 CD/SE(CD1)/KHEP/SD Supa dam-Erosion of Supa reservoir upstream bank on left and right bank-Protection measures.
Oct.06 Running P
15 CD/SE(CD1)/KHEP/SD Supa dam-Erosion of Supa reservoir upstream bank on left and right bank-Inspection.
Oct.06 Jan.07 P
16 CD/SE(CD1)/KHEP/SD Supa dam- rock slide/protection to left bank.
Jul.03 Aug.07 T
17 CD/SE(CD1)/KHEP/KOPH Supa dam- rock slide/protection to left bank.
Oct.06 May 07 T
18 CD/SE(CD1)/KHEP/KOD Kodasalli dam-revival of instruments. May 05 Jul.06 P
19 CD/SE(CD1)/KHEP/GS Geodetic survey, Tracer studies and Sedimentation survey.
Feb.03 Dec.08 T
20 CD/SE(CD1)/KHEP/HW History writing of KHEP stage-I-Phase-I (Excluding Supa & Upper Kaneri).
Aug.97 Nov.04 T
21 CD/SE(CD1)/KHEP Requirement of water for enhancement of capacity at Kaiga Nuclear Plant.
Dec.09 Running T
22 CD/SE(CD1)/KHEP/NPH R,M &U of unit 4,5&6 at NPH-Testing for the soundness of the stator foundation sole plates.
Jun.09 Sep.09 T
23 CD/SE(CD1)/KHEP/SD Supa dam-Arresting leakages in lift well in block No.15.
Apr.09 Jul.09 T
24 CD/SE(CD1)/KHEP/TD Technical Audit observation on Kali wing works-Cracks observed near spillway crest gates of Tattihalla dam.
Jun.09 Nov.09 T
25 CD/SE(CD1)/KHEP/KPH Kadra dam Power house-Unit no.1.DT liner repairs.
Jan.03 May 04 T
26 CD/SE(CD1)/KHEP/SD Supa dam-Tracer studies to ascertain the sources & path of seepage in the dam.
Apr.03 Jul.05 T
27 CD/SE(CD1)/KHEP/UKD Upper Kaneri dam-Issue of flood warning notices.
Jun.09 Jul.09 P
28 CD/SE(CD1)/KHEP Preparation of Data books of Kadra and Kodasalli dams.
Oct.08 Running T
29 CD/SE(CD1)/KHEP Lifting of water from Kali river to the proposed sugar factory at Hullatti, Haliyal by M/s.GMR industries.
Feb.09 Mar.09 P
30 CD/SE(CD1)/KHEP/SD Supa dam-Sedimentation assessment.
Jun.06 Jun.06 T
31 CD/SE(CD1)/KHEP/SD Supa dam-Inflow &out flow details. Jul.07 May 09 P
32 CD/SE(CD1)/KHEP/SD Supa dam-Inflow &out flow details. Jun.09 Dec.09 P
33 CD/SE(CD1)/KHEP/SD Supa dam-Seepage and Jan.06 Dec.07 P
instrumentation details.
34 CD/SE(CD1)/KHEP/SD Supa dam-Seepage and instrumentation details.
Jan.08 Dec.09 P
34a CD/SE(CD1)/KHEP/SD Supa dam-Seepage and instrumentation details.
Jan 12 running P
35 CD/SE(CD1)/KHEP/SD Supa dam-Test results of water samples.
Mar.06 Running P
36 CD/SE(CD1)/KHEP Hydro meteorological details of KHEP. Jan.01 Running P
37 CD/SE(CD1)/KHEP/KD Kadra dam-Details of instrumentation readings and results of water samples.
Jan.06 Dec.07 P
38 CD/SE(CD1)/KHEP/KD Kadra dam-Details of instrumentation readings and results of water samples.
Jan.08 Dec.10 P
38/a
CD/SE(CD1)/KHEP/KD Kadra dam( Earthen)-Details of instrumentation readings and results of water samples.
Jan.11 Running P
38/b
CD/SE(CD1)/KHEP/KD Kadra dam( Concrete)-Details of instrumentation readings and results of water samples.
Jan.11 Running P
39 CD/SE(CD1)/KHEP/KOD Kodasalli dam-Details of instrumentation readings and results of water samples.
Jan.01 Dec.05 P
40 CD/SE(CD1)/KHEP Kodasalli dam-Details of instrumentation readings and results of water samples.
Jan.06 Dec.12 P
40a CD/SE(CD1)/KHEP Kodasalli dam-Details of instrumentation readings and results of water samples.
Jan.13 Running P
41 CD/SE(CD1)/KHEP Bommanahalli and Tattihalla- Details of instrumentation readings and results of water samples.
Oct.05 Running P
42 CD/SE(CD1)/KHEP Upper Kaneri dam-Details of instrumentation readings and results of water samples.
Sep.05 Running P
43 CD/SE(CD1)/KHEP Dry,Wet,Max & Min. temperature recorded at Ambikanagar Lab.
Jan.06
Running
P
44 CD/SE(CD1)/KHEP/SD Report of Rehabilitation & Resettlement of KHEP Stage-II
Running P
45 CD/SE(CD1)/KHEP/SD Supa dam-Inflow and out flow details Jan.10 May.11 P
46 CD/SE(CD1)/KHEP/SD Supa dam-Inflow and out flow details Jun.11 Aug.12 P
47 CD/SE(CD1)/KHEP/SD Supa dam-Inflow and out flow details Sep.12 Oct.13 P
48 CD/SE(CD1)/KHEP/SD Supa dam-Inflow and out flow details Nov.13 Running P
49 CD/SE(CD1)/KHEP/SD Supa dam- Seepage and instrumentation details.
Jan.13 Running P
50 CD/SE(CD1)/KHEP/SD Supa dam- Seepage control measures from formed drains in Block No.8.
Sep.08 Running T
51 CD/SE(CD1)/KHEP Collapsed rock bolt protection of approach channel of Tattihalla and Bommanahalli Water Conductor system and dents observed in pressure shafts of NGPH at 1190 Adit
Jul.12 Running T
52 CD/SE(CD1)/KPH Pumping of water from bore hole drilled in ODY of Kadra Power house
Nov.11 Running T
53 CD/SE(CD1)/KHEP vw¯ ºN® 30.03.2012 Š® N®w®Ýl® y®ä„® î¯ q¯ Áy®räNµ‡®±ªå y®äN®hî¯ TŠ®±î® Nµ²l®š®¢ë AnµN®h±Ô y¯ ý®æÁu®ªå „®² N®±›q® Hº… ®v‡®± …SµÌ
ÎMarch.12 May.12 T
54 CD/SE(CD1)/Kadra PH/Seep
Kadra power house seepage- Sinking of bore wells
May 04 Running T
55 CD/SE(CD1)/KPH Power supply from Kadra Power house to Kadra Colony
Nov.12 Dec.12 T
Karnataka Power Corporation Ltd., List Files and Records – BTPS- RTPS-Unit-8 & Consultancy, Maralihalla Pump house
Name of the Office: CCED/SE(CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore. SL. No.
File No.
SUBJECT Opening Date
of File
Closing Date of File / Running File
Date of Transfer
of File and Authority
whom Transferred
Nature of File Permanent/ Temporary
REMARKS
65 Munirabad Power house ADDTL UNIT 1X10MW Correspondence file VOL-II
29.04.2013 Running Permanent
66 Girijapur barrage consultancy correspondence file VOL-I
11.05.2012 26.02.2014 Permanent
67 Girijapur barrage consultancy correspondence file VOL-II
01.03.2014 Running Permanent
68 BTPS-Ash pond stg-II Tender file Vol-I
18.05.2013 20.07.2013 Permanent
69 BTPS-Ash pond stg-II Tender file Vol-II
31.07.2013 Running Permanent
70 BTPS-Ash pond stg-II Design File Vol-I
24.04.2013 Running Permanent
71 BTPS-Ash pond stg-II Construction Drg File Vol-I
19.12.2013 Running Permanent
72 BTPS-Ash pond stg-II Correspondence File Vol-I
05.03.2010 29.12.12 Permanent
73 BTPS-Ash pond stg-II Correspondence File Vol-II
04.01.2013 Running Permanent
74 Extension to Drug controller office.-CONST DRGS FILE VOL-I
01.02.2013 26.12.2013 Permanent
75 Extension to Drug controller office.-CONST DRGS FILE VOL-II
03.01.2014 Running Permanent
76 Extension to Drug controller office.-Design FILE VOL-I
23.01.2014 Running Permanent
77 Extension to Drug controller office.-Correspondence FILE VOL-I
07.08.2012 Running Permanent
78 Extension to Drug controller office.-Architectural drgs FILE VOL-I
22.11.2012 Running Permanent
79 BTPS TOWNSHIP-OHT CONST DRG FILE VOL-I
02.03.2013 Running Permanent
80 BTPS TOWNSHIP- VIP GH CONST DRG FILE VOL-I
02.02.2012 15.06.2012 Permanent
81 BTPS TOWNSHIP- VIP GH CONST DRG FILE VOL-II
31.07.2012 14.02.2013 Permanent
82 BTPS TOWNSHIP- VIP GH CONST DRG FILE VOL-III
14.03.2013 Running Permanent
83 BTPS TOWNSHIP- VIP GH ARCHT DRG FILE VOL-I
03.02.2012 Running Permanent
84 BTPS TOWNSHIP- CORPORATE GH ARCHT DRG FILE VOL-I
10.07.2012 Running Permanent
85 BTPS TOWNSHIP- CORPORATE GH CONST DRG FILE VOL-I
05.04.2012 22.08.2012 Permanent
86 BTPS TOWNSHIP- CORPORATE GH CONST DRG FILE VOL-II
04.09.2012 Running Permanent
87 VUGPH-IX220KV ADDNL LINE BAY DESIGN& DRG VOL-I
08.10.2013 Running Permanent
88 A2-TYPE BUILDINGS:- DESIGN DOCUMENTS
24-May-2012
7-Jan-2013
Permanent
89 A2-TYPE BUILDINGS:- (COMMENTED DRAWINGS)
22-Jun-2012
2-Apr-2013
Permanent
90 A2-TYPE BUILDINGS ( APPROVED DRAWINGS)
6-Jun-2012
22-Jan-2013
Permanent
91 A2-E& A2-I BLOCKS ( APPROVED DRAWINGS)
19-Mar-2013
19-Mar-2013
Permanent
92 NON-CORPORATE GUEST HOUSE: DESIGN DOCUMENTS
8-May-2012
18-Jul-2012
Permanent
93 NON-CORPORATE GUEST HOUSE(COMMENTED DRAWINGS)
13-Feb-2013
3-Apr-2013
Permanent
94 NON-CORPORATE GUEST HOUSE(APPROVED DRAWINGS)
21-Jul-2012
28-May-2013
Permanent
95 SHOPPING COMPLEX COMMENTED DRAWINGS
17-Aug-2013
Running Permanent
96 SHOPPING COMPLEX (APPROVED DRAWINGS)
12-Sep-2013
17-Feb-2014 Permanent
97 WATER DISTRIBUTION AND SEWER NETWORK CORRESPONDENCE & DRAWINGS
19-Apr-2013
Running Permanent
98 GENERAL CORRESPONDENCE OF EXTERNAL WORKS (WTP/STP/ELECTRICAL WORKS ETC.)
8-Nov-2013
Running Permanent
99 SECURITY BLOCK DRAWINGS (COMMENTED/APPROVED)
13-Dec-2013
Running Permanent
100 SPORTS AND RECREATION CENTRE DRAWINGS (COMMENTED/APPROVED)
18-Dec-2013
Running Permanent
101 WATER SUPPLY, SANITARY, STORM WATER DRAINAGE & BUILDINGS PLUMBING WORKS ( APPROVED DRAWINGS)
14-Aug-2013
Running Permanent
102 PACKAGE-1,3,6 ARCHITECTURAL DRAWINGS (COMMENTED/APPROVED) BUS STAND DRAWINGS (COMMENTED/APPROVED)
14-Nov-2013
06-JAN-2014 Permanent
103 RTPS- CONSTRUCTION OF STORE CUM WORKSHOP FOR HT MOTORS
18-Feb-2011
Running Permanent
104 KHEP-I CONSTRUCTION OF OFFICE COMPLEX AT AMBIKANAGAR
13-Oct-2011
Running Permanent
105 VHEP- CONSTRUCTION OF OFFICE COMPLEX AT HOSANGADI COLONY
5-Mar-2011
Running Permanent
106 KHEP-I CONSTRUCTION OF OFFICE COMPLEX AT GANESHGUDI
4-Mar-2013
Running Permanent
107 BTPS- MILL SERVICE BUILDING CORRESPONDENCE & DRAWINGS
30-Jun-2012
Running Permanent
108 RTPS- CONSTRUCTION OF CANTEEN BUILDING AT SHAKTINAGAR COLONY
13-Jul-2012
1-Oct-2012
Permanent
109 VHEP- CONSTRUCTION OF FOOT BRIDGE AT MALALI VILLAGE
21-Mar-2012
11-Jul-2012
Permanent
110 RTPS - CONSTRUCTION OF PERMANENT OFFICE BUILDING FOR CHPII & CHP-E SUB DIVISION OFFICE
04-JUL-2011 Running Permanent
111 BTPS TOWNSHIP CORRESPONDENCES OF ALL
31-12-2012 Running Permanent
PACKAGES
112 RPCL TOWNSHIP- WORKSLIP 20-10-2011 Running Permanent
113 BTPS TOWNSHIP- INVOICE/BILLS OF STUP CONSULTANT
22-03-2010 Running Permanent
114 YTPS-GMW-RAW WATER PUMPHOUSE
06.11.2013 Running Permanent
115 YTPS-GMW-ASH WATER PUMPHOUSE, WORKSHOP, PIPE CORRIDOR
24.10.2013 Running Temporary
116 YTPS-GMW-GENERAL 27.11.2013 Running Permanent
Karnataka Power Corporation Ltd., List Files and Records – KPCL OFFICE BUILDING,ADPH ADMIN BUILDING, BTPS B&C TYPE BUILDINGS…, Name of the Office: CCED/SE(CD-2) :SANTOSHA.S, AE(C) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore
Sl
No.
File No
Subject
Opening
date
Closing date
Date of transfer of
file/authority whom
transferred.
Nature of file Temporary /permanent
Remarks
1
2
3
4
5
6
7
8
1 57 RTPS- Construction of office building for kpcl @ Shakthinagar,Raichur.-Design file VOL-I
11.11.2011 Running Permanent
2 58 RTPS- Construction of office building for kpcl @ Shakthinagar, Raichur.-Construction drawing file VOL-I
10.11.2011
Running Permanent
3 59 KPCL New office complex at Drug controller premises.-CONST DRGS FILE VOL-IV
21.09.2011
13.04.2012
Permanent
4 60 KPCL New office complex at Drug controller premises.-CONST DRGS FILE VOL-V
03.05.2012
Running
Permanent
5 61 KPCL New office complex at Drug controller premises.-ARCH DRGS FILE VOL-II
31.03.2012
Running
Permanent
6 62 Munirabad Power house ADDTL UNIT 1X10MW Correspondence file VOL-I
11.04.2012
Running
Permanent
7 63 Munirabad Power house ADDTL UNIT 1X10MW Construction Drgs file VOL-I
05.04.2012
Running
Permanent
8 64 Munirabad Power house ADDTL UNIT 1X10MW Design file VOL-I
17.04.2012
Running
Permanent
8 1
ADPH – Providing water supply scheme to guest house, cottages and ornamental gardens at sseethagiri hillock area on right bank of Almatti dam & GLSR for Guest house at Almatti.
02.11.2011 Running Permanent
9 1 Western ghats Environment Forum 12.04.2011 Running Permanent
10 1 Raw water from Narayanpur to RTPS 30.04.2012 Running Permanent
11 2
Construction of gated barrage for storage of water across Krishna river on U/s of confluence of Krishna & Bhjima
16.05.2012 Running Permanent
Karnataka Power Corporation Ltd., List of files and Records under Section 4 (10(a) of the Right to Information Act 2005
Name of the office Address Sl.No.
File No.
Subject
Opening Date of File
Closing date of File/Running file
Date of Transfer of File & Authority whom transferred.
Nature of file Permanent / Temporary
Remarks
1 CD/AL MATTI/Admin.BLK Almatti Administrative Building
18.01.2006 22.01.2010
Closed
Permanent
2 CD/SE3/Admin.Block/Ambikanagar
/Ganeshgudi Ambikanagar and Ganeshgudi Office Complex
22.01.2009 24.10.2009
Closed
Permanent
3 ED(C)/CNNL/Badanavalu LIS Badanavalu LIS
18.05.2004 08.08.2007
Closed
Permanent
4 CD/C3/Kalasa & Bandura Bandurnala diversion scheme
20.09.2007 31.03.2010 Closed
Permanent
5 -do- Kalasa & Bandurnala Diversion Scheme
March
2003
Dec.2004
Closed
Permanent
6 -do- Volume –I 09.11.2000 25.11.2000
Permanent
7 -do- Volume-II 24.12.2001 05.03.2004
Permanent
8 -do- Volum,e-III
20.09.2002 26.02.2004
Permanent
9 -do- Volume-IV 01.01.2005 Sept.2007
Closed
Permanent
10 CD-1/EE-1/MESCOM Electrification & electrification works of corporate office at paradigm plaza,
21.12.2002 13.02.2003
Closed
Permanent
Sl.No.
File No.
Subject
Opening Date of File
Closing date of File/Running file
Date of Transfer of File & Authority whom transferred.
Nature of file Permanent / Temporary
Remarks
pandeshwar, mangalore
11 CD/Consultancy/Hanumapur Hanumapur pump house
13.04.2004 03.08.2004
Closed
Permanent
12 CD4/Consul/CCEK Hasehalla Foot Bridge
20.09.2008 09.06.2004
Closed
Permanent
13 CD/VUGH/Bldg Hosangadi office Complex
13.02.2006 29.05.2008
Closed
Permanent
14 CD3/CONSULTANCY/INDI Indi LIS
20.04.2005 23.11.2005
Closed
Permanent
15 CD/Consul/JVSL Jindal vijayanagar steel plant Augmentation of Raw
Water
08.01.2003 16.10.2003
Closed
Permanent
16 CD/CONSULT/KUWS&DB Karwar-Ankola combined water supply scheme
30.10.2004 20.11.2000 Closed
Permanent
17 CD/Foot bridge/Ulavi Kumbaral Foot Bridge
16.04.2004 27.01.2007 closed
Permanent
18 CD/SE-1/MGHE MGHE Power Channel Rectification Works
16.08.2008
19.05.2009 closed
Permanent
19 KPCL/UKP/LIS/Rajankollur Rajankollur lift irrigation scheme
Permanent
20 -do- Volume – I 12.12.2006 09.11.2007 Permanent
21 -do- Volume - II 09.11.2007 11.06.2008 Permanent
22 -do- Volume – III
11.06.2008 12.01.2010
Closed
Permanent
23 CD/Consul/CCEK RCC bridge across 20.09.2003 09.06.2004 Permanent
Sl.No.
File No.
Subject
Opening Date of File
Closing date of File/Running file
Date of Transfer of File & Authority whom transferred.
Nature of file Permanent / Temporary
Remarks
Hasehalla near halavalli RH centre
Closed
24 Upper Bhadra Project Volume-I
Permanent
25 -do- Volume-I 13.09.2007 21.06.2008
Permanent
26 -do- Volume-III 21.06.2008 19.12.2009
27 CD/Consul/VVNL V.V.N.L administrative building
Permanent Handed over
to SE (Consultancy)
28 CD/Consul/VVNL VVNL-Shiva & Shimsha HEP Renovation Volume-I
18.11.2003 25.02.2006
Permanent
29 -do- Volume –II 28.03.2005 30.09.2006 Closed
Permanent
30 CD/C3/VHEP-II/EPC VHEP Volume-I
07.04.2005 13.04.2007 Permanent
31 -do- Volume-II 01.01.2005 31.07.2006 Permanent
32 -do- Volume-III 18.09.2007 15.05.2008 Permanent
33 -do- Volume –IV
15.05.2008 Running Permanent
34 CD3/C1/VHEP-II VHEP Stage – II (Precision Survey Works – M/s.ALCON)
17.01.2005 06.02.2009 Closed
Permanent
35 CD/C3/CON/RAM-III Rammamm HEP Volume-I
25.12.2007 Permanent
36 -do- Volume-II 26.12.2007 Running
Permanent
37 CD/BT-TS/WBM BTPS Township -WBM 01.02.2010 Running Permanent
Sl.No.
File No.
Subject
Opening Date of File
Closing date of File/Running file
Date of Transfer of File & Authority whom transferred.
Nature of file Permanent / Temporary
Remarks
Road
38 CD/BT-TS-Consultancy BTPS Township –Consultancy Volume-I
03.09.2009 01.12.2009 Permanent
39 -do- Volume-II 01.12.2009 Running
Permanent
40 ED(C)/Simplex/614 Vishnugad Pipalkoti HEP-444 MW
19.01.2008 Closed
04.03.2008
Permanent
41 CDC3/Welfare Cess Construction workers welfare cess act 1996-guidelines
11.12.2008 16.09.2009
Closed
Permanent
42 CD/C3/TUNGA Tunga Anicut Hydro Electric Project [Consultancy Services]
23.12.2008 13.08.2009
Closed
Permanent
43 -do- Alkananda Hydro Electric Power company Ltd.,
21.02.2007 04.12.2007
Closed
Permanent
44 -do- Singatalur Lift Irrigation Project
26.12.2003 26.12.2003
Closed
Permanent
45 -do- Binga Ghat Tunnel 14.05.2004 26.05.2004
Closed
Permanent
46 KPCL/CE/EEC/BWSSB/CE
(Yelahanka) Bangalore Water Supply Project –II from Forbes Sagar to TK’halli
05.05.2008 13.05.2008
Closed
Permanent
47 CD/DPR(New Project) Bankable DPR for Gangavali Stage-I, Kali stage-II & Aghanashini
19.04.2007 29.10.2007
Closed
Permanent
Sl.No.
File No.
Subject
Opening Date of File
Closing date of File/Running file
Date of Transfer of File & Authority whom transferred.
Nature of file Permanent / Temporary
Remarks
48 VUGPH-Stage-II Control Room Layout of VUGPH
16.12.2008 18.11.2009
Closed
Permanent
49 ED(C)/Y-Kaggal Y-Kaggal Lift Irrigation Scheme
20.08.2007 20.09.2007
Closed
Permanent
50 ED(C)/KNNL/Markandeya Markandeya Dam 07.03.2007 07.03.2007
Closed
Permanent
51 -do- Rehar – II HEP & Kotni – II HEP
28.06.2007 28.06.2007
closed
Permanent
52 ED(C)/Lata Tapovan Lata Tapovan 03.06.2006 22.06.2006
Closed
Permanent
53 ED(C)/KNNL/UTP(SE-Consultancy) Aqueduct Across Kumadavathi
30.03.2004 14.03.2007 Closed
Permanent
54 CD2/EE5/Consul Water Supply to EPIP at Ganjimutt
08.10.2002 03.12.2002 Closed
Permanent
55 CDC3/VHEP-II/EPC VUGPH Stage-II Unit -3 of Performance Certificate(M/s.Subhadra Consulting Engineers)
17.10.2006 12.02.2009 Closed
Permanent
56 CDA/TPC/PL Tungabhadra Power Company Pvt.Ltd. Singatalur – Huligudda Mini Hydel Scheme
14.10.2003 15.10.2003 closed
Permanent
57 CDC1/VHEP-II/EPC VUGPH Volume-I
14.05.1997 20.12.2004
Closed
Permanent
58 -do- Volume – II 01.04.2007 30.09.2007
Closed
Permanent
59 -do- Volume – III 01.08.2006 08.12.2008
Closed
Permanent
60 CDC3/VHEP-II/EPC VHEP- Hydro Mechanical Works
20.11.2006 08.01.20-6
Closed
Permanent
61 -do- VUGPH- Drawings 25.01.2008 03.04.2008
closed
Permanent
Sl.No.
File No.
Subject
Opening Date of File
Closing date of File/Running file
Date of Transfer of File & Authority whom transferred.
Nature of file Permanent / Temporary
Remarks
62 -do- VUGPH Top Adit Construction drawings Volume - I
01.02.2006 05.07.2006
closed
Permanent
63 -do- Volume-II 22.01.2008 25.01.2008
closed
Permanent
64 -do- Volume – I 31.10.2006 07.07.2007
closed
Permanent
65 CDC3/KNNL/UBP Upper Bhadra Volume – I
16.09.2005 12.09.2007
Closed
Permanent
66 CDC3/Rammam Rammam- HEP Volume – I
01.12.2006 31.12.007
Closed
Permanent
67 Kalasa & Bhandura Nala 23.02.2001 01.06.2002
Closed
Permanent
68 CD/BT-TS/RB(General
Correspondence)
BTPS Township B & C Type Qtrs. Volume –I
22.09.2008 05.02.2010
closed
Permanent
69 -do- Volume –2 05.02.2010 25.08.2010 closed
Permanent
70 -do- Volume –3 25.08.2010 04-01-2012 Closed
Permanent
71 -do- Volume - 4 04-01-2012
Running permanent
72 CD/BT-TS/CONSUL BTPS Township -GENERAL Volume – I
01.09.2009 01.12.2009 closed
Permanent
73 -do- Volume – 2 01.12.2009
22.06.2010
closed
Permanent
74 -do- Volume – 3 22.06.2010 06.09.2010
closed
Permanent
75 -do- Volume – 4 06.09.2010 18-06-2011
closed
Permanent
76 -do- Volume - 5 18-06-
2011
Running Permanent
77 CD/BT-TS/ PKG-1 BTPS Township 30.08.2010 22-09-2011 Permanent
Sl.No.
File No.
Subject
Opening Date of File
Closing date of File/Running file
Date of Transfer of File & Authority whom transferred.
Nature of file Permanent / Temporary
Remarks
Type-A1, A2, VIP, Corporate and Non-corporate Guest House Volume-1
closed
78 -do- Volume-2 22.09.2011 Running permanent
79 PKG-I-VIP Guest house Construction drawings Volume-1
06-12-
2011
15-05-2012
closed
permanent
80 -do- Volume-II 15-06-
2012
Running permanent
81 PKG-I-Corporate guest house Construction drawings Volume-1
01-03-
2012
Running permanent
82 CD/BT-TS/ PKG- 2 BTPS Township External Works
21.09.2010 Running Permanent
83 CD/BT-TS/ PKG- 3 BTPS Township
15.10.2010 Running Permanent
84 CD/BT-TS/ PKG- 4 BTPS Township 16.12.2010 Running Permanent
85 CD/BT-TS/ PKG- 6 BTPS Township
29.11.2010 Running Permanent
86 CD/BT-TS/ PKG- 7 BTPS Township
26.08.2010 Running Permanent
87 CD/RP-TS/RB(general
correspondence) RPCL Quarters Volume-1
01.01.2010 15-12-2010
closed
Permanent
88 -do- Volume-2 15-12-
2010
Running permanent
89 CD/BT-TS/RB BTPS Quarters Drawings sent to site
22.07.2010 Running Permanent
90 CD/RP-TS/RB RPCL Quarters Drawings sent to site
16.11.2010 Running Permanent
91 CD/C3/KNNL/UDB Upper Bhadra project Consultancy services
16-09-
2005
12-09-2007
closed
permanent
Files and Records Subject: Construction of New office complex at RTPS, YTPS-RSMY, BTPS RSMY-misc, Shunt reactor at RTPS Name of the Office : CCED, Sector: Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore. Sector SECD-2/CCED
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
2012-13 and 20113-14 (upto March 2014)
1 New Office Complex at R Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-XI-Tender correspondence TPS/green building)
January 2013 Running permanent
YTPS-RSMY works vol. I May 2012 December 13 Permanent YTPS-RSMY works vol. II January 14 April 2014 Permanent YTPS-RSMY works vol. III May 2014 running Permanent
2 RTPS Establishing of 1 No. of 220 kv shunt reactor bay at 400kv switch yard. Vol-I
December 2011 June 2012 Permanent
RTPS Establishing of 1 No. of 220 kv shunt reactor bay at 400kv switch yard. Vol-II
July12 April 2014 Permanent
3 500mv, 400/220/33 kv interconnecting transformer and associated switch yard equipments.Vol-I
October 2012 December2012 Permanent
500mv, 400/220/33 kv
interconnecting transformer and
December2012 April 2013 Permanent
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
associated switch yard
equipments.Vol-II
500mv, 400/220/33 kv interconnecting transformer and associated switch yard equipments.Vol-I
April 2013 January 2014 Permanent
4 Providing power supply to KPC
colony form Nagjari PH
December 2012 running Permanent
5 BTPS –RSMY for interlining of railway tracks & manual unloading of coal around unit-1 to 3
January 2014 Running Permanent
Karnataka Power Corporation Ltd.,
List Files and Records – BTPS- Construction of Raw Water Pond Name of the Office: CCED/SE-2 (CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
1 1 Estimate (Original) Permanent Closed 2 2 Concrete lining /Rcc / Pcc / Fiber
reinforcement (Propylene Fiber etc. Permanent Closed
3 3 Bid documents for site grading of plant
area of BTPS Permanent Closed
4 4 Fiber reinforcement Permanent Closed 5 5 Light compaction equipment ( for U/s
protection works) Permanent Closed
6 6 Design file (Test results, Stability
results, Zonal section 75% dependability
values)
Permanent Closed
7 7 Bed treatment – Note to TD (Draft) Permanent Closed 8 8 Stability analysis results Permanent Closed 9. 9. Final alignment – Modified proposal
(Mallapur) Permanent Closed
10 10 Capacity calculations Permanent Closed 11 11 Geo-membrane Permanent Closed 12 12 GRI Standards & Test methods for
HDPE Geo-membrane Permanent Closed
13 13 Geo-membrane, IISc., Bangalore Permanent Closed 14 14 HDPE Geo-membrane Permanent Closed 15 15 Bed treatment – Location of Geo-
membrane Permanent Closed
16 16 Methodology of laying Geo-membrane Permanent Closed 17 17 Bed treatment Permanent Closed 18 18 CMG & Miscellaneous (Core) Permanent Closed (old)
19 19 General correspondence – Vol – I Permanent Closed
(New)
20 20 General correspondence – Vol –I I Permanent Closed 21 21 General correspondence – Vol - III Permanent Closed 22 22 General correspondence – Vol – IV Permanent Closed
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
23 23 Approach Bridge to Jack well pump
house Permanent Closed
24 24 Correspondence with IISc.,. Permanent Closed 25 25 Soil test results of RWP – Vol – I Permanent Closed 26 26 Soil test results of RWP – Vol – II Permanent Closed 27 27 Upstream protection to RWP projected
to TC Permanent Closed
28 28 Toe – line of RWP & Ash pond (Stage –
II) Permanent Closed
29 29 Provision of Geo-membrane, Approval
of QAP & FQAP Permanent Closed
30 30 Out fall – Design of RCC cascade
arrangement Permanent Closed
31 31 Upstream protection embankment near
approach bridge (Photos)
Permanent Closed
32 32 RWP – EIRL Permanent Closed 33 33 EIRL – Approved rates Permanent Closed 34 34 Embankment – Hearting with
impervious soil, casing with semi – impervious soil
Permanent Closed
35 35 Provision of Bed lining Permanent Closed 36 36 Agenda Note / EIRL / Soil capping Permanent Closed 37 37 EIRL – TC (Photos) Permanent Closed 38 38 Fact Finding Committee report Permanent Closed 39 39 Geo-membrane – Latest Permanent Closed 40 40 Tender correspondence – Vol – I Permanent Closed 41 41 Tender correspondence – Vol - II Permanent Closed 42 42 Tender correspondence – Vol - III Permanent Closed 43 43 Office Notes (HO Approvals) Permanent Running 44 44 Note to TD / TC – Correspondence –
Vol – I Permanent Closed
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
45 45 Stage – I - Upstream slope protection
(Restoration work) Permanent Closed
46 46 Stage – II – e-procurement / Tendering Permanent Running 47 47 Minutes of meetings – Vol – I Permanent Closed 48 48 Minutes of meetings – Vol –II Permanent Closed 49 49 Storage capacity (Fetch) Permanent Closed 50 50 Raw water requirement 3 Units. Permanent Running 51 51 Jack well Design Vol-I. Permanent Closed 52 52 Jack well Design Vol-II. Permanent Closed 53
53
Design of Intake gate. Permanent Closed
54 54 Jack well Brick wall Permanent Closed
55 55 Jack well – Alternate roofing. Permanent Closed 56 56 General Correspondence – Vol-I 05.02.2010 Permanent 57 57 General Correspondence – Vol-II 20.12.2010 Running Permanent 58 58 Increase in Quantities (ON enclosed) 08.10.2010 Running Permanent 59 59 Soil reports of RWP Stage-II 07.04.2010 Running Permanent 60 60 HDPE Geo-membrane - QAP & FQP 25.11.2010 Running Permanent 61 61 Work slip / EIRL of RWP-Stg-II 01.06.2011 Running Permanent 62 62 Note on joint inspection & testing of
HDPE Geo-membrane
07.05.2011 Permanent
63 63 Committee report on availability of
homogeneous soil
28.02.2011
Karnataka Power Corporation Ltd.,
List Files and Records – BTPS- Construction of Ash Pond
Name of the Office: CCED/SE-2 (CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
1 2 3 4 5 6 7 8
1 1 Ash pond- General correspondence..
Vol-I 18.06.04 20.08.05 --
Permanent Closed
2 2 Ash pond- General correspondence..
Vol-II 27.01.05 20.10.05
Permanent Closed
3 3 Ash pond- General correspondence..
Vol-III 31.03.06 17.07.09
Permanent Closed
4 4 Ash pond (Drawing) 2005 2006 Permanent Closed
5 5 Ash pond correspondence with IISc Bangalore 30.12.04 31.10.06
Permanent Closed
6 6 Life of Ash pond 25.02.2010 Running Permanent 7 7 Committee report on life of Ash pond 21.04.2010 Permanent
Karnataka Power Corporation Ltd., List Files and Records – BTPS- Maralihalla water supply Scheme (MS-Pipe line)
Name of the Office: CCED/SE-2 (CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
1 1 Maralihalla water supply scheme-Vol-I 04.08.03 30.01.04
Permanent Closed
2 2 Maralihalla water supply scheme-Vol-II 26.10.04 10.11.04
Permanent Closed
3 3 Maralihalla water supply scheme-Vol-III 21.09.04 10.05.05
Permanent Closed
4 4 Maralihalla water supply scheme- Tender correspondence
11.03.04 21.10.04 Permanent Closed
5 5 Maralihalla water supply scheme- consultancy
10.01.03 09.07.03 Permanent Closed
6 6 Maralihalla water supply scheme- General 06.08.04 11.01.2010
Permanent Closed
7 7 Maralihalla water supply scheme- Third party inspection
01.10.04 29.10.05 Permanent Closed
8 8 Maralihalla water supply scheme-IVRCL 21.04.04 24.11.04
Permanent Closed
9 9 Maralihalla water supply scheme- Technical committee
14.01.03 02.04.04 Permanent Closed
10 10 Maralihalla water supply scheme-Air release Valve –Vol-I 02.03.05 17.06.05
Permanent Closed
11 11 Maralihalla water supply scheme- Approch Bridge
30.06.02 24.08.03 Permanent Closed
12 12 Maralihalla water supply scheme- Drawing
27.05.05 24.03.07 Permanent Closed
13 13 Maralihalla water supply scheme- Air Release Valve –Vol-II 30.06.05 21.11.05
Permanent Closed
14 14 Maralihalla water supply scheme- Butter fly Valve & Zero – Velocity 11.01.05 26.05.05
Permanent Closed
15 15 Maralihalla water supply scheme-Consultancy-DCPL Kolkata 26.11.05 13.0707
Permanent Closed
16 16 Maralihalla water supply scheme- DCPL-Additional Services
05.05.04 03.01.07 Permanent Closed
17 17 Maralihalla water supply scheme-Air release Valve- Third party inspection- –M/s Quest Ltd.
27.07.05 13.09.06 Permanent Closed
18 18 Strengthening of ARV’s 25.08.2010 Running Permanent
19 19 Maralihalla water supply scheme – MS pipeline – As built drawings 21.09.2011 Permanent Closed
Karnataka Power Corporation Ltd., List Files and Records – BCCP-Raw water pipeline from BWSSB plant at Rajajeshwarinagar to Bidadi plant site
Name of the Office: CCED/SE-2 (CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
1 1 Bidadi pipeline correspondence 29.09.2010 Running Permanent 2 2 Gravity main design file 29.09.2010 Running Permanent 3 3 Drawing file(Alternative alignments ) Running Permanent Three(03) Nos 4 4 BCCP/RWS/DRGS(Old) Permanent Closed 5 5 Tender approvals(Old) Permanent Closed 6 6 Bidadi Correspondence(Old) Permanent Closed
7 7 Bidadi Raw water supply Designs details(Old)
Permanent Closed
8 8 Bidadi office Notes(Old) Permanent Closed 9 9 Bidadi Inspection(Old) Permanent Closed
10 10 BCCP – Compound wall for railway siding at Bidadi 12.12.2011 Running Permanent
Karnataka Power Corporation Ltd., List Files and Records – RPCL/YTPS-Pipelines for CSR scheme, Construction water supply and drinking water supply schemes.
