FIE
LD
C
ON
ST
RU
CT
IO
N
JO
Y O
F T
HE
P
EO
PL
E
So
uth
S
ain
t A
nth
on
y R
ec
re
atio
n C
en
te
r
89
0 C
RO
MW
EL
L A
VE
NU
E
ST
. P
AU
L, M
N 5
51
14
TIT
LE
SH
EE
T
17060
02/15/2017
JR
P
JR
P
6
VICINITY MAP DRAWING INDEXGENERAL NOTES
T1.0 TITLE SHEET
EX.1 SITE SURVEY
C1.1 REMOVALS PLAN
C1.2 LAYOUT, FINISHING AND LANDSCAPING PLAN
C1.3 GRADING AND DRAINAGE PLAN
C2.1 SITE DETAILS
FIELD CONSTRUCTION
JOY OF THE PEOPLE /
SOUTH SAINT ANTHONY
RECREATION CENTER
JOY OF THE PEOPLE
890 CROMWELL AVENUE
ST. PAUL, MN 55114
1. ALL CONSTRUCTION MUST COMPLY WITH APPLICABLE STATE AND LOCAL ORDINANCES.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR AND SHALL PAY FOR ALL CONSTRUCTION STAKING / LAYOUT.
3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL RELATED CONSTRUCTION PERMITS. SUBMIT A COPY OF ALL PERMITS
TO THE CITY.
4. INSTALL CONTROL FENCING AND BARRICADING AS NECESSARY TO PROTECT THE PUBLIC.
5. INSPECT SITE AND REVIEW SOIL BORINGS TO DETERMINE EXTENT OF WORK AND NATURE OF MATERIALS TO BE HANDLED.
6. REFER TO SPECIFICATIONS FOR DEWATERING REQUIREMENTS.
7. CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT.
8. REFER TO THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE, PART OF SECTION 01 89 13, FOR EROSION
CONTROL REQUIREMENTS. SECTION 31 00 00 SHALL BE RESPONSIBLE FOR FULL IMPLEMENTATION OF THE SWPPP.
9. MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED DIRT AND DEBRIS ON A DAILY
BASIS. PROTECT DRAINAGE SYSTEMS FROM SEDIMENTATION AS A RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS.
10. MAINTAIN DUST CONTROL DURING GRADING OPERATIONS.
11. ALL EROSION CONTROL METHODS SHALL COMPLY WITH MPCA AND LOCAL REGULATIONS.
12. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING SITE FEATURES (INCLUDING TURF AND
VEGETATION) WHICH ARE TO REMAIN.
13. PROPOSED CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISH GRADE UNLESS OTHERWISE NOTED.
14. PROPOSED ELEVATIONS SHOWN TYPICALLY AS 02.1 OR 02 SHALL BE UNDERSTOOD TO MEAN 202.1 OR 202.
15. SPOT ELEVATIONS SHOWN INDICATE TOP OF CURB OR TOP OF TURF GRADES, UNLESS NOTED OTHERWISE.
16. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DETERMINING QUANTITIES OF CUT, FILL AND WASTE MATERIALS TO
BE HANDLED, AND FOR AMOUNT OF GRADING TO BE DONE IN ORDER TO COMPLETELY PERFORM ALL WORK INDICATED ON
THE DRAWINGS. IMPORT SUITABLE MATERIAL AND EXPORT UNSUITABLE / EXCESS / WASTE MATERIAL AS REQUIRED. ALL
COSTS ASSOCIATED WITH IMPORTING AND EXPORTING MATERIALS SHALL BE INCIDENTAL TO THE CONTRACT.
17. NO FINISHED SLOPES SHALL EXCEED 4' HORIZONTAL TO 1' VERTICAL (4:1), UNLESS OTHERWISE NOTED.
18. ALL DISTURBED AREAS WHICH ARE NOT DESIGNATED TO BE PAVED OR RECEIVE TURF SHALL RECEIVE AT LEAST 6" OF
TOPSOIL AND SHALL BE SEEDED. REFER TO SHEETS C1.2 FOR SEED LOCATIONS.
19. FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN ACCEPTABLE TURF, THE
CONTRACTOR SHALL RE-SEED ALL APPLICABLE AREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF
THE ENGINEER.
20. ALL STORM SEWER PIPE SHALL BE PVC PIPE (ASTM D3034, SDR 35) INSTALLED IN ACCORDANCE WITH ASTM D2321, UNLESS
OTHERWISE NOTED.
21. FLEXIBLE JOINTS AT STORM SEWER PIPE CONNECTIONS TO STRUCTURES:
a. IN ACCORDANCE WITH MINNESOTA PLUMBING CODE, PROVIDE FLEXIBLE JOINTS AT ALL PIPE CONNECTIONS TO ALL
STORM SEWER STRUCTURES.
b. ACCEPTABLE MANUFACTURERS / PRODUCTS:
i. FERNCO, “CONCRETE MANHOLE ADAPTORS” OR “LARGE-DIAMETER WATERSTOPS”
ii. PRESS-SEAL, WATERSTOP GROUTING RINGS”
iii. OR APPROVED EQUAL.
22. ANY MANHOLE, CATCH BASIN, STORM SEWER, DRAINTILE OR OTHER POTENTIAL SOURCE FOR CONTAMINATION SHALL BE
INSTALLED AT LEAST 10 FEET HORIZONTALLY FROM ANY WATERMAIN PER MINNESOTA PLUMBING CODE. THIS ISOLATION
DISTANCE SHALL BE MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION
SOURCE (OUTER EDGE OF STRUCTURES OR PIPING OR SIMILAR).
23. LOCATE ALL EXISTING UTILITIES, VERIFY LOCATION, SIZE AND INVERT ELEVATION OF ALL EXISTING UTILITIES. VERIFY
LOCATIONS, SIZES AND ELEVATIONS OF SAME BEFORE BEGINNING CONSTRUCTION.
24. CONTRACTOR SHALL MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES. PROVIDE TEMPORARY STORM SEWER
(INCLUDING, BUT NOT LIMITED TO, CATCH BASINS, MANHOLES, PIPING, ETC.) AS REQUIRED. EXISTING STORM SEWER SHALL
NOT BE REMOVED UNTIL TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED AND FUNCTIONAL. COORDINATE ALL
REMOVALS WITH APPROPRIATE TRADES (SITE UTILITY CONTRACTOR, MECHANICAL CONTRACTOR, ETC.) AS REQUIRED.
25. THE CONTRACTOR SHALL, AT THE COMPLETION OF THE PROJECT, PROVIDE AS-BUILT DRAWINGS ILLUSTRATING ALL UTILITY
WORK INCLUDING STORM SEWER, DRAIN TILE AND ALL APPURTENANCES WHICH WERE INSTALLED OR ENCOUNTERED ON
THE SITE.
City- 0
4/0
4/1
7
City- 0
6/1
4/1
7
1. INSPECTION CONTACT: THE DEVELOPER SHALL CONTACT THE RIGHT OF WAY INSPECTOR DICK ROHLAND AT 651-485-1688 ONE WEEK PRIOR TO BEGINNING WORK TO DISCUSS
TRAFFIC CONTROL, PEDESTRIAN SAFETY AND COORDINATION OF ALL WORK IN THE PUBLIC RIGHT OF WAY. NOTE: IF A ONE WEEK NOTICE IS NOT PROVIDED TO THE CITY, ANY
RESULTING DELAYS SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. AS PART OF THE ROW PERMITTING PROCESS, TWO WEEKS BEFORE ANY WORK BEGINS THAT
IMPACTS THE ROW IN ANY WAY THE DEVELOPER SHALL PROVIDE TO THE ROW INSPECTOR THE NAME AND CONTACT INFORMATION OF THE CONSTRUCTION PROJECT MANAGER OR
CONSTRUCTION PROJECT SUPERINTENDENT. IF THIS INFORMATION IS NOT PROVIDED THERE MAY BE A DELAY IN OBTAINING PERMITS FOR THE WORK IN THE ROW. SAID DELAYS WILL
BE THE SOLE RESPONSIBILITY OF THE DEVELOPER.
