62
ESA UNCLASSIF Prepared b Reference Issue Revision Date of Iss Status Document Distributio Ka Ban Statem IED – Releasable by sue t Type on d SSPA ment of W e to the Public GRSTSYST 1 0 22/05/201 Approved/ SOW (KaSSPA Work THWSOW13 /Applicable A) 1007HSOe GSS European Space O Robert D- T F +4 esoc Operations Centre t-Bosch-Strasse 5 64293 Darmstadt Germany T +49 (0)6151 900 49 (0)6151 90495 www.esa.int c e 5 t y 0 5 t

Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Prepared bReference Issue Revision Date of IssStatus DocumentDistributio

  

 

 

 

Ka Ban

Statem 

IED – Releasable

by      

sue    

t Type    on   

d SSPA 

ment of W

e to the Public

 GRST‐SYST1 0 22/05/201Approved/SOW 

 

(KaSSPA

Work  

T‐HW‐SOW‐

13 /Applicable

 

A) 

‐1007‐HSO‐

‐GSS 

European Space ORobert

D-

TF +4

esocOperations Centret-Bosch-Strasse 564293 Darmstadt

GermanyT +49 (0)6151 90049 (0)6151 90495

www.esa.int

 

c e 5 t y 0 5 t

Page 2: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 2/35

KaSSPA SOW

Date 22/05/201

 

 

 

 

Title

Issue

Author

      

Approved

 

    

  Reason for

  Initial Issu

    

 

Issue 1 

  Reason fo

  Initial Issu

IED – Releasable

13 Issue 1 Rev 0

Ka Ban

1

 

by

r change 

ue 

or change 

ue 

e to the Public

0

 

d SSPA Stat

 

tement of W

 

Work

Revision

Date

Date

Issue

 1

Revision

Date

22/05/2

n 0

22/0

Revisi

0

n 0 

Pages

2013 All

5/2013

ion

s

 Date 

   22/0

 Parag

  

05/2013

graph(s)

 

Page 3: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 3/35

KaSSPA SOW

Date 22/05/201

 

Table of con

1 INTRO Scope1.1 The Te1.2 Backg1.3 Applic1.4 Acron1.5 Defini1.6

2 WORK Work 2.1

2.1.1WP 12.1.2WP 22.1.3WP 32.1.4WP 42.1.5WP 52.1.6Warr3 REQUI

Docum3.1 Hardw3.2 Softw3.3

4 SCHED4.1.1Kick‐4.1.2Prog4.1.3Preli4.1.4Critic4.1.5Test 4.1.6 Facto4.1.7 Final4.1.8Addi5 DOCUM

Gener5.1 Runni5.2

5.2.1 Issue5.2.2Minu5.2.3Actio5.2.4Prog5.2.5Tech

Review5.3

IED – Releasable

13 Issue 1 Rev 0

ntents:

ODUCTION ..e of the Docechnology Rround for tcable and Reyms and abtions .........K TO BE PERLogic .........1000: Prelim2000: Detai3000: Proto4000: Proto5000: Deliveranty ..........IREMENTS Fmentation ..ware ...........are ............DULE AND M‐off Meetingress meetinminary Descal Design RReadiness Rory accepta Presentatitional meetMENTATIOral requiremng Documeed Documenutes of Meeon Item List ress Reporthnical Notesw Data Pack

e to the Public

0

..................cument .......Research Prhe activity .eference Dobbreviations..................

RFORMED ....................minary Studled Design .otype Manuotype Testinery at ESOC..................FOR DELIVE......................................................MILESTONESg (K.O.M.) ..ngs (P.M.) ..ign Review Review (C.DReview (T.Rnce Test Reon (F.P.) ....tings ...........N ..............ments .........ents ............nt List (IDL) eting (MoM(AIL) .........ts (PR) ........s (TNs) ........kages .........

..................

...................rogramme .....................ocuments (As .........................................................................y ...................................facturing anng (FAT) ......C and Final P...................ERABLES .............................................................S .....................................................(P.D.R.) ......R.) ............R.R.) ............eview (F.A.T................................................................................................................) .............................................................................................

..................

...................

...................

...................AD’s and RD.................................................................................................................nd Integrati...................Presentation...............................................................................................................................................................................................................T.) ...............................................................................................................................................................................................................................

..................

...................

...................

...................D’s) .............................................................................................................................ion ................................n ..................................................................................................................................................................................................................................................................................................................................................................................................................................................................

..................

...................

...................

...................

...................

...................

...................

..................

...................

...................

...................

...................

...................

...................

...................

..................

...................

...................

...................

..................

...................

...................

...................

...................

...................

...................

...................

...................

..................

...................

...................

...................

...................

...................

...................

...................

...................

.................

..................

..................

..................

..................

..................

..................

.................

..................

..................

..................

..................

..................

..................

..................

.................

..................

..................

..................

.................

..................

..................

..................

..................

..................

..................

..................

..................

.................

..................

..................

..................

..................

..................

..................

..................

..................

............... 6

................ 6

................ 6

................ 6

................ 8

................ 8

................ 9

............... 9

................ 9

.............. 10

.............. 11

.............. 12

.............. 12

.............. 13

.............. 14

............. 14

.............. 14

.............. 15

.............. 15

............. 15

.............. 16

.............. 16

.............. 17

.............. 17

.............. 17

.............. 17

.............. 17

.............. 18

............. 18

.............. 18

.............. 18

.............. 19

.............. 19

.............. 19

.............. 19

.............. 20

.............. 20

 

6666889

0

444

66

8888

00

Page 4: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 4/35

KaSSPA SOW

Date 22/05/201

 

5.3.1Kick 5.3.2Preli5.3.3Critic5.3.4Test 5.3.5 Facto5.3.6 Final

Types5.45.4.1Com5.4.2Tech5.4.3Perfo5.4.4Part 5.4.5Mech5.4.6Test 5.4.7Acce5.4.8Acce5.4.9User5.4.10 M5.4.11 In5.4.12 Ci5.4.13 Re6 GENER

Respo6.1 Staffin6.2 Sched6.3 Repor6.4 Meeti6.5

7 TESTIN Accep7.1 Test o7.2 Test c7.3

8 OPTIO On‐sit8.1

 

List of Tabl

Table 1 LTable 2 LTable 3 L 

IED – Releasable

13 Issue 1 Rev 0

Off Meetingminary Descal Design RReadiness Rory Accepta Review Do of Documepliance Mahnical Descrormance AnList ............hanical andPlan ..........

eptance Testeptance Testr’s Manual ..Maintenancenstallation Mircuit Diagraeliability AnRAL PROJEConsibility.....ng ...............dule Controlrting ...........ings ............NG, ACCEPTptance test oorganizationonduction .

ONS ............te installatio

les

List of DocuList of HardList of Meet

e to the Public

0

g (KOM) Daign Review Review (CDRReview (TRRance Test Reocumentatioents ............trices .........iption (TD) .nalysis .......................... Electrical I..................t Proceduret results .......................e Manual ....Manual .......ams and Bonalysis.........CT MANAGE....................................l .....................................................TANCE ANDobjectives an .....................................................on ..............

umentation ware Delivetings ..........

ata Package(PDR) DataR) Data PackR) Data Paceview (FAT)on ..............................................................................................................nterface Co...................es (ATP) ..................................................................................oard Layouts...................EMENT ASP...............................................................................................D WARRANTand principl...........................................................................

Deliverableerables ..........................

 ..................a Package ...kage ...........ckage ..........) Data Packa..................................................................................................................ontrol Docu..................................................................................................................s ....................................PECTS ........................................................................................................TY ..............es .........................................................................................

es .....................................................

...................

...................

...................

...................age ...............................................................................................................................ment (ICD).........................................................................................................................................................................................................................................................................................................................................................................................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

..............................................................................................................................................................................................................................................................................................................................................................................................................................

...................

...................

...................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

.................

..................

..................

..................

..................

..................

.................

..................

..................

..................

.................

..................

..................

..................

..................

.............. 20

.............. 21

.............. 21

.............. 22

.............. 22

.............. 22

.............. 22

.............. 22

.............. 23

.............. 23

.............. 23

.............. 24

.............. 24

.............. 24

.............. 25

.............. 26

.............. 26

.............. 28

.............. 28

.............. 28

............. 29

.............. 29

.............. 30

.............. 30

.............. 32

.............. 33

............. 33

.............. 33

.............. 33

.............. 34

............. 35

.............. 35

.............. 15

.............. 15

.............. 16

 

0

444

668889

00

3

4

556

Page 5: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 5/35

KaSSPA SOW

Date 22/05/201

 

List of Figu

Figure 1

IED – Releasable

13 Issue 1 Rev 0

ures

Tentative S

e to the Public

0

Schedule ................................................................................................................ 16

 

6

Page 6: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 6/35

KaSSPA SOW

Date 22/05/201

 

1 IN

S1.1

This Statemrequired bdevelopmeas an appli The docum

 The activit In side thisrequiremeoutside a bor label on

T1.2

TRP is ESA'on the earESA directo

B1.3

The EuropeTracking anSystems EnOperations

IED – Releasable

13 Issue 1 Rev 0

NTRODU

Scope of th

ment of Woy the Europent of a “Kaicable docu

ment is struc

Chapteapplica

Chapte

Chapteoutput

Chapte

Chapte

Chapte

Chapte

Chapte

Chapte

y described

s SoW, normnts, or provbox. The reqn the left co

The Techn

's work horsly stages oforates. 

Backgroun

ean Space And Commanngineering Ds (D/HSO), l

e to the Public

0

UCTION 

he Docum

ork (SOW) dpean Space a Band SSPAment throu

ctured as fo

er 1 introduable and ref

er 2 present

er 3 defines t. 

er 4 contain

er 5 contain

er 6 contain

er 7 contain

er 8 contain

er 9 contain

d in this SOW

mal text (novides informquirements lumn. State

ology Res

se programf technology

nd for the 

Agency (ESAnd (TT&C) oDepartmenlocated at t

ment 

escribes theAgency (refA”. It will beughout the e

ollows: 

ces the bacference doc

ts the requi

the work to

s the requir

s the requir

s the requir

s the requir

s the requir

s the list of

W is a new a

ot inside a bmation. Theare inside b

ement of co

search Pro

mme supporty developm

activity 

A) operates operations ot (HSO‐G) ohe Europea

e activities ferred to ascome part oexecution o

ckground ancuments (in

rements an

o be perfor

rements on

rements on

rements on

rements on

rements on

f required o

activity. 

ox) is descrre is no neeboxes with ompliance sh

ogramme

ting the stuent (TRLs 1

a network of different of the ESA Dan Space Op

to be execus “ESA” or “of the contof the work

nd main objcluding app

nd constrain

med in the 

n deliverable

n schedule a

n document

n project ma

n testing, ac

ptions 

riptive text ted of statemthe corresphall be prov

udy of new t‐3). As a ma

S/X/Ka‐bancategories 

Directorate Operations Ce

uted and ththe Agencyract (Appen

ectives of tplicable stan

nts on the sy

contract to

es. 

and milesto

ation. 

anagement 

ceptance a

that introdument of componding reqvided for th

technologieandatory pr

nd antennasof spacecraOf Human Sentre (ESOC

e deliveraby”) in relationdix 1) and s

he work, anndards). 

ystem to be

o produce th

nes. 

aspects 

nd warranty

uces the mpliance witquirement rese require

es, focusing rogramme, 

s for Telemeaft. The GroSpaceflight C), is respon

les on to the shall serve 

nd quotes 

e produced.

he required

y. 

th text eference ements. 

primarily it serves all

etry, ound and nsible for 

 

 

Page 7: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 7/35

KaSSPA SOW

Date 22/05/201

 

the designoperate ES The freque

 All the ban ESA Deep SDownloadiavailable oKa Band USpacecraftdeterminaamplifiers  One of thePower Am A Solid Statechnologymaintain tfactor to b

 TRP prograproductiondesign andimplement

IED – Releasable

13 Issue 1 Rev 0

, developmSA satellites

ency bands 

S Band

S Band

X Band

X Band

X Band

K Band

Ka Ban

Ka Ban

nds are alrea

Space Statioing, Commaon ESA Deepplink and Dt, for Radio tion. Uplink

e main elemplifier that 

te High Powy required ihe units thae considere

Use of Eursemicondu

Non ITAR t

In case of uavailability

am looks fon equipmend the architet a solution 

e to the Public

0

ent and pros, including 

supported 

 UL: 2025‐2

 DL: 2200‐2

d UL: 7145‐7

d DL(EES): 80

d DL: 8400‐8

d DL: 25.5‐2

d DL: 31.8‐3

d UL: 34.2‐

ady implem

ons supportand and Trap Space Statownlink to Science (RSk signals sha

ments requirshall delive

wer amplifies available tat will be imed for the se

opean Techuctor transis

technology 

use of potey of all such 

r the develont in some feecture of theasily upgr

ocurement the above m

by ESTRACK

2120 MHz fo

2300 MHz fo

7235 MHz fo

025‐8400 M

8500 MHz fo

7.0 GHz for

32.3 GHz fo

34.7 Ghz fo

mented in ES

t present macking of sptions. Futurincrease thSE) applicatiall be ampli

red for the ir a high pow

er as requirto allow thimplementedelection of t

hnology willstors 

will be pref

ntial ITAR reparts shall

opment of aeatures (e.ghe equipmeradable to t

of the groumentioned 

K are: 

or Uplink 

or Downlink

or Uplink 

MHz for Dow

or Downlink

r Downlink

or Downlink

or Uplink 

STRACK exc

missions on Xacecraft. Kare Deep Spae throughpions and forfied to an a

implementawer level in

ed by the sts developmd in ESTRACthe main co

l be preferre

ferred for a

estricted tebe ensured

a prototypeg. redundannt shall conhe final pro

nd station iantennas a

wnlink 

ept the Ka 

X Band (7‐8a Band dowace missionsput betweenr more accuadequate po

ation of the the band o

tations doement. The neK makes thomponents.

ed for all co

ll parts 

echnology ind by the con

e. This protoncy or remonsider the fioduction un

infrastructund its assoc

Band UL.. 

 GHz) for Tewnlink (32 Gs will requirn the Grounurate navigaower level b

e Ka Band upof 34.2 to 34

es not exist aeed of mane future ava. In particul

omponents 

n the Activitntractor. 

otype may dote M&C). Nnal configuit level. 

ure requiredciated equip

elemetry Hz) is alreadre the presend Station aation and orby means of

plink is the 4.7 GHz. 

at present bufacturing aailability anar: 

specifically

ty, long term

differ from tNeverthelesration and s

d to pment. 

dy ence of a nd the rbit f power 

High 

but the and n important 

y for 

the final s the shall 

 

Page 8: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 8/35

KaSSPA SOW

Date 22/05/201

 

 

A1.4

The follow ID  Ref

AD1  GR

AD2  MI

A1.5

IED – Releasable

13 Issue 1 Rev 0

Applicable

wing docume

ference 

RST‐SYST‐HW‐SP

L HDBK 217 

Acronyms 

e to the Public

0

e and Refe

ents are app

P‐1003‐HSO‐GS

and abbr

AD 

AIL 

ALC 

AM/PM 

AR 

ATP 

C.V. 

