  • Ju-Goang Lee

  • A Study on the Development of A Study on the Development of

    Korea Korea GreenroadsGreenroads Rating SystemRating System1. Present State of Green Certification System in Domestic and Foreign Regions2. Development of Korean Evaluation Indicators for Greenroads Certification System 3. Results of Pilot Project4. Future Directions

  • 1. Present 1. Present State of Green State of Green Certification SystemCertification Systemin in Domestic and Foreign RegionsDomestic and Foreign Regions

  • � Building area is the area that is most closely approached by consumers (users)

    Compared to other construction products, and because they are eco-friendly products,

    Visible effects are great, leading to sudden increase in consumption globally.

    � For this, Green Certification System, which is the construction guideline that considers energy and environment, expanded.

    � Eco-friendly Certification System ; BREEM(England), LEED(United States), Green Star(Australia), CASBEE(Japan),

    Certified as Eco-friendly Construction(South Korea]

    � Title and Evaluation Content of Eco-friendly Certification System differ for every nation,

    But the core content of the measurement items are equivalent

    � Important Evaluation Criteria that signifies Green Buildings are divided into 5 kinds which are ①Energy Efficiency,②Quality of Inner Environment, ③Efficiency of Water Circulation, ④ Material Efficiency,⑤Construction Process� In case of Green Buildings it has been reported that ①①①①Energy Consumption reduces

    30∼∼∼∼50%, ②②②②CO2 Emission Decreases by 35%, ③③③③Amount of Wastes decreases by 70%,④④④④Amount of Water Usage Decreases by 40%� Meanwhile, only an average of 5% in additional fees for construction

    BuildingsBuildings(Foreign)(Foreign)

  • � Green Certification System for Domestic Constructions include a eco-friendly

    Construction Certification System operated by MLTM and ME(Ministry of Environment)

    � 4 Benefits of Certification System includes Mitigation of Environmental Improvement Charges

    (greatest 50%), Alleviation of Acquisition Fees‧Registration Fees(greatest 15%),Mitigation of Construction Standard(Greatest 12%), Special Support(Only within Seoul)

    BuildingsBuildings(South Korea](South Korea]❙Procedures for Design Phase❙ ❙ Procedures for Approval ❙ ❙ Procedures for Maintenance ❙

  • � Green Certification System

    � Targets

    - Green Technology Certification: 10 areas,

    60 focused areas

    - Certification as Green Manufacturer: Increase

    in sales by30% through Green Technology and

    certified as Green Company to corporate that

    accomplishes the goal

    � Method: Green, Technology, Marketability

    are evaluated and if over 70 points out of

    100 points, will be turned over to review

    committee to make final decisions

    � Benefits: Currently, details are being

    decided about direct and indirect benefits

    - For example: National R&D points, Preference of

    Limited Export Guarantee, etc.

    Green Certification for Green Certification for Green Certification for Green Certification for Technology and CorporationsTechnology and CorporationsTechnology and CorporationsTechnology and Corporations� Domestic Carbon Labeling System

    � Target: All products excluding primary

    field livestocks and forest products,

    medication and medical appliances

    � Benefits: Eco-friendly Image of the

    Company’s brand is enhanced,

    Government Recommendation

    Support for Public Relation by Media

    � Foreign Carbon Labeling System

    � Introduced in England, France,

    United States

    � In foreign countries, the objective is to

    provide amount of CO2 by marking it on

    products than focusing on benefits of

    incorporation

    Green Certification Green Certification Green Certification Green Certification for Productsfor Productsfor Productsfor Products

  • ❙Application level of Greenroads Certification❙ ❙Ranking of Greenroads Certification❙� Greenroads certification system is rated the Silver, Gold, Evergreen by evaluatingthe road projects which are designing and under construction.