Name of the Office: CCED/SE-2 (CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
1 1 CSR Scheme - Correspondence and design file 26.08.2010 Running
Permanent
2 2 Construction & drinking water supply – Correspondence & Design file
Running Permanent
3 3 Construction & drinking water supply - Drawing file 28.03.2011 Running
Permanent
Karnataka Power Corporation Ltd., List Files and Records – RTP- Status Report on the water supply to RTPS colony.
Name of the Office: CCED/SE-2 (CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
1 1 Status report on water supply to RTPS colony
04.10.2010 Running Permanent
Karnataka Power Corporation Ltd., List Files and Records – BTPS- RTPS-Unit-8 & Consultancy, Maralihalla Pump house
Name of the Office: CCED/SE(CD-2) Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
1 RTPS-Unit-8 Circulating water system-Correspondence file Vol-I
17.07.07 11.12.07 Permanent Closed
2 RTPS-Unit-8 Circulating water system-Correspondence file Vol-II
01.01.08 12.02.09 Permanent Closed
3 RTPS-Unit-8 Circulating water system-Correspondence file Vol-III
03.07.08 - Permanent Closed
4 RTPS-Unit-8 Circulating water system-Correspondence file Vol-IV
08.06.09 04.11.09 Permanent Closed
5 RTPS-Unit-8 Circulating water system-Correspondence file Vol-V
02.09.09 Closed
6 RTPS- Unit-8 Circulating water system- Hydraulic Study
26.07.06 11.12.06 Permanent Closed
7 RTPS- Unit-8 Circulating water system- Design-Vol-I
- - Permanent Closed
8 RTPS- Unit-8 Circulating water system- Design-Vol-lI
- - Closed
9 RTPS- Unit-8 Circulating water system- Construction Drg-Vol-I
17.04.08 07.05.09 Permanent Closed
10 RTPS- Unit-8 Circulating water system- Construction Drg-Vol-II
18.02.09 18.08.09 Permanent Closed
11 RTPS- Unit-8 - Cable Trench 31.07.06 06.06.07 Permanent Closed 12 Rammam- HEP- Stage-III-
(3x40MW) Bridges & approach Roads Package General correspondence
12.01.07 Running
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
13 Rammam- Bridge- Design of 35 M span Lodhama Khola &55M Span Rammam Power house Bridge-Design
- Running Permanent
14 Rammam-Stage-III-HEP- (3x40MW) Bid drawings
- - Permanent Closed
15 Rammam 35M Span Lodhama Khola & 55M span Rammam Power house Bridge Fabrication
15.12.05 27.01.10 Permanent Closed
16 Water supply Scheme –Narayanpur Reservoir To BTPS Correspondance-Vol-I
13.07.07 04.11.08 Permanent Closed
17 Water supply Scheme –Narayanpur Reservoir To BTPS- office Note
19.09.08 02.02.10 Permanent Closed
18 Ghataprhaba-Right Bank Canal-Power house- -Civil works
08.03.10 Running
19 Munirabad-Left Bank Of TB dam-Power house- Civil works
20.02.10 Running
20 Approach Bridge to Maralihalla Pump house Design
- - Permanent Closed
21 Water supply Scheme- to BTPS-Maralihalla Pump house correspodance-Vol-I
15.12.03 14.10.04 Permanent Closed
22 Water supply Scheme- to BTPS-Maralihalla Pump house correspodance-Vol-II
15.10.04. 15.01.05 Permanent Closed
23 Water supply Scheme- to BTPS-Maralihalla Pump house
15.01.05- 31.03.05 Permanent Closed
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
correspodance-Vol-III 24 Water supply Scheme- to BTPS-Ma
Pump house correspodance-Vol- IV 01.04.05 16.06.05 Permanent Closed
25 Water supply Scheme- to BTPS-Maralihalla Pump house correspodance-Vol- V
17.06.06 09.08.05 Permanent Closed
26 BTPS-Maralihalla Pump house office Note –Vol-VI
01.04.06 22.06.07 Permanent Closed
27 BTPS-Release of EMD to Bidders 21.07.04 04.01.05 Permanent Closed 28 High level Bridge,& Approach
Bridge-Deck Slab-----Correspondence file-Vol-I
01.06.05 30.12.05 Permanent Closed
29 High level Bridge, & Approch Bridge –Deck slab correspondence file Vol-II – Design
01.01.06 15.07.06 Permanent Closed
30 High level Bridge & Design 22.06.06 Closed Permanent Closed 31 Construction of Retaining wall in
Parking area 28.01.05 Closed Permanent Closed
32 BTPS-Maralihall Pump house Electrical Substation –Correspondence- Design & Drawings
12.01.05 06.12.05 Permanent Closed
33 BTPs-Balance civil works of Approach Bridge of Maralihalla Pump house, Construction drg.
- - Permanent Closed
34
Additional water supply Scheme to BTPS
10.08.05 31.03.06 Permanent Closed
35 KPCL New office complex at Drug controller premises.-CONST DRGS
25.08.2010 12.11.2010 Permanent
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
FILE VOL-I
36
KPCL New office complex at Drug controller premises.-CONST DRGS FILE VOL-II
26.11.2010 27.12.2010 Permanent
37 KPCL New office complex at Drug controller premises.-CONST DRGS FILE VOL-III
06.01.2011 Running Permanent
38
KPCL New office complex at Drug controller premises.-Correspondence
23.08.2010 Running Permanent
39 KPCL New office complex at Drug controller premises.-ARCH DRGS FILE VOL-I
16.03.2009 Running Permanent
40 KPCL New office complex at Drug controller premises.-DESIGN FILE VOL-I
08.09.2010 20.01.2011 Permanent
41 KPCL New office complex at Drug controller premises.-DESIGN FILE VOL-II
20.02.2011 Running Permanent
42 KPCL New office complex at Drug controller premises.-SERVICE DRGS FILE VOL-I
10.10.2009 Running Permanent
43 BTPS –Construction of multistoried buildings-Type B&C.-CONST DRG FILE-VOL-I
22.07.2010 Running Permanent
44 BTPS –Construction of multistoried buildings-Type B&C.-DESIGN FILE-VOL-I
13.11.2009 16.04.2010 Permanent
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
45 BTPS –Construction of multistoried buildings-Type B&C.-DESIGN FILE-VOL-II
01.01.2010 28.05.2010 Permanent
46 BTPS –Construction of multistoried buildings-Type B&C.-DESIGN FILE-VOL-III
08.03.2011 02.05.2011 Permanent
47 BTPS –Construction of multistoried buildings-Type B&C.-DESIGN FILE-VOL-IV
01.07.2011 Running Permanent
48 RPCL –Construction of multistoried buildings-Type B&C.-CONST DRG FILE-VOL-I
25.02.2010 Running Permanent
49 RPCL –Construction of multistoried buildings-Type B&C.-DESIGN FILE-VOL-I
11.11.2010 Running Permanent
50 ADPH-Construction of administrative block –CONST DRG FILE VOL-I
04.08.2009 Running Permanent
51 ADPH-Construction of administrative block –DESIGN FILE VOL-I
21.07.2009 25.02.2010 Permanent
52 ADPH-Construction of administrative block –DESIGN FILE VOL-II
30.03.2010 Running Permanent
53 VHEP-Construction of permanent B&C type residential buildings at Hosangadi colony-DRG FILE VOL-I
31.05.2011 Running Permanent
Sl. No.
File No.
Subject Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
54 RPCL-YTPS –Raw water intake/ash slurry pipeline corridor-correspondence file
23.05.2011 Running Permanent
55 RTPS- Construction of office building for KPCL @ Shakthinagar, RAichur- Correspondence file
11.04.2011 Running Permanent
56 RTPS- Construction of office building for KPCL @ Shakthinagar, RAichur- Architectural drawings file
16.05.2011 Running Permanent
LIST OF FILES LIST OF FILES AND RECORDS UNDER SECTION 4(1)A OF THE RIGHT OF INFORMATION ACT 2005
Name of the Office: Office of the Chief Enginer (Civil Designs)
BTPS, RTPS,YTPS,ALMATTI ADM.BUILDING, COTTAGE, RAICHUR ADM .BUILDING,ALL PROJECTS MAINTENANCE,
Address: No. 22/23, Sudharshan Complex, Sheshadri Raod,Gandhinagar, Bangalore -560009
Sl. Subject Opening date of file Closing Date
of file
Date of transfer of
file and authority
whom transferred
Nature of File Permanent /Temporary Remarks
1 Yermaras thermal power station construction compound wall Volume I 04.05.2009 11.09.09 Permanent Closed
2 Yermaras thermal power station construction compound wall Volume II 14.09.2009 - Permanent Running
3
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-I 3.06.2008 21.05.2009 Permanent Running
4
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-II Correspondence with H.O. & M/s. Studio Decode. 21.05.2009 28.12.2009 Permanent Running
5
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-III Correspondence with CE(TD) 8.09.2009 - Permanent Running
6
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-IV Correspondence with H.O. & M/s. Studio Decode. 6.01.10 - Permanent Running
7
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-V-Tender correspondence 11.12.2009 2.3.2010 Permanent Running
8
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-VI-Tender correspondence 2.03.2010 - Permanent Running
9
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-VII-Tender correspondence 17.03.2010 - Permanent Running
10
Construction of Guest HOuse at Almatti project site – Correspondence with consultant M/s. Hedge & Hedge & H.O. SE(E) ADPH. 26.04.2008 - Permanent Running
11
Construction of cottages at Almatti Dam site correspondence with H.O. Consultant M/s. Neotech Consultants & SE(E)/ADPH. 29.01.2009 - Permanent Running
12
Damages to various components of Gerusoppa dam due to discharges of surplus water through radial gate – Expert committee & recommendations, correspondence with CCES. H.O. Design Calculations, drawings. 12.09.2007 - Permanent Running
13
Restoration of damaged right bank road to power house, left & right banks flood protection works with a spillway guide walls. Estimate, correspondence with H.O. 13.10.2008 - Permanent Running
14
Restoration of damaged right bank road to power house, left & right banks flood protection works with a spillway guide walls. Estimate Rs. 1028/- lakhs. 4.11.2009 - Permanent Running
15 Protection works to D/S Left Bank of Kodasallii Dam 14.11.2006 - Permanent Running
16
Sewage treatment plant @ Ambikanagar & Ganeshagudi Project report & correspondence. 23.12.2006 - Permanent Running
17 Construction of ‘C’ Type quarter at Ambikanagar. 30.07.2004 - Permanent Running
18 Protective measures for the land --- zones at NPH Ghal roral KHEP-I 14.12.2005 - Permanent closed
19
Treatment to roof slab of residential buildings – KHEP-I, RTPS, Shakti Bhavan, Power House SPH, SGS, NPH & STR. 20.12.2005 - Permanent Running
20
Improvements to existing road from entrance of saddle dam to PH, protection to L/B & restoration of right bank road to power house 27.05.2009 - Permanent Running
21 Water supply to Jog colony SVP & Ambikanagar Colony. 8.03.2005 - Permanent Running
22 KHEP/SVP – High mast/watch tower at Hydel Projects. 25.01.2006 - Permanent Running
23 Digitisation of original tracings of all the projects of KPCL. 1.12.2004 - Permanent Closed
24
Consultancy service for furnishing compliance to MOEF clearance of RTPS Unit - 8.-Vol-I 5-Jan 6-Jul Permanent Closed
25
Consultancy service for furnishing compliance to MOEF - for clearance & RTPS 8th unit.-Vol-II 6-Jul - Permanent Running
26 Construction of U - 8 6-May - Permanent Running 27 Bhadra Hydro Electric project 9-Jul - Permanent Running 28 KHEP General 5-Jul - Permanent Running 29 SHEP - L'maki, Jog & STR. 9-Jul - Permanent Running
30 Residental quarters at Munirabad colony. 9-Nov - Permanent Running
31 KHEP, proposal for construction of New office complex at Ganeshgudi. 9-Jan - Permanent Running
32 Augumentation of Ash bund consultancy services. 8-Oct - Permanent Running
33 Construction of Ash bund - II design note Oct-99 Oct-99 Permanent
34 Ash bund - II -Estiamte - Permanent Closed 35 Ash bund - II 1-Jun 4-Sep Permanent Closed 36 Ash bund - II 2-Jun 4-Sep Permanent Closed 37 Ash bund 1 -RTPS 2-Dec 2-Dec Permanent 38 RTPS Unit 1 to 7-Miscellaneous 5-May - Permanent Running
39 R.T.P.S. Station building U - 8 - 250 MW RA based on 2007-08.
Calculations-worked sheets - Permanent Closed
40 RTPS RA Estimate Calculations-worked - Permanent Closed
sheets
41 RTPS RA Rate analysis Calculations-worked
sheets - Permanent Closed
42 RTPS RA SR 2006 - 07 (R) Calculations-worked
sheets - Permanent Closed
43 RTPS RA Bid evaluation - Revaluation calculation.
Calculations-worked sheets - Permanent Closed
44 RTPS 250 MW - U - 8 - Tender correspondence Vol-I Octber 2006 7-May Permanent Closed
45 RTPS 250 MW - U - 8 - Tender correspondence- Vol-II 7-Apr - Permanent Closed
46
BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS 6-Jan 6-Apr Permanent Closed
47
BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS Vol -II 6-Apr - Permanent Closed
48
BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS-OS No. 15184 of 2006 Between M/s M.C.C. Pvt. Ltds., Ahemadabad - Permanent Running
49
BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS -List of Documents given to leagal cell - Permanent Running
50
Manufacture & supply of 72 Nos. of size 250 NB flanged end, cast steel, double air release --- Vol - I. Febraury2006 Febraury2006 Permanent Clsoed
51
Manufacture & supply of 72 Nos. of size 250 NB flanged end, cast steel, double air release --- Vol - II. 6-Mar 7-Jun Permanent Clsoed
52
BTPS - Laying jointing, te stings commissioning of M.s. pipe line from Maralihalla to BTPS--Zero velocity & Butter fly valve (balance works) 6-May 7-Mar Permanent closed
53 Remedial / Restoration measures for safety of Ash Bond - II Vol-I 5-Apr 5-Dec Permanent Closed
54 Remedial / Restoration measures for safety of Ash Bond - II Vol-II 6-Jan Apr-06 Permanent Closed
55 Remedial / Restoration measures for safety of Ash Bond - II Vol-III 6-May - Permanent Running
56 Construction Ash bund-Design Note - Permanent - 57 Gerusoppa Right to information 11.09.2009 - Permanent Closed 58 KPCL Colony details 18.10.2008 - Permanent
59
Construction of Guest HOuse at Almatti project site – Correspondence with consultant M/s. Hedge & Hedge & H.O. SE(E) ADPH.Vol-II 09.09.2010 Permanent Running
60
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-VIII-Correspondece with M/s Bluestar Ltd., 10.03.2010 Permanent Running
61
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-IX-Correspondece with CCET.,Retender correspondence 15.11.2010 Permanent Running
62
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-X-Correspondece with M/s Studio Decode 10.03.2011 Permanent Running
63
KHEP -II Kadra Power House Seepage, Sinking of Borewells in switch yard,Grouting in Block No.1 5-Jul Permanent Running
64 Construction of entrance arch @ Almatti Dec.-2009 Permanent Running
65 Power supply to Kadra colony from Kadra power house 15.03.2012 Permanent Running
66 YTPS – Ground level reservoir, sump & pump house
17.05.2011 Permanent Running
Name of the Office: Office of the Chief Enginer (Civil Designs)
Address: No. 22/23, Sudharshan Complex, Sheshadri Raod,Gandhinagar, Bangalore
Railway Siding and Marshalling yard works of BTPS
Sl. Subject
1 Expansion of Existing R.S.G. BTPS 2 Circular & others (works related) 3 Circulars and others general. 4
BTPS-RSMY - Correspondance with State Government, Railway.
5 BTPS-RSMY- Correspondance with CE(BTPS) vol-II
6 BYPS-RSMY- Correspondance with CETD - vol-II
7 BTPS RSMY - Correspondance with CE (TD). 8 BTPS RSMY - Correspondance with CE (TD). Continued 9 BTPS RSMY P.W. works including signal & Telecommunication Vol-I
10 BTPS RSM P.W. works including signal & Telecommunication Vol-II
11 Correspondence with M/s.PPPL Vol-I
12 Correspondence with M/s. PPPL Vol-II 13 Correspondence with M/s.PPPL Vol-III
14 P.W. works Tender correspondence Vol-I 15 Bid documents P.W. works 16 Bid documents P.W. works 17 Bid documents P.W. works 18 BTPS - providing concrete apron Bid documents - SRC construction & Maralihalla water supply - Balance works manufacture of 72 no. of Air telease valve
19 BTPS RSMY Earth work formation in bance - cutting Bid documents Schedule - B.
20 BTPS RSMY Earlier work formation Tender correspondence- Vol-II 22 RSMY General correspondence
23 RSMY - Earth work - Tender correspondence. 24 RSMY General correspondence 25 RSMY General correspondence 26 BTPS progress Review meeting 27 BTPS RSMY site co-ordination meeting 28 BTPL - BTPS - RSMY quality control 29 BTPS RSMY - correspondence with CE(BTPS) BTPS - RSMY - Rate analysis
30 BTPS - RSMY CMG Technicall Committee Board meeting
31 BTPS - RSMY CMG Technicall Committee Board meeting - II
32 BTPS RSMY Qty Calculation 33 BTPS - RSMY P.W. tender 34 BTPS RSMY - payment 35 Correspondence with MD & TD Vol-II 36 BTPS - RSMY - CMG 37 Service Station 38 RTPS- Railway siding
39 BTPS- consultancy services for providing Y junction and additional track for manual coal unloading adjacent to coal stock yard-2 at BTPS railway siding and marshalling yard
40 YTPS- Railway siding
LIST OF FILES LIST OF FILES AND RECORDS UNDER SECTION 4(1)A OF THE RIGHT OF INFORMATION ACT 2005
Name of the Office: Office of the Chief Enginer (Civil Designs)
BTPS, RTPS,YTPS,ALMATTI ADM.BUILDING, COTTAGE, RAICHUR ADM .BUILDING,ALL PROJECTS MAINTENANCE,
Address: No. 22/23, Sudharshan Complex, Sheshadri Raod,Gandhinagar, Bangalore -560009
Sl. Subject Opening date of file
Closing Date of file
Date of transfer of
file and authority
whom transferre
d
Nature of File
Permanent /Temporary Remarks
1 Yermaras thermal power station construction compound wall Volume I 04.05.2009 11.09.09 Permanent Closed
2 Yermaras thermal power station construction compound wall Volume II 14.09.2009 - Permanent Running
3 Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-I 3.06.2008 21.05.2009 Permanent Running
4
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-II Correspondence with H.O. & M/s. Studio Decode. 21.05.2009 28.12.2009 Permanent Running
5
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-III Correspondence with CE(TD) 8.09.2009 - Permanent Running
6
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-IV Correspondence with H.O. & M/s. Studio Decode. 6.01.10 - Permanent Running
7
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-V-Tender correspondence 11.12.2009 2.3.2010 Permanent Running
8
Construction of New office complex at RTPS Green Building with LEED Facilitation.Vol-VI-Tender correspondence 2.03.2010 - Permanent Running
9
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-VII-Tender correspondence 17.03.2010 - Permanent Running
10
Construction of Guest HOuse at Almatti project site – Correspondence with consultant M/s. Hedge & Hedge & H.O. SE(E) ADPH.vol.1 26.04.2008 - Permanent Running
11
Construction of Guest HOuse at Almatti project site – Correspondence with consultant M/s. Hedge & Hedge & H.O. SE(E) ADPH.Vol-2 Sep-11 Permanent Running
12 ADPH -water supply scheme to guest house, cottages and garden and other miscellaneous at ADPH site Nov-11 Permanent Running
13
Construction of cottages at Almatti Dam site correspondence with H.O. Consultant M/s. Neotech Consultants & SE(E)/ADPH. 29.01.2009 - Permanent Running
14
Damages to various components of Gerusoppa dam due to discharges of surplus water through radial gate – Expert committee & recommendations, correspondence with CCES. H.O. Design Calculations, drawings. 12.09.2007 - Permanent Running
15
Restoration of damaged right bank road to power house, left & right banks flood protection works with a spillway guide walls. Estimate, correspondence with H.O. 13.10.2008 - Permanent Running
16
Restoration of damaged right bank road to power house, left & right banks flood protection works with a spillway guide walls. Estimate Rs. 1028/- lakhs. 4.11.2009 - Permanent Running
17 Protection works to D/S Left Bank of Kodasallii Dam 14.11.2006 - Permanent Running
18 Sewage treatment plant @ Ambikanagar & Ganeshagudi Project report & correspondence. 23.12.2006 - Permanent Running
19 Construction of ‘C’ Type quarter at Ambikanagar. 30.07.2004 - Permanent Running
20 Protective measures for the land --- zones at NPH Ghal roral KHEP-I 14.12.2005 - Permanent closed
21
Treatment to roof slab of residential buildings – KHEP-I, RTPS, Shakti Bhavan, Power House SPH, SGS, NPH & STR. 20.12.2005 - Permanent Running
22
Improvements to existing road from entrance of saddle dam to PH, protection to L/B & restoration of right bank road to power house 27.05.2009 - Permanent Running
23 Water supply to Jog colony SVP & Ambikanagar Colony. 8.03.2005 - Permanent Running 24 KHEP/SVP – High mast/watch tower at Hydel Projects. 25.01.2006 - Permanent Running
25 Digitisation of original tracings of all the projects of KPCL. 1.12.2004 - Permanent Closed
26 Consultancy service for furnishing compliance to MOEF clearance of RTPS Unit - 8.-Vol-I 5-Jan 6-Jul Permanent Closed
27 Consultancy service for furnishing compliance to MOEF - for clearance & RTPS 8th unit.-Vol-II 6-Jul - Permanent Running
28 Construction of U - 8 6-May - Permanent Running 29 Bhadra Hydro Electric project 9-Jul - Permanent Running 30 KHEP General 5-Jul - Permanent Running 31 SHEP - L'maki, Jog & STR. 9-Jul - Permanent Running 32 Residental quarters at Munirabad colony. 9-Nov - Permanent Running
33 KHEP, proposal for construction of New office complex at Ganeshgudi. 9-Jan - Permanent Running
34 Augumentation of Ash bund consultancy services. 8-Oct - Permanent Running 35 Construction of Ash bund - II design note Oct-99 Oct-99 Permanent 36 Ash bund - II -Estiamte - Permanent Closed 37 Ash bund - II 1-Jun 4-Sep Permanent Closed 38 Ash bund - II 2-Jun 4-Sep Permanent Closed 39 Ash bund 1 -RTPS 2-Dec 2-Dec Permanent 40 RTPS Unit 1 to 7-Miscellaneous 5-May - Permanent Running
41 R.T.P.S. Station building U - 8 - 250 MW RA based on 2007-08.
Calculations-worked sheets - Permanent Closed
42 RTPS RA Estimate Calculations-worked
sheets - Permanent Closed
43 RTPS RA Rate analysis Calculations-worked
sheets - Permanent Closed
44 RTPS RA SR 2006 - 07 (R) Calculations-worked
sheets - Permanent Closed
45 RTPS RA Bid evaluation - Revaluation calculation. Calculations-worked
sheets - Permanent Closed 46 RTPS 250 MW - U - 8 - Tender correspondence Vol-I Octber 2006 7-May Permanent Closed 47 RTPS 250 MW - U - 8 - Tender correspondence- Vol-II 7-Apr - Permanent Closed
48 BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS 6-Jan 6-Apr Permanent Closed
49 BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS Vol -II 6-Apr - Permanent Closed
50
BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS-OS No. 15184 of 2006 Between M/s M.C.C. Pvt. Ltds., Ahemadabad - Permanent Running
51
BTPS - Laying jointing, testings commissioning of M.s. pipe line from Maralihalla to BTPS -List of Documents given to leagal cell - Permanent Running
52 Manufacture & supply of 72 Nos. of size 250 NB flanged end, cast steel, double air release --- Vol - I. Febraury2006
Febraury2006 Permanent Clsoed
53 Manufacture & supply of 72 Nos. of size 250 NB flanged end, cast steel, double air release --- Vol - II. 6-Mar 7-Jun Permanent Clsoed
54
BTPS - Laying jointing, te stings commissioning of M.s. pipe line from Maralihalla to BTPS--Zero velocity & Butter fly valve (balance works) 6-May 7-Mar Permanent closed
55 Remedial / Restoration measures for safety of Ash Bond - II Vol-I 5-Apr 5-Dec Permanent Closed
56 Remedial / Restoration measures for safety of Ash Bond - II Vol-II 6-Jan Apr-06 Permanent Closed
57 Remedial / Restoration measures for safety of Ash Bond - II Vol-III 6-May - Permanent Running
58 Construction Ash bund-Design Note - Permanent - 59 Gerusoppa Right to information 11.09.2009 - Permanent Closed 60 KPCL Colony details 18.10.2008 - Permanent
61
Construction of Guest HOuse at Almatti project site – Correspondence with consultant M/s. Hedge & Hedge & H.O. SE(E) ADPH.Vol-II 09.09.2010 Permanent Running
62
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-VIII-Correspondece with M/s Bluestar Ltd., 10.03.2010 Permanent Running
63
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-IX-Correspondece with CCET.,Retender correspondence 15.11.2010 Permanent Running
64
Construction of New office complex at RTPS Green Building with LEED Facilitation.-Vol-X-Correspondece with M/s Studio Decode 10.03.2011 Permanent Running
65 KHEP -II Kadra Power House Seepage, Sinking of Borewells in switch yard,Grouting in Block No.1 5-Jul Permanent Running Construction of entrance arch @ Almatti Dec.-2009 Permanent Running
Karnataka Power Corporation Limited
List of Files and Records Under Section 4 (1) (a) of the Right to Information Act 2005
Name of the Office: CCED / SE(CD-3)
Address: 22/23, SUDARSHAN COMPLEX,1 FLOOR, SHESHADRI ROAD,BANGALORE-560009
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
BTPS- Unit No. 1
1 CD/BT-2/R & VOL-1 BTPS-Plant Road Works 02/4/04 25/10/05
2 -do-VOL-2 -do- 25/10/05 24/03/06 -do-
3 do-VOL-3 -do- 24/3/06 28/8/07 -do-
4 do-VOL-4 -do- 28/3/07 19/5/08 -do-
5 do-VOL-5 -do- 19/5/08 running -do-
6 CD/BT/U-2/VOL-1 BTPS-Switch yard Road-correspondence 3/4/06 running -do---
7 -do-VOL-1 BTPS-Plant Road Works-work slip & EIRL-PACKAGE-1 & 3
19/01/07 18/7/07 -do-
8 -do-VOL-1 PLANT ROAD- SURVEY 16/8/05 03/6/06 -do-
9 -do-VOL-2 PLANT ROAD- SURVEY 4/6/06 Running -do-
10 CD/BT/U-1
Vol-1
Clarified Water Storage Tank & Pump
House
May’05 Aug’06
11 -do- RWPH-MCC Building June’05 June’06
12 CD/BT/U1/EPC/SYC - 1 Switch Yard Control room
12.05.04 Running
13 CD/BT/U1/EPC/CWPH -1 CW Pump house Forebay
21.02.05 Running
14 CD/BT/U1/EPC/CWC-1 CW – Channel 13.05.05 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
15 CD/BT/U1/EPC/CWPH -
1- 1 to 10
CW Pump House
19.12.05 Running
16 CD/BT/U1/EPC/ID 1to 3 ID Fan Foundation
11.03.05 Running
17 CD/BT/U1/EPC /CWS 1
to 4
CW System 16.07.04 Running
18 CD/BT/U1/EPC /SYS -1
to 4
400 x 220 KV Switch Yard Substation
20.05.04 Running
19 CD/BT/U1/EPC/CWP- 1 CW Pit Correspondence
27.11.04 Running
20 CD/BT/U1/EPC/ TF- 1 Design of Tower Foundation TA/TAP/TB/TBP/TC/TCP/TD/TDP
05.10.04 Running
21 CD/BT/U1/EPC/ SyEs-
1to 3
400 x 220 KV Switch Yard Equipment Supporting Structure
08.07.05 Running
22 CD/BT/U1/EPC/ Swyd - 1 315 KVA Transformer
12.07.05 Running
23 CD/BT/U1/EPC/ PTP –
1to 6
Pre-Treatment Plant
03.02.06 Running
24 CD/BT/U1/EPC / NDCT-
1to 6
NDCT – Correspondence
03.12.03 Running
25 CD/BT/U1/EPC / NDCT/
Dwg /1to 6
NDCT – DRGS Files
Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
26 CD/BT/U1/EPC / NDCT/
Pvc/1
NDCT – PVC /Pipes 06.02.04 Running
27 CD/BT/U1/EPC / CH / 1to
4
Chimney – Correspondence
02.01.04 Running
28 CD/BT/U1/EPC / CH / drg
– 1to 4
Chimney DRGS –Files
- Running
29 CD/BT/U1/EPC /FPH- 1 FOAM Pump House
28.07.06 Running
30 CD/BT/U1/EPC /AHS – 1
to 2
Water Treatment Plant (Clarifier)
AHS – Handling
05.07.06 Running
31 CD/BT/U1/EPC / ETP- 1to
2
Effluent Treatment Plant
05.08.06 Running
32 CD/BT/U1/EPC / STP- 1 Sewage Treatment Plant
08.03.07 Running
33 CD/BT/U1/EPC / TB/ 1to
8
Technical Building
14.12.04 Running
34 CD/BT/U1/EPC / PH- 1 to
3
Architectural DRGS
30.09.04 Running
35 CD/BT/U1/EPC /AW – 1to
4
Air Washer
28.04.05 Running
36 CD/BT/U1/EPC / FS – 1to
3
Fire Station
06.09.04 Running
37 CD/BT/U1/EPC / HWP- 1 Hotwel Makeup Pump
14.06.05 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
38 CD/BT/U1/EPC / BPH-1 Booster Pump House
08.06.05 Running
39 CD/BT/U1/EPC /PH- 1 AB – Bay Stair Case
18.02.05 Running
40 CD/BT/U1/EPC /SAF- 1 Seal Air Fan Foundation
01.10.05 Running
41 CD/BT/U1/EPC /CH – 1 to
2
Compressor House
07.10.05 Running
42 CD/BT/U1/EPC /WS- 1 BTPS –Work Slip file
- Running
43 CD/BT/U1/EPC /Cla-1 Cladding File / Metal deck
(27.06.06 (23.04.05)
23.04.05/
27.06.06
Running
44 CD/BT/U1/EPC /PH/ 1 to
12
Power House (Station Building)
28.04.04 Running
45 CD/BT/U1/EPC /PH/ TG -
1 to 3
TG – Foundation
08.04.04 Running
46 CD/BT/U1/EPC /PH/ BFP-
1
TDBFP/MDBFP Correspondence
11.05.04 Running
47 CD/BT/U1/EPC /AHS – 1
to 4
Ash handling System
20.03.04 Running
48 CD/BT/U1/EPC /CEP- 1 CEP – Pit
11.03.05 Running
49 CD/BT/U1/EPC /Bri - 1 Bricks File
07.02.06 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
50 CD/BT/U1/EPC /SUB/-1to
2
Silo Utility Building
12/12/05 Running
51 CD/BT/U1/EPC /ASPH –
1 to 2
Ash Slurry / Ash Disposal WTR PH
26.12.05 Running
52 CD/BT/U1/EPC /AS- 1to 2 Ash Silo
06.05.06 Running
53 CD/BT/U1/EPC /FOPH- 1
to 2
Fuel Oil Pump House
30.12.05 Running
54 CD/BT/U1/EPC /CR – 1 to
2
Cable Rack to RWPH – MCC Building
30.12.05 Running
55 CD/BT/U1/EPC /PR -1 to
3
Pipe Rack
15.10.05 Running
56 CD/BT/U1/EPC /CR - 1 Cable Rack from Transformer Yard to
Switch yard
30.12.05 Running
57 CD/BT/U1/EPC / ASPPH-
1 to 2
ESP-ASP Wash Pump House
01.08.05 Running
58 CD/BT/U1/EPC / SLF- 1 Stator Lifting Foundation
30.08.05 Running
59 1,2 Air Compressor House
11.10.05 Running
60 CD/BT/U1/EPC /VPH- 1
to 2
Vacuum Pump House
14.09.05 Running
61 CD/BT/U1/EPC / Weekly Progress Report Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
62 CD/BT/U1/EPC / Site Co-ordination Meeting
17.06.04 Running
63 CD/BT/U1/EPC / Minutes of Discussion Meeting
30.07.04 Running
64 CD/BT/U1/EPC /Fly Ash
Vol -1.2.3.4.5
Transportation Line Buffer Hopper to Silo – A627, A020,613, 642, 643
28.01.06 Running
65 CD/BT/U1/EPC /Fly Ash
Fly Ash Transportation Line Buffer Hopper to Silo 650, 1/3, 2/3 “A” … A651 & 652 627, ( 1 to 20), 613 ( Vol -4)
28.01.06 Running
66 CD/BT/U1/EPC /AWRPH-
1
Ash Water Recovery Pump House, A617, A618, 622 (A) A521, A030, 651, 652
20.03.06 Running
67 CD/BT/U1/EPC /PR 1 to 2 Pipe Rack from Ash slurry PH to Recovery Water Pump House, 610, 632
28.06.06 Running
68 CD/BT/U1/EPC /PR 1 to
5
Pipe rack from Ash Slurry PH to Ash Recovery PH , 637, 636, 649, 610 & 648
28.12.06 Running
69 CD/BT/U1/EPC /PR Vol
(1)
Pipe rack from Ash Slurry PH to Ash Recovery PH, ‘A’ cat ‘610, 637, 636, 632, 627, 613- Not received ‘A’ Category drg. File
06.10.06 Running
70 CD/BT/U1/EPC - 1 BTPS – 1 Fabrication Drg.111,112,113,114,115,116, A-650 1/3, 2/3
17.11.07 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
71 CD/BT/U1/EPC /PR 1to 2 ESP-APH Wash Pump House 530,531,532,509/E226,228,100/M 242,266 E-267 100-E212,508 -R1 509-R1
04.08.05 Running
72 CD/BT/U1/EPC /MQP- 1 MQP
09.09.04 Running
73 CD/BT/U1/EPC /CTT- 1 Collector Tank Tower
21.04.06 Running
74 CD/BT/U1/EPC /SWOH -
1
Service Water Over Head Tank 05.11.05
Running
BTPS-Unit-2
1 CD/BT/U-2 VOL-1 BTPS-Construction drawings-
Correspondence
30/8/06 28/3/08
2 CD/BT/U-2 VOL-2 BTPS-Construction drawings-
Correspondence
28/3/08 10/7/08 -do-
3 CD/BT/U-2 VOL-3 BTPS-Construction drawings-
Correspondence
10/7/08 31/12/08 -do-
4 CD/BT/U-2 VOL-4 BTPS-Construction drawings-
Correspondence
01/01/09 10/2/09 -do-
5 CD/BT/U-2 VOL-5 BTPS-Construction drawings-
Correspondence
11/2/09 30/6/09 -do-
6 CD/BT/U-2 VOL-6 BTPS-Construction drawings-
Correspondence
30/6/09 15/9/09 -do-
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
7 CD/BT/U-2 VOL-7 BTPS-Construction drawings-
Correspondence
16/9/09 4/12/09 -do-
8 CD/BT/U-2 VOL-8 BTPS-Construction drawings-
Correspondence
5/12/09 31/1/10 -do-
9 CD/BT/U-2 VOL-9 BTPS-Construction drawings-
Correspondence
1/2/10 31.05.10 -do-
10 CD/BT-2/EPC/PR-vol-1 BTPS- Daily progress report 24/7/08 30/6/09 -do-
11 -do-vol-2 -do- 1/7/09 23/2/09 -do-
12 -do-vol-3 -do- 24/2/09 Contd -do-
13 CD/BT2/ EPC/WPR BTPS- Weekly progress report 29/9/07 6/7/09 -do-
14 CD/BT2/ EPC/MPR`vol-1 BTPS- Monthly progress report Sept-08 May-09 -do-
15 Vol-2 BTPS- Monthly progress report June-09 Jan-10 -do-
16 CD/BT-2 /VA BTPS-General Civil work-Vender
Approvel-Correspondence-Vol-1
21/8/08 28/1/09 -do-
17 CD/BT-2 / Sewage Treatment Plant 6/5/04 22/4/07 -do-
18 CD/BT-2 EPC /CWPH Clarified water pump house 9/9/08 Contd -do-
19 CD/BT-2/ CMG-file 25/3/08 Contd -do-
20 CD/BT-2/GT Geo-Technical Investigation
13/6/05 Contd. -do-
21 CD/BT/U2/EPC/Sy -1 to 4 BTPS Unit-2 Switch yard 09.01.08 Running
22. CD/BT/U2/EPC /CWS 1to
2
CW-System 15.02.08 Running
23. CD/BT/U2/EPC /CWPH-1
to 5
CW – Pump House 11.07.08 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
24. CD/BT/U2/EPC /CWP - 1 CW – Pit 29.11.08 Running
25. CD/BT/U2/EPC /CHI 1 to
2
Chimney 16.02.08 Running
26. CD/BT/U2/EPC / NDCT –
1 to 3
NDCT 30.10.08 Running
27. CD/BT/U2/EPC / ID -1 ID Fan 26.08.08 Running
28. CD/BT/U2/EPC /PTP 1 to
2
Raw Water Treatment Plant (RWTP) 07.09.09 Running
29. CD/BT/U2/EPC /CTT 1 Collector Tank Tower 22.10.09 Running
30. CD/BT/U2/EPC /BAH 1 Bottom Ash Hopper 17.12.09 Running
31. CD/BT/U2/EPC /SWOH 1 Service Water – Over head Tank 25.11.08 Running
32. CD/BT/U2/EPC /Silo 1 BTPS I & II As Storage Silo 28.08.09 Running
33. CD/BT/U2/EPC /PH 1 to
14
Power house Building (PH) 26.08.08 Running
34. CD/BT/U2/EPC /CVPH 1
to 3
Combined Vaccum Pump House 11.06.09 Running
35. CD/BT/U2/EPC /CH 1 Compressor House 10.06.09 Running
36. CD/BT/U2/EPC /ASPH 1
to 2
Ash Slurry PH 31.03.09 Running
37. CD/BT/U2/EPC /AWR 1 Air washer Room 06.09.08 Running
38. CD/BT/U2/EPC /TG 1 to 3 TG Foundations 17.01.08 Running
39. CD/BT/U2/EPC /BFP 1 to
2
TDBFP / MDBFP 25.06.08 Running
40. CD/BT/U2/EPC /SLF 1 Stator Lifting 24.09.08 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
41. CD/BT/U2/EPC 1 RODM Plant 25.07.08 Running
42. CD/BT/U2/EPC /PH 1 Crane Girder 30.06.08 Running
43. CD/BT/U2/EPC /PH 1 Plot Plan 13.11.07 Running
44. CD/BT/U2/EPC /PH 1 Sumps / Pumps 16.04.09 Running
45. CD/BT/U2/EPC /PH 1 List of Drawings Running
46. CD/BT/U2/EPC /SUB 1 Ash Silo Utility Building 11.02.10 Running
47. CD/BT/U2/EPC /PH 1 to 2 Layout Plan 02.01.08 Running
48. CD/BT/U2/EPC / Fly 1 to
3
BTPS Unit-2 – Dry Fly Ash 30.10.09 Running
49. CD/BT/U2/EPC / PH 1 Critical composite piping 06.12.08 Running
50. CD/BT/U2/EPC /FS 1 Fire Station 28.01.10 Running
51. CD/BT/U2/EPC/QC QC System 02.02.10 Running
52. CD/BT/U2/EPC General Correspondences 13.01.06 Running
53. CD/BT/U2/EPC 1 CMG Meeting 11.04.08 Running
54. CD/BT/U2/EPC Meeting File 17.10.06 Running
55. CD/BT/U2/EPC Record notes of discussions / Site Co-ordination meeting
02.05.08 Running
56. CD/BT/U2/EPC 1 Daily Progress Reports 26.07.08 Running
57. CD/BT/U2/EPC 1 Weekly Progress Reports 31.05.08 Running
58. CD/BT/U2/EPC 1 Monthly Progress Reports Running
59. CD/BT/U2/EPC 1 LOA File 19.11.08 Running
60. CD/NP New Power Projects in 11th & 12th Plan 24.03.09 Running
61. CD/BT/U2/EPC 1 Technical Correspondence 10.06.08 Running
62. CD/BT/U2/EPC 1 L-1 – Network –File 24.03.08 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
63. CD/BT/U2/EPC/FQP BTPS Unit-2 : FQP File 17.03.08 Running
64. CD/Ch Godna Project 16.03.09 Running
65. CD/BT/U31 BTPS Unit-3 File 31.07.07 Running
66. CD/YTPS Yermaras TPS Running
67. CD/RPCL RPCL File 23.05.09 Running
68. CD/BT/U3/AHS BTPS Unit-3 Ash Handling 17.11.09 Running
99 CD/BT/U-2 VOL-10 BTPS-Construction drawings-
Correspondence
31.05.10 -do-
100 CD/BT/U-2 VOL-11 BTPS-Construction drawings-
Correspondence
01.06.10 31.08.10
101 CD/BT/U-2 VOL-12 BTPS-Construction drawings-
Correspondence
1.09.10 31.01.11.