C/I3 

CCSDS 

CDR 

CFI 

CPM 

ESA 

ESOC 

ESTRACK

FP 

FR 

HPA 

HW 

ICD 

IM3 

IR  

KOM 

M&C 

MoM 

MPR 

MTBF 

PDR 

RD 

RF 

SOW 

SPF 

SRS 

SW 

TBC 

TBD 

erence Do

plicable to t

Title 

S  Ka Band S

1 Rev 0 

Iss F Noti

eviations

Applic

Action

Autom

Ampli

Accep

Accep

Curric

Third 

Consu

Critica

Custo

Critica

Europ

Europ

  ESA T

Final P

Final R

High P

Hardw

Interf

Third 

Interm

Kick‐O

Monit

Minut

Mont

Mediu

Prelim

Refere

Radio

Statem

Single

Softw

Softw

To Be 

To Be 

ocuments 

this study 

Solid State Pow

ce 2 

cable Documen

n Item List 

matic Level Con

tude to phase 

ptance Review

ptance Test Pro

culum Vitae 

Order intermod

ultative Commit

al Design Review

mer Furnished 

al Path Method

pean Space Age

pean Space Ope

racking Networ

Presentation 

Review 

Power Amplifie

ware 

ace Control Do

order intermod

mediate Review

Off Meeting 

toring and Cont

tes of Meeting

hly Progress Re

um Time Betwe

minary Design re

ence Documen

frequency 

ment Of Work

e Point Failure 

ware Requireme

ware 

Confirmed (by

Determined (b

(AD’s and

wer Amplifier (K

nt 

ntrol 

modulation tra

cedures 

dulation produ

ttee for Space D

Item 

ncy 

erations Centre

rk 

cument 

dulation produc

trol 

eport 

een Failures 

eview 

ents Specificatio

y the Agency) 

by the Contract

d RD’s) 

KaSSPA). Iss  2

 

nsfer 

ct level 

Data Systems 

cts 

on 

or) 

Date 

22/05/2013 

 

Page 9: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 9/35

KaSSPA SOW

Date 22/05/201

 

D1.6

The Technoas follows: 

Techno

TRL1 

TRL2 

TRL3 

TRL4 

TRL5 

TRL6 

TRL7 

TRL8 

TRL9 

 

2 W

This chapteresults. Thobjectives 

W2.1

The study w Pre Det Pro Pro

                    1 ecss‐e‐10

IED – Releasable

13 Issue 1 Rev 0

Definitions

ology Readi1 

ology Readiness

Basic prin

Technolo

Analytica

Compone

Compone

System/s

(ground 

System p

Actual sy

Actual sy

WORK TO

er describese contractoof the activ

Work Logic

will includeeliminary Sttailed Desigototype Manototype Test

                    

0C‐Draft(6A

e to the Public

0

TBS 

TC 

TM 

TN 

TO 

TRL 

TRP 

TT&C 

WP 

iness Levels

s Level 

nciples observe

ogy concept and

al and experime

ent and/or brea

ent and/or brea

subsystem mod

or space)  

prototype demo

ystem complete

ystem “flight‐pr

O BE PER

s the work tor can propovity are fulfi

e the designudy gn nufacturingting 

                

ugust2007)

To Be 

Teleco

Telem

Techn

Techn

Techn

Techn

Tracki

Work 

s (i.e. achiev

ed and reported

d/or applicatio

ental critical fun

adboard valida

adboard valida

del or prototype

onstrated in a s

ed and flight‐qu

roven” through

RFORMED

to be perfoose a differeilled. 

 activities a

g and integr

), http://ww

Specified (by t

ommand 

metry 

nical Note 

nical Officer 

nology Readines

nology Research

ing, Telemetry 

Package 

ved status o

d  

n formulated 

nction and/or c

ted in the labo

ted in the relev

e demonstrated

space environm

ualified through

 successful mis

rmed, the rent Work B

and the man

ration 

ww.ecss.nl/.

he Agency) 

ss Level 

h Programme 

and Command

of developm

characteristic p

ratory environm

vant environme

d in the relevan

ment  

h test and demo

ssion operation

required dereakdown S

nufacturing 

ment of a te

roof‐of‐concep

ment  

ent  

nt environment

onstrated (grou

s  

liverables aStructure pr

and testing

chnology) a

pt performed  

t  

und or flight)  

and the exprovided tha

g of the pro

are defined 

ected at the 

totype. 

 

Page 10: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 10/35

KaSSPA SOW

Date 22/05/201

 

Desceil

Del Doc 

DEV‐0001 

DEV‐0002 

2.1.1 W

I

T

DEV‐0003 

DEV‐0004 

O

DEV‐0005 

IED – Releasable

13 Issue 1 Rev 0

scription of ling cost forlivery at ESOcumentatio

The condevelopand in o

The condefinedto thossignatudelivery

WP 1000: P

Input  This SO NegotiTask descri

A prelimband SSsolutio

Appropreportemechan

Output  

The out5.3.2 Thresults 

e to the Public

0

f the Upgradr this upgraOC on and Final

ntractor shapments, tecorder to red

ntractor shad in art. 5 pae already idure, for appry note as de

Preliminary

OW.  ation/KOMption 

minary studSPA. Duringns in order 

priate tradeed. Technicanical, therm

tput of this he followingincluded inDetailed blSingle poinMain paramAM/PM, thranges of aProposed sEMI, EMC aList of longList of IPR sList of critic(present an

de of the prde 

 Presentatio

all consider chnologies aduce develo

all identify, art 2 paragrdentified in roval by ESAefined in ar

y Study 

 minutes of

dy will be cag the executto meet AD

‐offs amongal analyses mal, technol

WP will be g aspects shn the PDR dalock diagramnt failures ameters budhermal dissiall parametesolutions foand stray rag lead itemssubject partcal aspects nd future) a

rototype to 

on 

the use as and processopment tim

during the raph 1 of ththe proposA. This shallrt. 5 part 2 p

f meeting 

arried out totion of this D1.

g available tshall cover ogies, man

the PDR dahall be specata packagems of the eqnd Failure pgets (RF poipation, etcers includedr achieving adiation asps ts of the desigand availabi

the level of

much as poses, in orde

me and cost.

design activhe contract)sal and apprl be supplemparagraph 2

o provide antask, the co

technical soall critical aufacturing, 

ata packagecifically anae: quipment wpropagationower, noise .) for varioud in the techcritical spe

pects 

gn, includinlity. 

f a producti

ossible of exr to speed‐ 

vities, any T intended troved by ESmented by a2 of the con

n architectuontractor sh

olutions shaareas of themaintenan

e whose conlysed as par

with definitin to externalevel, P1dB, Gus operationhnical specicifications

ng compone

ion unit incl

xisting interup and secu

Third Party o be used iSA upon cona draft verstract.  

ural design ohall provide 

all be perfore design (elece, etc.) 

ntents are drt of this tas

on of modual units analGroup Delanal cases coification 

ent procurem

luding 

rnal ure design 

Product (asn addition ntract sions of the 

of the Ka design 

rmed and ectrical, 

described insk and the 

ules lysis ay, IM3, overing 

ment 

 

Page 11: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 11/35

KaSSPA SOW

Date 22/05/201

 

A

DEV‐0006 

2.1.2 W

I

DEV‐0007 

DEV‐0008 

IED – Releasable

13 Issue 1 Rev 0

Approval co

Successplace aperform

WP 2000: D

Input  This SO PDR Da PDR coTask descri

The DeSSPA. Ais inclu

This tas

e to the Public

0

PreliminaryPreliminaryExpected p

ondition 

sful close‐ot the end omances prio

Detailed De

OW and theata Packageonclusions/mption 

tailed DesigAll the workded in this t

sk shall in pAmplificatiensuring th The pre

P1dB, C/ there w There wPower mod The the The po

functiospecifiemanufa

The faiother p

Detailed thDetailed MDetailed LoReliability fUpdate of Test Plan List of critic

y mechanicy  Local M&performance

ut of the PDf the Prelimor to start th

esign 

 negotiatione minutes of m

gn will covek related to task 

articular incon chain dehat: eamplifier is/I3 and AM/will be a corwill be a cordules and oermal desigwer supplieonal and pered environmacturing andlure of one part, subsyshermal desigMechanical Docal M&C dfigures SPF list 

cal compon

al and therm&C design es vs. ESOC

DR and assominary Studyhe detailed 

n/KOM min

meeting 

er the detailthe electric

clude: esign. In par

s not limitin/PM. rrect handlinrrect behavutput combn do not coes, the alarmrformance rment, and ind reliability subsystem tem or modgn Design esign and a

nents (includ

mal design

C requireme

ociated actioy to analysedesign 

nutes.  

ed design ocal and mec

rticular, the

ng the perfo

ng of the reiour of the biner designompromise tms and securequiremenn compliancrules. or module dule of the 

ssociated d

ding quantit

ents 

ons closed. e the design

of the moduchanical des

e pre amplif

ormances o

edundancy. ALC n, in particuthe reliabiliurities satisfnts, in the apce with app

does not geunit 

documentat

ties) for lon

 The PDR, sn and expec

ules of the Ksign of the e

fier  shall be

f the HPA, s

ular ensurinity of the amfy the applicpplicable anlicable desi

enerate dam

tion 

ng term mai

shall take cted 

Ka Band equipment 

e designed 

specially on

g that: mplifier cable nd gn , 

mage to 

intenance

 

 

Page 12: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 12/35

KaSSPA SOW

Date 22/05/201

 

DEV‐0009 

O

DEV‐0010 

A

DEV‐0011 

2.1.3 W

I

PRO‐0001 

PRO‐0002 

PRO‐0003 

PRO‐0004 

O

PRO‐0005 

PRO‐0006 

A

PRO‐0007 

2.1.4 W

I

IED – Releasable

13 Issue 1 Rev 0

The pro

Output  

The out5.3.3  

Approval co

Successplace aperform

WP 3000: P

Input  This SO CDR Da CDR coTask descri

This tastheir in

The Properform

The con

No CFI 

Output  

The outassemb

The out5.3.4  

Approval co

At the eReviewproced

WP 4000: P

Input  This SO

e to the Public

0

Analysis ofceiling pric

ototype con

tput of this 

ondition 

sful close‐ot the end omances prio

Prototype M

OW and theata Packageonclusions/mption 

sk will coventegration a

ototype Conmances of t

ntractor shaDraft User Electrical s

item will be

tput of this bled ready f

tput of this 

ondition 

end of the Pw shall take ures and au

Prototype T

OW and the

f impact of uce for recurr

nfiguration s

WP will be

ut of the CDf the Detailor to launch

Manufactu

 negotiatione minutes of 

r the manufnd the elab

nfiguration he design 

all provide tManual chematics, 

e provided b

WP will befor testing.

WP will be

Prototype Mplace to anauthorise the

Testing (FA

 negotiation

upgrading trent units 

shall be froz

 the CDR da

DR and assoed Design th the manuf

uring and I

n/KOM min

meeting 

facturing ofboration of t

shall allow 

the product

Board layo

by the Agen

 the Prototy

 the TRR da

Manufacturalyse the tee start of th

AT) 

n/KOM min

he prototyp

zen at the C

ata package

ociated actioto analyse tfacturing.

Integration

nutes.  

f the differethe test pro

the comple

t document

uts, interco

ncy

ype comple

ata package

ing, Integraest results oe Equipmen

nutes.  

pe to a prod

CDR 

e whose con

ons closed. he design a

ent modulesocedures.

ete validatio

tation assoc

onnection w

etely manuf

 whose con

ation Testingof the different FAT. 

duction unit

ntents are d

 The CDR, sand expecte

s of the pro

on of the 

ciated with t

wirings. 

factured and

ntents are d

g, a Test Reent module

t and 

described in

shall take ed 

ototype, 

the unit:

escribed in 

eadiness es, test 

 

Page 13: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 13/35

KaSSPA SOW

Date 22/05/201

 

T

PRO‐0008 

PRO‐0009 

PRO‐0010 

PRO‐0011 

O

PRO‐0012 

A

PRO‐0013 

2.1.5 W

I

T

PRO‐0014 

PRO‐0015 

PRO‐0016 

PRO‐0017 

O

PRO‐0018 

PRO‐0019 

PRO‐0020 

A

IED – Releasable

13 Issue 1 Rev 0

Test Pl Techni Test PrTask descri

The conagreed chapte

AcceptATP. 

For conthe agr

The conaccordi

Output  

The outdescrib

Approval co

At comof the t

WP 5000: D

Input  This SO DocumTask descri

The con

The confinal dePackag

The conagreed listed in

The conpresent

Output  

Unit De

Final Pr

Set of u

Approval co

e to the Public

0

an cal Specificarocedures ption 

ntractor shaduring the r 5 of this S

ance Testin

nditionally areed proble

ntractor shaing with the

tput of this bed in 5.3.5 

ondition 

pletion of ttesting cam

Delivery at

OW and thements produption 

ntractor sha

ntractor shaestination. Tes shall be s

ntractor shaduring the n 3.1 

ntractor shatation shall 

elivered at E

resentation

updated do

ondition 

ation 

all test the udevelopmeOW. 

ng shall be fo

accepted rem fixed wit

all provide ae requireme

WP will be

the tests, a paign and a

t ESOC and

 negotiationuced during 

all deliver th

all be respoThe packagesuitable for

all produce different re

all prepare take place 

ESOC  

 hold at ESO

cumentatio

unit followient activitie

ormally bas

leases, the hin 30 days

a test reporents of 5.4.8

 the Test Re

FAT Reviewaccept the e

d Final Pres

n/KOM minthe activity

he unit at E

onsible for pe shall be sur transport t

a final set oeviews. The

a final presenot later th

OC 

on 

ng the Testes according

sed on the a

contractor s.

rt with the r8 

eport Data 

w shall take equipment.

sentation

nutes.  y 

SOC premis

packing the uitable for tto Australia

of documene number of

entation tohan one mo

t Plan and pg with the re

approved (b

shall re‐del

results of th

Package wh

place to an

ses unless o

system for transportatia, Argentina

ntation incluf copies of t

 be hold at onth after th

procedures (equirement

by ESA) vers

liver the sys

he testing ca

hose conten

alyse the te

otherwise ag

transportation via air laa and Spain.

uding all thethe docume

ESOC. This he FAT revie

(ATP)ts of 

sions of the

stem with 

ampaign 

nts are 

est results 

greed. 

tion to its and or sea. 

e updates entation is 

ew. 

 

 

Page 14: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 14/35

KaSSPA SOW

Date 22/05/201

 

PRO‐0021 

2.1.6 W

PRO‐0022 

PRO‐0023 

PRO‐0024 

PRO‐0025 

3 R

D3.1

Code 

DEL‐0001 

DEL‐0002 

DEL‐0003 

DEL‐0004 

DEL‐0005 

DEL‐0006 

DEL‐0007 

DEL‐0008 

DEL‐0009 

IED – Releasable

13 Issue 1 Rev 0

Accept

Warranty  

The con22). 

The Waincludin

Until therrors fexclude

The conthe wa

REQUIRE

Document

Title 

KOM Data

PDR Data

CDR Data

TRR Data 

Test resu

User Man

Maintena

Final Pres

Executive

e to the Public

0

ance of ESA

ntractor sha

arranty pering hardwar

he end of thfound in theed). 

ntractor sharranty perio

MENTS F

tation 

a Package 

 Package 

 Package 

Package 

lts 

nual 

ance Manua

sentation 

e Summary 

A of final de

all provide a

iod shall covre, software

he warrantye delivery (r

all ensure thod are resol

FOR DEL

M

FADe

FADe

al  FADe

Fi(Tshcocowunnenorein

Fi

livery 

a Warranty

ver the corre, configurat

y period, therequest for 

hat serious lved within 

IVERABL

Milestone 

weeks afte

weeks befo

weeks befo

weeks befo

AT review +elivery of th

AT review +elivery of th

AT review +elivery of th

nal PresentThe final prehall be free ommercial oonfidential ihich shouldnder separaecessary. Nor disseminestrictions sdicated.)

nal Present

according t

rection of etion or docu

e contractonew or cha

anomalies 30 days. 

