ESA UNCLASSIF
Prepared bReference Issue Revision Date of IssStatus DocumentDistributio
Ka Ban
Statem
IED – Releasable
by
sue
t Type on
d SSPA
ment of W
e to the Public
GRST‐SYST1 0 22/05/201Approved/SOW
(KaSSPA
Work
T‐HW‐SOW‐
13 /Applicable
A)
‐1007‐HSO‐
e
‐GSS
European Space ORobert
D-
TF +4
esocOperations Centret-Bosch-Strasse 564293 Darmstadt
GermanyT +49 (0)6151 90049 (0)6151 90495
www.esa.int
c e 5 t y 0 5 t
ESA UNCLASSIF
Page 2/35
KaSSPA SOW
Date 22/05/201
Title
Issue
Author
Approved
Reason for
Initial Issu
Issue 1
Reason fo
Initial Issu
IED – Releasable
13 Issue 1 Rev 0
Ka Ban
1
by
r change
ue
or change
ue
e to the Public
0
d SSPA Stat
tement of W
Work
Revision
Date
Date
Issue
1
Revision
Date
22/05/2
n 0
22/0
Revisi
0
n 0
Pages
2013 All
5/2013
ion
s
Date
22/0
Parag
05/2013
graph(s)
ESA UNCLASSIF
Page 3/35
KaSSPA SOW
Date 22/05/201
Table of con
1 INTRO Scope1.1 The Te1.2 Backg1.3 Applic1.4 Acron1.5 Defini1.6
2 WORK Work 2.1
2.1.1WP 12.1.2WP 22.1.3WP 32.1.4WP 42.1.5WP 52.1.6Warr3 REQUI
Docum3.1 Hardw3.2 Softw3.3
4 SCHED4.1.1Kick‐4.1.2Prog4.1.3Preli4.1.4Critic4.1.5Test 4.1.6 Facto4.1.7 Final4.1.8Addi5 DOCUM
Gener5.1 Runni5.2
5.2.1 Issue5.2.2Minu5.2.3Actio5.2.4Prog5.2.5Tech
Review5.3
IED – Releasable
13 Issue 1 Rev 0
ntents:
ODUCTION ..e of the Docechnology Rround for tcable and Reyms and abtions .........K TO BE PERLogic .........1000: Prelim2000: Detai3000: Proto4000: Proto5000: Deliveranty ..........IREMENTS Fmentation ..ware ...........are ............DULE AND M‐off Meetingress meetinminary Descal Design RReadiness Rory accepta Presentatitional meetMENTATIOral requiremng Documeed Documenutes of Meeon Item List ress Reporthnical Notesw Data Pack
e to the Public
0
..................cument .......Research Prhe activity .eference Dobbreviations..................
RFORMED ....................minary Studled Design .otype Manuotype Testinery at ESOC..................FOR DELIVE......................................................MILESTONESg (K.O.M.) ..ngs (P.M.) ..ign Review Review (C.DReview (T.Rnce Test Reon (F.P.) ....tings ...........N ..............ments .........ents ............nt List (IDL) eting (MoM(AIL) .........ts (PR) ........s (TNs) ........kages .........
..................
...................rogramme .....................ocuments (As .........................................................................y ...................................facturing anng (FAT) ......C and Final P...................ERABLES .............................................................S .....................................................(P.D.R.) ......R.) ............R.R.) ............eview (F.A.T................................................................................................................) .............................................................................................
..................
...................
...................
...................AD’s and RD.................................................................................................................nd Integrati...................Presentation...............................................................................................................................................................................................................T.) ...............................................................................................................................................................................................................................
..................
...................
...................
...................D’s) .............................................................................................................................ion ................................n ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................
..................
...................
...................
...................
...................
...................
...................
..................
...................
...................
...................
...................
...................
...................
...................
..................
...................
...................
...................
..................
...................
...................
...................
...................
...................
...................
...................
...................
..................
...................
...................
...................
...................
...................
...................
...................
...................
.................
..................
..................
..................
..................
..................
..................
.................
..................
..................
..................
..................
..................
..................
..................
.................
..................
..................
..................
.................
..................
..................
..................
..................
..................
..................
..................
..................
.................
..................
..................
..................
..................
..................
..................
..................
..................
............... 6
................ 6
................ 6
................ 6
................ 8
................ 8
................ 9
............... 9
................ 9
.............. 10
.............. 11
.............. 12
.............. 12
.............. 13
.............. 14
............. 14
.............. 14
.............. 15
.............. 15
............. 15
.............. 16
.............. 16
.............. 17
.............. 17
.............. 17
.............. 17
.............. 17
.............. 18
............. 18
.............. 18
.............. 18
.............. 19
.............. 19
.............. 19
.............. 19
.............. 20
.............. 20
6666889
0
444
66
8888
00
ESA UNCLASSIF
Page 4/35
KaSSPA SOW
Date 22/05/201
5.3.1Kick 5.3.2Preli5.3.3Critic5.3.4Test 5.3.5 Facto5.3.6 Final
Types5.45.4.1Com5.4.2Tech5.4.3Perfo5.4.4Part 5.4.5Mech5.4.6Test 5.4.7Acce5.4.8Acce5.4.9User5.4.10 M5.4.11 In5.4.12 Ci5.4.13 Re6 GENER
Respo6.1 Staffin6.2 Sched6.3 Repor6.4 Meeti6.5
7 TESTIN Accep7.1 Test o7.2 Test c7.3
8 OPTIO On‐sit8.1
List of Tabl
Table 1 LTable 2 LTable 3 L
IED – Releasable
13 Issue 1 Rev 0
Off Meetingminary Descal Design RReadiness Rory Accepta Review Do of Documepliance Mahnical Descrormance AnList ............hanical andPlan ..........
eptance Testeptance Testr’s Manual ..Maintenancenstallation Mircuit Diagraeliability AnRAL PROJEConsibility.....ng ...............dule Controlrting ...........ings ............NG, ACCEPTptance test oorganizationonduction .
ONS ............te installatio
les
List of DocuList of HardList of Meet
e to the Public
0
g (KOM) Daign Review Review (CDRReview (TRRance Test Reocumentatioents ............trices .........iption (TD) .nalysis .......................... Electrical I..................t Proceduret results .......................e Manual ....Manual .......ams and Bonalysis.........CT MANAGE....................................l .....................................................TANCE ANDobjectives an .....................................................on ..............
umentation ware Delivetings ..........
ata Package(PDR) DataR) Data PackR) Data Paceview (FAT)on ..............................................................................................................nterface Co...................es (ATP) ..................................................................................oard Layouts...................EMENT ASP...............................................................................................D WARRANTand principl...........................................................................
Deliverableerables ..........................
..................a Package ...kage ...........ckage ..........) Data Packa..................................................................................................................ontrol Docu..................................................................................................................s ....................................PECTS ........................................................................................................TY ..............es .........................................................................................
es .....................................................
...................
...................
...................
...................age ...............................................................................................................................ment (ICD).........................................................................................................................................................................................................................................................................................................................................................................................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
..............................................................................................................................................................................................................................................................................................................................................................................................................................
...................
...................
...................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
.................
..................
..................
..................
..................
..................
.................
..................
..................
..................
.................
..................
..................
..................
..................
.............. 20
.............. 21
.............. 21
.............. 22
.............. 22
.............. 22
.............. 22
.............. 22
.............. 23
.............. 23
.............. 23
.............. 24
.............. 24
.............. 24
.............. 25
.............. 26
.............. 26
.............. 28
.............. 28
.............. 28
............. 29
.............. 29
.............. 30
.............. 30
.............. 32
.............. 33
............. 33
.............. 33
.............. 33
.............. 34
............. 35
.............. 35
.............. 15
.............. 15
.............. 16
0
444
668889
00
3
4
556
ESA UNCLASSIF
Page 5/35
KaSSPA SOW
Date 22/05/201
List of Figu
Figure 1
IED – Releasable
13 Issue 1 Rev 0
ures
Tentative S
e to the Public
0
Schedule ................................................................................................................ 16
6
ESA UNCLASSIF
Page 6/35
KaSSPA SOW
Date 22/05/201
1 IN
S1.1
This Statemrequired bdevelopmeas an appli The docum
The activit In side thisrequiremeoutside a bor label on
T1.2
TRP is ESA'on the earESA directo
B1.3
The EuropeTracking anSystems EnOperations
IED – Releasable
13 Issue 1 Rev 0
NTRODU
Scope of th
ment of Woy the Europent of a “Kaicable docu
ment is struc
Chapteapplica
Chapte
Chapteoutput
Chapte
Chapte
Chapte
Chapte
Chapte
Chapte
y described
s SoW, normnts, or provbox. The reqn the left co
The Techn
's work horsly stages oforates.
Backgroun
ean Space And Commanngineering Ds (D/HSO), l
e to the Public
0
UCTION
he Docum
ork (SOW) dpean Space a Band SSPAment throu
ctured as fo
er 1 introduable and ref
er 2 present
er 3 defines t.
er 4 contain
er 5 contain
er 6 contain
er 7 contain
er 8 contain
er 9 contain
d in this SOW
mal text (novides informquirements lumn. State
ology Res
se programf technology
nd for the
Agency (ESAnd (TT&C) oDepartmenlocated at t
ment
escribes theAgency (refA”. It will beughout the e
ollows:
ces the bacference doc
ts the requi
the work to
s the requir
s the requir
s the requir
s the requir
s the requir
s the list of
W is a new a
ot inside a bmation. Theare inside b
ement of co
search Pro
mme supporty developm
activity
A) operates operations ot (HSO‐G) ohe Europea
e activities ferred to ascome part oexecution o
ckground ancuments (in
rements an
o be perfor
rements on
rements on
rements on
rements on
rements on
f required o
activity.
ox) is descrre is no neeboxes with ompliance sh
ogramme
ting the stuent (TRLs 1
a network of different of the ESA Dan Space Op
to be execus “ESA” or “of the contof the work
nd main objcluding app
nd constrain
med in the
n deliverable
n schedule a
n document
n project ma
n testing, ac
ptions
riptive text ted of statemthe corresphall be prov
udy of new t‐3). As a ma
S/X/Ka‐bancategories
Directorate Operations Ce
uted and ththe Agencyract (Appen
ectives of tplicable stan
nts on the sy
contract to
es.
and milesto
ation.
anagement
ceptance a
that introdument of componding reqvided for th
technologieandatory pr
nd antennasof spacecraOf Human Sentre (ESOC
e deliveraby”) in relationdix 1) and s
he work, anndards).
ystem to be
o produce th
nes.
aspects
nd warranty
uces the mpliance witquirement rese require
es, focusing rogramme,
s for Telemeaft. The GroSpaceflight C), is respon
les on to the shall serve
nd quotes
e produced.
he required
y.
th text eference ements.
primarily it serves all
etry, ound and nsible for
.
l
ESA UNCLASSIF
Page 7/35
KaSSPA SOW
Date 22/05/201
the designoperate ES The freque
All the ban ESA Deep SDownloadiavailable oKa Band USpacecraftdeterminaamplifiers One of thePower Am A Solid Statechnologymaintain tfactor to b
TRP prograproductiondesign andimplement
IED – Releasable
13 Issue 1 Rev 0
, developmSA satellites
ency bands
S Band
S Band
X Band
X Band
X Band
K Band
Ka Ban
Ka Ban
nds are alrea
Space Statioing, Commaon ESA Deepplink and Dt, for Radio tion. Uplink
e main elemplifier that
te High Powy required ihe units thae considere
Use of Eursemicondu
Non ITAR t
In case of uavailability
am looks fon equipmend the architet a solution
e to the Public
0
ent and pros, including
supported
UL: 2025‐2
DL: 2200‐2
d UL: 7145‐7
d DL(EES): 80
d DL: 8400‐8
d DL: 25.5‐2
d DL: 31.8‐3
d UL: 34.2‐
ady implem
ons supportand and Trap Space Statownlink to Science (RSk signals sha
ments requirshall delive
wer amplifies available tat will be imed for the se
opean Techuctor transis
technology
use of potey of all such
r the develont in some feecture of theasily upgr
ocurement the above m
by ESTRACK
2120 MHz fo
2300 MHz fo
7235 MHz fo
025‐8400 M
8500 MHz fo
7.0 GHz for
32.3 GHz fo
34.7 Ghz fo
mented in ES
t present macking of sptions. Futurincrease thSE) applicatiall be ampli
red for the ir a high pow
er as requirto allow thimplementedelection of t
hnology willstors
will be pref
ntial ITAR reparts shall
opment of aeatures (e.ghe equipmeradable to t
of the groumentioned
K are:
or Uplink
or Downlink
or Uplink
MHz for Dow
or Downlink
r Downlink
or Downlink
or Uplink
STRACK exc
missions on Xacecraft. Kare Deep Spae throughpions and forfied to an a
implementawer level in
ed by the sts developmd in ESTRACthe main co
l be preferre
ferred for a
estricted tebe ensured
a prototypeg. redundannt shall conhe final pro
nd station iantennas a
k
wnlink
k
k
ept the Ka
X Band (7‐8a Band dowace missionsput betweenr more accuadequate po
ation of the the band o
tations doement. The neK makes thomponents.
ed for all co
ll parts
echnology ind by the con
e. This protoncy or remonsider the fioduction un
infrastructund its assoc
Band UL..
GHz) for Tewnlink (32 Gs will requirn the Grounurate navigaower level b
e Ka Band upof 34.2 to 34
es not exist aeed of mane future ava. In particul
omponents
n the Activitntractor.
otype may dote M&C). Nnal configuit level.
ure requiredciated equip
elemetry Hz) is alreadre the presend Station aation and orby means of
plink is the 4.7 GHz.
at present bufacturing aailability anar:
specifically
ty, long term
differ from tNeverthelesration and s
d to pment.
dy ence of a nd the rbit f power
High
but the and n important
y for
m
the final s the shall
ESA UNCLASSIF
Page 8/35
KaSSPA SOW
Date 22/05/201
A1.4
The follow ID Ref
AD1 GR
AD2 MI
A1.5
IED – Releasable
13 Issue 1 Rev 0
Applicable
wing docume
ference
RST‐SYST‐HW‐SP
L HDBK 217
Acronyms
e to the Public
0
e and Refe
ents are app
P‐1003‐HSO‐GS
and abbr
AD
AIL
ALC
AM/PM
AR
ATP
C.V.
