K. Mercier , Shanghai meeting , 19th-22 May 2014
CNES, 5th June 2014
Karine MERCIER
EUSO BalloonKey Point Flight Acceptance
Introduction
K. Mercier , Shanghai meeting , 19th-22 May 20142
CONTEXT
EUSO Balloon is a mission being a part of “STRATO Science 2014” the CNES Balloons campaign planned in August 2014 at Timmins.
Instrument is at the end of phase D so before leaving to flight we have to make sure that it is ready for the mission
Key Point Flight Acceptance
K. Mercier , Shanghai meeting , 19th-22 May 20143
Agenda Morning
Mercredi 4 JuinCNES Toulouse
Début Durée Objet Organisme Orateur8:45 0:15 Accueil9:00 Introduction
0:10 Introduction CNES Karine Mercier0:05 Organisation Key Point CNES Yves André0:15 EUSO-Balloon Mission IRAP Peter Von Ballmoos
9:15 Instrument Overview0:15 General view APC Guillaume Prévôt0:15 Configuration evolution APC Guillaume Prévôt / Gilles Roudil0:05 Instrument budgets APC Guillaume Prévôt
10:05 Tests results
1:00Electronics Chain tests:Description and results (functional, Thermal, Performance) HW & SW
INFN/LAL Giuseppe Osteria & Pierre Barrillon
11:05 0:15 Break
0:30Optical tests: Description and results
IRAP Peter von Ballmoos
0:10Instrument tests:Description and results
IRAP Pierre Barrillon
12:00 Performances0:15 EUSO-Balloon main performances IRAP Peter von Ballmoos
0:20 Test performance results IRAP Peter von Ballmoos
0:10 EUSO Balloon performance synthesis IRAP Peter von Ballmoos12:45 1:15 Lunch
K. Mercier , Shanghai meeting , 19th-22 May 20144
Agenda Afternoon
14:00 Balloon aspects0:05 Balloon State of compliance (mission and documentation) CNES Jean Evrard0:10 Siren coupled tests results INFN Napoli Giuseppe Osteria0:10 Safety status CNES Jean Evrard
14:25 Actions0:10 Wrap Up Previous Review actions APC Guillaume Prévôt
14:35 EUSO Balloon Campaign0:10 Euso Ballon Flight conditions IRAP Peter von Ballmoos
0:10 Campaign activities Plan APC Guillaume Prévôt
0:05 Project team Organisation APC Guillaume Prévôt
0:05 Schedule APC Guillaume Prévôt15:05 IR-Cam
0:25 Description and main test results UAH Hector Prieto
0:10 Campaign organisation; tests Plan and schedule UAH Hector Prieto15:40 0:15 Break15:55 KP Board Discussion
0:30 Board internal Discussions16:25 1:00 Board / Project team Questions / Answers17:25 0:30 Key Point Board conclusions Board
17:55 End