ELECTRIC POWER RESEARCH INSTITUTE MRP Reactor Internals Program Review Dennis Weakland, FirstEnergy Corp., MRP Chairman Glenn Gardner, Dominion, MRP RI Focus Group Chairman Tom Alley, Duke Energy, MRP Inspection ITG Chairman Anne Demma, EPRI, MRP RI Focus Group Project Manager June 21, 2007 NRC Headquarters

June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

ELECTRIC POWERRESEARCH INSTITUTE

MRP Reactor InternalsProgram Review

Dennis Weakland, First Energy Corp.,MRP Chairman

Glenn Gardner, Dominion, MRP RI FocusGroup Chairman

Tom Alley, Duke Energy, MRP InspectionITG Chairman

Anne Demma, EPRI, MRP RI FocusGroup Project Manager

June 21, 2007NRC Headquarters

Page 2: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Agenda

1A -aTime Item Presenter

8:00 a.m. Opening NRC/NEI

8:05 Purpose and Objective of Meeting Dennis Weakland, First EnergyCorp.

8:15 Guidelines Context and Approach Glenn Gardner, Dominion

8:45 Guidelines Outline and Contents Glenn Gardner, Dominion

9:30 Break

9:45 Inspection Standards Approach Tom Alley, Duke Energy

10:45 Fleet Implementation Glenn Gardner, Dominion

11:00 Discussion All

11:45 Summary and Future Meetings All

12:00 Adjourn

© 2007 Electric Power Research Institute, Inc. All rights reserved.j I..., I iELECTRIC POWER2i rI I j RESEARCH INSTITUTE

Page 3: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Purpose and Objective of Meeting

Dennis Weakland

© 2007 Electric Power Research Institute, Inc. All rights reserved.. - LECTRIC POWER

3RESEARCH INSTITUTE

Page 4: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Purpose of Presentation

• Request for'SER of I&E Guidelines

* Guidelines Principles and Approach

* Outline of Guidelines and Contents

" Inspection Standards Approach

" Vision of Guidelines Implementation

4LCTI POWER© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 5: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

U

Request for SER on Guidelines

* In 2/23/07 meeting with NRC, suggestion that more NRCresources would be applied, and individual reviewefficiency would result

• An MRP decision to request SER was made andconcurred by executives of PWR Materials ManagementProgram (PMMP) on 4/23/07

* Guidelines will remain under NEI 03-08

© 2007 Electric Power Research Institute, Inc. All rights reserved. a I=.F.. I PLECTRIC POWER5 RESEARCH INSTITUTE

Page 6: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Guidelines Context and Approach

Glenn Gardner

@ 2007 Electric Power Research Institute, Inc. All rights reserved. 2ELECTRIC POWER

Page 7: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Internals Functions and Design

1 Plenum Cover

V* • Vent Valve

Core Support Shield

9 Support the corePlenum Cylinder Direct the cooling flow

Upper Grid Assembly * Maintain reactivity control

Te Structural support fore-Thermal Shieldf

, Core Barrel other functions

Lit Lower Grid Assembly

IMI Guide Tube

7 Electric Power Research Institute, Inc. All rights reserved. 7 I.•.lRESEARCH INSTITUTE

(9

© 200

Page 8: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

'Aging Mechanisms in PWR Internals

* Stress Corrosion Cracking (SCC)* Irradiation Assisted SCC (IASCC)** Wear* Fatigue* Thermal Aging Embrittlement (TE)* Irradiation Embrittlement (IE)** Irradiation-induced Stress Relaxation (IR)*and Creep (IC)*

° Void Swelling (VS)*

* Require neutron fluence

2007 Electric Power Research Institute, Inc. All rights reserved. 8I RESEARCH INSTITUTE

Page 9: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

1 Aging Effects in PWR Internals

" Increased yield strength (beneficial)" Reduced ductility" Reduced fracture toughness" Loss of preload

" Wear** Cracks** Distortion** Gaps*

* Potentially observable by NDE methods

2007 Electric Power Research Institute, Inc. All rights reserved. 9. l-'l RESEARCH INSTITUTE

Page 10: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Context of Guidelines

