KADUNA STATE GOVERNMENT
MINISTRY FOR LOCAL GOVERNMENT AFFAIRS
SECTOR IMPLEMENTATION PLAN (SIP)
GOVERNANCE SECTOR
2017 – 2019
FORWORD
The Ministry for Local Government and Chieftaincy Affairs (MLG&CA) in compliance
with the policy directive of the Kaduna State Government, elected on popular mandate
by the teeming electorate aspiring for sustainable change to restore the main purposes
of Governance, which includes service provision, a prudent management of human
resources and guaranteeing peace, orderliness and security of lives and properties,
developed its Sector Implementation Plan (SIP) to be able to provide functions and
essentials services in line with the State Development Plan (SDP). The SIP has been
drawn bearing in mind the mandate of the Ministry; amongst others include coordinating
the activities of the 23 Local Government Areas and 32 Emirates and Chiefdoms in the
State and related agencies involved in Local Government Administration. The Ministry
for Local Government also proposes and implements policies towards enhancement
and maintenance of Law and Order, as well as the well being of the various
communities in the 23 Local Government Areas of the State. The aim of the Ministry in
this respect is to raise a formidable Local Governments and Traditional Institutions
administrative systems with qualitative, political and administrative machinery that is
highly disciplined, prudent in resource management and guarantor of societal security.
The Ministry’s SIP is outlined to achieve enhancement of transparent, inclusive
Governance, improved service delivery, development of accountability and transparent
Government institutions at all levels and the restoration of public sector to provide
effective and efficient services. For this plan to succeed, the focus of the Ministry will be
to implement to the fullest by ensuring that it is achievable and within the resources
available for the Local Government. All efforts towards infrastructure and service
delivery will be carried out in an effective manner to avoid wastages.
The Ministry for Local Governments will ensure the use of professionalism and quality
leadership in the conduct of public service, by providing good leadership and ensure
discipline in the implementation of the plan, with all stakeholders expected to
demonstrate support in the conduct of the business of Local Government administration
and Traditional Institutions.
The plan will require partnership with other sectors of Government, especially in the
area of legislation, implementation, monitoring and the cooperation of Local
Government Councils for effective service delivery.
MUHAMMAD BASHIR SA’IDU
Hon. Commissioner
Table of Contents
Table of Contents ........................................................................................................................................ 4
Annexes ........................................................................................................................................................ 6
Acknowledgements ..................................................................................................................................... 7
Table of Acronyms ...................................................................................................................................... 8
Executive Summary .................................................................................................................................... 9
Chapter One: Introduction ............................................................................................................... 10
1.1 Introduction ................................................................................................................................ 10
1.2 Summary of the Process Used for the SIP Development .................................................. 11
1.3 Summary of the sector’s Programmes, Outcomes and Related Expenditures .
..................................................................................................................................................... 13
1.4 Structure of the SIP Document ............................................................................................... 14
Chapter Two: The Sector and Policy in the State ........................................................................ 15
2.1 Overview of the Sector’s Institutional Structure ................................................................... 15
2.3 Sector Policy .............................................................................................................................. 18
2.4 Statement of the Sector’s Mission, Vision and Core Values. ............................................. 18
2.5 The sector’s Objectives, Programmes and Outcomes for the SIP Period ....................... 19
2.6 Developing sector objectives, programmes and programmes’ outcomes ............................ 20
Chapter Three: Development of Sector Strategy .................................................................. 21
3.1 Outline of Major Strategic Challenges Facing the Sector ...................................... 21
3.2 Strategic Responses to the Challenges ........................................................................ 21
3.3 Personnel Number and Costs: Existing and Projected ............................................... 21
3.4 Total Overhead Cost: Existing and Projected ................................................................ 21
3.5 Sector’s Strategy Priorities .................................................................................................... 22
3.6 Detailed Sector Strategies (the Logframe)............................................................................ 23
3.8 Responsibilities and Operational Plan ................................................................................... 47
Chapter Four: Expenditure Projection Process and Capital – Recurrent Expenditures
Comparison ..................................................................................................................................... 48
4.1 The process used to make Expenditure Projections ........................................................... 48
4.2 Capital – Recurrent Expenditures Comparison .................................................................... 48
Chapter Five: Annual Performance Review and Monitoring and Evaluation............................ 49
5.1 Conducting Annual Sector Review ......................................................................................... 49
5.2 Monitoring and Evaluation of the SIP .................................................................................... 49
5.3 Completing Sector Performance Management Framework (PMF) ........................................ 50
Annexes
Table of Acronyms
Table 1: Programmes, Outcomes and Cost/Expenditures
Fig 1: Organogram of the Ministry
Fig 2: Sector’s Workforce
Table 2: Summary of Sector Objectives, Programmes and Outcome Deliverables
Table 3: Personnel Number and Costs: Existing and Projected
Table 4: Overhead Cost: Existing and Projected
Table 5: Summary of Projects’ Expenditure and Output Measures
Table 6: Capital Recurrent Expenditure Comparison
Table 7: Sector Performance Management Framework
Acknowledgements
The Development of this Sector Implementation Plan for the Ministry for Local Government would not have been possible without the efforts of the Ministerial Steering Committee (SPT) that deserves commendation. In this respect I wish to express my most profound and sincere appreciation to the Governor of the State, Mal. Nasir Ahmed El-Rufai, for his visionary leadership stance and total commitment to positive change for suitable development through adequate planning. Similarly, appreciation must also go to the Honourable Commissioner for Local Government, Alh. Mohammed Bashir Saidu, for his benevolence guidance and support throughout the process. He was firm and upright to ensure that a sound and all inclusive SIP is produced in line with the Ministry’s mandate. It is a fact known that previous administrations have produced development plans. However, none has developed a plan on sectoral basis. It is my believe that this document will be used as a guide for effective service delivery and will impact positively on Local Government Administration in the State. The role of the Ministry for Budget and Planning (MoBP) who provided support throughout the process must be acknowledged. To produce this document, contributions were received from all departments of the Ministry and for this, I acknowledge the management and staff of Ministry for Local Government for their institutional knowledge and commitment, which was critical to the entire process and remains much appreciated. Lets make Kaduna Great Again!
IBRAHIM SAMBO mni PERMANENT SECRETARY
MINISTRY FOR LOCAL GOVERNMENT AND CHIEFTAINCY AFFAIRS, KADUNA.
Table of Acronyms List and define all the acronyms used in the SIP document. Ensure alphabetical listing of the acronyms for ease of reference
Acronym Definition
BCC Budget Call Circular
MoBP Ministry of Budget and Planning
SIP Sector Implementation Plan
MLG Ministry for Local Government
KSDP Kaduna State Development Plan
LGA Local Government Area
LGC Local Government Council
LGEA Local Government Education Authority
KDSCC Kaduna State Council of Chiefs
ALGON Association of Local Governments of Nigeria
BPRS Budget Planning Research and statistics
J A ,A C. Joint Account Allocation Committee
C.A. Chieftaincy Affairs.
B.M. Boundary Matter
M&E Monitoring and Evaluation
PRS Planning, Research and Statistics
SDP Sector Development Plan
9
Executive Summary The SIP document came about as a child of necessity due to wastage of resources
experienced overtime. The Government of the day, driven by the change mantra found it
much desirous to ensure that Government spending is effective, efficient and value driven.
To achieve, this, the State Development Plan (SDP) was produced and thereafter the
Sector Development Plan was conceived as a working document for its sector for the use of
the State. However, the document is clearly spell out the process through which strategies,
policies are prioritize in carrying out Government’s projects/programmes and also to reform
the Local Government for improved service delivery and strengthening the capacity of Local
Government staff for improved performance at various spheres including Internal Revenue
Generation.
This document (SIP) is the product of a vigorous and extensive training of the SPT and their
subsequent dedication and commitment for the document to be a reality. The major
stakeholders i.e. Local Governments’ political and administrative machinery, the Traditional
Council and of course the general populace, stand to achieve value for money
programmes/projects earmarked in the document.
In this regards, the 2017 – 2019 planning period will receive a major impact in terms of
programme/project outputs, which will be geared towards specified outcomes based on
actual projected ceiling devoid of unnecessary wastage associated with public expenditure
of yester years.
The Machinery of Monitoring and Evaluation (M&E) in the Planning, Research and Statistics
(PRS) units of the Ministry has been re-structured, re-defined and re-organized to functions
under the direct supervision of the Hon. Commissioner with a view to pursue the plan to its
logical conclusion.
The SIP document if implemented will set a new dawn for successes in Government
expenditure by ensuring that every kobo spent is effectively directed to a specified target
group, it will as well re-store the public confidence on those in power and at the same time
propel growth and sustainable development. The document will enable for the effective
implementation of the SIP as it relates to Local Government Administration and Traditional
Institutions in the States, and also enable Government expenditure to reflect Government’s
priorities for the development of Local Government Areas and Traditional Institutions in the
State.
10
Chapter One: Introduction
1.1 Introduction The production of Sector Implementation Plan (SIP) has become very necessary as it is meant to guide the execution of projects/programmes that will bring about a holistic economic development of the state in all sectors. The motivation that brought about the development of the SIP include:
➢ Providing policy direction and guidelines for all sectors of the state’s economy ➢ Helping all sectors in keying into the vision enshrined in the Kaduna State
Development Plan(2016-2020) while taking cognizance of the dwindling oil revenue, decrease of monthly allocation to states and the economic situation of the world
➢ Enabling each sector to prioritize its overall projects/programmes and be able to come up with a realistic budget that will recognize value for money
➢ It will serve as a means of direction to the citizens of the State on what the Government intends to carry out as its developmental projects/programmes over the next four years.