102 CD/BT/U-2 VOL-13 BTPS-Construction drawings-
Correspondence
1.02.11 Contd.
RTPS 8
1 CD/RT8/CO CO-ORDINATION MEETING FILE 25.07.07 Running
2 CD/RT8/PR WEEKLY PROGRESS REVIEW 27.07.07 Running 3 CD/RT8/PR MONTHLY PR
+OGRESS REVIEW 19.10.07 Running
4 CD/RT8 MILESTONE 17.07.07 Running
5 CD/RT8 /CMG CMG MEETING 18.10.07 Running 6 CD/RT8 /M MEETING 12.09.07 Running 7 CD/RT8 LETTER OF AWARD (LOA )-V 04.06.08 Running
8 CD/RT8/DG DG SET – 750 KV 26.03.08 Running 9 CD/RT8/BAH EXCAVATION BACKFILLING BOTTOM 25.01.08 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
ASH HOPPER 10 CD/RT8/FH FIRE HYDRANT (FIRE PROTECTION) 17.10.07 Running
11 CD/RT8/G GEOLOGICAL DATA – REGARDING 27.03.08 Running 12 CD/RT8/ID 1 & 2
ID FAN 05.10.07 Running
13 CD/RT8/FD
FD FAN FOUNDATION 21.08.07 Running
14 CD/RT8/PA
PA FAN FOUNDATION 15.10.07 Running
15 CD/RT8/BFP
BOILER FEED PUMP (BFP) 20.09.07 Running
16 CD/RT8 1 & 2
STANDARD NOTES FOR RCC / STEEL WORKS
28.09.07 Running
17 CD/RT8 /Sy 1,2 &3
SWITCH YARD 16.02.08 Running
18 CD/RT8 /CWP
CW - PIT 07.02.08 Running
19 CD/RT8 /AHS 1,2,3,4,5,6 & 7
ASH HANDLING SYSTEM 13.09.07 Running
20 CD/RT8 / 1
MISCELLANEOUS PUMPS 30.05.08 Running
21 CD/RT8 /FOPH 1
FUEL OIL PUMP HOUSE (FOPH) 19.04.08 Running
22 CD/RT8 /CLA 1,2,3,4,5,6 ,7&8
CLARIFIER 03.05.07 Running
23 CD/RT8 /ASPH 1,2 &3
ASH SLURRY PUMP HOUSE 09.04.09 Running
24 CD/RT8 /BAH 1,2 BOTTOM ASH HOPPER 18.04.09 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
25 CD/RT8 /CTT
COLLECTOR TANK TOWER 17.07.09 Running
26 CD/RT8 /ADPL
ASH DISPOSAL PIPE LINE 06.07.09 Running
27 CD/RT8 /SUB
ASH SITE UTILITY BUILDING 03.06.09 Running
28 CD/RT8 /FLY
RTPS UNIT-8 DRY FLY ASH Running
29 CD/RT8 /PR PIPE RACK 16.07.09 Running 30 CD/RT8 /PH
1,2,3,4,5,6,7,8,9,10,11, 12,13 & 14
STATION BUILDING 12.07.07 Running
31 CD/RT8 /PH STATION BUILDING GENERAL CORRESPONDENCE
12.07.07 Running
32 CD/RT8 /PH /TG 1,2,3,4, 6 & 7
T.G.FOUNDATION & EQUIPMENT 03.1.07 Running
33 CD/RT8 /PH CRANE GIRDER
Running
34 CD/RT8 /PH ROOF TRUSS
02.08.07 Running
35 CD/RT8 /PH /FAB 1,2,3,4,5,6,7,8,9,
10,11.12,13
FABRICATION DRAWING / A CATEGORY FILE
05.10.07 Running
36 CD/RT8 /ACAWPH 1,2,3
AIR COMPRESSOR HOUSE / AIR WASHER
16.02.08 Running
37 CD/RT8
L2 NET WORK LIFE 13.11.07 Running
38 CD/RT8
RTPS UNIT – 8 LAYOUT PLANT 27.12.07 Running
39 CD/RT8/CEP
RTPS UNIT – 8 CEP – PIT 11.12.07 Running
40 CD/RT8 /PH 12,3 RTPS UNIT – 8 ARCHITECTURAL 29.09.07 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
DRAWING 41 CD/RT8
PIPING LAYOUT / GENERAL 20.09.07 Running
42 CD/RT8/PH 1,2
ELECTRICAL DRAWINGS INSTALLATION
09.04.08 Running
43 CD/RT8/PH
TRANSFORMER S 20.03.08 Running
44 CD/RT8/PH
ROOF DECKING 21.05.08 Running
45 CD/RT8/PH
EOT / HOT CRANES 09.07.08 Running
46 CD/RT8/CR
CABLE RACK (DSA) 06.08.08 Running
47 CD/RT8/C
RTPS – Unit-8 – CE(TD)/BHEL
Correspondence file – Vol. - I
08.05.07 31.03.08
48 CD/RT8/C
RTPS – Unit-8 – CE(TD)/BHEL
Correspondence file – Vol. - II
02.04.08 01.08.08
49 CD/RT8/C
RTPS – Unit-8 – CE(TD)/BHEL
Correspondence file – Vol. - III
05.08.08 27.11.08
50 CD/RT8/C
RTPS – Unit-8 – CE(TD)/BHEL
Correspondence file – Vol. - IV
05.12.08
51 CD/RT8/C
RTPS – Unit-8 - CCET Correspondence
file - Vol. – I
12.07.07
52 CD/RT8/C
RTPS – Unit-8 – SNC Fabrication
Correspondence file - Vol. - I
16.11.07
53 CD/RT8/C
RTPS – Unit-8 – Consultancy & 28.02.07 17.11.07
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
engineering service Tender
correspondence file
54 CD/RT8/C
RTPS – Unit-8 – Consultancy &
Engineering Service – M/s FI
correspondence file Vol. – I
24.05.07 30.04.08
55 CD/RT8/C
RTPS – Unit-8 – Consultancy &
Engineering Service – M/s FI
correspondence file Vol. - II
02.05.08
56 CD/RT8/C
RTPS – Unit-8 –Consultancy &
Engineering services for station building
payment to M/s FI, Vol. I
10.05.07 25.06.09
57 CD/RT8/C
RTPS – Unit-8 –Consultancy &
Engineering services for station building
payment to M/s FI, Vol. II
¾.07.09
58 CD/RT8/C
RTPS – Unit-8 – Vibration Isolation
System correspondence file Vol. –I
31.08.06 29.01.08
59 CD/RT8/C
RTPS – Unit-8 – Vibration Isolation
System correspondence file Vol. -II
14.02.08
60 CD/RT8/C
RTPS – Unit-8 – Import of VIS from
GERMANY – M/s GERB – Release of
Custom duty and further payments
22.09.07
61 CD/RT8/C
RTPS – Unit-8 – Test certificate for
Vibration Isolation system file
03.01.08
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
62 CD/RT8/CHS
RTPS – Unit-8 – Coal handling system
correspondence file – Vol. – I
20.12.07
63 CD/RT8/C/CLA
RTPS – Unit-8 –Additional clarifier
correspondence file Vol. - I
09.07.07 28.08.09
64 CD/RT8/C/CLA
RTPS – Unit-8 – Additional clarifier
correspondence file Vol. – II
31.08.09
65 CD/RT8/C/AHS
RTPS – Unit-8 –Ash handling system
correspondence file – Vol. – I
26.09.08 21.10.09
66 CD/RT8/C/AHS
RTPS – Unit-8 –Ash handling system
correspondence file – Vol. – II
01.09.09
67 CD/RT8/C/GT/AP RTPS – Geotechnical Investigation on top
of Ash pond
24.07.06 17.11.06
68 CD/RT8/C/GT/AP RTPS – Unit-8 – Geo technical
Investigation.
25.07.06 30.09.06
69 CD/RT8/GC RTPS – Unit-8 –General correspondence
file Vol. – I
01.03.07 29.06.09
70 CD/RT8/GC RTPS – Unit-8 –General correspondence
file Vol. – II
02.07.09
71 CD/RT8 RTPS – Unit-8 – Weekly/Monthly
progress file
21.06.07
72 CD/RT/GC RTPS – General correspondence Vol. – I 27/30.07.0
7
73 CD/RT8/CMG Contract Management Group file 12.09.07
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
ADPH
1 CD/ADPH ADPH -Model Studies KERS Correspondences (with GM)
19.05.03 still running
2 CD/ADPH ADPH -Double Skin Insulated Wall Cladding
16.01.03 06.01.03
3 CD/ADPH ADPH -Contract Grouting of DT & EDT
21.02.04 17.08.04
4 CD/ADPH ADPH -Reservoir Levels and Flow details of Almatti & Narayanapura
17.05.03 10.05.06
5 CD/ADPH ADPH-Approach Road to service Bay & Cons. Of compound
30.03.04 06.12.04
6 CD/ADPH ADPH -False Ceiling
22.12.04 16.08.04
7 CD/ADPH ADPH -Glazing Work
16.06.04 08.08.05
8 CD/ADPH ADPH - WARP – Around
20.05.03 17.08.03
9 CD/ADPH ADPH -Extended Draft tube & Building
31.03.03 26.05.04
10 CD/ADPH ADPH -Office Note of CCED on Files Referred by HO – Providing…………..
07.06.04 01.03.05
11 CD/ADPH 1 ADPH General Correspondence
13.02.02 07.08.03
12 CD/ADPH 2 ADPH – General Correspondence
30.08.03 05.10.05
13 CD/ADPH 3 ADPH – General Correspondence
29.09.05 Running
Sl. No.
File No./ Vol No.
Subject Opening Date of File
Closing Date of file / Running file
Date of Transfer of File & Authority whom transferred
Nature of File Permanent / Temporary
Remarks
14 CD/ADPH 1 Work Slip File
16.12.03 10.05.06
15 CD/ADPH 1 ADPH – Breast Wall
16.06.06 19.08.06
16 CD/ADPH 1 ADPH – Construction Drawing
28.01.03 01.07.06
17 CD/ADPH 1 Stability Analysis
……………
May 1979
18 CD/ADPH 1 ADPH – Sub Committee
27.03.07 Running
19 CD/ADPH 1 ADPH Performance Audit …….
20.12.04 07.07.05
20 CD/ADPH Tests Result of III Consignment Jabba/p
21 CD/ADPH ADPH – ODY Vol -1,2
07.10.02 06.10.04
22 CD/ADPH ADPH - Agreement 23 CD/ADPH ADPH – Estimates 24 CD/ADPH ADPH- Evaluation of Tender
25 CD/ADPH 1) Service Bay (Structural)
2) Service bay (Design)
3) Service Bay (Structural)
4) Service Bay (Fabrication)
26 CD/ADPH Mechanical Structural Steel 1,2,3
27 CD/ADPH Extra Item Rate List
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-BTPS UNIT-3, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED BTPS Unit-3 Date: 30.06.2012 Sector: SE(CD) - 3
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sl
No.
File No. Volme
No.
Subject Opening
Date of file
Closing
date of
file /
Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of file
Permanent/Temporary
Remarks.
1 CD/BT-U3/GEN 1 GENERAL 01.07.2010 Running - Permanent
2 CD/BT-U3/GO 1 GOVERNMENT ORDERS (G.O) 07.06.2010 Running - Permanent
3 CD/BT-U3/AGREEMENT 1 AGREEMENT, CONTRACT CO-
ORDINATION PROCEDURE &
BILLING BREAK-UP
08.12.2010 Running - Permanent
4 CD/BT-U3/MOM 1 MINUTES OF MEETING 23.10.2009 Running - Permanent
5 CD/BT-U3/PLOT PLAN 1 PLOT PLAN 03.03.2011 Running - Permanent
6 CD/BT-U3/geo tech/ 1 GEOTECHNICAL
INVESTIGATION LAYOUTS
AND REPORTS
10.11.2010 Running Permanent
7 CD/BT-U3/RSMY 1 RAILWAY SIDING &
MARSHALLING YARD
21.09.2010 Running - Permanent
8 CD/BT-U3/L1/L2 1 L1, L2 SCHEDULES 26.11.2010 Running - Permanent
9 CD/BT-U3/Progress 1 PROGRESS REPORTS 01.07.2011 Running - Permanent
10 CD/BT-U3/Misc 1 MISCELLANEOUS 30.04.2011 Running - Permanent
11 CD/BT-U3/TP 1 CONSULTANCY
ENGINEERING SERVICES
23.09.2010 Running - Permanent
12 CD/BT-U3/ESP 1 ESP & ESP FOUNDATIONS 17.06.2011 Running - Permanent
13 CD/BT-U3/ESPCR 1 E S P CONTROL ROOM 19.09.2011 Running - Permanent
14 CD/BT-U3/BOILER 1 BOILER & BOILER
FOUNDATIONS
12.08.2011 Running - Permanent
15 CD/BT-U3/M&B 1 MILL & BUNKER BAY 06.09.2011 Running - Permanent
STRUCTURES
16 CD/BT-U3/DSS 1 DUCT SUPPORTING
STRUCTURE
07.09.2011 Running - Permanent
17 CD/BT-U3/PA,FD & SA 1 PA/FD/SA FANS 25.07.2011 Running - Permanent
18 CD/BT-U3/TRANS 1 TRANSFORMER YARD 25.07.2011 Running - Permanent
19 CD/BT-U3/CHP 1 CHP GENERAL 18.08.2011 Running - Permanent
20 CD/BT-U3/JNT 13 1 JUNCTION TOWER 13 12.04.2012 Running - Permanent
21 CD/BT-U3/JNT 14 1 JUNCTION TOWER 14 11.04.2012 Running - Permanent
22 CD/BT-U3/JNT 15 1 JUNCTION TOWER 15 12.12.2011 Running - Permanent
23 CD/BT-U3/JNT 16 1 JUNCTION TOWER 16 10.09.2011 Running - Permanent
24 CD/BT-U3/JNT 17 1 JUNCTION TOWER 17 09.09.2011 Running - Permanent
25 CD/BT-U3/JNT 18 1 JUNCTION TOWER 18 09.09.2011 Running - Permanent
26 CD/BT-U3/JNT 19 1 JUNCTION TOWER 19 09.09.2011 Running - Permanent
27 CD/BT-U3/JNT 20 1 JUNCTION TOWER 20 10.09.2011 Running - Permanent
28 CD/BT-U3/JNT 21 1 JUNCTION TOWER 21 19.09.2011 Running - Permanent
29 CD/BT-U3/WT-5 1 WAGON TIPPLER 5 12.08.2011 Running - Permanent
30 CD/BT-U3/WT-4 1 WAGON TIPPLER 4-VOL-I 15.06.11 Running - Permanent
31 CD/BT-U3/WT-4 1 WAGON TIPPLER 4-VOL-II 05.04.12 Running - Permanent
32 CD/BT-U3/S & R 1 STACKER CUM RECLAIMER 12.08.2011 Running - Permanent
33 CD/BT-U3/CONVEYORS
(GENERAL)
1 CONVEYOR - GENERAL
(CONVEYOR PROFILES)
13.07.2011 Running - Permanent
34 CD/BT-U3/CONVEYORS
(24 M)
1 24 M STANDARD GALLERY 22.12.2011 Running - Permanent
35 CD/BT-U3/CONVEYORS
(15,18,21 M)
1 15, 18, 21 M STANDARD
GALLERY
20.04.2012 Running - Permanent
36 CD/BT-U3/BCN 38 A/B &
39 A/B
1 BCN- 38 A/B & 39 A/B 29.03.2012 Running - Permanent
37 CD/BT-U3/PCH 1 PRIMARY CRUSHER HOUSE 07.09.2011 Running - Permanent
38 CD/BT-U3/RODM 1 LLTRA FILTRATION SYSTEM 03.10.2011 Running - Permanent
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-BTPS UNIT-1, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED BTPS Unit-I Date :30.06.2012
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sl No. File No. Volme
No.
Subject Opening
Date of
file
Closing
date of file
/ Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of file
Permanent/Temporary
Remarks.
1 CD / SE (2) / BT / AFRT 1 Afforestation - - - - closed
2 CD / SE (2) / BT / BLR 1 Boiler - - - - closed
3 CD / SE (2) / BT / BKR 1 Bunker bay structures - - - - closed
4 CD / SE (2) / BT / CHP 1 to 9 Coal Handling Plant - - - - closed
5 CD / SE (2) / BT / CHP 1 General notes for concrete and
steel
- - - -
closed
6 CD / SE (2) / BT / CHP/TH 1 Track hopper - - - -
closed
7 CD / SE (2) / BT/ CHP/
WT
1 Wagon tippler - - - -
closed
8 CD / SE (2) / BT / CHP 1 Transfer house TH1, TH2 & TH3 - - - - closed
9 CD / SE (2) / BT /
CHP/CH
1 Crusher house - - - -
closed
10 CD / SE (2) / BT / CHP 1 Shed - Track hopper, Wagon
tippler, Bull dozer, BCN 5
- - - -
closed
11 CD/SE (2)/ BT /CHP/BCN 1 Belt conveyors - BCN 1A / 1B & 2A /
2B (Tunnels)
- - - -
closed
12 CD/SE (2)/BT /CHP /PH 1 Pent house - BCN 2A / 2B & ERH - - - -
closed
13 CD / SE (2) / BT / CHP/SR 1 Stacker reclaimer - - - -
closed
14 CD/SE (2)/ BT / CHP/ERH 1 Emergency reclaimer hopper - - - -
closed
15 CD / SE (2) /BT/CHP/JNT 1 Junction towers - 1, 2, 3, 4, 4A & 4B - - - -
closed
16 CD / SE (2) / BT / CHP 1 Trestle & foundation for belt
conveyors - 2A / 2B, 3, 4, 5, 6, 7, 8A
/ 8B, 9A / 9B, 10A / 10B, 11A / 11B
- - - -
closed
& 12A/ 12B
17 CD / SE (2) / BT / CHP 1 Single conveyor galleries - 18m,
15m & 12m
- - - -
closed
18 CD / SE (2) / BT / CHP 1 Double conveyor galleries - 24m,
18m & 15m
- - - -
closed
19 CD / SE (2) / BT / CHP 1 Galleries - 10A / 10B, 11A / 11B &
12A / 12B
- - - -
closed
20 CD / SE (2) / BT / CHP 1 Garland drains & coal pile runoff pit - - - - closed
21 CD / SE (2) / BT / CHP 1 Fan rooms - - - - closed
22 CD/SE (2)/BT/CHP/MCC 1 MCC rooms - 1, 2 & 3 - - - -
closed
23 CD / SE (2) / BT / CHP 1 Wagon tippler control room - - - - closed
24 CD / SE (2) / BT / CHP 1 Dust extraction system & feeders - - - - closed
25 CD / SE (2) / BT / CHP 1 Underground water tanks - - - - closed
26 CD / SE (2) / BT / CHP 1 Pump cum compressor room - - - - closed
27 CD / SE (2) / BT / CHP 1 Tunnel ventilation system - - - - closed
28 CD / SE (2) / BT / CHP 1 Metal cladding - - - - closed
29 CD / SE (2) / BT / CHP 1 GA & FL drawings - - - - closed
30 CD / SE (2) / BT / PS 1 Construction Power Supply - - - - closed
31 CD / SE (2) / BT / DC 1 Diversion Canal - - - - closed
32 CD / SE (2) / BT / DRG 1 Drawing Schedule - - - - closed
33 CD / SE (2) / BT / ESP 1 ESP - - - - closed
34 CD / SE (2) / BT / FAN 1 PA & FD Fans - - - - closed
35 CD / SE (2) / BT / ID 1 ID duct supporting structures - - - - closed
36 CD / SE (2) / BT / GEN 1 General (BTPS) - - - - closed
37 CD / SE (2) / BT / CIR 1 Circular - - - - closed
38 CD / SE (2) / BT / GEO 1 Geotechnical Reports - - - - closed
39 CD / SE (2) / BT / GP 1 Grading Plan - - - - closed
40 CD / SE (2) / BT / LOA 1 LOA (BHEL) - - - - closed
41 CD / SE (2) / BT / LOCO 1 Loco shed & Annexure building - - - -
closed
42 CD / SE (2) / BT / MSH 1 Milestone Schedules (Netwk & Drg) - - - - closed
43 CD / SE (2) / BT / MILL 1 Bowl Mill - - - - closed
44 CD / SE (2) / BT / MOM 1 Minutes of Meetings - - - -
closed
45 CD / SE (2) / BT / PP 1 Plot Plan - - - - closed
46 CD / SE (2) / BT / MP
(BHEL)
1 Monthly Progress (BHEL) - - - -
closed
47 CD / SE (2) / BT / MP
(CEA)
1 Monthly Progress (CEA) - - - -
closed
48 CD / SE (2) / BT / MP (FI) 1 Monthly Progress (FICHTNER) - - - -
closed
49 CD / SE (2) / BT / MRM
(CCED)
1 Monthly Review Meeting (CCED) - - - -
closed
50 CD / SE (2) / BT / RC 1 Review Consultancy - - - - closed
51 CD / SE (2) / BT / ROAD 1 Roads - - - -
closed
52 CD / SE (2) / BT / HFO 1 HFO unloading pump house - - - - closed
53 CD / SE (2) / BT / TEN 1 Tender - - - - closed
54 CD / SE (2) / BT / WH 1 Ware House / Chemical House - - - - closed
55 CD / SE (2) / BT / WS /
CPU
1 Water System & CPU Units - - - -
closed
56 CD / SE (2) / BT / WP (S) 1 Weekly Progress (Site) - - - -
closed
57 CD / SE (2) / BT / WS (D) 1 Weekly Status - - - -
closed
58 CD / SE (2) / BT / APP 1 Clearances / Approvals - - - - closed
59 CD / SE(2) / BT / BHEL-
DRG
1 Status Of Drawings (BHEL) - - - -
closed
60 CD / SE (2) / BT / MRHS 1 Mill reject handling system - - - -
closed
61 CD / SE (2) / BT / RODM 1 RODM plant - - - -
closed
62 CD / SE (2) / BT / DM 1 DM make up water pump house - - - - closed
63 CD / SE (2) / BT / TRS 1 Transformer yard - - - - closed
64 CD / SE (2) / BT / ESP 1 ESP - - - - closed
65 CD / SE (2) / BT / ECR 1 ESP control room - - - - closed
66 CD / SE (2) / BT / FBR 1 Fire barrier wall - - - - closed
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-BTPS UNIT-2, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right To Information Act 2005
Name of the Office : CCED BTPS Unit-2 Dste : 30.06.2012
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sector: SE(CD)-3
Sl
No. File No.
Volme
No. Subject
Opening
Date of file
Closing
date of
file /
Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of file
Permanent/Temporary Remarks.
1 CD/BTU2/BLR 1 Boiler & Boiler Area 07.12.07 Closed - -
2 CD/BTU2/Fans 1 PA/FD/Seal Air fans 28.05.08 Closed - -
3 CD/BTU2/M&B 1 Mill & Bunker Bay structures 19.05.08 Closed - -
4 CD/BTU2/Mill Fnd 1 Bowl Mill Foundation 29.07.08 Closed - -
5 CD/BTU2/MRHS 1 Mill Reject Handling System 22.11.08 Closed - -
6 CD/BTU2/ESP CR 1 ESP Control Room 03.09.08 Closed - -
7 CD/BTU2/ESP 1 ESP & ESP Area 12.12.07 Closed - -
8 CD/BTU2/DM&CST 1
DM/CST & DM Make up
Pumphouse 27.06.08 Closed - -
9 CD/BTU2/Trans 1 Transformer yard 25.06.08 Closed - -
10 CD/BTU2/FOPH 1 Fuel Oil Pump house 05.09.08 Closed - -
11 CD/BTU2/Racks 1,2 Pipe/Cable Racks 09.03.09 Closed - -
12 CD/BTU2/INSP 1 Third party Inspection 14.05.08 RUNNING - -
13 CD/BTU2/Elec 1 Electrical 21.11.09 Closed - -
14 CD/RTU8/Misc-Drgs 1 Miscellaneous Drawings Closed - -
15 CD/BTU2/General 1,2 General 02.07.07 Closed - -
16 CD/RTU8/Meeting 1 Review / Minutes of meetings Closed - -
17 CD/BTU2/W-Pr Weekly Progress Report 11.02.09 Closed - -
18 CD/BTU2/CHP/Gen 1 Coal Handling System-General 18.11.08 Closed - -
19 CD/BTU2/ S&R 1 Stacker / Reclaimer 21.01.10 Closed - -
20 CD/BTU2/ JNT 4A 1 Junction Tower 4A/4B 28.10.10 Closed
21 CD/BTU2/ JNT 5 1 Junction Tower 5 24.02.10 Closed - -
22 CD/BTU2/ JNT 6 1 Junction Tower 6 08.12.09 Closed - -
23 CD/BTU2/ JNT 7 1 Junction Tower 7 27.11.09 Closed - -
24 CD/BTU2/ JNT 8 1 Junction Tower 8 10.12.09 Closed - -
25 CD/BTU2/ JNT 9 1 Junction Tower 9 14.12.09 Closed - -
26 CD/BTU2/ JNT 10 1 Junction Tower 10 08.02.10 Closed - -
27 CD/BTU2/JNT 11 1 Junction Tower 11 11.06.2010 Closed - -
CD/BTU2/JNT 12 1 Junction Tower 12 22.07.10 Closed - -
28 CD/BTU2/Conveyors 1 Conveyors 14.12.09 Closed - -
29 CD/BTU2/BCN 13 1 conveyor 13 03.08.10 Closed - -
30 CD/BTU2/BCN 14 1 conveyor 14 25.08.10 Closed - -
31 CD/BTU2/BCN 15 1 conveyor 15 29.05.10 Closed - -
32 CD/BTU2/BCN 16 1 conveyor 16 13.10.10 Closed - -
33 CD/BTU2/BCN 17 1 conveyor 17 22.07.10 Closed - -
34 CD/BTU2/BCN 18 1 conveyor 18 19.03.10 Closed - -
35 CD/BTU2/BCN 19 1 conveyor 19 01.07.10 Closed - -
36 CD/BTU2/BCN 20 1 conveyor 20 22.03.10 Closed - -
37 CD/BTU2/BCN 21 1 conveyor 21 10.02.10 Closed - -
38 CD/BTU2/BCN 22 1 conveyor 22 12.01.10 Closed - -
39 CD/BTU2/BCN 23 1 conveyor 23 05.12.09 Closed - -
40
CD/BTU2/BCN
24/25 1 conveyor 24/25 26.03.10 Closed - -
41 CD/BTU2/WT 1 Wagon Tippler 06.03.10 Closed - -
42 CD/BTU2/PH 1 Pumphouse 28.05.10 Closed - -
43 CD/BTU2/cladding 1 Cladding sheets 16.06.10 Closed - -
44 CD/BTU2/MCC 1 MCC 02.07.10 Closed - -
45 CD/BTU2/RO-DM 1
RO-DM Plant & UV Filtration
Shed 14.12.10 Closed - -
46 CD/BTU2/CH 1 Crusher house 30.04.10 Closed - -
47 CD/BTU2/ERH 1 Emergency reclaim hopper 13.05.11 Closed - -
48 CD/BTU2/FQP 1 Field Quality Assurance Plans 21.10.09 Closed - -
49 CD/BTU2/Misc 1 BTPS - Miscellaneous 06.08.08 Closed - -
50 CD/BTU2/MoM 1 Minutes of meeting 10.07.09 Closed - -
51 CD/BTU2/General 3 General Correspondence of BTPS
unit 1 & 2
March '12 Running
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-RTPS UNIT-8, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office: CCED
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sector: SE(CD)-3
Sl
No. File No.
Volme
No. Subject
Opening
Date of
file
Closing
date of
file /
Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of file
Permaenent/Temporary Remarks.
1 CD/RTU8/CHP/Tecpro 1 Coal Handling System 23.10.08 Closed - -
CD/RTU8/CHP/PRO 1 CHP-Stacker/Reclaimer 04.12.08 Closed - -
CD/RTU8/CHP/CR1&2 1 Compressor Room 1& 2 16.04.09 Closed - -
2 CD/RTU8/Boiler 1 Boiler Area & Boiler 31.05.07 Closed - -
3 CD/RTU8/M&B 1 Mill & Bunker Bay 19.07.07 Closed - -
4 CD/RTU8/Mill 1 Mill Foundations 10.11.08 Closed - -
5 CD/RTU8/MRHS 1 Mill Reject Handling System 19.07.07 Closed - -
6 CD/RTU8/Fans 1 PA/FD/Seal Air fans 06.02.09 Closed - -
7 CD/RTU8/ESP 1 ESP & ESP Area 30.05.07 Closed - -
8 CD/RTU8/ESP CR 1 ESP Control Room 19.11.07 Closed - -
9 CD/RTU8/Racks 1 Cable/Pipe Rack 03.01.09 Closed - -
10 CD/RTU8/Trans 1 Transformer Yard 23.07.08 Closed - -
11 CD/RTU8/FP&AS 1
Fire protections & Alaram
Systems 20.05.08 Closed - -
12 CD/RTU8/DM-CST 1 Condensate Storage Tank 08.05.09 Closed - -
13 CD/RTU8/Elec 1 Electrical 27.11.08 Closed - -
14 CD/RTU8/General 1,2 General 19.06.07 Closed - -
15 CD/RTU8/INSP 1 Third party Inspection 10.07.07 Closed - -
16 CD/RTU8/Meeting 1 Review Meeting 20.11.08 Closed - -
17 CD/RTU8/Mon-Pr 1 Monthly Progress Report 16.10.08 Closed - -
18 CD/RTU8/Misc-Drgs 1 Miscellaneous Drawings 09.03.10 Closed - -
19 CD/RTPS/General 1 General Correspondence of all 8
units of RTPS
March
'12
Running
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-YTPS, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED YTPS Sector: SE(CD) - 3
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sl
No.
File No. Volme
No.
Subject Opening
Date of file
Closing
date of
file /
Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of file
Permanent/Temporary
Remarks.
1 CD/YT-U1/GEN 1 GENERAL 07.09.2009 Running - Permanent
2 CD/YT-U1/Misc 1 MISCELLANEOUS 11.02.2011 Running - Permanent
3 CD/YT-U1/GO 1 GOVERNMENT ORDERS
(G.O)
26.05.2010 Running - Permanent
4 CD/YT-U1/AGREEMENT 1 AGREEMENT,
CONTRACT CO-
ORDINATION
PROCEDURE & BILLING
BREAK-UP
Running - Permanent
5 CD/YT-U1/MOM 1 MINUTES OF MEETING 31.05.2010 Running - Permanent
6 CD/YT-U1/RPCL BOARD /
O.C MTNGS
1 RPCL - BOARD /
OPERATION
COMMITTEE MEETINGS
/ AGENDA & MoM
01.06.2011 Running - Permanent
7 CD/ YT-U1/TP 1 CONSULTANCY
ENGINEERING SERVICES
13.02.2012 Running - Permanent
8 CD/YT-U1/PLOT PLAN 1 PLOT PLAN / LAYOUTS 20.10.2010 Running - Permanent
9 CD/YT-U1/geo tech/ 1 GEOTECHNICAL
INVESTIGATION
LAYOUT AND REPORTS
03.05.2010 Running Permanent
10 CD/YT-U1/RSMY 1 RAILWAY SIDING &
MARSHALLING YARD
20.07.2010 Running - Permanent
11 CD/YT-U1/L1-L2 1 L1, L2 SCHEDULES Running - Permanent
12 CD/YT-U1/Progress 1 PROGRESS REPORTS 15.09.2010 Running - Permanent
13 CD/YT-U1/ESP 1 ESP & ESP
FOUNDATIONS
17.01.2011 Running - Permanent
14 CD/YT-U1/BOILER/ 1 BOILER & BOILER
FOUNDATIONS
27.09.2010 Running - Permanent
15 CD/YT-U1/M&B 1 MILL & BUNKER BAY
STRUCTURES / MILL
FOUNDATIONS
04.11.2010 Running - Permanent
16 CD/YT-U1/Constn power 1 CONTROL ROOM FOR
CONSTRUCTION
POWER SUPPLY
22.03.2011 Running - Permanent
17 CD/YT-U1/DSS 1 DUCT SUPPORTING
STRUCTURE
07.12.2011 Running - Permanent
18 CD/YT-U1/PA,FD & SA 1 PA/FD/SA FANS 22.10.2011 Running - Permanent
19 CD/YT-U1/CHIMNEY 1 TWIN FLUE CHIMNEY 20.06.2012 Running - Permanent
KARNATAKA POWER CORPORATION LIMITED.
( Raichur Thermal Power Station ) LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE : CQE(T) Ref : ED(CA) & CS Ltr.No.A1R5A (R1A) Dated. 07.05.14
ADDRESS : RTPS – KPCL, SHAKTINAGAR.
Sl.No. File No. Subject Opening date of
File
Closing Date of
file/Running File.