    � Silver is between 40-50%(43-53points) level and granted when volunteering eco-friendly

    activities are conducted

    � Gold is between 50-60%(54-63points) level of overall

    � Evergreen is granted when activity takes up 60% of overall activities (64 points)

    � In addition, when it is between 30~40% level of overall the overall points (32-42 points),

    Certified level is granted

    American American GreenroadGreenroadCertification SystemCertification System(Evaluation System)(Evaluation System) ❙Greenlites Magnitudes of Certified Class(NY)❙

  • � Registration for Certification� Applicant Are divided into general class, levels,

    maintenance business type, owner alignment

    type, construction alignment type, and others

    select from one of the 5 review packages

    � Assigned to certified Greenroad reviewer after

    inserting the project information

    � Certification Registration � Pay certification fees after receiving the manual

    and screening consent

    � Certification Audit

    If conditions of individual credits are ready while

    progressing the project, related documents are

    inserted on Greenroads Certification Organization

    � Post Management� After Certification, progress of the business should

    regularly be reported to Greenroads Certification

    Organization (recommended)

    � After certification, report should be submitted

    after 5 years (required) ❙greenroads Certifying Process❙

  • � CEEQUAL of England is the eco-friendly certification system that emphasizes

    the environmental and functional sustainability in civil engineering and

    public sector projects

    � Targets of Certification are the overall SOC facilities and It is formed of evaluative functions

    and divided into 4 rankings on the stage right before construction

    � The desire for sustainability is stronger than eco-friendly application

    � Certification is granted if more than 25% are attained out of 2,000 points formed

    of 208 questions . (best ranking 75%)

    � CEEQUAL Evaluative System

    � Evaluative Formation : Applicant, Evaluator(Substitute for Applicant fills out evaluation chart),

    Formed of verifier(CEEQUAL substitute that certifies the filled out evaluation chart)

    � Evaluative Criteria: Project Management(10.9%), Land Application(7.9%), Landscape(7.4%),

    Ecosystem Management(8.8%), Historical Background(6.7%), Water Resources

    and Water Environment(8.5%), Energy and Carbon Emission(9.5%), Material

    Application(9.4%), Waste Management System(8.4%), Traffic(8.1%),

    Influence of surrounding environment(7.0%), Community(8.1%)

    CEEQUAL of CEEQUAL of EnglandEngland

  • � Australian AGIC is an eco-friendly certification system that takes Englands

    CEEQUAL as its motive and adds social and economical elements bring in sustainability

    � Certification targets are the overall SOC facilities and are possible to be evaluated

    during the stage before construction

    � It is not as activated as Greenroads of United States or CEEQUAL of England

    � Specific Evaluation System or Manual do not exist yet

    � In AGIC Evaluative Criteria, there are 7 criteria and 23 specific criteria

    � Evaluative Criteria : Project Management and Policies, Economical Analysis,

    Utility of Resources, Amount of Exhausted Waste,

    Ecological Management, Influence on the Community,

    Construction Workers and working environment

    AGIC of Australia AGIC of Australia AGIC of Australia AGIC of Australia AGIC of Australia AGIC of Australia AGIC of Australia AGIC of Australia

  • 2. Development 2. Development of Korean Evaluation Indicators of Korean Evaluation Indicators for for GreenroadsGreenroads Certification SystemCertification System

  • � In terms of highway construction projects, development of Greenroads Certification and manual based on this criteria is under developmental plans� Index is set so that Greenroads Certification can be utilized when selecting construction or contractorsSimple and Simple and QuantitativeQuantitativeEvaluationEvaluation � Non-evaluators will easily decide the evaluative range and criteria� Alimentation of qualitative evaluation� Made Simple and Clear so that non-professionals can easily understand

    � Evaluative criteria is constructed so that it can be evaluated quantitativelyMaintainingMaintainingCompatibilityCompatibilityWith United StatesWith United States � Compatibility with American Greenroads Certification is applied on evaluative criteria and index � Only criteria that does not fit domestic law was suggested for exchangeMinimizing EffortsMinimizing EffortsUsed for EvaluationUsed for Evaluation � Form that is necessary for evaluation is developed, and made so that it can be written in minimized amount of time � Existing form should be applied to the maximum for document submitted for evaluation. Efforts put into producing new forms should be minimized

  • � Environmental Review Process� (Lifecycle Cost Analysis, LCA� Lifecycle Inventory, LCI� Quality Control Plan� Noise Mitigation Plan� Waste Management Plan� Pollution Prevention Plan� Low-impact Development, LID, for stormwater� Pavement Management Plan� Site Management Plan for environment, utilities� Educational Outreach – Publicize sustainability info.