MRP I&E

"Guidelines

Curet Issues,

IGuidelinesapplicable to allplants for bothcurrent and futureterms

© 2007 Electric Power Research Institute, Inc. All rights reserved. 10 f~f Ia I ELCTICPOWER10ESEARCH INSTITUTE

Page 11: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Current Issues I Operating Experience

Flow induced vibration fatigue

m

9 SCC of bolting and pins

• Wear

" IASCC of bolting

© 2007 Electric Power Research Institute, Inc. All rights reserved. af~f l IELECRICPOWER11 C1121 RESEARCH tNSTITUTE

Page 12: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

IM

License Renewal Context

" Aging management reviews

" GALL Report

• Aging management programs

* Licensee commitments on reactor internals

* NRC approval of programs and inspection plans

© 0 e co R a Iien ris e dELECTRIC POWER02007 E lectric Power Research Institute, Inc. Al rghts reserved. 12 L .n I U RESEARCH INSTITUTE

Page 13: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

MRP Approach to Aging and LicenseRenewal- 1

" I&E guidelines for management of aging effects tomaintain function

" 'Needed' and 'mandatory' elements to assure uniformimplementation under NEI-03-08

" Guidelines have appendix describing how the 10elements of an aging management program areimplemented

C 2007 Electric Power Research Institute, Inc. All rights reserved. 13 - r RESEARCH INSTITUTE

Page 14: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

MRP Approach to Aging and LicenseRenewal- 2

I Guidelines have provisions for fleet-wide reporting andcollective action

- MRP will develop a standard submittal for reactorinternals inspection programs

* Guidelines are intended to provide the criteria andmeans to satisfy plant-specific commitments

2007 Electric Power Research Institute, Inc- All rights reserved. 14 RESEARCH INSTITUTE

Page 15: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

7,ASME XI Context

" ASME Xl inspection rules apply only to removable coresupport structures

" IWB-2500 B-N-3 requires only VT-3

* ASME Code valuable reference for several examinationsthat go beyond VT-3

* Augmented internals inspections could be performedduring an ASME vessel ISI or on a separate schedule asnecessary

2007 Electric Power Research Institute, Inc. All rights reserved. 15 . .RESEARCH INSTITUTE

Page 16: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Principles of I&E Guidelines

* Maintain internals function and safety

* Long-term asset reliability and preservation

* Fleet-wide management of internals aging -

effective information integration

* Consistent application in PWR fleet

* Periodic review and update of guidelines

07 Electric Power Research Institute, Inc. All rights reserved. 16 RESEARCH INSTITUTE© 200

Page 17: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Technical Bases for Guidelines-------- -- -

Locations, &

Research

© 2007 Electric Power Research Institute, Inc- All rights reserved. 17 .ESECARIC POWERRESEARCH INSTITUTE

Page 18: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

m

Aging Management Approach

" Use functionality analysis and operating/inspectionexperience to help guide timing and extent of inspections

" Leverage prior experience

* Monitor operating parameters

* Rely on existing ASME XI programs to the extentpracticable

ELCRCPOWER18 armI2 I RESEARCH INSTITUTE© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 19: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

SCollection/Assessment of Industry.Experience

" Good aging management programs require continuing,assessment of operating experience

" Since only outlier examples of degradation are expectedinitially, need to share individual experience with rest of.fleet

" Best to have uniform MRP assessment of experienceand its implications

* Results in periodic update of the Guidelines

2007 Electric Power Research Institute, Inc. All rights reserved. 19 III/ i RE SEARCH INSTITUTE

Page 20: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Guidelines Outline and Contents

Glenn Gardner

© 2007 Electric Power Research Institute, Inc. All rights reserved.Et ECTRIC POWER

20 IRESEARCH INSTITUTE

Page 21: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

I&E Guidelines Outline

1 - Executive Summary

2 - Introduction

3 - Component Categorization

4 - Inspection Strategies

5 - Inspection Acceptance Criteria

6 - Load Conditions for Evaluation7 - Evaluation Methodology

8 - Summary of Requirements9 - References

Appendix A - Aging Management Program Attributes

2007 Electric Power Research Institute, Inc- All rights reserved. 21 -'r 2 1 RESEARCH INSTITUTE

Page 22: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Section 2 - Introduction

* Includes a brief summary of past work (MRP-189, 190 &191) including initial screening Categories A, B, C