➢ It will also serve as a means of involving the private sectors players to contribute their own quota in moving the overall state’s economy forward
Objectives of the SIP document:
i) The SIP documents represents a process through which strategies, policies are prioritized in carrying out Government projects/programmes.
ii) Reform of the Local Governments to improve service delivery. iii) Strengthening the capacity of Local Governments for improved performance in
various spheres including Internal Revenue Generation. iv) Development of Traditional Institutions in Kaduna State. v) Enhancement of security at grassroots through Traditional Institutions.
Other specific of the SIP Document includes:
i) To enable the effective implementation of the State Development Plan as it relates to the Local Government Administration and Traditional Institutions in the State.
ii) To enable Government’s expenditure to reflects Government’s priorities for the Development of Local Government Areas and Traditional Institutions in the State.
The Importance of SIP:
i) Promotes transparency probity and accountability in Government’s expenditures. ii) Provide clear understanding of Government’s policies priorities and goals as
contained in State Development Plan.
11
1.2 Summary of the Process Used for the SIP Development
The process for developing this SIP document involves translating the long-term
policies of Kaduna State government as articulated in the State Development Plan
(SDP) and other national policy document
into medium term goals and outcomes. The
State Development Plan reflects the state
government’s desire to restore Kaduna
State to its lost glory through a planned,
orderly and coherent development of the
state. The goal is to achieve inclusive
economic growth and socio-economic
transformation of the state that translates
into substantial improvements in the quality
of lives of Kaduna citizens, through higher
productivity and competitiveness.
This SIP documents sets out linkages between the Ministry of Rural and Community
Development sector’s activities and the long-term development goals of the
government, as articulated in the SDP, over the period 2017 – 2019 within the limits of
available resources. It also sets out well-defined programmes, outputs and outcomes of
the sector as well as means by which the performance of the sector will be measured
and evaluated. The SIP will form the basis for the preparation of the Sector’s annual budget.
The SIP development process in the Ministry for Local Government started with the
inauguration of the Sector Planning Committee (SPT) by the Hon. Commissioner with
the following membership:
▪ Muh’d Bashir Saidu
Hon. Commissioner - Chairman
▪ Ibrahim Sambo mni
Permanent Secretary - Dep. Chairman
▪ Hassan Junaid
Dep. Director, Admin & Supply - Member
▪ Moh’d Amin Yahaya
Asst. Director, Inspectorate - Member
12
▪ Mal. Dauda Shehu
Asst. Director, Finance & Accounts - Member
▪ Mr. J. J. Bitiyong
Director, Budget and Planning - Secretary
The Committee was mandated to co-opt the following:
▪ Saleh Adamu - Asst. Chief Local Govt. Officer
▪ Sani Galadima - Asst. Chief Executive Officer
▪ Musa Jaja - Prin. Admin. Officer
▪ Dinah M. Duniya (Mrs)- Prin. Executive Officer (I) Acct.
▪ Murtala Yahaya - Prin. Executive Officer II (Gen)
▪ Paul Augustine - Computer Operator (PRS)
• Upon receipt of a Circular from MoBP in respect of the SIP, a meeting was convened by the Permanent Secretary on behalf of the Honourable Commissioner and a committee was set up headed by the Director PRS to study the documents and produce an up-to-date SIP.
• Members of the Committee otherwise known as Sector Planning Team (SPT) were drawn from all departments of the Ministry (Admin and Finance, Inspectorate, Boundary and Chieftaincy Matters).
• The Committee made contacts with the MoBP in order to obtain relevant documents and information to guide the process.
• The DPRS (Chairman of the Steering Committee) and other members of the Committee attended a training workshop in respect of the SIP.
• On return from the workshop, other members of the Committee were briefed on all that transpired at the workshop.
• The Honourable Commissioner/Permanent Secretary encouraged the Committee to take the assignment seriously and also assured them of their full support in producing a workable document for the Ministry.
Weaknesses:
• Inadequate involvement of external stakeholders.
• Insufficient time given to prepare the SIP.
• Inadequate data and lack of a data bank to access adequate information.
13
1.3 Summary of the sector’s Programmes, Outcomes and Related Expenditures Table 1: Programmes, outcomes and cost/expenditures
Programme Outcome Budgeted Expenditure
2017 2018 2019
1.1 Coordination and Establishment of Traditional Institutions in the State.
Improved security and peaceful co-existence.
1.2 Capacity Building Improved capacity of Traditional Institutions.
1.3 Construction/Rehab. of Traditional Rulers Palaces
Provision of conducive and befitting Palaces
1.4 Construction / renovation of offices within the Ministry
Enhanced service delivery
1.5 Conduct inspection on Local Government books of account, projects and programmes
Improved efficiency in the use of LGAs resources
1.6 Coordinate the activities of Joint Accounts and Allocation Committee (JAAC)
Improved financial performance
1.7 Capacity Building Improved staff capacity.
1.8 Production of general operational guidelines for Local Government Council operation
General operational guidelines for Local council operatio produced
1.9 Strengthen of Donor Partners Forum at LGAs
Donor Partners Forum strengthened
1.10 Strengthen Executive Council on Local Government Administration.
Executive council strengthened on Local Government Administration
1.11 Monitoring & Evaluation of Local Government Internal Revenue
Improved revenue collection
1.12 Budget preparation programmes for the 23 Local Governments
Timely production of Annual 23 Local Government Budget
Total Cost
Indicative Budget Ceiling
Indicative Budget Ceiling – Total Cost
14
1.4 Structure of the SIP Document Chapter 1 - Introduction: The chapter sets out the justifications for SIP and the aims
and objectives of the SIP document; it provides a brief description of the
process used for developing the SIP; it provides a summary of the sector’s
objectives and related expenditures.
Chapter 2 - The Sector and Policy in the State: This chapter deals with the
composition (manpower) of the Ministry, the organizational structures,
functions of the departments and their limitations. As a sub-sector, it
clearly spells out the vision, mission and core value statement. The
chapter also brought out the sectors objectives, its programmes and
subsequent deliverable outcomes.
Chapter 3 - Development of Sector Strategy: Chapter Three deals with marshalling
responses to the identified challenges failing the sector with a view of
adopting these responses obtained from the KSDP, which will
subsequently meant form the basis of project expenditure and output
measures, which are contained on table 3.6 containing the sub-sectors
activities whose output are clearly spelt out on table 3.7.
Chapter 4 - Expenditure Projection Process and Capital – Recurrent Expenditures
Comparison: This Chapter is mainly meant for comparative analysis
where costs relating to Recurrent (Personnel & Overhead) and capital are
subjected to comparison places on ratio of 60:40 for capital and recurrent
respectively as a policy thrust of the present administration for the period
covering the SIP document 2017 – 2019.
Chapter 5 - Annual Performance Review and Monitoring and Evaluation: This is
solely for M&E purposes and Table 7 is dedicated to ease the task.
15
Chapter Two: The Sector and Policy in the State
2.1 Overview of the Sector’s Institutional Structure
Ministry for Local Government presently has a Commissioner, Permanent Secretary and three (3) Departments (each headed by a Director) while Planning, Monitoring and Evaluation Unit is also headed by a Director. Find below the Organizational Structure of the Ministry.
The Ministry has a total staff strength of 110 on the payroll disaggregated 79 males and 30 females in 2016. Administration and Finance has the highest number of the workforce of 56 which made up of 39nos male and 17nos females. A number of highly experienced senior members of staff are retiring/approaching retirement. In view of that, there is the need for recruitment of new staff for each of the Departments as seen below:
i) Inspectorate - 25 ii) Admin & Finance - 10 iii) Chieftaincy & Boundary - 10
The Ministry structure in terms of genders ratio ……… which is adequate, while that of the skilled staff of the Ministry requires additional 39 staff.
(Fig 1)
ORGANOGRAM OF THE MINISTRY
ESTABLISHMENT STAFF
STRENGTH
M F
COMMISSIONER
1
PERM. SEC 1
SPECIAL ASSISTANTS
2
PERSONAL/SEC. 1
AUDIT
4
PME 3
PR O
1
DIRECTORS 3
DDs/ADs
19 1
D R IVERS
5
OTHER OFFICERS 54
28
TOTAL 93
30
OVERALL TOTAL 123
GOVERNOR
COMMISSIONER
PERSONAL SECRETARY
PR O
PERMANENT SECRETARY
INTERNAL AUDITORS
PLANNING, MONITORING &
EVALUATION
SECRETARIES (2)
ADMINISTRATION
& FINANCE BOUNDARY & CHIEFTAINCY
MATTERS
LOCAL GOVT. INSPECTORATE
ADMIN .
HUMAN RESOU RCE
GENERAL ADMIN
D.D. FINANCE
& ACCOUNTS
DEPUTY DIR.
SUPERVISORS
FIRE UNIT
DEPUTY DIR.