Date of Transformer
file Authority
whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
1 CQET/P1A/ General File 01.10.1999 Running -
permanent 2 CQET/P1B Deputation/Representation 22.03.2005 Running. - permanent
3 CQET/P1C Recruitment 23.09.2005 Running. - permanent
4 CQET/P1D Promotions 20.08.2005 Running. - permanent
5 CQET/P1E Transfers. 18.12.199 Running. - permanent
6 CQET/P1F Leave 14.10.2006 Running. - permanent
7 CQET/P1G Increments. 28.09.1998 Running. - permanent
8 CQET/P1H Advances. 19.08.2003 Running. - permanent
9 CQET/P1I Compensation. 17.01.2000 Running. - permanent
10 CQET/P1J Overtime. 04.10.2007 Running. - permanent
11 CQET/P1K Other benefits. - Running.- - permanent
12 CQET/P2B Training. 22.03.2005 Running. - permanent
13 CQET/P2C Welfare. - - - -
14 CQET/P2D Discipline. 16.11.2003 Running. - permanent
15 CQET/P2E Retirement 19.04.2006 Running. - permanent
16 CQET/P1B Power 29.03.1980 Running. - permanent
17 CQET/P1C2 Water. 29.03.1980 Running. - permanent
18 CQET/P1D2A Telephone 10.04.1997 Running. - permanent
19 CQET/P1A2B Vehicle. 15.11.2007 Running. - permanent
20 CQET/B2T Railway. Running. - permanent
21 CQET/A2D Hiring. Running. - permanent
22 CQET/A3B Rents. Running. - permanent
23 CQET/A3C Taxes Running. - permanent
24 CQET/A3D Repairs - Maintenance Running. - permanent
25 CQET/A4B Municipal services. Running. - permanent
26 CQET/A4C Dispensaries. 05.09.2005 Running. - permanent
27 CQET/A5B Stationery. 10.07.1981 Running. - permanent
28 CQET/A5C Printing. -
29 CQET/A5D Furniture. 24.09.1980 Running. - permanent
30 CQET/A5E Office equipments. 24.03.1980
31 CQET/A5F Book & Periodicals. Running. - permanent
32 CQET/A5G Petty purchases. 24.09.1981 Running. - permanent
33 CQET/A6B Tour Programmers. 08.09.1982 Running. - permanent
34 CQET/A6C Noties/ compliance. Running. - permanent
35 CQET/A7A Security. Running. - permanent
36 CQET/A7B Police. Running. - permanent
37 CQET/A7C Watch & Ward. Running. - permanent
38 CQET/A7D Civil Defences. Running. - permanent
39 CQET/A7E Safety of employees. 27.03.2008 Running. - permanent
40 CQET/A7F Thefts. Running. - permanent
41 CQET/Q2D Travelling allowance. Running. - permanent
42 CQET/Q2E Pension. 16.03.1983 Running. - permanent
43 CQET/Q3E Motor car/Cycle advance. 19.08.2003 Running. - permanent
44 CQET/Q3F Providient fund recoveries.
19.08.2003 Running. - permanent
45 CQET/Q3G Insurance recoveries. 29.11.1982 Running. - permanent
46 CQET/Q3I Income tax recoveries. 11.11.1979 Running. - permanent
47 CQET/Q3J H.B.A , H.P.A / Rent Running. - permanent
48 CQET/Q6A Audit recoveries (Internal) 19.08.1979 Running. - permanent.
MISCELLANEOUS FILES.
1 2 3 4 5 6 7
1 CQET/Q2A Uniform 10.11.1980 Running. -
2 Canteen Coupon. 09.07.1992 Running. -
3 CQET/A7A Sub-Stores account 18.07.1994 Running. -
4 - Accounts correspondence 21.08.1981 Running. -
5 - Medical Attendance - Running. -
6 - Festival Advance 24.04.2009 Running. -
7 - Incentive. 26.10.2002 Running. -
8 CQET/A3A Casual and 26.11.1979 Running. -
9 CQET/Q2D DA file (Dearness allowance_ 24.06.1993 Running. -
10 - Quarters. 19.11.1979 Running. -
11 - Type writer. 02.04.1981 Running. -
12 - Stationery code No file. - Running. -
13 - Assets and Liabilities. 06.05.1989 Running. -
14 - S.R. (Standing regulation) 10.12.1990 Running. -
15 - T.A bill file. 27.05.2003 Running. -
16 - Materials Gate pass file. 15.09.2004 Running. -
17 - Computer file. 29.09.2003 Running. -
18 - T & P file. 05.02.1993. Running. -
19 - Attendance file. 18.10.2005 Running. -
20 - Circular file. 31.03.2005 Running. - permanent
21 - EL/Commuted leave file. 05.02.2003 Running. - permanent
22 - Confidential file. 12.10.199 Running. - permanent
23 - Disciplinary case file. Running. - permanent
24 - Imp rest Account file. 15.03.2004 Running. - permanent
25 - Temporary Advance file. 21.03.2003 Running. - permanent
26 CQE(T) Legal- Head legal service. 17.07.2010 Running. - permanent
25 CQET-RTA RTA Act U/S 4(1) (a) of RTA- 2005 09.04.2010 Running. - permanent
KARNATAKA POWER CORPORATION LIMITED. ( Raichur Thermal Power Station )
LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE: CQE(T) Ref : ED(CA) & CS Ltr.No.A1R5A (R1A) Dated. 07.05.14
ADDRESS: RTPS – KPCL – SHAKTINAGAR.
Sl. No.
File No. Subject Opening
date of File Closing Date of
file/Running File.
Date of Transformer file Authority
whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
STATION BUILDING UNIT-8
1 CQET/Y1A FA OK Cards 27.07.2007 Running. - permanent
2 CQET/Y2A CA OK Cards 27.07.2007 Running. - permanent
3 CQET/Y3A Batch weights -1 27.07.2007 29.06.2009 - -
4 CQET/Y4A Batch weights-2 29.06.2009 Running. - permanent
5 CQET/Y5A BP calibration 06.09.2007 Running. - permanent
6 CQET/Y6A Back fill E-row ESP control
04.03.2008 Running. - permanent
7 CQET/Y7A HZ –row ,ESP control internal columns back filling
02.04.2008 Running. - permanent
8 CQET/Y8A ESP, PA Fan A & B pass back filling.
21.04.2008 Running. - permanent
9 CQET/Y9A FA & G-row , ESP control back filling
02.03.2008 Running. - permanent
10 CQET/Y10A A-row , BFP, FD Fan A pass back filling.
24.03.2008- Running. - permanent
11 CQET/Y11A Boiler , FD fan B-pass Air washer back filling.
09.04.2008 Running. - permanent
12 CQET/Y12A FA OK cards for mortar 09.04.2008 Running. - permanent
13 CQET/Y13A CTR invoice 13.09.2008 Running. - permanent
14 CQET/Y14A Test schedule cubes 04.05.2009 Running. - permanent
15 CQET/Y15A CTR Invoice 29.12.2007 Running. - permanent
16 CQET/16A Cement requisition. 23.07.2007 Running. - permanent
17 CQET/Y17A Cube test schedule 07.08.2007 Running. - permanent
18 CQET/Y18A Cement test reports 01.08.2007 Running. - permanent
19 CQET/Y19A Cement test reports 26.05.2009 Running. permanent
20 CQET/Y20A Cement test reports 22.10.2009 Running. permanent
21 CQET/Y21A SBC Correspondence 06.07.2007 Running. permanent
R.C.C. COOLING TOWER UNIT-8
22 CQET/Y22B Cooling tower correspondence
09.10.2007 Running.
permanent
23 CQET/Y23B CA OK Cards. 26.11.2007 Running. permanent
24 CQET/Y24B FA OK cards. 26.11.2007 Running. - permanent
25 CQET/Y25B Batch weights. 07.12.2007 Running. - permanent
26 CQET/Y26B Batching plant Calibration.
11.02.2008 19.10.2009 -
R.C.C.CHIMNEY UNIT-8
27 CQET/Y27C Chimney Correspondence 17.01.2008 Running. permanent
28 CQET/Y28C CA OK Cards. 19.01.2008 06.09.2009
29 CQET/Y29C FA OK cards. 19.01.2008 06.09.2009 -
30 CQET/Y30C Batch weights. 19.01.2008 06.09.2009 -
31 CQET/Y31 C Mix design 16.07.2007 Running. - Permanent
C.W . PUMP HOUSE UNIT-8
32 CQET/Y32D Correspondence 03.03.2008 Running. permanent
33 CQET/Y33D CA OK cards 04.04.2008 18.09.2009 ‘
34 CQET/Y34D FA OK cards 04.04.2008 18.09.2009 ‘-
35 CQET/Y35D Batch weights. 04.04.2008 18.09.2009 - -
36 CQET/Y36D Back filling. 12.10.2009 13.10.2009
ASH HANDLING SYSTEM UNIT-8 37 CQET.Y37E Correspondence 01.06.2009 Running. - permanent
38 CQET/Y38E CA OK cards 30.05.2009 Running. - permanent
39 CQET/Y39E FA OK cards 30.05.2009 Running. - permanent
40 CQET/Y40E Batch weights. 30.05.2009 Running. - permanent
ADDITIONAL CALIFIER UNIT-8 41 CQET/Y41F Correspondence 08.05.2009 Running. permanent
42 CQET/Y42F CA OK cards 26.05.2009 Running. - permanent
43 CQET/Y43F FA OK cards 26.05.2009 Running. - permanent
44 CQET/Y44F Batch weights. 26.05.2009 Running. - permanent
SWITCH YARD
45 CQET/Y45G Correspondence 06.09.2009 Running. - permanent
46 CQET/Y46G CA OK Cards. 25.06.2009 06.01.2010 - -
47 CQET/Y47G FA OK Cards. 25.06.2009 06.01.2010 - -
48 CQET/Y48G Batch weights. 25.06.2009 06.01.2010 - permanent
49 CQET/Y49G Back filling. 27.12.2009 Running. - permanent
50 CQET/Y50G Back filling. 14.09.2009 Running. - permanent
MILL REJECT COAL HANDLING SYSTEM.
51 CQET/Y50H Correspondence 16.10.2009 Running. - permanent
52 CQET/Y52H CA OK Cards. 16.10.2009 Running. - permanent
53 CQET/Y53H FA OK Cards. 16.10.2009 Running. - permanent
54 CQET/Y54H Batch weights. 09.10.2009 Running. - permanent
EXTENSION OF COAL HANDLING SYSTEM. 55 CQET/Y55I Correspondence 13.01.2009 Running. - permanent
56 CQET/Y56I CA OK Cards. 04.07.2009 Running. - permanent
57 CQET/Y57I FA OK Cards. 04.07.2009 Running. - permanent
58 CQET/Y58 I Batch weights. 04.07.2009 Running. - permanent
59 CQET/Y59 J Correspondence 06.05.2008 Running. - permanent
60 CQET/Y60 J CA OK Cards. 02.05.2008 Running. - permanent
61 CQET/Y61 J FA OK Cards. 09.05.2008 Running. - permanent
62 CQET/Y62 J Batch weights. 09.05.2008 Running. - permanent
63 CQET/Y63 J Chi: 1310 to 1490 29.11.2008 Running. - permanent
64 CQET/Y64 J Chi: 1160 to 1310 18.08.2008 Running. - permanent
65 CQET/Y65 J Chi: 1490 to 1570 02.12.2008 Running. - permanent
66 CQET/Y66 J Chi: 1010 to 1060 21.01.2008 Running. - permanent
67 CQET/Y67 J Chi: 800 to 1010 17.10.2008 Running. Permanent
ALMATTI DUMP POWR HOUSE.
68 CQET/ Y68 K CA , FA Correspondence & Batch weights.
26.10.2009 Running.
- permanent
OTHERS
69 CQET/Y69 L Compound wall Road works & Misc. works.
22.10.2008 Running.
- permanent
70 CQET/Y70 L Security compound wall 20.11.2008 Running. - permanent
71 CQET/Y71 L YTPS Mix design 28.04.2009 Running. Permanent
72 CQET/Y72 L Unit-8 Correspondence 04.07.2008 Running. Permanent
73 CQET/Y73 L Administration Unit-8 26.06.2008 Running. Permanent
74 CQET/Y 74L Mix design 09.04.2008 Running. - Permanent
75 CQET/Y75L Mix design 16.04.2005 Running. Permanent.
76 CQET/Y76 L YTPS Batch weights. 04.03.2010 Running. Permanent
77 CQET/Y77 L YTPS Correspondence 04.03.2010 Running. Permanent
78 CQET/Y 78 M Testing of materials from Private Agency.
25.03.2007 Running.
Permanent
79 CQET/Y 79 N MTR of All civil works. 06.03.2007 Running. Permanent
80 CQET/Y 80 O Budget 02.08.2006 Running. Permanent
81 CQET/Y 81 P Cement test report of ADPH
27.11.2008 Running.
Permanent
82
CQET/Y 82 Q OK Cards for CA Unit-8 25.02.2008 Running.
Permanent.
83 CQET/Y 83 R OK Cards for FA Unit-9 25.02.2008
Running.
Permanent.
84 CQET/ Y 84 S OK Cards for Back fill Unit-8 works.
07.03.2008 Running.
Permanent.
85 CQET/Y 85 T Cement test report of Unit-8 works
04.08.2007 Running.
Permanent
86 CQET/Y 86 U Procurement / General. 26.08.2008 Running.
Permanent
87 CQET/Y 87 V Requisition of Cement Unit-8
08.06.2006 Running.
Permanent
88 CQET/Y 88 W YTPS Drawings. 11.02.2010 Running. Permanent
89 CQET/Y 89 X ADPH Correspondence 23.07.2009 Running. Permanent
90 CQET/Y 90 Y Facilities Available at Laboratory
25.08.2007 Running.
Permanent
91 CQET/Y 91 Z Physical verification of Assets.
22.03.2002 Running.
Permanent
CQE(T)
NON OPERATED FILE.
Sl.No File Nos. Name of the file.
13 CQET P2C Welfare/
20 CQET A2J Railway
21 CQET P2D Hiring.
22 CQET/A3B Rents.
23 CQET/ A3C Taxes
24 CQET/A3D Repairs and Maintenance
25 CQET / A4B Municipal services
28 CQET A5C Printing.
31 CQET/ A5F Book and periodicals.
34 CQET/ A6C Notes compliance
35 CQET/ A7A Security.
36 CQET/ A7B Police.
37 CQET/A7C Watch and Ward
38 CQET/A7D Civil Defiance.
40 CQET/A7F Thefts.
41 CQET Q2D Traveling allowance
47 CQET/A3J HBA HPA / Rent Recoveries.
Files and Records –Quality control, Computer maintenance
Name of the Office : CCED, SECD-3 sector Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
Quality Control 1 RTPS- New office complex-supply
of steel –vendor approval October 2013 Permanent Running
2 RPCL-Plant water system -FQP January2014 Permanent Running 3 RPCL-Chimney-FQP January2013 Permanent Running 4 RPCL-GMW-Vendor approval to
miscellaneous items
November 2013 Permanent Running
5 RTPS –Battery room Novermber2013 Permanent Closed
6 RPCL-GEMW -FQP January 2014 Permanent Running 7 RPCL-IDCT-Mix design July2013 Permanent Running
8 RPCL_IDCT-FQP August2013 Permanent Running 9 RPCL-steel approval to vendors January2013 Permanent Running
11 RPCL-BTG correspondence May 2012 Permanent Running
12 RPCL-GMW-Mix design April 2014 Permanent Running
13 RPCL- Mix design-Chimney July 2013 Permanent Running
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
14 RTPS-Testing charges of cement cubes
Permanent Running
15 BTPS-U-III-Switchyard-Mix Design July 2012 Permanent Running 16 BTPS-U-III-BTG Architectural &
Structural steel works-Mix design May 2012 Permanent Running
17 BTPS-U-III-CHP & AP-Mix design Janaury2012 Permanent Running
18 BTPS-U-III -Chimney February 2013 Permanent Running 19 BTPS-U-III- Cooling Tower February 2013 Permanent Running
21 BTPS-U-III- NDCT-FQP June 2013 Permanent Running 22 BTPS-U-III-Chimney -FQP November 2012 Permanent Running 23 BTPS- QAP-Material Qualtiy June 2012 Permanent Closed
24 BTPS-U-III-Steel structures-FQP August2012 Permanent Closed
25 BTPS U-III-BTG-UPV tests January 2013 Permanent Running
26 BTPS-U-III-Vendor approval -Steel October 2012 Permanent Closed
27 BTPS- Vendor approval for A.R. Bricks
December 2012 Permanent Closed
28 BTPS_U-III-FQP-Foundation superstructure, civil works
March 2012 Permanent Running
Computers 1 Plotter-OCE plotwave 300 Permanent Running 2 Plotter HP Design Jet TS1300 Permanent Running 3 LAN Permanent Running
4 Procurement of new computers Permanent Running 5 Procurement of other items Permanent Running 6 Data Card Correspondence Permanent Running 7 E Tabs 8 In House technical interaction and
paper presentation Closed
9 Development of soft ware Running 10 Biometric Attendance Running
Files and Records –, Audit, General,. Technical committee meeting, contract Management Group meeting, Registration of Contractors,
Computer maintenance etc.,
Name of the Office : CCED Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore.
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
1 K BIS, QC, PFC, FICCI, IGS, CBIP
and ITA Correspondences. (Box
File. 3 Nos closed one running
Permanent Running
2 EIRL/WS Committee
Agenda/Minutes File (Box File 2
Nos)
Permanent Running
3 RTPS RTPS Unit-8, Condition of
Contract & Escalation Derivations
(Box File 1 No)
Permanent Closed
4 CMG Agenda & Minutes. Permanent Running
5 S T P Details (Box File 1 No)
Permanent Closed
6 Correspondences General matters
Permanent Running
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
7 Contract Management Group
Meeting H O Office CMG (HO)
Minutes
Permanent Running
8 G Letters from MD,s Office
.
Permanent Running
9 Board of Directors Meeting (B )
Agenda & Minutes -RPCL
Permanent Running
11 M Board of Directors Meeting (B O
D) Agenda & Minutes old file
Permanent Running
12 Technical Committee Meetings (T C
M ) Agenda & Minutes
Permanent Running
13 Affidavit, Audit Para, IA Queries
Correspondences office copy
Permanent Running
14 Budget Permanent Running Special Core Group Meeting Permanent Running
15 Integrated Energy Polr
Closed
16 Works Tender Notification for
Information. Closed
17 Registration Certificates-Class III
and class IV from other projects
Permanent Running
18 Registration General correspondence
Permanent Running
19 Issue of Registration certificates Permanent Running
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
21 Request for issue of Registration application form
Permanent Running
22 Monthly DD towards registration fee Permanent Running 23 Registration Of Contract in KPCL
Modification Proposal CMG (HO)
Yellow File-20
Permanent Closed
234 Registration of Contract in KPCL
(Old Yellow File 1 No.)
Permanent Closed
25 List of Contractors (2 Spiral Book) (Old Yellow File 1 No
Permanent Closed
26 Registration Of Contract Draft for
Approval (Old Green File-2009)
Permanent Closed
27 Contractors Grievances on
Registrations
Permanent Running
28 Registration of Contract (2009) PPT Maintenance
Permanent Running
29 Computers maintenance Permanent Running
30 Patil Computers report Cards on
Computer maintenance
Closed
31 Computers AMC CCED’s Office
Correspondences (Old Yellow File)
Permanent Closed
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
32 Plotter AMC Correspondences and
Maintenance.
Permanent Running
33 Hp Lap-Top Supplied Details (
Plastic File)
Permanent Closed
34 Glodyne Technoserve Ltd. Report
Cards & Maintenance
Permanent Closed
35 Auto CAD Upgradation
Correspondences and purchase
proposals
Permanent Running
36 STAAD-Pro 8Vi Correspondences
and purchase proposals
Permanent Running
37 Local area Net work Permanent Running 38 Development of software for CCED
office Permanent Running
39 E procurement Permanent Running 40 Brochures Permanent Running 41 Printers(Procurement, service,
consumables) Permanent Running
47 In House Technical Interaction meeting
Permanent Running
48 Rico officio digital copier with printer Permanent Running
Sl. No.
File No.
Subject Registration of Contract
(Class-I)
Opening Date of
File
Closing Date of
File/Running file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent/ Temporary
Remarks
1 2 3 4 5 6 7 8
49 Circulars-computer, training etc., Permanent Running Permanent Running
Karnataka Power Corporation Ltd.,
List Files and Records –Quality Control Works
Name of the Office : CCED
Address: 22/23, Sudarshan complex, I floor, Gandhinagar, Bangalore
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
1 Kodasalli Dam Concreting. Permanent Closed
2 Kadra Power House works Permanent Closed
3 RTPS Stage-III bid document Permanent Closed
4 Gerusoppa- QC works- Monthly report Permanent Closed
5 Monthly report – February-2000. Permanent Closed
6 Sarpadi barrage hydro electric project draft tender document.
Permanent Closed
7 Monthly test report KHEP Stage-II. Permanent Closed
8 Kali wing- QC works- comprehensive
review report
Permanent Closed
9. Review report of quality of works (Supa
wings).
Permanent Closed
10 Gerusoppa project- QC review reports –
199-2000
Permanent Closed
11 Verifying unserviceable scrap materials. Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
12 Ghataprabha Power House MTR. Permanent Closed
13 Compression test of concrete cylinders. Permanent Closed
14 Monthly test report of Kadra earthen
dam extended reach-II.
Permanent Closed
15 Procurement of cement autoclave. Permanent Closed
16 Progress of R and R works of UKP Permanent Closed
17 Testing of drinking water supplied to
colonies.
Permanent Closed
18 Temperature record of QC lab Permanent Closed
19 Cement concrete tests of RTPS. Permanent Closed
20 List of officials working in CQE(T)
division.
Permanent Closed
21 Construction of high school building at
Kargal colony.
Permanent Closed
22 Monthly progress report of Kali wing. Permanent Closed
23 Monthly meeting with CCED. Permanent Closed
24 Circulars and miscellaneous etc., Permanent Closed
25 RTPS MTR July – 26 to June – 98. Permanent Closed
26 Procurement of AEA for KHEP and
Gerusoppa - 1999 – 2000.
Permanent Closed
27 Zuari – cement Gerusoppa dam. Permanent Closed
28 Studies conducted on different aspects
of quality control at Ambikanagar
laboratory from June – 1999 Till date.
Permanent Closed
29 M.T.R. Kodasalli Permanent Closed
30 Fly ash R.T.P.S. Permanent Closed
31 Dry and wet thermometer readings.
Permanent Closed
32 R.T.P.S. MTR. Permanent Closed
33 Water supply scheme to the vijayanagar
Thermal Power Station.
Permanent Closed
34 VTPS – Feasibility report for water Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
supply.
35 KHEP-stage-II- QC comprehensive
review reports for the year 1997-98
Permanent Closed
36 KHEP-stage-II- QC comprehensive
review reports
Permanent Closed
37 Sarapadi Draft tender document. Permanent Closed
38 General file. Permanent Closed
39 Classified list of Indian standards. Permanent Closed
40 Cement supply correspondence. Permanent Closed
41 Usage of concrete pump for P.H. works
at Kadra and Kodasalli.
Permanent Closed
42 RTPS Unit – 5 & 6 fabrication of steel
works.
Permanent Closed
43 Objection report of Kadra power house. Permanent Closed
44 Sarapadi draft tenders. Permanent Closed
45 VHEP and SHEP –QC review report- july 1991 to june 1992
Permanent Closed
46 RTPS- QC review report for the year 1991-92
Permanent Closed
47 Procurement of Admixtures for KHEP Stage-II and Gerusoppa works for the
working season – 98 – 99.
Permanent Closed
48 General file. Permanent Closed
49 M.T.R. for the month Sept. – 2000.
(Linganamakki, Kargal, Jog)
Permanent Closed
50 Monthly report of quality control works. Permanent Closed
51 Objection reports of Kodasalli PH. Permanent Closed
52 Supply of high strength cement to RTPS
works.
Permanent Closed
53 General file. Permanent Closed
54 Gerusoppa project- QC review report monthly report
Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
55 RTPS- QC comprehensive review report Permanent Closed
56 General file. Permanent Closed
57 Monthly cement concrete test of
R.T.P.S.
Permanent Closed
58 General file. Permanent Closed
59 Rectification of circulating water
tunnels.
Permanent Closed
60 General file. Permanent Closed
61 UKP progress report. Permanent Closed
62 General file.
Permanent Closed
63 MTR of R.T.P.S. Permanent Closed
64 Cement test report. Permanent Closed
65 Monthly test report pof Kadra dam. Permanent Closed
66 General file. Permanent Closed
67 Temperature record of Gerusoppa dam. Permanent Closed
68 Delegation of powers to GM(C & D). Permanent Closed
69 Monthly progress report of Kali wing. Permanent Closed
70 Water Sample test. Permanent Closed
71 General file. Permanent Closed
72 Chemical test report of water samples at Sarapady barrage.
Permanent Closed
73 General file. Permanent Closed
74 Brindhavan power house file. Permanent Closed
75 Asset cooling sheets as on 31.03.2001. Permanent Closed
76 Water samples pertaining to RTPS. Permanent Closed
77 General file. Permanent Closed
78 Monthly report of quality control works. Permanent Closed
79 General file. Permanent Closed
80 Monthly report of quality control works. Permanent Closed
81 General file. Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
82 General file. Permanent Closed
83 Gradation analysis results of CA, FA. Permanent Closed
84 Report on routine activities of EE-10
division.
Permanent Closed
85 Casting and testing of cement concrete
cylindrical samples.
Permanent Closed
86 Temperature chart of Lab. Permanent Closed
87 Concrete test results. Permanent Closed
88 General file. Permanent Closed
89 Testing of cylindrical specimen. Permanent Closed
90 Supply of admixtures to KHEP Stage –
II and Gerusoppa.
Permanent Closed
91 General file. Permanent Closed
92 Temperature of quality control
laboratory.
Permanent Closed
93 General file. Permanent Closed
94 Review report on quality control works
(RTPS).
Permanent Closed
95 Construction of permanent office
complex at Jog.
Permanent Closed
96 Minutes of meeting of Q.C. and
construction staff.
Permanent Closed
97 GPH general file. Permanent Closed
98 General file. Permanent Closed
99 Kodasalli power house concreting works.
Permanent Closed
100 Gerusoppa –QC monthly report
Permanent Closed
101 Gradation of course aggregates. Permanent Closed
102 Gerusoppa, VHEP and Bhadra projects-
QC monthly report
Permanent Closed
103 Monthly review meeting with CCED. Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
104 Test report on physical properties of
cement.
Permanent Closed
105 Agreement for the construction of
additional water conductor system
between Linganamakki dam power
house and Talakalale Reservoir.
Permanent Closed
106 Drawings of RTPS. Permanent Closed
107 Minutes of Board meetings. Permanent Closed
108 RTPS review report for the year 1997.-98
Permanent Closed
109 Progress report of RTPS. Permanent Closed
110 Monthly test reports. Permanent Closed
111 M.T.R. Kadra dam July – 1995. Permanent Closed
112 Test report for the month May – 1999. Permanent Closed
113 Kodasalli general file. Permanent Closed
114 Kadra Laboratory temperature
Permanent Closed
115 General file. Permanent Closed
116 EIRL / work slip committee.
Permanent Closed
117 Celebration of quality month. Permanent Closed
118 Monthly report on quality control
works.
Permanent Closed
119 General file. Permanent Closed
120 Test report of cement concrete works. Permanent Closed
121 General file. Permanent Closed
122 General file. Permanent Closed
123 KHEP Stage-II- QC review report for
the year 1999-2000
Permanent Closed
124 Monthly abstract of cement concrete
tests.
Permanent Closed
125 Unserviceable materials in quality Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
control laboratory at RTPS.
126 General file of R.T.P.S. Permanent Closed
127 General file of Mani dam. Permanent Closed
128 Review report on quality control on
Supa dam works.
Permanent Closed
129 General file of R.T.P.S. Permanent Closed
130 Comprehensive review report on quality
of works under Nagajhari wing.
Permanent Closed
131 Minutes of meeting held in the chamber
of CCET.
Permanent Closed
132 Monthly review report of RTPS. Permanent Closed
133 Procurement of lab equipments and
other materials to Kali project.
Permanent Closed
134 General file. Permanent Closed
135 Non-availability of vehicle. Permanent Closed
136 Comprehensive review report on quality
of works under Nagzhari wing.
Permanent Closed
137 Comprehensive review reports and
correspondence.
Permanent Closed
138 Monthly test/review reports of RTPS.
Permanent Closed
139 Monthly abstract of test report on
earthen embankment works.
Permanent Closed
140 Comprehensive review report on quality
of works under RTPS.
Permanent Closed
141 Rectification works of CW tunnels.
Permanent Closed
142 Gerusoppa, BHEP QC works monthly
review report
Permanent Closed
143 General file. Permanent Closed
144 Monthly report on quality control Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
works.
145 Monthly review report of Kali-IInd
Stage.
Permanent Closed
146 M.T.R. of R.T.P.S.
Permanent Closed
147 General file. Permanent Closed
148 Monthly test report of Gerusoppa
project.
Permanent Closed
149 Minutes of the meeting about quality
control works.
Permanent Closed
150 Monthly review report for the month
March – 1998.
Permanent Closed
151 Procurement of AEA for KHEP – 95 –
97.
Permanent Closed
152 Quality control reports November –
1998 of All project.
Permanent Closed
153 Kodasalli power house and dam back
filling
Permanent Closed
154 Monthly test report of Kodasalli power
house.
Permanent Closed
155 Test report on physical properties of
cement.
Permanent Closed
156 Quality month – 1999. Permanent Closed
157 Monthly report on Quality control work. Permanent Closed
158 Test on cement samples. Permanent Closed
Karnataka Power Corporation Ltd.,
List Files and Records –Quality Control Works
Name of the Office :
Address:22/23, Sudarshan Complex, First Floor, Gandhinagar, Bangalore
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
1 CRR of Chakra wing upto end of June –
1979.
Permanent Closed
2 Monthly report on quality control
works.
Permanent Closed
3 Quality control comprehensive review
report for the year 1995 – 96 KHEP – II
stage.
Permanent Closed
4 Varahi-1985 july to 1986 june- QC
comprehensive review report
Permanent Closed
5 QC Works –Comprehensive Review
report
Permanent Closed
6 Gerusoppa and varahi –QC review report for the period from july 1997 to
june 1998
Permanent Closed
7 Gerusoppa and varahi –QC
works –detailed review report for the period from july 1997 to june 1998
Permanent Closed
10 Comprehensive review report on quality of works under Varahi/Sharavathi wing
for the period from 01.07.1995 to 30.06.1996
Permanent Closed
11 Quality control comprehensive review report 1994-95 RTPS works
Permanent Closed
12 RTPS 5th and 6th unit-QC works review report for the year 1997 to june1998
Permanent Closed
13 Quality control comprehensive annual review report for 1994 – 95 RTPS
works.
Permanent Closed
14 Quality control comprehensive review Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
report 1994 – 95 RTPS works.
15 Comprehensive review report on
quality concrete works under
Varahi/Sharavathi wing for the period
from 01.07.1995 to 30.06.1996.
Permanent Closed
16 Comprehensive review report on quality
of work, under Varahi/Sharavathi wing
for the period from 01.07.1994 to
30.06.1995.
Permanent Closed
17 Gerusoppa, Bhadra and vara;hi- QC
works review report for the year july
1996 to 1997
Permanent Closed
18 Gerusoppa, Bhadra and vara;hi- QC
works review report for the year july
1996 to 1997
Permanent Closed
19 Comprehensive review report on quality
control works of Varahi/Sharavathi and Bhadra period from 01.07.1996 to
30.06.1997.
Permanent Closed
20 Comprehensive review report on quality
control works of Varahi Bhadra period
from 01.07.1996 to 30.06.1997.
Permanent Closed
21 Comprehensive review report on quality control works of Varahi wing for the
period 1st July 1982 to 30th June 1981.
Permanent Closed
22 Comprehensive review re port on
quality control works of Varahi wing for
the period 1st July 1982 to 30th June.
Permanent Closed
23 Varahi project –QC review report-1983
july to 1984 june
Permanent Closed
24 ARP VHEP – 90 – 91. Permanent Closed
25 CRR of Chakra wing upto end of June Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
1979.
26 ARR – 1984 – 85.
Permanent Closed
27 Annual review report on quality works
of Supa dam works. For the year 1978 –
79.
Permanent Closed
28 Kali wing comprehensive review report
for the year 1988 – 89.
Permanent Closed
29 ARR of Kali wing 1988 – 89. Permanent Closed
30 Annual review report on Quality control
of Supa dam works for the year 1978 – 79.
Permanent Closed
31 C0mprohensive review report for kali wing for the year 1986-87
Permanent Closed
32 Annual review report of KHEP wing for the year 1984 – 85.
Permanent Closed
33 Annual review report of KHEP wing for
the year 1984 – 85.
Permanent Closed
34 CRR of Nagjhari wing from 1st July
1977 to 30th June – 78.
Permanent Closed
35 CRR on Quality control works of Kali
wing for the period from 01.07.1992 to
30.06.1993
Permanent Closed
36 Comprehensive review report Nagjhari
wing for the period from 01.07.1979 to
30.06.80.
Permanent Closed
37 Comprehensive review report Nagjhari
wing for the period from 01.07.1980 to
30.06.1981.
Permanent Closed
38 Comprehensive review report of Varahi
wing
Permanent Closed
39 Comprehensive review report of Varahi Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
wing from 1.7.1985 to 30.06.1988
40 Comprehensive review report of Varahi
wing 1.07.1987 to 30.06.1988
Permanent Closed
41 ARR VHEP 88 – 89 Permanent Closed
42 Comprehensive review report on quality
of works under Varahi/STR wing for the
period between 01.07.1989 to
30.06.1990.
Permanent Closed
43 Comprehensive review report on quality of works under Varah for the period
between 01.07.1986 to 30.06.1987.
Permanent Closed
44 CRR (Nagjhari wing) 1977 – 78. Permanent Closed
45 Comprehensive review report on quality of works under Nagjhari wing up to
June – 75.
Permanent Closed
46 Comprehensive review report on quality
of works under Chakra wing 01.07.1980 to 30.06.1981.
Permanent Closed
47 CRR 84 – 85 Varahi wing.
Permanent Closed
48 Comprehensive review report on quality control of works under Chakra wing up
to end of June 1979
Permanent Closed
49 Quality control reports 1979-80 to 1982
– 83 VHEP.
Permanent Closed
50 CRR on Quality of works under Varahi
wing From 01.07.1081 to 30.06.1982.
Permanent Closed
51 Comprehensive review on quality of
works under Nagjhari wing up to June –
1975.
Permanent Closed
52 Comprehensive review report on quality
of works under Varahi for the period
Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
between 01.07.1983 to 30.06.1984
53 Comprehensive review report on quality
of works under Varahi wing from
01.07.1981 to 30.06.1982.
Permanent Closed
54 CRR Varahi wing. Permanent Closed
55 Comprehensive review report on quality
o f cement under Chakra wing.
Permanent Closed
56 ARR 1977 – 78 Nagjhari wing. Permanent Closed
57 CRR Chakra wing 01.07.1979 to
30.06.1980.
Permanent Closed
58 RTPS- Comprehensive Permanent Closed
59 RTPS- Comprohensive review report for
the period 1.07.85 to 30.06.86
Permanent Closed
60 RTPS- Comprohensive review report for
the period 1.07.86 to 30.06.87
Permanent Closed
61 RTPS- Comprohensive review report for
the period 1.07.87 to 30.06.88
Permanent Closed
62 QC review report of mini hydel scheme
1.07.84 to 30.06.85
Permanent Closed
63 Mani dam Part I and II objection reports Permanent Closed
64 Chakra rock fill dam pending OR’s Permanent Closed
65 Mani dam part I and II objection reports. Permanent Closed
66 Chakra rock fill dam finalized OR’s Permanent Closed
67 Annual review report for 1976-77. Permanent Closed
68 VHEP/STR ARR 91-92. Permanent Closed
69 Comprehensive review report 1976 – 77 Nagjhari wing.
Permanent Closed
70 Comprehensive review report on works of quality control in RTPS wing fro the
year 1980 – 81.
Permanent Closed
71 Comprehensive review report on quality Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
control works at RTPS for the period
July 1981 to 30 June 1982.
72 Comprehensive review report on quality
control works at RTPS wing for the
period 01.07.1982 to 30.06.1983.
Permanent Closed
73 RTPS- QC review reports-1.07.83 to
30.06.84
Permanent Closed
74 Comprehensive review report on quality
control works for Kali wing for the
period from 01.07.1993 to 30.06.1994.
Permanent Closed
75 Objection reports. Permanent Closed
76 Comprehensive re view report on quality of work under Kali wing for the
period between 01.07.1989 to 30.06.1990.
Permanent Closed
77 KHEP- Qc review report- 1.07.1987 to 30.06.1988
Permanent Closed
78 ARR of KHEP 1988 – 89 Permanent Closed
79 QC comprehensive review report-for the
year 199-92
Permanent Closed
80 Quality control comprehensive review
report for the year 1995-96 KHEP – II Stage
Permanent Closed
81 Annual review report for the year 1990-91.
Permanent Closed
82 Concrete mix designs RTPS. Permanent Closed
83 QC review report for RTPS 1.07.83 to
30.06.1984
Permanent Closed
84 QC review report for RTPS 1.07.86 to
30.06.198787
Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
85 QC review report for Kali wing for the
period 1.7.1992 to 30.06.1983
Permanent Closed
86 Kali wing QC review report for the year
1993-94
Permanent Closed
87 Comprehensive review report on quality
of works under Nagjhari wing for the
period 01.07.1978 to 30.06.1979.
Permanent Closed
88 Annual review report of quality control
works of Kadra Stage-II.
Permanent Closed
89 Comprehensive review report on quality
control works at RTPS for the period
01.07.1982 to 30.06.1983.
Permanent Closed
90 Revised mix design for units and 6 RTPS.
Permanent Closed
91 RTPS ARR 1992-93. Permanent Closed
92 Kali stage II- QC areview report for the
year july 1996 to july1997
Permanent Closed
93 Kali stage II- QC areview report for the
year july 1996 to july1997
Permanent Closed
94 Quality control comprehensive review
report for the year 1995-96 KHEP-II Stage.