2. SAFE WORK SITE REQUIREMENTS: THE CONTRACTOR SHALL PROVIDE A CONTINUOUS, ACCESSIBLE AND SAFE PEDESTRIAN WALKWAY THAT MEETS ADA AND MN MUTCD STANDARDS
IF WORKING IN A SIDEWALK AREA, AND TRAFFIC CONTROL PER MN MUTCD REQUIREMENTS FOR WORK IN THE PUBLIC RIGHT OF WAY.
3. ROADWAY RESTORATION: AS PER THE CITY'S "STANDARD SPECIFICATION FOR STREET OPENINGS" POLICY, RESTORATION ON ROADWAY SURFACES LESS THAN 5 YEARS OLD WILL
REQUIRE FULL WIDTH MILL AND OVERLAY OR ADDITIONAL DEGRADATION FEES. DEGRADATION FEES ARE DETERMINED BY CONTACTING THE RIGHT OF WAY SERVICE DESK AT
651-266-6151. PAVEMENT RESTORATION SHALL BE COMPLETED BY THE ST. PAUL PUBLIC WORKS STREET MAINTENANCE DIVISION. ALL RELATED COSTS ARE THE RESPONSIBILITY OF
THE DEVELOPER/CONTRACTOR. CONTACT STREET MAINTENANCE AT 651.266.9700 FOR ESTIMATE OF COSTS FOR PAVEMENT RESTORATION.
4. ORDERING OBSTRUCTION AND EXCAVATION PERMITS: CONTACT PUBLIC WORKS RIGHT OF WAY SERVICE DESK AT 651-266-6151. IT IS STRONGLY RECOMMENDED THAT
CONTRACTORS CALL FOR COST ESTIMATES PRIOR TO BIDDING TO OBTAIN ACCURATE COST ESTIMATES.
5. OBSTRUCTION PERMITS: THE CONTRACTOR MUST OBTAIN AN OBSTRUCTION PERMIT IF CONSTRUCTION (INCLUDING SILT FENCES) WILL BLOCK CITY STREETS, SIDEWALKS OR
ALLEYS, OR IF DRIVING OVER CURBS.
6. EXCAVATION PERMITS: ALL DIGGING IN THE PUBLIC RIGHT OF WAY REQUIRES AN EXCAVATION PERMIT. IF THE PROPOSED BUILDING IS CLOSE TO THE RIGHT OF WAY, AND
EXCAVATING INTO THE RIGHT OF WAY IS NEEDED TO FACILITATE CONSTRUCTION, CONTACT THE UTILITY INSPECTOR.
7. FAILURE TO SECURE PERMITS: FAILURE TO SECURE OBSTRUCTION PERMITS OR EXCAVATION PERMITS WILL RESULT IN A DOUBLE-PERMIT FEE AND OTHER FEES REQUIRED UNDER
CITY OF ST. PAUL LEGISLATIVE CODES.
8. CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO THE MAINLINE SIDEWALK, CURB, DRIVE ACCESS AND BOULEVARD LANDSCAPING CAUSE DURING THE CONSTRUCTION. CONTRACTOR
ADVISED TO DOCUMENT PRE-EXISTING CONDITION OF THE RIGHT OF WAY PRIOR TO COMMENCEMENT OF THE CONSTRUCTION.