ASST. DIRECTOR 23 LGAS
12 ZONAL OFFICES
STORES
SPECIAL ASSISTANT (2)
16
In a table, present an analysis of the sector’s workforce by institutions, department, grade levels, and gender (how many are male and how many are female). Institution: Ministry for Local Government & Chieftaincy Affairs. Fig 2:
Departments Grade Level
Gender
Male Female
Administration & Finance Department 16 2 0
15 5 0
14 4 3
13 4 2
12 5 6
10 4 1
09 4 1
08 1 2
07 4 2
06 0 0
05 2 0
04 2 0
03 2 0
Sub-Total 39 17
Inspectorate Department 16 1 0
15 4 1
14 6 0
13 4 2
12 11 4
10 7 3
09 3 1
08 0 2
Sub-Total 36 13
Chieftaincy and Boundary Department 16 1 0
15 0 0
14 1 0
13 2 0
12 0 0
10 0 0
09 0 0
08 1 0
Sub-Total 5 0
Overall Total 80 30
Staff Strength
110
17
2.2 The Current Situation in the Sector
o Admin & Finance Department: Undertake Human Resource Management and Development (General Administration, Training & Administration of Human Resource functions) Financial Management and Ministerial Accounts through Budgetary Allocation, Coordination of the activities of Development Partners/Donor Agencies, and carry out planning, monitoring and evaluation of project and programmes and facilitates annual performance review.
o Inspectorate Department: Saddled with the responsibilities of coordinating the JAAC Meeting, supervising the activities of the 23 Local Government Areas and advising the State Executive Council on Local Government Administration.
o Chieftaincy and Boundary Department: Handles all matters related to Traditional Institutions and harmonized Boundary/Land disputes within the 32 Emirate and Chiefdoms in the State.
• The provision of quality services to citizens of the State is hinged on Governance and Administration Sector. The Sector covers the activities of a number of MDAs under the executive arm of Government. The State Government’s ability to deliver quality services depends on the quality and efficiency of the institutions and processes.
• Over the years, poor financial management and planning has led to opaque, bloated budgets that failed to propel the State’s development. In additional, the weakness of legislative oversight allowed the situation whereby projects intended to benefit the poor were used as opportunities for political gain or diverted as opportunities for short-changing the electorates.
• The Civil Service is unmotivated with poor service delivery record and limited accountability to the people. The State House of Assembly is unable to execute its key functions, Local Governments are not performing to expectation, the judiciary is inadequately funded. The bureaucracy is subject to extensive patronage, making it unable to implement policies freely and fairly. This administration has, as a result committed to transparent governance and improved service delivery and specifically, reforming the public service.
• Key Challenges: o Inadequate capacity of the Inspectorate staff to effectively monitor and
evaluate local government performance. o High cost of governance which has affected the provision of service delivery
at the LGAs levels. o Poor funding of projects across all the Local Governments as captured in
the Budgets of the last five years;
ESTABLISHMENT STAFF
STRENGTH
M F
COMMISSIONER 1
PERM. SEC 1
SPECIAL ASSISTANTS 2
PERSONAL/SEC. 1
AUDIT 4
PME 3
PRO 1
DIRECTORS 3
DDs/ADs 19 1
DRIVERS 5
OTHER OFFICERS 54 28
TOTAL 93 30
OVERALL TOTAL 123
18
o Poor oversight and supervision of Local Government Councils and employees due to inadequate manpower of the Inspectorate Department of the Ministry;
• The prospect and future potentials of the Ministry for Local Government and Chieftaincy Affairs lies in its ability to steer a formidable Local Government and Traditional Institutions administrations with an effective and efficient service delivery through a qualitative political and administrative machinery, that are discipline in prudent resource management and societal security.
2.3 Sector Policy
The thrust of governance and administration policy in Kaduna State is the institution of a good governance system that is founded on a component and responsive public service with zero tolerance for corruption.
• Enhancement of transparent and inclusive governance and improved service delivery;
• Development of accountable and transparent institutions at all levels; and
• Restoration of the public service to previous high standards.
2.4 Statement of the Sector’s Mission, Vision and Core Values.
Mission:
• To promote, Supervise, Regulate, and Coordinate the activities of the 23 LGAs in the state and related agencies for Local Government Administration.
• To manage all matters including appointment / deposition of Traditional Rulers in the State.
• To advise and supervise Emirate/Traditional Councils in carrying out their duties.
• To propose policies to enhance the maintenance of Law and Order and the well-being of various communities in the State.
Vision:
• To attain a formidable Local Government and Traditional Institutions Administration with an effective and efficient service delivery through qualitative political and administrative machinery that is disciplined in prudent resource management and societal security.
Core Value: • Professionalism, Integrity, Teamwork, Accountability and Transparency.
19
2.5 The sector’s Objectives, Programmes and Outcomes for the SIP Period Table 2: Summary of Sector Objectives, Programmes and Outcome Deliverables
Sector Objective Programme Outcome Deliverable KPI of Outcome
Baseline (i.e. Value of Outcome in 2016)
Outcome Target
2017 2018 2019
To create the right organizational and decision making structure to drive achievement of expected service delivery out come at LGAs with sound fiscal prudence and organization efficiency.
Traditional institution programme
Reduced frequency of inter-communal clashes
Frequency of inter-communal crises
N/A Reduce the frequency of
inter-communal
clashes by 5%
Reduce the frequency of
inter-communal
clashes by 8%
Reduce the frequency of
inter-communal clashes by 13%
Local government monitoring programme
Enhanced public service standard and improved service delivery
Average LGA performance score
N/A Improve LG performance level by 20%
Improve LG performance level by 20%
Improve LG performance level by 20%
20
2.6 Developing sector objectives, programmes and programmes’ outcomes The below highlighted the programmes and outcomes of the Sector.
Coordinating and Establishment of Traditional Institutions at all levels
Implementation of Government policy on security and other vital issues affecting the State.
Capacity Building programmes Improved capacity of Traditional Rulers
Construction/Rehab. of Traditional Rulers Palaces
Provisions of conducive and befitting Palaces for positive results.
Construction / renovation of offices within the Ministry
Enhanced service delivery
Conducting inspection on Local Government books of account, projects and programmes
Improved efficiency in the resources of LGAs
Capacity Building programmes Improved staff capacity.
Coordinating the activities of Joint Accounts and Allocation Committee (JAAC)
Improved financial performance
Preparation of general operational guidelines for Local Government Council operation
To ensure effective and efficient service delivery.
Strengthening of Partners Forum at LGAs Enhanced coordination with Donor Partners
Strengthening Executive Council on Local Government Administration.
EC on LG Administration
M&E of Local Government Internal Revenue Programmes
Improved revenue collection
Budget preparation programmes for the 23 Local Governments
Timely production of Annual 23 Local Government Budget
21
Chapter Three: Development of Sector Strategy
3.1 Outline of Major Strategic Challenges Facing the Sector
• The key challenges facing Ministry has been outlined in section 2.2.
3.2 Strategic Responses to the Challenges
Challenges Responses
o Inadequate capacity to effectively monitor and evaluate LGAs performance
Strengthening the capacity of Inspectorate Staff
o High cost of governance which has affected the provision of service delivery at the LGA level.
Reform of Local Government to improve service delivery
o Poor funding of projects across all the Local Governments as captured in the Budgets of the last five years;
Intensified IGR efforts and diversification from non-oil revenue sources. Regulation of allocation ratio between capital and recurrent.
3.3 Personnel Number and Costs: Existing and Projected Table 3: Personnel Number and Costs: Existing and Projected
Year Personnel Number
Personnel Cost (N million)
Budget Ceiling (N million)
Approved 2016 120 89.2
Actual as at May 2016 113 29.9
Projected 2017
Projected 2018
Projected 2019
3.4 Total Overhead Cost: Existing and Projected Complete Table 4 with overhead cost data. The Administration Department or PRS Department of the sector should be able to provide the data.
Table 4: Overhead Cost: Existing and Projected
Year Overhead Cost
(N million) Budget Ceiling
(N million)
Approved 2016 454.5
22
Year Overhead Cost
(N million) Budget Ceiling
(N million)
Actual as at May 2016 124.6
Projected 2017 480.3
Projected 2018 480.3
Projected 2019 480.3
3.5 Sector’s Strategy Priorities
• Strengthening capacity of Local Government for improved performance in various spheres including Internal Revenue Generation.
• Reform of Local Government to improve service delivery
• Effective Local Government administration and strong traditional institutions that would enhance the impact of governance.
• Improved and efficient service delivery by the Ministry to the Local Governments.
• Improved and efficient service delivery by the Ministry to the Local Governments
23
3.6 Detailed Sector Strategies (the Logframe)
Table 5: Summary of Projects’ Expenditures and Output Measures
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
Improved working environment.
% of Constructed / renovated offices and equipment within the Ministry.
Furnishing of offices block at the Ministry’s Headquarters
Ministry’s offices furnished.
Number of offices furnished
All offices to be
renovated
Admin & Finance.
Enhance public service standards & improved service delivery.
No of block wall fence constructed
Construction of block wall fence @ Sarkin Kajuru’s Palace, Kajuru.
Block wall fence @ Sarkin Kajuru’s Palace, Kajuru constructed.
Percentage level of work done
40% Project work in progress.
100% complete
Chieftaincy and Boundary Matters
Enhance public service standards & improved service delivery.
Nos of places constructed
Construction of Council chambers at Emir of B/Gwari Palace, Birnin Gwari.
Council chambers at Emir of B/Gwari Palace, Birnin Gwari constructed.
Percentage level of work done
25% Project completed.
100% complete
Chieftaincy and Boundary Matters
Enhance public service standards & improved service delivery.
Nos of zonal office furnished
Furnishing of 6 Zonal offices at Zaria, S/Gari, K/North, Kachia and Jema’a.
