MONTHLY REPORT ON FUEL SUPPLY FOR GAS BASED POWER STATIONS IN THE COUNTRY For the month of JUN 2010 S. No Name of Power Station Installed Capacity @ (MW) Located in the State Gen $ (MUs) Gas Supplied/ Consumed+ (MMSCMD) Alternate fuel used(KL) Gen Loss due to short supply of Gas as reported (MUs) Gas Allotted (MMSCMD) Naptha HSD Remarks Gas * Requirement at 90% PLF (MMSCMD) CENTRAL SECTOR 1 FARIDABAD CCPP 431.59 HARYANA 259.34 1.81 0.00 0.00 1.86 0.00 2.07 2 ANTA CCPP 419.33 RAJASTHAN 191.80 1.37 0.00 0.00 1.34 0.00 2.01 3 AURAIYA CCPP 663.36 UTTAR PRADESH 364.59 2.80 95.62 0.06 2.83 0.00 3.18 4 DADRI CCPP 829.78 UTTAR PRADESH 484.38 1.77 0.00 0.00 2.94 0.00 3.98 2344.06 1300.11 8.97 7.75 0.06 Sub Total (NR) 95.62 0.00 11.24 5 GANDHAR CCPP 657.39 GUJARAT 392.04 2.72 0.00 0.00 3.17 0.00 3.16 6 KAWAS CCPP 656.20 GUJARAT 339.71 2.40 15.11 0.00 2.40 2.49 3.15 7 RATNAGIRI CCPP I 740.00 MAHARASHTRA 248.10 2.02 0.00 0.00 2.03 0.00 3.55 8 RATNAGIRI CCPP II 740.00 MAHARASHTRA 252.41 2.02 0.00 0.00 2.02 0.00 3.55 9 RATNAGIRI CCPP III 740.00 MAHARASHTRA 447.19 2.02 0.00 0.00 2.02 0.00 3.56 3533.59 1679.45 11.64 11.18 0.00 Sub Total (WR) 15.11 2.49 16.97 10 KATHALGURI CCPP 291.00 ASSAM 122.25 1.30 0.00 16.07 1.40 0.00 1.40 11 AGARTALA GT 84.00 TRIPURA 54.99 0.76 0.00 0.00 0.75 0.00 0.58 375.00 177.24 2.15 2.06 16.07 Sub Total (NER) 0.00 0.00 1.98 6252.65 3156.80 22.76 20.99 16.13 Total (CS) 110.73 2.49 30.19 STATE SECTOR 12 I.P.CCPP 270.00 DELHI 136.10 1.27 0.00 0.00 1.41 0.00 1.30 13 PRAGATI CCPP 330.40 DELHI 209.86 1.52 0.00 0.00 1.57 0.00 1.59 14 DHOLPUR CCPP 330.00 RAJASTHAN 211.12 1.38 0.00 0.00 1.50 0.00 1.58 15 RAMGARH CCPP 113.80 RAJASTHAN 22.21 0.44 0.00 0.00 0.75 0.66 1.18 1044.20 579.29 5.23 4.61 0.00 Sub Total (NR) 0.00 0.66 5.65 16 DHUVARAN CCPP 218.62 GUJARAT 64.20 0.43 0.00 0.00 0.82 0.00 1.05 17 HAZIRA CCPP 156.10 GUJARAT 87.86 0.65 0.00 0.00 0.80 0.00 0.75 18 UTRAN CCPP 518.00 GUJARAT 231.26 1.52 0.00 0.00 1.84 0.00 2.49 19 URAN CCPP 912.00 MAHARASHTRA 469.49 3.68 0.00 126.32 4.90 0.00 4.38 1804.72 852.81 8.36 6.28 126.32 Sub Total (WR) 0.00 0.00 8.67 20 KARAIKAL CCPP 32.50 PUDUCHERRY 17.14 0.16 0.00 5.51 0.15 0.00 0.16 21 KOVIKALPAL CCPP 107.00 TAMIL NADU 48.46 0.32 0.00 28.36 0.32 0.00 0.51 22 KUTTALAM CCPP 100.00 TAMIL NADU 46.35 0.31 0.00 0.00 0.31 0.00 0.48 23 NARIMANAM GPS 10.00 TAMIL NADU 0.00 0.00 0.00 0.00 0.00 0.00 Power station is not in operation 0.00 24 VALUTHUR CCPP 186.20 TAMIL NADU 0.00 0.00 0.00 0.00 0.00 Both the units are under shut down 0.89 435.70 111.95 0.78 0.79 33.87 Sub Total (SR) 0.00 0.00 2.04 25 LAKWA GT 120.00 ASSAM 59.84 0.85 0.00 5.49 0.94 0.00 0.84 26 NAMRUP CCPP 95.00 ASSAM 41.39 0.57 0.00 2.19 0.58 0.00 0.43 27 NAMRUP ST 24.00 ASSAM 4.67 0.10 0.00 0.30 0.08 0.00 0.14 28 BARAMURA GT 37.50 TRIPURA 14.46 0.21 0.00 0.00 0.24 0.00 0.26 29 ROKHIA GT 90.00 TRIPURA 37.43 0.62 0.00 0.00 0.60 0.00 0.63 366.50 157.79 2.44 2.35 7.98 Sub Total (NER) 0.00 0.00 2.30 1