C/I3
CCSDS
CDR
CFI
CPM
ESA
ESOC
ESTRACK
FP
FR
HPA
HW
ICD
IM3
IR
KOM
M&C
MoM
MPR
MTBF
PDR
RD
RF
SOW
SPF
SRS
SW
TBC
TBD
erence Do
plicable to t
Title
S Ka Band S
1 Rev 0
Iss F Noti
eviations
Applic
Action
Autom
Ampli
Accep
Accep
Curric
Third
Consu
Critica
Custo
Critica
Europ
Europ
ESA T
Final P
Final R
High P
Hardw
Interf
Third
Interm
Kick‐O
Monit
Minut
Mont
Mediu
Prelim
Refere
Radio
Statem
Single
Softw
Softw
To Be
To Be
ocuments
this study
Solid State Pow
ce 2
cable Documen
n Item List
matic Level Con
tude to phase
ptance Review
ptance Test Pro
culum Vitae
Order intermod
ultative Commit
al Design Review
mer Furnished
al Path Method
pean Space Age
pean Space Ope
racking Networ
Presentation
Review
Power Amplifie
ware
ace Control Do
order intermod
mediate Review
Off Meeting
toring and Cont
tes of Meeting
hly Progress Re
um Time Betwe
minary Design re
ence Documen
frequency
ment Of Work
e Point Failure
ware Requireme
ware
Confirmed (by
Determined (b
(AD’s and
wer Amplifier (K
nt
ntrol
modulation tra
cedures
dulation produ
ttee for Space D
w
Item
d
ncy
erations Centre
rk
r
cument
dulation produc
w
trol
eport
een Failures
eview
t
ents Specificatio
y the Agency)
by the Contract
d RD’s)
KaSSPA). Iss 2
nsfer
ct level
Data Systems
cts
on
or)
Date
22/05/2013
ESA UNCLASSIF
Page 9/35
KaSSPA SOW
Date 22/05/201
D1.6
The Technoas follows:
Techno
TRL1
TRL2
TRL3
TRL4
TRL5
TRL6
TRL7
TRL8
TRL9
2 W
This chapteresults. Thobjectives
W2.1
The study w Pre Det Pro Pro
1 ecss‐e‐10
IED – Releasable
13 Issue 1 Rev 0
Definitions
ology Readi1
ology Readiness
Basic prin
Technolo
Analytica
Compone
Compone
System/s
(ground
System p
Actual sy
Actual sy
WORK TO
er describese contractoof the activ
Work Logic
will includeeliminary Sttailed Desigototype Manototype Test
0C‐Draft(6A
e to the Public
0
TBS
TC
TM
TN
TO
TRL
TRP
TT&C
WP
s
iness Levels
s Level
nciples observe
ogy concept and
al and experime
ent and/or brea
ent and/or brea
subsystem mod
or space)
prototype demo
ystem complete
ystem “flight‐pr
O BE PER
s the work tor can propovity are fulfi
c
e the designudy gn nufacturingting
ugust2007)
To Be
Teleco
Telem
Techn
Techn
Techn
Techn
Tracki
Work
s (i.e. achiev
ed and reported
d/or applicatio
ental critical fun
adboard valida
adboard valida
del or prototype
onstrated in a s
ed and flight‐qu
roven” through
RFORMED
to be perfoose a differeilled.
activities a
g and integr
), http://ww
Specified (by t
ommand
metry
nical Note
nical Officer
nology Readines
nology Research
ing, Telemetry
Package
ved status o
d
n formulated
nction and/or c
ted in the labo
ted in the relev
e demonstrated
space environm
ualified through
successful mis
D
rmed, the rent Work B
and the man
ration
ww.ecss.nl/.
he Agency)
ss Level
h Programme
and Command
of developm
characteristic p
ratory environm
vant environme
d in the relevan
ment
h test and demo
ssion operation
required dereakdown S
nufacturing
.
ment of a te
roof‐of‐concep
ment
ent
nt environment
onstrated (grou
s
liverables aStructure pr
and testing
chnology) a
pt performed
t
und or flight)
and the exprovided tha
g of the pro
are defined
ected at the
totype.
ESA UNCLASSIF
Page 10/35
KaSSPA SOW
Date 22/05/201
Desceil
Del Doc
DEV‐0001
DEV‐0002
2.1.1 W
I
T
DEV‐0003
DEV‐0004
O
DEV‐0005
IED – Releasable
13 Issue 1 Rev 0
scription of ling cost forlivery at ESOcumentatio
The condevelopand in o
The condefinedto thossignatudelivery
WP 1000: P
Input This SO NegotiTask descri
A prelimband SSsolutio
Appropreportemechan
Output
The out5.3.2 Thresults
e to the Public
0
f the Upgradr this upgraOC on and Final
ntractor shapments, tecorder to red
ntractor shad in art. 5 pae already idure, for appry note as de
Preliminary
OW. ation/KOMption
minary studSPA. Duringns in order
priate tradeed. Technicanical, therm
tput of this he followingincluded inDetailed blSingle poinMain paramAM/PM, thranges of aProposed sEMI, EMC aList of longList of IPR sList of critic(present an
de of the prde
Presentatio
all consider chnologies aduce develo
all identify, art 2 paragrdentified in roval by ESAefined in ar
y Study
minutes of
dy will be cag the executto meet AD
‐offs amongal analyses mal, technol
WP will be g aspects shn the PDR dalock diagramnt failures ameters budhermal dissiall parametesolutions foand stray rag lead itemssubject partcal aspects nd future) a
rototype to
on
the use as and processopment tim
during the raph 1 of ththe proposA. This shallrt. 5 part 2 p
f meeting
arried out totion of this D1.
g available tshall cover ogies, man
the PDR dahall be specata packagems of the eqnd Failure pgets (RF poipation, etcers includedr achieving adiation asps ts of the desigand availabi
the level of
much as poses, in orde
me and cost.
design activhe contract)sal and apprl be supplemparagraph 2
o provide antask, the co
technical soall critical aufacturing,
ata packagecifically anae: quipment wpropagationower, noise .) for varioud in the techcritical spe
pects
gn, includinlity.
f a producti
ossible of exr to speed‐
vities, any T intended troved by ESmented by a2 of the con
n architectuontractor sh
olutions shaareas of themaintenan
e whose conlysed as par
with definitin to externalevel, P1dB, Gus operationhnical specicifications
ng compone
ion unit incl
xisting interup and secu
Third Party o be used iSA upon cona draft verstract.
ural design ohall provide
all be perfore design (elece, etc.)
ntents are drt of this tas
on of modual units analGroup Delanal cases coification
ent procurem
luding
rnal ure design
Product (asn addition ntract sions of the
of the Ka design
rmed and ectrical,
described insk and the
ules lysis ay, IM3, overing
ment
s
n
ESA UNCLASSIF
Page 11/35
KaSSPA SOW
Date 22/05/201
A
DEV‐0006
2.1.2 W
I
T
DEV‐0007
DEV‐0008
IED – Releasable
13 Issue 1 Rev 0
Approval co
Successplace aperform
WP 2000: D
Input This SO PDR Da PDR coTask descri
The DeSSPA. Ais inclu
This tas
e to the Public
0
PreliminaryPreliminaryExpected p
ondition
sful close‐ot the end omances prio
Detailed De
OW and theata Packageonclusions/mption
tailed DesigAll the workded in this t
sk shall in pAmplificatiensuring th The pre
P1dB, C/ there w There wPower mod The the The po
functiospecifiemanufa
The faiother p
Detailed thDetailed MDetailed LoReliability fUpdate of Test Plan List of critic
y mechanicy Local M&performance
ut of the PDf the Prelimor to start th
esign
negotiatione minutes of m
gn will covek related to task
articular incon chain dehat: eamplifier is/I3 and AM/will be a corwill be a cordules and oermal desigwer supplieonal and pered environmacturing andlure of one part, subsyshermal desigMechanical Docal M&C dfigures SPF list
cal compon
al and therm&C design es vs. ESOC
DR and assominary Studyhe detailed
n/KOM min
meeting
er the detailthe electric
clude: esign. In par
s not limitin/PM. rrect handlinrrect behavutput combn do not coes, the alarmrformance rment, and ind reliability subsystem tem or modgn Design esign and a
nents (includ
mal design
C requireme
ociated actioy to analysedesign
nutes.
ed design ocal and mec
rticular, the
ng the perfo
ng of the reiour of the biner designompromise tms and securequiremenn compliancrules. or module dule of the
ssociated d
ding quantit
ents
ons closed. e the design
of the moduchanical des
e pre amplif
ormances o
edundancy. ALC n, in particuthe reliabiliurities satisfnts, in the apce with app
does not geunit
documentat
ties) for lon
The PDR, sn and expec
ules of the Ksign of the e
fier shall be
f the HPA, s
ular ensurinity of the amfy the applicpplicable anlicable desi
enerate dam
tion
ng term mai
shall take cted
Ka Band equipment
e designed
specially on
g that: mplifier cable nd gn ,
mage to
intenance
ESA UNCLASSIF
Page 12/35
KaSSPA SOW
Date 22/05/201
DEV‐0009
O
DEV‐0010
A
DEV‐0011
2.1.3 W
I
T
PRO‐0001
PRO‐0002
PRO‐0003
PRO‐0004
O
PRO‐0005
PRO‐0006
A
PRO‐0007
2.1.4 W
I
IED – Releasable
13 Issue 1 Rev 0
The pro
Output
The out5.3.3
Approval co
Successplace aperform
WP 3000: P
Input This SO CDR Da CDR coTask descri
This tastheir in
The Properform
The con
No CFI
Output
The outassemb
The out5.3.4
Approval co
At the eReviewproced
WP 4000: P
Input This SO
e to the Public
0
Analysis ofceiling pric
ototype con
tput of this
ondition
sful close‐ot the end omances prio
Prototype M
OW and theata Packageonclusions/mption
sk will coventegration a
ototype Conmances of t
ntractor shaDraft User Electrical s
item will be
tput of this bled ready f
tput of this
ondition
end of the Pw shall take ures and au
Prototype T
OW and the
f impact of uce for recurr
nfiguration s
WP will be
ut of the CDf the Detailor to launch
Manufactu
negotiatione minutes of
r the manufnd the elab
nfiguration he design
all provide tManual chematics,
e provided b
WP will befor testing.
WP will be
Prototype Mplace to anauthorise the
Testing (FA
negotiation
upgrading trent units
shall be froz
the CDR da
DR and assoed Design th the manuf
uring and I
n/KOM min
meeting
facturing ofboration of t
shall allow
the product
Board layo
by the Agen
the Prototy
the TRR da
Manufacturalyse the tee start of th
AT)
n/KOM min
he prototyp
zen at the C
ata package
ociated actioto analyse tfacturing.
Integration
nutes.
f the differethe test pro
the comple
t document
uts, interco
ncy
ype comple
ata package
ing, Integraest results oe Equipmen
nutes.
pe to a prod
CDR
e whose con
ons closed. he design a
n
ent modulesocedures.
ete validatio
tation assoc
onnection w
etely manuf
whose con
ation Testingof the different FAT.
duction unit
ntents are d
The CDR, sand expecte
s of the pro
on of the
ciated with t
wirings.
factured and
ntents are d
g, a Test Reent module
t and
described in
shall take ed
ototype,
the unit:
d
escribed in
eadiness es, test
n
ESA UNCLASSIF
Page 13/35
KaSSPA SOW
Date 22/05/201
T
PRO‐0008
PRO‐0009
PRO‐0010
PRO‐0011
O
PRO‐0012
A
PRO‐0013
2.1.5 W
I
T
PRO‐0014
PRO‐0015
PRO‐0016
PRO‐0017
O
PRO‐0018
PRO‐0019
PRO‐0020
A
IED – Releasable
13 Issue 1 Rev 0
Test Pl Techni Test PrTask descri
The conagreed chapte
AcceptATP.
For conthe agr
The conaccordi
Output
The outdescrib
Approval co
At comof the t
WP 5000: D
Input This SO DocumTask descri
The con
The confinal dePackag
The conagreed listed in
The conpresent
Output
Unit De
Final Pr
Set of u
Approval co
e to the Public
0
an cal Specificarocedures ption
ntractor shaduring the r 5 of this S
ance Testin
nditionally areed proble
ntractor shaing with the
tput of this bed in 5.3.5
ondition
pletion of ttesting cam
Delivery at
OW and thements produption
ntractor sha
ntractor shaestination. Tes shall be s
ntractor shaduring the n 3.1
ntractor shatation shall
elivered at E
resentation
updated do
ondition
ation
all test the udevelopmeOW.
ng shall be fo
accepted rem fixed wit
all provide ae requireme
WP will be
the tests, a paign and a
t ESOC and
negotiationuced during
all deliver th
all be respoThe packagesuitable for
all produce different re
all prepare take place
ESOC
hold at ESO
cumentatio
unit followient activitie
ormally bas
leases, the hin 30 days
a test reporents of 5.4.8
the Test Re
FAT Reviewaccept the e
d Final Pres
n/KOM minthe activity
he unit at E
onsible for pe shall be sur transport t
a final set oeviews. The
a final presenot later th
OC
on
ng the Testes according
sed on the a
contractor s.
rt with the r8
eport Data
w shall take equipment.
sentation
nutes. y
SOC premis
packing the uitable for tto Australia
of documene number of
entation tohan one mo
t Plan and pg with the re
approved (b
shall re‐del
results of th
Package wh
place to an
ses unless o
system for transportatia, Argentina
ntation incluf copies of t
be hold at onth after th
procedures (equirement
by ESA) vers
liver the sys
he testing ca
hose conten
alyse the te
otherwise ag
transportation via air laa and Spain.
uding all thethe docume
ESOC. This he FAT revie
(ATP)ts of
sions of the
stem with
ampaign
nts are
est results
greed.
tion to its and or sea.
e updates entation is
ew.
ESA UNCLASSIF
Page 14/35
KaSSPA SOW
Date 22/05/201
PRO‐0021
2.1.6 W
PRO‐0022
PRO‐0023
PRO‐0024
PRO‐0025
3 R
D3.1
Code
DEL‐0001
DEL‐0002
DEL‐0003
DEL‐0004
DEL‐0005
DEL‐0006
DEL‐0007
DEL‐0008
DEL‐0009
IED – Releasable
13 Issue 1 Rev 0
Accept
Warranty
The con22).
The Waincludin
Until therrors fexclude
The conthe wa
REQUIRE
Document
Title
KOM Data
PDR Data
CDR Data
TRR Data
Test resu
User Man
Maintena
Final Pres
Executive
e to the Public
0
ance of ESA
ntractor sha
arranty pering hardwar
he end of thfound in theed).
ntractor sharranty perio
MENTS F
tation
a Package
Package
Package
Package
lts
nual
ance Manua
sentation
e Summary
A of final de
all provide a
iod shall covre, software
he warrantye delivery (r
all ensure thod are resol
FOR DEL
M
2
2
2
2
FADe
FADe
al FADe
Fi(Tshcocowunnenorein
Fi
livery
a Warranty
ver the corre, configurat
y period, therequest for
hat serious lved within
IVERABL
Milestone
weeks afte
weeks befo
weeks befo
weeks befo
AT review +elivery of th
AT review +elivery of th
AT review +elivery of th
nal PresentThe final prehall be free ommercial oonfidential ihich shouldnder separaecessary. Nor disseminestrictions sdicated.)
nal Present
according t
rection of etion or docu
e contractonew or cha
anomalies 30 days.
LES
r KOM
ore PDR
ore CDR
ore TRR
+ he unit
+ he unit
+ he unit
tation esentation of all or informationd be provideate cover if o copyrightation hall be
tation
to the contr
errors foundumentation
r shall be reanged requi
identified b
Numb
Electr
Electr
Electr
Electr
Electr1 Pape
Electr1 Pape
Electr1 Pape
n, ed
t
Electr
Electr
ract conditi
d in the delivn.
esponsible trements ar
by the Agen
ber of Copie
onic format
onic format
onic format
onic format
onic formater copy wit
onic formater copy wit
onic formater copy wit
onic format
onic format
ons (clause
very,
to fix all e
cy during
es
t
t
t
t
t +h the unit
t + h the unit
t + h the unit
t
t
ESA UNCLASSIF
Page 15/35
KaSSPA SOW
Date 22/05/201
Table 1
H3.2
Code
DEL‐0010
Table 2
S3.3
SM‐0001
4 S
SM‐0002
SM‐0003
SM‐0004
Meeting
KOM PDR CDR TRR FAT
IED – Releasable
13 Issue 1 Rev 0
List of
Hardware
Title
Ka SSPA P
List of
Software
Any devthe asswith th
SCHEDUL
The conwork anjustified
The conAny dev
The duactivitycomple
Descripti
Kick Off MeetiPreliminary DCritical DesignTest ReadinessPrototype Acce
e to the Public
0
Documenta
Prototype
Hardware D
veloped locociated unie associate
LE AND M
ntractor shand the miled.
ntractor shaviations sha
ration of thy (delivery oetion of the
on
ing esign Review
n Review s Review eptance Test
(Tfrcowunnenorein
ation Delive
M
Fi
Deliverable
cal or remott. The softwed reviews (
MILESTO
all establishestones in Ta
all monitor all be duly j
e work shaof updated sFinal Prese
The Executivee of all comonfidential ihich shouldnder separaecessary. Nor disseminestrictions sdicated.)
erables
Milestone
nal Present
es
te M&C firmware requirePDR, CDR, F
NES
h a scheduleable 3. Any
the major mustified.
ll not exceeset of TNs, Fentation).
ve shall be mmercial oinformationd be provideate cover if o copyrightation hall be
tation
mware or soed documeFAT)
e that is condeviation s
milestones s
ed 24 monthFinal Report
Events Timmonths)ToTo + 6 To + 12 To + 22 To + 23
r n, ed
t
Numb
1 unit
oftware shants will be d
nsistent withshall be iden
schedule in
hs from kickt and Execu
meline\(in
ber of Items
ll be delivedelivered to
h the plannntified and
dicated in T
k‐off to endutive Summ
Location
ESOC ContractoESOC Tele/VideContracto
s
red with ogether
ed start of duly
Table 3.