Permanent Closed
95 Quality control comprehensive review report 1994-95 RTPS works.
Permanent Closed
96 RTPS 5th and 6th unit-QC
comporohensive review report
Permanent Closed
97 Quality control comprehensive annual
review report for 1994 – 95 KHEP 2nd
stage.
Permanent Closed
98 KHEP stage-II quality control works
Kadra annual review report for year
1996-97.
Permanent Closed
Sl.
No.
File
No. Subject
Opening
Date of
File
Closing
Date of
File/Running
file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 2 3 4 5 6 7 8
99 General file. Permanent Closed
100 Mani dam-II stage works, mix studies. Permanent Closed
101 Monthly test report of Chakra rock fill
dam.
Permanent Closed
102 Mani dam General file. Permanent Closed
103 VHEP Mani dam OR’s Permanent Closed
104 Objection report of Tattihalla dam. Permanent Closed
105 Monthly test report Chakra project. Permanent Closed
106 Monthly test report of VHEP pick up
dam works.
Permanent Closed
107 Monthly test report RTPS works. Permanent Closed
108 Monthly test report of Mani dam.
Permanent Closed
109 Monthly abstract of test report on
earthen embankment works (Mani dam)
Permanent Closed
110 Objection report of VHEP – UGPH works.
Permanent Closed
111 Monthly test report of mani dam. Permanent Closed
112 Monthly test report VHEP Mani dam Permanent Closed
KARNATAKA POWER CORPORATION LIMITED
List of Files and Records Under Section 4 (1) (a) of the Right to Information Act 2005
Name of the Office: CCED
Address: KPCL, 1ST FLOOR, SUDARSHAN COMPLEX, SESHADRI ROAD, BANGALORE-560 009
Sl. No.
File No./ Vol No.
Subject Opening Date of
File
Closing Date of
file / Running
file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent / Temporary
Remarks
1. 1 House Building Advance 25.08.02 - - Permanent 2. 2 Transport subsidy 08.07.03 - - Permanent 3. 3 Purchase of Computers 01.04.01 - - Permanent 4. 4 Extra Wages 06.04.04 - - Permanent 5. 5 Vehicle Advance 01.08.02 - - Permanent 6. 6 Uniforms Jan.1996 - - Permanent 7. 7 Festival Advance 05.08.02 - - Permanent
8. 8 Medical Facility for Retired employees
13.11.02 - - Permanent
9. 9 Stationery Sept.02 - - Permanent
10. 10 Xerox & Amonia Printing machine correspondence
01.01.2000 - - Permanent
11. 11 Direct Payment at M.R.Bills 06.06.02 - - Permanent 12. 12 Option for Medical Treatment 18.11.02 - - Permanent
13. 13 Purchase at Jumbo Xerox machine
Sept.07 - - Permanent
14. 14 Sanction Memo at M.R. Bills July.01 - - Permanent 15. 32 H.O. Notification 30.10.06 - - Permanent 16. 33 Annual increment 15.01.05 - - Permanent 17. 34 Leave Sanctioned Memo’s 18.12.06 - - Permanent 18. 35 Deputation 20.05.04 - - Permanent
19. 36 Attendance Extract 22.02.10 - - Permanent 20. 37 Stagnation Increment 23.02.2000 - - Permanent 21. 38 No Objection Certificate 07.09.04 - - Permanent 22. 39 VRS 20.02.03 - - Permanent 23. 40 General File 24.01.07 - - Permanent 24. 41 Pension & Other related to that 08.07.2000 - - Permanent 25. 42 Leave correspondence project
area 03.05.07 - - Permanent
26. 43 Transfers 11.05.07 - - Permanent
27. 44 HTC 16.06.04 - - Permanent 28. 45 Use of Kannada in 19.06.04 - - Permanent
Sl. No.
File No./ Vol No.
Subject Opening Date of
File
Closing Date of
file / Running
file
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent / Temporary
Remarks
Administration 29. 46 Leave Bangalore Unit 03.11.07 - - Permanent 30. 47 Allocation of work 08.09.04 - - Permanent 31. 48 In house and out house training 20.11.04 - - Permanent 32. 49 H.O. letters / Memo’s 13.09.04 - - Permanent 33. 50 H.O. Memo’s / Circular /SR’s 27.06.05 - - Permanent 34. 51 Promotions 27.03.03 - - Permanent 35. 52 Special Casual Leave 20.5.05 - - Permanent 36. 53 Computer Stationery Purchase 09.08.06 - - Permanent 37. 54 Work Force 26/2008 - - Permanent 38. 55 Tenders 17.11.08 - - Permanent 39. 56 TA Bills 05.03.10 - - Permanent 40. 57 Legal Cases / Disciplinary action 05.01.07 - - Permanent 41. 58 Miscellaneous 29.01.09 - - Permanent 42. 59 T& P Materials file 01.04.05 - - Permanent 43. 69 M/f filing - - Permanent 44. 70 Imprest file - - Permanent 45. 71 Reservation for SC/ST/OBC in
public procurement of goods and services
19.08.08 - - Permanent
46. 72 Armed Forces Flags 17.03.09 - - Permanent 47. 73 Foundation Day Celebration 15.04.08 - - Permanent 48. 74 Taxies Correspondence 02.02.09 - - Permanent 49. 75 Security measures 24.06.08 - - Permanent 50. 76 Union Correspondence 29.09.07 - - Permanent 51. 77 Telephone details 02.08.08 - - Permanent
52. 78 Procurement of Plotter Machine 20.05.10 - - Permanent 53. 79 Shift Allowance 08.09.08 - - Permanent 54. 80 Production Incentive 20.12.08 - - Permanent 55. Refilling of catridges 9.06.2011 permanent
FILE INDEX-BELLARY THERMAL POWER STATION UNIT-3, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector: SE(CD) - 3
Address : Sudarshan Complex, Seshadri road, Bangalore - 09
Sl
No.
File No. Vol.
No
Subject Opening
Date of
file
Closing
date of file
/ Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of
file
Permanent/
Temporary
Remarks
1. CD/BT-U3/JNT 12 EXTN 1 JUNCTION TOWER 12 25.07.2012 Running - Permanent
2. CD/BT-U3/JNT 15 1 JUNCTION TOWER 15 12.12.2011 Running - Permanent
3. CD/BT-U3/JNT 16 1 JUNCTION TOWER 16 10.09.2011 Running - Permanent
4. CD/BT-U3/JNT 21 1 JUNCTION TOWER 21 19.09.2011 Running - Permanent
5. CD/BT-U3/WT-5 1 WAGON TIPPLER 5 12.08.2011 Running - Permanent
6. CD/BT-U3/WT-4 1 WAGON TIPPLER 4-VOL-I 15.06.2011 05.04.2012 - Permanent
7. CD/BT-U3/WT-4 2 WAGON TIPPLER 4-VOL-II 05.04.2012 Running - Permanent
8. CD/BT-U3/BCN 13 B & C 1 BCN-13 B & C -TUNNEL 24.12.2012 Running - Permanent
9. CD/BT-U3/BCN 14 A/B 1 BCN-14 A/B 29.11.2012 Running - Permanent
10. CD/BT-U3/BCN 26 A/B 1 BCN-26 A/B 05.02.2013 Running - Permanent
11. CD/BT-U3/BCN 27 A/B 1 BCN-27 A/B 06.04.2013 Running - Permanent
12. CD/BT-U3/BCN 33 A/B 1 BCN-33 A/B 29.11.2012 Running - Permanent
13. CD/BT-U3/BCN 34 1 BCN-34 Tunnel 29.11.2012 Running - Permanent
14. CD/BT-U3/BCN 35 1 BCN-35 Tunnel 29.11.2012 Running - Permanent
15. CD/BT-U3/PH 1 PENT HOUSE FOR ALL
TUNNELS
10.03.2014 Running - Permanent
16. CD/BT-U3/PCH 1 PRIMARY CRUSHER
HOUSE
07.09.2011 Running - Permanent
17. CD/BT-U3/SCH 1 SECONDARY CRUSHER
HOUSE
07.09.2011 Running - Permanent
18. CD/BT-U3/SCH 1 SECONDARY CRUSHER
HOUSE
07.09.2011 Running - Permanent
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-YERMARUS THERMAL POWER STATION, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector: SE(CD) - 3
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sl.
No. File No.
Volume
No. Subject
Opening
Date of file
Closing
date of file
/ Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of file
Permanent/
Temporary
Remarks
1. CD/YT-U1/BOILER 1 BOILER FOUNDATIONS 27.09.2010 Running - Permanent
2. CD/YT-U1/M&B 1 MILL & BUNKER 04.11.2010 Running - Permanent
3. CD/YTPS/CHIMNEY 1 TWIN FLUE CHIMNEY 01.06.2012 31.08.2013 - Permanent
4. CD/YTPS/CHIMNEY 2 TWIN FLUE CHIMNEY 01.09.2013 Running - Permanent
5. CD/YTPS/CEC/RPCL 1 CEC RPCL
CORRESPONDANCE
12.08.2012 Running - Permanent
6. CD/YT-U1&U2/JNT-1 1 JUNCTION TOWER -1 25.07.2012 Running - Permanent
7. CD/YT-U1&U2/JNT-3 1 JUNCTION TOWER -3 03.09.2012 Running - Permanent
8. CD/YT-U1&U2/JNT-6 1 JUNCTION TOWER -6 03.09.2012 Running - Permanent
9. CD/YT-U1&U2/JNT-14 1 JUNCTION TOWER -14 07.11.2012 Running - Permanent
10. CD/YT-U1&U2/JNT-15 1 JUNCTION TOWER -15 23.11.2012 Running - Permanent
11. CD/YTPS/WT 1 WAGON TIPPLER 1,2,3 & 4 24.08.2012 Running - Permanent
12. CD/YT-U1&U2/BCN-
1A/B & 1C/D
1 BCN - 1 A/B & 1 C/D 17.07.2013 Running Permanent
13. CD/YT-U1&U2/BCN- 10
& 11
1 BCN - 10 & 11 -TUNNEL 23.02.2013 Running - Permanent
14. CD/YT-U1&U2/BCN-
17A/B & 19A/B
1 BCN - 17 A/B & 19 A/B 25.07.2012 Running - Permanent
15. CD/YT-U1/PH 1 PENT HOUSE - TUNNELS 23.02.2013 Running - Permanent
16. CD/YT-U1&U2/MCC-
WT
1 MCC NEAR WAGON
TIPPLER
12.03.2013 Running - Permanent
17. CD/YT-U1&U2/MCC-
BUNNKER
1 MCC NEAR BUNKER
AREA
12.03.2013 Running - Permanent
18. CD/YTPS/CEC/RPCL 1 CEC RPCL CORRESPONDANCE 12.08.2012 Running - Permanent
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-RAICHUR THERMAL POWER STATION, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector: SE(CD) - 3
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sl
No
.
File No. Volme
No. Subject
Opening Date of file
Closing
date of file / Running
file
Date of Transfer of
file & Authority
whom transferred
Nature of file
Permanent/
Temporary
Remarks.
1
CD/RTPS/MESCEL 1 RTPS –UNIT8
CORRESPONDENCES
STRENGTHENING OF
CONVEYORS
14.05.2012 Running - Permanent
KARNATAKA POWER CORPORATION LIMITED
List of Files and Records Under Section 4 (1) (a) of the Right to Information Act 2005
Name of the Office: Chief Engineer ( Civil Design), Karnataka Power Corporation Ltd.,
Address : No.22/23, 1ST FLOOR, SUDARSHAN COMPLEX, BANGALORE-560 009. Subject : YTPS(2X800MW) & BTPS U3(1X700MW) WORKS
YTPS(2X800MW)
Sl. No.
File No. / Vol No.
Subject Opening
Date of File
Closing Date of
file / Running
Date of Transfer of File
& Authority whom
transferred
Nature of File
Permanent / Temporary
Remarks
1 CD/YTPS/CST Condensate Storage tank and CS Transfer Pump House
25/06/2013 Running Permanent
Sl. No.
File No. / Vol No.
Subject Opening
Date of File
Closing Date of
file / Running
Date of Transfer of File
& Authority whom
transferred
Nature of File
Permanent / Temporary
Remarks
2 CD/YTPS/CPU Condensate Polishing Unit regeneration building Volume - 1 Volume - 2
14/05/2013 4/12/2013
28/11/2013
Running
Permanent
3 CD/YTPS/DM Demineralized Storage Tank And Pump House –Volume 1 Volume 2
18/12/2012
18/11/2013
Running
Permanent
4 CD/YTPS/ERH Emergency Reclaim Hopper- ERH 1 & 2
13/12/2012 Running Permanent
5 CD/YTPS/ERH Emergency Reclaim Hopper –ERH Shed
01/10/2013 Running Permanent
6 CD/YTPS/FOPH FUEL OIL PUMP HOUSE 03/07/2013 21/04/2014 Permanent
7 CD/YTPS/FOUPH Fuel Oil Unloading Pump House 05/11/2013 Running Permanent
8 CD/YTPS/Pipe Rack Pipe rack (FOPH & FOUPH) 13/12/2013 Running Permanent
9 CD/YTPS/RODM RODM Volume – 1 Volume - 2
25/05/2012 18/05/2013
10/05/2013
Running
Permanent
10 CD/YTPS/FOPH Treated Water Tank(RODM) 05/04/2013 Running Permanent
11 CD/YTPS/JNT10 Junction tower – JNT 10 10/12/2012 Running Permanent
12 CD/YTPS/JNT12 Junction tower – JNT 12 30/11/2012 Running Permanent
13 CD/YTPS/BCN 10/11 Belt Conveyor 10 & 11 04/03/2013 Running Permanent
14 CD/YTPS/BCN 12AB Belt Conveyor 12AB 24/08/2013 Running Permanent
15 CD/YTPS/BCN 13AB Belt Conveyor 13AB 13/12/2013 Running Permanent
16 CD/YTPS/BCN 14AB Belt Conveyor 14AB 25/09/2012 Running Permanent
17 CD/YTPS/BCN 15AB Belt Conveyor 15AB 21/09/2012 Running Permanent
BTPS U3(1X700MW)
1 CD/BT-3/CST Condensate storage tank 07/05/2012 Running Permanent
2 CD/ BT-3/DM plant DM storage tank & pump house –
Volume - 1 Volume - 2
16/04/2012 30/05/13
23/05/2013
Running
Permanent
3 CD/ BT-3/ERH Emergency reclaim hopper 30/06/2012 Running Permanent
4 CD/ BT-3/FOPH Fuel Oil Pump House
Volume – 1 Volume - 2
16/1/2012 23/2/2013
11/02/2013
Running
Permanent
5 CD/ BT-3/Pipe rack Pipe Rack 14/05/2012 02/06/2014 Permanent
6 CD/ BT-3/RODM Reverse Osmosis Demineralized 05/09/2012 03/06/2014 Permanent
7 CD/ BT-3/SWOHT Service water overhead tank
Volume – 1 Volume - 2
23/05/2012 27/05/2013
10/05/2013
Running
Permanent
8 CD/ BT-3/BCN 13B/C
Belt conveyor - 13B/C 04/05/2012 Running Permanent
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-BTPS UNIT-3, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector: SE(CD) - 3
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sl
No. File No.
Vol.
No Subject
Opening Date
of file
Closing date of file /
Running
file
Date of Transfer of file
& Authority whom
transferred
Nature of file
Permanent/ Temporary
Remarks.
1 CD/BT-U3/geo tech/ 1
GEOTECHNICAL
INVESTIGATION
LAYOUTS AND
REPORTS
10.11.2010 Running - Permanent
2 CD/BT-U3/ESP 1 ESP & ESP
FOUNDATIONS 17.06.2011 Running - Permanent
3 CD/BT-U3/ESPCR 1 E S P CONTROL ROOM 19.09.2011 Running - Permanent
4 CD/BT-U3/BOILER 1 BOILER & BOILER
FOUNDATIONS 12.08.2011 Running - Permanent
5 CD/BT-U3/M&B 2 MILL & BUNKER BAY
STRUCTURES 06.09.2011 Running - Permanent
6 CD/BT-U3/DSS 1 DUCT SUPPORTING
STRUCTURE 07.09.2011 Running - Permanent
7 CD/BT-U3/PA,FD &
SA 1 PA/FD/SA FANS 25.07.2011 Running - Permanent
8 CD/BT-U3/TRANS 1 TRANSFORMER YARD 22.05.2012 Running - Permanent
9 CD/BT-U3/CWST 1 CLARIFIED WATER
STORAGE TANK 27.06.12 Running - Permanent
10 CD/BT-U3/CHP 1 CHP GENERAL 18.08.2011 Running - Permanent
11 CD/BT-U3/JNT 13 1 JUNCTION TOWER 13 12.04.2012 Running - Permanent
12 CD/BT-U3/JNT 14 1 JUNCTION TOWER 14 11.04.2012 Running - Permanent
13 CD/BT-U3/JNT 17 1 JUNCTION TOWER 17 09.09.2011 Running - Permanent
14 CD/BT-U3/JNT 18 1 JUNCTION TOWER 18 09.09.2011 Running - Permanent
15 CD/BT-U3/JNT 19 1 JUNCTION TOWER 19 09.09.2011 Running - Permanent
16 CD/BT-U3/JNT 20 1 JUNCTION TOWER 20 10.09.2011 Running - Permanent
17 CD/BT-U3/JNT 5
(EXT) 1
JUNCTION TOWER 5
(EXT) 10.12.12 Running - Permanent
18 CD/BT-U3/S & R 1 STACKER CUM
RECLAIMER 12.08.2011 Running - Permanent
19
CD/BT-
U3/CONVEYORS
(GENERAL)
1 CONVEYOR - GENERAL
(CONVEYOR PROFILES) 13.07.2011 Running - Permanent
20
CD/BT-
U3/CONVEYORS (24
M & 34M)
1 24 M & 34M STANDARD
GALLERY 22.12.2011 Running - Permanent
21
CD/BT-
U3/CONVEYORS
(15,18,21 M)
1 15, 18, 21 M STANDARD
GALLERY 16.04.2012 Running - Permanent
22 CD/BT-U3/BCN 13B
& 13C 1 BCN-13B & 13C 24.12.2012 Running - Permanent
23 CD/BT-U3/BCN 28
A/B & 14 A/B (EXT) 1
BCN- 28 A/B & 14 A/B
(EXT) 29.11.2012 Running - Permanent
24 CD/BT-U3/BCN 29
A/B & 32 A/B 1 BCN- 29 A/B & 32 A/B 10.12.2012 Running - Permanent
25 CD/BT-U3/BCN 30 &
31 1 BCN- 30 & 31 28.12.2012 Running - Permanent
26 CD/BT-U3/BCN 36
A/B 1 BCN- 36 A/B 26.04.2013 Running - Permanent
27 CD/BT-U3/BCN 37
A/B 1 BCN- 37 A/B 23.05.2013 Running - Permanent
28 CD/BT-U3/BCN 38
A/B & 39 A/B 1 BCN- 38 A/B & 39 A/B 29.03.2012 Running - Permanent
29 CD/BT-U3/MCC-10 1 MCC-10 22.04.2013 Running - Permanent
30 CD/BT-U3/CHP-
cladding 1
CHP - CLADDING
SHEETS 20.05.2013 Running - Permanent
31 CD/BT-U3/YT-
U1&2/DEF 1
JUNCTION TOWER
DEFLECTION 11.01.2013 Running - Permanent
32 CD/BT-U3/CSP 1 COAL SETTLING POND 21.01.2014 Running - Permanent
33 CD/BT-U3/HT SWG 1 HT SWITCH GEAR
ROOM 22.01.2014 Running - Permanent
Karnataka Power Corporation Ltd.
List of Files and Records Under Section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CQE(BTPS) ANNEXURE - II
Address : CQE(BTPS)/KPCL.
Sl
No.
File
no. Subject
Opening date
of file
Closing date
of file/
Running file
Date of
Transfer of file
& Authority
whom
transferred
Nature of File Prmanent/
Temporary Remarks
1
1
Administration
correspondence Vol I 05.05.04 31.12.05 _ Permanent - (Closed)
2 Administration
correspondence Vol II 03.01.06 29.12.08 _ Permanent - (Closed)
3 Administration
correspondence Vol III 02.01.09 31.03.10 _ Permanent - (Running)
4
2
Attendence extract
correspondence Vol I 17.04.04 16.01.09 _ Permanent - (Closed)
5 Attendence extract
correspondence Vol II 16.02.09 17.03.10 _ Permanent - (Running)
6
3
Leave correspondence Vol
I 20.05.04 21.03.07 _ Permanent - (Closed)
7 Leave correspondence Vol
II 23.03.07 23.03.10 _ Permanent - (Running)
8 4 Leave applications -
copies June-2006 Dec-2009 _ Permanent - (Running)
9 5 Circular file 14.07.04 01.04.10 _ Permanent - (Running)
10 6 Income Tax Forecast 23.01.06 07.04.10 _ Permanent - (Running)
11 7 Attendence extract
(Trainee) 02.05.05 01.02.10 _ Permanent - (Closed)
12 8 Festival advance
correspondence 24.09.04 06.01.10 _ Permanent - (Running)
13 9 Imprest correspondence 23.07.04 01.04.10 _ Permanent - (Running)
14 10 HTC/TTA/TA
correspondence 24.06.06 27.03.10 _ Permanent - (Running)
15 11 Kannada usage
correspondence 28.08.04 01.04.10 _ Permanent - (Running)
16 12 Work force 09.07.04 01.04.10 _ Permanent - (Running)
17 13 Correspondence about
accidents etc if any 13.02.06 01.04.10 _ Permanent - (Running)
18 14 Medical correspondence 29.07.04 07.04.10 _ Permanent - (Running)
19 15 Shift allowance
correspondence 23.11.04 29.03.10 _ Permanent - (Running)
20
16
Extra wages
correspondence Vol I 13.05.04 10.09.07 _ Permanent - (Closed)
21 Extra wages
correspondence Vol II 16.11.07 12.10.09 _ Permanent - (Running)
22 17 Vehicle correspondence 20.06.05 17.12.09 _ Permanent - (Running)
23 18
Conusumeable materials :
Correspondences,
Indents, gate pass etc
12.08.04 25.03.10 _ Permanent - (Running)
24 19 Mobile correspondence 11.08.04 27.03.10 _ Permanent - (Running)
25 20 Work allocation 24.08.04 21.02.09 _ Permanent - (Running)
26 21 PADS / CR's
correspondence 14.03.05 29.07.09 _ Permanent - (Running)
27 22 Miscellaneous 26.10.06 11.02.10 _ Permanent - (Running)
28 23 SR & Pay revision 10.04.07 05.05.07 _ Permanent - (Running)
KARNATAKA POWER CORPORATION LIMITED.
( Raichur Thermal Power Station ) LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE : CQE(T)
ADDRESS : RTPS – KPCL, SHAKTINAGAR.
Sl.No. File No. Subject Opening date of File
Closing Date of file/Running File.
Date of Transformer file Authority whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
1 CQET/P1A/ General File 01.10.1999 Running -
permanent
2 CQET/P1B Deputaton 22.03.2005 Running. - permanent
3 CQET/P1C Recruitment 23.09.2005 Running. - permanent
4 CQET/P1D Promotions 20.08.2005 Running. - permanent
5 CQET/P1E Transfers. 18.12.199 Running. - permanent
6 CQET/P1F Leave 14.10.2006 Running. - permanent
7 CQET/P1G Increments. 28.09.1998 Running. - permanent
8 CQET/P1H Advances. 19.08.2003 Running. - permanent
9 CQET/P1I Compensation. 17.01.2000 Running. - permanent
10 CQET/P1J Overtime. 04.10.2007 Running. - permanent
11 CQET/P1K Other benefits. - Running.- - permanent
12 CQET/P2B Training. 22.03.2005 Running. - permanent
13 CQET/P2C Welfare. - - - -
14 CQET/P2D Discipline. 16.11.2003 Running. - permanent
15 CQET/P2E Retirement 19.04.2006 Running. - permanent
16 CQET/P1B Power 29.03.1980 Running. - permanent
17 CQET/P1C2 Water. 29.03.1980 Running. - permanent
18 CQET/P1D2A Telephone 10.04.1997 Running. - permanent
19 CQET/P1A2B Vehicle. 15.11.2007 Running. - permanent
20 CQET/B2T Railway. - Running. - permanent
21 CQET/A2D Hiring. - Running. - permanent
22 CQET/A3B Rents. - Running. - permanent
23 CQET/A3C Taxes - Running. - permanent
24 CQET/A3D Repairs - Maintenance - Running. - permanent
25 CQET/A4B Municipal services. - Running. - permanent
26 CQET/A4C Dispensaries. 05.09.2005 Running. - permanent
27 CQET/A5B Stationery. 10.07.1981 Running. - permanent
28 CQET/A5C Printing. - -
29 CQET/A5D Furniture. 24.09.1980 Running. - permanent
30 CQET/A5E Office equipments. 24.03.1980
31 CQET/A5F Book & Periodicals. - Running. - permanent
32 CQET/A5G Petty purchases. 24.09.1981 Running. - permanent
33 CQET/A6B Tour Programmers. 08.09.1982 Running. - permanent
34 CQET/A6C Noties/ compliance. - Running. - permanent
35 CQET/A7A Security. - Running. - permanent
36 CQET/A7B Police. - Running. - permanent
37 CQET/A7C Watch & Ward. - Running. - permanent
38 CQET/A7D Civil Defences. - Running. - permanent
39 CQET/A7E Safety of employees. 27.03.2008 Running. - permanent
40 CQET/A7F Thefts. - Running. - permanent
41 CQET/Q2D Travelling allowance. - Running. - permanent
42 CQET/Q2E Pension. 16.03.1983 Running. - permanent
43 CQET/Q3E Motor car/Cycle advance. 19.08.2003 Running. - permanent
44 CQET/Q3F Providient fund
recoveries. 19.08.2003 Running. -
permanent
45 CQET/Q3G Insurance recoveries. 29.11.1982 Running. - permanent
46 CQET/Q3I Income tax recoveries. 11.11.1979 Running. - permanent
47 CQET/Q3J H.B.A , H.P.A / Rent - Running. - permanent
48 CQET/Q6A Audit recoveries (Internal) 19.08.1979 Running. - permanent.
MISCELLANEOUS FILES.
1 2 3 4 5 6 7
1 CQET/Q2A Uniform 10.11.1980 Running. -
2 Canteen Coupon. 09.07.1992 Running. -
3 CQET/A7A Sub-Stores account 18.07.1994 Running. -
4 - Accounts correspondence 21.08.1981 Running. -
5 - Medical Attendance - Running. -
6 - Festival Advance 24.04.2009 Running. -
7 - Incentive. 26.10.2002 Running. -
8 CQET/A3A Casual and 26.11.1979 Running. -
9 CQET/Q2D DA file (Dearness allowance_ 24.06.1993 Running. -
10 - Quarters. 19.11.1979 Running. -
11 - Type writer. 02.04.1981 Running. -
12 - Stationery code No file. - Running. -
13 - Assets and Liabilities. 06.05.1989 Running. -
14 - S.R. (Standing regulation) 10.12.1990 Running. -
15 - T.A bill file. 27.05.2003 Running. -
16 - Materials Gate pass file. 15.09.2004 Running. -
17 - Computer file. 29.09.2003 Running. -
18 - T & P file. 05.02.1993. Running. -
19 - Attendance file. 18.10.2005 Running. -
20 - Circular file. 31.03.2005 Running. - permanent
21 - EL/Commuted leave file. 05.02.2003 Running. - permanent
22 - Confidential file. 12.10.199 Running. - permanent
23 - Disciplinary case file. Running. - permanent
24 - Imp rest Account file. 15.03.2004 Running. - permanent
25 - Temporary Advance file. 21.03.2003 Running. - permanent
KARNATAKA POWER CORPORATION LIMITED. ( Raichur Thermal Power Station )
LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE: CQE(T)
ADDRESS: RTPS – KPCL – SHAKTINAGAR.
Sl. No.
File No. Subject Opening date of File
Closing Date of file/Running File.
Date of Transformer file Authority whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
STATION BUILDING UNIT-8
1 CQET/Y1A FA OK Cards 27.07.2007 Running. - permanent
2 CQET/Y2A CA OK Cards 27.07.2007 Running. - permanent
3 CQET/Y3A Batch weights -1 27.07.2007 29.06.2009 - -
4 CQET/Y4A Batch weights-2 29.06.2009 Running. - permanent
5 CQET/Y5A BP calibration 06.09.2007 Running. - permanent
6 CQET/Y6A Back fill E-row ESP
control 04.03.2008 Running. - permanent
7 CQET/Y7A HZ –row ,ESP control internal columns back
02.04.2008 Running. - permanent
filling
8 CQET/Y8A ESP, PA Fan A & B pass
back filling. 21.04.2008 Running. -
permanent
9 CQET/Y9A FA & G-row , ESP
control back filling 02.03.2008 Running. -
permanent
10 CQET/Y10A A-row , BFP, FD Fan A
pass back filling. 24.03.2008- Running. - permanent
11 CQET/Y11A Boiler , FD fan B-pass Air washer back filling.
09.04.2008 Running. - permanent
12 CQET/Y12A FA OK cards for mortar 09.04.2008 Running. - permanent
13 CQET/Y13A CTR invoice 13.09.2008 Running. - permanent
14 CQET/Y14A Test schedule cubes 04.05.2009 Running. - permanent
15 CQET/Y15A CTR Invoice 29.12.2007 Running. - permanent
16 CQET/16A Cement requisition. 23.07.2007 Running. - permanent
17 CQET/Y17A Cube test schedule 07.08.2007 Running. - permanent
18 CQET/Y18A Cement test reports 01.08.2007 Running. - permanent
19 CQET/Y19A Cement test reports 26.05.2009 Running. permanent
20 CQET/Y20A Cement test reports 22.10.2009 Running. permanent
21 CQET/Y21A SBC Correspondence 06.07.2007 Running. permanent
R.C.C. COOLING TOWER UNIT-8
22 CQET/Y22B Cooling tower
correspondence 09.10.2007
Running.
permanent
23 CQET/Y23B CA OK Cards. 26.11.2007 Running. permanent
24 CQET/Y24B FA OK cards. 26.11.2007 Running. - permanent
25 CQET/Y25B Batch weights. 07.12.2007 Running. - permanent
26 CQET/Y26B Batching plant
Calibration. 11.02.2008 19.10.2009
-
R.C.C.CHIMNEY UNIT-8
27 CQET/Y27C Chimney Correspondence 17.01.2008 Running. permanent
28 CQET/Y28C CA OK Cards. 19.01.2008 06.09.2009
29 CQET/Y29C FA OK cards. 19.01.2008 06.09.2009 -
30 CQET/Y30C Batch weights. 19.01.2008 06.09.2009 -
31 CQET/Y31 C Mix design 16.07.2007 Running. - Permanent
C.W . PUMP HOUSE UNIT-8 32 CQET/Y32D Correspondence 03.03.2008 Running. permanent
33 CQET/Y33D CA OK cards 04.04.2008 18.09.2009 ‘
34 CQET/Y34D FA OK cards 04.04.2008 18.09.2009 ‘-
35 CQET/Y35D Batch weights. 04.04.2008 18.09.2009 - -
36 CQET/Y36D Back filling. 12.10.2009 13.10.2009 -
ASH HANDLING SYSTEM UNIT-8 37 CQET.Y37E Correspondence 01.06.2009 Running. - permanent
38 CQET/Y38E CA OK cards 30.05.2009 Running. - permanent
39 CQET/Y39E FA OK cards 30.05.2009 Running. - permanent
40 CQET/Y40E Batch weights. 30.05.2009 Running. - permanent
ADDITIONAL CALIFIER UNIT-8 41 CQET/Y41F Correspondence 08.05.2009 Running. permanent
42 CQET/Y42F CA OK cards 26.05.2009 Running. - permanent
43 CQET/Y43F FA OK cards 26.05.2009 Running. - permanent
44 CQET/Y44F Batch weights. 26.05.2009 Running. - permanent
SWITCH YARD
45 CQET/Y45G Correspondence 06.09.2009 Running. - permanent
46 CQET/Y46G CA OK Cards. 25.06.2009 06.01.2010 - -
47 CQET/Y47G FA OK Cards. 25.06.2009 06.01.2010 - -
48 CQET/Y48G Batch weights. 25.06.2009 06.01.2010 - permanent
49 CQET/Y49G Back filling. 27.12.2009 Running. - permanent
50 CQET/Y50G Back filling. 14.09.2009 Running. - permanent
MILL REJECT COAL HANDLING SYSTEM. 51 CQET/Y50H Correspondence 16.10.2009 Running. - permanent
52 CQET/Y52H CA OK Cards. 16.10.2009 Running. - permanent
53 CQET/Y53H FA OK Cards. 16.10.2009 Running. - permanent
54 CQET/Y54H Batch weights. 09.10.2009 Running. - permanent
EXTENSION OF COAL HANDLING SYSTEM.
55 CQET/Y55I Correspondence 13.01.2009 Running. - permanent
56 CQET/Y56I CA OK Cards. 04.07.2009 Running. - permanent
57 CQET/Y57I FA OK Cards. 04.07.2009 Running. - permanent
58 CQET/Y58 I Batch weights. 04.07.2009 Running. - permanent
STACKER RECLIMER UNIT-8 59 CQET/Y59 J Correspondence 06.05.2008 Running. - permanent
60 CQET/Y60 J CA OK Cards. 02.05.2008 Running. - permanent
61 CQET/Y61 J FA OK Cards. 09.05.2008 Running. - permanent
62 CQET/Y62 J Batch weights. 09.05.2008 Running. - permanent
63 CQET/Y63 J Chi: 1310 to 1490 29.11.2008 Running. - permanent
64 CQET/Y64 J Chi: 1160 to 1310 18.08.2008 Running. - permanent
65 CQET/Y65 J Chi: 1490 to 1570 02.12.2008 Running. - permanent
66 CQET/Y66 J Chi: 1010 to 1060 21.01.2008 Running. - permanent
67 CQET/Y67 J Chi: 800 to 1010 17.10.2008 Running. Permanent
ALMATTI DUMP POWR HOUSE.
68 CQET/ Y68 K CA , FA Correspondence
& Batch weights. 26.10.2009
Running. -
permanent
OTHERS
69 CQET/Y69 L Compound wall Road works & Misc. works.
22.10.2008 Running.
- permanent
70 CQET/Y70 L Security compound wall 20.11.2008 Running. - permanent
71 CQET/Y71 L YTPS Mix design 28.04.2009 Running. Permanent
72 CQET/Y72 L Unit-8 Correspondence 04.07.2008 Running. Permanent
73 CQET/Y73 L Administration Unit-8 26.06.2008 Running. Permanent
74 CQET/Y 74L Mix design 09.04.2008 Running. - Permanent
75 CQET/Y75L Mix design 16.04.2005 Running. Permanent.
76 CQET/Y76 L YTPS Batch weights. 04.03.2010 Running. Permanent
77 CQET/Y77 L YTPS Correspondence 04.03.2010 Running. Permanent
78 CQET/Y 78 M Testing of materials from
Private Agency. 25.03.2007
Running.
Permanent
79 CQET/Y 79 N MTR of All civil works. 06.03.2007 Running. Permanent
80 CQET/Y 80 O Budget 02.08.2006 Running. Permanent
81 CQET/Y 81 P Cement test report of
ADPH 27.11.2008
Running.
Permanent
82 CQET/Y 82 Q OK Cards for CA Unit-8 25.02.2008 Running. Permanent.
83 CQET/Y 83 R OK Cards for FA Unit-9 25.02.2008 Running. Permanent.
84 CQET/ Y 84 S OK Cards for Back fill
Unit-8 works. 07.03.2008
Running.
Permanent.
85 CQET/Y 85 T Cement test report of
Unit-8 works 04.08.2007
Running.
Permanent
86 CQET/Y 86 U Procurement / General. 26.08.2008 Running. Permanent
87 CQET/Y 87 V Requisition of Cement
Unit-8 08.06.2006
Running. Permanent
88 CQET/Y 88 W YTPS Drawings. 11.02.2010 Running. Permanent
89 CQET/Y 89 X ADPH Correspondence 23.07.2009 Running. Permanent
90 CQET/Y 90 Y Facilities Available at
Laboratory 25.08.2007
Running.
Permanent
91 CQET/Y 91 Z Physical verification of
Assets. 22.03.2002
Running.
Permanent
CQE(T)
NON OPERATED FILE.
Sl.No File Nos. Name of the file.
13 CQET P2C Welfare/
20 CQET A2J Railway
21 CQET P2D Hiring.
22 CQET/A3B Rents.
23 CQET/ A3C Taxes
24 CQET/A3D Repairs and Maintenance
25 CQET / A4B Municipal services
28 CQET A5C Printing.
31 CQET/ A5F Book and periodicals.
34 CQET/ A6C Notes compliance
35 CQET/ A7A Security.
36 CQET/ A7B Police.
37 CQET/A7C Watch and Ward
38 CQET/A7D Civil Defiance.
40 CQET/A7F Thefts.
41 CQET Q2D Traveling allowance
47 CQET/A3J HBA HPA / Rent Recoveries.
Karnataka Power Corporation Ltd.
List of Files and Records Under Section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CQE(BTPS) ANNEXURE - I
Address : CQE(BTPS)/KPCL
Sl
No.