6 Zonal offices at Zaria, S/Gari, K/North, Kachia and Jema’a furnished.
. Number of zonal offices furnished
25% completed.
100% complete
Department of Inspectorate
Implementation of resolved boundaries / land disputes.
No of beacons constructed
Beaconing of disputed boundaries at Jama’a Emirate and Fantswam Chiefdom.
Disputed boundaries at Jama’a Emirate and Fantswam Chiefdom beaconed.
Percentage level of work done
25% completed.
100% complete
Chieftaincy and Boundary Matters
Enhance public service standards &
No of palaces rehabilitated / constructed
Construction/ Rehabilitation of Sarkin Lere’s
Sarkin Lere’s Palace @ Lere constructed and
Percentage level of work done
25% completed.
100% complete
Chieftaincy % Boundary Matters
24
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
improved service delivery.
Palace @ Lere.
rehabilitated.
Implementation of resolved boundaries / land disputes.
100% Beaconing of disputed boundaries at Kumana/ Piriga
Disputed boundaries at Kumana/Piriga beaconed.
Percentage level of work done.
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Enhance public service standards & improved service delivery.
90% Rehabilitation / furnishing of Chief of Saminaka’s Palace, Saminaka
Chief of Saminaka’s Palace, Saminaka rehabilitated and furnished.
Percentage level of work done
25% completed.
Chieftaincy and Boundary Matters
Enhance public service standards & improved service delivery.
90% Construction / furnishing of Chief of Kagarko’s Palace at Kagarko.
Chief of Kagarko’s Palace at Kagarko rehabilitated and furnished.
Percentage level of work done
25% completed.
Chieftaincy and Boundary Matters
Provision of conducive and befitting accommodation for positive result
100% Proposed completion of 4 bedrooms flats and furnishing of Emir of Zazzau Guest House at Tukur-Tukur, Zaria.
4 bedrooms flats and furnishing of Emir of Zazzau Guest House at Tukur-Tukur, Zaria completed.
Percentage level of work done
60% 70% Chieftaincy & Boundary Matters
Provision of conducive and befitting accommodation for positive result
100% Construction of wall fence and boys-quarters of Emir of Birnin Gwari Guest House at B/Gwari.
Wall fence and boys-quarters of Emir of Birnin Gwari Guest House at B/Gwari constructed.
Percentage level of work done
60% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Proposed renovation of Chief of Jere Palace at Jere
Chief of Jere Palace at Jere renovated.
Percentage level of work done
80% Chieftaincy & Boundary Matters
25
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
Provision of conducive and befitting palaces for positive result
100% Construction/ furnishing of Chief of Godogodo Palace at Gidan Waya
Chief of Godogodo Palace at Gidan Waya construction and furnished.
Percentage level of work done
70% Chieftaincy & Boundary Matters
Provision of conducive and befitting accommodation for positive result
100% Construction of 4nos bedroom flat at Chief of Kumana palace Geshere.
Chief of 4nos bedroom flat at Chief of Kumana palace Geshere constructed. .
Percentage level of work done
60% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Completion of block wall fence at Chief of Moro’s palace at Manchok Phase II.
Block wall fence at Chief of Moro’s palace at Manchok constructed
Percentage level of work done
80% Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Land dispute between Rumaiya, Kumana Chiefdom of Kauru LGA and Gure, Piriga Chiefdom of Lere LGA
Land dispute between Rumaiya, Kumana Chiefdom of Kauru LGA and Gure, Piriga Chiefdom of Lere LGA resolved.
Percentage level of work done
100% 100% 100% Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Land dispute between Kwaba Community and Baba Kampani of Zazzau Emirate Council, Zaria LGA
Land dispute between Kwaba Community and Baba Kampani of Zazzau Emirate Council, Zaria LGA resolved.
Percentage level of work done
100% 100% 100% Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Boundary dispute between Takad Chiefdom and Kagoro Chiefdom of Kaura LGA
Boundary dispute between Takad Chiefdom and Kagoro Chiefdom of Kaura LGA resolved.
Percentage level of work done
100% 100% 100% Chieftaincy & Boundary Matters
26
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
Implementation of resolved boundaries / land disputes.
100% Boundary dispute between Adara and Gbagyi Chiefdom at Kaso of Chikun LGA and Kachia LGA respectively.
Boundary dispute between Adara and Gbagyi Chiefdom at Kaso of Chikun LGA and Kachia LGA respectively resolved.
Percentage level of work done
100% 100% 100% Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Boundary / Land dispute between Pambegua District, Zazzau Emirate and Lamiro District Kurama Chiefdom.
Boundary / Land dispute between Pambegua District, Zazzau Emirate and Lamiro District Kurama Chiefdom resolved.
Percentage level of work done
100% 100% 100% Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Land dispute between Antong (Kurmin Musa) and Ngarti Gidan Mana District.
Land dispute between Antong (Kurmin Musa) and Ngarti Gidan Mana District resolved.
Percentage level of work done
100% 100% 100% Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Land dispute between the District Head of Gwaraje and the people of Gwaraje Community.
Land dispute between the District Head of Gwaraje and the people of Gwaraje Community resolved.
Percentage level of work done
100% 100% 100% Chieftaincy & Boundary Matters
Enhance public service standards & improved service delivery.
100% Renovation / furnishing of Council of Chief chambers and Lugard Hall
Renovated / furnished Kaduna State Council of Chief Chambers.
Percentage level of work done
100% Chieftaincy & Boundary Matters
27
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
Provision of conducive and befitting palaces for positive result.
100% Completion and furnishing of Reception Hall of Chief of Takad Palace, Fadan Attakar.
Palace Hall @ Chief of Takad Palace, Fadan Attakar constructed and furnished.
Percentage level of work done
100% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Proposed construction of 4nos bedroom Bungalow Guest House of Emir of Jama’a at Kafanchan
4nos bedroom Bungalow Guest House of Emir of Jama’a at Kafanchan constructed
Percentage level of work done.
60% Chieftaincy & Boundary Matters
Enhanced public service delivery
100% Construction of proposed Council chamber at Chief of Kauru’s palace, Kauru.
Proposed Council chamber at Chief of Kauru’s palace, Kauru constructed and completed.
Percentage level of work done
70% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Construction of block of wall fence at Uchu Ninzo Palace / Ninzo
Block wall fence at Uchu Ninzo Palace / Ninzo constructed and completed
Percentage level of work done
70% Chieftaincy & Boundary Matters
Provision of conducive and befitting accommodation for positive result
100% Construction of His Highness Sarkin Lere’s official residence at Lere.
His Highness Sarkin Lere’s official residence at Lere constructed and completed.
Percentage level of work done
70% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Construction of Chief of Piriga Palace at Piriga.
Chief of Piriga Palace at Piriga constructed and completed.
Percentage level of work done
60% Chieftaincy & Boundary Matters
Provision of conducive and
100% Proposed wall fence at chief of
Wall fence at chief of Ayu Palace,
Percentage level of work
70% Chieftaincy & Boundary
28
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
befitting palaces for positive result
Ayu Palace, Mayir.
Mayir constructed and completed.
done Matters
Provision of conducive and befitting palaces for positive result
100% Completion of Guest Charlet at His Highness Ere-Koro’s Palace at Ku bacha Phase II
Guest Chalet at His Highness Ere-Koro’s Palace at Kubacha Phase II constructed and completed
Percentage level of work done
60% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Upgrading of Chief of Numana’s Palace at Gwantu
Chief of Numana’s Palace at Gwantu upgraded and completed.
Percentage level of work done
80% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Completion of Agwam Adara Palace at Kachia.
Agwam Adara Palace at Kachia constructed and completed.
Percentage level of work done
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Completion of block of wall fence at His Highness Tum-Nikyob Palace, Ung. Fari.
Block wall fence at His Highness Tum-Nikyob Palace, Ung. Fari constructed and completed.
Percentage level of work done
70% Chieftaincy & Boundary Matters
Enhance public service standards & improved service delivery.
No of palaces rehabilitated /
furnished
Rehabilitation / Furnishing of Emir of Zazzau’s Palace
Emir of Zazzau’s Palace furnished and rehabilitated.
Percentage level of work done
25% completed.
Chieftaincy % Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Construction of proposed Ngbiar Anghan Palace at Fadan Kamantan
Proposed Ngbiar Anghan Palance at Fadan Kamantan constructed
Percentage level of work done
70% Chieftaincy & Boundary Matters
Provision of conducive and befitting
100% Construction of Agwom Adara’s Palace at Kachia
Agom Adara’s Palace at Kachia constructed
Percentage level of work done
60% Chieftaincy & Boundary Matters
29
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
palaces for positive result
Provision of conducive and befitting palaces for positive result
100% Construction of His Highness Uchu’s Ninzo Palace.
His Highness Uchu’s Ninzo Palace constructed.
Percentage level of work done
70% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Construction of Agwam Takad palace at Padan Attakar
Agwam Takad palace at Padan Attakar constructed.
Percentage level of work done
80% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Construction of Chief of Nyenkpa’s palace at Barde
Chief of Nyenkpa’s palace at Barde constructed.
Percentage level of work done
90% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Proposed upgrading of Emir of Jama’a Palace at Kafanchan.
Emir of Jama’a Palace at Kafanchan upgraded.
Percentage level of work done
90% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Proposed waiting area for Council Chambers at His Highness Agwatyap palace, Zagon Kataf
Proposed waiting area for Council Chambers at His Highness Agwatyap palace, Zagon Kataf constructed and completed.