9. SIDEWALK GRADES MUST BE CARRIED ACROSS DRIVEWAYS.
10. A CONSTRUCTION IN RIGHT OF WAY: ALL WORK ON CURBS, DRIVEWAYS, AND SIDEWALKS WITHIN THE PUBLIC RIGHT OF WAY MUST BE DONE TO CITY STANDARDS AND
SPECIFICATIONS BY A CONTRACTOR LICENSED TO WORK IN THE CITY RIGHT-OF-WAY UNDER A PERMIT FROM PUBLIC WORKS SIDEWALK SECTION 651-266-6108. SIDEWALK GRADES
MUST BE CARRIED ACROSS DRIVEWAYS.
11. RIGHT OF WAY RESTORATION: RESTORATION OF ASPHALT AND CONCRETE PAVEMENTS ARE PERFORMED BY THE PUBLIC WORKS STREET MAINTENANCE DIVISION. THE CONTRACTOR
IS RESPONSIBLE FOR PAYMENT TO THE CITY FOR THE COST OF THESE RESTORATIONS. THE CONTRACTOR SHALL CONTACT PUBLIC WORKS STREET MAINTENANCE TO SET UP A
WORK ORDER PRIOR TO BEGINNING ANY REMOVALS IN THE STREET AT 651-266-9700. PROCEDURES AND UNIT COSTS ARE FOUND IN STREET MAINTENANCE'S "GENERAL
REQUIREMENTS – ALL RESTORATIONS" AND ARE AVAILABLE AT THE PERMIT OFFICE.
12. A SEWER CONNECTION PERMIT: LICENSE HOUSE DRAIN CONTRACTOR TO OBTAIN (SEWER CONNECTION PERMIT) TO CONSTRUCT NEW SANITARY AND STORM CONNECTION IN STREET
FROM MAIN TO THE PROPERTY. CALL ST PAUL PW PERMIT DESK 651-266-6234 FOR INFORMATION ON OBTAINING THIS PERMIT.
13. EXISTING STREET AND PARK TREES ARE TO BE PROTECTED AT ALL TIMES. TREES DAMAGED OR REMOVED DURING CONSTRUCTION SHALL BE RESTORED OR REPLACED TO THE
SATISFACTION OF, AND AT NO COST TO, THE CITY AS DETERMINED BY THE FORESTRY MANAGER.
14. BOULEVARD AND PARK TURF RESTORATION IS TO INCLUDE THE FOLLOWING:
a. WHERE DRIVEWAYS, SIDEWALKS OR OTHER SURFACE PAVING ARE REMOVED ALL CONCRETE, ASPHALT AND BASE MATERIALS SHALL BE REMOVED.
b. BOULEVARD SOILS ARE TO BE PROTECTED DURING CONSTRUCTION. SOIL COMPACTION DUE TO CONSTRUCTION ACTIVITIES SHALL BE MITIGATED AND SOILS LOOSENED PRIOR TO
FINAL GRADING.
c. BOULEVARDS AND TURF SURFACES SHALL BE RESTORED WITH A MINIMUM OF 4" OF TOPSOIL.
15. CONCRETE WASHOUTS SHALL NOT BE LOCATED WITHIN THE DRIP LINE OF A TREE.
16. THE REMOVAL, PRUNING, AND/OR PLANTING OF TREES ON THE PUBLIC BOULEVARD REQUIRES AN APPROVED PERMIT FROM THE CITY FORESTER 651-632-5129. ANY WORK MUST BE
COMPLETED BY A LICENSED TREE CONTRACTOR.
17. CONSTRUCTION SUPPLIES, MATERIALS, SPOILS, EQUIPMENT, AND VEHICLES SHALL NOT BE STORED OR OPERATED WITHIN THE DRIP LINE OF ANY PUBLIC STREET OR PARK TREE
WITHOUT PRIOR WRITTEN APPROVAL FROM THE CITY FORESTER. IF THE BOULEVARD MUST BE USED FOR CONSTRUCTION ACTIVITIES, SITE ACCESS ROUTES, MATERIAL STORAGE OR
OTHER RELATED ACTIVITIES, PROTECTIVE MEASURES APPROVED BY THE CITY FORESTER SHALL BE TAKEN TO REDUCE SOIL COMPACTION AND PROTECT TREE(S) FROM DAMAGE.