LES 

r KOM 

ore PDR 

ore CDR 

ore TRR

+ he unit 

+  he unit 

+  he unit 

tation esentation of all or informationd be provideate cover if o copyrightation hall be 

tation

to the contr

errors foundumentation

r shall be reanged requi

identified b

Numb

Electr

Electr

Electr

Electr

Electr1 Pape

Electr1 Pape

Electr1 Pape

n, ed 

Electr

Electr

ract conditi

d in the delivn. 

esponsible trements ar

by the Agen

ber of Copie

onic format

onic format

onic format

onic format

onic formater copy wit

onic formater copy wit

onic formater copy wit

onic format

onic format

ons (clause

very, 

to fix all e 

cy during 

es 

t +h the unit 

t + h the unit 

t + h the unit 

 

 

Page 15: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 15/35

KaSSPA SOW

Date 22/05/201

 

Table 1 

H3.2

Code 

DEL‐0010 

Table 2 

S3.3

SM‐0001 

4 S

SM‐0002 

SM‐0003 

SM‐0004 

 

Meeting 

KOM PDR CDR TRR FAT 

IED – Releasable

13 Issue 1 Rev 0

List of 

Hardware 

Title 

Ka SSPA P

List of 

Software 

Any devthe asswith th

SCHEDUL

The conwork anjustified

The conAny dev

The duactivitycomple

Descripti

Kick Off MeetiPreliminary DCritical DesignTest ReadinessPrototype Acce

e to the Public

0

Documenta

Prototype 

Hardware D

veloped locociated unie associate

LE AND M

ntractor shand the miled. 

ntractor shaviations sha

ration of thy (delivery oetion of the 

on 

ing esign Review

n Review s Review eptance Test

(Tfrcowunnenorein

ation Delive

M

Fi

Deliverable

cal or remott. The softwed reviews (

MILESTO

all establishestones in Ta

all monitor all be duly j

e work shaof updated sFinal Prese

The Executivee of all comonfidential ihich shouldnder separaecessary. Nor disseminestrictions sdicated.)

erables 

Milestone 

nal Present

es 

te M&C firmware requirePDR, CDR, F

NES 

h a scheduleable 3. Any 

the major mustified.  

ll not exceeset of TNs, Fentation).  

ve shall be mmercial oinformationd be provideate cover if o copyrightation hall be 

tation 

mware or soed documeFAT)

e that is condeviation s

milestones s

ed 24 monthFinal Report

Events Timmonths)ToTo + 6 To + 12 To + 22 To + 23

r n, ed 

Numb

1 unit

oftware shants will be d

nsistent withshall be iden

schedule in

hs from kickt and Execu

meline\(in 

ber of Items

 

ll be delivedelivered to

h the plannntified and 

dicated in T

k‐off to endutive Summ

Location 

ESOC ContractoESOC Tele/VideContracto

red with ogether 

ed start of duly 

Table 3. 

d of the ary, and 

or’s 

eoconf or’s

 

Page 16: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 16/35

KaSSPA SOW

Date 22/05/201

 

FP 

Table 3 

Figure 1 

ME‐0001 

ME‐0002 

ME‐0003 

ME‐0004 

4.1.1 K

ME‐0005 

ME‐0006 

ME‐0007 

4.1.2 P

ME‐0008 

ID Task Nam

1 Negotiat2 Prelimin3 PDR4 Detailed5 CDR6 Manufac7 TRR8 Testing9 FAT10 Delilvery

Pres.11 FP

IED – Releasable

13 Issue 1 Rev 0

Final Presenta

List of 

Tentat

For eacpresent

The conparties Agencyright tothe con

For all rthe reqThe conand sub

The concontracserver onotify v

Kick‐off Me

The Kic

The obj(specifiand the

The dosection

Progress m

Progrespremis

me Start

tion/KOM Mon 02/09

nary Study Tue 03/09

Mon 03/0

d Design Tue 04/03

Mon 01/09

cturing & AssTue 02/09

Mon 04/0

Tue 05/05

Mon 03/08

y and Final  Tue 04/08/15

Tue 01/09

e to the Public

0

ation

Meetings 

tive Schedul

ch meeting tation 

ntractor sha(including s

y reserves tho invite thirdntractor's ag

review meequired docuntractor shab‐contracto

ntractor shactor shall deor submit bvia e‐mail th

eeting (K.O

ck‐Off Meet

jectives of tication, SOWe presentat

cumentation 0 

meetings (P

ss Meetingses and shal

Finish

9/1Mon 02/09/1

9/13Fri 28/02/14

3/1Mon 03/03/1

3/14Fri 29/08/14

9/1Mon 01/09/1

9/14Fri 01/05/15

5/1Mon 04/05/1

5/15Fri 31/07/15

8/1Mon 03/08/1

Mon 31/08/15

9/15Tue 01/09/15

Jul3rd Qu

le 

the contrac

all give to thsubcontracthe right of pd parties togreement, t

etings the comentation all be respoor(s) person

all take andeposit the eby email nothe relevant 

O.M.) 

ting shall be

the meetingW, contraction of the t

on, which th

P.M.) 

s take placel be suppor

Sep Novuarter

ctor shall pr

he Agency ptors) to be participatio meetings, to facilitate 

ontractor shis available onsible for enel as need

 produce thelectronic vet later than distribution

e held at Ag

g are the finual issues), echnical ap

he Contracto

e typically atrted by adeq

Jan Mar M1st Quarter

To + 24 

rovide an ag

prior noticeheld in conn in such mwith due noinformatio

hall ensure at the Agen

ensuring theded  

he Minutes ersion of thseven workn list of the

ency’s prem

nalization ofthe establi

pproach 

or shall pro

t 8‐12 weekquate docu

May Jul Sep3rd Quarter

genda and h

 of any meenection wit

meetings. Thotice to then exchange

that propency at least e participati

of the Meee minutes oking days afir availabilit

mises. 

f the applicshment of a

vide for the

ks intervals mentation. 

Nov Jan1st Quarter

ESOC 

hand‐outs o

etings with h the contrhe Agency re contractore 

r notice is g2 weeks inion of his pe

eting (MoM)on the ESOCfter the meety. 

able documa detailed s

e KOM is de

at contractThe contra

Mar May Jur 3rd Q

of his 

third ract. The eserves ther and with 

given and  advance. ersonnel 

). The C FTP eting and 

ments chedule 

etailed in 

or's actor shall 

ul Sep NovQuarter

 

 

 

Page 17: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 17/35

KaSSPA SOW

Date 22/05/201

 

4.1.3 P

ME‐0009 

4.1.4 C

ME‐0010 

4.1.5 T

ME‐0011 

4.1.6 F

ME‐0012 

ME‐0013 

4.1.7 F

ME‐0014 

ME‐0015 

ME‐0016 

IED – Releasable

13 Issue 1 Rev 0

presentfollowicontracsubcon

Preliminary

A Prelimof the pempha

Critical Des

A DesigWP’s. A

Test Readin

After cobe orgaperformprocedThe dosect 5.3

Factory acc

Factoryshall tetest pla

After coreview demonthe spewhich t

Final Presen

The finof the s

The Fininforma

The con

e to the Public

0

t a report ong period, mctor shall enntractor’s pe

y Design Re

minary Desipreliminary sis on the s

sign Review

gn Review sA presentat

ness Review

ompletion oanized by thmances of tures will becumentatio3.4 

ceptance T

y Acceptancest the unit an and proc

ompletion omeeting orstrates to tecifications,the Contrac

ntation (F.

al presentastudy and th

nal presentaation and fr

ntractor sha

of the work major problnsure that teople is ava

eview (P.D

ign Review study. A prubjects liste

w (C.D.R.)

hall take plion of the d

w (T.R.R.)

of the Manuhe Contracthe differene reviewed aon, which th

Test Review

ce Tests shaand state itcedures app

of the acceprganized by he satisfact the equipmctor shall pr

.P.) 

tion will behe perform

ation and three of any r

all deliver a

performed,lem areas athe approprailable for th

D.R.) 

shall take presentation ed in the pr

ace at Agendesign shall 

ufacturing aor at his pret modules aand approvhe Contracto

w (F.A.T.)

all take placts complianproved at TR

ptance teststhe Contration of the Ament will beovide for th

 held at ESOances of th

he Executiveestriction to

t the Final p

, study resund envisageriate experthese meetin

place at Ageof the desireliminary s

ncy’s premistake place.

and Assembemises. Thisand subasseved for the aor shall pro

e at contracce against tRR shall be a

s the resultsctor at his pAgency thate released fhe FAT is de

OC. The cone unit. 

e summary o distributio

presentatio

ults to date, ed correctivise includinngs. 

ency’s premgn shall taktudy work d

ses after fin  

bly tasks, a rs review wiemblies. Theapplication vide for the

ctor’s premthe Agency applied. 

s will be revpremises. Wt the equipmor delivery.etailed in se

ntractor will

shall be freon by ESA.

n: 

work plannve actions. Tng possible 

ises after fike place witdescription

nalization of

review meell verify thee test plan ato the test e TRR is det

mises. The corequiremen

viewed duriWhen the rement comp The documct. 5.3.5 

l present th

e of any pro

ned for the The 

nalization h special . 

f design 

eting shall e and test campaign. ailed in 

ontractor nts. The 

ing a eview lies with mentation, 

he results 

oprietary 

 

Page 18: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 18/35

KaSSPA SOW

Date 22/05/201

 

4.1.8 A

ME‐0017 

5 D

G5.1

DOC‐0001 

DOC‐0002 

DOC‐0003 

DOC‐0004 

DOC‐0005 

R5.2

The documschedule. 

IED – Releasable

13 Issue 1 Rev 0

Additional 

Additioconsidemeetintelema

DOCUME

General re

The Tec

The contheir na(FTP. E‐

The concode (e

For anymasterdigitally

For Datset of hof eachindex obe mar

Running D

ments listed

e to the Public

0

A completeagreed durThe Final PThe ExecutThe Ka SSP

meetings 

onal meetinered necessgs may be rtics means.

ENTATIO

equiremen

chnical docAll the docThe text shacceptableDrawings sA full comppart of the

ntractor shaative forma‐mail,…) or 

ntractor shae.g. virus). 

y documentr paper versy signed. 

ta Packageshandbooks sh single voluof the subjecrked with a 

Documents

 hereafter w

e set of the ring the diffPresentationtive SummaPA prototyp

gs (workingsary. In partrequired. Th. 

N  

nts 

umentationuments shahall be printe for specificshall be inseplement of  maintenan

all submit at (e.g. MS Ousing a CD‐

all ensure th

t requiring Esion to bear

s made up bshall be proume. Each incts dealt wititle indicat

will evolve w

documentaferent revien  ary e 

g meetings) ticular durinhese meetin

n shall meetall be writteted on DIN Ac drawings.erted in the all drawingsnce manuals

ll documenOffice, Open‐ROM/DVD.

hat electron

ESA approvar all applicab

by several voovided eithendividual voith in the voting the sub

with the pro

ation produws 

may be heng the initiangs include 

t the followen in EnglishA4 size pap

text wheres, circuit dias. 

ts to ESA ein Office, LaT. 

nic docume

al, the contble signatur

olumes, a lier in a separolume shall olume itselfbject of that

oject progre

uced during 

ld at the Col phases of videoconfe

wing requireh er. Larger p

e they are nagrams etc.

ither in searTeX, …), eith

nts do not c

ractor shallres or a PDF

ist of contenrate volumebe providef. The cover t particular 

ess or have 

the study u

ontractors pthe projecterences and

ments: 

paper sizes a

eeded;  shall be su

rchable PDFher over the

contain any

 produce atF copy prep

nts of the ce or at the bed with a deof each vovolume. 

no fixed iss

updated as 

premises if t such d other 

are only 

pplied as 

F AND in e Internet 

y harmful 

t least one ared to be 

omplete beginning etailed lume shall 

sue 

 

Page 19: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 19/35

KaSSPA SOW

Date 22/05/201

 

5.2.1 Is

DOC‐0006 

DOC‐0007 

5.2.2 M

DOC‐0008 

DOC‐0009 

5.2.3 A

DOC‐0010 

DOC‐0011 

5.2.4 P

DOC‐0012 

IED – Releasable

13 Issue 1 Rev 0

ssued Docu

The condocumminuterevisionand dis

This listprogres

Minutes of 

The conthe minshall berepreserelevan

The miidentifyupdatebe sign

Action Item

The conwith thminuteorigin, date .. 

The AIL

Progress Re

The conaddressreport shall giv

e to the Public

0

ument List

ntractor shaents produces. The list sn, date of isstribution.. 

t shall be coss meetings

f Meeting (

ntractor is rnutes of all e issued andentative andnt meeting. 

nutes shall y all agreeme of the Actied and dist

m List (AIL) 

ntractor shae Agency. Ees of the medue date, o

L update sha

eports (PR)

ntractor shased to the Ashall refer tve: DescriptionaccomplishAction itemEvents antReasons foplanned an

t (IDL) 

all create anced during thall containssue, status 

ontinuouslys 

(MoM) 

responsible meetings hd distributed to the ESA

have a cleaments madeon Item Listtributed at t

all maintainEach item weeting at whoriginator, a

all be review

all provide, Agency's repto the curre

n of progreshed, ms completeicipated to or slippage and/or taken

nd maintainthe work, inn the docum(draft or ap

y updated an

for the preeld in connd to all partA Contracts 

ar and unique and actiont (AIL) and tthe end of e

n an Action will be uniquhich the actactionee, sta

wed at each

every montpresentativent activities

ss: actual vs

ed during thbe accompand/or prob, with revis

n an Issued ncluding repment referepproved by 

nd shall be 

eparation coection withticipants, toOfficer, no

ue configurans accepted the Issued Devery meeti

Item List (Auely numbeion was agratus (open, 

h progress m

th, a Monthves, coverings shown on

s. schedule,

he reportinglished durinblem areas, ed complet

Document ports, specince, type othe Agency

reviewed d

onfigurationh the contrao the Agenct later than

ation code, at the meeDocument Ling. 

AIL), recordired with rereed and wiclosed, wit

meeting 

hly Progressg the contra the latest i

 milestones

g period (grng the next if any, and tion date pe

List, recordfications, pf documenty), confiden

uring the re

n and distribact. Typed vcy's technican one week 

clearly labeeting, togethList (IDL). A 

ng all actionference to till record dahdrawn) an

s Report (Mactual activissued bar c

s and event

reen flags), reporting pcorrective er activity (r

ing all the lans and t, issue and ntiality level

elevant 

bution of ersions al after the 

elled and her with an draft shall 

ns agreed the ate of nd closing 

MPR), vities. This chart and 

ts 

period, actions red flags) 

 

 

Page 20: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 20/35

KaSSPA SOW

Date 22/05/201

 

DOC‐0013 

5.2.5 T

DOC‐0014 

DOC‐0015 

R5.3

DOC‐0016 

5.3.1 K

DOC‐0017 

DOC‐0018 

DOC‐0019 

IED – Releasable

13 Issue 1 Rev 0

During shall prsummaweek a

Technical N

As soonapprovetc., wh

Furthercase, a 

Review Da

The Revcorresp

Kick Off Me

The conKOM. 

The KO

Slides aKOM. T

e to the Public

0

Status repoMilestone Expected dLast up to dAIL up to d

special or crovide by e‐ary of activitnd the gree

Notes (TNs)

n as they beval all technhich are pro

r detail couspecific Tec

ata Packag

view Data Pponding rev

eeting (KO

ntractor sha

OM Data PacK.O.M. slid

o Proo Preo Stato Crito Scho Milo Meo Pay

CompliancMinutes ofRedlined ve

and compliaThe complet

ort on all lopayment stdate for majdate scheduate 

critical phas‐mail a Weeties performen and red f

ecome availical notes, ioduced duri

ld be requirchnical Not

ges 

Packages shview. 

M) Data P

all prepare 

ckage shall des coveringoject teamesentation otement of ctical Itemshedule estones  eting planyment plane matrices af Meeting ersion of re

ance matricte KOM doc

ng lead or ctatus, jor scheduleule 

ses of the acekly Progresmed during flags. 

lable, the concluding ening the exec

red, depende will be req

hall be sent 

Package 

a KOM Data

include at leg at least: 

of the techncompliance

against ESA

equirements

es shall be cumentatio

critical deliv

e items. 

ctivity at thss Report (Wlast week, t

ontractor shngineering dcution of th

ding on the quested. 

at least two

a Package a

east: 

nical approa

A requireme

s (if any cha

sent at leasn shall be s

very items

e Agency reWPR) with tthe foresee

hall submit drawings, mhe contract

course of t

o weeks in a

as documen

ach 

ents 

ange agreed

st one weekent no late

equest, the he executiven activities 

for the Agemanufacturi

he project. 

advance of 

ntation to su

d during the

k in advancer than two w

contractor ve in the next

ency's ng plans, 

In that 

the 

upport the 

e KOM) 

e of the weeks 

 

Page 21: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 21/35

KaSSPA SOW

Date 22/05/201

 

5.3.2 P

DOC‐0020 

DOC‐0021 

5.3.3 C

DOC‐0022 

DOC‐0023 

DOC‐0024 

IED – Releasable

13 Issue 1 Rev 0

after th

Preliminary

The con

The do

Critical Des

The con

The do

 

ESA apmanufa

e to the Public

0

he KOM is h

y Design Re

ntractor sha

cumentatioPreliminary

o Deto Deso Mao Simo Elec

deso Preo Relo Alao Exp

CompliancList of critic(present anCeiling pricMechanica

sign Review

ntractor sha

cumentatioTechnical dExpected pThermal AnCompliancPart List MechanicaUser’s ManTest Plan Test proce

proval of thacturing act

hold. 

eview (PDR

all prepare 

on of the P.Dy Technical tailed Blockscription of in paramet

mulation resctrical Desigscription of eliminary meiability, singrms and secpected perfoe matricescal aspects nd future) aces al and electr

w (CDR) Da

all prepare 

on of the C.Ddescription performancenalysis e matrices

al and electrnual (prelim

dures (preli

he Critical Dtivity of the 

R) Data Pa

a PDR Data

D.R. shall coDescription

k diagrams othe equipmers budgetsults gn (Electricathe electricechanical agle point faicurities ormances v

of the desigand availabi

rical ICD (HW

ata Packag

a CDR Data

D.R. shall coof the equie Analysis

rical ICD (HWminary) 

iminary) 

Design Revieconcerned

ackage 

 Package to

over at leastn containingof the equipment and itss (Power, G

al Block Diacal parts andnd thermal ilure and fa

vs. ESOC req

gn, includinlity. 

W and SW)

ge 

 Package to

over at leastpment 

W and SW i

ew is manda hardware.

o document

t:g: pment s constituenain, Noise, 

grams of thd its constitdesign ilure propa

quirements

ng compone

o document

t: 

f applicable

atory prior t

t and suppo

nt modules IP3, …) 

he equipmetuent modu

gation anal

ent procurem

t and suppo

e) 

to start any

ort the PDR.

nt and ules) 

ysis 

ment 

ort the DR.