Percentage level of work done
90% Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Renovation of His Highness Kpop Ham Palace at Kwoi
His Highness Kpop Ham Palace at Kwoi renovated.
Percentage level of work done
90% Chieftaincy & Boundary Matters
Enhance public service
90% Construction of self-contained at
Self-contained at Sarkin Saminaka
Percentage level of work
Chieftaincy and
30
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
standards & improved service delivery.
Sarkin Saminaka Palace.
Palace constructed.
done.
Boundary Matters.
Implementation of resolved boundaries / land disputes.
100% Beaconing of disputed boundaries at Idon/Iri Districts
Disputed boundaries at Idon/Iri Districts beaconed.
Percentage level of work done
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Beaconing of disputed boundaries at Kagoro/ Kaninkon Chiefdom
Disputed boundaries at Kagoro/Kaninkon Chiefdom beaconed.
Percentage level of work done
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Beaconing of disputed boundaries at Rido/ Kidunu Villages, Kajuru District
Disputed boundaries at Rido/Kidunu Villages, Kajuru District beaconed.
Percentage
level of work
done
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Beaconing of disputed boundaries at Millennium City Layout
Disputed boundaries at Millennium City Layout beaconed.
Percentage
level of work
done
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Provision of conducive and
Construction of Guest House of
Guest House of His highness
Percentage level of work
Chieftaincy and
31
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
befitting palaces for positive result
His highness Kpop Ham at Kwoi (Phase III) to completion.
Kpop Ham at Kwoi (Phase III) to completion constructed.
done constructed.
Boundary Matters.
Provision of conducive and befitting palaces for positive result
Improvement of Numana’s palace at Gwantu.
Improved Numana’s palace at Gwantu.
Percentage level of work done
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive result
Improvement of Gwong palace at Fadan Kagoma.
Improved Gwong palace at Fadan Kagoma.
Percentage level of work done
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive result
Construction of block of wall-fence at Piriga palace.
Block wall-fence at Piriga palace constructed.
Percentage level of work done
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive result
Construction of block of wall fence at Koro palace in Kubacha.
Block wall fence at Koro palace in Kubacha constructed.
Percentage level of work done
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive result
Construction of block of wall fence at Agwan Bajju palace in zonkwa.
Block wall fence at Agwan Bajju palace in zonkwa constructed.
Percentage level of work done
Project awaiting due process approval.
Chieftaincy and Boundary Matters.
Total for Capital
Improved financial
% of Budget activities
Conduct Bi-Annual budget
Bi-Annual budget review meetings
Number of LGAs staff
Inspectorate
32
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
performance executed. performance review meetings with 23 LGAs staff
held. participated.
To ensure effective and efficient service delivery.
No of prepared general & operational guidelines for LGAs.
Conduct new trainings for Council members and staff of MLG&CA on Local Government Administration
MLG&CA staff trained on local government administration
Number of MLG&CA staff trained.
Inspectorate
Improved performance
% of staff promoted
Personnel Management Board (PMB) meeting on promotion.
Personnel Management Board Meeting held
No of staff promoted
Admin & Finance
To ensure effective and efficient service delivery.
No of ICT equipments maintained
Maintenance of ICT & Computer equipment
Computers and ICT equipment maintained.
Number of computers and ICT equipment maintained.
Admin & Finance
To ensure effective and efficient service delivery.
No of working materials provided.
Provision of working materials and logistics for general administration
Working materials and logistics provided.
Number of working materials and logistics for general administration provided.
Admin & Finance
Ensure effective and efficient service delivery.
No of equipment maintained.
Maintenance of motor vehicles and capital assets.
Motor vehicles and capital assets maintained.
number of vehicles and assets maintained.
Admin & Finance
Effective and efficient service delivery.
100% Quarterly meetings of Council of chief’s
Quarterly meetings of council of chief held.
Number of quarterly meetings held.
25% completed.
100% 100% 100% Chieftaincy & Boundary Matters
33
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
Effective and efficient service delivery.
100% Workshop for Districts Heads and Ardo’s in Kaduna State
Workshop for Districts Heads and Ardo’s in Kaduna State held.
Number of workshop held
% of workshop conducted.
100% 100% 100% Chieftaincy & Boundary Matters
Effective and efficient service delivery.
100% Attend National Council meetings of Traditional Rulers at Abuja
National Council meetings of Traditional Rulers at Abuja attended.
Number of traditional Rulers attended National Council meeting
% of National Council meeting conducted.
100% 100% 100% Chieftaincy & Boundary Matters
Implementation of service delivery for grassroot security.
100% State Government contribution to Zazzau Emirate
Effective and efficient service delivery.
Monthly State Government contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to B/Gwari Emirate
Effective and efficient service delivery.
Monthly State Government contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Jama’a Emirate
Effective and efficient service delivery.
Monthly State Government Monthly contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementatio 100% State Government Effective and Monthly 55% of 100% 100% 100% Dept. of
34
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
n of service delivery for grassroot security.
contribution to Kagoro Chiefdom
efficient service delivery.
State Government contribution.
State Government monthly contribution to Emirates/ Chiefdoms.
Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Jaba Chiefdom
Effective and efficient service delivery.
Monthly State Government contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Bajju Chiefdom
Effective and efficient service delivery.
Monthly State Governmencontribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Attyap Chiefdom
Effective and efficient service delivery.
Monthly State Government contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Moroa Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contributio
100% 100% 100% Dept. of Admin & Finance
35
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
n to Emirates/ Chiefdoms.
Implementation of service delivery for grassroot security.
100% State Government contribution to Gwong Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Adara Chiefdom
Effective and efficient service delivery.
Monthly
State
Governmentc
ontribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Numana Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Koro Chiefdom
Effective and efficient service delivery.
f Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms
100% 100% 100% Dept. of Admin & Finance
36
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
.
Implementation of service delivery for grassroot security.
100% State Government contribution to Kauru Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Gbagyi Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Lere Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Kagarko Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementatio 100% State Government Effective and State 55% of 100% 100% 100% Dept. of
37
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
n of service delivery for grassroot security.
contribution to Ninzo Chiefdom
efficient service delivery.
Government
contribution. State Government monthly contribution to Emirates/ Chiefdoms.
Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Kajuru Chiefdom
Effective and efficient service delivery.
MonthlyState
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Jere Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Takad Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for
100% State Government contribution to Anghan Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
55% of State Governme
100% 100% 100% Dept. of Admin & Finance
38
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
grassroot security.
contribution. nt monthly contribution to Emirates/ Chiefdoms.
Implementation of service delivery for grassroot security.
100% State Government contribution to Nyenkpa Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Tsam Chiefdom
Effective and efficient service delivery.
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Kaninko Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Kurama Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to
100% 100% 100% Dept. of Admin & Finance
39
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
Emirates/ Chiefdoms.
Implementation of service delivery for grassroot security.
100% State Government contribution to Ikulu Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Kumana Chiefdom
Effective and efficient service delivery.
MonthlyState
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Godogodo Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Ayu Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms
100% 100% 100% Dept. of Admin & Finance
40
Outcome 2019 (in narrative form)
Outcome Target 2019
Project / Activity Title
Budgeted Expenditure / Cost
(N million) Output Output KPI
Base Line (i.e. Output Value in 2016)
Output Target MDA Responsible
2017 2018 2019 2017 2018 2019
.
Implementation of service delivery for grassroot security.
100% State Government contribution to Fantswam Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
y
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Saminaka Chiefdom
Effective and efficient service delivery.
Monthly
State
Government
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% State Government contribution to Piriga Chiefdom
Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100% Dept. of Admin & Finance
Total Recurrent
Grand Total
41
3.7 Developing Projects and Projects’ Outputs
• To create the right organizational and decision making structure that will enhance accountability and transparency to drive achievement of expected service delivery out come at all Local Government Areas.
Project Output
Furnishing of office block at the Ministry’s Headquarters
Ministry’s offices furnished.
Construction of block wall fence @ Sarkin Kajuru’s Palace, Kajuru.
Block wall fence @ Sarkin Kajuru’s Palace, Kajuru constructed.
Construction of Council chambers at Emir of B/Gwari Palace, Birnin Gwari.
Council chambers at Emir of B/Gwari Palace, Birnin Gwari constructed.
Furnishing of 6 Zonal offices at Zaria, S/Gari, K/North, Kachia and Jema’a.
6 Zonal offices at Zaria, S/Gari, K/North, Kachia and Jema’a furnished.
Beaconing of disputed boundaries at Jama’a Emirate and Fantswam Chiefdom.
Disputed boundaries at Jama’a Emirate and Fantswam Chiefdom beaconed.
Construction/ Rehabilitation of Sarkin Lere’s Palace @ Lere.
Sarkin Lere’s Palace @ Lere constructed and rehabilitated.
Beaconing of disputed boundaries at Kumana/ Piriga
Disputed boundaries at Kumana/Piriga beaconed.
Rehabilitation / furnishing of Chief of Saminaka’s Palace, Saminaka
Chief of Saminaka’s Palace, Saminaka rehabilitated and furnished.
Construction / furnishing of Chief of Kagarko’s Palace at Kagarko.
Chief of Kagarko’s Palace at Kagarko rehabilitated and furnished.
Proposed completion of 4 bedrooms flats and furnishing of Emir of Zazzau Guest House at Tukur-Tukur, Zaria.
Bedrooms Emir of Zazzau Guest House at Tukur-Tukur, Zaria completed and furnished.