d of the ary, and
or’s
eoconf or’s
ESA UNCLASSIF
Page 16/35
KaSSPA SOW
Date 22/05/201
FP
Table 3
Figure 1
ME‐0001
ME‐0002
ME‐0003
ME‐0004
4.1.1 K
ME‐0005
ME‐0006
ME‐0007
4.1.2 P
ME‐0008
ID Task Nam
1 Negotiat2 Prelimin3 PDR4 Detailed5 CDR6 Manufac7 TRR8 Testing9 FAT10 Delilvery
Pres.11 FP
IED – Releasable
13 Issue 1 Rev 0
Final Presenta
List of
Tentat
For eacpresent
The conparties Agencyright tothe con
For all rthe reqThe conand sub
The concontracserver onotify v
Kick‐off Me
The Kic
The obj(specifiand the
The dosection
Progress m
Progrespremis
me Start
tion/KOM Mon 02/09
nary Study Tue 03/09
Mon 03/0
d Design Tue 04/03
Mon 01/09
cturing & AssTue 02/09
Mon 04/0
Tue 05/05
Mon 03/08
y and Final Tue 04/08/15
Tue 01/09
e to the Public
0
ation
Meetings
tive Schedul
ch meeting tation
ntractor sha(including s
y reserves tho invite thirdntractor's ag
review meequired docuntractor shab‐contracto
ntractor shactor shall deor submit bvia e‐mail th
eeting (K.O
ck‐Off Meet
jectives of tication, SOWe presentat
cumentation 0
meetings (P
ss Meetingses and shal
Finish
9/1Mon 02/09/1
9/13Fri 28/02/14
3/1Mon 03/03/1
3/14Fri 29/08/14
9/1Mon 01/09/1
9/14Fri 01/05/15
5/1Mon 04/05/1
5/15Fri 31/07/15
8/1Mon 03/08/1
Mon 31/08/15
9/15Tue 01/09/15
Jul3rd Qu
le
the contrac
all give to thsubcontracthe right of pd parties togreement, t
etings the comentation all be respoor(s) person
all take andeposit the eby email nothe relevant
O.M.)
ting shall be
the meetingW, contraction of the t
on, which th
P.M.)
s take placel be suppor
Sep Novuarter
ctor shall pr
he Agency ptors) to be participatio meetings, to facilitate
ontractor shis available onsible for enel as need
produce thelectronic vet later than distribution
e held at Ag
g are the finual issues), echnical ap
he Contracto
e typically atrted by adeq
Jan Mar M1st Quarter
To + 24
rovide an ag
prior noticeheld in conn in such mwith due noinformatio
hall ensure at the Agen
ensuring theded
he Minutes ersion of thseven workn list of the
ency’s prem
nalization ofthe establi
pproach
or shall pro
t 8‐12 weekquate docu
May Jul Sep3rd Quarter
genda and h
of any meenection wit
meetings. Thotice to then exchange
that propency at least e participati
of the Meee minutes oking days afir availabilit
mises.
f the applicshment of a
vide for the
ks intervals mentation.
Nov Jan1st Quarter
ESOC
hand‐outs o
etings with h the contrhe Agency re contractore
r notice is g2 weeks inion of his pe
eting (MoM)on the ESOCfter the meety.
able documa detailed s
e KOM is de
at contractThe contra
Mar May Jur 3rd Q
of his
third ract. The eserves ther and with
given and advance. ersonnel
). The C FTP eting and
ments chedule
etailed in
or's actor shall
ul Sep NovQuarter
ESA UNCLASSIF
Page 17/35
KaSSPA SOW
Date 22/05/201
4.1.3 P
ME‐0009
4.1.4 C
ME‐0010
4.1.5 T
ME‐0011
4.1.6 F
ME‐0012
ME‐0013
4.1.7 F
ME‐0014
ME‐0015
ME‐0016
IED – Releasable
13 Issue 1 Rev 0
presentfollowicontracsubcon
Preliminary
A Prelimof the pempha
Critical Des
A DesigWP’s. A
Test Readin
After cobe orgaperformprocedThe dosect 5.3
Factory acc
Factoryshall tetest pla
After coreview demonthe spewhich t
Final Presen
The finof the s
The Fininforma
The con
e to the Public
0
t a report ong period, mctor shall enntractor’s pe
y Design Re
minary Desipreliminary sis on the s
sign Review
gn Review sA presentat
ness Review
ompletion oanized by thmances of tures will becumentatio3.4
ceptance T
y Acceptancest the unit an and proc
ompletion omeeting orstrates to tecifications,the Contrac
ntation (F.
al presentastudy and th
nal presentaation and fr
ntractor sha
of the work major problnsure that teople is ava
eview (P.D
ign Review study. A prubjects liste
w (C.D.R.)
hall take plion of the d
w (T.R.R.)
of the Manuhe Contracthe differene reviewed aon, which th
Test Review
ce Tests shaand state itcedures app
of the acceprganized by he satisfact the equipmctor shall pr
.P.)
tion will behe perform
ation and three of any r
all deliver a
performed,lem areas athe approprailable for th
D.R.)
shall take presentation ed in the pr
ace at Agendesign shall
ufacturing aor at his pret modules aand approvhe Contracto
w (F.A.T.)
all take placts complianproved at TR
ptance teststhe Contration of the Ament will beovide for th
held at ESOances of th
he Executiveestriction to
t the Final p
, study resund envisageriate experthese meetin
place at Ageof the desireliminary s
ncy’s premistake place.
and Assembemises. Thisand subasseved for the aor shall pro
e at contracce against tRR shall be a
s the resultsctor at his pAgency thate released fhe FAT is de
OC. The cone unit.
e summary o distributio
presentatio
ults to date, ed correctivise includinngs.
ency’s premgn shall taktudy work d
ses after fin
bly tasks, a rs review wiemblies. Theapplication vide for the
ctor’s premthe Agency applied.
s will be revpremises. Wt the equipmor delivery.etailed in se
ntractor will
shall be freon by ESA.
n:
work plannve actions. Tng possible
ises after fike place witdescription
nalization of
review meell verify thee test plan ato the test e TRR is det
mises. The corequiremen
viewed duriWhen the rement comp The documct. 5.3.5
l present th
e of any pro
ned for the The
nalization h special .
f design
eting shall e and test campaign. ailed in
ontractor nts. The
ing a eview lies with mentation,
he results
oprietary
ESA UNCLASSIF
Page 18/35
KaSSPA SOW
Date 22/05/201
4.1.8 A
ME‐0017
5 D
G5.1
DOC‐0001
DOC‐0002
DOC‐0003
DOC‐0004
DOC‐0005
R5.2
The documschedule.
IED – Releasable
13 Issue 1 Rev 0
Additional
Additioconsidemeetintelema
DOCUME
General re
The Tec
The contheir na(FTP. E‐
The concode (e
For anymasterdigitally
For Datset of hof eachindex obe mar
Running D
ments listed
e to the Public
0
A completeagreed durThe Final PThe ExecutThe Ka SSP
meetings
onal meetinered necessgs may be rtics means.
ENTATIO
equiremen
chnical docAll the docThe text shacceptableDrawings sA full comppart of the
ntractor shaative forma‐mail,…) or
ntractor shae.g. virus).
y documentr paper versy signed.
ta Packageshandbooks sh single voluof the subjecrked with a
Documents
hereafter w
e set of the ring the diffPresentationtive SummaPA prototyp
gs (workingsary. In partrequired. Th.
N
nts
umentationuments shahall be printe for specificshall be inseplement of maintenan
all submit at (e.g. MS Ousing a CD‐
all ensure th
t requiring Esion to bear
s made up bshall be proume. Each incts dealt wititle indicat
s
will evolve w
documentaferent revien ary e
g meetings) ticular durinhese meetin
n shall meetall be writteted on DIN Ac drawings.erted in the all drawingsnce manuals
ll documenOffice, Open‐ROM/DVD.
hat electron
ESA approvar all applicab
by several voovided eithendividual voith in the voting the sub
with the pro
ation produws
may be heng the initiangs include
t the followen in EnglishA4 size pap
text wheres, circuit dias.
ts to ESA ein Office, LaT.
nic docume
al, the contble signatur
olumes, a lier in a separolume shall olume itselfbject of that
oject progre
uced during
ld at the Col phases of videoconfe
wing requireh er. Larger p
e they are nagrams etc.
ither in searTeX, …), eith
nts do not c
ractor shallres or a PDF
ist of contenrate volumebe providef. The cover t particular
ess or have
the study u
ontractors pthe projecterences and
ments:
paper sizes a
eeded; shall be su
rchable PDFher over the
contain any
produce atF copy prep
nts of the ce or at the bed with a deof each vovolume.
no fixed iss
updated as
premises if t such d other
are only
pplied as
F AND in e Internet
y harmful
t least one ared to be
omplete beginning etailed lume shall
sue
ESA UNCLASSIF
Page 19/35
KaSSPA SOW
Date 22/05/201
5.2.1 Is
DOC‐0006
DOC‐0007
5.2.2 M
DOC‐0008
DOC‐0009
5.2.3 A
DOC‐0010
DOC‐0011
5.2.4 P
DOC‐0012
IED – Releasable
13 Issue 1 Rev 0
ssued Docu
The condocumminuterevisionand dis
This listprogres
Minutes of
The conthe minshall berepreserelevan
The miidentifyupdatebe sign
Action Item
The conwith thminuteorigin, date ..
The AIL
Progress Re
The conaddressreport shall giv
e to the Public
0
ument List
ntractor shaents produces. The list sn, date of isstribution..
t shall be coss meetings
f Meeting (
ntractor is rnutes of all e issued andentative andnt meeting.
nutes shall y all agreeme of the Actied and dist
m List (AIL)
ntractor shae Agency. Ees of the medue date, o
L update sha
eports (PR)
ntractor shased to the Ashall refer tve: DescriptionaccomplishAction itemEvents antReasons foplanned an
t (IDL)
all create anced during thall containssue, status
ontinuouslys
(MoM)
responsible meetings hd distributed to the ESA
have a cleaments madeon Item Listtributed at t
all maintainEach item weeting at whoriginator, a
all be review
)
all provide, Agency's repto the curre
n of progreshed, ms completeicipated to or slippage and/or taken
nd maintainthe work, inn the docum(draft or ap
y updated an
for the preeld in connd to all partA Contracts
ar and unique and actiont (AIL) and tthe end of e
n an Action will be uniquhich the actactionee, sta
wed at each
every montpresentativent activities
ss: actual vs
ed during thbe accompand/or prob, with revis
n an Issued ncluding repment referepproved by
nd shall be
eparation coection withticipants, toOfficer, no
ue configurans accepted the Issued Devery meeti
Item List (Auely numbeion was agratus (open,
h progress m
th, a Monthves, coverings shown on
s. schedule,
he reportinglished durinblem areas, ed complet
Document ports, specince, type othe Agency
reviewed d
onfigurationh the contrao the Agenct later than
ation code, at the meeDocument Ling.
AIL), recordired with rereed and wiclosed, wit
meeting
hly Progressg the contra the latest i
milestones
g period (grng the next if any, and tion date pe
List, recordfications, pf documenty), confiden
uring the re
n and distribact. Typed vcy's technican one week
clearly labeeting, togethList (IDL). A
ng all actionference to till record dahdrawn) an
s Report (Mactual activissued bar c
s and event
reen flags), reporting pcorrective er activity (r
ing all the lans and t, issue and ntiality level
elevant
bution of ersions al after the
elled and her with an draft shall
ns agreed the ate of nd closing
MPR), vities. This chart and
ts
period, actions red flags)
ESA UNCLASSIF
Page 20/35
KaSSPA SOW
Date 22/05/201
DOC‐0013
5.2.5 T
DOC‐0014
DOC‐0015
R5.3
DOC‐0016
5.3.1 K
DOC‐0017
DOC‐0018
DOC‐0019
IED – Releasable
13 Issue 1 Rev 0
During shall prsummaweek a
Technical N
As soonapprovetc., wh
Furthercase, a
Review Da
The Revcorresp
Kick Off Me
The conKOM.
The KO
Slides aKOM. T
e to the Public
0
Status repoMilestone Expected dLast up to dAIL up to d
special or crovide by e‐ary of activitnd the gree
Notes (TNs)
n as they beval all technhich are pro
r detail couspecific Tec
ata Packag
view Data Pponding rev
eeting (KO
ntractor sha
OM Data PacK.O.M. slid
o Proo Preo Stato Crito Scho Milo Meo Pay
CompliancMinutes ofRedlined ve
and compliaThe complet
ort on all lopayment stdate for majdate scheduate
critical phas‐mail a Weeties performen and red f
)
ecome availical notes, ioduced duri
ld be requirchnical Not
ges
Packages shview.
M) Data P
all prepare
ckage shall des coveringoject teamesentation otement of ctical Itemshedule estones eting planyment plane matrices af Meeting ersion of re
ance matricte KOM doc
ng lead or ctatus, jor scheduleule
ses of the acekly Progresmed during flags.
lable, the concluding ening the exec
red, depende will be req
hall be sent
Package
a KOM Data
include at leg at least:
of the techncompliance
against ESA
equirements
es shall be cumentatio
critical deliv
e items.
ctivity at thss Report (Wlast week, t
ontractor shngineering dcution of th
ding on the quested.
at least two
a Package a
east:
nical approa
A requireme
s (if any cha
sent at leasn shall be s
very items
e Agency reWPR) with tthe foresee
hall submit drawings, mhe contract
course of t
o weeks in a
as documen
ach
ents
ange agreed
st one weekent no late
equest, the he executiven activities
for the Agemanufacturi
he project.
advance of
ntation to su
d during the
k in advancer than two w
contractor ve in the next
ency's ng plans,
In that
the
upport the
e KOM)
e of the weeks
t
ESA UNCLASSIF
Page 21/35
KaSSPA SOW
Date 22/05/201
5.3.2 P
DOC‐0020
DOC‐0021
5.3.3 C
DOC‐0022
DOC‐0023
DOC‐0024
IED – Releasable
13 Issue 1 Rev 0
after th
Preliminary
The con
The do
Critical Des
The con
The do
ESA apmanufa
e to the Public
0
he KOM is h
y Design Re
ntractor sha
cumentatioPreliminary
o Deto Deso Mao Simo Elec
deso Preo Relo Alao Exp
CompliancList of critic(present anCeiling pricMechanica
sign Review
ntractor sha
cumentatioTechnical dExpected pThermal AnCompliancPart List MechanicaUser’s ManTest Plan Test proce
proval of thacturing act
hold.
eview (PDR
all prepare
on of the P.Dy Technical tailed Blockscription of in paramet
mulation resctrical Desigscription of eliminary meiability, singrms and secpected perfoe matricescal aspects nd future) aces al and electr
w (CDR) Da
all prepare
on of the C.Ddescription performancenalysis e matrices
al and electrnual (prelim
dures (preli
he Critical Dtivity of the
R) Data Pa
a PDR Data
D.R. shall coDescription
k diagrams othe equipmers budgetsults gn (Electricathe electricechanical agle point faicurities ormances v
of the desigand availabi
rical ICD (HW
ata Packag
a CDR Data
D.R. shall coof the equie Analysis
rical ICD (HWminary)
iminary)
Design Revieconcerned
ackage
Package to
over at leastn containingof the equipment and itss (Power, G
al Block Diacal parts andnd thermal ilure and fa
vs. ESOC req
gn, includinlity.