18. STREET TREES SHALL BE PROTECTED BY ESTABLISHING A TREE PROTECTION ZONE USING 4' TALL FENCING INSTALLED AT THE DRIP LINE OF THE TREE. TREE PROTECTION FENCING
SHALL BE INSTALLED PRIOR TO THE START OF ANY SITE WORK AND MAINTAINED FOR THE DURATION OF THE PROJECT. PROPOSED WORK WITHIN, OR CHANGES TO THE LOCATION OF
TREE PROTECTION FENCING SHALL BE REVIEWED BY THE CITY FORESTER PRIOR TO ALTERATION.
19. THE LOCATION OF TREE PROTECTION FENCES IS SHOWN ON THE PLANS.
20. CONTRACTOR SHALL CONTACT THE CITY FORESTER 651-632-2437, PRIOR TO DEMOLITION OR OTHER LAND DISTURBANCE ASSOCIATED WITH SITE CONSTRUCTION, TO VERIFY TREE
PROTECTION MEASURES.
21. SITE RESTORATION OF CONSTRUCTION LIMITS IS REQUIRED FOLLOWING CONSTRUCTION.
NOTES - CITY OF SAINT PAUL
P8 X1
P3
P3
P5
P5
P1
P1
P6
P14
P14
R2
R1
R1
R3
R4
P14
R1
P1
P14
P14
P14
R7
P13P12
P1
P2
P14
P14
P6
P14
P14
P8
P14
P14
X1
P7
P11
P9
P11
P9
P1
P1
P3
P4
P14
P7
P7
P5
P5
P14
P4
P14
P1
P2
R5
X1
SILVER MAPLE TREES (2) HAVE
BEEN REMOVED (BY CITY)
R7
NOTES:
LEGEND
GRAVEL REMOVALS
FENCING REMOVALS
REMOVALS KEY NOTE
PROPERTY LINE
1. REFER TO SHEET T1.0- TITLE SHEET, FOR GENERAL NOTES.
2. MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING VEGETATION AND SITE
FEATURES (CURBS, WALKS, PAVEMENTS, OVERHEAD AND UNDERGROUND
UTILITIES, SIGNAGE, FENCING, ROADWAYS, ETC.) WHICH ARE TO REMAIN.
3. REPAIR OR REPLACE EXISTING PROPERTY AND SITE FEATURES, INCLUDING GRASS
AND VEGETATION, WHICH IS TO REMAIN THAT IS DAMAGED BY THE WORK, TO
OWNER'S SATISFACTION AND AT NO ADDITIONAL COST TO THE OWNER.
4. VISIT THE SITE PRIOR TO BIDDING; BE FAMILIAR WITH ACTUAL CONDITIONS IN THE
FIELD. EXTRA COMPENSATION WILL NOT BE ALLOWED FOR CONDITIONS WHICH
COULD HAVE BEEN DETERMINED OR ANTICIPATED BY EXAMINATION OF THE SITE,
THE CONTRACT DRAWINGS AND THE INFORMATION AVAILABLE PERTAINING TO
EXISTING SOILS, UTILITIES AND OTHER SITE CHARACTERISTICS.
5. THE CONTRACTOR SHALL HIRE THE SERVICES OF A UTILITY LOCATOR COMPANY
TO LOCATE ALL PRIVATELY OWNED UTILITIES THAT MAY BE DISTURBED BY
CONSTRUCTION OPERATIONS.
6. TREE PROTECTION: PROVIDE 4'' HIGH ORANGE SNOW FENCE AT DRIP LINE OF
EXISTING TREES PRIOR TO ANY CONSTRUCTION ACTIVITIES AND MAINTAIN
THROUGHOUT THE WORK.