Construction of wall fence and boys-quarters of Emir of Birnin Gwari Guest House at B/Gwari.
Wall fence and boys-quarters of Emir of Birnin Gwari Guest House at B/Gwari constructed.
Proposed renovation of Chief of Jere Palace at Jere
Chief of Jere Palace at Jere renovated.
Construction/ furnishing of Chief of Godogodo Palace at Gidan Waya
Chief of Godogodo Palace at Gidan Waya construction and furnished.
Construction of Chief of 4nos bedroom flat at Chief of Kumana palace Geshere.
Chief of 4nos bedroom flat at Chief of Kumana palace Geshere constructed. .
Completion of block wall fence at Chief of Moro’s palace at Manchok Phase II.
Block wall fence at Chief of Moro’s palace at Manchok constructed and completed
42
constructed.
Land dispute between Rumaiya, Kumana Chiefdom of Kauru LGA and Gure, Piriga Chiefdom of Lere LGA
Land dispute between Rumaiya, Kumana Chiefdom of Kauru LGA and Gure, Piriga Chiefdom of Lere LGA resolved.
Land dispute between Kwaba Community and Baba Kampani of Zazzau Emirate Council, Zaria LGA
Land dispute between Kwaba Community and Baba Kampani of Zazzau Emirate Council, Zaria LGA resolved.
Boundary dispute between Takad Chiefdom and Kagoro Chiefdom of Kaura LGA
Boundary dispute between Takad Chiefdom and Kagoro Chiefdom of Kaura LGA resolved.
Boundary dispute between Adara and Gbagyi Chiefdom at Kaso of Chikun LGA and Kachia LGA respectively.
Boundary dispute between Adara and Gbagyi Chiefdom at Kaso of Chikun LGA and Kachia LGA respectively resolved.
Boundary / Land dispute between Pambegua District, Zazzau Emirate and Lamiro District Kurama Chiefdom.
Boundary / Land dispute between Pambegua District, Zazzau Emirate and Lamiro District Kurama Chiefdom resolved.
Land dispute between Antong (Kurmin Musa) and Ngarti Gidan Mana District.
Land dispute between Antong (Kurmin Musa) and Ngarti Gidan Mana District resolved.
Land dispute between the District Head of Gwaraje and the people of Gwaraje Community.
Land dispute between the District Head of Gwaraje and the people of Gwaraje Community resolved.
Renovation / furnishing of Council of Chief chambers and Lugard Hall
Renovated / furnished Kaduna State Council of Chief Chambers.
Completion and furnishing of Reception Hall of Chief of Takad Palace, Fadan Attakar.
Palace Hall @ Chief of Takad Palace, Fadan Attakar constructed and furnished.
Proposed construction of 4nos bedroom Bungalow Guest House of Emir of Jama’a at Kafanchan
4nos bedroom Bungalow Guest House of Emir of Jama’a at Kafanchan constructed
Construction of proposed Council chamber at Chief of Kauru’s palace, Kauru.
Proposed Council chamber at Chief of Kauru’s palace, Kauru constructed and completed.
Construction of block wall fence at Uchu Ninzo Palace / Ninzo
Block wall fence at Uchu Ninzo Palace / Ninzo constructed and completed
Construction of His Highness Sarkin Lere’s official residence at Lere.
His Highness Sarkin Lere’s official residence at Lere constructed and completed.
Construction of Chief of Piriga Palace at Piriga.
Chief of Piriga Palace at Piriga constructed and completed.
Proposed wall fence at chief of Ayu Palace, Mayir.
Wall fence at chief of Ayu Palace, Mayir constructed and completed.
Completion of Guest Charlet at His Highness Ere-Koro’s Palace at Kubacha Phase II
Guest Chalet at His Highness Ere-Koro’s Palace at Kubacha Phase II constructed and completed
43
Upgrading of Chief of Numana’s Palace at Gwantu
Chief of Numana’s Palace at Gwantu upgraded and completed.
Completion of Agwam Adara Palace at Kachia.
Agwam Adara Palace at Kachia constructed and completed.
Completion of block wall fence at His Highness Tum-Nikyob Palace, Ung. Fari.
Block wall fence at His Highness Tum-Nikyob Palace, Ung. Fari constructed and completed.
Rehabilitation / Furnishing of Emir of Zazzau’s Palace
Emir of Zazzau’s Palace furnished and rehabilitated.
Construction of proposed Ngbiar Anghan Palace at Fadan Kamantan
Proposed Ngbiar Anghan Palance at Fadan Kamantan constructed
Construction of Agom Adara’s Palace at Kachia
Agom Adara’s Palace at Kachia constructed
Construction of His Highness Uchu’s Ninzo Palace.
His Highness Uchu’s Ninzo Palace constructed.
Construction of Agwam Takad palace at Padan Attakar
Agwam Takad palace at Padan Attakar constructed.
Construction of Chief of Nyenkpa’s palace at Barde
Chief of Nyenkpa’s palace at Barde constructed.
Proposed upgrading of Emir of Jama’a Palace at Kafanchan.
Emir of Jama’a Palace at Kafanchan upgraded.
Proposed waiting area for Council Chambers at His Highness Agwatyap palace, Zagon Kataf
Proposed waiting area for Council Chambers at His Highness Agwatyap palace, Zagon Kataf constructed and completed.
Renovation of His Highness Kpop Ham Palace at Kwoi
His Highness Kpop Ham Palace at Kwoi renovated.
Construction of self-contained at Sarkin Saminaka Palace.
Self-contained at Sarkin Saminaka Palace constructed.
Beaconing of disputed boundaries at Idon/Iri Districts
Disputed boundaries at Idon/Iri Districts beaconed.
Beaconing of disputed boundaries at Kagoro/ Kaninkon Chiefdom
Disputed boundaries at Kagoro/Kaninkon Chiefdom beaconed.
Beaconing of disputed boundaries at Rido/ Kidunu Villages, Kajuru District
Disputed boundaries at Rido/Kidunu Villages, Kajuru District beaconed.
Beaconing of disputed boundaries at Millennium City Layout
Disputed boundaries at Millennium City Layout beaconed.
Construction of Guest House of His highness Kpop Ham at Kwoi (Phase III) to completion.
Guest House of His highness Kpop Ham at Kwoi (Phase III) to completion constructed.
Improvement of Numana’s palace at Gwantu. Improved Numana’s palace at Gwantu.
Improvement of Gwong palace at Fadan Improved Gwong palace at Fadan Kagoma.
44
Kagoma.
Construction of block wall-fence at Piriga palace.
Block wall-fence at Piriga palace constructed.
Construction of block wall fence at Koro palace in Kubacha.
Block wall fence at Koro palace in Kubacha constructed.
Construction of block wall fence at Agwan Bajju palace in zonkwa.
Block wall fence at Agwan Bajju palace in zonkwa constructed.
Conduct Bi-Annual budget performance review meetings with 23 LGAs staff
Bi-Annual budget review meetings held.
% of LGAs with positive results. Partner’s activities coordinated.
Conduct new trainings for Council members and staff of MLG&CA on Local Government Administration
Nos of MLG&CA are trained.
Personnel Management Board (PMB) meeting on promotion.
No of staff promoted
Maintenance of ICT & Computer equipment ICT equipment maintained.
Provision of working materials and logistics for general administration
Working materials and logistics provided.
Maintenance of motor vehicle and capital assets.
Motor vehicle and capital assets maintained.
Quarterly meetings of Council of chief’s meeting
Quarterly meetings of Traditional Institutions held.
Workshop for Districts Heads and Ardo’s in Kaduna State
Workshop for Districts Heads and Ardo’s in Kaduna State held.
National Council of Traditional Rulers at Abuja National Council of Traditional Rulers at Abuja held.
State Government contribution to Zazzau Emirate
Effective and efficient service delivery.
State Government contribution to B/Gwari Emirate
Effective and efficient service delivery.
State Government contribution to Jama’a Emirate
Effective and efficient service delivery.
State Government contribution to Kagoro Chiefdom
Effective and efficient service delivery.
State Government contribution to Jaba Chiefdom
Effective and efficient service delivery.
State Government contribution to Bajju Chiefdom
Effective and efficient service delivery.
45
State Government contribution to Attyap Chiefdom
Effective and efficient service delivery.
State Government contribution to Moroa Chiefdom
Effective and efficient service delivery.
State Government contribution to Gwong Chiefdom
Effective and efficient service delivery.
State Government contribution to Adara Chiefdom
Effective and efficient service delivery.
State Government contribution to Numana Chiefdom
Effective and efficient service delivery.
State Government contribution to Koro Chiefdom
Effective and efficient service delivery.
State Government contribution to Kauru Chiefdom
Effective and efficient service delivery.
State Government contribution to Gbagyi Chiefdom
Effective and efficient service delivery.
State Government contribution to Lere Chiefdom
Effective and efficient service delivery.
State Government contribution to Kagarko Chiefdom
Effective and efficient service delivery.
State Government contribution to Ninzo Chiefdom
Effective and efficient service delivery.
State Government contribution to Kajuru Chiefdom
Effective and efficient service delivery.
State Government contribution to Jere Chiefdom
Effective and efficient service delivery.
State Government contribution to Takad Chiefdom
Effective and efficient service delivery.
State Government contribution to Anghan Chiefdom
Effective and efficient service delivery.
State Government contribution to Nyenkpa Chiefdom
Effective and efficient service delivery.
State Government contribution to Tsam Chiefdom
Effective and efficient service delivery.