    � Part 1. Project Requirements(PR, 11 necessary criteria for certification)� Environment & Water (EW, 8 Items, Total 21 Credits)� Access & Equity (AE, 9 Items, Total 30 Credits)� Construction Activities (CA, 8 Items, Total 14 Credits)� Materials & Resources (MR, 6 Items, Total 23 Credits)� Pavement Technology (PT, 6 Items, Total 20 Credits)� Custom Credit (CC, 1 Items, Total 10 Credits)

    � Part 2. Voluntary Credits(VC, Additional Criteria for Certification, 6 areas,38 items, Total of 118 Points)By considering compatibility with Greenroads Certification of United States, evaluative criteria is set in equivalent terms.

    - 11 necessary criteria and 38 additional criteria (6 criteria, 38 items, 118points)

    However, detailed items of Voluntary Credits are partially adjusted to fit domestic law.

  • 3. 3. Results of Pilot ProjectResults of Pilot Project

  • Site of Pilot Project : Construction in Line 600 of Highway

    in Outer ring of Busan (6th area)

    Project Period : 2011 - 2016(1,500 days)

    Expenses : 118.3 billion won(including taxes),Payments of Materials (17.3 billion won) paid separately

    Purposes

    � Part of the project of constructing 9th floor lines in nationwide main roads

    � Through the processing of bypass in traffic of Gimhae and Downtown Busan, it is part of the

    highway (L=48.8km) in outer ring roads of Busan, and the total extension is 4.735km, 4 lane roads

    [Tunnels: About 4.3km]

    � Activation in interaction between Busan and East-West Kyung Nam area is set as the goal

    � Through this project, Green Highway will be established in large cities through

    elimination of delays and holdings

    � Improvement in Accessibility in Gimhae of Kyungnam area and Busan of East-

    West decentralization, Activation of Regional Development and Promote

    discovery of Tourism Resources

  • Design Report (Machinery, Electricity, etc)Construction Management PlanVE (Value Engineering) ReportReport on Preventive Plans for DisasterStructure and Repair BillVarious Bills (Machinery and others)Load Statement (Architecture)Report on Geotechnical InvestigationReport on Tunnel Analysis

  • Results on Pilot ProjectBased on the results of pilot projects on construction (6th area) on the Line 600 Outer ring of Busan, only 5 out of 11 requirements were satisfied,resulting as uncertified ranking� In order to becoming certified as Greenroads, all 11 requirements

    must be implemented and documented.

    Voluntary Credits (VC) had 32 points and if all of the requirements were accomplished,it will be certified as Greenroads

  • Evaluation Results of Proj. RequirementsThis construction satisfied 5 out of 11 criteria of the project requirements

    � Criteria of Acquired Scores : Environmental Review Process, Life Cycle Cost Analysis,

    Quality Control Plan, Noise Mitigation Plan, Waste Management Plan

    � Criteria for Scores not Acquired : Life Cycle Inventory, Pollution Prevention Plan,

    Low Impact Development, Pavement Management

    System, Site Maintenance Plan, Educational Outreach

  • Evaluation Results of EWThis construction acquired 10 out of 21 points for the criteria of environment and waterThere were efforts in constructing eco-friendly highways, but partial criteria were insufficient� Criteria of Acquired Scores : Environment Management System, Runoff Quality, Site Vegetation,

    Ecological Connectivity, Light Pollution

    � Criteria for Scores not Acquired : Runoff Flow Control, Stormwater Cost Analysis,