KEY NOTE LEGEND
REMOVE CONCRETE SLAB, INCLUDING BENCHES WHERE APPLICABLE
REMOVE GRAVEL
REMOVE FENCING (INCLUDING FOOTINGS)
REMOVE PORTABLE DASHER BOARDS (PLASTIC WALLS)- SALVAGE FOR RE-USE
REMOVE STORM SEWER
PROTECT CONCRETE PAVEMENT
PROTECT LIGHT POLE AND ASSOCIATED ELECTRICAL
PROTECT BITUMINOUS PAVEMENT
PROTECT PLAYGROUND INCLUDING SURFACE EQUIPMENT, WALLS, AND POSTS
PROTECT FENCING (INCLUDING FOOTINGS AND GATES)
PROTECT CONCRETE WALL
PROTECT STORM SEWER
PROTECT STORM SEWER STRUCTURE
PROTECT SANITARY SEWER
PROTECT SANITARY SEWER STRUCTURE
PROTECT WATERMAIN
PROTECT HYDRANT
PROTECT GATE VALVE
PROTECT TREE - REFER TO NOTE 6 ABOVE
REFER TO SHEET C1.3 - GRADING AND DRAINAGE PLAN FOR TREATMENT
R1
R1
R2
R3
R4
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
X1
FIE
LD
C
ON
ST
RU
CT
IO
N
JO
Y O
F T
HE
P
EO
PL
E
So
uth
S
ain
t A
nth
on
y R
ec
re
atio
n C
en
te
r
89
0 C
RO
MW
EL
L A
VE
NU
E
ST
. P
AU
L, M
N 5
51
14
RE
MO
VA
LS
PL
AN
14084
02/15/2017
JR
P
JR
P
6
0 15 30
R5
City- 0
4/0
4/1
7
City- 0
6/1
4/1
7
BASELINE FOR
DIMENSIONS: CORNER OF
BUILDING, PARALLEL/
PERPENDICULAR TO EAST
FACING WALL
4
0
.0
0
'
1
8
0
.0
0
'
1
2
0
.0
0
'
3
1
.0
0
'
SYNTHETIC
TURF FIELD
(120' x 180')
21,600 S.F.
7
C2.1
7
C2.1
7
C2.1
7
C2.1
5
C2.1
5
C2.1
CONCRETE WALK
9
C2.1
8
.0
0
'
2 - EMERALD LUSTRE
MAPLE (2-1/2" CAL)
10
C2.1
SEED & MULCH ALL
DISTURBED AREAS
SEED & MULCH ALL
DISTURBED AREAS
SEED & MULCH ALL
DISTURBED AREAS
SEED & MULCH ALL
DISTURBED AREAS
SEED & MULCH ALL
DISTURBED AREAS
NOTES:
FIE
LD
C
ON
ST
RU
CT
IO
N
JO
Y O
F T
HE
P
EO
PL
E
So
uth
S
ain
t A
nth
on
y R
ec
re
atio
n C
en
te
r
89
0 C
RO
MW
EL
L A
VE
NU
E
ST
. P
AU
L, M
N 5
51
14
LA
YO
UT
, F
IN
IS
HIN
G
AN
D L
AN
DS
CA
PIN
G
PL
AN
17050
02/15/2017
JR
P
JR
P
6
0 15 30
LEGEND
REFERENCE KEY TO SITE DETAILS
DETAIL I.D NUMBER (TOP)
DETAIL SHEET NUMBER (BOTTOM)
PROPOSED SYNTHETIC TURF FIELD
PROPERTY LINE
1
C2.1
5
C2.1
1. REFER TO SHEET T1.0 - TITLE SHEET FOR GENERAL NOTES.
2. ALL APPLICABLE DIMENSIONS ARE TO FACE OF CURB / TURF EDGE, UNLESS
OTHERWISE NOTED.
3. CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD
LAYOUT.