File
no. Subject
Opening
date of file
Closing date
of file/
Running file
Date of Transfer
of file &
Authority whom
transferred
Nature of File
Prmanent/ Temporary Remarks
1 1 Initial Misc File (General) 08.07.2002 29-11-2004 _ Permanent - (Closed)
2 2 Misc. / Technical Correspondence 10.06.2002 05.04.2004 _ Permanent - (Closed)
3 3 Misc.Technical file 06.08.2004 12.02.2006 _ Permanent - (Closed)
4 4 Mix Design studies 03.04.2004 11.03.2005 _ Permanent - (Closed)
5 5 Station Building Unit - I
correspondence 01.10.2004 17.04.2006 _ Permanent - (Closed)
6 6 RSMY works - BTPS 23.11.2004 16.10.2007 _ Permanent - (Closed)
7 7 CHP works Unit-I 15.06.2004 13.05.2009 _ Permanent - (Closed)
8 8 Pull Out & Plate load test Reports
NDCT - I & II 10.09.2004 07.10.2009 _ Permanent - (Closed)
9 9 Cooling TowerUnit-I
Correspondences 29.11.2004 24.06.2006 _ Permanent - (Closed)
10 10 Bricks Testing Results - Station
Building and allied works 24.03.2006 05.12.2007 _ Permanent - (Closed)
11 11 Chimney and CW piping
Correspondences 21.12.2004 31.07.2006 _ Permanent - (Closed)
12 12 Maralihalla Civil Works 26.11.2004 02.07.2009 _ Permanent - (Closed)
13 13 MS pipe line works - Hydraulic test
Correspondences 02.08.2006 06.05.2008 _ Permanent - (Closed)
14 14 MS pipe lining/Gunniting works -
Correspondences 12.01.2005 16.11.2006 _ Permanent - (Closed)
15 15 MS pipe laying works 19.02.2005 12.02.2008 _ Permanent - (Closed)
16 16 Borrow Areas - Test results (VSL +
Private)- RW Pond works 09.07.2002 24.03.2006 _ Permanent - (Closed)
17 17 R.W.P-H.D.P.E - Geo Membrane
Correspondences 21.10.2005 02.06.2007 _ Permanent - (Closed)
18 18 R.W. Pond Correspondence 02.09.2004 13.03.2008 _ Permanent - (Closed)
19 19
R.W.Pond U/S protection /
Restoration Works -
Correspondence
28.12.2005 29-09-2008 _ Permanent - (Closed)
20 20 Borrow area test results- for Ash
pond works 21.09.2005 28.11.2006 _ Permanent - (Closed)
21 21 Ash pound-Dump yard soil testing
correspondence 25.02.2005 19.09.2006 _ Permanent - (Closed)
22 22
Ash pond- Soil Test reports
pertaining to alignment Trails Pits &
aligment deepen pit
20.07.2005 09.01.2006 _ Permanent - (Closed)
23 23 Ash pond - permeability test results 09.11.2004 16.03.2006 _ Permanent - (Closed)
24 24 Ash pond works - Correspondence 09.12.2004 30.10.2006 _ Permanent - (Closed)
25 25 RWP - PH- PT plant pipe laying works
Correspondences 06.12.2006 06.07.2007 _ Permanent - (Closed)
26 26 QC Monthly tests reports (Received
from sub-divisions) - Vol - I to V June-04 Mar-10 _ Permanent - (Closed)
27 27 QC Monthly tests reports - Vol - I
to XIII Dec-02 Mar-10 _ Permanent - (Closed)
28 28 Cement Test Reports Vol-1 10.04.2004 12.04.2006 _ Permanent - (Closed)
29 29 Cement Test Reports Vol-2 15.04.2006 01.04.2010 _ Permanent - (Closed)
30 30 Consultancy- Material testing
Charges (General) 16.12.2005 04.04.2009 _
Permanent
(Running).
31 31
Civil foundation and superstructure
Works-Station Building,Boiler
Transfarmer Yard and CW Pipe Line
(Unit-2 Correspondences)
30.05.2008 23.12.2011 _ Permanent (Closed).
32 32 Consultancy- Material testing
Charges (M/s. G.I.L) 25.11.2008 31.08.2010 _ Permanent (Closed).
33 33 Cooling Tower NDCT-2
Correspondences 17.11.2008 21.10.2009 _ Permanent (Closed).
34 34 Single Flue Chimney Unit-2
Correspondence 20.09.2008 05.06.2010 _ Permanent (Closed).
35 35 Consultancy- Material testing
Charges (M/s. Lanco) 07.10.2008 14.10.2010 _ Permanent (Closed).
36 36 Unit II Chimney Acid resistance
Bricks Correspondence 25.04.2005 24.11.2009 _ Permanent - (Closed)
37 37 R.W.Pond-stage II correspondences
/ Test results 11.11.2008 14.09.2013 _
Permanent
(Running).
38 38 Main plant Aux Building Works -
Unit-2 Correspondences (M/s. ERA) 28.05.2009 06.12.2012 _
Permanent
(Running).
39 39 Ash Handling system Unit-2 17.08.2009 25.02.2012 _ Permanent (Closed).
40 40 Unit-2 CHP Correspondence 20.10.2009 12.07.2012 _ Permanent (Closed).
41 41 PTP Unit2 Correspondence 17.02.2010 12.01.2012 _ Permanent (Closed).
42 42 Consultancy- Material testing
Charges PJB 31.01.2006 09.04.2010 _ Permanent (Closed).
43 43 Consultancy- Material testing
Charges JSS 27.06.2009 25.03.2010 _ Permanent (Closed).
44 44 Consultancy- Material testing
Charges BEPL 17.12.2008 24.02.2012 _ Permanent (Closed).
45 45 Consultancy- Material testing
Charges M/s. Sunil Hi Tech 05.09.2009 29.02.2012 _ Permanent (Closed).
46 46 Consultancy- Material testing
Charges M/s. Tech Pro 01.09.2009 09.10.2012 _ Permanent (Closed).
47 47 Consultancy- Material testing
Charges M/s. EIEL 31.05.2009 23.10.2009 _ Permanent (Closed).
48 48 Disposal Exeavated Muck from
location of CRP 30.07.2007 24.02.2009 _ Permanent - (Closed)
49 49 Minutes of meeting 03.07.2004 05.05.2009 _ Permanent
(Running).
50 50 BTPS Misc. works - Correspondence 27.05.2005 10.04.2010 _ Permanent
(Running).
51 51 Internal Roads Package 1, 3,4 & 5 03.03.2006 17.03.2009 _ Permanent (Closed).
52 52 Water Sample - Results 13.01.2005 11.10.2007 _ Permanent - (Closed)
53 53 Mix Designs - Final Approval copies. 21.04.2004 24.09.2013 _ Permanent
(Running).
54 54 Design mix approval ltrs sent to
BHEL 27.07.2009 09.01.2013 _
Permanent
(Running).
55 55 Q.C Building Correspondence BTPS 08.05.2002 28.01.2010 _ Permanent
(Running).
56 56 Budget 04.10.2004 01.02.2014 _ Permanent
(Running).
57 57 T&P File (General correspondence) 29.03.2004 04.07.2013 _ Permanent
(Running).
58 58 T&P File (Receipts of items) 14.05.2004 10.05.2013 _ Permanent
(Running).
59 59 M/s. Aimil Ltd (Correspondences) 24.09.2004 17.03.2010 _ Permanent (Closed).
60 60 PVC Fill / PIPE NDCT-I & II
Correspondences 17.4.2006 24.11.2009
Permanent - (Closed)
61 61 MTR Reports from CCED 28.05.2004 14.09.2007 Permanent - (Closed)
62 62 Computer correspondence 23.09.2004 21.05.2014
Permanent
(Running).
63 63 Approved Testing Charges -Rates
file 14.06.2006 15.12.2012
Permanent
(Running).
64 64
Quality Document Reports
(Booklets/Files) received from M/s.
BHEL (Total 172 Nos).
May-04 Dec-09
Permanent (Closed).
65 65
Pipe Lining/gunniting/laying works
(Third party Inspection reports).
(Total 16 Nos).
Jan-06 Dec-06
Permanent - (Closed)
66 66 Quality Manual draft file 24.03.2006 05.10.2010 Permanent (Closed).
67 67 Dump yards-Inside & out side BTPS
KPCL Compound 02.02.2011 17.06.2011
Permanent - (Closed)
68 68 Unit-3-Site Grading and RNS dump
yard test Results 27.12.2010 31.01.2011
Permanent - (Closed)
69 69
Barrow area's acquisition by agency -
Consent land details -EE(QC) BTPS
copy
06.06.2011 06.06.2011
Permanent (Closed).
70 70 Calibration File of CTM'S 05.02.2011 27.03.2014
Permanent
(Running).
71 71 Raw Water Pond Stage -II H.D.P.E-
Correspondence 08.01.2011 17.08.2012
Permanent (Closed).
72 72 RWP - R-2- Restoration Works . Aggregates and soil OK cards
17.06.2008 27.02.2008
Permanent - (Closed)
73 73 Expansion of Existing Railway Siding
And Marshalling Yard -Unit-1 to 2 &3 19.05.2011 11.01.2013
Permanent (Closed).
74 74 R.W.P.Pipe line -Unit -II 21.9.2010 11.02.2011
Permanent (Closed).
75 75
Consultancy-M/s Engenius Erectors
Pvt. Ltd. -Testing Charges & Test
reprots
03.12.2010 23.07.2012
Permanent (Closed).
76 76 Town ship Drawings- 27.10.2010 28.03.2014
Permanent
(Running).
77 77 Cement Test Reports- O/c's 12.03.2009 06.09.2011 Permanent (Closed).
78 78 Unit-3 CHP & AHP- Correspondence 27.01.2011 14.03.2014
Permanent
(Running).
79 79 BTPS Misc.works -Correspondence-2 11.01.2011 16.05.2014
Permanent
(Running).
80 80 Town ship Correspondence 12.07.2010 08.02.2013 Permanent (Closed).
81 81 Raw Water Pond Stage -II Drawings 09.04.2010 02.04.2011
Permanent
(Running).
82 82 M.T.R- Rececived from Sub divisions
--V-6 April 2010 Jul-12
Permanent (Closed).
83 83 Unit-3 Main plant- Correspondence 09.04.2012 30.04.2014
Permanent
(Running).
84 84 Raw Water Pond Stage -II Borrow
area test results 17.04.2010 26.03.2013
Permanent (Closed).
85 85 Unit-2 CHP Correspondence Vol II 31.07.2012 03.03.2014
Permanent
(Running).
86 86 Town ship Correspondence Vol II 11.07.2012 20.05.2014
Permanent
(Running).
87 87 Unit-3 CHP Drawings 27.06.2011 02.06.2012
Permanent
(Running).
88 88 Unit-3 Chimney correspondence 23.07.2012 19.03.2014
Permanent
(Running).
89 89 Unit-3 NDCT correspondence 11.09.2012 14.05.2014
Permanent
(Running).
90 90 Unit-3 ODY correspondence 19.11.2012 09.05.2014
Permanent
(Running).
91 91 Unit-3 Bhavani Erectors Ltd 25.02.2013 09.04.2014
Permanent
(Running).
92 92 Unit-3 Power Mech 03.01.2014 20.05.2014
Permanent
(Running).
93 93
Construction of Additional
generating unit (1×10MW) at
Munirabad Dam Power House
04.02.2013 20.05.2014
Permanent
(Running).
94 94 Construction of Ash pond stage - II
Borrow area soil sampling details 26.12.2013 12.05.2014
Permanent
(Running).
Karnataka Power Corporation Ltd.
List of Files and Records Under Section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CQE(BTPS) ANNEXURE - II
Address : CQE (BTPS)/KPCL.
Sl
No.
File
no. Subject
Opening
date of file
Closing date
of file/
Running file
Date of Transfer
of file &
Authority whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1
1
Administration
correspondence Vol I 05.05.04 31.12.05 _ Permanent - (Closed)
2 Administration
correspondence Vol II 03.01.06 29.12.08 _ Permanent - (Closed)
3 Administration
correspondence Vol III 02.01.09 30.08.11 Permanent - (Closed)
4 Administration
correspondence Vol IV 01.09.11 18.07.13 _ Permanent - (Closed)
95 95 Ash Pond Stage-II Correspondence 08.02.2014 14.05.2014
Permanent
(Running).
96 96 Ash Pond Stage-II Drawings 19.12.2013 21.02.2014
Permanent
(Running).
97 97 Internal Audit File 03.07.2013 06.08.2013
Permanent
(Running).
98 98 M.T.R- Rececived from Sub divisions
--V-7 Aug-12 Apr-14
Permanent
(Running).
5 Administration
correspondence Vol V 19.07.2013 13.05.2014 _ Permanent - (Running)
6
2
Attendance extract
correspondence Vol I 17.04.04 16.01.09 _ Permanent - (Closed)
7 Attendance extract
correspondence Vol II 16.02.09 16.09.2013 _ Permanent - (Closed)
8 Attendance extract
correspondence Vol III 17.10.2013 16.05.2014 _ Permanent - (Running)
9
3
Leave correspondence Vol I 20.05.04 21.03.07 _ Permanent - (Closed)
10 Leave correspondence Vol II 01.04.07 15.09.07 Permanent - (Closed)
11 Leave correspondence Vol
III 16.09.10 30.06.2013 _ Permanent - (Closed)
12 Leave correspondence Vol
IV 01.07.13 17.05.2014 _ Permanent - (Running)
13 4 Leave applications - copies June-2006 May -2014 _ Permanent - (Running)
14 5
Circular file Vol I 14.07.04 07.06.11 Permanent - (Closed)
15 Circular file Vol II 21.06.12 08.05.14 _ Permanent - (Running)
16 6 Income Tax Forecast 23.01.06 13.05.14 _ Permanent - (Running)
17 7 Attendance extract
(Trainee) 02.05.05 01.02.10 _ Permanent - (Closed)
18 8 Festival advance
correspondence 24.09.04 03.04.14 _ Permanent - (Running)
19 9 Imprest correspondence 23.07.04 11.04.14 _ Permanent - (Running)
20 10 HTC/TTA/TA
correspondence 24.06.06 23.01.14 _ Permanent - (Running)
21 11 Kannada usage
correspondence 28.08.04 03.05.14 _ Permanent - (Running)
22 12 Work force 09.07.04 03.05.14 _ Permanent - (Running)
23 13 Correspondence about
accidents etc if any 13.02.06 03.05.14 _ Permanent - (Running)
24 14 Medical correspondence 29.07.04 09.05.14 _ Permanent - (Running)
25
15
Shift allowance
correspondence Vol-I 23.11.04 22.03.14 _ Permanent - (Closed)
26 Shift allowance
correspondence Vol-II 16.04.14 17.05.14 _ Permanent - (Running)
27
16
Extra wages correspondence
Vol I 13.05.04 10.09.07 _ Permanent - (Closed)
28 Extra wages correspondence
Vol II 16.11.07 17.02.12 _ Permanent - (Running)
29 17 Vehicle correspondence 20.06.05 17.07.12 _ Permanent - (Running)
30
18
Conusumeable materials :
Correspondences, Indents,
gate pass etc Vol-I
12.08.04 06.08.13 _ Permanent - (Closed)
31
Conusumeable materials :
Correspondences, Indents,
gate pass etc Vol-II
09.10.13 06.05.14 _ Permanent - (Running)
32 19 Mobile correspondence 11.08.04 22.09.11 _ Permanent - (Running)
33 20 Work allocation 24.08.04 01.09.13 _ Permanent - (Running)
34 21 PADS / CR's
correspondence 14.03.05 24.07.13 _ Permanent - (Running)
35 22 Miscellaneous 17.10.06 11.11.11 _ Permanent - (Running)
36 23 Material drawn from stores
by raising PI 18.11.04 24.07.12 _ Permanent - (Running)
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-YTPS, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector: SE(CD) - 3
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
EE: G.Manohar
Sl No.
File No. Subject Volume No.
Opening Date of file
Closing date of file / Running
file
Date of Transfer of
file & Authority
whom transferred
Nature of file Permanent/ Temporary
Remarks.
0 MAILS 1 13/12/2010 Running Permanent Yellow file 1 CD/YTPS/CWPH/ CWPH 1,2 01/12/2011 23/09/2011 Permanent Box file 3 24/09/2011 13/02/2012 Permanent Box file 4 14/02/2012 24/07/2012 Permanent Box file 5 25/07/2012 12/12/2012 Permanent Box file 6 18/12/2012 15/03/2013 Permanent Box file 7 15/03/2013 24/03/2013 Permanent Box file 8 30/05/2013 13/08/2013 Permanent Box file 9 13/08/2013 Running Permanent Box file 2 CD/YTPS/CWPH/ CWPH ELECTRICAL
ANNEX BUIDING 1 04/09/2012 November Permanent Box file
2 November Permanent Box file 3 CD/YTPS/ACWPH/ ACW 1 17/02/2012 21/05/2013 Permanent Box file 2 26/06/2013 26/04/2014 Permanent Box file 3 26/04/2014 Running Permanent Box file 4 CD/YTPS/CWPH/ CW CHANNEL 1 27/02/2013 Running Permanent Box file 5 CD/YTPS/EPC/SY/ SWITCH YARD 1 06/01/2011 19/07/2012 Permanent Box file 2 24/7/2012 21/01/2013 Permanent Box file
3 Only A CAT approved designs & drawings
Running Permanent Box file
4 21/01/2013 05/07/2013 Permanent Box file 5 05/07/2013 23/11/2013 Permanent Box file 6 28/11/2013 Running Permanent Box file 7 CD/YTPS/ID/ ID FAN 1 14/12/2010 Running Permanent Box file 8 CD/C3/YTPS/IDCT/ IDCT 1 18/04/2012 17/10/2012 Permanent Box file 2 18/05/2013 30/06/2013 Permanent Box file 3 01/07/2013 15/07/2013 Permanent Box file 4 15/07/2013 10/10/2013 Permanent Box file 5 10/10/2013 30/10/2013 Permanent Box file 6 01/11/2013 14/11/2013 Permanent Box file 7 15/11/2013 20/12/2013 Permanent Box file 8 21/12/2013 18/02/2014 Permanent Box file 9 25/02/2014 Running Permanent Box file 9 CD/YTPS/PWS/ PWS 1 23/09/2011 02/01/2014 Permanent Box file 2 02/01/2014
PWS- SETTLING TANK
1 24/09/2013 Running Permanent Box file
PWS-AWR 1 07/04/2014 Running Permanent Box file
PWS - FWST 1 26.10.2013 Running Permanent Box file
PWS - MF 1 01.03.2014 Running Permanent Box file
PWS - FWPH 1 07.03.2014 Running Permanent Box file
PWS – Sludge thickener
1 01.11.2013 Running Permanent Box file
10 OZONISATION 1 18/01/2014 Running Permanent Box file 11 SWITCHYARD
ADDITIONAL SCOPE
1 21/11/2011 Running Temporary Pink file
12 CHIMNEY 1 23/06/2011 Running Permanent Box file 13 CD/YTPS/GCW/ GCW 1 03/01/2011 Running Permanent Box file 14 CHEMICAL HOUSE 1 15/12/2010 Running Temporary Yellow file 15 NDCT 1 15/06/2010 Running Temporary Yellow file 16 GMW 1 19/05/2011 Running Permanent Box file 17 AHS 1 07/11/2011 Running Temporary Yellow file 18 CABLE TRAY 1 09/08/2011 Running Permanent Yellow file
KARNATAKA POWER CORPORATION LIMITED
FILE INDEX-YTPS, TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector: SE(CD) - 3
Address : Sudarshan Complex, Sheshadri road, Bangalore - 09
Sl
No
.
File No. Volme
No. Subject
Opening
Date of file
Closing
date of file
/ Running
file
Date of
Transfer of
file &
Authority
whom
transferred
Nature of file
Permanent/
Temporary
Remarks
.
1 CD/YT-U1&2/ESP 1 ESP & ESP
FOUNDATIONS 17.01.2011 Running - Permanent
2 CD/YT-U1&2/ESPCR 1 ESP CONTROL ROOM 13.07.2012 Running - Permanent
3 CD/YT-U1/BOILER/ 1 BOILER & BOILER
FOUNDATIONS 27.09.2010 Running - Permanent
4 CD/YT-U1& U2/DSS 1 DUCT SUPPORTING
STRUCTURE 07.12.2011 Running - Permanent
5 CD/YT-U1&
U2/TRANSFORMERS 1 TRANSFORMERS 07.10.2011 Running - Permanent
6 CD/YT-U1& U2/PA,FD
& SA 1 PA/FD/SA FANS 22.10.2011 Running - Permanent
7 CD/YT-U1&2/M&B 1 MILL & BUNKER 04.11.2010 Running - Permanent
FOUNDATIONS
8 CD/YT-U1&2/MOM 2 MINUTES OF MEETING 31.05.2010 Running - Permanent
9 CD/YT-U1/CHP - Gen 1 CHP GENERAL 24.02.2011 Running - Permanent
10 CD/YT-U1&U2/SCH-
1&2 1
SECONDARY
CRUSHER HOUSE 1 & 2 15.11.2012 Running - Permanent
11 CD/YT-U1&U2/PCH-
1&2 1
PRIMARY CRUSHER
HOUSE 1 & 2 14.09.2012 Running - Permanent
12 CD/YT-U1&U2/JNT-2 1 JUNCTION TOWER -2 26.07.2012 Running - Permanent
13 CD/YT-U1&U2/JNT-4 1 JUNCTION TOWER -4 26.07.2012 Running - Permanent
14 CD/YT-U1&U2/JNT-5 1 JUNCTION TOWER -5 30.07.2012 Running - Permanent
15 CD/YT-U1&U2/JNT-7 1 JUNCTION TOWER -7 21.08.2012 Running - Permanent
16 CD/YT-U1&U2/JNT-8/9 1 JUNCTION TOWER -
8&9 17.08.2012 Running - Permanent
17 CD/YT-U1&U2/JNT-11 1 JUNCTION TOWER -11 30.11.2012 Running - Permanent
18 CD/YT-U1&U2/JNT-13 1 JUNCTION TOWER -13 30.11.2012 Running - Permanent
19 CD/YT-
U1&U2/CONVEYORS 1
CONVEYOR GALLERIES
20.12.2012 Running - Permanent
20 CD/YT-U1&U2/BCN-2
C/2D & 2A/2B 1 BCN - 2A/B & 2C/D 02.03.2013 Running - Permanent
21 CD/YT-U1&U2/BCN-3
C/3D & 3A/3B 1 BCN - 3A/B & 3C/D 31.01.2013 Running - Permanent
22 CD/YT-U1&U2/BCN-4
A/B 1 BCN - 4 A/B 13.12.2012 Running - Permanent
23 CD/YT-U1&U2/BCN- 5
& 6 1 BCN - 5 & 6 05.09.2012 Running - Permanent
24 CD/YT-U1&U2/BCN-
7A/B & 8A/B 1 BCN - 7 A/B & 8 A/B 13.02.2013 Running - Permanent
25 CD/YT-U1&U2/BCN-
9A/B 1 BCN - 9 A/B 24.08.2012 Running - Permanent
26 CD/YT-U1&U2/BCN-
16A/B & 18A/B 1 BCN - 16 A/B & 18 A/B 25.07.2012 Running - Permanent
27 CD/YT-U1&U2/DS 1 DOZER SHED 21.01.2013 Running - Permanent
28 CD/YT-U1&U2/S & R 1 STACKER & RECLAIMER
02.08.2012 Running - Permanent
29 CD/YT-&U2/CHP/MOM 1 CHP-MOM 21.03.2013 Running - Permanent
30 CD/YT-U1&U2/MCC
(SR) 1
MCC ROOM IN SR AREA
12.11.2013 Running - Permanent
31 CD/YT-U1&U2/MCC
(CH) 1
MCC ROOM NEAR
CRUSHER AREA 12.03.2013 Running - Permanent
KARNATAKA POWER CORPORATION LIMITED (RAICHUR POWER CORPORATION LIMITED- CIN U40101KA2009PLC049582)
FILE INDEX-YTPS UNIT-1&2 (2x800 MW), TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector:
SE(CD) - 3
Date- 09.06.2014
Address : Sudarshan Complex, Sheshadri road, Bangalore -
09
Sl
No
.
File Name. Volu
me
No.
Subject Opening
Date of file
Closing
date of file
/ Running
file
Date of
Transf
er of
file &
Author
ity
whom
transfe
rred
Nature of
file
Permanent
/Temporar
y
Remarks.
1 YTPS - General 1 YTPS - GENERAL 26.09.2011 Permanent
(Running)
Box file
2 YTPS-General
Correspondence
1 General Correspondence
01.10.2010 Permanent (Running)
Yellow file
3 YTPS-(Unit 1 & 2)- TG
FOUNDATION
(STIM MANUAL)
1 YTPS- TG
FOUNDATION 03.08.2011 29.08.2013 Permanent
(Closed)
Yellow
Color file
4 YTPS-(Unit 1 & 2)- TG
FOUNDATION
(STIM MANUAL)
2 YTPS- TG
FOUNDATION 30.09.2013 Permanent
(Running)
Pink Color
File
5 YTPS-Progress report
Weekly/Fortnightly/Mon
thly
1 Progress Report 22.12.2010 Permanent
(Running)
Yellow file
6 YTPS-L1 Mile Stone 1 L 1 Mile Stone 21.05.2010 Permanent
(Running)
Yellow file
7 YTPS-Contract Co-
ordination Procedure
1 CC Procedure 21.05.2010 Permanent (Running)
Yellow file
8 YTPS-Records notes of
meeting
1 Records notes of
meeting
19.07.2010 Permanent
(Running)
Yellow file
9 YTPS-Project
Management Group
1 PMG Meeting 27.11.2010 Permanent
(Running)
Green file
10 YTPS-Bottom Ash
Hopper
1 Bottom Ash Hopper 23.08.2011 Permanent
(Running)
Yellow file
11 YTPS-Elevators (Station
Building
and Service Building)
1 YTPS- Elevators 16.12.2011 Permanent
(Running)
Yellow file
KARNATAKA POWER CORPORATION LIMITED (RAICHUR POWER CORPORATION LIMITED- CIN
U40101KA2009PLC049582)
FILE INDEX-YTPS UNIT-1&2 (2x800 MW), TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED
Address : Sudarshan Complex, Sheshadri
road, Bangalore - 09
Sector:
SE(CD) - 3
Date- 09.06.201
4
Package- YTPS-(2X800 MW)- STATION BUILDING, TG
FOUNDATION,
DG BUILDING
Sl
No.
File Name. Volum
e No.
Subject Opening
Date of file
Closing
date of
file /
Running
file
Date of
Transfer
of file &
Authority
whom
transferre
d
Nature of
file
Permanent/
Temporary
Remarks
.
1 YTPS-(2X800MW)- TG
BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING -
TG
EQUIPMENT
LAYOUT
PLANS
18.10.2010 24.09.201
1
Permanent
(Closed)
Box file
2 YTPS-(2X800MW)- TG
BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
2 STATION
BUILDING -
TG
EQUIPMENT LAYOUT
PLANS
25.09.2011 15.12.201
1
Permanent
(Closed)
Box file
3 YTPS-(2X800MW)- TG
BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
3 STATION
BUILDING - TG
EQUIPMENT LAYOUT
PLANS
15.12.2011 27.02.201
2
Permanent
(Closed)
Box file
4 YTPS-(2X800MW)- TG
BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
4 STATION
BUILDING - TG
EQUIPMENT
27.02.2012 30.01.201
3
Permanent
(Closed)
Box file
LAYOUT
PLANS
5 YTPS-(2X800MW)- TG
BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
5 STATION BUILDING -
TG EQUIPMENT
LAYOUT PLANS
30.01.2013 Permanent (Running)
Box file
6 YTPS (2 X 800MW)
BOILER- STATION
BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION BUILDING-
BOILERS
28.09.2010 22.11.201
1
Permanent (Closed)
Box file
7 YTPS (2 X 800MW)
DESIGN REPORT, CSR-
WATER SUPPLY
SCHEME, MILE STONE
1 YTPS-
DESIGN
REPORT, CSR-
WATER
SUPPLY
SCHEME,
MILE STONE
01.06.2010 Permanent
(Running)
Box file
8 YTPS (2 X 800MW)- EOT
CRANE GIRDER
1 YTPS- EOT
CRANE
GIRDER
22.03.2011 26.08.201
3
Permanent
(Closed)
Box file
9 YTPS-(2X800MW)-
STATION BUILDING (OIL
ROOM, OIL CANAL AND
LUBE OIL
DETAILS)(CD/YTPS/U-
1&2/EPC/PH/…..)
1 YTPS-
STATION
BUILDING -
OIL ROOM,
OIL CANAL
AND OIL
DETAILS
19.04.2011 Permanent(
Running)
Box file
10 YTPS-(2X800MW)-
STATION BUILDING (LP
AND HP HEATERS &
SELF CLEANING
STRAINERS)
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 YTPS-
STATION
BUILDING -
LP AND HP
HEATERS
03.08.2011 Permanent
(Running)
Box file
11 YTPS-(2X800MW)-
STATION BUILDING
(EQUIPMENT
FOUNDATIONS)
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING-
EQUIPMENT
FOUNDATIO
NS
28.10.2013 Permanent
(Running)
Box file
12 YTPS-(2X800MW)- DG
BUILDING
(CD/YTPS/U-
1&2/EPC/DG/…..)
1 YTPS- DG
BUILDING
11.01.2012 Permanent
(Running)
Box file
13 YTPS-(2X800MW)-
STATION BUILDING
COMPOSITE PIPING
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING -
COMPOSITE
PIPING
LAYOUT
22.08.2012 Permanent
(Running)
Box file
14 YTPS-(2X800MW)-
STATION BUILDING
(CCR/CER/MCC)
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING
(CCR/CER/M
CC)
17.09.2011 27.04.201
2
Permanent
(Closed)
Box file
15 YTPS-(2X800MW)-
STATION BUILDING
(CCR/CER/MCC)
(CD/YTPS/U-
1&2/EPC/PH/…..)
2 STATION
BUILDING
(CCR/CER/M
CC)
01.05.2012 12.02.201
4
Permanent
(Closed)
Box file
16 YTPS (2 X 800MW)
STATION BUILDING- CW
& CEP PIT(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION BUILDING-
CW AND CEP PIT
14.02.2012 04.04.201
4
Permanent(Closed)
Box file
17 YTPS-(2X800MW)- TG
FOUNDATION-TG
PLATFORMS
(CD/YTPS/U-
1&2/EPC/TG/…..)
1 TG FOUNDATION
- TG
PLATFORMS
30.05.2013 Permanent
(Running)
Box file
18 YTPS-(2X800MW)-
STATION BUILDING
ARCHITECTURAL
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING -
ARCHITECTU
RAL
DRAWINGS
13.08.2012 Permanent
(Running)
Box file
19 YTPS (2 X 800MW)
STATION BUILDING-
TDBFP AND MDBFP
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING-
TDBFP AND
MDBFP
09.03.2012 03.04.201
3
Permanent
(Closed)
Box file
20 YTPS (2 X 800MW)
STATION BUILDING-
TDBFP AND MDBFP
(CD/YTPS/U-
1&2/EPC/PH/…..)
2 STATION
BUILDING-
TDBFP AND
MDBFP
03.04.2013 12.12.201
3
Permanent
(Closed)
Box file
21 YTPS (2 X 800MW)
STATION BUILDING-
TDBFP AND MDBFP
(CD/YTPS/U-
1&2/EPC/PH/…..)
3 STATION
BUILDING-
TDBFP AND
MDBFP
12.12.2013 Permanent
(Running)
Box file
22 YTPS-(2X800MW)- TG
FOUNDATION-RAFT
(CD/YTPS/U-
1&2/EPC/TG/…..)
1 TG
FOUNDATION
-RAFT
21.11.2011 Permanent
(Running)
Box file
23 YTPS-(2X800MW)- TG
FOUNDATION-TOP
DECK (CD/YTPS/U-
1&2/EPC/TG/…..)
1 TG
FOUNDATION-
TOP DECK
26.07.2012 10.12.201
2
Permanent
(Closed)
Box file
24 YTPS-(2X800MW)- TG
FOUNDATION-TOP
DECK (CD/YTPS/U-
1&2/EPC/TG/…..)
2 TG
FOUNDATION-
TOP DECK
10.12.2012 30.09.201
3
Permanent
(Closed)
Box file
25 YTPS-(2X800MW)-
STATION BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING-
GENERAL
MECHANICA
L LAYOUTS
21.12.2010 30.04.201
1
Permanent
(CLosed)
Box file
26 YTPS-(2X800MW)-
STATION BUILDING
(CD/YTPS/U-
1&2/EPC/PH/…..)
2 STATION
BUILDING-
GENERAL
MECHANICA
L LAYOUTS
02.05.2011 Permanent
(Running)
Box file
27 YTPS-(2X800MW)-
STATION BUILDING -
STRUCTURAL FRAMING
1 STATION
BUILDING-
STRUCTURAL
10.04.2012 Permanent
(Running)
Box file
(CD/YTPS/U-
1&2/EPC/PH/…..)
FRAMING
28 YTPS-(2X800MW)-
STATION BUILDING -
FLOOR FRAMING
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING-FLOOR
FRAMING
28.05.2012 Permanent
(Running)
Box file
29 YTPS-(2X800MW)-
STATION BUILDING - GA
& RC FLOORS
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION BUILDING-
GA & RC
FLOORS
29.04.2013 Permanent
(Running)
Box file
30 YTPS-(2X800MW)-
STATION BUILDING
(CCR)- FLOOR FRAMING
(CD/YTPS/U-
1&2/EPC/PH/…..)
1 STATION
BUILDING(CC
R)- FLOOR
FRAMING
09.04.2013 Permanent
(Running)
Box file
KARNATAKA POWER CORPORATION LIMITED (RAICHUR POWER CORPORATION LIMITED- CIN
U40101KA2009PLC049582)
FILE INDEX-YTPS UNIT-1&2 (2x800MW), TECHINICAL FILES
List of Files and Records under section 4(1) (a) of the Right to Information Act 2005
Name of the Office : CCED Sector: SE(CD) - 3 Date:- 09.06.201
4
Address : Sudarshan Complex,
Sheshadri road, Bangalore - 09
Package- YTPS-(2X800 MW)-Ash
Handling Plant
Sl
No.
File Name. Volume
No.
Subject Opening
Date of file
Closing
date of file
/ Running
file
Date of
Transfer
of file &
Authority
whom
transferre
d
Nature of
file
Permanent/
Temporary
Remarks.
1
YTPS- ASH HANDLING
SYSTEM-MECHANICAL
GA LAYOUTS
(CD/YTPS/U-
1&2/EPC/AHP/….)
1
ASH
HANDLING
SYSTEM-
MECH. GA
LAYOUTS
21/08/2012 3/5/2013 Permanent
(closed)
Box file
2
YTPS- ASH HANDLING
SYSTEM-MECHANICAL
GA LAYOUTS
(CD/YTPS/U-
1&2/EPC/AHP/….)
2
ASH
HANDLING
SYSTEM-
MECH. GA
LAYOUTS
3/5/2013 22/10/2013 Permanent
(closed)
Box file
3
YTPS- ASH HANDLING
SYSTEM-MECHANICAL
GA LAYOUTS
(CD/YTPS/U-
1&2/EPC/AHP/….)
3
ASH
HANDLING
SYSTEM-
MECH. GA
LAYOUTS
23/11/2013 Permanent (Running)
Box file
4 YTPS-(2X800 MW)-AHS-
BOTTOM ASH HOPPER
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 BOTTOM
ASH HOPPER 17/08/2012 5/10/2013 Permanent
(closed)
Box file
5 YTPS-(2X800 MW)-AHS-
BOTTOM ASH HOPPER
(CD/YTPS/U-
1&2/EPC/AHP/….)
2 BOTTOM
ASH HOPPER 19/10/2013 Permanent
(Running)
Box file
6 YTPS- AHP- VACUUM
PUMP HOUSE CUM
COMPRESSOR HOUSE
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 VACCUM
PUMP
HOUSE AND
COMPRESSO
R HOUSE
12/4/2013 6/8/2013 Permanent
(closed)
Box file
7 YTPS- AHP- VACUUM
PUMP HOUSE CUM
COMPRESSOR HOUSE
(CD/YTPS/U-
1&2/EPC/AHP/….)
2 VACCUM
PUMP
HOUSE AND
COMPRESSO
R HOUSE
6/8/2013 Permanent
(Running)
Box file
8 YTPS-AHP-HT SWITCH
GEAR ROOM
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 HT SWGR
ROOM 28/09/2013 Permanent
(Running)
Box file
9 YTPS-AHP-FAE TOWERS
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 FAE
TOWERS 4/9/2013 Permanent
(Running)
Box file
10 YTPS- AHP- FLY ASH SILO
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 FLY ASH
SILO 13/12/2012 28/12/2013 Permanent
(closed)
Box file
11 YTPS- AHP- FLY ASH SILO
(CD/YTPS/U-
1&2/EPC/AHP/….)
2 FLY ASH
SILO 28/12/2013 Permanent
(Running)
Box file
12 YTPS- AHP- ASH WATER
PUMP HOUSE & ASH
WATER TANK(CD/YTPS/U-
1&2/EPC/AHP/….)
1 ASH WATER
PUMP
HOUSE AND ASH WATER
TANK
25/06/2013 5/12/2013 Permanent(
closed)
Box file
13 YTPS- AHP- ASH WATER
PUMP HOUSE & ASH
WATER TANK
(CD/YTPS/U-
1&2/EPC/AHP/….)