W and SW)
ge
Package to
over at leastpment
W and SW i
ew is manda hardware.
o document
t:g: pment s constituenain, Noise,
grams of thd its constitdesign ilure propa
quirements
ng compone
o document
t:
f applicable
atory prior t
t and suppo
nt modules IP3, …)
he equipmetuent modu
gation anal
ent procurem
t and suppo
e)
to start any
ort the PDR.
nt and ules)
ysis
ment
ort the DR.
y
ESA UNCLASSIF
Page 22/35
KaSSPA SOW
Date 22/05/201
5.3.4 T
DOC‐0025
DOC‐0026
5.3.5 F
DOC‐0027
DOC‐0028
5.3.6 F
DOC‐0029
T5.4
5.4.1 C
DOC‐0030
DOC‐0031
IED – Releasable
13 Issue 1 Rev 0
Test Readin
The con
The Tesdocum
Factory Acc
The de
The Accdocum
Final Review
At the F
Types of D
Compliance
The comcontrac
An indidocum
e to the Public
0
ness Review
ntractor sha
st Readinesentation: Dry‐run TeTest proceUser’s docu
o Useo Mao Inst
Mechanica
ceptance T
livery of eac
ceptance reentation: AcceptanceTest proceUser’s docu
o Useo Mao Inst
Circuit DiagPart Lists Mechanica
w Docume
Final ReviewUpdated seFinal PreseExecutive S
Document
e Matrices
mpliance mctor with ea
vidual Coments
w (TRR) Da
all prepare
ss Review D
st Results (cdures (onlyumentationer’s Manualintenance Mtallation Maal and electr
Test Review
ch unit will
eview Data
e Test Resudures (onlyumentationer’s Manualintenance Mtallation Magrams and b
al and electr
entation
w the contret of the doentation slidSummary (w
s
matrices shaach one of t
pliance Ma
ata Packag
a TRR Data
ata Package
compared ay reference an Manual anual rical ICD’s
w (FAT) Da
be made af
Package sh
lts (compary reference an Manual anual board(s) lay
rical ICD’s
actor shall ocuments prdes (withoutwithout cop
ll indicate tthe paragra
trix shall be
ge
Package to
e shall cont
against requand issue if
ata Packag
fter an A.R.
all contain a
red against and issue if
youts
provide theroduced dut copyright pyright or di
he statemephs of the A
e issued for
o document
ain at least
uirements)f already sen
ge
of the part
at least the
requiremenf already sen
e following dring the stuor disseminisseminatio
ent of compAgency requ
each one o
and suppo
the followi
nt)
icular unit i
following
nts) nt)
documentaudy nation restrn restrictio
liance of thuirements..
of the applic
rt the TRR.
ng
is made.
tion:
rictions) ns)
e
cable
ESA UNCLASSIF
Page 23/35
KaSSPA SOW
Date 22/05/201
DOC‐0032
DOC‐0033
5.4.2 T
DOC‐0034
DOC‐0035
5.4.3 P
DOC‐0036
5.4.4 P
DOC‐0037
IED – Releasable
13 Issue 1 Rev 0
The comrefereninclude
The comdocumCompliexplana
Technical D
The tecthe resthis des
The tec
Performanc
This doperformmeasurwith threquire
Part List
A list co
e to the Public
0
mpliance mnce and issue columns foThe requireTitle of theRequired vCompliancMeasured/Remarks.
mpliance shent, one reqant”. In casation for th
Description
chnical Descults of the asign with th
o Deto Deso Levo Simo Elec
deso Preo Relo Alao Exp
chnical desc
ce Analysis
ocument canmances of trements, ane requiremements.
ontaining al
matrices shaue, and the or: ement refee requiremevalue e status (C//Expected v
hall be statequirement se of non‐coe non‐comp
n (TD)
cription shaanalysis andhe requiremtailed Blockscription of vel diagramsmulation resctrical Desigscription of eliminary meiability, singrms and secpected perfo
cription sha
s
n be includehe equipmenalysis, simuments in ord
ll parts emp
ll include incompliance
rence ent
/NC) value
ed paragrapin each rowompliance apliance in th
all include thd simulationments. The tk diagrams othe equipms or budgetults gn (Electricathe electricechanical agle point faicurities ormances v
ll be update
ed as a partent shall beulations ander to state t
ployed on th
n the headee matrix refe
ph per paragw, with C or a proposed vhe remark c
he descriptins performeechnical deof the equipment and itss of main p
al Block Diacal parts andnd thermal ilure and fa
vs. ESOC req
ed at each n
t of the teche described d/or budgetthe expecte
he equipme
r the requirerence and
graph of theNC for “Comvalue shall column.
ion of the eed to sustaiescription shpment s constituenarameters
grams of thd its constitdesign ilure propa
quirements
new technic
hnical descrtogether wts of the deed complian
ent manufac
rements docissue. The
e requiremempliant” orbe given wi
quipment dn the comphall include
nt modules
he equipmetuent modu
gation anal
cal review.
ription. The ith the sustesign and conce with the
cturing shal
cument matrix will
ents r “Not ith a brief
design and pliance of at least:
nt and ules)
ysis
expected taining ompared ese
ll be
ESA UNCLASSIF
Page 24/35
KaSSPA SOW
Date 22/05/201
5.4.5 M
DOC‐0038
5.4.6 T
DOC‐0039
DOC‐0040
5.4.7 A
DOC‐0041
DOC‐0042
DOC‐0043
IED – Releasable
13 Issue 1 Rev 0
genera
Mechanica
A docuadequainterfacof thes
Test Plan
The teswill be with th
Test Plashall be
Acceptance
The tesequipm
Test pr
The doinforma
e to the Public
0
ted. The listModule whPart referePart numbManufactuQuality lev
l and Elect
ment contaately shall bcing informe interfacesExternal MAttaching pGrounding Cooling intConnector
o Namo Cono Cono Pin o Typo Sign
For remotetelemetries
st plan list tmeasured fe ATP.
an shall be ae used to de
e Test Proc
st procedurement. The AT
ocedures sh
cument shaation:
t shall contahere the paence in the eer (manufaurer vel (if applic
trical Interf
aining the inbe issued. Thation, and as. At least th
Mechanical dpoints defin definitionterfaces andlist includinme of the connector typnnector funlist
pe of signalsnal Characte control, a s, …
he test to bfor each tes
approved pefine the Ac
cedures (AT
es shall defTP can be m
hall be appr
all contain a
ain for eachrt is mountequipment cturer refer
able)
rface Contr
nformation his documeall the requhe followingdimensionsnition
d requiremeng onnector e and positction
s eristics (voldefinition o
be carried ovst. The test
prior to the scceptance T
TP)
ine the waymerged in a
roved prior
a list of test
h part: ed (Topo) rence)
rol Docume
necessary tnt shall conired hardwg informatio
ents
ion
tage, maximof protocol,
ver the equplan can be
start of theTest Proced
y each test wsingle docu
to the start
and for eac
ent (ICD)
to define thntain all meare and sofon shall be
mum rating available c
uipment ande merged in
test sequeures.
will be perfument with
t of the test
ch test at le
he interfaceschanical anftware charaincluded:
gs, …) commands,
d the param a single do
nce. Once a
ormed overthe test pla
t sequence.
east the follo
s d electrical acteristics
meter that ocument
approved
r the an.
owing
ESA UNCLASSIF
Page 25/35
KaSSPA SOW
Date 22/05/201
5.4.8 A
DOC‐0044
DOC‐0045
DOC‐0046
2 The overatesting pha
IED – Releasable
13 Issue 1 Rev 0
Acceptance
The Accequipmeach tethe me
Each te
The tesphases requiretesting Each rocolumn
all complianase for this
e to the Public
0
Test identifTest set‐upTest instruMeasuremMeasuremFormulae fA void resushall includdefinition.
e Test resu
ceptance Tement’s testinest performeasurement
est result shUnit underConfiguratmodules) Date and tTest operaTesting phaTest name Test result Required preference) Status of co
st summary against the
ement2. Thisresults and
ow of the tans: the performThe specifiThe measu
nce for a paparticular r
fication incp ments requ
ment accuracment procedfor the calcuult form as ede all the da
lts
est Results ng sequenceed over theresults and
heet shall ber test (equipion of the u
ime of the ttor ase or number
performance
ompliance (
is a table te requiremes summary d the complable shall inc
mance title ed value ured value
articular reqrequiremen
luding refer
uired cy ure step byulation to bexample of ata required
is the docume. The docue equipmend complianc
e identified pment type unit (referen
test
(according
e (as in the
(C or NC)
hat synthesent and indishall allow iance statuclude for a
and refere
quirement ist
rence to the
y step be made forthe final red in the Acc
ment that cument shall t plus a testce status.
with the foand serial nnce and ser
with the te
specificatio
sises the tesicates the oto have a qs. given perfo
nce
s the logica
e Test Plan
indirect mesults. The teptance Te
compiles thecomprise tt summary
ollowing datnumber) ial number
est procedu
on, including
st results in overall compuick look of
ormance at
l AND of the
easurementest result test results d
e results of he result shtable that s
ta:
of the diffe
re)
g requireme
the differepliance agaif the equipm
least the fo
e complianc
ts emplate ocument
the heets of synthesizes
erent
ent
nt testing inst each ment
ollowing
ces in each
ESA UNCLASSIF
Page 26/35
KaSSPA SOW
Date 22/05/201
5.4.9 U
DOC‐0047
5.4.10 M
DOC‐0048
DOC‐0049
IED – Releasable
13 Issue 1 Rev 0
User’s Man
The Useshall incontain
Maintenan
The Mafinding merged
The Ma
e to the Public
0
The status
nual
er manual stroduce then: A brief desBlock diagrequipmentExplanatioand softwaA descriptisystem at uTechnical sAbsolute mfault toleraInstruction
o Poso Loco Rem
A copy of tannexed.
nce Manua
aintenance and troubld together w
aintenance Descriptionshall includof each drawill aid themulti‐drawdiagrams sencounterethe drawingiven. Evercode/numbdetail:
of complian
shall indicate User to th
cription of rams shall bt description of the priare point of on, from thunit level; specificationmaximum raance characn for the usessible configcal monitor mote monitthe interfac
al
manual shaeshooting owith the use
manual shan of equipmde a descripawer include understanwer system ahall clearly ed from theng, a level pry unit in thber. In part
nce (C or NC
te the functhe use and o
the purposebe providedn; nciples of of view he signal flow
ns of each satings of thecteristics of e of the systgurations ofand controtor and contes of the eq
all provide aof the systeer and/or in
all contain ament/systemption from aed in the syding of the a block diagindicate the input to thlan for the ie block diagicular the fo
C)
tions and choperation o
e and techn as an aid to
operation of
w point of v
subsystem ae equipmeneach electrtem includif the systeml; trol. quipment (H
a guide for pm. The Mainstallation m
at least the m at unit/cira signal flowystem. A geequipmentgram is reque different he output oinput/outpugram shall bollowing ite
haracteristicf the system
nical functioo the under
f the system
view, of the
and its extent including rical interfacng: m;
HW and SW
preventive intenance mmanuals in a
following sercuit diagraw point of vineral block t concept (iuired for eaconnectorsof the draweut points ofbe marked wems shall be
cs of the sysm. It shall th
oning of therstanding of
m from a ha
e function o
rnal interfafault emissce.
W) or ICD can
maintenancmanual cana single doc
ections: m level. Thiiew of the ddiagram atn case of a ch drawer)s and test poer. At the bof each unit swith its proe included in
stem and herefore
e system. f the
rdware
of the
ces; sion and
n be
ce, fault n be cument
is section drawer, or t unit level
. The block oints ottom of shall be per type n adequate
ESA UNCLASSIF
Page 27/35
KaSSPA SOW
Date 22/05/201
IED – Releasable
13 Issue 1 Rev 0
e to the Public
0
o A dcon
o A lamu
o A pcascon
o Whmetyp
A table of cthe drawerTechnical deach unit/mhave a deddocumenta
o Meo Circo Par
cono Listo Dra
reqinclbe g
o Rac(inp
First Level o Tes
A reresfor
o Tesaligadjcleaoutshabe
Preventive
escription ontrol and moayout of thelti‐drawer sower distribe of multi‐dnnector; here applicachanical loce of signalsconnectors r. documentatmodule shadicated paraation: chanical laycuit diagramrts list includnnectors; t of signals fawer cablinguired. One luding whergiven even ck cabling: fput/output)Maintenanst procedureecommenduming the eeach test;st proceduregnment procustment poarly indicatetput of all inall be given. indicated; maintenan
of the functonitoring ree units in thsystem); bution plandrawer syste
able, drawincation of th routed thrused in the
tion of singall be given. agraph, whi
yout of them and correding electric
for each inpg. Completewiring list fre applicablif this couldfull‐wiring li) shall be prce and alignes for functed list of teexpected te
e, test set‐ucedures at uoints and thed. Nominanterface signIn case of d
nce, fault‐fin
tions perforequiremente drawer (i
n within the em) starting
ng of the drae connectoough each ce drawer an
le units/moIn particulach shall con
unit; sponding bcal compon
put and outpe wiring listsfor each conle drawer ind imply somsts of rack irovided. nment procional testinst equipmeest results, w
up with recounit level. Feir physicall values andnals betweedigital signa
nding and t
rmed in eacs; n each draw
drawer (wig from the d
awer interfars, type of cconnector;d location o
odules. In thar, each singntain the fo
oard(s) layonents, mech
put connecs for the drannector connterface panme documeninterconnec
cedures. Thing of the sysent shall be with toleran
ommended For each un location ind toleranceen units andals the meas
roubleshoo
h single uni
wer in case
ithin each ddrawer mai
ace panel inconnector u
of each con
his section dgle unit/mollowing
out; hanical parts
tor; awer cablinntained in thnel connectntation reduction cablin
is shall contstem at drawgiven. A tabnces, shall b
test equipmit, all test a the unit shs at the inpd at each tesuring cond
oting. The ag
it and its
of a
drawer in ins input
ndicating used and
nector in
details of odule will
s and
ng are he drawer, tors, shall undancy; g
tain: wer level. ble be provided
ment and nd hall be ut and est point ditions shall
greed
ESA UNCLASSIF
Page 28/35
KaSSPA SOW
Date 22/05/201
5.4.11 In
DOC‐0050
DOC‐0051
5.4.12 C
DOC‐0052
5.4.13 R
DOC‐0053
IED – Releasable
13 Issue 1 Rev 0
nstallation
The Insdisassemerged
the inst
Descripparticuphysicamade tMainteprovide
Circuit Diag
The Ciridentifytroubleincludeand/or includewith thmanua
Reliability A
The RedetailinThe ana
e to the Public
0
maintenanrecommenand tables First Level
n Manual
stallation membly of thed together w
tallation maA detailed including srequiremePacking/unInstructionPreventiveEarthing anPreventionption of the lar attentioal charactero the approenance maned in this se
grams and
rcuit diagramy any compeshooting oed. Additionmodules sh
ed with the e part list. Tl
Analysis
liability Anang the rulesalysis shall c
nce philosopnded spare pdescribing Maintenan
anual shall e system anwith the use
anual shall aphysical deize, weight,nts; npacking insns for equip measures tnd power rens to be takeequipment
on to plug aristics. In thiopriate wirinual. The infection.
d Board Lay
ms and boaonent in thn the equipnally, the inthall be incluindication oThis docum
alysis will in and assumconclude th
phy shall beparts shall bfault symptce shall be
give all infond for its inser and/or m
at least conescription of, power con
structions;ment dismato be takenequirementen before fit interfaces llocation, siis section ofng and signformation n
youts
rd layouts se equipmenpment. The terconnectiuded. The laof the placeentation ca
clude an anmptions takehe MTBF or
e clearly indbe given. Prtoms and coincluded in
ormation nestallation. Tmaintenance
ntain: f the equipmnsumption,
antling and n prior to thts. irst equipmto other eqgnal allocatf the Installnal characteneeded to id
shall help, tnt and perfocircuit diagng diagramayout of bote of each coan be includ
nalysis of then when calthe failure
icated and reventive morrective acthis part
ecessary forhe Installate manuals i
ment breakcooling and
assemblinge equipmen
ent switch quipment/stion within ation manueristic lists pdentify the
ogether witorm the reqram of each
m between dth faces of emponent aded as a par
e reliabilityculating therate figures
a list of maintenancections requi
r the assemion manualn a single d
kdown in racd environme
g; nt installatio
on ystems, witthe plug anual, referencprovided as lists has to
th the partsquired h board shadifferent boeach board nd its topo rt of the ma
y of the eque reliability s of the equ
e schedules red for
bly and can be ocument.
cks, units, ental
on
th nd signal ce can be part of the be
s list, to
all be oards will be according intenance
ipment figures. uipment.