4. LANDSCAPE ARCHITECT MUST INSPECT AND APPROVE FINISH GRADING
BEFORE CONTRACTOR PROCEEDS WITH SEEDING.
5. ALL DISTURBED AREAS WHICH ARE NOT DESIGNATED TO BE SYNTHETIC
TURF SHALL RECEIVE AT LEAST 6" OF TOPSOIL AND SHALL BE SEEDED.
6. FAILURE OF SEED DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO
PROVIDE AN ACCEPTABLE TURF, THE CONTRACTOR SHALL RE-SEED ALL
APPLICABLE AREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE
SATISFACTION OF THE ENGINEER.
7. BEGIN TURF ESTABLISHMENT IMMEDIATELY AFTER SEEDING , REFER TO
SPECIFICATION FOR PROCEDURE.
City- 0
4/0
4/1
7
City- 0
6/0
9/1
7
CB 1 (EXISTING)
RIM = 199.2
INV. = 195.60 (EXISTING - FIELD VERIFY)
CORE DRILL AND RECONSTRUCT
STRUCTURE AS REQUIRED. PROVIDE
FLEXIBLE JOINT AT CONNECTION.
CO 3
INV. = 199.00
2
C2.1
A
01.6
01.1
SYNTHETIC
TURF FIELD
(120' x 180')
21,600 S.F.
01.3
00.8
2
0
1
201
2
0
1
1
"x
1
2
" F
L
A
T
T
IL
E
WYE 2
INV. = 198.40
WYE 4
INV. = 198.68
WYE 3
INV. = 198.53
120' - 8" COLLECTOR
PIPE @ 0.50%
75' - 8" COLLECTOR PIPE
@ 0.59%
CONNECT FT AT
INV. = 198.26
CONNECT FT AT
INV. = 198.23
CONNECT FT AT
INV. = 198.77
181' - 6" DT @ 0.00%
INV. = 199.00
4
C2.1
129' - 12" PVC
(SDR 26) @ 0.70%
118' - 8" COLLECTOR
PIPE @ 0.85%
CONNECT FT AT
INV. = 198.76
CONNECT FT AT
INV. = 198.62
1
"x
1
2
" F
L
A
T
T
IL
E
1
"x
1
2
" F
L
A
T
T
IL
E
1
"x
1
2
" F
L
A
T
T
IL
E
1
"x
1
2
" F
L
A
T
T
IL
E
1
"x
1
2
" F
L
A
T
T
IL
E
1
"x
1
2
" F
L
A
T
T
IL
E
CONNECT FT AT
INV. = 198.49
CO 2
INV. = 198.44
4
C2.1
CO 1
INV. = 198.05
4
C2.1
5
C2.1
1
C2.1
1
C2.1
1
C2.1
6
C2.1
6
C2.1
MH 102
RIM = 200.0 (6" BURY DEPTH)
INV. = 196.50 E
INV. = 198.00 NW / SW
48" ID
R-1642
2
0
2
A
MH 101
RIM = 200.4
INV. = 193.5/ 193.7 (EXISTING - FIELD
VERIFY)
INV. = 195.45 (SW 6")
CORE DRILL AND RECONSTRUCT
STRUCTURE AS REQUIRED. PROVIDE
FLEXIBLE JOINT AT CONNECTION.
30' - 6" PVC (SDR 26)
@ 0.50%
WYE 5
INV. = 198.83
CONNECT FT AT
INV. = 198.90
REFER TO NOTES (SHEET
T1.) SPECIFICALLY CITY OF
SAINT PAUL REQUIREMENTS
A
SILT FENCE = 710 L.F.
ROCK CONSTRUCTION ENTRANCE = 35 C.Y.