State Government contribution to Kaninko Chiefdom
Effective and efficient service delivery.
State Government contribution to Kurama Chiefdom
Effective and efficient service delivery.
State Government contribution to Ikulu Effective and efficient service delivery.
46
Chiefdom
State Government contribution to Kumana Chiefdom
Effective and efficient service delivery.
State Government contribution to Godogodo Chiefdom
Effective and efficient service delivery.
State Government contribution to Ayu Chiefdom
Effective and efficient service delivery.
State Government contribution to Fantswam Chiefdom
Effective and efficient service delivery.
State Government contribution to Saminaka Chiefdom
Effective and efficient service delivery.
State Government contribution to Piriga Chiefdom
Effective and efficient service delivery.
47
3.8 Responsibilities and Operational Plan Discuss the organisational responsibilities for implementing the SIP (i.e. who is responsible for what?). Column 12 of Table 5 already specifies the MDAs responsible for the respective projects.
• See column 12 of table 5 above.
48
Chapter Four: Expenditure Projection Process and Capital – Recurrent Expenditures Comparison
4.1 The process used to make Expenditure Projections
The ministry for Local Government & Chieftaincy Affairs is yet to receive its Budgetary ceiling for MoBP.
4.2 Capital – Recurrent Expenditures Comparison Same as 4.1 above.
Table 6: Capital - Recurrent Expenditures Comparison
Year Personnel
Expenditure (N’ 000)
Overhead Expenditure
(N’ 000)
Capital Expenditure
(N’ 000)
Ratio of Capital to Recurrent
Expenditure
Projected 2017 63,937,323.33 469,560,834.00 250,000,000.00 783,498,157.33
Projected 2018
Projected 2019
49
Chapter Five: Annual Performance Review and Monitoring and Evaluation
5.1 Conducting Annual Sector Review Briefly describe the following:
• What form will the annual review of the SIP take?
• When will it be performed and what process will it involve?
• How will the results be used in making revisions to this SIP next year? The M&E Department of the MoBP should be able to support sectors in writing this section. A standard approach is to first develop the review guideline, train the SPTs on the guideline as well as the sector score card, and writing up the review report.
5.2 Monitoring and Evaluation of the SIP Outline commitment and responsibilities for monitoring and evaluation work, including:
• Who will collect data
• Who will perform the analysis?
• How will the results be reported?
• What will the results be used for? Again, the M&E Department of the MoBP should be able to support sectors in writing this section.
50
5.3 Completing Sector Performance Management Framework (PMF)
Table 7: Sector Performance Management Framework
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Improved working environment.
% of Constructed / renovated offices and equipment within the Ministry.
Ministry’s offices furnished.
% of offices. furnished
100%
4,000,000
Admin & Finance.
Enhance public service standards & improved service delivery.
No of block wall fence constructed
Block wall fence @ Sarkin Kajuru’s Palace, Kajuru constructed.
% of block wall fence @ Sarkin Kajuru’s Palace, Kajuru constructed.
40% Project work in progress.
838,044.90
Chieftaincy and Boundary Matters
Enhance public service standards & improved service delivery.
Nos of palaces constructed
Council chambers at Emir of B/Gwari Palace, Birnin Gwari constructed.
% of Council chambers at Emir of B/Gwari Palace, Birnin Gwari constructed.
25% Project completed.
10,379,462.63
Chieftaincy and Boundary Matters
Enhance public service standards & improved service delivery.
Nos of zonal office furnished
6 Zonal offices at Zaria, S/Gari, K/North, Kachia and Jema’a furnished.
% of zonal offices furnished.
25% completed.
2,308,500.00
Department of Inspectorate
Implementation of resolved boundaries / land disputes.
No of beacons constructed
Disputed boundaries at Jama’a Emirate and Fantswam Chiefdom beaconed.
% of implemented resolved boundaries / land disputes.
25% completed.
4,495,800.75
Chieftaincy and Boundary Matters
51
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Enhance public service standards & improved service delivery.
No of palaces rehabilitated / constructed
Land dispute between Kwaba Community and Baba Kampani of Zazzau Emirate Council, Zaria LGA resolved.
% level of completion
25% completed.
4,495,800.75
Chieftaincy % Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Boundary dispute between Takad Chiefdom and Kagoro Chiefdom of Kaura LGA resolved.
% of implemented resolved boundaries / land disputes.
100% completed, awaiting payment.
3,200,000
Chieftaincy and Boundary Matters
Enhance public service standards & improved service delivery.
90% Boundary dispute between Adara and Gbagyi Chiefdom at Kaso of Chikun LGA and Kachia LGA respectively resolved.
% of Chief of Saminaka’s Palace, Saminaka rehabilitated and furnished.
25% completed.
2,995,859.26
Chieftaincy and Boundary Matters
Enhance public service standards & improved
90% Boundary / Land dispute between Pambegua District,
% of Chief of Kagarko’s Palace at Kagarko rehabilitated
25% completed.
10,070,040.75
Chieftaincy and Boundary Matters
52
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
service delivery.
Zazzau Emirate and Lamiro District Kurama Chiefdom resolved.
and furnished.
Provision of conducive and befitting accommodation for positive result
100% Land dispute between Antong (Kurmin Musa) and Ngarti Gidan Mana District resolved.
% of bedrooms flats and furnishing of Emir of Zazzau Guest House at Tukur-Tukur, Zaria completed
60% 70%
40,001,464.70
Chieftaincy & Boundary Matters
Provision of conducive and befitting accommodation for positive result
100% Land dispute between the District Head of Gwaraje and the people of Gwaraje Community resolved.
% of wall fence and boys-quarters of Emir of Birnin Gwari Guest House at B/Gwari constructed.
60%
5,707,830.00
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Renovated / furnished Kaduna State Council of Chief Chambers.
% of Chief of Jere Palace at Jere renovated.
80%
11,567,671.50
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Palace Hall @ Chief of Takad Palace, Fadan Attakar constructed and furnished.
% of Godogodo Palace at Gidan Waya constructed / furnished/
70%
21,127,933.50
Chieftaincy & Boundary Matters
Provision of conducive
100% 4nos bedroom Bungalow
% of bedroom flat at Chief of
60%
37,501,
Chieftaincy &
53
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
and befitting accommodation for positive result
Guest House of Emir of Jama’a at Kafanchan constructed
Kumana palace Geshere constructed.
443.00 Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Proposed Council chamber at Chief of Kauru’s palace, Kauru constructed and completed.
% of block wall fence at Chief of Moro’s palace at Manchok Phase II completed.
80%
21,203,322.50
`
Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Block wall fence at Uchu Ninzo Palace / Ninzo constructed and completed
% of disputed land between Rumaiya, Kumana Chiefdom of Kauru LGA and Gure, Piriga Chiefdom of Lere LGA resolved..
100% 100% 100%
3,200,000.00
Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% His Highness Sarkin Lere’s official residence at Lere constructed and completed.
% of disputed land between Kwaba Community and Baba Kampani of Zazzau Emirate Council, Zaria LGA resolved.
100% 100% 100%
2,500,000.00
Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Chief of Piriga Palace at Piriga constructed and completed.
% of disputed boundary between Takad Chiefdom and Kagoro Chiefdom of Kaura LGA
100% 100% 100%
2,000,000.00
Chieftaincy & Boundary Matters
54
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
resolved.
Implementation of resolved boundaries / land disputes.
100% Wall fence at chief of Ayu Palace, Mayir constructed and completed.
% of disputed boundary between Adara and Gbagyi Chiefdom at Kaso of Chikun LGA and Kachia LGA resolved.
100% 100% 100%
4,000,000.00
Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Guest Chalet at His Highness Ere-Koro’s Palace at Kubacha Phase II constructed and completed
% of disputed boundary / Land between Pambegua District, Zazzau Emirate and Lamiro District Kurama Chiefdom resolved.
100% 100% 100%
3,200,000.00
Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Chief of Numana’s Palace at Gwantu upgraded and completed.
% of disputed land between Antong (Kurmin Musa) and Ngarti Gidan Mana District resolved.
100% 100% 100%
1,500,000.00
Chieftaincy & Boundary Matters
Implementation of resolved boundaries / land disputes.
100% Agwam Adara Palace at Kachia constructed and completed.
% of disputed land between the District Head of Gwaraje and the people of Gwaraje Community resolved.
100% 100% 100%
1,700,000.00
Chieftaincy & Boundary Matters
55
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Enhance public service standards & improved service delivery.
100% Block wall fence at His Highness Tum-Nikyob Palace, Ung. Fari constructed and completed.
% of Kaduna State Council of Chief Chambers renovated and furnished.
100%
34,384,704.38
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result.
100% Emir of Zazzau’s Palace furnished and rehabilitated.
% of Palace Hall @ Chief of Takad Palace, Fadan Attakar constructed and furnished.
100%
15,870,360.37
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Proposed Ngbiar Anghan Palance at Fadan Kamantan constructed
% of bedroom Bungalow Guest House of Emir of Jama’a at Kafanchan constructed.
60%
15,747,350.30
Chieftaincy & Boundary Matters
Enhanced public service delivery
100% Agom Adara’s Palace at Kachia constructed
% of Council chamber at Chief of Kauru’s palace, Kauru constructed.
70%
27,632,968.20
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% His Highness Uchu’s Ninzo Palace constructed.
% of block wall fence at Uchu Ninzo Palace / Ninzo constructed
70%
21,123,020.00
Chieftaincy & Boundary Matters
Provision of conducive and befitting accommodation for positive result
100% Agwam Takad palace at Padan Attakar constructed.