2 ASH WATER
PUMP
HOUSE AND
ASH WATER
TANK
5/12/2013 21/12/2013 Permanent
(closed)
Box file
14 YTPS- AHP- ASH WATER
PUMP HOUSE & ASH
WATER TANK
3 ASH WATER
PUMP
HOUSE AND
ASH WATER
TANK
21/12/2013 Permanent
(Running)
Box file
15 YTPS- AHP- ASH SLURRY
& BA OVERFLOW PUMP
HOUSE
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 ASH
SLURRY &
BA
OVERFLOW
PUMP
HOUSE
16/09/2013 5/11/2013 Permanent
(Running)
Box file
16 YTPS- AHP- ASH SLURRY
& BA OVERFLOW PUMP
HOUSE
(CD/YTPS/U-
1&2/EPC/AHP/….)
2 ASH
SLURRY &
BA
OVERFLOW
PUMP
HOUSE
23/11/2013 6/1/2014 Permanent
(Running)
Box file
17 YTPS- AHP- ASH SLURRY
& BA OVERFLOW PUMP
HOUSE
(CD/YTPS/U-
1&2/EPC/AHP/….)
3 ASH
SLURRY &
BA
OVERFLOW PUMP
HOUSE
6/1/2014 Permanent
(Running)
Box file
18 YTPS- AHP- SILO UTILITY
BUILDING
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 SILO
UTILITY BUILDING
15/05/2013 Permanent
(Running)
Box file
19 YTPS- ASH /COAL
HANDLING
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 ASH/COAL
HANDLING
1/9/2010 Permanent
(Running)
Yellow
file
20 YTPS-AHP- PIPE RACK
(CD/YTPS/U-
1&2/EPC/AHP/….)
1 AHP-PIPE
RACK
21/02/2014 Permanent
(Running)
Box file
Karnataka Power Corporation Limited List of Files and Records under Section 4(1)(a) of the Right to information Act-2005
Name of the Office:- CQAE(Hosangadi)
Address:- Quality Control Sub-Division KPC Ltd., Hosangadi
Sl.No. File
No. SubjectSubjectSubjectSubject Opening date
of File
Closing date of
File/Running
Date of Transfer
of File and
Authority whom
Nature of File
permanent
temporary
Remarks
transferred
1
2
3
4
5
6
7
8
1
2
1
1(A)
Dam safety drawings/
correspondance
-- ’’ --
Aug-1985
Aug-2007
Aug-2007
Running
Permanent
3
4
5
2
2(A)
2(B)
Dam safety Monthly Reports Dam safety Monthly Reports Dam safety Monthly Reports Dam safety Monthly Reports
-- ’’ --
-- ’’ --
Aug-2005
Dec-2008
Apr-2011
Dec-2008
Apr-2011
Running
Permanent
6
7
3
3(A)
Attendance Correspondance
-- ’’ --
Nov-2006
Apr-2012
Apr-2012
Running
Permanent
8
4 General Correspondance Feb-2007 Running Permanent
9
10
5
5(A)
Administratative
Correspondance
-- ’’ --
Nov-2006
Dec-2009
Dec-2009
Running
Permanent
11
6 VUGPH Construction
Drawings V0l-1 to 4
Jul-2007 Nov-2008 Permanent
12
7 VUGPH Technical
Correspondance
Jan-2006 Jan-2009
Permanent
13
7(A)
VUGPH Technical
Correspondance
Jan-2009
Running
14
8
VUGPH Concrete Test Report
Jul-2006 Sept-2009 Permanent
15
16
9
9(A)
RCC Tunnel/Pressure shaft
O.K.Cards
-- ’’ --
May-2006
May-2007
May-2007
Running
Permanent
17
10
VUGPH O.K.Cards
Jan-2007
Mar-2009
Permanent
18
11
Leave Application
Nov-2010
Running
Permanent
Karnataka Power Corporation Limited List of Files and Records under Section 4(1)(a) of the Right to information Act-2005
Name of the Office:- CQAE(Kadra)
Address:- Quality Control Sub-Division KPC Ltd., Kadra
Sl.No. File
No. SubjectSubjectSubjectSubject Opening date
of File
Closing date
of
File/Running
Date of Transfer of
File and Authority
whom transferred
Nature of File
permanent
temporary
Remarks
1 2 3 4 5 6 7 8
1 1 Circular FileCircular FileCircular FileCircular File
12-3-2004 Running Permanent
2 2 Leave FileLeave FileLeave FileLeave File
28-5-2002 Running Permanent
3 3 Technical FileTechnical FileTechnical FileTechnical File
18-9-2000 Running Permanent
4 4 Calibration of Equipment 14-6-1999 Running Permanent
5 5 Test Result of drinking water 1-12-1998 Running Permanent
6 6 Monthly Progress Report 11-3-2006 Running Permanent
7 7 T & P 2-9-2002 Running Permanent
8 8 Material Testing (Dept.) 28-11-2001 Running Permanent
9 9 Instrumentation of Kodasalli
Concrete dam
Jan-2004 Running Permanent
10 10 Instrumentation of Kadra
Concrete dam
Jan-2204 Running Permanent
11 11 Instrumentation of Kadra
Earthen Dam
Jan-2004 Running Permanent
12
12
Kadra/Kodasalli
Correspondance
27-12-2004 Running Permanent
13
13 Leaching detailsLeaching detailsLeaching detailsLeaching details 26-9-2001 Running Permanent
14
14
Chemical analysis of
Water/Kodasalli dam
23-1-2002 Running Permanent
15
15
Water samples of
Kadra/Kodasalli dam
18-2-2000 Running Permanent
16
16
Kadra Concrete dam Chemical
analysis (Block No.1)
22-4-2002 Running Permanent
17
17
Kadra Concrete dam test results
of water samples
Dec-1997 Running Permanent
18
18
Test Result of Water samples
Earthen dam Kadra
14-3-1997 Running Permanent
19
19
Leaching analysis of Kadra dam 14-5-1997 Running Permanent
20
20
Humidity,Max. & Min./Dry &
Wet/Temp.at Q.C.Lab.Kadra
6-2-2004 Running Permanent
21
21
Cement Testing
26-4-2007
Running
Permanent
Karnataka Power Corporation Limited List of Files and Records under Section 4(1)(a) of the Right to information Act-2005
Name of the Office:- CQAE(Ambikanagar)
Address:- Quality Control Sub-Division KPC Ltd., Ambikanagar
Sl.No. File
No. SubjectSubjectSubjectSubject Opening date
of File
Closing date
of
File/Running
Date of Transfer of
File and Authority
whom transferred
Nature of File
permanent
temporary
Remarks
1 2 3 4 5 6 7 8
1 1 Attendance Extract fileAttendance Extract fileAttendance Extract fileAttendance Extract file
Dec’ 01 Running Permanent
2 2 WorWorWorWork Force Filek Force Filek Force Filek Force File
July’ 02 Running Permanent
3 3 Medical, FA & Encashment FileMedical, FA & Encashment FileMedical, FA & Encashment FileMedical, FA & Encashment File
July’ 03 Running Permanent
4 4 Progress Report File Jan’ 94 Running Permanent
5 5 Extra wages File Oct’ 04 Running Permanent
6 6 Leave Letter File July’ 03 Running Permanent
7 7 Incentive File Sept’ 00 Running Permanent
8 8 Transfer & Relief file May’ 88 Running Permanent
9 9 Accident Reports Jan’ 92 Running Permanent
10 10 Soil test reports File Nov’ 03 Running Permanent
11 11 Kappada Gudda wind Farm
File
Dec’ 94 Closed
Jan’03
Permanent
12
12
BTPS Ash Pond test reports
file
June’ 05 Running Permanent
13 13 GHHS Project File Nov ’03 Closed Permanent
14
14
Consultancy (Soil Tests) File Consultancy (Soil Tests) File Consultancy (Soil Tests) File Consultancy (Soil Tests) File Dec’ 95
Running Permanent
15
15 Administrative (Genl.) File Apr’ 06 Running Permanent
16 16 O.K. Cards File
Oct’ 09 Running Permanent
17
17 Drinking water test reports
File
Oct’ 97 Running Permanent
18 18 BP dam drawing Charts File Nov’ 85 Running Permanent
19
19
BP & T’halla dam
Instrumentation File
Apr’ 00 Running Permanent
20
20
Maint. Of Q.C.Lab. Maint. Of Q.C.Lab. Maint. Of Q.C.Lab. Maint. Of Q.C.Lab. June’ 85 Running Permanent
21 21
Testing Rates Testing Rates Testing Rates Testing Rates Mar’ 93 Running Permanent
22 22
Chemical testing Aug’ 00 Running Permanent
23
23 Chemical testing of Pickup
dam
June’ 97 Running Permanent
24 24
Chemical testing of SVP dam Chemical testing of SVP dam Chemical testing of SVP dam Chemical testing of SVP dam Mar’86 Running Permanent
25
25
Chemical testing of Kadra/ Chemical testing of Kadra/ Chemical testing of Kadra/ Chemical testing of Kadra/ July’ 02
Aug-07
Permanent
26 25(A)
Kodasalli damKodasalli damKodasalli damKodasalli dam
-- ’’ --
Sept-07 Running
27
26
T & P Sept’ 07 Running Permanent
28
27
Dandeli U/S Intech & NPH
Chemical analysis
July ’ 00 Running Permanent
29 28 Chemical analysis of Supa dam
Nov ’03 Running Permanent
30
29
Chemical analysis of BP,
T’halla & UK dam
Jan’ 99
Running Permanent
31
30 Chemical analysis of BTPS Dec’ 01 Running Permanent
32 31 Investigation samples
Aug’ 05 Running Permanent
33
32 Lab. Temperature recording Mar’ 99 Running Permanent
Karnataka Power Corporation Limited List of Files and Records under Section 4(1)(a) of the Right to information Act-2005
Name of the Office:- CQAE(Ganeshgudi)
Address:- Quality Control Sub-Division KPC Ltd., Ganeshgudi
Sl.No. File No. SubjectSubjectSubjectSubject
Opening date
of File
Closing date
of
File/Running
Date of Transfer of
File and Authority
whom transferred
Nature of File
permanent
temporary
Remarks
1
2
3
4
5
6
7
8
1
1
Seismic Stations File
July’ 09
Running
Permanent
2 Supa Dam Instrumentation Oct’ 05 Running Permanent
Karnataka Power Corporation Limited List of Files and Records under Section 4(1)(a) of the Right to information Act-2005
Name of the Office:- CQE-K Kadra
Address:- Quality Control Division KPC Ltd., Kadra, Karwar Uttara Kannada
Sl.N
o.
File No. SubjectSubjectSubjectSubject
Opening date
of File
Closing date of
File/Running
Date of Transfer
of File and
Authority whom
transferred
Nature of File
permanent
temporary
Remarks
1
2
3
1
1(A)
1(B)
Kadra Lab.Temperature &
Hydrometer reading
--’’ --
-- ’’ --
6-3-1993
l1-4-2001
9-4-12
7-4-2001
5-3-12
Running
Permanent
4
5
2
2(A)
Kadra Earthen dam chemical
analysis
-- ’’ --
6-12-2000
17-10-2007
18-9-2007
Running
Permanent
6
7
8
9
3
3(A)
3(B)
3(C)
Monthly Progress ReportMonthly Progress ReportMonthly Progress ReportMonthly Progress Report
-- ’’ --
-- ’’ --
-- ’’ --
30-3-1996
2-4-2001
1-10-2007
11-4-12
30-11-2000
7-9-2007
6-3-12
Running
Permanent
10
11
12
4
4(A)
4(B)
Leaching analysis of Kadra damLeaching analysis of Kadra damLeaching analysis of Kadra damLeaching analysis of Kadra dam
-- ’’ --
-- ’’ --
5-10-95
6-11-2001
12-9-2007
27-9-2001
11-8-2007
Running
Permanent
13
14
15
16
17
18
19
5
5(A)
5(B)
5(C)
5(D)
5(E)
5(F)
Kadra Instrumentation
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
15-3-1991
10-6-1995
15-4-1998
1-10-2001
19-4-2004
4-10-2007
9-4-12
18-5-1995
20-3-1998
10-1-2001
9-3-2004
5-9-2007
5-3-12
Running
Permanent
20
21
6
6(A)
Kadra Earthen dam Piezometer
reading
-- ’’ --
11-4-2004
6-11-2007
5-9-2007
Running
Permanent
22
23
7
7(A)
Kadra, Kodasalli dam & Power
House Correspondance
-- ’’ --
2-9-1997
7-10-2008
11-9-2008
Running
Permanent
24 8 Kali Stage-II Departmental
Works (Kadra & Kodasalli)
13-4-2004 Running Permanent
25
26
9
9(A)
Chemical Analysis of Kadra
concrete dam & drainage gallery
-- ’’ --
28-5-2001
23-12-06
15-12-2006
Running
Permanent
27 10 Seepage details of
Kadra/Kodasalli dam
30-8-2005 Running permanent
28
29
11
11(A)
Air & Water Temperature of
Kadra/Kodasalli dam
-- ’’ --
9-11-2009
14-4-12
16-3-12
Running
Permanent
30
31
12
12(A)
Testing of drinking water samples
-- ’’ --
28-10-1997
29-6-2009
9-5-2009
Running
Permanent
32
33
34
13
13(A)
13(B)
Q.C.Budget Correspondance
-- ’’ --
-- ’’ --
29-1-1992
8-10-2001
19-1-2010
19-9-2001
30-12-2009
Running
Permanent
35
36
14
14(A)
Internal audit Correspondance
-- ’’ --
28-5-2002
10-3-2010
4-8-2009
Running
Permanent
37 15 Schedule of ratesSchedule of ratesSchedule of ratesSchedule of rates
27-6-96 Running Permanent
38
39
40
16
16(A)
16(B)
Testing of Materials (out side
Agencies)
-- ’’ --
-- ’’ --
16-2-1988
16-2-2001
16-9-2004
4-10-96
13-4-2004
Running
Permanent
41
42
43
17
17(A)
17(B)
Procurement of Servicing of
T & P by M/s.Aimil Ltd.,
--’’ --
-- ’’ --
8-10-1991
27-4-2001
15-11-2006
7-3-2001
11-8-2006
Running
Permanent
44
45
46
18
18(A)
18(B)
Computer CorrespondanceComputer CorrespondanceComputer CorrespondanceComputer Correspondance
-- ’’ --
-- ’’ --
25-6-1993
27-5200
7-1-2006
4-5-2000
24-11-2005
Running
Permanent
47
48
49
19
19(A)
19(B)
KHEP-I & II Encardiorite
Electronics Correspondance
-- ’’ --
-- ’’ --
7-8-1992
5-5-1994
12-1-2010
6-12-1995
19-12-2009
Running
Permanent
50
51
52
20
20(A)
20(B)
Tender Notification
-- ’’ --
-- ’’ --
23-9-1994
25-1-2003
8-11-2008
201-2003
24-10-2008
Running
Permanent
53 21 Kali Sharavathi Pumped Water 21-10-2008 Running Permanent
54
55
22
22(A)
Dam Safety
-- ’’ --
9-7-2001
28-9-2007
13-9-2005
Running
Permanent
56
57
23
23(A)
B.T.P.S.
-- ’’ --
12-7-2000
20-2-2006
17-8-2002
1-4-2009
Permanent
58 24 Impairment of Assets 28-2-2005 21-3-2006 Permanent
59
60
25
25(A)
Kalasa Banduri Nala Reports
-- ’’ --
10-1-2001
28-9-2006
16-1-2003
Running
Permanent
61 26 Ash Bund Test Results of RTPS 26-12-2000 27-7-2006 Permanent
62 27 Hasehalla Correspondance 19-3-2005 23-5-2008 Permanent
63
64
28
28(A)
Kappadgudda, Guledagudda
Wind
-- ’’ --
29-4-2002
17-7-2009
2-8-2002
Running
Permanent
65
66
29
29(A)
Hydrological Details
-- ’’ --
14-12-2000
29-6-2008
31-12-2002
Running Permanent
67 30 Kadra Power House Objection
Report
20-1-1992 6-12-1999
Permanent
68 31 Kadra Concrete dam Objection
Report
28-4-1992 18-2-1993
Permanent
69 32 General Objection Report 12-10-1989 29-9-1997
Permanent
70 33 Kadra Concrete dam test results
of aggregates
23-4-1993 4-10-2001
Permanent
71 34 Kadra Concrete dam
correspondance
24-12-1992 21-7-1995
Permanent
72 35 Kadra Concrete dam mass
concrete temperature
18-4-1994 4-6-1996
Permanent
73
74
36
36(A)
Procurement of
plasticiser/Admixture
-- ’’ --
19-10-1993
26-10-1995
6-9-1995
22-8-2000 Permanent
75
76
37
37(A)
Kadra earthen dam Reach-I
permeability water loss grouting
-- ’’ --
17-7-89
28-9-94
27-9-94
18-3-96
Permanent
77 38 Kadra earthen dam Reach-IV
MTR slope test & permeability
3-2-89
11-1-95
Permanent
78 39 Soil test result of earthen dam
Reach-III & General
4-3-91 7-12-95
Permanent
79 40 Kadra earthen dam Extended
Portion Reach-II permeability
water loss grouting & General
19-8-89 24-2-96
Permanent
80 41 Kadra earthen dam Reach-III
permeability water loss &
grouting
12-1-1989 13-6-1995
Permanent
81
82
42
42(A)
Kadra earthen dam pizeometer
reading
-- ’’ --
4-3-1999
11-9-2001
4-8-2001
19-3-2004
Permanent
83 43 Kadra earthen dam Reach-IV
seepage
4-1-2001 24-6-2004
Permanent
84 44 KHEP Stage-II General
correspondance
15-3-1996 29-9-2001
Permanent
85 45 KHEP Stage-II Building
correspondance
26-9-1990 25-11-1996
Permanent
86 46 Certification of weights &
measures
21-6-1991 10-4-19995
Permanent
87 47 Testing concrete cubes Mari Nasik 18-12-1991 16-7-1999
Permanent
88 48 Narrative proposals report to be
submitted to MD
15-12-1995 1-9-2001
Permanent
89 49 Soil test result from Investigation
Project
28-11-1994 24-1-2004
Permanent
90
50 Chemical Analysis of Cement 4-6-1994 1-1-2001
Permanent
91 51
Test results of Report RTPS
22-6-1994 26-2-2004
Permanent
92
93
52
52(A)
Soil test result Construction
Project
-- ’’ --
19-10-1985
24-5-1994
31-8-1989
30-3-2000
Permanent
94
53
Kali AEA file
10-6-1993 26-11-1996
Permanent
95
96
97
98
54
54(A)
54(B)
54(C)
KHEP –II mix design studies
-- ’’ --
-- ’’ --
-- ’’ --
1-7-1987
24-11-1990
7-7-1994
6-7-1997
21-7-1990
28-3-1994
17-12-1996
4-9-2004
Permanent
99 55 Mix design of fly ash 25-7-1995 7-9-1999
Permanent
100
101
102
56
56(A)
56(B
Mix design of Ash Bond
Different aspects
-- ’’ –
-- ’’ --
3-6-2000
27-5-1999
Nov-1997
18-8-2000
12-5-2000
4-9-2004
Permanent
103 57 KHEP Stage Relative Humidity 4-5-1987 11-7-1991
Permanent
104
105
58
58(A)
Cement Test Results of Kadra
Lab.
-- ’’ --
7-6-1998
12-10-1998
6-7-1998
12-3-2001
Permanent
106 59 Kalasa Nala Scheme consultancy
work
11-1-2001 3-5-2001
Permanent
107 60 Kadra PH correspondance 20-5-1993 1-1-2001
Permanent
108 61 Monthly test report & Kadra
result of CA & FA
Nov-94 2-11-1999
Permanent
109 62 Test result of Kadra PH CA & FA 5-1-1995 2-8-1999
Permanent
110 63 Kadra dam Air & Water
Temperature
15-2-1992 5-4-1992
Permanent
111 64 Pullout Test of Kadra dam 28-2-1995 6-5-1997
Permanent
112 65 Kadra concrete dam Chemical
analysis of sand
17-10-1978 15/16-1-1993
Permanent
113 66 Kadra concrete dam permeability
grouting/water loss
6-8-1983 9-9-1995
Permanent
114 67 Test result of CA & FA Kadra
concrete dam
5-1-1995 11-6-1997
Permanent
115 68 Test result of CA & FA Kadra
Tail Race Work
2-1-1996 5-3-1997
Permanent
116 69 Geo Technical sub-surface
Investigation for Kaiga Township
16-6-1994 15-4-2002
Permanent
117
118
70
70(A)
Consultancy File
-- ’’ --
26-12-1996
13-1-2001
25-3-2000
29-11-2001 Permanent
119 71 Kaiga consultancy work 24-10-2000 22-5-2004
Permanent
120 72 Seepage details of collected at
various locations at Kadra
concrete & earthen dam
28-2-1997 8-3-2001
Permanent
121 73 Kadra earthen dam Reach-I soil
test result
1-1-1990 18-3-1997
Permanent
122
123
74
74(A)
Kali wing Annual correspondance
report
-- ’’ --
1984
1993
1985
1994
Permanent
124
125
126
75
75(A)
75(B)
Kadra PH OK Cards
-- ’’ --
-- ’’ --
29-6-1989
16-10-1991
9-10-1996
1-6-1991
29-4-1992
6-4-1999
Permanent
127 76 Chemical analysis of water
completed projects
15-1-1993 16-10-1995
Permanent
128 77 Procurement of T & P 26-10-1991 25-1-1993
Permanent
129 78 Kadra PH Construction Drawings -- 11-1-1995
Permanent
130 79 Kadra power House DT liner
repairs
28-1-2003 17-7-2005
Permanent
131 80 Water supply to Kaiga Township 7-2-2003 6-8-2003
Permanent
132 81 Zindal Steel Plant 22-2-1995 7-8-2001
Permanent
133 82 Almatti Water sample test 17-4-2001 28-5-2001
Permanent
134 83 Bidadi Project testing of soil
sample
17-1-1998 19-3-1998
Permanent
135 84 Minutees of meeting 7-6-1997 4-3-1999
Permanent
136
137
85
85(A)
Chemical analysis of Kodasalli
dam water
-- ’’ --
31-5-2001
13-1-2010
12-12-2009
Running
Permanent
138
139
86
86(A)
Kodasalli dam objection report
-- ’’ --
28-4-1992
27-9-1996
18-2-1993
25-6-1999
Permanent
140 87 Kodasalli PH Objection report 13-1-1990 28-2-1997 Permanent
141 88 General Objection Report 12-10-1989 29-9-1997 Permanent
142 89 Kodasalli dam PH Mix design
correspondance
21-11-1989 18/19-11-1992 Permanent
143
144
145
90
90(A)
90(B)
Kodasalli dam correspondance
-- ’’ --
– ’’ --
9-1-1992
21-10-1993
5/6-1-1996
10-8-1993
29-12-1995
10-11-1998
Permanent
146 91 Test report of Kodasalli dam CA
& FA
Nov’94 6-4-2000 Permanent
147 92 Kodasalli Air & water Temp. 29/30-8-1991 3-5-2005 Permanent
148 93 Kodasalli dam mass concrete
Temp.
Feb’94 1-6-1999 Permanent
149
150
94
94(A)
Kodasalli dam grouting &
permeability
-- ’’ --
7-1-1989
7-9-1999
16-8-1993
3-5-2000
Permanent
151 95 Pullout Test Kodasalli dam 18-5-1995 5-7-1995 Permanent
152 96 Hydrological details Kodasalli
Reservoir
9-6-2001 31-12-2001 Permanent
153 97 Cement Test report
Kadra/Kodasalli dam
19-10-2001 7-4-2004 Permanent
154 98 Kodasalli PH Correspondance 30-12-1991 10-10-1996 Permanent
155 99 Construction Drawing of
Kodasalli dam
24-2-1995 23-8-2000 Permanent
156
157
158
159
160
100
100(A)
100(B)
100(C)
100(D)
Kodasalli dam
Instrumentation
--’’ --
-- ’’ --
-- ’’ --
-- ’’ --
19-2-1991
29-1-1996
19-4-2004
4-10-2007
9-4-12
6-12-1995
2-3-2001
5-9-2007
5-3-12
Running
Permanent
161 101 Kodasallli dam leaching analysis 31-10-2001 Running Permanent
162 102 Ambikanagar Q.C.Lab.building
repairs
27-9-1994 21-1-2010 Permanent
163
164
103
103(A)
Chemical analysis B.P.dam,
T”halla dam & U.K.dam
-- ’’ --
4-12-2000
9-3-2010
24-12-2009
Running
Permanent
165
166
104
104(A)
Maximum & Minimum
Temperature of A’nagar Lab.
-- ’’ --
4-12-2001
6-1-2010
5-12-2009
Running
Permanent
167 105 A’nagar Departmental works 19-1-2002 Running PermanentPermanentPermanentPermanent
168
169
170
106
106(A)
106(B)
Pressure gauge readings of
B.P.Dam, T’halla & U.K.dam
-- ’’ --
-- ’’ --
8-5-1995
1-1-2001
3-10-2007
9-12-2000
10-9-2007
Running
Permanent
171 107 Chemical test result of water
samples of investigation project
salt & silt
8-6-1994 20-4-1999 Permanent
172 108 Unserviceable list of A’nagar
T & P
6-1-1999 Permanent
173
174
109
109(A)
Chemical analysis of Supa dam
water
-- ’’ --
6-12-2000
3-11-07
5-9-2007
Running
Permanent
175 110 Ganeshgudi Departmental works 28-7-2003 Running Permanent
176
177
178
111
111(A)
111(B)
Supa dam instrumentation &
correspondance
-- ’’ --
-- ’’ --
2-7-1976
8-9-1990
9-10-2003
24-6-1982
31-7-2001
Running
Permanent
179 112 Supa dam left bank down stream
& Right bank hill slope
28-12-2006 12-11-2008 Permanent
180
181
182
113
113(A)
113(B)
Supa Dam seepage reading
-- ’’ --
-- ’’ --
19-8-1991
10-4-2001
14-8-2008
8-3-2001
1-2-2008
Running
Permanent
183
184
185
186
187
114
114(A
114(B)
114(1
114(2))
Maint. Of seismic station & other
Civil Works
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
3-12-1994
12-2-2001
2-11-2002
8-6-2006
11-4-12
4-1-2001
1-10-2002
1-10-2005
16-3-12
Running
Permanent
188
189
190
191
192
115
115(A)
115(B)
115(C)
115(D)
Seismic Reports Seismic Reports Seismic Reports Seismic Reports
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
1-9-1992
20-9-1993
8-12-1995
10-7-2000
22-5-2004
7-9-1993
10-11-1995
10-4-2000
8-4-2004
28-9-2007
Permanent
193
194
116
116(A)
Seismic station correspondance &
meeting Reports
-- ’’ --
1-4-1997
23-2-2008
6-12-2007
Running
Permanent
195
196
117
117(A)
Electricity bills of seismic station
-- ’’ --
1-1-2001
4-9-2006
14-7-2006
Running
Permanent
197
198
118
118(A)
Air & Water Temp. of Supa dam
-- ’’ --
2-11-1993
1-4-2002
5-3-2002
29-8-2004
Permanent
199 119 Supa dam General
correspondance
15-3-1989 14-11-2000 Permanent
200 120 Supa dam Hydrological data 12-7-1997 9-7-2001 Permanent
201 121
Supa dam drilling & grouting 23-1-1993 10-1-2000 Permanent
202
122 Supa L/B & R/B Testing of water
sample
29-5-1995 1-1-1996 Permanent
203 123 Supa dam soil testing 13-1-1989 27-12-1990 Permanent
204 124 Seismic station Gulbargh 6-10-1983 10-2-1995 Permanent
205
125 Seismic observation Kali new
work
4-9-1999 7-9-1999 Permanent
206 126 Seismic instrument 16-8-1990 7-6-1993 Permanent
207 127 Procurement of recording device
papers
20-3-1995 1-3-2002 Permanent
208 128 Micro earthquake data
consultation work
22-11-2001 28-3-2003 Permanent
209 129
Ghataprabha PH testing of
material
19-5-1994 7-3-2001 Permanent
210
211
130
130A)
Talakalale Instrumentation
reading
-- ’’ --
17-7-2002
8-1-2010
10-12-2009
Running
Permanent
212
213
131
131(A)
Test report of Cement Kargal
Dept. Works
-- ’’ --
12-11-2002
10-2-2009
27-11-2008
Running
Permanent
214 132 Chemical Test Results of Water
(Linganamakki & Talakalale
dam)
3-10-2001 8-1-2010 Permanent
215
216
217
133
133(A)
133(B)
Kargal Lab. Temperature
-- ’’ --
-- ’’ --
9-6-1989
4-5-2004
3-1-2010
6-4-2004
10-12-2009
Running
Permanent
218 134 Chemical Test Report of Kargal 15-10-1998 31-3-2004 Permanent
219
220
135
135(A)
Linganamakki Instrumentation
-- ’’ --
4-5-2004
8-1-2010
10-12-2009
Running
Permanent
221 136 Kargal, Hosangadi & Gerusoppa
correspondance
6-7-2009 Running Permanent
222 137 Providing Deep/surface pointing
of Linganamakki dam
20-4-2009 Running Permanent
223
224
225
226
138
138(A)
138(B)
138(C)
Gerusoppa Dam Instrumentation
-- ’’ --
-- ’’ --
-- ’’ --
6-4-2004
11-9-2007
6-2-2010
11-4-12
11-8-2007
10-12-2009
6-3-12
Running
Permanent
227
228
139
139(A)
Leaching analysis/Seepage &
Chemical analysis of water of
Gerusoppa dam
-- ’’ --
13-3-2003
11-1-2010
4-12-2009
Running
Permanent
229 140 Gerusoppa dam correspondance 7-12-1990 28-7-2001 Permanent
230 141 Gerusoppa dam Objection report 19-8-1980 20-8-1996 Permanent
231 142 ARR of Gerusoppa dam 2001 2002 Permanent
232 143 Air & Water temp. of Gerusoppa
dam
5-3-2002 5-12-2003 Permanent
233 144 Gerusoppa building
correspondance
28-4-1999 10-8-2001 Permanent
234 145 Testing of Drinking water samples 13-8-1991 21-6-2001 Permanent
235 146 Cement correspondance of
Gerusoppa
29-12-1989 28-6-2001 Permanent
236 147 Procurement of materials 21-7-1998 21-9-2001 Permanent
237 148 Budget File Gerusoppa 22-2-1990 31-3-2001 Permanent
238
239
149
149(A)
MRR of Gerusoppa
-- ’’ --
4-3-1996
9-5-2000
4-7-1997
1-8-2001
Permanent
240 150 Gerusoppa Power House O.K.
Cards
27-1-1992 18-7-2001 Permanent
241
242
243
151
151(A)
151(B)
Mani,Varahi, Pickup dam
Instrumentation
-- ’’ --
-- ’’ --
7-9-1999
4-6-2009
16-8-11
11-5-2009
6-7-11
Running
Permanent
244
245
152
152(A)
Chakra,Savehaklu & Hosur
Saddle dam piezometer reading
-- ’’ --
5-5-2004
6-1-2010
10-12-2009
Running
Permanent
246
247
153
153(A)
VHEP Mani dam, Pickup dam
Chemical analysis of water
-- ’’ --
29-10-2001
16-2-2010
29-10-2009
Running
Permanent
248 154 UGPH Instrumentation (Under
ground power house)
7-9-1999 11-10-2006 Permanent 249 155 Mani dam, Pickup dam, Inflow,
Outflow
6-8-2009
Running Permanent 250 156 Kargal,Gerusoppa, Hosangadi
correspondance file
9-7-2009 Running Permanent
251
252
157
157(A)
Hosangadi UGPH 3 & 4 Unit O.K
Cards
-- ’’ --
8-7-2006
12-2-2008
3-8-2007
14-3-2009
Permanent
253 158 VHEP Stage-II Correspondance 14-2-2006 2-9-2009 Permanent 254 159 Hosangadi UGPH 3 & 4 unit
cement test Report
27-5-2006 January -2009 Permanent 255 160 Progress Report File UGPH 3 & 4
Unit
29-3-2007 29-1-2009 Permanent 256 161 Hosangadi UGPH 3 & 4 Unit
Concrete test report
27-6-2006 12-3-2009 Permanent 257
258
162
162(A)
ARR of Varahi Project
-- ’’ --
1995
1996
1996
1997 Permanent
259 163 Draft Report of the behaviour
Mani Dam
For the year 2001 Permanent 260 164 Soil Test of Mani Dam 17-3-2001 23-6-2001 Permanent 261 165 Varahi Pending Objection Report 24-5-1984 21-6-1997 Permanent 262 166 Mani Monthly Report 8-10-2003 12-6-2007 Permanent
263
264
167
167(A)
Soil Test Report of Chakra Dam
-- ’’ --
4-12-1978
Jan-84
20-5-1983
July-85 Permanent
265 168 Soil Test report of Hulekal
Forebay
19-12-1979 9-10-1984 Permanent 266 169 Soil Test of Mani Dam Apr-1977 July-1986 Permanent 267 170 Soil Test of Savehaklu dam 2-3-1978 9-10-1979 Permanent
Agreement Books 1 2 3 4 5 6 7 8
268 171 Agreement documents of Supa
Saddle dam No.2
2 Nos.
269 172 Agreement documents for
foundation for Towers at Out
door yard
1 No.
270 173 Agreement documents for Supa
dam & Power House 5 Nos.
271 174 Agreement documents for
Consultancy Schedule dam No.1 1 No.
272 175 Agreement documents for
Schedule dam No.1 1 No.
273 176 Agreement documents for Right
bank Supa dam 1 No.
274 177 Agreement documents for
approach Channel T’halla &
B.P.dam
1 No.
275 178 Agreement documents for
Construction of Tunnel 1 No.
276 179 Agreement documents for
plugging up of investigation drifts
caves of Supa dam
1 No.
277 180 Agreement documents for Upper
Kaneri dam & Balance work 2 Nos.
278 181 Agreement documents for Power
House Right Bank 1 No.
279 182 Agreement documents for Balance
work of Upper Kaneri Concrete
dam
1 No.
280 183 Agreement documents for
Instrumentation of Kadra dam 1 No.
281 184 Agreement documents for T’halla
dam & Balance work T’halla
approach channel
2 Nos.
282 185 Agreement documents for Surge
Tank Pressure shaft 2 Nos.
283 186 Agreement documents for
Excavation of Nagajhari power
house
2 Nos.
284 187 Agreement documents for
approach channel & Tunnel
intake
2 Nos.
285 188 Agreement documents for
Instrumentation of Kodasalli dam 4 Nos.
