11
-e Karnataka Industrial AreasDevelopment Board No.49,4* & 5* Floors, Khanija Bhavan, Race Course Road, Bangalore - 560001 No.IADB/ JD(T&P) / 608 / 2016-77 Dt. 12-4-2416 CIRCULAR Sub: Fixation of time limit for allotment of land, building construction permit and providing water supply connection to the plots allotted in KIADB Industrial Areas. -oOo- The Government of India has implemented Business Reforms Action Plan 2016 under Ease of Doing Business in order to perform public works within the stipulated time limit. The Karnataka Industrial Areas Development Board (KIADB) is acquiring lands throughout the State for development of industrial areas and allotting land to the entrepreneurs after providing all the infrastru cture faciiitie s. KIADB is approving Development plan / Building plan submitted by the Entrepreneurs for construction of building in tJle aLlotted plots. KIADB is issuing Commencement Certificate & Occupancy Certificate and also arranging water supply to the unit. The above activities will have to be completed within the stipulated time from the date of receiving applications till issue of approval letters/ Certificates to the allottees/ entrepreneurs.

Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

Embed Size (px)

Citation preview

Page 1: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

-e

Karnataka Industrial Areas Development BoardNo.49,4* & 5* Floors, Khanija Bhavan, Race Course Road, Bangalore - 560 001

No.IADB/ JD(T&P) / 608 / 2016-77Dt. 12-4-2416

CIRCULAR

Sub: Fixation of time limit for allotment of land,building construction permit and providing

water supply connection to the plots allotted in

KIADB Industrial Areas.

-oOo-

The Government of India has implemented Business Reforms Action

Plan 2016 under Ease of Doing Business in order to perform public works

within the stipulated time limit.

The Karnataka Industrial Areas Development Board (KIADB) is

acquiring lands throughout the State for development of industrial areas

and allotting land to the entrepreneurs after providing all the

infrastru cture faciiitie s.

KIADB is approving Development plan / Building plan submitted by

the Entrepreneurs for construction of building in tJle aLlotted plots. KIADB

is issuing Commencement Certificate & Occupancy Certificate and also

arranging water supply to the unit.

The above activities will have to be completed within the stipulated

time from the date of receiving applications till issue of approval letters/

Certificates to the allottees/ entrepreneurs.

Page 2: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

: : 2 : :

The time limit stipulated for each activity is as detailed below:

sl.No

Details Time limit

1 . Allotment of Plot

a. Initial Deposit along with theapplication (3Oo/o / 2Qo/' / LA% ofthe Land Cost)

30 days from the dateof communication.

b . 7Oo ,80% & 9Oo/o of land cost Within 90/ 1s0/ 180days from the date ofallotment letter.

c . Obtaining Possession Certificate One month from thedate of issue ofconfirmatory letter ofallotment

d Execution of Lease cum saleagreement /Lease deed

One month from thedate of PossessionCertificate.

e . Approval for Development PlanlBuilding Plan.

Six months from thedate of execution ofLease cnm saleagreement /Leasedeed .

f. Completion of construction ofbuilding, installation ofmachinery and commencementof production

36160 months fromthe date of PossessionCertificate

Page 3: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

: : 3 : :

2 . Construction of Building

From the date of friing application

{*ith al1 relevant documents/NoObiection Certificates)a. Approval of Development planl

Building plan.45 days

b , Issue of Commencementcertificate

30 days

Issue of Occupancy certificate 3O days

? Water Supply conneetion

From the date of application (with a-11relevant documents/No ObjectionCertificates)

45 days

All the Development Officers are directed to strictiy adhere to the

stipulated time limit for the above activities. Any lapses in performing t}-e

above duties will be viewed seriously and disciplinary action will be

initiated against erred officers.

sd/-Chief Executive Officerand Executive Member

To1. Chief Development Officer & Chief Engineer, KiADB, Bengaluru.

2. Joint Director (T. & C. P), KIADB, Bengaluru.

3. All Development Officers and Executive Engineers, KIADB Zonal

Offices.4. Technical Assistant-l & II, KIADB, Bangalore

5. All Deputy Development Officers & Assistant Executive Engineers,

KIADB, ZonaT offices.

6. All Assistant Secretaries, KIADB, Head office and Zonal. offices.

Page 4: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

: : 4 : :Copy to:

1. The Additional Chief Secretary to Govt., Commerce and IndustriesDepartment, Vikasa Soudha, Bengaluru : for kind information.

2. Trle Commissioner for iD, Industries and Commerce Dept., KhanijaBhavan, Bengaluru : for kind information.

Page 5: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*
Page 6: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*
Page 7: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*
Page 8: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*
Page 9: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

Time Line / Schedule for Approval of Development plan/ Building plan:

Events Time Scheduled A. Submission of the Application by the

Applicant in the Zonal Office, KIADB.

I. The proposal with an extent of plot.

For Development plan approval: <5acres (Non Residential/Industrial),

<3acres (Residential)

Building Plan approval: Height of building<G+3 or 15m.

i. Scrutiny of Documents & NOC’s by the

Assistant Engineer.

ii. Inspection Letter to Applicant for

Inspection of site.

iii. Site Inspection by the DO along with

DDO & AE.

iv. Uploading of Site Inspection report.

v. Verification of drawing/plans by AE

and forwarding with opinion to DDO.

vi. Verification by DDO and forwarding

with recommendation for Approval to

DO.

vii. Approval by DO.

5 Working Days

2 Working Days

7 Working Days

2 Working Days 5 Working Days 5 Working Days

3-4 Working Days

Page 10: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

II. The proposal with an extent of plot.

For Development plan approval: >5acres (Non Residential/Industrial), >3acres (Residential)

For Building Plan approval: Height of building> G+3 or 15m.

i. Scrutiny of Documents & NOC’s by the

Assistant Engineer.

ii. Inspection Letter to Applicant for

Inspection of site.

iii. Site Inspection by the DO along with DDO & AE.

iv. Uploading of Site Inspection report.

v. Verification of drawing/plans by AE and

forwarding with opinion to DDO.

vi. Verification by DDO and forwarding with

opinion to DO.

vii. Verification by DO and sends to Head

Office (CDO&CE) with recommendation along with site inspection report,

Documents/NOC’s for approval.

viii. Scrutiny by Caseworker and sends with

opinion to JD(T&P)

ix. JD(T&P) Verifies and sends with

recommendation for approval to CDO&CE

x. CDO&CE Accords in principle approval and sends back for further process to DO

section.

xi. Accords approval by DO.

3 Working Days 7 Working Days

2 Working Days 2 Working Days 4 Working Days 4 Working Days 5 Working Days 3 Working Days 4 Working Days

7 Working Days 4 Working Days

Page 11: Karnataka Industrial Areas Development Board - kiadb.inkiadb.in/wp-content/uploads/2017/01/Circular_on_Timeline.pdf · -e Karnataka Industrial Areas Development Board No.49,4* & 5*

Note:

Sl No.

Details

Total Time Limit for approval

Building Plan/Development Plan

1. The proposal with an extent of plot.

For Development plan: <5acres (Non-Residential/Industrial),

<3acres (Residential)

For Building Plan approval: Height of building <G+3 or 15m.

30 Days

2. The proposal with an extent of plot.

For Development plan: >5acres (Non-Residential/Industrial),

>3acres (Residential)

For Building Plan approval: Height of building >G+3 or 15m.

45 Days