ESA UNCLASSIF
Page 29/35
KaSSPA SOW
Date 22/05/201
DOC‐0054
6 G
The standathe Contraactivity, wh
R6.1
RE‐0001
RE‐0002
RE‐0003
RE‐0004
RE‐0005
RE‐0006
IED – Releasable
13 Issue 1 Rev 0
Unless
GENERAL
ard requiremact) shall aphich shall p
Responsib
The conmanage
The conthe devcommu
The conthat wiprojectwork
The prorequirethe proof the aforeseetelecon
The maincludeContracAgency
The Comanage
e to the Public
0
otherwise e
L PROJEC
ments for Mply, taking arevail in cas
ility
ntractor wilement of thOrganisatioOrganisatiopreparatioMonitoringPreparatioReporting tvenues, etc
ntractor shavelopment. unication be
ntractor shall perform tt manager s
oject managed in this S.Ooject managactivities peen activitiesnferences th
anagement es the manactor’s own y of all aspe
ntractor shement, visib
established
CT MANA
Managemenaccount of tse of conflic
ll be responhe contract,on of the pron of the sun of minuteg of efficienn and updato ESA, inclc.
all define a The Contraetween the
all implemethe tasks rehall have th
ger is the onO.W. in timger is responerformed, ms. The projehe availabili
of all tasks agement of resources. Tcts of the w
all impose obility and co
, the analys
AGEMEN
nt, Reportinthe followinct.
nsible of all , namely: roject teamub‐contractoes, agendasnt executionting of the uding meet
single and oact defines tAgency and
ent a projectquired to fuhe access to
nly and finae and fulfillnsible of themain achievect managerity of the ne
shall be thesubcontracThe Contracwork
on his subcoontrol that a
sis shall be p
T ASPEC
g, Meetingsng specific r
the tasks re
within the ors (if any) , venues, etn of the taskcontract sctings, prepa
only .interfthe only vald the Contr
t organisatiulfil the woro the resour
al responsibing the reqe periodic rements, grer shall ensurecessary pe
e responsibctors as welctor shall pr
ontractors (are at least
performed
CTS
s and Deliverequiremen
elated to th
Company. relationshiptc.; ks; hedule; aration of m
ace for all mid interfaceactor
ion under thrk describedrces necess
le of the deuired perforeport that ween and redre at revieweople and do
ility of the Cl as the conrovide com
(if any) requequivalent
following A
erables (Apnts for the p
e proper
p, including
minutes, age
matters relaes for all for
he project md in this S.Oary to comp
elivery of thrmances. Awill included flags and nws, meetingsocumentati
Contractor.ntrol of the plete visibil
uirements f to the requ
AD2
pendix 3 topresent
g meetings,
endas,
ated with rmal
manager O.W. The plete the
e items Additionally e a report next s and on.
This
ity to the
for uirements
ESA UNCLASSIF
Page 30/35
KaSSPA SOW
Date 22/05/201
S6.2
ST‐0001
ST‐0002
ST‐0003
ST‐0004
S6.3
SC‐0001
IED – Releasable
13 Issue 1 Rev 0
imposemanagesubconStatemContracvisibilit
Staffing
The Comanagethe manamedthe ConThe C.Vsubmitt
The conand org
The conproject
The connecessathe relecontracshall prsuccessrequireproducAs a gu
This listContrac
Schedule C
A detai
e to the Public
0
ed on the Coement and ntractor andent, specifictor and hisy.
ntractor shement of thin parts of t. If there is ntractor shaV. of all the ted
ntractor shaganisation.
ntractor shat.
ntractor shaary to carryevant chaptctor on all arovide sufficsfully by theed technicalced to the reideline, theHardware aDesign tooTesting tooEquipmentQuality assAdministrat is not intector to defi
Control
led plannin
ontractor. Tcontrol prod shall integcations ands subcontra
all identify the project athe design, any changeall immediakey Person
all documen
all ensure th
all provide ty out in an eters. The Agaspects relatcient resoure specified dl specificatioequired stae following rand softwals, ols and equit productionsurance, ative and sended to be ne and prop
ng network s
The Contracocedures wigrate these id milestone ctors shall b
the person and his/her quality assue of personntely informnel, which m
nt and justif
he availabil
the personneffective andgency shall bted to the erces to ensudate, that tons and thandards. resources are design en
ipment n and manu
cretarial sumandatorypose his pro
shall be pre
ctor shall opth respect tinto the ovedates of thbe given to
who will bedeputy. Alsurance and nel in these the Agencymust includ
fy the team
ity of the ke
nel, materiad economicbe providedexecution oure that thehe system wat the system
re suggestengineers,
ufacturing fa
pport. y or exhaustoject team.
epared by th
perate the nto the activerall projecthe contractsthe Agency
e responsibso the persocontractua positions dy and propode his full qu
m build up, it
ey staff as r
als, equipmecal way the d with compf the contrae project wiwill be desigm will be en
ed:
acilities,
tive. It is the
he Contract
necessary ities of eacht. A copy ofs between ty to provide
le for the on(s) responal aspects shduring the cose his replaualifications
ts structure
equired by
ent and factasks as deplete visibilact. The Conll be complgned to mengineered a
e responsib
tor in the fo
h f the Work the e full
nsible for hall be contract, acement. s, shall be
e, location
the
ilities fined in ity by the ntractor eted et the and
bility of the
orm of a
ESA UNCLASSIF
Page 31/35
KaSSPA SOW
Date 22/05/201
SC‐0002
SC‐0003
SC‐0004
SC‐0005
SC‐0006
SC‐0007
IED – Releasable
13 Issue 1 Rev 0
CPM (Cby the Ait as a rdifferenwill devall suchinspect
The pla
The conagreed
The conmeetindocum
Modificwritingmentio
The schStructu
The Coprovisioenforce
e to the Public
0
Critical PathAgency thereference font tools for velop betweh internal dotion by the A
anning shallAll tasks mThe work mduration. Ldetail is noAll functionlogical conManpowerparticular anetwork; The duratioaccount thclosing perAvailable sThe type oor fraction
ntractor shaat the kick‐
ntractor shags, indicatinents deliver
cations of th by the Ageoned in the c
hedule shallure and shal
ntractor shon of all gooe the followEffective costaff respoAdherenceUse of thes
Method) n Contractoror reportingthe controleen this andocumentatiAgency
meet the fust be showmust be broLonger duraot possible;nal prerequnection witr constraintactivities an
on of each ae number oriods etc; lack for eacf manpowes thereof, d
all be respo‐off meetin
all present ang the currered, etc.)
he scheduleency's reprecontract
l be based oll reflect the
all operate ods and serwing: ommunicatnsible for the to these pse plans and
network drar shall schedg. If the Conl of the projd the CPM non used by
following rewn; oken down iations are on
isites for thth a leadings shall be innd shall not
activity shaof staff, ava
ch activity; aer (engineerduring all ac
onsible for mg
an up to daent status o
e shall only esentative fo
on the Conte milestone
a schedule rvices. The s
ion of the lahe executiolans and schd schedules
wn over a cdule his wontractor inteject he musnetwork spe the Contra
equirements
in activities nly permitte
he start of a activity, evncluded in tproduce lo
ll be given iilability of e
as well as thr, technicianctivities shal
maintaining
te chart forof the contr
be contractor contractu
tractor’s proes included i
control sysschedule co
atest approon of the wohedules; s to control
calendar grirk accordingends to use st ensure thecified in thactor shall b
s:
of betweened when de
n activity mvent or interthe planninggical constr
n working wequipment,
he critical pn, etc.) and ll be shown
the schedu
r review at aact activity
tually bindiual and adm
oposed Woin section 4
tem that enontrol system
oved plans aork;
actively the
id. After agrg to this plaadditional
hat no discrehis section. be accessible
n 2 and 8 wefinition in f
must be shorface; g by rescheraints in the
weeks, takinleave and c
ath must bethe numbe on the plan
ule (in bar c
all conseque(WP's comp
ng if approvministrative
rk Breakdow4.
nsures the tm shall in p
and schedul
e execution
reement an and use or epancies Moreover e for
weeks further
wn by a
duling the e planning
ng into company
e visible; r of men, n.
hart form)
ent pleted,
ved in matters as
wn
timely articular
les to the
n of the
ESA UNCLASSIF
Page 32/35
KaSSPA SOW
Date 22/05/201
SC‐0008
R6.4
RP‐0001
RP‐0002
RP‐0003
RP‐0004
RP‐0005
RP‐0006
RP‐0007
IED – Releasable
13 Issue 1 Rev 0
The Coand assmonthl
Reporting
The conaddressconten
During contracsummathe fore
Weeklyfirst we
In specin a gre
The conContracthe wo(due toThis nostate of
During plan, pwork. Aassocia
The contest protests thleast on
e to the Public
0
work, anticTimely repproject schEffective aimplementMaintenanschedule a
ntractor shsess the imply progress
ntractor shased to the Ats of the M
specific andctor to provary of the steseen activ
y report is deek of the m
ial circumsteater depth
ntractor shacts Officer) rk programo e.g. procurotification shf the recove
the course rocedure, sAreas and eated with th
ntractor shaogram, or ahat it wishesne week in
cipating proorting of anheduling offnalysis of sutation of thence of an upnd progress
all regularlypact on futureport or e
all provide, Agency's repPR are liste
d critical phvide by e‐matatus of the ities for the
due on first month.
tances the Aof detail an
all notify thof any even or significarement prohall be madery actions
of the contpecificationquipment uhe contract s
all notify ths mutually s to witnessadvance.
oblems, rathny actual orficer of the Cuch reportee required cp‐to‐date scs reporting
y review theure activitieach meetin
every montpresentativd in 5.2.4.
hases of theail a Weeklyactivities pe next week
labour day
Agency maynd/or a high
e Agency's nt likely to cantly impactoblems, unade in 48 hou
tract the Agn or other dused duringshall also be
e Agency atagreed, in os. The Agen
her than jus foreseeablContractor;ed deviationcorrective ahedule oveto the Agen
e planning ses. A reviewg
th, a Monthves, covering
e developmey Progress Rperformed dk.
of the wee
y require thher reportin
representatcause majot the scope vailability ours after the
gency shall bdocumentat the develoe available
t least two worder to enacy shall not
st for recorde deviation; ns and the daction; rview that ncy.
status and tw shall be do
hly Progressg the contra
ent ESA maReport (WPduring last w
k. Monthly
e implemenng frequenc
tives (Technr delays to tof the wor
of facilities oe problem a
be affordedtion relevanopment/testfor inspecti
weeks befoable the Agtify the cont
ding progresn from the p
definition an
permits effe
the progressone prior to
s Report (Mactual activ
y request toR) with the week and th
report is du
ntation of scy
nical Managthe time sck to be perfor resourcearises, despi
d free accessnt to the proting activitieion and aud
ore the startency to seletractor of it
ss; plan to the
nd
ective
s of work each
MPR), vities. The
o the executive he status of
ue on the
cheduling
ger and hedule of formed s, etc.). ite of the
s to any ogram of es dit
t of any ect those ts visit at
ESA UNCLASSIF
Page 33/35
KaSSPA SOW
Date 22/05/201
M6.5
ME‐0018
ME‐0019
7 T
A7.1
TST‐0001
TST‐0002
TST‐0003
TST‐0004
TST‐0005
TST‐0006
TST‐0007
T7.2
TST‐0008
IED – Releasable
13 Issue 1 Rev 0
Meetings
The list
Additioheld at request
TESTING,
Acceptanc
The CoSpecificshall bethe reqverifica
o
o
o
o
The tes
Experiminto acc
In casecan be analysisdemon
When tthe righ
The contesting,
The conthe ope
Test organ
Accept
e to the Public
0
t of meeting
onal periodiContractort.
, ACCEPT
ce test obj
ntractor shcation havee checked. Tquirements,ation methoDesign: Thedesign (e.gInspection(e.g. type oAnalysis: TequipmentTest: The cequipment
sts must pro
mental errocount when
s, where dirderived fros or figures stration of
test results ht to call for
ntractor sha, including t
ntractor shaerational en
nization
ance of com
gs is detaile
cal progresr’s premises
TANCE AN
jectives an
all prove toe been met. The contrac the actual od that will e compliancg. presence : The compof connectohe compliat charactericompliance t
ovide conclu
rs shall be nn measuring
rect measuom other quderived by the specifie
are inconclr repetition
all be respotest harness
all provide anvironment
mponents a
d in Table 3
s Meetings s or by video
ND WAR
nd princip
o the AgencyAll paramector shall pror expectedbe employece to the spof redundaliance to thor) nce to the sstics (e.g. Mto the spec
usive proof
negligible cog the equipm
rement of auantities, whpurely theoed MTBF
usive, the A of one or m
onsible to prses, input d
and use hardefined in
nd subsyste
3
to follow thoconferenc
RRANTY
ples
y that all reeters given irovide a Comd performaed among thpecification nt outputs)e specificat
specificationMTBF, powecification is v
that the eq
ompared wment.
a quantity ishich have boretical calc
Agency's tecmore tests o
roduce any data sample
rdware/softthe specific
ems procure
he evolutioce at Agency
quirementsn the technmpliance Stnce of the uhe followingis inherent ) tion is verifi
n is verifieder breakdowverified thr
quipment m
with the mea
s not feasibeen measuculation is o
chnical repror for addit
necessary is, comman
tware that acation
ed from sub
n of the stuy or contrac
s of the Tecnical specifictatement munit and theg: with the em
ed inspecti
d by analysiswn level, …) ough testin
meets its spe
asured valu
le or imprared. The usonly accepta
resentative ional tests
item to supd procedur
are represe
bcontractor
udy can be ctor’s
hnical cations
matrix with e
mployed
ng the unit
s of the
ng of the
ecifications
e or taken
ctical, it e of able, for
shall have
port es.
ntative of
rs will be
ESA UNCLASSIF
Page 34/35
KaSSPA SOW
Date 22/05/201
TST‐0009
TST‐0010
TST‐0011
TST‐0012
T7.3
TST‐0013
TST‐0014
TST‐0015
IED – Releasable
13 Issue 1 Rev 0
the resmanufaContracbe infoto attenaccepta
Factoryreleasebe prec
During tests pethe equ
The accacceptaresults.statem
All requguarancertificAgency
Test condu
For all mmust bconditiinspectshould
Specialthe intecorrect
The folVisual iboards,ModulespecificOverallinterfac
e to the Public
0
ponsibility oacturers woctor will havrmed of thend the testsance docum
y acceptance of the equceded by: PreparatioDelivery offull test pro
factory accerformed buipment pri
ceptance doance tests, w. Each Test ent (C or NC
uired test etee a calibrates must by who will h
uction
modules ane demonstrons under wtion and funbe well kno
attention serface with t functioning
lowing testinspection: , waveguidee tests: Testcations are l functional ces, alarms
of the Contorks and wilve the respese test in as. The Contrmentation to
ce of the eqipment for
n and agreef pre‐acceptocedure.
ceptance, thy the Contror to the fo
ocuments swith the daresult will bC)
quipment sration valid be availableave the righ
nd for the corated. It showhich the pnctional testown.
shall be givethe monitog of the har
s shall be inInspection e and coaxiat of individuthose approtest: Operaetc.
ractor. Suchl verify confonsibility foadvance andractor shall o be provid
uipment. Adelivery to
ement withtance test r
he Agency rractor. The Cormal accep
hall containate of testinbe accompa
shall be provduring all the for inspectht to check
omplete sysould be noteperformancets will alway
en to the exoring and cordware as w
ncluded as aof the systeal componeual modulesoved in the ation of the
h acceptancformity witor acceptand reserves tinclude theed to the A
cceptance athe Agency
the Agencyesults to th
eserves theContractor ptance tests
n the requirg, and spacanied by its
vided by thhe scheduletion by the tthe calibrat
stem confored that thise specificatiys be includ
xternal interontrol systewell as any e
a minimum em, the rackents etc. s and spare Design repsystem and
ce tests shoh the specifce or rejectthe right to ese tests in gency.
at this stagey. Factory a
y of the teste Agency; t
e right to beshall verify s.
ements, thece for entry specificatio
e Contractoed test sequtechnical retion.
rmity with ts includes thions must bded, otherw
rfaces of thm shall be cembedded s
in the accek and all mo
parts. The aort. d check of f
ould take plafications. Thtion. The Agsend a reprthe overall
e will signifycceptance t
t procedurethese shall c
e present in correct fun
e result of pof the final
on and its Co
or, who musuence. Calibepresentativ
the specifiche environmbe met Visuwise the test
e system. Inchecked ousoftware.
ptance proodules, elec
applicable
front panel
ace at the he gency shall resentative
y the tests shall
es; cover the
any or all nctioning of
pre‐ test ompliance
st bration ve of the
ations mental al t principles
n particulart to prove
cedure: ctronic
controls,
r
ESA UNCLASSIF
Page 35/35
KaSSPA SOW
Date 22/05/201
8 O
OPT‐0001
O8.1
OPT‐0002
3 ESA Deep(Argentina
IED – Releasable
13 Issue 1 Rev 0
RF: ThisSpecificAC Powinrush cbe verifInterfacLocal acorrectEnvironspecifieSoak teconditi
OPTIONS
The conoptions
On‐site ins
The uncontrac
p Space Stat)
e to the Public
0
s includes acation. wer supply: Pcurrent, efffied ce: All internd Remote t functioningnmental coned range of est: A soak tons.
