Upload
georgina-page
View
252
Download
2
Tags:
Embed Size (px)
Citation preview
Kanban and pull-based manufacturing
Lean manufacturing execution
Costing for Lean manufacturingCost calculation without route
Planning /scheduling
Productionschedules
Scheduledkanbans
Kanban schedulingboard
Event kanbans
Period templates
Kanban and pull-based execution
Manufacturing without PO
Bar codes
Organization
Production flow
Work cells / resource groups
Manufacturingkanbans
Enhanced forecast scheduling
Withdrawalkanbans
Kanban boardfor process
Kanban inventory overview
Cycle time performance indicator
Subcontractingkanbans
Value stream operating unit
Activities
Printing(kanban cards, picking lists)
LocationsFinancial dimensions
Supplyschedule form
Capable to promise (CTP)
Kanban quantity calculation
Kanban inventory integration
Lean manufacturing
Backflush costing
Lean manufacturing execution
Multi-activity kanbans – Kanban flows
Integration in master planning (mixed mode)• Full visibility of kanban schedule to master planning
• Supply schedule overview
• Capable to promise (CTP) based on explosion and work cell schedule
Visual user interfaces• Kanban boards – Scheduling, process, transfer
• Kanban quantity overviews
• Cycle time performance indicator
• Bar code support
Unified kanban architecture
Replenishment strategies
5
Kanban board for process jobs
• Job list / sequence
• Job details• Instructions• Picking list• Pegged jobs
(upstream)• Bar code
mode• Bar code
input• Finished
goods overview
• Material overview
© 2011 Microsoft Corporation. All rights reserved. Microsoft, Microsoft Dynamics, and the Microsoft Dynamics logo are trademarks of the Microsoft group of companies. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this
presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft
cannot guarantee the accuracy of any information provided after the date of this presentation.
MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.
CCAX2012BV075