    Habitat Restoration

  • Evaluation Results of AEThis construction acquired 5 out of 30 points for the criteria of Access & EquityEfforts were put into constructing eco-friendly highways, but partial criteria were insufficient� Criteria of Acquired Scores : Scenic Views, Cultural Outreach

    � Criteria for Scores not Acquired : Safety Audit, Intelligent Transportation System, Context

    Sensitive Solution, Traffic Emissions Reduction, Biological

    distinction between straight traffic passage and flow traffic,

    Single-purpose roads for vehicle cargo and design and constructing

    crossroads, Transit Access

  • Evaluation Results of CAThis construction acquired 4 out of 14 points for criteria of construction activitiesOut of the criteria of construction activities, plans were established for areas related to institutional regulations such as quality and environmentHowever, plans for detailed practical criteria was relatively insufficient� Criteria of Acquired Scores : Quality Management System, Environmental Training,

    Site Recycling Plan

    � Criteria for Scores not Acquired : Fossil Fuel Reduction, Equipment Emissions Reduction,

    Paving Emissions Reduction, Water Tracking, Contractor Warranty

  • Evaluation Results of MRThis construction acquired 12 out of 23 points on criteria of materials and resourcesOut of the evaluation criteria of materials and resources, plans were established from designing stage for most criteria If there are application regulations, design and plans were established according to the guidelines of the regulations� Criteria of Acquired Scores : Pavement Reuse, Recycled Materials, Energy Efficiency,

    Regional Materials

    � Criteria of Scores not Acquired : Life Cycle Assessment, Earthwork Balance

  • Evaluation Results of PTThis construction acquired 1 out of 20 points for the criteria of pavement technology For the evaluation criteria of pavement technology, various technology considered the environment before being applied on the design, but it was not in the level to acquire scores design Thus, expanded application of various pavement technology are necessary� Criteria of Acquired Scores : Pavement Performance Tracking

    � Criteria for Scores not Acquired : Long-Life Pavement, Permeable Pavement, Warm Mix Asphalt,

    Cool Pavement, Quiet Pavement

  • Scorecard of Pilot ProjectPoint Totals

    A = Achieved by this project

    P = Potentially achievable with low additional effort

    M = Maximum achievable regardless of additional effort

    Certification Levels

    C = Certified (All PR’s Met + At Least 32 Points)

    S = Silver (All PR’s Met + At Least 43 Points)

    G = Gold (All PR’s Met + At Least 54 Points)

    E = Evergreen (All PR’s Met + At Least 64 Points)

    In this Final Report on Pilot Project, additional efforts that are need in order to

    gain points for unaccomplished criteria are included.

    � The criteria where points can be earned with relatively minor efforts are marked and distinguished

    as potential acquisition scores

    � These criteria can be input with small efforts and without paying additional fees, so scores can be

    acquired by conducting additional documentation or analysis

    � Through 46, these potential acquisition scores can be certified as silver ranking of Greenroads

  • Scorecard of Pilot Project

    Scores and Ranking that can be certified through

    investment of additional fees and maximized efforts are

    included in the EverGreen ranking with 81 points

  • 4. Future Directions4. Future Directions

  • Additional ConductAdditional ConductOf Pilot ProjectOf Pilot Project � By conducting 2 more demonstrated projects, criteria not fitting with domestic laws should be exchanged, eliminated, or implemented after making changes on standardsSet IndicatorsSet Indicatorsto meetto meetObjectives ofObjectives ofCertificationCertification � Just like the United States, it is necessary to implement with objectives such as public promotion and regional economic activation as well as differentiation in index � Constructing Korean type of Greenroads Certification or when selecting construction corporation, index will be set in order to be utilized

    � organization and services (designer or contractor) is mixed, so fixation is

    needed Ranking ofRanking ofEvaluation scoresEvaluation scores � In terms of the index mutually offset from the detailed evaluation criteria, alternative index is used and score ranking is being planned (For example ,long lasting pavement, mesophilic asphalt, permeable pavements, pavements with little noise cannot be implemented at the same time so when

    score is acquired from one criteria, it is impossible to acquire score from

    others.)