 

Page 22: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 22/35

KaSSPA SOW

Date 22/05/201

 

5.3.4 T

DOC‐0025 

DOC‐0026 

5.3.5 F

DOC‐0027 

DOC‐0028 

5.3.6 F

DOC‐0029 

T5.4

5.4.1 C

DOC‐0030 

DOC‐0031 

IED – Releasable

13 Issue 1 Rev 0

Test Readin

The con

The Tesdocum

Factory Acc

The de

The Accdocum

Final Review

At the F

Types of D

Compliance

The comcontrac

An indidocum

e to the Public

0

ness Review

ntractor sha

st Readinesentation: Dry‐run TeTest proceUser’s docu

o Useo Mao Inst

Mechanica

ceptance T

livery of eac

ceptance reentation: AcceptanceTest proceUser’s docu

o Useo Mao Inst

Circuit DiagPart Lists Mechanica

w Docume

Final ReviewUpdated seFinal PreseExecutive S

Document

e Matrices

mpliance mctor with ea

vidual Coments 

w (TRR) Da

all prepare 

ss Review D

st Results (cdures (onlyumentationer’s Manualintenance Mtallation Maal and electr

Test Review

ch unit will 

eview Data 

e Test Resudures (onlyumentationer’s Manualintenance Mtallation Magrams and b

al and electr

entation 

w the contret of the doentation slidSummary (w

 

matrices shaach one of t

pliance Ma

ata Packag

a TRR Data 

ata Package

compared ay reference an  Manual anual rical ICD’s 

w (FAT) Da

be made af

Package sh

lts (compary reference an  Manual anual board(s) lay

rical ICD’s 

actor shall ocuments prdes (withoutwithout cop

ll indicate tthe paragra

trix shall be

ge 

Package to

e shall cont

against requand issue if

ata Packag

fter an A.R. 

all contain a

red against and issue if

youts 

provide theroduced dut copyright pyright or di

he statemephs of the A

e issued for 

o document 

ain at least 

uirements)f already sen

ge 

of the part

at least the 

requiremenf already sen

e following dring the stuor disseminisseminatio

ent of compAgency requ

each one o

and suppo

the followi

nt) 

icular unit i

following 

nts) nt) 

documentaudy nation restrn restrictio

liance of thuirements..

of the applic

rt the TRR.

ng 

is made.  

tion: 

rictions) ns)

e   

cable 

 

Page 23: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 23/35

KaSSPA SOW

Date 22/05/201

 

DOC‐0032 

DOC‐0033 

5.4.2 T

DOC‐0034 

DOC‐0035 

5.4.3 P

DOC‐0036 

5.4.4 P

DOC‐0037 

IED – Releasable

13 Issue 1 Rev 0

The comrefereninclude

The comdocumCompliexplana

Technical D

The tecthe resthis des

The tec

Performanc

This doperformmeasurwith threquire

Part List 

A list co

e to the Public

0

mpliance mnce and issue columns foThe requireTitle of theRequired vCompliancMeasured/Remarks.  

mpliance shent, one reqant”. In casation for th

Description

chnical Descults of the asign with th

o Deto Deso Levo Simo Elec

deso Preo Relo Alao Exp

chnical desc

ce Analysis

ocument canmances of trements, ane requiremements. 

ontaining al

matrices shaue, and the or: ement refee requiremevalue e status (C//Expected v

hall be statequirement se of non‐coe non‐comp

n (TD) 

cription shaanalysis andhe requiremtailed Blockscription of vel diagramsmulation resctrical Desigscription of eliminary meiability, singrms and secpected perfo

cription sha

n be includehe equipmenalysis, simuments in ord

ll parts emp

ll include incompliance

rence ent 

/NC) value 

ed paragrapin each rowompliance apliance in th

all include thd simulationments. The tk diagrams othe equipms or budgetults gn (Electricathe electricechanical agle point faicurities ormances v

ll be update

ed as a partent shall beulations ander to state t

ployed on th

n the headee matrix refe

ph per paragw, with C or a proposed vhe remark c

he descriptins performeechnical deof the equipment and itss of main p

al Block Diacal parts andnd thermal ilure and fa

vs. ESOC req

ed at each n

t of the teche described d/or budgetthe expecte

he equipme

r the requirerence and 

graph of theNC for “Comvalue shall column. 

ion of the eed to sustaiescription shpment s constituenarameters  

grams of thd its constitdesign ilure propa

quirements

new technic

hnical descrtogether wts of the deed complian

ent manufac

rements docissue. The 

e requiremempliant” orbe given wi

quipment dn the comphall include 

nt modules 

he equipmetuent modu

gation anal

cal review. 

ription. The ith the sustesign and conce with the

cturing shal

cument matrix will 

ents r “Not ith a brief 

design and pliance of at least: 

nt and ules) 

ysis 

expected taining ompared ese 

ll be 

 

Page 24: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 24/35

KaSSPA SOW

Date 22/05/201

 

5.4.5 M

DOC‐0038 

5.4.6 T

DOC‐0039 

DOC‐0040 

5.4.7 A

DOC‐0041 

DOC‐0042 

DOC‐0043 

IED – Releasable

13 Issue 1 Rev 0

genera

Mechanica

A docuadequainterfacof thes

Test Plan 

The teswill be with th

Test Plashall be

Acceptance

The tesequipm

Test pr

The doinforma

e to the Public

0

ted. The listModule whPart referePart numbManufactuQuality lev

l and Elect

ment contaately shall bcing informe interfacesExternal MAttaching pGrounding Cooling intConnector 

o Namo Cono Cono Pin o Typo Sign

For remotetelemetries

st plan list tmeasured fe ATP. 

an shall be ae used to de

e Test Proc

st procedurement. The AT

ocedures sh

cument shaation: 

t shall contahere the paence in the eer (manufaurer vel (if applic

trical Interf

aining the inbe issued. Thation, and as. At least th

Mechanical dpoints defin definitionterfaces andlist includinme of the connector typnnector funlist 

pe of signalsnal Characte control, a s, … 

he test to bfor each tes

approved pefine the Ac

cedures (AT

es shall defTP can be m

hall be appr

all contain a

ain for eachrt is mountequipment cturer refer

able) 

rface Contr

nformation his documeall the requhe followingdimensionsnition 

d requiremeng onnector e and positction 

s eristics (voldefinition o

be carried ovst. The test 

prior to the scceptance T

TP) 

ine the waymerged in a 

roved prior 

a list of test 

h part: ed (Topo) rence) 

rol Docume

necessary tnt shall conired hardwg informatio

ents 

ion 

tage, maximof protocol,

ver the equplan can be

start of theTest Proced

y each test wsingle docu

to the start

and for eac

ent (ICD) 

to define thntain all meare and sofon shall be 

mum rating available c

uipment ande merged in

 test sequeures.

will be perfument with 

t of the test

ch test at le

he interfaceschanical anftware charaincluded: 

gs, …) commands, 

d the param a single do

nce. Once a

ormed overthe test pla

t sequence.

east the follo

s d electrical acteristics 

meter that ocument 

approved 

r the an. 

 

owing 

 

Page 25: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 25/35

KaSSPA SOW

Date 22/05/201

 

5.4.8 A

DOC‐0044 

DOC‐0045 

DOC‐0046 

                    2 The overatesting pha

IED – Releasable

13 Issue 1 Rev 0

Acceptance

The Accequipmeach tethe me

Each te

The tesphases requiretesting Each rocolumn

                    

all complianase for this 

e to the Public

0

Test identifTest set‐upTest instruMeasuremMeasuremFormulae fA void resushall includdefinition. 

e Test resu

ceptance Tement’s testinest performeasurement 

est result shUnit underConfiguratmodules) Date and tTest operaTesting phaTest name Test result Required preference) Status of co

st summary against the

ement2. Thisresults and

ow of the tans: the performThe specifiThe measu

                

nce for a paparticular r

fication incp ments requ

ment accuracment procedfor the calcuult form as ede all the da

lts 

est Results ng sequenceed over theresults and

heet shall ber test (equipion of the u

ime of the ttor ase or number 

performance

ompliance (

 is a table te requiremes summary d the complable shall inc

mance title ed value ured value

articular reqrequiremen

luding refer

uired cy ure step byulation to bexample of ata required

is the docume. The docue equipmend complianc

e identified pment type unit (referen

test 

(according

e (as in the 

(C or NC) 

hat synthesent and indishall allow iance statuclude for a 

and refere

quirement ist 

rence to the

y step be made forthe final red in the Acc

ment that cument shall t plus a testce status. 

with the foand serial nnce and ser

 with the te

specificatio

sises the tesicates the oto have a qs. given perfo

nce 

s the logica

e Test Plan

 indirect mesults. The teptance Te

compiles thecomprise tt summary

ollowing datnumber) ial number 

est procedu

on, including

st results in overall compuick look of

ormance at 

l AND of the

easurementest result test results d

e results of he result shtable that s

ta: 

of the diffe

re) 

g requireme

the differepliance agaif the equipm

least the fo

e complianc

ts emplate ocument 

the heets of synthesizes 

erent 

ent 

nt testing inst each ment 

ollowing 

ces in each 

 

Page 26: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 26/35

KaSSPA SOW

Date 22/05/201

 

5.4.9 U

DOC‐0047 

5.4.10 M

DOC‐0048 

DOC‐0049 

IED – Releasable

13 Issue 1 Rev 0

User’s Man

The Useshall incontain

Maintenan

The Mafinding merged

The Ma

e to the Public

0

The status 

nual 

er manual stroduce then: A brief desBlock diagrequipmentExplanatioand softwaA descriptisystem at uTechnical sAbsolute mfault toleraInstruction

o Poso Loco Rem

A copy of tannexed. 

nce Manua

aintenance and troubld together w

aintenance Descriptionshall includof each drawill aid themulti‐drawdiagrams sencounterethe drawingiven. Evercode/numbdetail: 

of complian

shall indicate User to th

cription of rams shall bt description of the priare point of on, from thunit level; specificationmaximum raance characn for the usessible configcal monitor mote monitthe interfac

al 

manual shaeshooting owith the use

manual shan of equipmde a descripawer include understanwer system ahall clearly ed from theng, a level pry unit in thber. In part

nce (C or NC

te the functhe use and o

the purposebe providedn; nciples of of view he signal flow

ns of each satings of thecteristics of e of the systgurations ofand controtor and contes of the eq

all provide aof the systeer and/or in

all contain ament/systemption from aed in the syding of the a block diagindicate the input to thlan for the ie block diagicular the fo

C) 

tions and choperation o

e and techn as an aid to

operation of

w point of v

subsystem ae equipmeneach electrtem includif the systeml; trol. quipment (H

a guide for pm. The Mainstallation m

at least the m at unit/cira signal flowystem. A geequipmentgram is reque different he output oinput/outpugram shall bollowing ite

haracteristicf the system

nical functioo the under

f the system

view, of the

and its extent including rical interfacng: m; 

HW and SW

preventive intenance mmanuals in a

following sercuit diagraw point of vineral block t concept (iuired for eaconnectorsof the draweut points ofbe marked wems shall be

cs of the sysm. It shall th

oning of therstanding of

m from a ha

e function o

rnal interfafault emissce. 

W) or ICD can

maintenancmanual  cana single doc

ections: m level. Thiiew of the ddiagram atn case of a ch drawer)s and test poer. At the bof each unit swith its proe included in

stem and herefore 

e system. f the 

rdware 

of the 

ces; sion and 

n be 

ce, fault n be cument 

is section drawer, or t unit level 

. The block oints ottom of shall be per type n adequate 

 

Page 27: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 27/35

KaSSPA SOW

Date 22/05/201

 

IED – Releasable

13 Issue 1 Rev 0

e to the Public

0

o A dcon

o A lamu

o A pcascon

o Whmetyp

A table of cthe drawerTechnical deach unit/mhave a deddocumenta

o Meo Circo Par

cono Listo Dra

reqinclbe g

o Rac(inp

First Level o Tes

A reresfor 

o Tesaligadjcleaoutshabe 

Preventive

escription ontrol and moayout of thelti‐drawer sower distribe of multi‐dnnector; here applicachanical loce of signalsconnectors r. documentatmodule shadicated paraation: chanical laycuit diagramrts list includnnectors; t of signals fawer cablinguired. One luding whergiven even ck cabling: fput/output)Maintenanst procedureecommenduming the eeach test;st proceduregnment procustment poarly indicatetput of all inall be given. indicated; maintenan

of the functonitoring ree units in thsystem); bution plandrawer syste

able, drawincation of th routed thrused in the

tion of singall be given. agraph, whi

yout of them and correding electric

for each inpg. Completewiring list fre applicablif this couldfull‐wiring li) shall be prce and alignes for functed list of teexpected te

e, test set‐ucedures at uoints and thed. Nominanterface signIn case of d

nce, fault‐fin

tions perforequiremente drawer (i

n within the em) starting

ng of the drae connectoough each ce drawer an

le units/moIn particulach shall con

unit; sponding bcal compon

put and outpe wiring listsfor each conle drawer ind imply somsts of rack irovided. nment procional testinst equipmeest results, w

up with recounit level. Feir physicall values andnals betweedigital signa

nding and t

rmed in eacs; n each draw

drawer (wig from the d

awer interfars, type of cconnector;d location o

odules. In thar, each singntain the fo

oard(s) layonents, mech

put connecs for the drannector connterface panme documeninterconnec

cedures. Thing of the sysent shall be with toleran

ommended For each un location ind toleranceen units andals the meas

roubleshoo

h single uni

wer in case 

ithin each ddrawer mai

ace panel inconnector u

of each con

his section dgle unit/mollowing 

out; hanical parts

tor; awer cablinntained in thnel connectntation reduction cablin

is shall contstem at drawgiven. A tabnces, shall b

test equipmit, all test a the unit shs at the inpd at each tesuring cond

oting. The ag

it and its 

of a 

drawer in ins input 

ndicating used and 

nector in 

details of odule will 

s and 

ng are he drawer, tors, shall undancy; g 

tain: wer level. ble be provided

ment and nd hall be ut and est point ditions shall 

greed 

 

 

Page 28: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 28/35

KaSSPA SOW

Date 22/05/201

 

5.4.11 In

DOC‐0050 

DOC‐0051 

5.4.12 C

DOC‐0052 

5.4.13 R

DOC‐0053 

IED – Releasable

13 Issue 1 Rev 0

nstallation

The Insdisassemerged

the inst

Descripparticuphysicamade tMainteprovide

Circuit Diag

The Ciridentifytroubleincludeand/or includewith thmanua

Reliability A

The RedetailinThe ana

e to the Public

0

maintenanrecommenand tables First Level 

n Manual 

stallation membly of thed together w

tallation maA detailed including srequiremePacking/unInstructionPreventiveEarthing anPreventionption of the lar attentioal charactero the approenance maned in this se

grams and

rcuit diagramy any compeshooting oed. Additionmodules sh

ed with the e part list. Tl 

Analysis 

liability Anang the rulesalysis shall c

nce philosopnded spare pdescribing Maintenan

anual shall e system anwith the use

anual shall aphysical deize, weight,nts; npacking insns for equip measures tnd power rens to be takeequipment

on to plug aristics. In thiopriate wirinual. The infection. 

d Board Lay

ms and boaonent in thn the equipnally, the inthall be incluindication oThis docum

alysis will in and assumconclude th

phy shall beparts shall bfault symptce shall be 

give all infond for its inser and/or m

at least conescription of, power con

structions;ment dismato be takenequirementen before fit interfaces llocation, siis section ofng and signformation n

youts 

rd layouts se equipmenpment. The terconnectiuded. The laof the placeentation ca

clude an anmptions takehe MTBF or 

e clearly indbe given. Prtoms and coincluded in 

ormation nestallation. Tmaintenance

ntain: f the equipmnsumption, 

antling and n prior to thts. irst equipmto other eqgnal allocatf the Installnal characteneeded to id

shall help, tnt and perfocircuit diagng diagramayout of bote of each coan be includ

nalysis of then when calthe failure 

icated and reventive morrective acthis part 

ecessary forhe Installate manuals i

ment breakcooling and

assemblinge equipmen

ent switch quipment/stion within ation manueristic lists pdentify the 

ogether witorm the reqram of each

m between dth faces of emponent aded as a par

e reliabilityculating therate figures

a list of maintenancections requi

r the assemion manualn a single d

kdown in racd environme

g; nt installatio

on ystems, witthe plug anual, referencprovided as lists has to 

th the partsquired h board shadifferent boeach board nd its topo rt of the ma

y of the eque reliability s of the equ

e schedules red for 

bly and  can be ocument. 

cks, units, ental 

on 

th nd signal ce can be part of the be 

s list, to 

all be oards will be according intenance 

ipment figures. uipment. 