S
ntractor shas when requ
stallation
it shall be inctor shall bedismountinpacking of shipping tounpacking;integration
tions are loc
all RF perfor
Power consfects of pow
rfacing with monitoringg of all locanditions: Veenvironmetest of minim
all commit tuired by ESA
nstalled in ae responsibng of the reall relevanto the TBD si; n and test o
cated on Ne
rmance req
sumption ofwer bus volt
external ung and controal M&C funcerification ofental conditmum 72 co
to provide aA during the
an ESA Deeple of: levant hardt hardware;te;
f the releva
ew Norcia (A
uirements i
f the systemtage and no
nits shall beol: Check ofctions. f operationions. ntinuous ho
a proposal ce duration o
p Space stat
dware;
ant hardwar
Australia), C
ncluded in
m, steady stoise. Worst c
e checked agf the TCP‐IP
at suitable
ours duratio
covering anof the proje
tion, locatio
re on site.
Cebreros (S
the Technic
ate and peacase condit
gainst the IM&C interf
points with
on under w
y of the folect.
on TBD3. Th
Spain) and M
cal
ak and ions shall
CD face and
hin the
orst case
lowing
he
Malargüe
Prepared by
Reference
Issue
Revision
Date of Issue
Status
Document Typ
Distribution
ESA UNCLASSIF
GRST-SYST-HW
Ka BandTechnic
GRST-S
1
0
22/05/
Approv
pe SP
IED – Releasable
-TS-1003-KaSSPA
d Solid Scal Spec
SYST-HW-SP-1
/2013
ved/Applicable
e to the Public
A_Spec-I1R0_ITT
State Pocification
003-HSO-GS
T
ower Amn
mplifier (SSPA)
European Space ORobert
D-
TF +4
esocOperations Centret-Bosch-Strasse 564293 Darmstadt
GermanyT +49 (0)6151 90049 (0)6151 90495
www.esa.int
c e 5 t y 0 5 t
13 Issue 1 Rev 0
IED – Releasable
s left blank
0
e to the Public
intentiona
lly
Page 3/27
KaSSPA Spec
Date 22/05/201
ESA UNCLASSIF
Title Ka B
Issue 1
Author
Approved by
Reason for c
Initial Issu
Issue 1
Reason fo
Initial Issu
13 Issue 1 Rev 0
IED – Releasable
and SSPA T
hange
ue
or change
ue
0
e to the Public
echnical Sp
pecification
Revision
Date 22/
Date
Issue
1
Revision
Date
22/05/2
0
/05/2013
Revision
0
0
Pages
2013 All
n
s
Date
16/0
Parag
02/2012
graph(s)
13 Issue 1 Rev 0
IED – Releasable
ntents:
ODUCTION ..e of the Doccable and Reyms and abtions .........ND SSPA SPm requirempment Confundancy conularity .......working monhibit ..........ical Requirenput port chmber of porquency Banut level ......erdrive andpedance/V.ise figure ...utput port mber of porquency Ban
B Compress
B Compressximum Outpedance/V.tput Protect of Band Oand Responsn ...............Maximum Minimum Gain Step .ALC Mode Gain variatGain slopeOutput poOutput po
0
e to the Public
..................cument .......eference Dobbreviations..................PECIFICATIOments ..........figuration ..ncept (P.U. ..................odes ............................ements .......haracteristicrts ..............nd ................................. Input proteS.W.R. .........................characteristrts ..............nd ...............sion point ...sion point (dtput Power S.W.R. .......tion ...........utput Noisese ................................Gain ..........gain ...............................................tion over free ..................wer Stabilitwer Stabilit
..................
...................ocuments (As \ .................................ON ...................................................only) .....................................................................................cs ........................................................................ection ..............................................tics .....................................................................degraded m........................................................e ...................................................................................................................................equency ba...................ty in 24 h ....ty with tem
..................
...................AD’s and RD..............................................................................................................................................................................................................................................................................................................................................................................................................mode) ........................................................................................................................................................................................................and ...................................................perature ....
..................
...................D’s) .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
..................
...................
...................
...................
...................
..................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
.................
..................
..................
..................
..................
.................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
............... 7
................ 7
................ 8
................ 8
.............. 10
............. 10
.............. 11
.............. 11
.............. 11
.............. 12
.............. 12
.............. 15
.............. 16
.............. 16
.............. 16
.............. 16
.............. 16
.............. 16
.............. 16
.............. 16
.............. 16
.............. 16
.............. 16
.............. 17
.............. 17
.............. 17
.............. 17
.............. 17
.............. 17
.............. 17
.............. 17
.............. 17
.............. 17
.............. 18
.............. 18
.............. 18
.............. 18
.............. 18
.............. 18
778800
666
13 Issue 1 Rev 0
IED – Releasable
oup Delay ...Group delaGroup delaGroup DelaStability w
se stability (ious and NoBand and Ormonics .....ase Noise ...rd Order Int
M/PM ..........mplifier Stabaces ...........t RF Port ....put RF Port .nhibit ConneConnectorsC Interface .&C Connectomote controcal M&C .....hanical Reqechanical Lamensions ....ss ..............ing .............ns power ....ins Voltagewer Consumad Unbalancwer Factor .ush Currentonmental reperature ....
midity ..........ude ............ation and Sh/EMC (P.U. otoring and Ceral ............C Protocol (P
0
e to the Public
..................ay in Band Vay slope .....ay Ripple ...ith temperaAllan Deviaon Linearitieut of Band S....................................termodulat..................ility ..................................................................ector ..........s ...................................or (P.U. onlol interface ..................quirements yout ..................................................................................e ..................mption ........ce .................................t .................equirement......................................................hock ...........only) ..........Control .........................P.U. only) ..
...................Variation ..........................................ature ..........ation) ..........es ...............Spurious ..........................................tion ....................................................................................................................................................................y) ...............(P.U. only)...................(P.U. only) ...............................................................................................................................................................................................s ........................................................................................................................................................................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
....................................................................................................................................................................................................................................................................................................................................................................................................................................................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
.............. 19
.............. 19
.............. 19
.............. 19
.............. 19
.............. 19
.............. 19
.............. 19
.............. 20
.............. 20
.............. 20
.............. 20
.............. 20
.............. 20
.............. 20
.............. 20
.............. 20
.............. 21
.............. 21
.............. 21
.............. 21
.............. 21
.............. 21
.............. 21
.............. 22
.............. 22
.............. 22
.............. 22
.............. 22
.............. 22
.............. 22
.............. 22
.............. 22
.............. 23
.............. 23
.............. 23
.............. 23
.............. 23
.............. 23
.............. 23
.............. 23
.............. 24
0000
4
13 Issue 1 Rev 0
IED – Releasable
of commandof telemetriof Alarms anmeters Logn Requiremhanical andtrical Layoutty ...............unding ........ng ..............ability (P.U.
ures
Suggested Diagram of
0
e to the Public
ds ...............ies ..............nd warningsging (P.U. o
ments .......... thermal Det .......................................................................only) .........
configuratif states ......
...................
...................s .................only) ..............................esign .........................................................................................................
on of the u...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
nit ................................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
...................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
..................
.............. 24
.............. 24
.............. 25
.............. 25
.............. 26
.............. 26
.............. 26
.............. 26
.............. 26
.............. 26
.............. 27
.............. 11
.............. 15
44
666666
15
13 Issue 1 Rev 0
IED – Releasable
NTRODU
ean Space And Commanngineering Ds (D/HSO), l, developmSA satellites
ency bands
S Band
S Band
X Band
X Band
X Band
K Band
Ka Ban
Ka Ban
nds are alrea
Space Statioing, Commaon ESA Deepplink and Dt, for Radio tion. Uplink
e main elemower Ampli
Scope of th
ment states
s Technical Sements, or box. The reqn the left co
0
e to the Public
UCTION
Agency (ESAnd (TT&C) oDepartmenlocated at tent and pros, including
supported
UL: 2025‐2
DL: 2200‐2
d UL: 7145‐7
d DL(EES): 80
d DL: 8400‐8
d DL: 25.5‐2
d DL: 31.8‐3
d UL: 34.2‐
ady operati
ons supportand and Trap Space Statownlink to Science (RSk signals sha
ments requirifier that sh
he Docum
the require
Specificatioprovides infquirements lumn. State
A) operates operations ot (HSO‐G) ohe Europeaocurement the above m
by ESTRACK
2120 MHz fo
2300 MHz fo
7235 MHz fo
025‐8400 M
8500 MHz fo
7.0 GHz for
32.3 GHz fo
34.7 Ghz fo
onally impl
t present macking of sptions. Futurincrease thSE) applicatiall be ampli
red for the ohall deliver a
ment
ed electrica
on, normal tformation. are inside b
ement of co
a network of different of the ESA Dan Space Opof the groumentioned
K are:
or Uplink
or Downlink
or Uplink
MHz for Dow
or Downlink
r Downlink
or Downlink
or Uplink
emented in
missions on Xacecraft. Kare Deep Spae throughpions and forfied to an a
operationala high powe
l performan
text (not insThere is noboxes with ompliance sh
S/X/Ka‐bancategories
Directorate Operations Cend station iantennas a
k
wnlink
k
k
n ESTRACK e
X Band (7‐8a Band dowace missionsput betweenr more accuadequate po
l implementer level in th
nces that sh
side a box) io need of stathe corresphall be prov
nd antennasof spacecraOf Human Sentre (ESOCinfrastructund its assoc
except the K
GHz) for Tewnlink (32 Gs will requirn the Grounurate navigaower level b
tation of thhe band of 3
hall be met
is descriptivatement of ponding reqvided for th
s for Telemeaft. The GroSpaceflight C), is responure requiredciated equip
K Band DL a
elemetry Hz) is alreadre the presend Station aation and orby means of
e Ka Band u34.2 to 34.7
by the Ka B
ve text that compliancequirement rese require
etry, ound and nsible for d to pment.
and the Ka
dy ence of a nd the rbit f power
uplink is 7 GHz.
Band SSPA.
introducese with text eference ements.
13 Issue 1 Rev 0
IED – Releasable
Applicable
wing docume
ference
ST‐SYST‐HW‐SO‐GSS
SS‐ST‐E50‐ 05C
SS‐ST‐E50‐02C
OC‐MAC‐TN‐10
OS‐SYST‐GST‐SS‐GS
ST‐SYST‐HW‐SS‐GS
dards can bendards can AD6 are ap
wing docume
ference L HDBK 217
61000‐6‐1
61000‐6‐3
Acronyms
a.s.l
AD
AIL
ALC
AM/PM
AR
ATP
C.V.
C/I3
CCSDS
CDR
CFI
CPM
dB
dBm
0
e to the Public
e and Refe
ents are app
SOW‐1007‐
C_Rev2
C
001‐OPS‐GIB
ST‐1001‐
SOW‐1001‐
e found on be found onpplicable on
ents are pro
TitleIss F N
ElectrGenecomm
ElectrGenecomm
and abbr
above s
Applicab
Action I
Automa
Amplitu
Accepta
Accepta
Curricul
Third O
Consult
Critical
Custom
Critical
Decibel
Decibel
erence Do
plicable to t
Title
Ka Band SS
Radio frequ
Ranging an
Basic M&C
Ground StaRev 0
General Re2 Rev 0,
http://www.e
n http://wwwly to P.U. Se
ovided as re
Notice 2
romagnetic coric standards mercial and lig
romagnetic coric standards mercial and lig
eviations
ea level
ble Document
tem List
atic Level Cont
ude to phase m
ance Review
ance Test Proc
lum Vitae
rder intermod
ative Commit
Design Review
er Furnished
Path Method
over 1 milliw
ocuments
this study
SPA Statement
uency and mo
nd Doppler tra
Protocol, Iss
ation Systems
equirements fo
ecss.nl/
w.ccsds.org/
ee chapter
eference.
ompatibility (E‐ Immunity foght‐industrial
ompatibility (E‐ Emission staght‐industrial
\
t
trol
modulation tr
cedures
dulation produ
ttee for Space
w
Item
att
(AD’s and
t of Work
odulation
acking
1 Rev 8
Integration S
or Equipment
2 for clarific
EMC) ‐ Part 6‐or residential, environments
EMC) ‐ Part 6‐andard for resenvironments
ansfer
uct level
Data Systems
d RD’s)
Standard, Iss 6
t Units (GREU)
cation.
A
‐1:
s, iss 2.0
‐3: sidential, s, Iss 2.1
s
Date
04/10/
31/07/
30/08/
6, 27/01/
), Iss 11/05/
uthor
/2011
/2008
/2005
/2009
/2009
Date
2005‐03
2011‐02
13 Issue 1 Rev 0
IED – Releasable
DC
ESA
ESOC
ESTRACK
FP
FR
GD
HPA
HW
Hz
ICD
IM3
IR
KOM
kVA
kW
lps
M&C
MHz
MoM
MPR
MTBF
MTTR
ns
PDR
P.U.
QA
R&D
RD
RF
SOW
SPF
SRS
SSPA
SW
TBC
TBC(c)
TBD
TBS
TC
TM
TN
TO
TRL
TRP
TT&C
VSWR
WBS
WP
0
e to the Public
Direct C
Europea
Europea
ESA Tra
Final Pre
Final Re
Group D
High Po
Hardwa
Hertz
Interfac
Third or
Interme
Kick‐Off
Kilovolt
Kilowatt
Litres pe
Monitor
Megahe
Minutes
Monthly
Medium
Mean T
Nanose
Prelimin
Product
Quality
Researc
Referen
Radiofre
Stateme
Single P
Softwar
Solid Sta
Softwar
To Be C
To be co
To Be D
To Be Sp
Telecom
Telemet
Technic
Technic
Technol
Technol
Tracking
Voltage
Work Br
Work Pa
Current
an Space Agen
an Space Ope
cking Networ
esentation
eview
Delay
ower Amplifier
are
ce Control Doc
rder intermod
ediate Review
f Meeting
amper
t
er second
ring and Cont
ertz
s of Meeting
y Progress Re
m Time Betwe
ime to Repair
cond
nary Design re
tion unit
Assurance
ch and Develo
nce document
equency
ent of work
Point Failure
re Requiremen
ate Power Am
re
onfirmed (by
onfirmed by t
Determined (by
pecified (by th
mmand
try
cal Note
cal Officer
logy Readines
logy Research
g, Telemetry a
Standing Wa
reakdown Str
ackage
ncy
rations Centre
rk
r
cument
dulation produ
w
rol
port
en Failures
r
eview
opment
t
nts Specificati
mplifier
the Agency)
he contractor
y the Contrac
he Agency)
ss Level
h Programme
and Command
ve Ratio
ucture
e
ucts
ion
r
ctor)
d
13 Issue 1 Rev 0
IED – Releasable
initions
ology Readfollows1:
nology Read
Basic pTechnoAnalytconcepCompoCompoSystemenviroSystemActual (grounActual
KA BAND
am looks fon equipmen“P.U. only”does not necurrent conertheless thion compliaasily upgrad
T‐10C (6 Mathe differenpreamplifieal requireme‐> Requirem
0
e to the Public
diness Level
diness Leve
principles obology conceical and exppt performeonent and/oonent and/om/subsystemnment (grom prototypesystem com
nd or flight) system “flig
D SSPA SP
r the develont in some fe”3 indicates eed to be imntract does he design anant with thedable to the
arch 2009), ces betweeer redundanents ment applic
ls (i.e. achie
l
bserved andept and/or aperimental ed or breadboaor breadboam model or ound or spae demonstrampleted and ght‐proven
PECIFICA
opment of aeatures thathat the ref
mplementednot need tond the archese requireme production
http://wwwen the protoncy, the rem
able to Prod
eved status
d reported application critical func
ard validateard validateprototype
ace) ated in a spd flight‐qua
” through s
ATION
a prototypeat will be indferred requd physically o be compliitecture of tments only n unit level.
w.ecss.nl/.otype and tmote M&C (
duction Un
of developm
formulatedction and/o
ed in the labed in the reldemonstrat
ace environalified throu
successful m
e. This protodicated alonuirement is in the protoant with ththe equipmapplicable t.
he producti(prototype
it only (not
ment of a te
d r character
boratory enlevant envirted in the r
nment ugh test and
mission oper
otype may dng the specapplicable ootype. The e requirem
ment shall coto P.U. and
ion unit reqonly require
to prototyp
echnology)
istic proof‐o
vironment ronment elevant
d demonstra
rations
differ from tification2. Tonly to the prototype pents labelleonsider the shall imple
quirements es local M&
pe)
are
of‐
ated
the final The productionproduced ed “P.U. final
ement a
are &C) and the
13 Issue 1 Rev 0
IED – Releasable
System req
Equipment
sted configu
onitoring an
e amplifier (
put power d
wer module
tput power
tput chain itput isolato
gested config
Redundanc
The ununit sha
c Filter and
Pre‐am(redundan
0
e to the Public
quiremen
Configura
uration of t
nd control
redundant
ivider
es (several i
r combiner
ncluding har (TBC)
guration of th
cy concept
it shall be sall impleme
Redundant
Redundant
Output Iso
M
mplifiers nt for P.U.)
ts
ation
he unit is sh
for P.U.)
n parallel)
armonic filt
e unit
(P.U. only)
elf‐redundaent at least
t preamplifi
t power sup
lator shall b
Inputpower
divider
Monitoring a
hown in Fig
er (TBC)4, fo
y)
ant. There isthe followin
iers
pply for the
be included
Input power divider
nd control
Powe
ure 1. The m
orward and
s no redundng redunda
M&C (M&C
if required
er Modules
main modu
reverse po
dant amplifncies:
C may be po
to meet sp
Output power Combner
les are:
ower couple
ier in the st
owered from
ecifications
Filter (TBC)
er and
tation. The
m both
s.