286 189 Supply of Quotations for
instrument of Supa dam
1 No.
287 190 Construction of Kodasalli PH
second supplementary agreement
1 No.
288
289
290
291
292
293
191
191(A)
191(B)
191(C)
191(D)
191(E)
Establishment
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
7-8-2001
16-9-2004
15-7-2006
20-3-2008
11-1-2010
10-6-11
27-9-2002
22-6-2006
12-7-2007
26-12-2009
27-5-11
Running
Permanent
294
295
296
192
192(A)
192(B)
General Establishment
-- ’’ --
-- ’’ --
10-8-2006
19-11-2008
13-8-11
17-11-2008
10-8-10
Running
Permanent
297 193 Samanvaya SabheSamanvaya SabheSamanvaya SabheSamanvaya Sabhe
20-3-2007
Running Permanent
298
299
194
194(A)
Transfer
-- ’’ --
20-11-2003
30-1-2009
9-9-2008
Running
Permanent
300
301
195
195(A)
Incentative
-- ’’ --
2-1-2003
5-1-2010
10-12-2009
Running
Permanent
302
303
196
196(A)
Deputation
-- ’’ --
10-4-2002
4-4-2009
6-1-2009
Running
Permanent
304 197 Meeting 7-9-2001
Running Permanent
305
306
198
198(A)
Extra Wages
-- ’’ --
30-12-2006
1-1-2010
22-12-2009
Running
Permanent
307
308
199
199(A)
Festival Advance
-- ’’ --
1-1-2001
10-12-2009
13-8-2009
Running
Permanent
309
310
200
200(A)
H.T.C. Leave
-- ’’ --
30-10-2001
9-11-10
30-10-10
Running
Permanent
311
312
313
314
315
316
317
201
201(A)
201(B)
201(C)
201(D)
201(E)
201(F)
Attendance
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
18-1-2000
16-8-2001
29-9-2002
17-4-2008
15-1-2010
16-5-11
11-4-12
15-8-2001
15-1-2002
15-3-2003
2-1-2010
26-4-11
20-3-12
Running
Permanent
318
319
202
202(A)
E.L.Encashment 17-5-2001
3-5-11
8-4-11
Running
Permanent
320 203 Quarter Allottment 4-8-1995
Running Permanent
321 204 Family ParticularsFamily ParticularsFamily ParticularsFamily Particulars
28-6-1990 Running Permanent
322
323
324
325
326
205
205(A)
205(B)
205(C)
205(D)
Leave Application
-- ’’ --
-- ’’ --
-- ’’ --
-- ’’ --
2-8-2001
2-5-2002
3-7-2008
30-12-2009
7-6-11
22-4-2002
25-5-2003
29-12-2009
31-5-11
Running
Permanent
327
328
329
206
206(A)
206(B)
Work Force
-- ’’ --
-- ’’ --
5-2-2007
7-6-10
2-4-12
3-5-10
1-3-12
Running
Permanent
330
331
207
207(A) Kannada PercentageKannada PercentageKannada PercentageKannada Percentage
-------- ’’ ’’ ’’ ’’ --------
4-9-2001
1-1-2010
1-12-2009
Running
Permanent
332
333
208
208(A) Accident Report Accident Report Accident Report Accident Report
-- ’’ --
4-3-1995
1-4-2009
28-3-2009
Running
Permanent
334 209 Disciplinary & Court 14-9-2001
Running Permanent
335 210 Canteen Coupon Requisition 28-7-2000 Running Permanent
336 211 C.T.C. 20-5-1993
Running Permanent
337
212 HBA Advance 11-9-2000 Running Permanent
338
339
213
213(A)
Vehicle correspondance
-- ’’ --
13-9-1995
29-1-2009
24-12-2008
Running
Permanent
340 214 Standing Regulations 22-09-2003 Running Permanent
341
342
215
215(A) CircularCircularCircularCircular
-- ’’ --
3-3-2003
3-7-2007
31-5-2007
Running
Permanent
343
216 Assets & Liabilities 25-4-2000 Running Permanent
344 217 Telephone correspondance
29-9-1997 Running Permanent
345
218 Voluntary Retirement 21-2-2004 Running Permanent
346 219 Retirement 22-4-1999 Running Permanent
347
348
220
220(A)
Confidential
-- ’’ --
4-1-2002
6-1-2010
29-7-2009
Running
Permanent
349
350
351
352
221
221(A)
221(B)
221(C)
ImprestImprestImprestImprest
-- ’’ --
-- ’’ --
-- ’’ --
4-10-2008
1-1-2010
3-1-11
2-4-12
29-12-2009
29-12-10
27-3-12
Running
Permanent
353 222
Emergent AdvEmergent AdvEmergent AdvEmergent Advanceanceanceance 28-10-1997 Running Permanent
354
355
223
223(A)
Substore
-- ’’ --
4-11-2003
16-3-11
16-12-10
Running
Permanent
356
357
224
224A) Telephone BillsTelephone BillsTelephone BillsTelephone Bills
-- ’’ --
28-3-2002
28-1-2010
30-12-2009
Running
Permanent
358
359
225
225(A)
Uniform Bills
-- ’’ --
16-7-2001
14-6-11
7-5-11
Running
Permanent
360 226
Service Bills 17-3-2003 Running Permanent
361
362
227
227(A)
T.A.Bills
-- ’’ --
25-5-2005
3-4-2009
12-3-2009
Running
Permanent
363 228
Private Agencies Testing
Charges (Remittance)
11-1-2002 Running Permanent
364
365
229
229(A)
Annual Accounts
-- ’’ --
22-8-1997
27-2-2003
25-1-2003
Running
Permanent
366 230
Income Tax Details 11-7-1995 Running Permanent
367 231
G.P.F.Correspondance 9-6-1999 Running Permanent
368 232
Old News paper Bills 7-7-1992 Running Permanent
369
370
233
233(A) Medical BillsMedical BillsMedical BillsMedical Bills
-- ’’ --
31-7-2007
7-6-11
13-5-11
Running
Permanent
371
372
234
234(A)
Procurement File
-- ’’ --
22-10-2003
13-7-2009
9-7-2009
Running Permanent
373 235 Inspection Report 12-1-2001 Running Permanent 374
375
236
236(A)
Physical Verification
-- ’’ --
24-1-2007
21-12-10
4-10-10
Running Permanent
376
377
237
237(A)
Unserviceable
-- ’’ --
10-4-2001
29-11-2007
15-11-2007
Running Permanent
378
379
238
238(A)
T & P
-- ’’ --
19-9-1985
16-2-2009
16-12-2008
Running Permanent
380
381
239
239(A)
Furniture
-- ’’ --
11-12-1985
28-2-2005
10-3-2004
Running Permanent
382
383
240
241(A)
Material Gate Pass
-- ’’ --
18-6-2001
17-2-2010
1-12-2009
Running Permanent
384
385
242
242(A)
Purchase Orders Kadra
-- ’’ --
29-2-1990
5-10-2000
30-12-1999
Running Permanent
386 243 Uniform Employees 9-3-2001 Running Permanent 387
388
244 Charge List
-- ’’ --
24-9-1996
31-1-2005
13-5-2005
Running
Permanent 389 245 Acceptance of debit Note Sept-1994 Running Permanent
KARNATAKA POWER CORPORATION LIMITED.
( Raichur Thermal Power Station ) LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE : CQE(T) Ref : ED(CA) & CS Ltr.No.A1R5A (R1A) Dated. 07.05.14
ADDRESS : RTPS – KPCL, SHAKTINAGAR.
Sl.No. File No. Subject Opening date of
File
Closing Date of
file/Running File.
Date of Transformer
file Authority
whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
1 CQET/P1A/ General File 01.10.1999 Running -
permanent 2 CQET/P1B Deputation/Representation 22.03.2005 Running. - permanent
3 CQET/P1C Recruitment 23.09.2005 Running. - permanent
4 CQET/P1D Promotions 20.08.2005 Running. - permanent
5 CQET/P1E Transfers. 18.12.199 Running. - permanent
6 CQET/P1F Leave 14.10.2006 Running. - permanent
7 CQET/P1G Increments. 28.09.1998 Running. - permanent
8 CQET/P1H Advances. 19.08.2003 Running. - permanent
9 CQET/P1I Compensation. 17.01.2000 Running. - permanent
10 CQET/P1J Overtime. 04.10.2007 Running. - permanent
11 CQET/P1K Other benefits. - Running.- - permanent
12 CQET/P2B Training. 22.03.2005 Running. - permanent
13 CQET/P2C Welfare. - - - -
14 CQET/P2D Discipline. 16.11.2003 Running. - permanent
15 CQET/P2E Retirement 19.04.2006 Running. - permanent
16 CQET/P1B Power 29.03.1980 Running. - permanent
17 CQET/P1C2 Water. 29.03.1980 Running. - permanent
18 CQET/P1D2A Telephone 10.04.1997 Running. - permanent
19 CQET/P1A2B Vehicle. 15.11.2007 Running. - permanent
20 CQET/B2T Railway. Running. - permanent
21 CQET/A2D Hiring. Running. - permanent
22 CQET/A3B Rents. Running. - permanent
23 CQET/A3C Taxes Running. - permanent
24 CQET/A3D Repairs - Maintenance Running. - permanent
25 CQET/A4B Municipal services. Running. - permanent
26 CQET/A4C Dispensaries. 05.09.2005 Running. - permanent
27 CQET/A5B Stationery. 10.07.1981 Running. - permanent
28 CQET/A5C Printing. -
29 CQET/A5D Furniture. 24.09.1980 Running. - permanent
30 CQET/A5E Office equipments. 24.03.1980
31 CQET/A5F Book & Periodicals. Running. - permanent
32 CQET/A5G Petty purchases. 24.09.1981 Running. - permanent
33 CQET/A6B Tour Programmers. 08.09.1982 Running. - permanent
34 CQET/A6C Noties/ compliance. Running. - permanent
35 CQET/A7A Security. Running. - permanent
36 CQET/A7B Police. Running. - permanent
37 CQET/A7C Watch & Ward. Running. - permanent
38 CQET/A7D Civil Defences. Running. - permanent
39 CQET/A7E Safety of employees. 27.03.2008 Running. - permanent
40 CQET/A7F Thefts. Running. - permanent
41 CQET/Q2D Travelling allowance. Running. - permanent
42 CQET/Q2E Pension. 16.03.1983 Running. - permanent
43 CQET/Q3E Motor car/Cycle advance. 19.08.2003 Running. - permanent
44 CQET/Q3F Providient fund recoveries.
19.08.2003 Running. - permanent
45 CQET/Q3G Insurance recoveries. 29.11.1982 Running. - permanent
46 CQET/Q3I Income tax recoveries. 11.11.1979 Running. - permanent
47 CQET/Q3J H.B.A , H.P.A / Rent Running. - permanent
48 CQET/Q6A Audit recoveries (Internal) 19.08.1979 Running. - permanent.
MISCELLANEOUS FILES.
1 2 3 4 5 6 7
1 CQET/Q2A Uniform 10.11.1980 Running. -
2 Canteen Coupon. 09.07.1992 Running. -
3 CQET/A7A Sub-Stores account 18.07.1994 Running. -
4 - Accounts correspondence 21.08.1981 Running. -
5 - Medical Attendance - Running. -
6 - Festival Advance 24.04.2009 Running. -
7 - Incentive. 26.10.2002 Running. -
8 CQET/A3A Casual and 26.11.1979 Running. -
9 CQET/Q2D DA file (Dearness allowance_ 24.06.1993 Running. -
10 - Quarters. 19.11.1979 Running. -
11 - Type writer. 02.04.1981 Running. -
12 - Stationery code No file. - Running. -
13 - Assets and Liabilities. 06.05.1989 Running. -
14 - S.R. (Standing regulation) 10.12.1990 Running. -
15 - T.A bill file. 27.05.2003 Running. -
16 - Materials Gate pass file. 15.09.2004 Running. -
17 - Computer file. 29.09.2003 Running. -
18 - T & P file. 05.02.1993. Running. -
19 - Attendance file. 18.10.2005 Running. -
20 - Circular file. 31.03.2005 Running. - permanent
21 - EL/Commuted leave file. 05.02.2003 Running. - permanent
22 - Confidential file. 12.10.199 Running. - permanent
23 - Disciplinary case file. Running. - permanent
24 - Imp rest Account file. 15.03.2004 Running. - permanent
25 - Temporary Advance file. 21.03.2003 Running. - permanent
26 CQE(T) Legal- Head legal service. 17.07.2010 Running. - permanent
25 CQET-RTA RTA Act U/S 4(1) (a) of RTA- 2005 09.04.2010 Running. - permanent
KARNATAKA POWER CORPORATION LIMITED. ( Raichur Thermal Power Station )
LIST OF FILES AND RECORDS UNDER SECTION 4(1) (a) OF THE RIGHT TO INFORMATION ACT 2005
NAME OF THE OFFICE: CQE(T) Ref : ED(CA) & CS Ltr.No.A1R5A (R1A)
Dated. 07.05.14
ADDRESS: RTPS – KPCL – SHAKTINAGAR.
Sl. No.
File No. Subject Opening
date of File Closing Date of
file/Running File.
Date of Transformer file Authority
whom transferred
Nature of file permanent /Temporary
Remarks.
1 2 3 4 5 6 7 8
STATION BUILDING UNIT-8
1 CQET/Y1A FA OK Cards 27.07.2007 Running. - permanent
2 CQET/Y2A CA OK Cards 27.07.2007 Running. - permanent
3 CQET/Y3A Batch weights -1 27.07.2007 29.06.2009 - -
4 CQET/Y4A Batch weights-2 29.06.2009 Running. - permanent
5 CQET/Y5A BP calibration 06.09.2007 Running. - permanent
6 CQET/Y6A Back fill E-row ESP control
04.03.2008 Running. - permanent
7 CQET/Y7A HZ –row ,ESP control internal columns back filling
02.04.2008 Running. - permanent
8 CQET/Y8A ESP, PA Fan A & B pass back filling.
21.04.2008 Running. - permanent
9 CQET/Y9A FA & G-row , ESP control back filling
02.03.2008 Running. - permanent
10 CQET/Y10A A-row , BFP, FD Fan A pass back filling.
24.03.2008- Running. - permanent
11 CQET/Y11A Boiler , FD fan B-pass Air washer back filling.
09.04.2008 Running. - permanent
12 CQET/Y12A FA OK cards for mortar 09.04.2008 Running. - permanent
13 CQET/Y13A CTR invoice 13.09.2008 Running. - permanent
14 CQET/Y14A Test schedule cubes 04.05.2009 Running. - permanent
15 CQET/Y15A CTR Invoice 29.12.2007 Running. - permanent
16 CQET/16A Cement requisition. 23.07.2007 Running. - permanent
17 CQET/Y17A Cube test schedule 07.08.2007 Running. - permanent
18 CQET/Y18A Cement test reports 01.08.2007 Running. - permanent
19 CQET/Y19A Cement test reports 26.05.2009 Running. permanent
20 CQET/Y20A Cement test reports 22.10.2009 Running. permanent
21 CQET/Y21A SBC Correspondence 06.07.2007 Running. permanent
R.C.C. COOLING TOWER UNIT-8
22 CQET/Y22B Cooling tower correspondence
09.10.2007 Running.
permanent
23 CQET/Y23B CA OK Cards. 26.11.2007 Running. permanent
24 CQET/Y24B FA OK cards. 26.11.2007 Running. - permanent
25 CQET/Y25B Batch weights. 07.12.2007 Running. - permanent
26 CQET/Y26B Batching plant Calibration.
11.02.2008 19.10.2009 -
R.C.C.CHIMNEY UNIT-8
27 CQET/Y27C Chimney Correspondence 17.01.2008 Running. permanent
28 CQET/Y28C CA OK Cards. 19.01.2008 06.09.2009
29 CQET/Y29C FA OK cards. 19.01.2008 06.09.2009 -
30 CQET/Y30C Batch weights. 19.01.2008 06.09.2009 -
31 CQET/Y31 C Mix design 16.07.2007 Running. - Permanent
C.W . PUMP HOUSE UNIT-8
32 CQET/Y32D Correspondence 03.03.2008 Running. permanent
33 CQET/Y33D CA OK cards 04.04.2008 18.09.2009 ‘
34 CQET/Y34D FA OK cards 04.04.2008 18.09.2009 ‘-
35 CQET/Y35D Batch weights. 04.04.2008 18.09.2009 - -
36 CQET/Y36D Back filling. 12.10.2009 13.10.2009
ASH HANDLING SYSTEM UNIT-8 37 CQET.Y37E Correspondence 01.06.2009 Running. - permanent
38 CQET/Y38E CA OK cards 30.05.2009 Running. - permanent
39 CQET/Y39E FA OK cards 30.05.2009 Running. - permanent
40 CQET/Y40E Batch weights. 30.05.2009 Running. - permanent
ADDITIONAL CALIFIER UNIT-8 41 CQET/Y41F Correspondence 08.05.2009 Running. permanent
42 CQET/Y42F CA OK cards 26.05.2009 Running. - permanent
43 CQET/Y43F FA OK cards 26.05.2009 Running. - permanent
44 CQET/Y44F Batch weights. 26.05.2009 Running. - permanent
SWITCH YARD
45 CQET/Y45G Correspondence 06.09.2009 Running. - permanent
46 CQET/Y46G CA OK Cards. 25.06.2009 06.01.2010 - -
47 CQET/Y47G FA OK Cards. 25.06.2009 06.01.2010 - -
48 CQET/Y48G Batch weights. 25.06.2009 06.01.2010 - permanent
49 CQET/Y49G Back filling. 27.12.2009 Running. - permanent
50 CQET/Y50G Back filling. 14.09.2009 Running. - permanent
MILL REJECT COAL HANDLING SYSTEM. 51 CQET/Y50H Correspondence 16.10.2009 Running. - permanent
52 CQET/Y52H CA OK Cards. 16.10.2009 Running. - permanent
53 CQET/Y53H FA OK Cards. 16.10.2009 Running. - permanent
54 CQET/Y54H Batch weights. 09.10.2009 Running. - permanent
EXTENSION OF COAL HANDLING SYSTEM. 55 CQET/Y55I Correspondence 13.01.2009 Running. - permanent
56 CQET/Y56I CA OK Cards. 04.07.2009 Running. - permanent
57 CQET/Y57I FA OK Cards. 04.07.2009 Running. - permanent
58 CQET/Y58 I Batch weights. 04.07.2009 Running. - permanent
59 CQET/Y59 J Correspondence 06.05.2008 Running. - permanent
60 CQET/Y60 J CA OK Cards. 02.05.2008 Running. - permanent
61 CQET/Y61 J FA OK Cards. 09.05.2008 Running. - permanent
62 CQET/Y62 J Batch weights. 09.05.2008 Running. - permanent
63 CQET/Y63 J Chi: 1310 to 1490 29.11.2008 Running. - permanent
64 CQET/Y64 J Chi: 1160 to 1310 18.08.2008 Running. - permanent
65 CQET/Y65 J Chi: 1490 to 1570 02.12.2008 Running. - permanent
66 CQET/Y66 J Chi: 1010 to 1060 21.01.2008 Running. - permanent
67 CQET/Y67 J Chi: 800 to 1010 17.10.2008 Running. Permanent
ALMATTI DUMP POWR HOUSE. 68 CQET/ Y68 K CA , FA Correspondence 26.10.2009 Running. - permanent
& Batch weights.
OTHERS
69 CQET/Y69 L Compound wall Road works & Misc. works.
22.10.2008 Running.
- permanent
70 CQET/Y70 L Security compound wall 20.11.2008 Running. - permanent
71 CQET/Y71 L YTPS Mix design 28.04.2009 Running. Permanent
72 CQET/Y72 L Unit-8 Correspondence 04.07.2008 Running. Permanent
73 CQET/Y73 L Administration Unit-8 26.06.2008 Running. Permanent
74 CQET/Y 74L Mix design 09.04.2008 Running. - Permanent
75 CQET/Y75L Mix design 16.04.2005 Running. Permanent.
76 CQET/Y76 L YTPS Batch weights. 04.03.2010 Running. Permanent
77 CQET/Y77 L YTPS Correspondence 04.03.2010 Running. Permanent
78 CQET/Y 78 M Testing of materials from Private Agency.
25.03.2007 Running.
Permanent
79 CQET/Y 79 N MTR of All civil works. 06.03.2007 Running. Permanent
80 CQET/Y 80 O Budget 02.08.2006 Running. Permanent
81 CQET/Y 81 P Cement test report of ADPH
27.11.2008 Running.
Permanent
82
CQET/Y 82 Q OK Cards for CA Unit-8 25.02.2008 Running.
Permanent.
83 CQET/Y 83 R OK Cards for FA Unit-9 25.02.2008
Running.
Permanent.
84 CQET/ Y 84 S OK Cards for Back fill Unit-8 works.
07.03.2008 Running.
Permanent.
85 CQET/Y 85 T Cement test report of Unit-8 works
04.08.2007 Running.
Permanent
86 CQET/Y 86 U Procurement / General. 26.08.2008 Running.
Permanent
87 CQET/Y 87 V Requisition of Cement Unit-8
08.06.2006 Running.
Permanent
88 CQET/Y 88 W YTPS Drawings. 11.02.2010 Running. Permanent
89 CQET/Y 89 X ADPH Correspondence 23.07.2009 Running. Permanent
90 CQET/Y 90 Y Facilities Available at Laboratory
25.08.2007 Running.
Permanent
91 CQET/Y 91 Z Physical verification of Assets.
22.03.2002 Running.
Permanent
CQE(T)
NON OPERATED FILE.
Sl.No File Nos. Name of the file.
13 CQET P2C Welfare/
20 CQET A2J Railway
21 CQET P2D Hiring.
22 CQET/A3B Rents.
23 CQET/ A3C Taxes
24 CQET/A3D Repairs and Maintenance
25 CQET / A4B Municipal services
28 CQET A5C Printing.
31 CQET/ A5F Book and periodicals.
34 CQET/ A6C Notes compliance
35 CQET/ A7A Security.
36 CQET/ A7B Police.
37 CQET/A7C Watch and Ward
38 CQET/A7D Civil Defiance.
40 CQET/A7F Thefts.
41 CQET Q2D Traveling allowance
47 CQET/A3J HBA HPA / Rent Recoveries.
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4[1 )a OF THE RIGHT TO INFORMATION ACT 2005 Name of the Office : CCED / SE CD-4
Address : O/o. CCED, # 22/23, Sudarshan Complex, Sheshadri Road, B’lore-560 009
Name of Works: Dam safety works of VARAHI HYDRO ELECTRIC PROJECT.
SL. No.
File No. SUBJECT
Opening Date
of File
Closing Date of
File / Running
Date of Transfer of File and
Authority whom Transferred
Nature of File
Permanent/ Temporary
REMARKS
File
1 CD/VHEP/FLOW/MANI DAM Inflow & Out flow details sheets of Mani dam 12/2004 12/2009 Permanent
2 CD/VHEP/FLOW/Pickup dam Inflow & Out flow details sheets of Pick up dam 12/2004 12/2009 Permanent
1(A) CD/VHEP/FLOW/MANI DAM Inflow & Out flow details sheets of Mani dam
04/2010 10/2011 Permanent
2(A) CD/VHEP/FLOW/Pickup dam Inflow & Out flow details sheets of Pick up dam
04/2010 10/2011 Permanent
3 CD/VHEP/Chakra Scheme General correspondence- CHAKRA scheme
12/2004 Running File Permanent
4 CD/VHEP/Chakra Scheme Installation of SPPs at Chakra/Helical fore bay Dam
01/2003 Running File Permanent
5 CD/VHEP/Chakra Scheme Instrumentation Readings of Chakra/Savehakulu dams 08/2005 Running File Permanent
6 CD/VHEP/Chakra Scheme Seepage report of Savehakulu dam 07/1997 08-2001 Permanent 7 CD/VHEP/Seep/Mani dam Seepage report of Mani dam 2002 2005 Permanent 8 CD/VHEP/FLOW/MANI DAM Inflow & Out flow details sheets of Mani
dam 1989 1998 Permanent
9 CD/VHEP/KERS/DSRP Correspondence with KERS & DSRP Departments 10/2005
11/2006 Permanent
10 CD/VHEP/Kyrgunda/DC Kyragunda draft channel Repair 2/1994 07/1994 Permanent 11 CD/VHEP/Air & water/MANI
DAM Air/Water/Temp & pendulum readings of Mani dam 07/1988 09/1998 Permanent
12 CD/VHEP/Air & water/MANI DAM
Air/Water/Temp & pendulum readings of Mani dam 09/1998 10/2005 Permanent
13 CD/VHEP/Seep/Mani dam Seepage report of Mani dam 12/1999 03/2002 Permanent
14 CD/VHEP/Ch ann./Mani dam Chemical Analysis of Water Mani dam 10/1996 04/2007 Permanent
15 CD/VHEP/Ch ann/Pi up dam Chemical Analysis of Water Pick up dam 09/1995 06/2006 Permanent
16 CD/VHEP/KERS/DSRP Correspondence with KERS & DSRP Departments
08/2005 06/2006 Permanent
17 CD/VHEP/Co water /Mani dam
Core water level Readings Mani dam 05/1992 10/2005 Permanent
18 CD/VHEP/Seep/Mani dam Seepage reports of Mani dam 01.2006 12/2008 Permanent
19 CD/VHEP/Under water/Mani dam
Under water Seepage Plugging – Mani
dam U/S 10/2000 Running File
20 CD/VHEP/Ins-Read/Pi up dam Instrumentation Readings Pick up Dam 04/2005 07/2007 Permanent
21 CD/VHEP/Seep-Read/Pi up dam
Seepage Readings – Pickup Dam 02/2006 09/2007 Permanent
22 CD/VHEP/Ins-Read/Md-Pi up
dam
Instrumentation Readings Mani dam & Pick up Dam 01/2006 12/2006 Permanent
23 CD/VHEP/Ins-Read/Md-Pi up
dam
Instrumentation Readings Mani dam & Pick up Dam 01/2007 12/2007 Permanent
24 CD/VHEP/Ins-Read/Md-Pi up
dam
Instrumentation Readings Mani dam & Pick up Dam 01/2008 12/2008 Permanent
25 CD/VHEP/Ins-Read/Md-Pi up
dam
Instrumentation Readings Mani dam & Pick up Dam 01/2009 12/2009 Permanent
26 CD/VHEP/Ins-Read/Md-Pick
up dam
Instrumentation Readings Mani dam & Pick up Dam 01/2010 Running File Permanent
27 CD/VHEP/Seep/Mani dam Seepage reports of Mani dam 01/2009 Running File
28 CD/VHEP/Flood zone Marking
VHEP – Flood Zone Marking 10/2006 Running File
29 CD/VHEP/Under water/Mani dam
Under water Seepage Plugging – Mani
dam U/S 08/1997 10/2000 Permanent
30 CD/VHEP/Seep/ Mani dam Seepage reports of Mani dam 1990 1999 Permanent
31 CD/VHEP/A4 -draw/Mani dam A-4 drawings of Instrumentation Mani dam Permanent
32 CD/VHEP/Dr holes/Mani dam Drilling of blocked foundation holes -- Mani dam
10/2007 Running File Permanent
33 CD/VHEP/KERS/DSRP Correspondence with KERS & DSRP Departments
2007 Running File
34 CD/VHEP/Chakra Scheme Sampekatte To Kodachadri Road-By KRDCL
06/2008 Running File
35 CD/VHEP/Ch ann/Mani dam Chemical Analysis of Water Mani dam 11/2007 Running File
36 CD/VHEP/G C /Mani dam VHEP – General Correspondence 03/2008 Running File
37 CD/VHEP/Met Report /Mani dam
Metrological reports – Mani dams 02/2006 Running File
38 CD/VHEP/EQ ins /Mani dam Fixing of earth quake measurement Instrument at Mani Dam
2009 Running File
39 CD/VHEP/Ins-Read/Md-Pi up
dam
Instrumentation Readings Mani dam & Pick up Dam 01/1995 11/2005 Permanent
40 CD/VHEP/Chakra Scheme EPT & SPP readings- Chakra dam 01/1999 04/2005 Permanent
41 CD/VHEP/Chakra Scheme EPT & SPP readings- Chakra dam 10/1986 12/1998 Permanent
42 CD/VHEP/KERS/DSRP Check list Correspondence 06/1993 08/1994 Permanent
43 CD/VHEP/Pi up dam Inflow details 1992 1993 Permanent
44 CD/VHEP/Chakra Scheme Precision Survey – Chakra dam 02/1990 Permanent
45 CD/VHEP/Chakra Scheme Daily seepage data 06/2000 11/2004 Permanent
46 CD/VHEP/Chakra Scheme/ Sav dam
Hydraulic data’s 06/2000 10/2000 Permanent
47 CD/VHEP/Chakra Scheme/ Sav dam
V-Notch readings- Savehakulu dam 06/2000 10/2000 Permanent
48 CD/VHEP/Chakra Scheme/ Sav dam
Instrumentation analysis- Sav dam 08/1986 1992 Permanent
49 CD/VHEP/Chakra Scheme/ Chakra dam
General Correspondence—Chakra dam 01/1989 12/1996 Permanent
50 CD/VHEP/Chakra Scheme/ Sav dam
Instruments reading- Savehkulu dam 08/1986 10/1990 Permanent
51 CD/VHEP/Chakra Scheme/ Sav dam
Daily seepage detas – Savehakulu dam 06/1994 07/1997 Permanent
52 CD/VHEP/Chakra Scheme/ Sav dam
Daily seepage data’s – Savehakulu dam 08/1997 10/1999 Permanent
53 CD/VHEP/Chakra Scheme/ Chakra dam
Graphs & instrumentation readings – Chakra dam
1995 Permanent
54 CD/VHEP/Chakra Scheme/ Chakra dam
Daily seepage data’s- Chakra dam 07/1995 07/1997 Permanent
55 CD/VHEP/Chakra Scheme/ Sav dam
Instrumentation readings savehukulu dam 01/1991 11/2007 Permanent
56 CD/VHEP/Chakra Scheme/ Sav dam
Instrumentation readings savehukulu dam 08/1986 10/1990 Permanent
57 CD/VHEP/Chakra Scheme/ Chakra dam
Daily seepage data’s- Chakra dam 07/1997 11/1999 Permanent
58 CD/VHEP/Chakra Scheme/ seepage data’s- Chakra dam 01/1987 08/2005 Permanent
Chakra
59 CD/VHEP/Chakra Scheme/ Chakra dam
Graphs & Instrumentation readings 1884 Permanent
60 CD/VHEP/Mani dam Instrument readings 1/1992 12/1992 Permanent
61 CD/VHEP/Mani dam Shifting of Junction boxes of Instruments 1990 1993 Permanent
62 CD/VHEP/Mani dam Silt collection in the Mani dam 02/1994 11/2004 Permanent
63 CD/VHEP/Mani dam Instrumentation of dams 1990 1996 Permanent
64 CD/VHEP/Mani dam Earth pressure cells Mani dams 07/1994 03/1998 Permanent
65 CD/VHEP/Mani dam Seepage Abstract report – Mani dam 01/1994 07/2005 Permanent
66 CD/VHEP/Mani dam Seepage report – mani dam 01/1996 01/1997 Permanent
67 CD/VHEP/Hu Fo Bay dam Instrumentation report – Hulical fore bay dam
1992 1993 Permanent
68 CD/VHEP/Mani dam Rock deformation reading Mani dam 1983 1991 Permanent
69 CD/VHEP/Mani dam EPT Readings – Mani dam 1988 01/2001 Permanent
70 CD/VHEP/Mani dam Up lift pressure cells Readings – Mani dam 01/1995 10/2005 Permanent
71 CD/VHEP/UGPH Instrumentation readings - UGPH 10/1996 02/2004 Permanent
72 CD/VHEP/Mani dam Metrological details Mani dam 06/2000 02/2005 Permanent
73 CD/VHEP/Mani dam Metrological details Mani dam 06/1998 06/2000 Permanent
74 CD/VHEP/Mani dam Seepage details – Mani dam 1992 1993 Permanent
75 CD/VHEP/Mani dam Hydrological details – Mani dam 11/1990 12/1991 Permanent
76 CD/VHEP/Dam safety Dam safety Correspondence 1995 04/2004 Permanent
76a CD/VHEP/Mani dam Daily seepage report – Mani dam 06/1995 12/1996 Permanent
77 CD/VHEP/Mani dam Correspondence file – Mani dam 01/1993 12/1994 Permanent
78 CD/VHEP/Pickup dam Inflow details – Pickup dam 1994 06/1995 Permanent
79 CD/VHEP/Mani dam Daily seepage sheets – Mani dam 01/1997 12/1998 Permanent
80 CD/VHEP/Mani dam Daily seepage sheets – Mani dam 06/1998 06/2000 Permanent
81 CD/VHEP/Mani dam Daily seepage sheets – Mani dam 06/2000 09/2001 Permanent
82 CD/VHEP/Mani dam Hydro & metrological readings Mani dam 11/1995 12/1998 Permanent
83 CD/VHEP/Mani dam Hydrological data – Mani dam 1/1992 12/1994 Permanent
84 CD/VHEP/Inst Man Instrumentation Manuals of Dams Permanent
85 CD/VHEP/Mani dam Instrumentation Readings 10/1986 12/1992 Permanent
86 CD/VHEP/Mani dam Seepage Readings – Mani dam 7/1990 04/1991 Permanent
87 CD/VHEP/Pick up dam Correspondence File – Pickup dam 02/1992 10/1999 Permanent
88 CD/VHEP/Mani dam Correspondence File – Pickup dam 01/1992 12/1993 Permanent
89 CD/VHEP/Pick up dam Instrumentation Readings – Pick up dam 07/1991 12/1995 Permanent
90 CD/VHEP/Mani dam Meteorological details – Mani dam 08/1998 01/2005 Permanent
91 CD/VHEP/Pick up dam Monthly Statements on Hydrology - Pickup dam
05/1992 04/2004 Permanent
92 CD/VHEP/Pick up dam Daily seepage data’s – Pick up dam 5/2000 06/2001 Permanent
93 CD/VHEP/Mani dam Seepage details – Mani dam 07/1993 08/1999 Permanent
94 CD/VHEP/Pickup dam Daily seepage sheets – Pickup dam 06/2001 10/2001 Permanent
95 CD/VHEP/ Pickup dam Daily seepage sheets – Pickup dam 06/1995 12/1996 Permanent
96 CD/VHEP/ Pickup dam Daily seepage sheets – Pickup dam 01/1997 12/1998 Permanent
97 CD/VHEP/ Pickup dam Thermometer Readings – Pickup dam 04/1989 08/1992 Permanent
98 CD/VHEP/ Pickup dam Joint meter Readings – Pickup dams 02/1987 02/1989 Permanent
99 CD/VHEP/ Pickup dam Pore Pressure Readings – Pickup dam 02/1987 03/1989 Permanent
100 CD/VHEP/ Pickup dam Rock Deformation Readings – Pickup dam 1983 1984 Permanent
101 CD/VHEP/Mani dam/Hos sad Instrumentation reading file of Hosur saddle dam
08/1987 06/1991 Permanent
102 CD/VHEP/Pickup dam/Saddles
Instrumentation readings of Pick up saddles
12/1986 11/1989 Permanent
103 CD/VHEP/ kalasasi Halla
Repairs to kalasasi Halla Chute/weir
09/2010 Running file Permanent
104 Cd/KHADRA Overhead tank at Khadra-RH Center 09/2010 Running file Permanent
105 CD/VHEP/Mani & Chakra dams
Surface settlement monuments at Mani & Chakra dams
09/2010 Running file Permanent
106 CD/VHEP dams Piezometer Readings of Chakra,Savehakkalu Hulical forebay and Hosur Dams
04/2010 Running file Permanent
107 CD/RTPS/Workshop Construction of store cum Workshop for H T motors-RTPS
02/2011 Running file Permanent
108 CD/VHEP/Pickup dam Revising MDDL at Varahi Pickup dam 04/2010 Running file Permanent
109 CD/VHEP/Dam safety Dam Safety including Pre & Post-monsoon correspondence
06/2010 Running file Permanent
110 CD/BT-TS/PKG-1/A2
BTPS: A2 Type Buildings Approved Drawings
04/2012 Running file Permanent
111 CD/BT-TS/PKG-1/A2 BTPS: A2 Type Buildings to be Approved Drawings
04/2012 Running file Permanent
112 CD/BT-TS/PKG-1/A2 BTPS: A2 Type Buildings Design Documents
04/2012 Running file Permanent
113 CD/BT-TS/PKG-1/NCGH BTPS: NCGH Approved Drawings 12/2011 Running file Permanent
114 CD/BT-TS/PKG-1/NCGH BTPS: NCGH to be Approved Drawings 12/2011 Running file Permanent
115 CD/BT-TS/PKG-1/NCGH BTPS: NCGH Design Documents 12/2011 Running file Permanent
116 CD/Office Bldg/A’nagar Construction of office Complex at Ambikanagar
04/2012 Running file Permanent
117 CD/RTPS/Office Building RTPS: Construction of permanent office building for CHP-II & CHP-E sub divisions
12/2011 Running file Permanent
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4[1 )a OF THE RIGHT TO INFORMATION ACT 2005
Name of the Office : CCED /SE CD-4
Address : O/o. CE [Civil Designs], # 22/23, Sudarshan Complex,Sheshadri Road, B’lore-560 009
NAME OF WORK: CONSTRUCTION OF NDCT UNIT-8 AT RTPS & DESIGN WORKS.
SL. No.
File No. SUBJECT
Opening Date
of File
Closing Date of File /
Running File
Date of Transfer of File and
Authority whom Transferred
Nature of File
Permanent/ Temporary
REMARKS
1 CD/RTPS/U-8 Works
RTPS Unit-8 NDCT Works Correspondence with M/s
NBCC
2006 Running Files Permanent Six Volumes
2 CD/RTPS/U-8 Works
RTPS Unit-8 NDCT Works Approved Drawings
2006 Running Files Permanent One Volume
3 CD/RTPS/U-8 Works
RTPS Cooling tower Unit-8 Performance
guarantee test
07/2010 Running Files Permanent
4 CD/ T-Beam Bridge
Design of T-beam bridge for power channel b/w
Linganamakki & Talakalale Reservoir at bidrur
03/2011 Running Files Permanent
5 CD/Foot Bridge Malali Foot Bridge near mastikatte
11/2010 Running Files Permanent
6 CD/ Office Complex
Office complex at Hosangadi
03/2011 Running Files Permanent
KARNATAKA POWER CORPORATION LIMITED
List of Files and Records Under Section 4 (1) (a) of the Right to Information Act 2005
Name of the Office: CCED /SE CD-4
Address : No.22/23, 1ST FLOOR, SUDARSHAN COMPLEX, BANGALORE-560 009.
Subject : Schedule of Rates & CSR Works.
Sl. No.
File No. / Vol No.
Subject Opening Date of
File
Closing Date of
file / Running
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent / Temporary
Remarks
1. CD/C4/SR 2011-12
SR 2011-12 Volume I & II 27.04.2010 23.06.2011 Permanent Closed
2. CD/RTPS/CSR/CW
Construction of Compound wall around Religious places & Grave yard
09.06.2010 22.07.2010 Permanent Closed
3. CD/RTPS/CSR/CW
Construction of Compound wall around Religious places & Grave yard-R1
28.07.2010 23.05.2011 Permanent Closed
4. CD/RTPS/CSR/Play Ground
Providing murrum blanket to play ground of the Govt. Higher Primary School at Edlapur
08.04.2010 07.06.2010 Permanent Closed
5. CD/RTPS/CSR/WS
CSR –Water Supply 08.04.2010 15.11.2010 Permanent Closed
6. CD/C4/BTPS/CSR
CSR-Activities-Thimmalapur 31.08.2010 22.09.2010 Permanent Closed
7. CD/C4/SR 2011-12
SR soft ware 1.10.2011
KARNATAKA POWER CORPORATION LIMITED
LIST OF FILES AND RECORDS UNDER SECTION 4[1 )a OF THE RIGHT TO INFORMATION ACT 2005
Name of the Office : CCED / SE CD-4
Address : O/o. CCED, # 22/23, Sudarshan Complex, Sheshadri Road, B’lore-560 009
Sl. No.
File No. / Vol No.
Subject Opening Date of
File
Closing Date of
file / Running
Date of Transfer of
File & Authority
whom transferred
Nature of File
Permanent / Temporary
Remarks
1 CD/C1/SR2013-14 Vol-I
Schedule of rates for the year 2013-14-correspondence file
22.04.2013 Running Temporary