" Introduces the concept of Functional Categories

- Concept going forward for the B and C components

• Summarizes Industry Materials Initiative Implementationrequirements

© 2007 Electric Power Research Institute, Inc. All rights reserved. RES ELECTRIC POWER22 ~ II~I RE SEARCH INSTITUTE

Page 23: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Section 3 - Categorization

• Summarizes:

- Common design characteristics of the PWR fleet

- Screening criteria

- Category definitions

- Components functional categories

© 2007 Electric Power Research Institute, Inc. All rights reserved. 23 ELTIRC2 POWER3RESEARCH INSTITUTE

Page 24: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Draft Flow Chart

An-

© 2007 Electric Power Research Institute, Inc. All rights reserved.24 f_....," I ELECTRIC POWER

24RESEARCH IN STITUTIE

Page 25: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

I Section 4- Inspection Strategies

* Describes the overall aging management strategy

* Describes the various examination methods:- Existing ASME Code Section XA visual examinations (VT-3)- Other visual, surface, and volumetric examination methods- Other aging management program elements such as monitoring

and trending- Integrated industry program

* Provides component-specific tables of Primary andExpansion components for each NSSS vendor withexamination requirements and cross references toacceptance criteria, functionality results, figures, etc.

2007 Electric Power Research Institute, Inc. All rights reserved. 25 .1 RESEARCH INSTITUTE

Page 26: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Section 5- Acceptance Criteria

* Provides component specific acceptance criteriafor the inspection requirements for

- Visual (VT-3) examinations,- Visual (VT-1) examinations,- Ultrasonic volumetric (UT) examinations of bolts

- Eddy Current Testing (ET) for surface examinations

* Describes the requirements for determiningreexamination intervals based on analysis

iECTRIC POWER© 207 letri PwerReearh nsttue, nc.Al riht reered.26 ~ I ~ 2 I RESEARCH NTUT

Page 27: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Section 6- Load Conditions for Evaluation

Describes:

" Typical expected and unexpected loads that must beapplied to internals component locations for any flawsexceeding acceptance criteria

" Typical corresponding loading combinations

" General requirements for stress analysis methods used forflaw evaluations

" Plant specific loading must be considered

2007 Electric Power Research Institute, Inc. All rights reserved. 27 =. / .1 1 RESEARCH INSTITUTE

Page 28: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Section 7 -Evaluation Methodology

* Describes various methodologies for evaluating flaws:-Limit load capacity demonstration- LEFM or EPFM assessment, depending on

applicability

" Provides bases for:- Flaw depth in the absence of flaw depth sizing- Flaw growth during operation until the next examination- Considerations for uninspectable regions- Flaw proximity/combination- Allowable flaw size determination- Fracture toughness limits for evaluation methods

© 2007 Electric Power Research Institute, Inc. All rights reserved. 28 RESEARCH INSTITUTE

Page 29: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Section 8 - Summary of Requirements

* Summarizes NEI 03-08'needed and mandatory

•Summarizes NEI 03-08'needed -and mandatoryrequirements for implementing the guidelines:

- Formal PWR Reactor Internals Program

- Inspection and other aging management

- Acceptance criteria and evaluation of results

- Reporting of results to MRP

a I...I I E LECTR•C POWER29 RESEARCH INSTITUTE© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 30: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Appendix A - Aging Management ProgramAttributes

- A

" Discusses how the program meets the 10 attributesdefined in the GALL

" Expected to serve as roadmap for NRC review ofguidelines

" Other appendices may also be needed to document thebases for our requirements

30 i.=I. i I ELECTRIC POWERRESEARCH INSTITUTE© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 31: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

M

Inspection Standards Approach

Tom Alley

@ 2007 Electric Power Research Institute, Inc. All rights reserved.3 ff .. 1 ELECTRIC POWER

31 ai- aiU I RESEARCH INSTITUTE

Page 32: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Topics

" Objective

" Strategy

" Technical Justifications

e Inspection Standards Organization

e Draft Schedule

© 2007 Electric Power Research Institute, Inc. All rights reserved.S i.._ r I ELECTRIC POWER

32 RESEARCH INSTITUTE

Page 33: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Objectives

* Provide reliable inspection techniques for componentsdesignated in the I&E Guidelines for Vessel Internals