% of Sarkin Lere’s official residence at Lere constructed.
70%
40,076,583.13
Chieftaincy & Boundary Matters
56
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Provision of conducive and befitting palaces for positive result
100% Chief of Nyenkpa’s palace at Barde constructed.
% of Chief of Piriga Palace at Piriga constructed.
60%
37,501,443.00
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Emir of Jama’a Palace at Kafanchan upgraded.
% of wall fence at chief of Ayu Palace, Mayir completed.
70%
25,333,633.50
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Proposed waiting area for Council Chambers at His Highness Agwatyap palace, Zagon Kataf constructed and completed.
% of Guest Charlet at His Highness Ere-Koro’s Palace at Kubacha Phase II completed
60%
5,843,670.00
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% His Highness Kpop Ham Palace at Kwoi renovated.
% of Chief of Numana’s Palace at Gwantu upgraded
80%
10,056,438.54
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Self-contained at Sarkin Saminaka Palace constructed.
% of Agwam Adara Palace at Kachia completed.
90,604,027.50
Chieftaincy & Boundary Matters
Provision of conducive and befitting
100% Disputed boundaries at Idon/Iri
% of block wall fence at His Highness
70%
35,403,322.50
Chieftaincy & Boundary
57
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
palaces for positive result
Districts beaconed.
Tum-Nikyob Palace, Ung. Fari completed.
Matters
Enhance public service standards & improved service delivery.
No of palaces
rehabilitated / furnished
Disputed boundaries at Kagoro/Kaninkon Chiefdom beaconed.
% level of completion
25% completed.
34,118,799.56
Chieftaincy % Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Disputed boundaries at Rido/Kidunu Villages, Kajuru District beaconed.
% of Ngbiar Anghan Palance at Fadan Kamantan constructed
70%
32,478,391.00
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Disputed boundaries at Millennium City Layout beaconed.
% of Agom Adara’s Palace at Kachia constructed
60%
15,115,259.26
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Guest House of His highness Kpop Ham at Kwoi (Phase III) to completion constructed.
% of Uchu’s Ninzo Palace constructed.
70%
20,550,000.50
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Improved Numana’s palace at Gwantu.
% of Agwam Takad palace at Padan Attakar constructed.
80%
25,333,633.50
Chieftaincy & Boundary Matters
58
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Provision of conducive and befitting palaces for positive result
100% Improved Gwong palace at Fadan Kagoma.
% of Nyenkpa’s palace at Barde constructed.
90%
13,426,721.00
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Block wall-fence at Piriga palace constructed.
% of Emir of Jama’a Palace at Kafanchan upgraded.
90%
10,056,438.54
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Block wall fence at Koro palace in Kubacha constructed.
% of waiting area for Council Chambers at His Highness Agwatyap palace, Zagon Kataf constructed.
90%
9,879,177.00
Chieftaincy & Boundary Matters
Provision of conducive and befitting palaces for positive result
100% Block wall fence at Agwan Bajju palace in zonkwa constructed.
% of Kpop Ham Palace at Kwoi renovated
90%
27,522,529.58
Chieftaincy & Boundary Matters
Enhance public service standards & improved service delivery.
90% % of self-contained at Sarkin Saminaka Palace constructed.
57,100,293
Chieftaincy and Boundary Matters.
59
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Implementation of resolved boundaries / land disputes.
100% % of boundaries / land disputes beaconed.
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Implementation of resolved boundaries / land disputes.
100% % of boundaries / land disputes beaconed.
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Implementation of resolved boundaries / land disputes.
100% 100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Implementation of resolved boundaries / land disputes.
100% % of
boundaries /
land disputes
beaconed.
100% completed, awaiting payment.
Chieftaincy and Boundary Matters
Provision of conducive and befitting palaces for positive result
% of Guest House of His highness Kpop Ham at Kwoi (Phase III) to completion constructed.
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive
% of Numana’s palace at Gwantu improved.
Chieftaincy and Boundary Matters.
60
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
result
Provision of conducive and befitting palaces for positive result
% of Gwong palace at Fadan Kagoma Improved.
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive result
% of Block wall-fence at Piriga palace constructed.
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive result
% of Block wall fence at Koro palace in Kubacha constructed.
Chieftaincy and Boundary Matters.
Provision of conducive and befitting palaces for positive result
% of block wall fence at Agwan Bajju palace in zonkwa constructed.
Project awaiting due process approval.
Chieftaincy and Boundary Matters.
Improved financial performance
% of Budget activities executed.
Bi-Annual budget review meetings held.
% of LGAs staff in the attendance of the review.
Interface between developments Partners sustained.
Scale up nos of Inspectorate staff
Partner’s activities coordinated.
% of Partners level coordinated.
To ensure effective and
No of prepared
Nos of MLG&CA are
% of MLG&CA are trained.
61
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
efficient service
delivery.
general & operational guidelines for LGAs.
trained.
Improved performance
% of staff promoted
No of staff promoted
% of staff promoted.
To ensure effective and efficient service delivery.
No of ICT equipments maintained
ICT equipment maintained.
% of ICT equipment maintained.
To ensure effective and
efficient service delivery.
No of working materials provided.
Working materials and logistics provided.
% of working materials and logistics for general administration provided.
Ensure effective and efficient service delivery.
No of equipment maintained.
Motor vehicle and capital assets maintained.
% of vehicles and assets maintained.
Effective and efficient service delivery.
100% Quarterly meetings of Traditional Institutions held.
% of quarterly meeting conducted.
25% completed.
100% 100% 100%
1,000,0
00.00
1,000,000
.00
1,000,000
.00
Inspectora
te
Effective and efficient service delivery.
100% Workshop for Districts Heads and Ardo’s in Kaduna State held.
% of workshop conducted.
% of workshop conducted.
100% 100% 100%
400,000
500,000 600,000
Inspectorate
Effective and efficient service delivery.
100% National Council of Traditional Rulers at Abuja held.
% of National Council meeting conducted.
% of National Council meeting conducted.
100% 100% 100%
10,000,
000.00
10,000,00
0.00
10,000,00
0.00
Inspectora
te
62
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State Government Monthly contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
500,00
0.00
500,000.0
0
500,000.0
0
Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State Government Monthly contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
2,000,000.00
2,000,000.00
2,000,000.00
Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State Government Monthly contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
5,000,000.00
5,000,000.00
5,000,000.00
Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State Government Monthly contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
4,000,000.00
4,000,000.00
4,000,000.00
Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State Government Monthly contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
37,200,000.00
37,200,000.00
37,200,000.00
Chieftaincy & Boundary Matters
Implementation of service
100% Effective and efficient service
% of State Government Monthly
55% of State Governmen
100% 100% 100%
15,612,500.00
15,612,500.00
15,612,500.00
Chieftaincy & Boundary
63
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
delivery for grassroot security.
delivery. contribution. t monthly contribution to Emirates/ Chiefdoms.
Matters
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State Government Monthly contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
4,516,000.00
4,516,000.00
4,516,000.00
Chieftaincy & Boundary Matters
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
78,050,022
78,050,022 78,050,022
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
53,975,931
53,975,931 53,975,931
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
19,285,866
19,285,866 19,285,866
Dept. of Admin & Finance
Implementation of service delivery for
100% Effective and efficient service delivery.
% of State
Government
Monthly
55% of State Government monthly
100% 100% 100%
18,231,780
18,231,780 18,231,780
Dept. of Admin & Finance
64
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
grassroot security.
contribution. contribution to Emirates/ Chiefdoms.
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
14,288,637
14,288,637 14,288,637
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
14,096,670
14,096,670 14,096,670
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
13,701,883
13,701,883 13,701,883
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
13,072,217
13,072,217 13,072,217
Dept. of Admin & Finance
Implementation of service delivery for grassroot
100% Effective and efficient service delivery.
% of State
Government
Monthly
55% of State Government monthly contribution
100% 100% 100%
12,904,419
12,904,419 12,904,419
Dept. of Admin & Finance
65
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
security. contribution. to Emirates/ Chiefdoms.
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
8,711,676
8,711,676 8,711,676
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
10,078,951
10,078,951 10,078,951
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
Implementation of service delivery for grassroot
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
66
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
security. to Emirates/ Chiefdoms.
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/
100% 100% 100%
7,337,272
7,337,272 7,337,272
Dept. of Admin & Finance
67
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Chiefdoms.
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
6,535,207
6,535,207 6,535,207
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
6,535,207
6,535,207 6,535,207
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
6,535,207
6,535,207 6,535,207
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
6,535,207
6,535,207 6,535,207
Dept. of Admin & Finance
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
6,535,207
6,535,207 6,535,207
Dept. of Admin & Finance
68
Name of Sector: GOVERNANCE
S/N Outcome (in narrative form)
Outcome Targets for 2019
Outputs for 2019
Output KPI Output
Baseline for 2016
Output Target Output Cost (from approved budget) MDA responsible
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
2017 Specific
2018 Indicative
2019 Indicative
2020 Indicative
Implementation of service delivery for grassroot security.
100% Effective and efficient service delivery.
% of State
Government
Monthly
contribution.
55% of State Government monthly contribution to Emirates/ Chiefdoms.
100% 100% 100%
6,535,207
6,535,207 6,535,207
Dept. of Admin & Finance
Total Cost of Results (Resources for Results) 728,530,657.99
754,301,553.17
761,466,984.44
69