Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Task 4: Pilot Study. July 31, 2006 Robert Bertini Sue Ahn. Presentation Outline. Work Plan – Progress Pilot Study Data Collected Data Analysis Results Remaining Task – TAC input - PowerPoint PPT Presentation
Citation preview
Using Archived Data to Measure Using Archived Data to Measure Operational Benefits of a System-wide Operational Benefits of a System-wide
Adaptive Ramp Metering (SWARM) Adaptive Ramp Metering (SWARM) SystemSystem
Task 4: Pilot StudyTask 4: Pilot Study
July 31, 2006July 31, 2006
Robert BertiniRobert Bertini
Sue AhnSue Ahn
Presentation OutlinePresentation Outline
Work Plan – ProgressWork Plan – Progress Pilot StudyPilot Study
Data CollectedData Collected Data AnalysisData Analysis ResultsResults Remaining Task – TAC inputRemaining Task – TAC input
Recommendations for the Regional Recommendations for the Regional StudyStudy
Work Plan - ProgressWork Plan - Progress
Task 1: Literature ReviewTask 1: Literature Review Report under revisionReport under revision
Task 2: Corridor SelectionTask 2: Corridor Selection Report under reviewReport under review
Task 3: Data Collection PlanTask 3: Data Collection Plan Report under reviewReport under review
Task 4: Pilot StudyTask 4: Pilot Study Freeway performanceFreeway performance On-ramp performance - ongoingOn-ramp performance - ongoing
On-ramp Queue Storage: On-ramp Queue Storage: Morning Peak Hours (6:30-Morning Peak Hours (6:30-
8:30AM)8:30AM)
0
100
200
300
400
500
600
700
800
900
1000
Wils
hire
Wal
ker
B-H
Hw
y
Alle
n
Den
ney
Hal
l
Scho
lls-F
erry
Gre
enbu
rg
Paci
fic H
wy
72nd
On-ramps on ORE 217 southbound
Avg. h
ou
rly v
olu
me (
vph
)
0
200
400
600
800
1000
1200
1400
1600
1800
Qu
eu
e s
tora
ge (
ft)
Volume Queue storage
On-ramp Queue Storage: On-ramp Queue Storage: Morning Peak Hours (4:30-Morning Peak Hours (4:30-
6:30PM)6:30PM)
0
100
200
300
400
500
600
700
800
900
1000
Wils
hire
Wal
ker
B-H
Hw
y
Alle
n
Den
ney
Hal
l
Scho
lls-F
erry
Gre
enbu
rg
Paci
fic H
wy
72nd
On-ramps on ORE 217 southbound
Avg. h
ou
rly v
olu
me (
vph
)
0
200
400
600
800
1000
1200
1400
1600
1800
Qu
eu
e s
tora
ge (
ft)
Volume Queue storage
Pilot Study: Data CollectionPilot Study: Data Collection
Location of On-rampsMeter: Outflows (Merging Rate)
Entrance: Inflows
Barnes Rd. / US26W Loop
US 26E Road tube CCTV camera
Wilshire Rd. Loop Road tube, Portable camera
Walker Rd. Loop CCTV camera
B-H Hwy LoopCCTV camera, Portable
camera
Allen Blvd. Loop CCTV camera
Denney Rd. Loop CCTV camera
Hall Blvd. Loop Road tube, Portable camera
Scholls-Ferry Rd. LoopCCTV camera, Portable
camera
Greenburg Rd. Loop CCTV camera
Pacific Hwy Loop CCTV camera
72nd Ave. Loop CCTV camera
Pilot Study: Data CollectionPilot Study: Data Collection
Pre-timed: June 19 – 23, 2006Pre-timed: June 19 – 23, 2006 SWARM: June 26 – 30, 2006SWARM: June 26 – 30, 2006
Accidents: June 21 and June 30 Accidents: June 21 and June 30 (excluded from analysis)(excluded from analysis)
Weather: Comparable (high Weather: Comparable (high temperature on the 2temperature on the 2ndnd week) week)
Pilot Study: Data AnalysisPilot Study: Data Analysis
Data Quality: Communication FailuresData Quality: Communication Failures Freeway: VMT, VHT, Travel Time, Freeway: VMT, VHT, Travel Time,
DelayDelay On-ramps: Queue spill-overOn-ramps: Queue spill-over
FrequencyFrequency DurationsDurations Total delay: on-going Total delay: on-going Challenge Challenge
Communication FailuresCommunication Failures
0%
2%
4%
6%
8%
10%
12%
14%
16%
Bar
nes
Rd.