 

Page 29: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 29/35

KaSSPA SOW

Date 22/05/201

 

DOC‐0054 

 

6 G

The standathe Contraactivity, wh

R6.1

 

RE‐0001 

RE‐0002 

RE‐0003 

RE‐0004 

RE‐0005 

RE‐0006 

IED – Releasable

13 Issue 1 Rev 0

Unless 

GENERAL

ard requiremact) shall aphich shall p

Responsib

The conmanage

 

The conthe devcommu

The conthat wiprojectwork 

The prorequirethe proof the aforeseetelecon

The maincludeContracAgency

The Comanage

e to the Public

0

otherwise e

L PROJEC

ments for Mply, taking arevail in cas

ility 

ntractor wilement of thOrganisatioOrganisatiopreparatioMonitoringPreparatioReporting tvenues, etc

ntractor shavelopment. unication be

ntractor shall perform tt manager s

oject managed in this S.Ooject managactivities peen activitiesnferences th

anagement es the manactor’s own y of all aspe

ntractor shement, visib

established

CT MANA

Managemenaccount of tse of conflic

ll be responhe contract,on of the pron of the sun of minuteg of efficienn and updato ESA, inclc. 

all define a The Contraetween the 

all implemethe tasks rehall have th

ger is the onO.W. in timger is responerformed, ms. The projehe availabili

of all tasks agement of resources. Tcts of the w

all impose obility and co

, the analys

AGEMEN

nt, Reportinthe followinct.  

nsible of all , namely: roject teamub‐contractoes, agendasnt executionting of the uding meet

single and oact defines tAgency and

ent a projectquired to fuhe access to

nly and finae and fulfillnsible of themain achievect managerity of the ne

shall be thesubcontracThe Contracwork 

on his subcoontrol that a

sis shall be p

T ASPEC

g, Meetingsng specific r

the tasks re

 within the ors (if any) , venues, etn of the taskcontract sctings, prepa

only .interfthe only vald the Contr

t organisatiulfil the woro the resour

al responsibing the reqe periodic rements, grer shall ensurecessary pe

e responsibctors as welctor shall pr

ontractors (are at least 

performed 

CTS 

s and Deliverequiremen

elated to th

Company.  relationshiptc.; ks; hedule; aration of m

ace for all mid interfaceactor 

ion under thrk describedrces necess

le of the deuired perforeport that ween and redre at revieweople and do

ility of the Cl as the conrovide com

(if any) requequivalent

following A

erables (Apnts for the p

e proper 

p, including

minutes, age

matters relaes for all for

he project md in this S.Oary to comp

elivery of thrmances. Awill included flags and nws, meetingsocumentati

Contractor.ntrol of the plete visibil

uirements f to the requ

AD2 

pendix 3 topresent 

g meetings, 

endas, 

ated with rmal 

manager O.W. The plete the 

e items Additionally e a report next s and on. 

 This 

ity to the 

for uirements 

 

 

Page 30: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 30/35

KaSSPA SOW

Date 22/05/201

 

S6.2

ST‐0001 

ST‐0002 

ST‐0003 

ST‐0004 

S6.3

SC‐0001 

IED – Releasable

13 Issue 1 Rev 0

imposemanagesubconStatemContracvisibilit

Staffing 

The Comanagethe manamedthe ConThe C.Vsubmitt

The conand org

The conproject

The connecessathe relecontracshall prsuccessrequireproducAs a gu

This listContrac

Schedule C

A detai

e to the Public

0

ed on the Coement and ntractor andent, specifictor and hisy. 

ntractor shement of thin parts of t. If there is ntractor shaV. of all the ted 

ntractor shaganisation. 

ntractor shat.  

ntractor shaary to carryevant chaptctor on all arovide sufficsfully by theed technicalced to the reideline, theHardware aDesign tooTesting tooEquipmentQuality assAdministrat is not intector to defi

Control 

led plannin

ontractor. Tcontrol prod shall integcations ands subcontra

all identify the project athe design, any changeall immediakey Person

all documen

all ensure th

all provide ty out in an eters. The Agaspects relatcient resoure specified dl specificatioequired stae following rand softwals, ols and equit productionsurance, ative and sended to be ne and prop

ng network s

The Contracocedures wigrate these id milestone ctors shall b

the person and his/her quality assue of personntely informnel, which m

nt and justif

he availabil

the personneffective andgency shall bted to the erces to ensudate, that tons and thandards. resources are design en

ipment n and manu

cretarial sumandatorypose his pro

shall be pre

ctor shall opth respect tinto the ovedates of thbe given to 

who will bedeputy. Alsurance and nel in these the Agencymust includ

fy the team

ity of the ke

nel, materiad economicbe providedexecution oure that thehe system wat the system

re suggestengineers, 

ufacturing fa

pport. y or exhaustoject team.

epared by th

perate the nto the activerall projecthe contractsthe Agency

e responsibso the persocontractua positions dy and propode his full qu

m build up, it

ey staff as r

als, equipmecal way the d with compf the contrae project wiwill be desigm will be en

ed: 

acilities, 

tive. It is the

he Contract

necessary ities of eacht. A copy ofs between ty to provide

le for the on(s) responal aspects shduring the cose his replaualifications

ts structure

equired by 

ent and factasks as deplete visibilact. The Conll be complgned to mengineered a

e responsib

tor in the fo

h f the Work the e full 

nsible for hall be contract, acement. s, shall be 

e, location 

the 

ilities fined in ity by the ntractor eted et the and 

bility of the 

orm of a 

 

Page 31: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 31/35

KaSSPA SOW

Date 22/05/201

 

SC‐0002 

SC‐0003 

SC‐0004 

SC‐0005 

SC‐0006 

SC‐0007 

IED – Releasable

13 Issue 1 Rev 0

CPM (Cby the Ait as a rdifferenwill devall suchinspect

The pla

The conagreed 

The conmeetindocum

Modificwritingmentio

The schStructu

The Coprovisioenforce

e to the Public

0

Critical PathAgency thereference font tools for velop betweh internal dotion by the A

anning shallAll tasks mThe work mduration. Ldetail is noAll functionlogical conManpowerparticular anetwork; The duratioaccount thclosing perAvailable sThe type oor fraction

ntractor shaat the kick‐

ntractor shags, indicatinents deliver

cations of th by the Ageoned in the c

hedule shallure and shal

ntractor shon of all gooe the followEffective costaff respoAdherenceUse of thes

 Method) n Contractoror reportingthe controleen this andocumentatiAgency 

 meet the fust be showmust be broLonger duraot possible;nal prerequnection witr constraintactivities an

on of each ae number oriods etc; lack for eacf manpowes thereof, d

all be respo‐off meetin

all present ang the currered, etc.) 

he scheduleency's reprecontract 

l be based oll reflect the

all operate ods and serwing: ommunicatnsible for the to these pse plans and

network drar shall schedg. If the Conl of the projd the CPM non used by

following rewn; oken down iations are on

isites for thth a leadings shall be innd shall not 

activity shaof staff, ava

ch activity; aer (engineerduring all ac

onsible for mg 

an up to daent status o

e shall only esentative fo

on the Conte milestone

a schedule rvices. The s

ion of the lahe executiolans and schd schedules

wn over a cdule his wontractor inteject he musnetwork spe the Contra

equirements

in activities nly permitte

he start of a activity, evncluded in tproduce lo

ll be given iilability of e

as well as thr, technicianctivities shal

maintaining 

te chart forof the contr

be contractor contractu

tractor’s proes included i

control sysschedule co

atest approon of the wohedules; s to control 

calendar grirk accordingends to use st ensure thecified in thactor shall b

s: 

of betweened when de

n activity mvent or interthe planninggical constr

n working wequipment, 

he critical pn, etc.) and ll be shown

the schedu

r review at aact activity 

tually bindiual and adm

oposed Woin section 4

tem that enontrol system

oved plans aork; 

actively the

id. After agrg to this plaadditional 

hat no discrehis section. be accessible

n 2 and 8 wefinition in f

must be shorface; g by rescheraints in the

weeks, takinleave and c

ath must bethe numbe on the plan

ule (in bar c

all conseque(WP's comp

ng if approvministrative

rk Breakdow4. 

nsures the tm shall in p

and schedul

e execution

reement an and use or epancies Moreover e for 

weeks further 

wn by a 

duling the e planning 

ng into company 

e visible; r of men, n. 

hart form) 

ent pleted, 

ved in  matters as

wn 

timely articular 

les to the 

n of the 

 

 

Page 32: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 32/35

KaSSPA SOW

Date 22/05/201

 

SC‐0008 

R6.4

 

RP‐0001 

RP‐0002 

RP‐0003 

RP‐0004 

RP‐0005 

RP‐0006 

RP‐0007 

IED – Releasable

13 Issue 1 Rev 0

The Coand assmonthl

Reporting 

The conaddressconten

During contracsummathe fore

Weeklyfirst we

In specin a gre

The conContracthe wo(due toThis nostate of

During plan, pwork. Aassocia

The contest protests thleast on

e to the Public

0

work, anticTimely repproject schEffective aimplementMaintenanschedule a

ntractor shsess the imply progress 

ntractor shased to the Ats of the M

specific andctor to provary of the steseen activ

y report is deek of the m

ial circumsteater depth 

ntractor shacts Officer) rk programo e.g. procurotification shf the recove

the course rocedure, sAreas and eated with th

ntractor shaogram, or ahat it wishesne week in 

cipating proorting of anheduling offnalysis of sutation of thence of an upnd progress

all regularlypact on futureport or e

all provide, Agency's repPR are liste

d critical phvide by e‐matatus of the ities for the

due on first month.

tances the Aof detail an

all notify thof any even or significarement prohall be madery actions

of the contpecificationquipment uhe contract s

all notify ths mutually s to witnessadvance. 

oblems, rathny actual orficer of the Cuch reportee required cp‐to‐date scs reporting 

y review theure activitieach meetin

every montpresentativd in 5.2.4.

hases of theail a Weeklyactivities pe next week

labour day 

Agency maynd/or a high

e Agency's nt likely to cantly impactoblems, unade in 48 hou

tract the Agn or other dused duringshall also be

e Agency atagreed, in os. The Agen

her than jus foreseeablContractor;ed deviationcorrective ahedule oveto the Agen

e planning ses. A reviewg 

th, a Monthves, covering

e developmey Progress Rperformed dk.  

of the wee

y require thher reportin

representatcause majot the scope vailability ours after the

gency shall bdocumentat the develoe available 

t least two worder to enacy shall not

st for recorde deviation; ns and the daction; rview that ncy. 

status and tw shall be do

hly Progressg the contra

ent ESA maReport (WPduring last w

k. Monthly 

e implemenng frequenc

tives (Technr delays to tof the wor

of facilities oe problem a

be affordedtion relevanopment/testfor inspecti

weeks befoable the Agtify the cont

ding progresn from the p

definition an

permits effe

the progressone prior to

s Report (Mactual activ

y request toR) with the week and th

report is du

ntation of scy 

nical Managthe time sck to be perfor resourcearises, despi

d free accessnt to the proting activitieion and aud

ore the startency to seletractor of it

ss; plan to the 

nd 

ective 

s of work  each 

MPR), vities. The 

o the executive he status of 

ue on the 

cheduling 

ger and hedule of formed s, etc.). ite of the 

s to any ogram of es dit 

t of any ect those ts visit at 

 

Page 33: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 33/35

KaSSPA SOW

Date 22/05/201

 

M6.5

ME‐0018 

ME‐0019 

7 T

A7.1

TST‐0001 

TST‐0002 

TST‐0003 

TST‐0004 

TST‐0005 

TST‐0006 

TST‐0007 

T7.2

      

TST‐0008 

IED – Releasable

13 Issue 1 Rev 0

Meetings 

The list

Additioheld at request

TESTING,

Acceptanc

The CoSpecificshall bethe reqverifica

o

o

o

o

The tes

Experiminto acc

In casecan be analysisdemon

When tthe righ

The contesting,

The conthe ope

Test organ

Accept

e to the Public

0

t of meeting

onal periodiContractort. 

, ACCEPT

ce test obj

ntractor shcation havee checked. Tquirements,ation methoDesign: Thedesign (e.gInspection(e.g. type oAnalysis: TequipmentTest: The cequipment

sts must pro

mental errocount when

s, where dirderived fros or figures stration of 

test results ht to call for

ntractor sha, including t

ntractor shaerational en

nization 

ance of com

gs is detaile

cal progresr’s premises

TANCE AN

jectives an

all prove toe been met. The contrac the actual od that will e compliancg. presence : The compof connectohe compliat charactericompliance t 

ovide conclu

rs shall be nn measuring

rect measuom other quderived by the specifie

are inconclr repetition

all be respotest harness

all provide anvironment

mponents a

d in Table 3

s Meetings s or by video

ND WAR

nd princip

o the AgencyAll paramector shall pror expectedbe employece to the spof redundaliance to thor) nce to the sstics (e.g. Mto the spec

usive proof 

negligible cog the equipm

rement of auantities, whpurely theoed MTBF 

usive, the A of one or m

onsible to prses, input d

and use hardefined in 

nd subsyste

3

to follow thoconferenc

RRANTY

ples 

y that all reeters given irovide a Comd performaed among thpecification nt outputs)e specificat

specificationMTBF, powecification is v

that the eq

ompared wment. 

a quantity ishich have boretical calc

Agency's tecmore tests o

roduce any data sample

rdware/softthe specific

ems procure

he evolutioce at Agency

quirementsn the technmpliance Stnce of the uhe followingis inherent ) tion is verifi

n is verifieder breakdowverified thr

quipment m

with the mea

s not feasibeen measuculation is o

chnical repror for addit

necessary is, comman

tware that acation 

ed from sub

n of the stuy or contrac

s of the Tecnical specifictatement munit and theg: with the em

ed inspecti

d by analysiswn level, …) ough testin

meets its spe

asured valu

le or imprared. The usonly accepta

resentative ional tests 

item to supd procedur

are represe

bcontractor

udy can be ctor’s 

hnical cations 

matrix with e 

mployed 

ng the unit 

s of the 

ng of the 

ecifications

e or taken 

ctical, it e of able, for 

shall have 

port es.

ntative of 

rs will be 

 

Page 34: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 34/35

KaSSPA SOW

Date 22/05/201

 

TST‐0009 

TST‐0010 

TST‐0011 

TST‐0012 

T7.3

TST‐0013 

TST‐0014 

TST‐0015 

IED – Releasable

13 Issue 1 Rev 0

the resmanufaContracbe infoto attenaccepta

Factoryreleasebe prec

During tests pethe equ

The accacceptaresults.statem

All requguarancertificAgency

Test condu

For all mmust bconditiinspectshould 

Specialthe intecorrect

The folVisual iboards,ModulespecificOverallinterfac

e to the Public

0

ponsibility oacturers woctor will havrmed of thend the testsance docum

y acceptance of the equceded by: PreparatioDelivery offull test pro

factory accerformed buipment pri

ceptance doance tests, w. Each Test ent (C or NC

uired test etee a calibrates must by who will h

uction 

modules ane demonstrons under wtion and funbe well kno

 attention serface with t functioning

lowing testinspection: , waveguidee tests: Testcations are l functional ces, alarms 

of the Contorks and wilve the respese test in as. The Contrmentation to

ce of the eqipment for 

n and agreef pre‐acceptocedure.

ceptance, thy the Contror to the fo

ocuments swith the daresult will bC) 

quipment sration valid be availableave the righ

nd for the corated. It showhich the pnctional testown.  

shall be givethe monitog of the har

s shall be inInspection e and coaxiat of individuthose approtest: Operaetc. 

ractor. Suchl verify confonsibility foadvance andractor shall o be provid

uipment. Adelivery to 

ement withtance test r

he Agency rractor. The Cormal accep

hall containate of testinbe accompa

shall be provduring all the for inspectht to check 

omplete sysould be noteperformancets will alway

en to the exoring and cordware as w

ncluded as aof the systeal componeual modulesoved in the ation of the 

h acceptancformity witor acceptand reserves tinclude theed to the A

cceptance athe Agency

 the Agencyesults to th

eserves theContractor ptance tests

n the requirg, and spacanied by its 

vided by thhe scheduletion by the tthe calibrat

stem confored that thise specificatiys be includ

xternal interontrol systewell as any e

a minimum em, the rackents etc. s and spare Design repsystem and

ce tests shoh the specifce or rejectthe right to ese tests in gency. 

at this stagey. Factory a

y of the teste Agency; t

e right to beshall verify s.  

ements, thece for entry specificatio

e Contractoed test sequtechnical retion. 

rmity with ts includes thions must bded, otherw

rfaces of thm shall be cembedded s

in the accek and all mo

parts. The aort. d check of f

ould take plafications. Thtion. The Agsend a reprthe overall 

e will signifycceptance t

t procedurethese shall c

e present in correct fun

e result of pof the final

on and its Co

or, who musuence. Calibepresentativ

the specifiche environmbe met Visuwise the test

e system. Inchecked ousoftware. 

ptance proodules, elec

applicable 

front panel 

ace at the he gency shall resentative 

y the tests shall 

es; cover the 

any or all nctioning of 

pre‐ test ompliance 

st bration ve of the 

ations mental al t principles 

n particulart to prove 

cedure: ctronic 

controls, 

 

Page 35: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

ESA UNCLASSIF

Page 35/35

KaSSPA SOW

Date 22/05/201

 

8 O

OPT‐0001 

O8.1

OPT‐0002 

  

                    3 ESA Deep(Argentina

IED – Releasable

13 Issue 1 Rev 0

RF: ThisSpecificAC Powinrush cbe verifInterfacLocal acorrectEnvironspecifieSoak teconditi

OPTIONS

The conoptions

On‐site ins

The uncontrac

                    

p Space Stat) 

e to the Public

0

s includes acation. wer supply: Pcurrent, efffied ce: All internd Remote t functioningnmental coned range of est: A soak tons. 