Jun10

Embed Size (px)

Citation preview

Page 1: Jun10

MONTHLY REPORT ON FUEL SUPPLY FOR GAS BASED POWER STATIONS IN THE COUNTRY For the month of JUN 2010

S. No Name of Power Station

Installed Capacity @

(MW)

Located in the State

Gen $ (MUs)

Gas Supplied/ Consumed+ (MMSCMD)

Alternate fuel used(KL)

Gen Loss due to short supply

of Gas as reported (MUs)

Gas Allotted

(MMSCMD) Naptha HSD

Remarks Gas * Requirement at 90% PLF (MMSCMD)

CENTRAL SECTOR 1 FARIDABAD CCPP 431.59 HARYANA 259.34 1.81 0.00 0.00 1.86 0.00 2.07 2 ANTA CCPP 419.33 RAJASTHAN 191.80 1.37 0.00 0.00 1.34 0.00 2.01 3 AURAIYA CCPP 663.36 UTTAR PRADESH 364.59 2.80 95.62 0.06 2.83 0.00 3.18 4 DADRI CCPP 829.78 UTTAR PRADESH 484.38 1.77 0.00 0.00 2.94 0.00 3.98 2344.06 1300.11 8.97 7.75 0.06 Sub Total (NR) 95.62 0.00 11.24 5 GANDHAR CCPP 657.39 GUJARAT 392.04 2.72 0.00 0.00 3.17 0.00 3.16 6 KAWAS CCPP 656.20 GUJARAT 339.71 2.40 15.11 0.00 2.40 2.49 3.15 7 RATNAGIRI CCPP I 740.00 MAHARASHTRA 248.10 2.02 0.00 0.00 2.03 0.00 3.55 8 RATNAGIRI CCPP II 740.00 MAHARASHTRA 252.41 2.02 0.00 0.00 2.02 0.00 3.55 9 RATNAGIRI CCPP III 740.00 MAHARASHTRA 447.19 2.02 0.00 0.00 2.02 0.00 3.56 3533.59 1679.45 11.64 11.18 0.00 Sub Total (WR) 15.11 2.49 16.97 10 KATHALGURI CCPP 291.00 ASSAM 122.25 1.30 0.00 16.07 1.40 0.00 1.40 11 AGARTALA GT 84.00 TRIPURA 54.99 0.76 0.00 0.00 0.75 0.00 0.58 375.00 177.24 2.15 2.06 16.07 Sub Total (NER) 0.00 0.00 1.98 6252.65 3156.80 22.76 20.99 16.13 Total (CS) 110.73 2.49 30.19

STATE SECTOR 12 I.P.CCPP 270.00 DELHI 136.10 1.27 0.00 0.00 1.41 0.00 1.30 13 PRAGATI CCPP 330.40 DELHI 209.86 1.52 0.00 0.00 1.57 0.00 1.59 14 DHOLPUR CCPP 330.00 RAJASTHAN 211.12 1.38 0.00 0.00 1.50 0.00 1.58 15 RAMGARH CCPP 113.80 RAJASTHAN 22.21 0.44 0.00 0.00 0.75 0.66 1.18 1044.20 579.29 5.23 4.61 0.00 Sub Total (NR) 0.00 0.66 5.65 16 DHUVARAN CCPP 218.62 GUJARAT 64.20 0.43 0.00 0.00 0.82 0.00 1.05 17 HAZIRA CCPP 156.10 GUJARAT 87.86 0.65 0.00 0.00 0.80 0.00 0.75 18 UTRAN CCPP 518.00 GUJARAT 231.26 1.52 0.00 0.00 1.84 0.00 2.49 19 URAN CCPP 912.00 MAHARASHTRA 469.49 3.68 0.00 126.32 4.90 0.00 4.38 1804.72 852.81 8.36 6.28 126.32 Sub Total (WR) 0.00 0.00 8.67 20 KARAIKAL CCPP 32.50 PUDUCHERRY 17.14 0.16 0.00 5.51 0.15 0.00 0.16 21 KOVIKALPAL CCPP 107.00 TAMIL NADU 48.46 0.32 0.00 28.36 0.32 0.00 0.51 22 KUTTALAM CCPP 100.00 TAMIL NADU 46.35 0.31 0.00 0.00 0.31 0.00 0.48 23 NARIMANAM GPS 10.00 TAMIL NADU 0.00 0.00 0.00 0.00 0.00 0.00 Power station is not in operation 0.00 24 VALUTHUR CCPP 186.20 TAMIL NADU 0.00 0.00 0.00 0.00 0.00 Both the units are under shut down 0.89 435.70 111.95 0.78 0.79 33.87 Sub Total (SR) 0.00 0.00 2.04 25 LAKWA GT 120.00 ASSAM 59.84 0.85 0.00 5.49 0.94 0.00 0.84 26 NAMRUP CCPP 95.00 ASSAM 41.39 0.57 0.00 2.19 0.58 0.00 0.43 27 NAMRUP ST 24.00 ASSAM 4.67 0.10 0.00 0.30 0.08 0.00 0.14 28 BARAMURA GT 37.50 TRIPURA 14.46 0.21 0.00 0.00 0.24 0.00 0.26 29 ROKHIA GT 90.00 TRIPURA 37.43 0.62 0.00 0.00 0.60 0.00 0.63 366.50 157.79 2.44 2.35 7.98 Sub Total (NER) 0.00 0.00 2.30