- Develop program in parallel with I&E Guidelinesdevelopment

- Participate in development of I&E Guidelines

- Coordinate activities of Inspection ITG and Internals FG

© E c R c i I r vR ELECTRIC POWER© 07 lcti ower Research Institute, Inc. All rights reserved. 3 U E I JRESEARCH INSTITUTE

Page 34: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Strategy

" Use existing techniques when possible

- ET of Flux thimble tubes

- UT of Baffle Former bolts

- UT of Core Barrel bolts

- Section XI VT examinations

" Document Inspection Standards in report organizedsimilar to BWRVIP-03

* NDE techniques to meet ASME Section V, Article 14,Low rigor

2007 Electric Power Research Institute. Inc- All rights reserved. 34 -"I I RESEARCH INSTITUTE

Page 35: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Technical Justifications Requirements

Meet ASME Section V, Article 14

- Applicable degradation mechanism to be detected

- Explain physics of inspection

- Scope and limitations of procedure

- Calibration

- Essential variables

- Determination of critical flaw to detect

- Flaw detectability

- Description of experiments & demonstrations

- Field experiences and confirmed results

2007 Electric Power Research Institute, Inc. All rights reserved. 35 I. 1 1 RESEARCH I NST

Page 36: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Implementation of TJs

* Must be approved by NDE Level III* Reviewed and accepted by Owner (Inspection ITG)* Applicable Authorized Inspection Agency

Consider 'global' review by ANIIs- Reduce individual site reviews

* 3rdparty (EPRI)- EPRI to publish report similar to BWRVIP-03- Document TJs that have been accepted- Document demonstrations, if applicable- Reference vendor procedure qualification records

and/or technical justifications

2007 Electric Power Research Institute, Inc. All rights reserved. 36 RESEARCH INSTITUTE

Page 37: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

I,

Strategy for Inspection Standards

Evaluation of potential NDE techniquesReview vendor procedure qualification records and/ortechnical justifications (TJ)* If acceptable document in Inspection Standards report

If procedure qualification necessary then:* Develop qualification program protocol based on I&E

Guidelines inputs* Fabricate qualification blocks• Qualify procedure by demonstration

Develop NDE techniques and equipment, if necessaryand qualify procedure

* Document process

© 2007 Electrc Power Research Institute, Inc- All rights reserved. 37 RESEARCH INSTITUTE

Page 38: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Inspection Standards

" Publish living document similar to BWRVIP-03- NDE program for Primary and Expansion components

- Update as necessary

" For each component

- Code exam, demonstration requirements and/orsummary of TJ

- Document essential variables from demonstrations

- Document results - reliability or capability of NDE or TJ

2007 Electric Power Research Institute, Inc. All rights reserved. 38 I. 1 U 1 RESEARCH INSTITUTE

Page 39: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Bolting Demonstration Status

" Reviewed EPRI reports and vendor procedure qualificationrecords and/or technical justifications (baffle-former)

- Satisfied that records are acceptable

- Need to summarize them and incorporate into, InspectionStandards

- Need to review other bolting UT techniques forincorporation

" Core Barrel Bolts

- Cooperating with Duke to design mockups

- Fabricating to EPRI QA program

- Plan to fabricate bolts with flaws- Conduct demonstrations

2007 Electric Power Research Institute, Inc. All rights reserved. 39 f* * a* RESEARCH INSTITUTE

Page 40: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Visual Examinations

* Provide recommendations concerning scanning speed,lighting, field of view, etc.

e Document technical justifications for use of- VT-1

- VT-3

" Evaluate accessibility of components

" Will consider BWRVIP lessons learned

ELECTRIC POWER

40 IU U RESEARCH INSTITUTE© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 41: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

U

Examples of Potential Inspections

e Core support to core barrel bolts (UT)

" Lower Grid assembly to core barrel bolts (UT)

* Baffle to former bolts or screws (UT)" Flow distributor to lower grid shell forging bolts (UT)

o Fuel alignment pins of the lower support (UT)

* Thimble tube (ET)

i=rai I ELECTRIC POWER41 C- RESEARCH INSTITUTE© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 42: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Draft Schedule

-, f. ;-Eý-Y

Review Baffle Bolt UT March - April 2007

4

Develop Core Barrel UTqualification program

April - September 2007

+

Draft Inspection Standards December 2007

Complete activities for other September 2007- October 2008

components

Complete Inspection Standards December 2008

© 2007 Electric Power Research Institute, Inc. All rights reserved. a i= re i PECRC POWER42 RESEARCH INSTITUTE

Page 43: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

-----------

Fleet Implementation

Glenn Gardner

© 2007 Electric Power Research Institute, Inc. All rights reserved. 4' r.I l I ELECTRIC POWER3 RESEARCH INSTITUTE

Page 44: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Implementation of I&E Guidelines - Preliminary

MRPI&E Guide

InMRPIsp. Stds.