S  

ntractor shas when requ

stallation 

it shall be inctor shall bedismountinpacking of shipping tounpacking;integration

                

tions are loc

all RF perfor

Power consfects of pow

rfacing with monitoringg of all locanditions: Veenvironmetest of minim

all commit tuired by ESA

nstalled in ae responsibng of the reall relevanto the TBD si; n and test o

cated on Ne

rmance req

sumption ofwer bus volt

external ung and controal M&C funcerification ofental conditmum 72 co

to provide aA during the

an ESA Deeple of: levant hardt hardware;te; 

f the releva

ew Norcia (A

uirements i

f the systemtage and no

nits shall beol: Check ofctions. f operationions. ntinuous ho

a proposal ce duration o

p Space stat

dware;  

ant hardwar

Australia), C

ncluded in 

m, steady stoise. Worst c

e checked agf the TCP‐IP 

 at suitable

ours duratio

covering anof the proje

tion, locatio

re on site. 

Cebreros (S

the Technic

ate and peacase condit

gainst the IM&C interf

 points with

on under w

y of the folect. 

on TBD3. Th

Spain) and M

cal 

ak and ions shall 

CD  face and 

hin the 

orst case 

lowing 

he 

Malargüe 

 

Page 36: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

Prepared by

Reference

Issue

Revision

Date of Issue

Status

Document Typ

Distribution

  

ESA UNCLASSIF

GRST-SYST-HW

   

Ka BandTechnic 

GRST-S

1

0

22/05/

Approv

pe SP

IED – Releasable

-TS-1003-KaSSPA

d Solid Scal Spec

SYST-HW-SP-1

/2013

ved/Applicable

e to the Public

A_Spec-I1R0_ITT

 

State Pocification

 

003-HSO-GS

T

ower Amn 

mplifier (SSPA)

European Space ORobert

D-

TF +4

esocOperations Centret-Bosch-Strasse 564293 Darmstadt

GermanyT +49 (0)6151 90049 (0)6151 90495

www.esa.int

 

c e 5 t y 0 5 t

Page 37: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

s left blank 

0

e to the Public

intentiona

 

lly 

 

Page 38: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

 Page 3/27

KaSSPA Spec

Date 22/05/201

ESA UNCLASSIF

 

Title Ka B

Issue 1

Author           

Approved by

    

  Reason for c

  Initial Issu

   

    

 

Issue 1 

  Reason fo

  Initial Issu

13 Issue 1 Rev 0

IED – Releasable

and SSPA T

hange 

ue 

or change 

ue 

0

e to the Public

 

echnical Sp

 

pecification

 

Revision

Date 22/

Date

Issue

  1 

Revision

Date

22/05/2

0

/05/2013

Revision

 0 

Pages

2013 All

n

s

 Date 

   16/0

  

 Parag

  

02/2012 

graph(s)

 

Page 39: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

ntents:

ODUCTION ..e of the Doccable and Reyms and abtions .........ND SSPA SPm requirempment Confundancy conularity .......working monhibit ..........ical Requirenput port chmber of porquency Banut level ......erdrive andpedance/V.ise figure ...utput port mber of porquency Ban

B Compress

B Compressximum Outpedance/V.tput Protect of Band Oand Responsn ...............Maximum Minimum Gain Step .ALC Mode Gain variatGain slopeOutput poOutput po

0

e to the Public

..................cument .......eference Dobbreviations..................PECIFICATIOments ..........figuration ..ncept (P.U. ..................odes ............................ements .......haracteristicrts ..............nd ................................. Input proteS.W.R. .........................characteristrts ..............nd ...............sion point ...sion point (dtput Power S.W.R. .......tion ...........utput Noisese ................................Gain ..........gain ...............................................tion over free ..................wer Stabilitwer Stabilit

..................

...................ocuments (As \ .................................ON ...................................................only) .....................................................................................cs ........................................................................ection ..............................................tics .....................................................................degraded m........................................................e ...................................................................................................................................equency ba...................ty in 24 h ....ty with tem

..................

...................AD’s and RD..............................................................................................................................................................................................................................................................................................................................................................................................................mode) ........................................................................................................................................................................................................and ...................................................perature ....

..................

...................D’s) .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................

..................

...................

...................

...................

...................

..................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

.................

..................

..................

..................

..................

.................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

............... 7

................ 7

................ 8

................ 8

.............. 10

............. 10

.............. 11

.............. 11

.............. 11

.............. 12

.............. 12

.............. 15

.............. 16

.............. 16

.............. 16

.............. 16

.............. 16

.............. 16

.............. 16

.............. 16

.............. 16

.............. 16

.............. 16

.............. 17

.............. 17

.............. 17

.............. 17

.............. 17

.............. 17

.............. 17

.............. 17

.............. 17

.............. 17

.............. 18

.............. 18

.............. 18

.............. 18

.............. 18

.............. 18

 

778800

666

Page 40: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

oup Delay ...Group delaGroup delaGroup DelaStability w

se stability (ious and NoBand and Ormonics .....ase Noise ...rd Order Int

M/PM ..........mplifier Stabaces ...........t RF Port ....put RF Port .nhibit ConneConnectorsC Interface .&C Connectomote controcal M&C .....hanical Reqechanical Lamensions ....ss ..............ing .............ns power ....ins Voltagewer Consumad Unbalancwer Factor .ush Currentonmental reperature ....

midity ..........ude ............ation and Sh/EMC (P.U. otoring and Ceral ............C Protocol (P

0

e to the Public

..................ay in Band Vay slope .....ay Ripple ...ith temperaAllan Deviaon Linearitieut of Band S....................................termodulat..................ility ..................................................................ector ..........s ...................................or (P.U. onlol interface ..................quirements yout ..................................................................................e ..................mption ........ce .................................t .................equirement......................................................hock ...........only) ..........Control .........................P.U. only) ..

...................Variation ..........................................ature ..........ation) ..........es ...............Spurious ..........................................tion ....................................................................................................................................................................y) ...............(P.U. only)...................(P.U. only) ...............................................................................................................................................................................................s ........................................................................................................................................................................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

....................................................................................................................................................................................................................................................................................................................................................................................................................................................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

.............. 19

.............. 19

.............. 19

.............. 19

.............. 19

.............. 19

.............. 19

.............. 19

.............. 20

.............. 20

.............. 20

.............. 20

.............. 20

.............. 20

.............. 20

.............. 20

.............. 20

.............. 21

.............. 21

.............. 21

.............. 21

.............. 21

.............. 21

.............. 21

.............. 22

.............. 22

.............. 22

.............. 22

.............. 22

.............. 22

.............. 22

.............. 22

.............. 22

.............. 23

.............. 23

.............. 23

.............. 23

.............. 23

.............. 23

.............. 23

.............. 23

.............. 24

 

0000

4

Page 41: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

of commandof telemetriof Alarms anmeters Logn Requiremhanical andtrical Layoutty ...............unding ........ng ..............ability (P.U. 

ures

Suggested Diagram of

0

e to the Public

ds ...............ies ..............nd warningsging (P.U. o

ments .......... thermal Det .......................................................................only) .........

configuratif states ......

...................

...................s .................only) ..............................esign .........................................................................................................

on of the u...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

nit ................................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

...................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

.............. 24

.............. 24

.............. 25

.............. 25

.............. 26

.............. 26

.............. 26

.............. 26

.............. 26

.............. 26

.............. 27

.............. 11

.............. 15

 

44

666666

15

Page 42: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

NTRODU

ean Space And Commanngineering Ds (D/HSO), l, developmSA satellites

ency bands 

S Band

S Band

X Band

X Band

X Band

K Band

Ka Ban

Ka Ban

nds are alrea

Space Statioing, Commaon ESA Deepplink and Dt, for Radio tion. Uplink

e main elemower Ampli

Scope of th

ment states 

s Technical Sements, or box. The reqn the left co

0

e to the Public

UCTION 

Agency (ESAnd (TT&C) oDepartmenlocated at tent and pros, including 

supported 

 UL: 2025‐2

 DL: 2200‐2

d UL: 7145‐7

d DL(EES): 80

d DL: 8400‐8

d DL: 25.5‐2

d DL: 31.8‐3

d UL: 34.2‐

ady operati

ons supportand and Trap Space Statownlink to Science (RSk signals sha

ments requirifier that sh

he Docum

the require

Specificatioprovides infquirements lumn. State

A) operates operations ot (HSO‐G) ohe Europeaocurement the above m

by ESTRACK

2120 MHz fo

2300 MHz fo

7235 MHz fo

025‐8400 M

8500 MHz fo

7.0 GHz for

32.3 GHz fo

34.7 Ghz fo

onally impl

t present macking of sptions. Futurincrease thSE) applicatiall be ampli

red for the ohall deliver a

ment 

ed electrica

on, normal tformation. are inside b

ement of co

a network of different of the ESA Dan Space Opof the groumentioned 

K are: 

or Uplink 

or Downlink

or Uplink 

MHz for Dow

or Downlink

r Downlink

or Downlink

or Uplink 

emented in

missions on Xacecraft. Kare Deep Spae throughpions and forfied to an a

operationala high powe

l performan

text (not insThere is noboxes with ompliance sh

S/X/Ka‐bancategories 

Directorate Operations Cend station iantennas a

wnlink 

n ESTRACK e

X Band (7‐8a Band dowace missionsput betweenr more accuadequate po

l implementer level in th

nces that sh

side a box) io need of stathe corresphall be prov

nd antennasof spacecraOf Human Sentre (ESOCinfrastructund its assoc

except the K

 GHz) for Tewnlink (32 Gs will requirn the Grounurate navigaower level b

tation of thhe band of 3

hall be met 

is descriptivatement of ponding reqvided for th

s for Telemeaft. The GroSpaceflight C), is responure requiredciated equip

K Band DL a

elemetry Hz) is alreadre the presend Station aation and orby means of

e Ka Band u34.2 to 34.7

by the Ka B

ve text that compliancequirement rese require

etry, ound and nsible for d to pment. 

and the Ka 

dy ence of a nd the rbit f power 

uplink is 7 GHz. 

Band SSPA.

introducese with text eference ements. 

 

 

Page 43: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Applicable

wing docume

ference 

ST‐SYST‐HW‐SO‐GSS 

SS‐ST‐E50‐ 05C

SS‐ST‐E50‐02C

OC‐MAC‐TN‐10

OS‐SYST‐GST‐SS‐GS 

ST‐SYST‐HW‐SS‐GS 

dards can bendards can AD6 are ap

wing docume

ference L HDBK 217 

61000‐6‐1 

61000‐6‐3 

Acronyms 

a.s.l 

AD 

AIL 

ALC 

AM/PM 

AR 

ATP 

C.V. 

C/I3 

CCSDS 

CDR 

CFI 

CPM 

dB 

dBm 

0

e to the Public

e and Refe

ents are app

SOW‐1007‐

C_Rev2 

001‐OPS‐GIB 

ST‐1001‐

SOW‐1001‐ 

e found on be found onpplicable on

ents are pro

TitleIss F N

ElectrGenecomm

ElectrGenecomm

and abbr

above s

Applicab

Action I

Automa

Amplitu

Accepta

Accepta

Curricul

Third O

Consult

Critical 

Custom

Critical 

Decibel 

Decibel 

erence Do

plicable to t

Title

Ka Band SS

Radio frequ

Ranging an

Basic M&C 

Ground StaRev 0 

General Re2 Rev 0, 

http://www.e

n http://wwwly to P.U. Se

ovided as re

 Notice 2

romagnetic coric standards mercial and lig

romagnetic coric standards mercial and lig

eviations 

ea level

ble Document

tem List

atic Level Cont

ude to phase m

ance Review

ance Test Proc

lum Vitae

rder intermod

ative Commit

Design Review

er Furnished 

Path Method

over 1 milliw

ocuments 

this study 

SPA Statement

uency and mo

nd Doppler tra

Protocol, Iss 

ation Systems

equirements fo

ecss.nl/ 

w.ccsds.org/ 

ee chapter 

eference.  

ompatibility (E‐ Immunity foght‐industrial 

ompatibility (E‐ Emission staght‐industrial 

t

trol

modulation tr

cedures

dulation produ

ttee for Space

w

Item

att

(AD’s and

t of Work 

odulation

acking

1 Rev 8

 Integration S

or Equipment

2 for clarific

EMC) ‐ Part 6‐or residential, environments

EMC) ‐ Part 6‐andard for resenvironments

ansfer

uct level

 Data Systems

d RD’s) 

Standard, Iss 6

t Units (GREU)

cation. 

A

‐1: 

s, iss 2.0 

‐3: sidential, s, Iss 2.1 

s

Date 

 

04/10/

31/07/

30/08/

6,  27/01/

), Iss  11/05/

uthor 

/2011

/2008

/2005

/2009

/2009

Date  

2005‐03

2011‐02

 

Page 44: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

DC 

ESA 

ESOC 

ESTRACK 

FP 

FR 

GD 

HPA 

HW 

Hz 

ICD 

IM3 

IR  

KOM 

kVA 

kW 

lps 

M&C 

MHz 

MoM 

MPR 

MTBF 

MTTR 

ns 

PDR 

P.U. 

QA 

R&D 

RD 

RF 

SOW 

SPF 

SRS 

SSPA 

SW 

TBC 

TBC(c) 

TBD 

TBS 

TC 

TM 

TN 

TO 

TRL 

TRP 

TT&C 

VSWR 

WBS 

WP 

0

e to the Public

Direct C

Europea

Europea

ESA Tra

Final Pre

Final Re

Group D

High Po

Hardwa

Hertz 

Interfac

Third or

Interme

Kick‐Off

Kilovolt

Kilowatt

Litres pe

Monitor

Megahe

Minutes

Monthly

Medium

Mean T

Nanose

Prelimin

Product

Quality 

Researc

Referen

Radiofre

Stateme

Single P

Softwar

Solid Sta

Softwar

To Be C

To be co

To Be D

To Be Sp

Telecom

Telemet

Technic

Technic

Technol

Technol

Tracking

Voltage

Work Br

Work Pa

Current

an Space Agen

an Space Ope

cking Networ

esentation

eview

Delay

ower Amplifier

are 

ce Control Doc

rder intermod

ediate Review

f Meeting

amper

er second

ring and Cont

ertz 

s of Meeting

y Progress Re

m Time Betwe

ime to Repair

cond

nary Design re

tion unit

Assurance

ch and Develo

nce document

equency

ent of work

Point Failure

re Requiremen

ate Power Am

re 

onfirmed (by 

onfirmed by t

Determined (by

pecified (by th

mmand

try 

cal Note

cal Officer

logy Readines

logy Research

g, Telemetry a

 Standing Wa

reakdown Str

ackage

ncy

rations Centre

rk

r

cument

dulation produ

w

rol

port

en Failures

r

eview

opment

t

nts Specificati

mplifier

the Agency)

he contractor

y the Contrac

he Agency)

ss Level

h Programme

and Command

ve Ratio

ucture

e

ucts

ion

r

ctor)

d

 

Page 45: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

initions 

ology Readfollows1: 

nology Read

Basic pTechnoAnalytconcepCompoCompoSystemenviroSystemActual (grounActual 

KA BAND

am looks fon equipmen“P.U. only”does not necurrent conertheless thion compliaasily upgrad

                    

T‐10C (6 Mathe differenpreamplifieal requireme‐> Requirem

0

e to the Public

diness Level

diness Leve

principles obology conceical and exppt performeonent and/oonent and/om/subsystemnment  (grom prototypesystem com

nd or flight) system “flig

D SSPA SP

r the develont in some fe”3 indicates eed to be imntract does he design anant with thedable to the

                

arch 2009), ces betweeer redundanents ment applic

ls (i.e. achie

bserved andept and/or aperimental ed  or breadboaor breadboam model or ound or spae demonstrampleted and ght‐proven

PECIFICA

opment of aeatures thathat the ref

mplementednot need tond the archese requireme production

http://wwwen the protoncy, the rem

able to Prod

eved status 

d reported application critical func

ard validateard validateprototype 

ace) ated in a spd flight‐qua

” through s

ATION 

a prototypeat will be indferred requd physically o be compliitecture of tments only n unit level.

w.ecss.nl/.otype and tmote M&C (

duction Un

of developm

formulatedction and/o

ed in the labed in the reldemonstrat

ace environalified throu

successful m

e. This protodicated alonuirement is in the protoant with ththe equipmapplicable t. 

he producti(prototype 

it only (not 

ment of a te

d r character

boratory enlevant envirted in the r

nment  ugh test and

mission oper

otype may dng the specapplicable ootype. The e requirem

ment shall coto P.U. and 

ion unit reqonly require

to prototyp

echnology) 

istic proof‐o

vironment ronment  elevant 

d demonstra

rations  

differ from tification2. Tonly to the prototype pents labelleonsider the shall imple

quirements es local M&

pe) 

are 

of‐

 

ated 

the final The productionproduced ed “P.U. final 

ement a 

are &C) and the 

 

 

Page 46: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

System req

Equipment 

sted configu

onitoring an

e amplifier (

put power d

wer module

tput power

tput chain itput isolato

gested config

Redundanc

The ununit sha

                    

c Filter and 

Pre‐am(redundan

0

e to the Public

quiremen

Configura

uration of t

nd control 

redundant 

ivider 

es (several i

r combiner 

ncluding har (TBC)  

guration of th

cy concept 

it shall be sall impleme

Redundant

Redundant

                

Output Iso

M

mplifiers nt for P.U.) 

ts 

ation 

he unit is sh

for P.U.) 

n parallel)

armonic filt

e unit 

(P.U. only)

elf‐redundaent at least

t preamplifi

t power sup

lator shall b

Inputpower

divider

Monitoring a

hown in Fig

er (TBC)4, fo

y) 

ant. There isthe followin

iers 

pply for the 

be included 

Input power divider 

nd control

Powe

ure 1. The m

orward and

s no redundng redunda

M&C (M&C

if required 

er Modules

main modu

 reverse po

dant amplifncies: 

C may be po

to meet sp

Output power Combner 

les are: 

ower couple

ier in the st

owered from

ecifications

Filter (TBC) 

er and 

tation. The 

m both 

s. 

