1
Announcing the Commissioning of the Jumeirah Beach Residence District Cooling Central Plant. Central Plant expertise doesn’t come easy; in fact it can cost millions. TAS, the industry leader in manufacturing high efficiency packaged central plants, has developed a portfolio of standard chilled water plant designs ranging from 400 to 8,000 tons. TAS central plants, with pre-engineered modular designs, can easily be customized to meet your specific project requirements such as at the 60,000 ton central plant at the Jumeirah Beach Residence, the first packaged district cooling central plant in the GCC region. TAS’ factory manufactured approach to building chilled water central plants enabled the Jumeirah Beach Residence to achieve a 10-month schedule from purchase order to on-site delivery. A TAS packaged system can be operational in literally half the time usually required by a traditional field constructed central plant. TAS modular packaging technology – it mitigates your project risk, shortens your construction schedule and saves you money – both up front and over time – in reduced energy consumption over your central plant’s operating life. Highly refined engineering designs noted for best of class efficiency; quality ISO 9001:2000 packaging processes; and superior operating performance. Expertise – it’s a reputation that we’ve earned one project at a time. Come chill at the beach – Jumeirah Beach Residence, Dubai, UAE. www.tas.ae tomorrow’s forecast for jumeirah beach residence – sunny and chilled!

Jumerirah Beach Commissioning

Embed Size (px)

Citation preview

Page 1: Jumerirah Beach Commissioning

Announcing the Commissioning of the Jumeirah Beach Residence District Cooling Central Plant.

Central Plant expertise doesn’t come easy; in fact it can cost millions. TAS, the industry leader in

manufacturing high efficiency packaged central plants, has developed a portfolio of standard chilled water

plant designs ranging from 400 to 8,000 tons. TAS central plants, with pre-engineered modular designs,

can easily be customized to meet your specific project requirements such as at the 60,000 ton central

plant at the Jumeirah Beach Residence, the first packaged district cooling central plant in the GCC region.

TAS’ factory manufactured approach to building chilled water central plants enabled the Jumeirah Beach

Residence to achieve a 10-month schedule from purchase order to on-site delivery. A TAS packaged system

can be operational in literally half the time usually required by a traditional field constructed central plant.

TAS modular packaging technology – it mitigates your project risk, shortens your construction schedule

and saves you money – both up front and over time – in reduced energy

consumption over your central plant’s operating life.

Highly refined engineering designs noted for best of class efficiency;

quality ISO 9001:2000 packaging processes; and superior operating

performance. Expertise – it’s a reputation that we’ve earned

one project at a time.

Come chill at the beach – Jumeirah

Beach Residence, Dubai, UAE.

www.tas.ae

tomorrow’s forecast for jumeirah beach residence – sunny and chilled!

TAS_Construction_gate_ad_v2.indd1 1 10/9/06 7:14:42 PM