Isolato(TBC)
r
13 Issue 1 Rev 0
IED – Releasable
Modularity
The uneach m
In case replaceamplifi
Under a
Unit workin
The unit
O
So
T
The unit
At
A
MR
Mc
The folloSSPA_O
will be used. Preamplifiers when pa
0
e to the Public
preamplifie
Several powallowing so
y
it shall be dmodule.
of failure oeable from ter or interr
a failure of
ng modes
shall imple
OFF:
STAND‐BY: output)
TRANSMIT:
shall imple
ALC_ON: he output
ALC_OFF:
MEM_ALC ORF_ON/OFF
MEM_ALC Oommands a
owing commON G
ToprT
d for Radiosers shall beassing from
er power su
wer moduleoft degradat
designed in
of one powethe front paupting the o
the M&C th
ement the fo
PreamplifiM&C rema
Preamplifi
Preamplifi
ement the fo
The Mpower leve
The at
ON: The secommands
OFF: The seare received
mands shall Goes from OThe commaon the powepreamplifieremains muThe comma
cience withe kept on tom STAND BY
upplies)
es (with its tion of outp
a modular f
er or preamanel withouoperations.
he unit shal
ollowing wo
ier and powains active (
ier Muted5.
ier and pow
ollowing wo
M&C controll
ttenuation v
et point of ts are receive
et point of td
be implemOFF to STANnd performer modulesr is switcheuted. The cond clears th
h strict requ avoid phasto TRANSM
own powerput power i
form allowi
mplifier modut the need
l continue w
orking state
wer modules(local and re
Power Mod
wer modules
orking mode
ls the atten
value is kep
the ALC is ked
the ALC is c
ented: ND BYms the neces and all thed on (to guommand enhe ALC set p
uirements ose variationMISION
r supply eacn case of fa
ng for indiv
ule, the moof switchin
working (AL
es as shown
s are OFF. emote)
dules ON (n
s are ON
es
uation valu
pt constant
ept when A
leared whe
ssary verific required aarantee phaables the copoint to a va
f phase stabs during wa
ch) in parallailure of one
vidual replac
odule shall bg off the wh
LC excluded
in Figure 2
no signal at
ue to keep c
ALC_ON/OF
n ALC_OFF
cations and uxiliary systase stabilityorrespondinalue that in
bility (or Allarming up o
el, e module.
cement of
be hole
).
:
the
constant
F or
or RF_OFF
switches tems. The y) and ng alarms.dicates
lan of the
13 Issue 1 Rev 0
IED – Releasable
SSPA_O
RF_ON
RF_OFF
ATTEN
SET_PO
0
e to the Public
ta
OFF GTtaTtaMp
GTmrcIlWmp
F GTacPtRWmpTatTp
OWER TaOrpT
that there isactivatedGoes from aThe commathe preampauxiliary sysThe commathat there isactivated. M&C of theproviding thGoes from OThe commamute of therequired aucorrespondn case that oop (with tWhen MEMmodify the Apoint is cleaGoes from TThe commaand disconncommand.Prior to the to avoid chaRF power. When MEMmodify the Apoint is cleaThe commaattenuator athe output RThe ALC Mopoint is reseThe commaamplifier byOutput powread telemepower valueThe ALC Mo
s no ALC set
any state tond disables
plifiers and pstems switcnd clears ths no ALC set
unit remaihe telemetrOFF or STANnd performe preamplifixiliary systeing alarms.the ALC mohe already
M_ALC ON mALC set poiared and ALTRANSMIT tnd disablesnects the au
removal ofanges on th
M_ALC ON mALC set poiared and ALnd sets a vaand this attRF power leode is alwayet if MEM_And sets a vay changing twer telemetetry with the is reach, tode is alway
t point (e.g.
o OFF states the correspower modhed on by She ALC set pt point (e.g.
ns on readyy of the uniND BY to TRms the necesers and enaems. The co
ode is ON, tstored set p
mode is activnt. OtherwiLC_OFF modto STAND Bs the RF powuxiliary syste
f the RF powe attenuato
mode is activnt. OtherwiLC_OFF modalue for thetenuation reevel. ys disabled (ALC is OFF.alue for thethe attenuary and mode commandhe commanys disabled (
. zero). ALC_
ponding alaules and disSSPA_ON copoint to a va. zero). ALC_
y to accept it either viaRANSMIT. ssary verificables the RFommand en
the unit shapoint). vated, the cise (MEM_Ade activatedY.wer, mutesems switch
wer, the ALCor value due
vated, the cise (MEM_Ade activatede attenuatioemains fixed
(ALC_OFF).
e RF output tor. The undify the atteded value. Ond ends. (ALC_OFF).
_OFF mode
arms and swsconnects tommand alue that in_OFF mode
new comm local and r
cations, remF power andables the
all activate t
command DALC_OFF) thd
the preamped on by RF
C loop shall e to the abs
command DALC_OFF) thd on of the amd independ
And the AL
power of thit shall readenuator to mOnce the ta
And the AL
e is
witches off he
dicates e is
ands and emote.
moves the d all the
the ALC
DOES NOT he ALC
plifiers F_ON
be frozen sence of
DOES NOT he ALC
mplifier’s ently of
LC loop set
he d the RF match the rgeted
LC loop set
13 Issue 1 Rev 0
IED – Releasable
ALC_ON
ALC_OF
MEM_A
MEM_A
rol shall be nded to impn value to avershoot wease of the e ALC set pos:
ent to the am
0
e to the Public
pN T
WpoeWeel
FF TaWkOm
ALC_ON TAc
ALC_OFF TA
done in sucplement theavoid strongwhen the unpreamplifieoint to a ne
MEM_ALC
then fix th
ALC_ON, Mmplifier.
point is alwaThe commaWhen the upoint. If theoutput powenabled andWhen the uexisting ALCexisting ALCoop cannot
The commaand the atteWhen MEMkept lookingOtherwise (mode activaThe commaALC loop whcommand isThe commaALC loop wh
ch a way thae ALC loop wg output poit returns toer gain aftew value wit
C_OFF, ALC_
e output to
MEM_ALC_O
ays reset. nd enables
unit is in statere is no stower and setsd the attenuunit is not inC set point, C set point st be enabled
nd disablesenuator remM_ALC ON mg for the moMEM_ALC_ated7. nd forces thhen an ALC_s received.nd forces thhen an ALC_
at transientwith small inower level vo RF ON mor cooling duthout interr
_OFF
o the new de
ON
the ALC Mte RF ON, itred set poin it as new Auator contrn TRANSMITthe commastored, the Ad until there
s the ALC Mmains fixed mode is activoment the A_OFF) the A
he amplifie_ON, ALC_O
he amplifie_OFF or RF_
t power peancrements avariations. Aode after a suring a shorrupting the
esired value
ode. t looks for tnt, the unit ALC set poinolled by theT state, if thand is refuseALC mode se is RF pow
ode, i.e. theto its last vavated, The AALC loop wiALC point is
r to keep thOFF, RF_ON
r to clear th_OFF comm
aks are avoiand decremAlso the impshort periodrt time OFF.RF transmis
e by changin
he stored Areads the p
nt. The ALC e ALC loop6.ere is no aled. If there set to ON, bwer (State TR
e ALC loop alue. ALC loop seill be enablecleared and
he set point or RF_OFF
he set pointmands are re
ded. It is ments of theplementatiod in RF OFF . ssion, a seq
ng the atten
ALC set present RF loop is . ready is an but the RANSMIT)
is disabled
et point is ed again. d ALC_OFF
t of the
t of the eceived
e on shall mode due
quence of
nuator
OF(*)ALC O
allo
A
13 Issue 1 Rev 0
IED – Releasable
gram of state
RF Inhibit
The RF circuit. Inhibit there isoutput
When tmonitoremoveautoma
FF* N/OFF not
owed
Sspa_Of
Atten
0
e to the Public
s
Inhibit conThe unit shconnector os an open cipower sha
the RF Inhiboring a “Waed (both pinatically retu
Off
RF_On
AA
A
nector imphall be activof the unit aircuit betwell be limited
bit is active,rning” or “Dns are againurning to the
Transmi
Sspa_On
Sspa_Off
ALC on ALC off MEM_ALCMEM_ALCAtten Set_Power
lements an ve (i.e. not mare shortedeen these twd to less tha
the unit shDegraded” sn in short), te same stat
it
n
ff
RF_On
C on C off
externally muted) onlyd by an extewo pins of tan 0.1 mW i
hall report bstatus. Whethe unit shate previous
STB
RF_Off
Comma
State
controlled hy when the ternal RF Inhithe unit RF n less than
by both locaen the exterall restart opto the RF In
TAND BY
nd
e
hard‐wired two pins of ibit system.Inhibit conn5 msec (TB
al and remornal RF Inhibperations nhibit.
ALC on ALC off MEM_ALCMEM_ALCAtten
security the RF . When nector, the BC).
ote bit is
C on C off
13 Issue 1 Rev 0
IED – Releasable
Electrical R
RF Input po
Number of p
The un
requency B
The inp
nput level
The unfrom ‐1
Overdrive an
4 The unwithouremovesignal a
The unsubseqmainta
mpedance/
The V.Sand no
Noise figure
The nowith a m
RF Output p
Number of p
The un
requency B
The out
0
e to the Public
Requirem
ort charact
ports
it shall have
Band
put frequen
it shall wor10 to +5 dBm
nd Input pr
it shall be at time limited. During tat the outpu
it shall be puent degrain the oper
/V.S.W.R.
S.W.R. on thn‐operating
e
ise figure atmatched lo
port chara
ports
it shall have
Band
tput freque
ents
teristics
e a single in
cy band sha
k and meetm.
rotection
able to work and withouthe overdrivut) but perf
protected todation afteations unde
he input RF g conditions
t maximumad connect
acteristics
e a single ou
ency band s
nput port
all cover fro
the specific
k with an inut subsequeve the unit sormances c
o withstandr the overder these circ
port shall bs, any mode
gain shall bed to the in
utput port
hall cover f
om 34200 to
cations for
put level upent degradashall contincan be degr
input levelrive is remocumstances
be better the.
be lower thnput port.
rom 34200
o 34700 MH
an input po
p to 10 dB oation after tnue operatinaded.
s up to 20 doved. It is nos (i.e. the un
an 1.3:1 (go
an 20 dB. T
to 34700 M
Hz.
ower level in
over nominathe overdrivng (i.e. deliv
dBm withouot requirednit can be m
oal 1.2:1) in
The test sha
MHz.
n the range
al level ve is vering a
ut to muted).
n operating
ll be done
13 Issue 1 Rev 0
IED – Releasable
P2dB Compre
The un
P2dB Compre
When ocompre
Maximum O
The unexceed
mpedance/
The V.Snon‐op
Output Prot
4 The untime. Fworking
Out of Band
The no
n band Res
In Bandrange, fband re
Gain
Maximum G
The unany inp
Minimum ga
0
e to the Public
ession point
it shall have
ession point
one power ession point
Output Pow
it shall geneed. The thr
/V.S.W.R.
S.W.R. on thperating con
tection
it shall not or load V.S.g mode and
Output No
ise at maxim
‐150 dBm/
‐150 dBm/
‐150 dBm/
sponse
d requiremefrom Psaturatesponse are
Gain
it shall provput power le
ain
t
e a P2dB com
t (degraded
module hast higher tha
wer
erate an alareshold for t
he output Rnditions, any
be damage.W.R. highed generate a
oise
mum gain p
Hz in the b
Hz in the b
Hz in the b
ents are app
tion to Psaturae not applic
vide gain enevel in the r
mpression p
d mode)
s failed or isan TBD dBm
arm when ththis alarm s
RF port shally mode
d by any VSr than 2:1, an alarm.
present at o
band from 8
band from 3
band from 3
plicable onl
ation‐20 dB. Uable.
nough to gurange of 2.2
oint higher
s switched om (output po
he output pshall be sett
l be better t
SWR at any the unit is a
utput port
8400 to 850
31800 to 32
37000 to 38
y in the higUnder this v
arantee the2.1.3 .
than 50 dB
off, the unitower).
power limit table throug
than 1:1.2 (
phase at ouallowed to g
shall be low
00 MHz
2300 MHz
8000 MHz
hest 20 dB value, the re
e required p
Bm (output
t shall have
is reached gh local M&
TBC) in ope
utput for ungo on STAN
wer than
of output pequirement
power of 2.
power).
a P2dB
or &C.
erating and
nlimited D‐BY
power ts about in
2.2.3 for
13 Issue 1 Rev 0
IED – Releasable
The unof 30 d
Gain Step
The gai
The accthe out
ALC Mode
The ALC(30 to 5
The ALC
After acdB for a
Gain variatio
4 The amspecifie
The amMHz su
Gain slope
The unband. T
Output pow
The outunder t
Output pow
The outconditi
0
e to the Public
it shall provBm for any
in step shal
curacy of thtput power
C requirem50 dBm).