1

Page 2: Jun10

S. No Name of Power Station

Installed Capacity @

(MW)

Located in the State

Gen $ (MUs)

Gas Supplied/ Consumed+ (MMSCMD)

Alternate fuel used(KL)

Gen Loss due to short supply

of Gas as reported (MUs)

Gas Allotted

(MMSCMD) Naptha HSD

Remarks Gas * Requirement at 90% PLF (MMSCMD)

3651.12 1701.84 16.81 14.03 168.17 Total (SS) 0.00 0.66 18.66

PVT SECTOR 30 VATWA CCPP 100.00 GUJARAT 69.91 0.52 0.00 0.00 0.49 0.00 0.48 31 TROMBAY CCPP 180.00 MAHARASHTRA 128.71 0.90 0.00 6.24 0.90 0.00 0.86 280.00 198.62 1.39 1.42 6.24 Sub Total (WR) 0.00 0.00 1.34 280.00 198.62 1.39 1.42 6.24 Total (PVT S) 0.00 0.00 1.34

PVT IPP SECTOR 32 BARODA CCPP 160.00 GUJARAT 68.60 0.50 0.00 0.20 0.45 0.00 0.77 33 ESSAR CCPP 515.00 GUJARAT 148.00 1.86 0.00 0.00 1.54 0.00 Allocation of gas is for 300 MW

capacity.

2.47

34 PEGUTHAN CCPP 655.00 GUJARAT 362.52 2.50 0.00 0.00 2.53 0.00 3.14 35 SUGEN CCPP 1147.50 GUJARAT 734.61 4.57 0.00 0.00 5.16 0.00 5.51 2477.50 1313.73 9.68 9.43 0.20 Sub Total (WR) 0.00 0.00 11.89 36 GAUTAMI CCPP 464.00 ANDHRA PRADESH 285.22 1.88 0.00 0.00 1.69 0.00 2.23 37 GODAVARI CCPP 208.00 ANDHRA PRADESH 140.67 1.01 0.00 0.00 1.01 0.00 1.00 38 JEGURUPADU CCPP 455.40 ANDHRA PRADESH 291.19 2.07 0.00 0.31 2.14 0.00 2.19 39 KONASEEMA CCPP # 445.00 ANDHRA PRADESH 175.00 1.33 0.00 0.00 1.33 0.00 2.14 40 KONDAPALLI EXTN CCPP . 233.00 ANDHRA PRADESH 101.37 1.12 0.00 0.00 1.59 0.00 1.62 41 KONDAPALLI CCPP 350.00 ANDHRA PRADESH 228.16 1.55 0.00 27.01 1.75 0.00 Gen. loss due to short supply of gas

by GAIL 1.68

42 PEDDAPURAM CCPP 220.00 ANDHRA PRADESH 142.77 1.00 0.00 0.00 1.00 2.00 1.06 43 VEMAGIRI CCPP 370.00 ANDHRA PRADESH 193.03 1.20 0.00 0.00 1.20 0.00 1.78 44 KARUPPUR CCPP 119.80 TAMIL NADU 51.85 0.35 0.00 0.00 0.50 0.00 0.58 45 P.NALLUR CCPP 330.50 TAMIL NADU 215.78 1.07 10293.24 0.00 1.07 4.00 1.59 46 VALANTARVY CCPP 52.80 TAMIL NADU 31.31 0.26 0.00 0.36 0.27 0.00 0.25 3248.5 1856.35 13.55 12.84 27.68 Sub Total (SR) 10293.24 6.00 16.12 47 DLF ASSAM GT 24.50 ASSAM 5.34 0.09 0.00 7.83 0.17 0.00 0.12 24.50 5.34 0.17 0.09 7.83 Sub Total (NER) 0.00 0.00 0.12 5750.5 3175.42 23.40 22.36 35.71 Total (PVT IPP S) 10293.24 6.00 28.13 GRAND TOTAL 15934.27 8232.68 64.36 58.80 226.25 10403.97 9.15

@ Installed Capacity is as on last day of the month * Normative gas requirement at 90 % PLF taking GCV of gas=9000k.Cal/SCM (except for Ramgarh CCGT for which GCV is 4150 kCal/SCM), station heat rate - 2900 k.Cal/kWh for open cycle and 2000 k.Cal/kWh for combined cycle. + Including R-LNG $ Provisional based on daily generation. #Konaseema CCPP (ST)165 MW commissioned in 30

th June 2010.

78.32

MUs - Million Units KL - Kilo Litre

HSD - High Speed Diesel - Data not available

2

MMSCMD - Million Standard Cubic Metre per day