Insp. Plan:_lOcations

ý-exams.•7 :-timing!•.

NRCSub m" itta-1 Review

=>Fu;t 1:>

NRCApproval E>

(SER)

[ eRAIresponses'Legend

MRP Guidance Doc

Owner Activity

iNRC Activity

Vendor Activity

MRP Activity'

© 2007 Electric Power Research Institute, Inc. All rights reserved. 44 1 ELECTRIC POWER

RESEARCH INSTITUTE

Page 45: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

E _

Implementation of I&E Guidelines - Preliminary

MRPInsp. Stids.

NRCri> Approval,

(SER)

Vendor Development-Vendor R/D-ToolingeQualification Reports*Personnel Training

42ý/I, 2•

On Site Integration -.,Programs/procedures*Integration w! ASME ISIeStrategic planning g

Project Planning,*.Vendor RFQ/,Bid! Selection-Contingency planningoIntegration*into Outage Sched

Mobilization-Crew allocation and qual*Equipment allocation/

transport\1_1 J...... f

f

@ 2007 Electric Power Research Institute, Inc. All rights reserved. 45 200 EIrv ELECTRIC POWER45 RESEARCH INSTITUTE

Page 46: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Implementation of I&E Guidelines - Preliminary

MRP Insp RptTemplate

-IntemalsInspections

=> Comparew/ Criteria

:> InspectionReport

Mod/Repair

at later outage,'req'd

*>SummaryReports

Owner IncorpRequired

I&E GuideRev as Req'd

cc: MRPFocus Grp,

Periodic Eval& Trend Rpt)

RI Focus GrpEval & Trend

< other,. Insp. Rpts

46 ELECTRIC POWER46 E =0 1 RESARCHINSTITUTE© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 47: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Discussion

EL ECTRIC POWER47 qRESEARCH INSTITUTE© 2007 Electric Power Research Institute, Inc. All rights reserved.

Page 48: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Summary and Future Meetings

2007 Electric Power Research Institute, Inc- All rights reserved. 48 RESEARCH INSTITUTE

Page 49: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

I&E Guidelines Schedule and Milestones

L 11--.E ,'.1 --- 7 1__ _ -- -- --~

I I&E Guidelines ]- Draft by 12/07

-- to NRC by 12/08Tk

TfAREVA Insp - List,Locations & Patterns

IWest. Insp - List,Locations & Patterns

"NDE-- Draft by.andards"' 12107

--Draft by 9/07ISR-9) - Published,P__ ̂ 11/06

AREVA Basis" Functionality Analysis" FMECA - A, B, C (MRP-189 & -190)* Screening - A and Non-A

Westinghouse Basis• Functionality Analysio FMECA- A, B, C (M* Screening - A and Nlull-a

TrTk I

AM Framework, Screening Criteria,MRP-134 MRP-175

Inspection and Flaw EvaluationFramework, MRP-153

-- Published2005

© 2007 Electric Power Research Institute, Inc. All rights reserved. 49 ELECTRIC POWERRES.EARCH INSTITUTE

Page 50: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

r

Future NRC/RI-FG Meeting Plan

* November 2007- Functionality Analysis Results

- Inspection Strategy

- I&E Guidelines Including Inspection Methods andQualification

- I&E Guidelines Support of License Renewal Commitment

*2008- Standard Aging Management Program Submittal

007 Electric Power Research Institute, Inc. All rights reserved. 50 1.. i U i RESEARCH INSTITUTE© 21

Page 51: June 21, NRC Headquarters · 2012. 11. 29. · Purpose of Presentation • Request for'SER of I&E Guidelines ... (MRP-189, 190 & 191) including initial screening Categories A, B,

Thank you!