C shall follo
ctivation ofan input pow
on over freq
mplitude resed frequenc
mplitude resub band insi
it shall haveThe slope w
wer Stability
tput powerthe followin
1 ho
ALC
wer Stability
tput powerons:
ALC
POU
The
Con
vide gain coinput powe
l be not gre
he gain settirange.
ents are ap
ow the state
f the ALC, thwer variatio
quency ban
ponse of thcy band (AL
ponse of thide the spec
e a gain slopwill be measu
y in 24 h
r of the unitng condition
our warm‐u
C OFF.
y with temp
r of the unit
C OFF
UT= P2dB
ermal range
ntinuous op
ontrol enouger level in th
eater than 0
ing shall be
plicable on
es diagram o
he unit shalon of ± 3dB
nd
he unit shallC OFF).
he unit shallcified frequ
pe lower thure in a spa
t shall not vans:
up
perature
t shall not va
e: 23 ± 3°C
peration (wa
gh to guarahe range of
0.2 dB.
better than
ly to the up
of Figure 2.
l keep the o.
l not vary m
l not vary mency band.
an 0.02 dB/an of ±10Mh
ary more th
ary more th
arm up time
ntee a maxf 2.2.1.3
n 0.25 dB fo
pper 20 dB o
output pow
more than 2
more than 0
/MHz in thehz.
han 0.5 dBp
han ±1 dB u
e not includ
imum outp
or the highe
of output po
er level sta
dBpk‐pk (T
.5 dBpk‐pk
e specified f
pk‐pk over 2
under the fo
ded)
ut power
est 20 dB of
ower range
ble in ±0.2
TBC) in the
in any 50
frequency
24 hours
ollowing
13 Issue 1 Rev 0
IED – Releasable
Group Delay
Group delay
The groband
The groinside t
Group delay
The groband. T
Group Delay
The ripnspk‐pk
Stability wit
The grotemper
Phase stabi
4 The foldBm raThe fol
Spurious an
n Band and
The spuand outinclude
0
e to the Public
y
y in Band Va
oup delay va
oup delay vathe specifie
y slope
oup delay slThe slope w
y Ripple
ple of the gk
th temperat
oup delay varature varia
ility (Allan
lowing speange. lowing mas
nd Non Lin
Out of Ban
urious preset of band fred in this req
ariation
ariation sha
ariation shaed frequenc
lope shall bwill be measu
group delay
ture
ariation shaation of 23 ±
n Deviation
cification h
sk shall be m
nearities
nd Spurious
ent at the orom DC to 4quirement.
all be lower
all be lower cy band
e lower thaured in a sp
inside the f
all be lower ± 5°C.
n)
holds for an
met:
ADEV
5*10‐14 5*10‐15
8*10‐16 8*10‐17
2*10‐17
s
output port 40 GHz. Any
than 0.5 ns
than 0.15 n
an 0.01 ns/Mpan of ±20 M
frequency b
than 1 nsp
ny regulated
(seg)τ= 1 sτ= 10 sτ= 100 τ= 1.000τ= 10.000
shall be lowy AM and PM
spk‐pk in th
nspk‐pk in a
MHz in the sMhz.
band shall b
k‐pk in 24 h
d output po
)
ss 0 s0 s
wer than ‐60M modulati
he specified
any 50 MHz
specified fre
be lower tha
hours and u
ower within
0 dBc both on spurious
frequency
sub band
equency
an 0.25
nder a
n the 40‐50
in band s is
0
13 Issue 1 Rev 0
IED – Releasable
Harmonics
Second
Phase Noise
Phase n
Third Order
When tsaturatat outp
AM/PM
The val
Amplifier St
The unoutput
nterfaces
The intwith eacharact
nput RF Po
The Inp
Flange
Output RF P
The Outhe top
Flange
RF Inhibit C
RF InhiPins are
0
e to the Public
d harmonic s
e
noise of the‐60 ‐ 10 * l‐120 dBc/H
Intermodu
the amplifietion power (put shall be
ue of AM/P
ability
it shall be uload.
erfaces of tach one of tteristics of t
ort
put RF port s
shall be 154
Port
utput RF porp side or rea
shall be 154
Connector
bit connecte TBD‐c.
shall be low
e unit shall bog10(fhz) dBHz
ulation
er is driven (PSAT (input) –lower than
PM shall be
uncondition
the equipmethe units. Althe differen
shall be WR
4 IEC UBR32
rt shall be War side of th
4 IEC UBR32
or shall be
wer than ‐60
be lower thc/Hz from abo
with two ca– 3 dB), the ‐12 dBc
lower than
ally stable a
ent shall bell the mechant interfaces
R28 and sha
20.
WR28 wavege unit.
20.
Sub‐D 9‐p
0 dBc
an m 1 Hz to 1ove 1 MHz o
arriers eachlevel of the
n 3 °/dB for
and not osc
e described anical, elects shall be de
all be locate
guide with f
(m) located
MHz offsetoffset from
one 3 dB lo third interm
any power
cillate for an
in a specifictrical, hardwescribed in
ed on the fro
flange and
d on the rea
t from the cthe carrier
ower than tmodulation
level up to
ny input and
c documentware and sothis docum
ont panel.
shall be loc
r panel of t
carrier
the input n products
saturation.
d any
t delivered oftware ment.
ated on
he unit.
13 Issue 1 Rev 0
IED – Releasable
Test Conne
The unfollowi
M&C Interf
M&C Conne
The M&
The un
Remote con
The phyprotoco
ocal M&C
Local M
Contro
LCD scr
Mechanica
The eq
Mechanical
The fol
0
e to the Public
ctors
it shall provng characteCoupling: Number ofType of conLocation:
face
ctor (P.U. o
&C connect
it shall mee
trol interfa
ysical M&C ol with the
M&C contro
ls shall be e
reens shall b
l Requirem
uipment me
ESOC Grou
ESOC Gene
The EMI/EM
The safety
Layout
lowing elem
M&C Conn
Input and O
Mains pow
Mechanica
Labels (Mo
vide a test ceristics:
f ports:nnector:
only)
or shall be
et the requi
ace (P.U. on
interface srequiremen
ls and displ
easily access
be provided
ments (P.U.
echanical co
und Station
eral require
MC require
requiremen
ments shall
nector
Output port
wer socket
al Fixation p
odel Referen
connector w
Higher tha1. K(f) front pane
RJ45 type.
rements of
nly)
hall be Ethents of AD4.
ays shall be
sible
d with backl
. only)
onfiguration
Systems Int
ments on E
ments (RD2
nts in force
be located
ts
points
nce, Serial N
with a samp
n 40 dB
l
AD5
ernet. The i
e located in
light capabi
n shall ensu
tegration St
qui0pment
2, RD3)
in CE
on the unit
Number, Ma
le of the ou
nterface sh
the front p
ility
ure the com
tandard (AD
Units (AD6
external si
anufacturer
utput signal
all impleme
anel
mpliance wit
D5)
6)
des:
r, …)
with the
ent TCP/IP
th:
13 Issue 1 Rev 0
IED – Releasable
Dimensions
The unrequire
Mass
The un
Cooling
1 The un
2 The pro
3 Air filte
Mains pow
Mains Volta
1 The unmonopFreque
2 Neutra
Power Cons
3 The ma
oad Unbala
4 For trip
Power Facto
5 The pow
nrush Curre
6 The inr
7 The pri
0
e to the Public
it mechanicements.
Width:
Height:
it mass sha
it shall be aMax Air floAir taken frAir exhaust
oper workin
ers shall be
wer
ge
it shall worphasic 230 Vncy 50 Hz ±
l shall be co
umption
aximum pow
ance
phase mains
or
wer factor o
ent
ush current
mary curre
cal layout sh
19” rac
20 U (T
ll be lower t
air cooled wow: 300 (TBrom the frot to the bac
ng of the co
installed at
k with a maV ± 10% or t± 5%
onnected to
wer consum
s voltage (p
of the unit s
t shall be lo
nt demand
hall be one
ck compatib
TBD) (890 m
than 100 kg
with the folloBD) lps ont ck
oling fans s
air inlets an
ains power wtriphase‐Y 4
o ground on
mption shall
oint 2.3.8.1
shall be not
wer than 2
of the units
or more bo
ble
mm)
g (TBC).
owing chara
shall be mon
nd shall be
with the fol400 V ± 10%
nly on powe
be not be g
1) the load u
t lower than
.5 * Inom at s
s shall be lo
oxes compat
acteristics:
nitored loca
easily repla
llowing cha%
er plant, not
greater tha
unbalance s
n 0.9.
switch on o
ower than 2
tible with A
al and remo
aceable.
racteristics
t in unit (TN
n 1.2 kVA
shall be low
of the unit.
2.5 * Inom for
AD5
otely.
N‐S)
wer than 5%
r any
13 Issue 1 Rev 0
IED – Releasable
transiti
Environme
Temperatu
Ambien
The unambien
The unbetweerange.
Storage
Humidity
The un
Altitude
The un
The una.s.l.
Vibration a
The eq
Normashall no
EMI/EMC (P
The eqand EN
Monitoring
General
1 The promandat
2 All the
(P.U. onAll the
0
e to the Public
on between
ental requ
re
nt temperat
it shall meent operating
it shall surven 5 and 45
e temperatu
it shall oper
it shall oper
it shall with
and Shock
uipment sh
l handling oot produce
P.U. only)
uipment sh 61000‐6‐1
g and Con
ototype neetory only fo
controls an
nly) controls an
n operation
uirements
ture ranges
et all specifig temperatu
vive when o°C. Perform
ure range sh
rate with up
rate at an a
hstand stora
all be prepa
of the equipdamage on
all be desig(immunity)
ntrol
eds to impleor P.U.
nd telemetri
nd telemetri
nal states of
s
s refer to air
cations (excure range b
perating unmances may
hall be betw
p to 90% re
ltitude of u
age and tran
ared for tra
pment when the equipm
gned to conf).
ement only
ies shall be
ies shall be
f the unit
r inlet temp
cept stabilitetween 18
nder a ambi be degrade
ween –30 a
lative humi
p to 2000 m
nsport at an
nsportation
n loading orment.
form to the
local monit
available lo
available re
perature
ty) when suand 28°C.
ent survivaed when ou
nd +70 deg
dity, no con
meters a.s.l.
n altitude of
n by air, tru
r unloading
e norms EN
toring. Rem
ocally
emotely exc
bmitted to
l temperatuutside the o
C.
ndensation.
..
f up to 1500
ck and ship
for transpo
61000‐6‐3
mote monito
cept the loc
an
ure range perational
.
00 meters
.
ortation
(emission)
oring is
cal/remote
13 Issue 1 Rev 0
IED – Releasable
mode sonly loc
3 (P.U. onThe unremotedisable
4 (P.U. onDuring remote
5 (P.U. onAfter swas defin
6 (P.U. on
M&C Proto
7 The remprotoco
8 The un
ist of comm
9 The fol
Additio
ist of telem
0 All comthe uniThe list
0
e to the Public
selection cocally.
nly) it shall be oe control is dd except th
nly) remote cone monitoring
nly) witching froned before
nly) At swit
ocol (P.U. o
mote M&C fol defined i
it shall be a
mands
lowing com SSPA O RF ON/ Alarm R Local/R Attenu Output ALC ON MEM_A Preamp
onal comma
metries
mmanded vat. t of telemet Output Output Attenu Output
ontrol. Such
operated bodisabled. Whe local/rem
ntrol, local mg shall be a
om local to switching, u
ch on. the u
only)
function shn AD4
able to hand
mmands shaON/OFF /OFF Reset Remote (avaation set vat power set N/OFF ALC ON/OFplifier Selecands can be
ariables sha
tries shall int Transmittet reflected Pation valuet power set
local/remo
oth remotelyWhen remotmote mode s
monitor shalso possible
remote conuntil progra
unit shall sta
all be imple
dle two simu
ll be availab
ailable only alue value
F ction added by t
ll provide a
nclude at leaed Power Power value
ote control s
y and localle control isselection co
all be also pe.
ntrol or viceammed othe
art in remo
emented wi
ultaneous r
ble
locally)
the manufac
a telemetry
ast the follo
shall not be
y. When loc selected , lontrol.
possible. Du
e versa, all serwise by c
te mode an
ith a TCP/IP
remote clien
cturer
feedback o
owing param
e available r
cal control local contro
uring local co
ettings shaommands.
nd in a safe
P interface w
nts.
f the actual
meters:
remotely,
is selected, ol is
ontrol,
ll remain
state.
with the
l status of
13 Issue 1 Rev 0
IED – Releasable
Additio
ist of Alarm
1 The unrange a
2 The list
Additio
3 In case dependdocumand thecontrol
4 The unnominadegrad
5 The list
Additio
6 In case warninwarninwhen t
Parameters
7 The un
0
e to the Public
Status o Local R Unit Sta ALC Sta MEM_A Tempe Selecte
onal parame
ms and wa
it shall activand the ope
t of alarms s Over te Over cu Power
onal alarms
that an aladent on theentation. We alarm indil.
it shall actival range andation on th
t of warning Fan sta Over O ALC no RF Inhi Rack ov
onal warning
that a warng is removeg was raisehe warning
s Logging (
it shall be a Receive Part (TB
of each moRemote Statatus (OFF‐Satus ALC Statusrature of thed preamplieters can be
arnings
vate alarmseration impl
shall includeemperatureurrent (per supplies stacan be add
rm is activa alarm and
When the alaication rem
vate a warnd the operae performa
gs shall incluatus (TBC) utput Powet regulatingbit activatever temperags can be ad
ning is actived the unit sd. The warng condition i
(P.U. only)
able to log aed commanBD) of mon
dule tus Stand By‐Tra
he unit fier e added by t
s when the mlies a risk of
e at least the (per moduRF module)atus ed by the m
ated the unishall be defarm is remoains until th
ning when thtion does nnces of the
ude at least
er g d ature dded by the
vated the unshall remainning indicatis no more
)
at least the fnds itoring info
ansmit)
the manufa
monitored vf damage.
he followingule TBC) )
manufacture
it shall go tofined by theoved the unhe alarm is
he monitornot generatee unit.
t the follow
e manufactu
nit shall conn in the samion shall dispresent.
following in
rmation de
acturer
variables ar
g paramete
er
o a safe state contractonit shall remcleared by a
ed variablee a risk of d
ing parame
urer
ntinue workme conditionsappear fro
nformation:
livered thro
re out of the
rs:
te which car in the unit
main in sucha local or re
s are out ofamage but
ters:
king. When ns than befom the mon
ough M&C
e nominal
n be t safe state emote
f the only a
the fore the itoring
13 Issue 1 Rev 0
IED – Releasable
8 The unperiod
9 The logsynchrorequire
Design Req
Mechanica
The un
Thermalifetimerange.
Thermaoperati
Electrical La
The eqor open
Critical interfer
Safety
The unequipm
The RF
Grounding
The un
Ageing
The eqand de
After fucontinu
During and abs
After th
0
e to the Public
Alarms
it shall provof 7 days an
gged informonize the syements.
quiremen
l and therm
it shall mee
al design she of the equ
al design shing tempera
ayout
uipment pen in the test
modules (lrences.
it shall meement in forc
power den
it shall mee
uipment shlivery.
unctional vauously for a
the ageing sence of po
he ageing a
generated
vide a LOG fnd allows to
mation shall ystem time.
ts
mal Design
et the requi
all assure nuipment of
all also ensature range
erformance t port.
ike low leve
et the legal se in the EU.
sity outside
et the requi
all be subm
alidation ant least 100
gain and ouower/gain ju
ny faulty co
file capabilito recover th
be time sta The unit sh
n
rements of
no degradat15 years, ov
ure minimae as defined
shall not be
el circuits) s
safety requ.
e the unit ca
rements of
mitted to age
nd coarse adHours
utput poweumps or glit
omponent s
ty that storhe stored va
amped. NTPhall be com
2.2.5, AD5
tion of perfover the spec
al sensitivity in 2.4.1.
e affected b
shall be ade
irements af
abinet shall
AD5 and AD
eing at the
djust, the eq
er shall be mtches and ve
hall be repl
es the inforalues via FT
P protocol shpatible with
and AD6.
ormance ovcified opera
y of the equ
by the prese
quately shi
ffecting per
be not exc
D6.
factory pre
quipment sh
monitored toerify the ov
laced and th
rmation durTP.
hall be usedh NTP serve
ver an expecating tempe
uipment to a
ence of a lo
elded to av
rsonnel and
eed 0.2 mW
vious to the
hall be swit
o check theverall perfor
he equipme
ring a
d to er
cted erature
an
ad, short
oid EMC
d
W/cm2.
e final test
tched ON
e variations rmance.
ent shall be
13 Issue 1 Rev 0
IED – Releasable
finally a
The faufailuresto solve
Reliability (
The eqhours. Tfigures
The selmaximu
The MTspares
The un
0
e to the Public
adjusted an
ults in comps in the same this reliab
(P.U. only)
uipment shThis requireof RD1.
ected semum junction
TTR (Mean Tare availab
it shall be m
nd ready for
ponents durme componebility default
)
all have a Mement shall
iconductor n temperatu
Time to Reple.
maintainabl
r final accep
ring ageing ent or modut.
MTBF (meanl be demons
technologyure.
pair) shall b
e for 15 yea
ptance testi
shall occur ule shall be
n time betwstrated by a
y shall have
e lower tha
ars.
ng.
seldom andinvestigate
ween failureanalysis wit
a MTBF of
an 1 hour pr
d randomlyed and actio
es) higher thh the reliab
at least 10^
rovided the
. Repetitiveons taken
han 20.000 bility
^6 hours at
e adequate
e