Isolato(TBC)

 

Page 47: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Modularity

The uneach m

In case replaceamplifi

Under a

Unit workin

The unit 

O

So

T

The unit 

At

A

MR

Mc

The folloSSPA_O

                    

will be used. Preamplifiers when pa

0

e to the Public

preamplifie

Several powallowing so

it shall be dmodule. 

of failure oeable from ter or interr

a failure of 

ng modes 

shall imple

OFF:  

STAND‐BY: output) 

TRANSMIT: 

shall imple

ALC_ON: he  output 

ALC_OFF: 

MEM_ALC ORF_ON/OFF 

MEM_ALC Oommands a

owing commON  G

ToprT

                

d for Radiosers shall beassing from

er power su

wer moduleoft degradat

designed in 

of one powethe front paupting the o

the M&C th

ement the fo

PreamplifiM&C rema

Preamplifi

Preamplifi

ement the fo

The Mpower leve

The at

ON:   The secommands

OFF:   The seare received

mands shall Goes from OThe commaon the powepreamplifieremains muThe comma

cience withe kept on tom STAND BY 

upplies) 

es (with its tion of outp

a modular f

er or preamanel withouoperations.

he unit shal

ollowing wo

ier and powains active (

ier Muted5. 

ier and pow

ollowing wo

M&C controll 

ttenuation v

et point of ts are receive

et point of td 

be implemOFF to STANnd performer modulesr is switcheuted. The cond clears th

h strict requ avoid phasto TRANSM

own powerput power i

form allowi

mplifier modut the need  

l continue w

orking state

wer modules(local and re

Power Mod

wer modules

orking mode

ls the atten

value is kep

the ALC is ked 

the ALC is c

ented: ND BYms the neces and all thed on (to guommand enhe ALC set p

uirements ose variationMISION 

r supply eacn case of fa

ng for indiv

ule, the moof switchin

working (AL

es as shown

s are OFF. emote) 

dules ON (n

s are ON 

es

uation valu

pt constant

ept when A

leared whe

ssary verific required aarantee phaables the copoint to a va

f phase stabs during wa

ch) in parallailure of one

vidual replac

odule shall bg off the wh

LC excluded

 in Figure 2

no signal at 

ue to keep c

ALC_ON/OF

n ALC_OFF 

cations and uxiliary systase stabilityorrespondinalue that in

bility (or Allarming up o

el, e module. 

cement of 

be hole 

). 

the 

constant 

F or 

or RF_OFF 

switches tems. The y) and ng alarms.dicates 

lan of the 

 

Page 48: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

SSPA_O

RF_ON 

RF_OFF

ATTEN 

SET_PO

0

e to the Public

ta

OFF  GTtaTtaMp

  GTmrcIlWmp

F  GTacPtRWmpTatTp

OWER  TaOrpT

that there isactivatedGoes from aThe commathe preampauxiliary sysThe commathat there isactivated. M&C of theproviding thGoes from OThe commamute of therequired aucorrespondn case that oop (with tWhen MEMmodify the Apoint is cleaGoes from TThe commaand disconncommand.Prior to the to avoid chaRF power. When MEMmodify the Apoint is cleaThe commaattenuator athe output RThe ALC Mopoint is reseThe commaamplifier byOutput powread telemepower valueThe ALC Mo

s no ALC set

any state tond disables

plifiers and pstems switcnd clears ths no ALC set

 unit remaihe telemetrOFF or STANnd performe preamplifixiliary systeing alarms.the ALC mohe already 

M_ALC ON mALC set poiared and ALTRANSMIT tnd disablesnects the au

removal ofanges on th

M_ALC ON mALC set poiared and ALnd sets a vaand this attRF power leode is alwayet if MEM_And sets a vay changing twer telemetetry with the is reach, tode is alway

t point (e.g.

o OFF states the correspower modhed on by She ALC set pt point (e.g.

ns on readyy of the uniND BY to TRms the necesers and enaems. The co

ode is ON, tstored set p

mode is activnt. OtherwiLC_OFF modto STAND Bs the RF powuxiliary syste

f the RF powe attenuato

mode is activnt. OtherwiLC_OFF modalue for thetenuation reevel. ys disabled (ALC is OFF.alue for thethe attenuary and mode commandhe commanys disabled (

. zero). ALC_

ponding alaules and disSSPA_ON copoint to a va. zero). ALC_

y to accept it either viaRANSMIT. ssary verificables the RFommand en

the unit shapoint).  vated, the cise (MEM_Ade activatedY.wer, mutesems switch

wer, the ALCor value due

vated, the cise (MEM_Ade activatede attenuatioemains fixed

(ALC_OFF). 

e RF output tor. The undify the atteded value. Ond ends. (ALC_OFF). 

_OFF mode

arms and swsconnects tommand alue that in_OFF mode

new comm local and r

cations, remF power andables the 

all activate t

command DALC_OFF) thd 

the preamped on by RF

C loop shall e to the abs

command DALC_OFF) thd on of the amd independ

And the AL

power of thit shall readenuator to mOnce the ta

And the AL

e is 

witches off he 

dicates e is 

ands and emote.  

moves the d all the 

the ALC 

DOES NOT he ALC 

plifiers F_ON 

be frozen sence of 

DOES NOT he ALC 

mplifier’s ently of 

LC loop set 

he d the RF match the rgeted 

LC loop set 

 

Page 49: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

ALC_ON

ALC_OF

MEM_A

MEM_A

 

                    

rol shall be nded to impn value to avershoot wease of the e ALC set pos: 

ent to the am

0

e to the Public

pN  T

WpoeWeel 

FF  TaWkOm

ALC_ON  TAc

ALC_OFF  TA  

                

done in sucplement theavoid strongwhen the unpreamplifieoint to a ne

MEM_ALC

then fix th

ALC_ON, Mmplifier. 

point is alwaThe commaWhen the upoint. If theoutput powenabled andWhen the uexisting ALCexisting ALCoop cannot

The commaand the atteWhen MEMkept lookingOtherwise (mode activaThe commaALC loop whcommand isThe commaALC loop wh

ch a way thae ALC loop wg output poit returns toer gain aftew value wit

C_OFF, ALC_

e output to

MEM_ALC_O

ays reset. nd enables

unit is in statere is no stower and setsd the attenuunit is not inC set point, C set point st be enabled

nd disablesenuator remM_ALC ON mg for the moMEM_ALC_ated7. nd forces thhen an ALC_s received.nd forces thhen an ALC_

at transientwith small inower level vo RF ON mor cooling duthout interr

_OFF 

o the new de

ON 

 the ALC Mte RF ON, itred set poin it as new Auator contrn TRANSMITthe commastored, the Ad until there

s the ALC Mmains fixed mode is activoment the A_OFF) the A

he amplifie_ON, ALC_O

he amplifie_OFF or RF_

t power peancrements avariations. Aode after a suring a shorrupting the 

esired value

ode.  t looks for tnt, the unit ALC set poinolled by theT state, if thand is refuseALC mode se is RF pow

ode, i.e. theto its last vavated, The AALC loop wiALC point is 

r to keep thOFF, RF_ON

r to clear th_OFF comm

aks are avoiand decremAlso the impshort periodrt time OFF.RF transmis

e by changin

he stored Areads the p

nt. The ALC e ALC loop6.ere is no aled. If there set to ON, bwer (State TR

e ALC loop alue. ALC loop seill be enablecleared and

he set point or RF_OFF

he set pointmands are re

ded. It is ments of theplementatiod in RF OFF . ssion, a seq

ng the atten

ALC set present RF loop is . ready is an but the RANSMIT) 

is disabled 

et point is ed again. d ALC_OFF 

t of the  

t of the eceived 

e on shall mode due 

quence of 

nuator 

 

Page 50: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

OF(*)ALC O

allo

A

13 Issue 1 Rev 0

IED – Releasable

gram of state

RF Inhibit 

The RF circuit. Inhibit there isoutput 

When tmonitoremoveautoma 

FF* N/OFF not 

owed 

Sspa_Of

Atten

0

e to the Public

Inhibit conThe unit shconnector os an open cipower sha

the RF Inhiboring a “Waed (both pinatically retu

Off

RF_On

AA

A

nector imphall be activof the unit aircuit betwell be limited

bit is active,rning” or “Dns are againurning to the

Transmi

Sspa_On

Sspa_Off

ALC on ALC off MEM_ALCMEM_ALCAtten Set_Power

lements an ve (i.e. not mare shortedeen these twd to less tha

 the unit shDegraded” sn in short), te same stat

it

n

ff

RF_On

C on C off

externally muted) onlyd by an extewo pins of tan 0.1 mW i

hall report bstatus. Whethe unit shate previous 

STB

RF_Off

Comma

State

controlled hy when the ternal RF Inhithe unit RF n less than 

by both locaen the exterall restart opto the RF In

TAND BY

nd

e

hard‐wired two pins of ibit system.Inhibit conn5 msec (TB

al and remornal RF Inhibperations nhibit. 

ALC on ALC off MEM_ALCMEM_ALCAtten

 

security the RF . When nector, the BC). 

ote bit is 

C on C off

 

Page 51: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Electrical R

RF Input po

Number of p

  The un

requency B

  The inp

nput level 

  The unfrom ‐1

Overdrive an

4  The unwithouremovesignal a

  The unsubseqmainta

mpedance/

  The V.Sand no

Noise figure

  The nowith a m

RF Output p

Number of p

  The un

requency B

  The out

0

e to the Public

Requirem

ort charact

ports 

it shall have

Band 

put frequen

it shall wor10 to +5 dBm

nd Input pr

it shall be at time limited. During tat the outpu

it shall be puent degrain the oper

/V.S.W.R. 

S.W.R. on thn‐operating

ise figure atmatched lo

port chara

ports 

it shall have

Band 

tput freque

ents 

teristics 

e a single in

cy band sha

k and meetm. 

rotection 

able to work and withouthe overdrivut) but perf

protected todation afteations unde

he input RF g conditions

t maximumad connect

acteristics

e a single ou

ency band s

nput port

all cover fro

 the specific

k with an inut subsequeve the unit sormances c

o withstandr the overder these circ

port shall bs, any mode

 gain shall bed to the in

utput port

hall cover f

om 34200 to

cations for 

put level upent degradashall contincan be degr

 input levelrive is remocumstances

be better the. 

be lower thnput port. 

rom 34200 

o 34700 MH

an input po

p to 10 dB oation after tnue operatinaded. 

s up to 20 doved. It is nos (i.e. the un

an 1.3:1 (go

an 20 dB. T

to 34700 M

Hz. 

ower level in

over nominathe overdrivng (i.e. deliv

dBm withouot requirednit can be m

oal 1.2:1) in

The test sha

MHz. 

n the range

al level ve is vering a 

ut  to muted). 

n operating 

ll be done

 

 

Page 52: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

P2dB Compre

  The un

P2dB Compre

  When ocompre

Maximum O

  The unexceed

mpedance/

  The V.Snon‐op

Output Prot

4  The untime. Fworking

Out of Band

  The no

n band Res

  In Bandrange, fband re

Gain 

Maximum G

  The unany inp

Minimum ga

0

e to the Public

ession point

it shall have

ession point

one power ession point

Output Pow

it shall geneed. The thr

/V.S.W.R. 

S.W.R. on thperating con

tection 

it shall not or load V.S.g mode and

 Output No

ise at maxim

‐150 dBm/

‐150 dBm/

‐150 dBm/

sponse 

d requiremefrom Psaturatesponse are

Gain 

it shall provput power le

ain 

e a P2dB com

t (degraded

module hast higher tha

wer 

erate an alareshold for t

he output Rnditions, any

be damage.W.R. highed generate a

oise 

mum gain p

Hz   in the b

Hz  in the b

Hz  in the b

ents are app

tion to Psaturae not applic

vide gain enevel in the r

mpression p

d mode) 

s failed or isan TBD dBm

arm when ththis alarm s

RF port shally mode 

d by any VSr than 2:1, an alarm. 

present at o

band from 8

band from 3

band from 3

plicable onl

ation‐20 dB. Uable. 

nough to gurange of 2.2

oint higher 

s switched om (output po

he output pshall be sett

l be better t

SWR at any the unit is a

utput port 

8400 to 850

31800 to 32

37000 to 38

y in the higUnder this v

arantee the2.1.3 . 

than 50 dB

off, the unitower).

power limit table throug

than 1:1.2 (

phase at ouallowed to g

shall be low

00 MHz 

2300 MHz 

8000 MHz 

hest 20 dB value, the re

e required p

Bm (output 

t shall have 

is  reached gh local M&

TBC) in ope

utput for ungo on STAN

wer than  

of output pequirement

power of 2.

power).

a P2dB 

or &C. 

erating and 

nlimited D‐BY 

power ts about in 

2.2.3 for 

 

Page 53: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

  The unof 30 d

Gain Step 

  The gai

  The accthe out

ALC Mode 

  The ALC(30 to 5

  The ALC

  After acdB for a

Gain variatio

4  The amspecifie

  The amMHz su

Gain slope 

  The unband. T

Output pow

  The outunder t

Output pow

  The outconditi

0

e to the Public

it shall provBm for any 

in step shal

curacy of thtput power 

C requirem50 dBm). 