Wils
hire
Rd.
Wal
ker
Rd.
B-H
Hw
y
Alle
n B
lvd.
Den
ney
Rd.
Hal
l Blv
d.
Scho
lls-F
erry
Rd.
Gre
enbu
rg R
d.
Paci
fic H
wy
On-ramps on ORE 217 southbound
% C
om
munic
ati
on f
ailure
s Pre-timed
SWARM
Performance Measures (6-Performance Measures (6-9AM)9AM)
VMT VHTTravel-Time
(minutes)
Delay (veh-hrs)
Pre-Timed 65,871 1,337 8.8 210
SWARM 66,426 1,416 9.2 283
% Change 0.8% 6.0% 5.1% 34.7%
What happened??What happened??
SWARM is not operating optimally SWARM is not operating optimally Parameters need to be fine-tunedParameters need to be fine-tuned Effect of communication failuresEffect of communication failures Smaller discharge rate from the Smaller discharge rate from the
bottleneckbottleneck Larger freeway delay but smaller Larger freeway delay but smaller
system-wide delaysystem-wide delay Larger inflow from the on-rampsLarger inflow from the on-ramps Short pilot study duration: The results Short pilot study duration: The results
are not statistically significant.are not statistically significant.
Delay (Pre-timed)Delay (Pre-timed)
Travel Direction
Diff
ere
nce
in d
ela
y (
vehic
le-h
ours
)
Delay (SWARM)Delay (SWARM)
Travel Direction
Diff
ere
nce
in d
ela
y (
vehic
le-h
ours
)
Change in Delay Change in Delay (SWARM – Pre-timed) (SWARM – Pre-timed)
Travel Direction
Diff
ere
nce
in d
ela
y (
vehic
le-h
ours
)
Change in DelayChange in Delay
0
10
20
30
40
50
60
70
Barnes
Wilshire
Walker
Bhhwy
Allen
Denney Ha
ll
Scholls
Greenburg
99W
Pre-timed
SWARM
Dela
y (
veh-h
rs)
On-ramp Volumes: On-ramp Volumes: Morning Peak Hours (6:30-Morning Peak Hours (6:30-
8:30AM)8:30AM)
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Barn
es
Wils
hire
Wal
ker
B-H
Hw
y
Alle
n
Den
ney
Hal
l
Scho
lls-
Ferr
y
Gre
enbu
rg
Paci
fic H
wy
On-ramps on ORE 217 Southbound
On-r
am
p v
olu
me (
vehic
les)
Pre-timed
SWARM
Pilot Study: Queue Spill-overPilot Study: Queue Spill-over
Location of On-ramps
Pre-timed SWARM
Walker Rd. No spill-over No spill-over
B-H Hwy Spill-over No spill-over
Allen Blvd. No spill-over No spill-over
Denney Rd. No spill-over No spill-over
Hall Blvd. No spill-over No spill-over
Scholls-Ferry Rd. No spill-over Spill-over
Pilot Study: Queue Spill-overPilot Study: Queue Spill-over
Location of On-ramps
Pre-timed SWARM
Walker Rd. No spill-over No spill-over
B-H Hwy Spill-over No spill-over
Allen Blvd. No spill-over No spill-over
Denney Rd. No spill-over No spill-over
Hall Blvd. No spill-over No spill-over
Scholls-Ferry Rd. No spill-over Spill-over
Pilot Study: Queue Spill-overPilot Study: Queue Spill-over
Total DurationFrequen
cyAvg. Duration
Pre-timed
25.2 mins 12 2.1 mins
SWARM 43.1 mins 9 5.0 mins
Scholls-Ferry Rd.
Total DurationFrequen
cyAvg. Duration
Pre-timed
11-12 mins (on 19th 22nd)
1 11-12 mins
SWARM 0 0 0
Beaverton-Hillsdale Highway
Next StepsNext Steps
Reasons for the increase in delayReasons for the increase in delay More analysis on on-rampsMore analysis on on-ramps
Total delay? – require counts at metersTotal delay? – require counts at meters Travel time (sampling frequency)Travel time (sampling frequency)
ReportReport
RecommendationsRecommendations
Data near bottleneck to measure Data near bottleneck to measure bottleneck discharge flowbottleneck discharge flow
Agree on performance measure for Agree on performance measure for on-rampson-ramps Total delay, queue length, queue spill-Total delay, queue length, queue spill-
overover All or selected on-rampsAll or selected on-ramps
Data collection method for on-rampsData collection method for on-ramps Video: time-consuming for total delayVideo: time-consuming for total delay