C shall follo

ctivation ofan input pow

on over freq

mplitude resed frequenc

mplitude resub band insi

it shall haveThe slope w

wer Stability

tput powerthe followin

1 ho

ALC

wer Stability

tput powerons: 

ALC

POU

The

Con

vide gain coinput powe

l be not gre

he gain settirange. 

ents are ap

ow the state

f the ALC, thwer variatio

quency ban

ponse of thcy band (AL

ponse of thide the spec

e a gain slopwill be measu

y in 24 h 

r of the unitng condition

our warm‐u

C OFF. 

y with temp

r of the unit

C OFF 

UT= P2dB 

ermal range

ntinuous op

ontrol enouger level in th

eater than 0

ing shall be 

plicable on

es diagram o

he unit shalon of ± 3dB

nd 

he unit shallC OFF). 

he unit shallcified frequ

pe lower thure in a spa

t shall not vans: 

up 

perature 

t shall not va

e: 23 ± 3°C

peration (wa

gh to guarahe range of

0.2 dB. 

better than

ly to the up

of Figure 2.

l keep the o.  

l not vary m

l not vary mency band.

an 0.02 dB/an of ±10Mh

ary more th

ary more th

arm up time

ntee a maxf 2.2.1.3

n 0.25 dB fo

pper 20 dB o

output pow

more than 2 

more than 0

/MHz in thehz. 

han 0.5 dBp

han  ±1 dB u

e not includ

imum outp

or the highe

of output po

er level sta

dBpk‐pk (T

.5 dBpk‐pk 

e specified f

pk‐pk over 2

under the fo

ded) 

ut power 

est 20 dB of 

ower range

ble in ±0.2 

TBC) in the 

in any 50 

frequency 

24 hours 

ollowing 

 

 

Page 54: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Group Delay

Group delay

  The groband 

  The groinside t

Group delay

  The groband. T

Group Delay

  The ripnspk‐pk

Stability wit

  The grotemper

Phase stabi

4  The  foldBm raThe fol 

 

Spurious an

n Band and

  The spuand outinclude

0

e to the Public

y in Band Va

oup delay va

oup delay vathe  specifie

y slope 

oup delay slThe slope w

y Ripple 

ple of the gk 

th temperat

oup delay varature varia

ility (Allan

lowing speange. lowing mas

nd Non Lin

 Out of Ban

urious preset of band fred in this req

ariation 

ariation sha

ariation shaed frequenc

lope shall bwill be measu

group delay 

ture 

ariation shaation of 23 ±

n Deviation

cification h

sk shall be m

nearities 

nd Spurious

ent at the orom DC to 4quirement.

all be lower 

all be lower cy band 

e lower thaured in a sp

inside the f

all be lower ± 5°C. 

n) 

holds  for an

met: 

ADEV 

5*10‐14 5*10‐15

8*10‐16 8*10‐17

2*10‐17 

output port 40 GHz. Any

than 0.5 ns

than 0.15 n

an 0.01 ns/Mpan of ±20 M

frequency b

than 1 nsp

ny regulated

 (seg)τ= 1 sτ= 10 sτ= 100 τ= 1.000τ= 10.000

shall be lowy AM and PM

spk‐pk in th

nspk‐pk in a

MHz in the sMhz. 

band shall b

k‐pk in 24 h

d output po

ss 0 s0 s 

wer than ‐60M modulati

he specified 

any 50 MHz

specified fre

be lower tha

hours and u

ower within

0 dBc both on spurious

frequency 

 sub band 

equency 

an 0.25 

nder a 

n the 40‐50

in band s is 

 

Page 55: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Harmonics 

  Second

Phase Noise

  Phase n

Third Order 

  When tsaturatat outp

AM/PM 

  The val

Amplifier St

  The unoutput 

nterfaces 

The intwith eacharact

nput RF Po

The Inp

Flange 

Output RF P

The Outhe top

Flange 

RF Inhibit C

RF InhiPins are

0

e to the Public

d harmonic s

noise of the‐60 ‐ 10 * l‐120 dBc/H

Intermodu

the amplifietion power (put shall be 

ue of AM/P

ability 

it shall be uload. 

erfaces of tach one of tteristics of t

ort 

put RF port s

shall be 154

Port 

utput RF porp side or rea

shall be 154

Connector 

bit connecte TBD‐c. 

shall be low

e unit shall bog10(fhz) dBHz 

ulation 

er is driven (PSAT (input) –lower than 

PM shall be 

uncondition

the equipmethe units. Althe differen

shall be WR

4 IEC UBR32

rt shall be War side of th

4 IEC UBR32

or shall be  

wer than ‐60

be lower thc/Hz  from  abo

with two ca– 3 dB), the ‐12 dBc

lower than

ally stable a

ent shall bell the mechant interfaces

R28 and sha

20.

WR28 wavege unit. 

20. 

Sub‐D 9‐p 

0 dBc

an  m 1 Hz to 1ove 1 MHz o

arriers eachlevel of the

n 3 °/dB for 

and not osc

e described anical, elects shall be de

all be locate

guide with f

(m) located

 MHz offsetoffset from 

 one 3 dB lo third interm

any power 

cillate for an

in a specifictrical, hardwescribed in 

ed on the fro

flange and 

d on the rea

t from the cthe carrier 

ower than tmodulation

level up to 

ny input and

c documentware and sothis docum

ont panel. 

shall be loc

r panel of t

carrier 

the input n products 

saturation.

d any 

t delivered oftware ment. 

ated on 

he unit. 

 

 

Page 56: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Test Conne

The unfollowi

M&C Interf

M&C Conne

The M&

The un

Remote con

The phyprotoco

ocal M&C 

Local M

Contro

LCD scr

Mechanica

The eq

Mechanical 

The fol

0

e to the Public

ctors 

it shall provng characteCoupling:  Number ofType of conLocation: 

face 

ctor (P.U. o

&C connect

it shall mee

trol interfa

ysical M&C ol with the 

M&C contro

ls shall be e

reens shall b

l Requirem

uipment me

ESOC Grou

ESOC Gene

The EMI/EM

The safety 

Layout  

lowing elem

M&C Conn

Input and O

Mains pow

Mechanica

Labels (Mo

vide a test ceristics: 

f ports:nnector:

only) 

or shall be 

et the requi

ace (P.U. on

interface srequiremen

ls and displ

easily access

be provided

ments (P.U.

echanical co

und Station 

eral require

MC require

requiremen

ments shall 

nector 

Output port

wer socket 

al Fixation p

odel Referen

connector w

Higher tha1.  K(f) front pane

RJ45 type. 

rements of 

nly) 

hall be Ethents of AD4.

ays shall be

sible 

d with backl

. only) 

onfiguration

Systems Int

ments on E

ments (RD2

nts in force 

be located 

ts 

points 

nce, Serial N

with a samp

n 40 dB 

AD5 

ernet. The i

e located in 

light capabi

n shall ensu

tegration St

qui0pment

2, RD3) 

in CE 

on the unit

Number, Ma

le of the ou

nterface sh

the front p

ility

ure the com

tandard (AD

 Units (AD6

 external si

anufacturer

utput signal 

all impleme

anel 

mpliance wit

D5) 

6) 

des: 

r, …) 

with the 

ent TCP/IP 

th: 

 

Page 57: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Dimensions 

The unrequire

Mass 

The un

Cooling 

1  The un

2  The pro

3  Air filte

Mains pow

Mains Volta

1  The unmonopFreque

2  Neutra 

Power Cons

3  The ma

oad Unbala

4  For trip

Power Facto

5  The pow

nrush Curre

6  The inr

7  The pri

0

e to the Public

it mechanicements.  

Width:  

Height:  

it mass sha

it shall be aMax Air floAir taken frAir exhaust

oper workin

ers shall be 

wer 

ge 

it shall worphasic 230 Vncy 50 Hz ±

l shall be co

umption 

aximum pow

ance 

phase mains

or 

wer factor o

ent 

ush current

mary curre

cal layout sh

19” rac

20 U (T

ll be lower t

air cooled wow:  300 (TBrom the frot to the bac

ng of the co

installed at 

k with a maV ± 10% or t± 5% 

onnected to

wer consum

s voltage (p

of the unit s

t shall be lo

nt demand 

hall be one 

ck compatib

TBD) (890 m

than 100 kg

with the folloBD) lps ont  ck 

oling fans s

air inlets an

ains power wtriphase‐Y 4

o ground on

mption shall

oint 2.3.8.1

shall be not

wer than 2

of the units

or more bo

ble 

mm) 

g (TBC).

owing chara

shall be mon

nd shall be 

with the fol400 V ± 10%

nly on powe

 be not be g

1) the load u

t lower than

.5 * Inom at s

s shall be lo

oxes compat

acteristics:

nitored loca

easily repla

llowing cha% 

er plant, not

greater tha

unbalance s

n 0.9. 

switch on o

ower than 2

tible with A

al and remo

aceable. 

racteristics 

t in unit (TN

n 1.2 kVA 

shall be low

of the unit. 

2.5 * Inom for

AD5 

otely.

N‐S)

wer than 5%

r any 

 

Page 58: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

transiti

Environme

Temperatu

Ambien

The unambien

The unbetweerange. 

Storage

Humidity 

The un

Altitude 

The un

The una.s.l. 

Vibration a

The eq

Normashall no

EMI/EMC (P

The eqand EN

Monitoring

General 

1  The promandat

2  All the 

(P.U. onAll the 

0

e to the Public

on between

ental requ

re 

nt temperat

it shall meent operating

it shall surven 5 and 45

e temperatu

it shall oper

it shall oper

it shall with

and Shock 

uipment sh

l handling oot produce 

P.U. only) 

uipment sh 61000‐6‐1 

g and Con

ototype neetory only fo

controls an

nly) controls an

n operation

uirements

ture ranges

et all specifig temperatu

vive when o°C. Perform

ure range sh

rate with up

rate at an a

hstand stora

all be prepa

of the equipdamage on

all be desig(immunity)

ntrol 

eds to impleor P.U. 

nd telemetri

nd telemetri

nal states of

s refer to air

cations (excure range b

perating unmances may

hall be betw

p to 90% re

ltitude of u

age and tran

ared for tra

pment when the equipm

gned to conf). 

ement only 

ies shall be 

ies shall be 

f the unit 

r inlet temp

cept stabilitetween 18 

nder a ambi be degrade

ween –30 a

lative humi

p to 2000 m

nsport at an

nsportation

n loading orment. 

form to the

local monit

available lo

available re

perature

ty) when suand 28°C. 

ent survivaed when ou

nd +70 deg 

dity, no con

meters a.s.l.

n altitude of

n by air, tru

r unloading 

e norms EN 

toring. Rem

ocally 

emotely exc

bmitted to 

l temperatuutside the o

C. 

ndensation.

.. 

f up to 1500

ck and ship

for transpo

61000‐6‐3 

mote monito

cept the loc

an 

ure range perational 

00 meters 

.  

ortation 

(emission) 

oring is 

cal/remote 

 

Page 59: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

mode sonly loc

3  (P.U. onThe unremotedisable

4  (P.U. onDuring remote

5  (P.U. onAfter swas defin

6  (P.U. on

M&C Proto

7  The remprotoco

8  The un

ist of comm

9  The fol

Additio

ist of telem

0  All comthe uniThe list

0

e to the Public

selection cocally. 

nly) it shall be oe control is dd except th

nly) remote cone monitoring

nly) witching froned before 

nly) At swit

ocol (P.U. o

mote M&C fol defined i

it shall be a

mands 

lowing com SSPA O RF ON/ Alarm R Local/R Attenu Output ALC ON MEM_A Preamp

onal comma

metries 

mmanded vat. t of telemet Output Output Attenu Output

ontrol. Such 

operated bodisabled. Whe local/rem

ntrol, local mg shall be a

om local to switching, u

ch on. the u

only) 

function shn AD4 

able to hand

mmands shaON/OFF /OFF Reset Remote (avaation set vat power set N/OFF ALC ON/OFplifier Selecands can be 

ariables sha

tries shall int Transmittet reflected Pation valuet power set 

local/remo

oth remotelyWhen remotmote mode s

monitor shalso possible

remote conuntil progra

unit shall sta

all be imple

dle two simu

ll be availab

ailable only alue value 

F ction added by t

ll provide a

nclude at leaed Power Power  value 

ote control s

y and localle control isselection co

all be also pe. 

ntrol or viceammed othe

art in remo

emented wi

ultaneous r

ble 

locally) 

the manufac

a telemetry 

ast the follo

shall not be

y. When loc selected , lontrol. 

possible. Du

e versa, all serwise by c

te mode an

ith a TCP/IP

remote clien

cturer 

feedback o

owing param

e available r

cal control local contro

uring local co

ettings shaommands. 

nd in a safe 

P interface w

nts. 

f the actual

meters: 

remotely, 

is selected, ol is 

ontrol, 

ll remain 

state.

with the 

l status of 

 

Page 60: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

Additio

ist of Alarm

1  The unrange a

2  The list

Additio

3  In case dependdocumand thecontrol

4  The unnominadegrad

5  The list

Additio

6  In case warninwarninwhen t

Parameters

7  The un

0

e to the Public

Status o Local R Unit Sta ALC Sta MEM_A Tempe Selecte

onal parame

ms and wa

it shall activand the ope

t of alarms s Over te Over cu Power 

onal alarms 

that an aladent on theentation. We alarm indil. 

it shall actival range andation on th

t of warning Fan sta Over O ALC no RF Inhi Rack ov

onal warning

that a warng is removeg was raisehe warning

s Logging (

it shall be a Receive Part (TB

of each moRemote Statatus (OFF‐Satus ALC Statusrature of thed preamplieters can be

arnings 

vate alarmseration impl

shall includeemperatureurrent (per supplies stacan be add

rm is activa alarm and 

When the alaication rem

vate a warnd the operae performa

gs shall incluatus (TBC) utput Powet regulatingbit activatever temperags can be ad

ning is actived the unit sd. The warng condition i

(P.U. only)

able to log aed commanBD) of mon

dule tus Stand By‐Tra

he unit fier e added by t

s when the mlies a risk of

e at least the (per moduRF module)atus ed by the m

ated the unishall be defarm is remoains until th

ning when thtion does nnces of the

ude at least

er g d ature dded by the

vated the unshall remainning indicatis no more 

at least the fnds itoring info

ansmit) 

the manufa

monitored vf damage.

he followingule TBC) ) 

manufacture

it shall go tofined by theoved the unhe alarm is 

he monitornot generatee unit. 

t the follow

e manufactu

nit shall conn in the samion shall dispresent. 

following in

rmation de

acturer 

variables ar

g paramete

er 

o a safe state contractonit shall remcleared by a

ed variablee a risk of d

ing parame

urer 

ntinue workme conditionsappear fro

nformation:

livered thro

re out of the

rs: 

te which car in the unit

main in sucha local or re

s are out ofamage but 

ters: 

king. When ns than befom the mon

 

ough M&C 

e nominal 

n be t  safe state emote 

f the only a 

the fore the itoring 

 

Page 61: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

8  The unperiod 

9  The logsynchrorequire

Design Req

Mechanica

The un

Thermalifetimerange. 

Thermaoperati

Electrical La

The eqor open

Critical interfer

Safety 

The unequipm

The RF 

Grounding 

The un

Ageing 

The eqand de

After fucontinu

During and abs

After th

0

e to the Public

Alarms

it shall provof 7 days an

gged informonize the syements. 

quiremen

l and therm

it shall mee

al design she of the equ

al design shing tempera

ayout 

uipment pen in the test

modules (lrences. 

it shall meement in forc

power den

it shall mee

uipment shlivery. 

unctional vauously for a

the ageing sence of po

he ageing a

 generated

vide a LOG fnd allows to

mation shall ystem time.

ts 

mal Design

et the requi

all assure nuipment of 

all also ensature range

erformance t port. 

ike low leve

et the legal se in the EU.

sity outside

et the requi

all be subm

alidation ant least 100 

gain and ouower/gain ju

ny faulty co

file capabilito recover th

be time sta The unit sh

rements of 

no degradat15 years, ov

ure minimae as defined

shall not be

el circuits) s

safety requ. 

e the unit ca

rements of 

mitted to age

nd coarse adHours

utput poweumps or glit

omponent s

ty that storhe stored va

amped. NTPhall be com

2.2.5, AD5

tion of perfover the spec

al sensitivity in 2.4.1.  

e affected b

shall be ade

irements af

abinet shall

AD5 and AD

eing at the 

djust, the eq

er shall be mtches and ve

hall be repl

es the inforalues via FT

P protocol shpatible with

and AD6.

ormance ovcified opera

y of the equ

by the prese

quately shi

ffecting per

 be not exc

D6.

factory pre

quipment sh

monitored toerify the ov

laced and th

rmation durTP. 

hall be usedh NTP serve

ver an expecating tempe

uipment to a

ence of a lo

elded to av

rsonnel and

eed 0.2 mW

vious to the

hall be swit

o check theverall perfor

he equipme

ring a 

d to er 

cted erature 

an 

ad, short 

oid EMC 

W/cm2. 

e final test 

tched ON 

e variations rmance. 

ent shall be 

 

Page 62: Ka SSPA (KaSSPA Statem ent of Workemits.sso.esa.int/emits-doc/ESOC/1-7513/7513_ews.pdf · Band SSPA ment throu tured as fo r 1 introdu ble and ref r 2 present r 3 defines . r 4 contain

13 Issue 1 Rev 0

IED – Releasable

finally a

The faufailuresto solve

Reliability (

The eqhours. Tfigures 

The selmaximu

The MTspares 

The un

0

e to the Public

adjusted an

ults in comps in the same this reliab

(P.U. only)

uipment shThis requireof RD1. 

ected  semum junction

TTR (Mean Tare availab

it shall be m

nd ready for

ponents durme componebility default

all have a Mement shall

iconductor n temperatu

Time to Reple. 

maintainabl

r final accep

ring ageing ent or modut. 

MTBF (meanl be demons

technologyure. 

pair) shall b

e for 15 yea

ptance testi

shall occur ule shall be 

n time betwstrated by a

y shall have 

e lower tha

ars.

ng. 

seldom andinvestigate

ween failureanalysis wit

a MTBF of 

an 1 hour pr

d randomlyed and actio

es) higher thh the reliab

at least 10^

rovided the

. Repetitiveons taken 

han 20.000 bility 

^6 hours at 