SEDIMENT CONTROL DEVICE AT STORM SEWER INLET = 3
APPROXIMATE EROSION CONTROL DEVICE
QUANTITIES
FIE
LD
C
ON
ST
RU
CT
IO
N
JO
Y O
F T
HE
P
EO
PL
E
So
uth
S
ain
t A
nth
on
y R
ec
re
atio
n C
en
te
r
89
0 C
RO
MW
EL
L A
VE
NU
E
ST
. P
AU
L, M
N 5
51
14
GR
AD
IN
G A
ND
DR
AIN
AG
E P
LA
N
17060
02/15/2017
JR
P
DA
R
6
0 15 30
LEGEND
REFERENCE KEY TO SITE DETAILS
DETAIL I.D NUMBER (TOP)
DETAIL SHEET NUMBER (BOTTOM)
EXISTING CONTOUR
EXISTING SPOT ELEVATION
PROPOSED CONTOUR
PROPOSED SPOT ELEVATION
ME = MATCH EXISTING
PROPOSED FLAT TILE (FT)
PROPOSED DRAINTILE (DT)
PROPOSED STORM SEWER
APPROXIMATE SOIL BORING LOCATION
PROPOSED MANHOLE (MH)
PROPOSED CLEANOUT (CO)
SEDIMENT CONTROL DEVICE AT STORM SEWER INLET
PROPOSED SILT FENCE
PROPOSED ROCK CONSTRUCTION ENTRANCE
PROPERTY LINE
1
C2.1
202
02.5
5
C2.1
A
1. REFER TO SHEET T1.0 - TITLE SHEET FOR GENERAL NOTES.
2. MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED DIRT AND DEBRIS ON A DAILY
BASIS. PROTECT DRAINAGE SYSTEMS FROM SEDIMENTATION AS A RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS.
3. MAINTAIN DUST CONTROL DURING GRADING OPERATIONS.
4. ALL EROSION CONTROL METHODS SHALL COMPLY WITH MPCA AND OTHER LOCAL REGULATIONS.
5. IF EROSION AND SEDIMENT CONTROL MEASURES TAKEN ARE NOT ADEQUATE AND RESULT IN DOWNSTREAM SEDIMENT, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING OUT DOWNSTREAM STORM SEWERS AS NECESSARY, INCLUDING
ASSOCIATED RESTORATION.
6. SEDIMENT CONTROL DEVICE AT STORM SEWER INLETS. AT THE INLETS TO ALL STORM SEWER STRUCTURES, PROVIDE A
PRODUCT FROM THE FOLLOWING LIST. ACCEPTABLE PRODUCTS:
A. WIMCO TOP SLAB™ MODEL RD 27.
B. INFRASAFE® SEDIMENT CONTROL BARRIER, DISTRIBUTED BY ROYAL ENVIRONMENTAL SYSTEMS, INC. SCB'S SHALL BE
SIZED SPECIFICALLY FOR THE STRUCTURE AND CASTING SPECIFIED. SCB'S SHALL BE EQUIPPED WITH FRAME AND
PERFORATED SHROUD AND SHALL BE WRAPPED ON THE OUTSIDE, COVERING THE PERFORATED WALL ONLY, WITH A
GEOTEXTILE SOCK.
C. DANDY BAG® OR DANDY BAG II® DISTRIBUTED BY BROCK WHITE COMPANY, ST. PAUL, MN (615) 647-0950. DANDY BAG
SHALL BE USED ONLY FOR CURB INLETS AFTER PAVEMENT (BINDER COURSE OR WEAR COURSE) IS INSTALLED OR AT
EXISTING PAVED AREAS.
D. INFRASAFE® DEBRIS COLLECTION DEVICE BY ROYAL ENVIRONMENTAL SYSTEMS, INC., DISTRIBUTED BY ESS BROTHERS,
9350 COUNTY ROAD 19, CORCORAN, MN 55357 DCD'S SHALL BE SIZED SPECIFICALLY FOR THE STRUCTURE AND CASTING
SPECIFIED. PROVIDE FILTER BAGS AND TIES FOR COMPLETE INSTALLATION.
E. OR APPROVED EQUAL.
DEWATERING
1. PREVENT SURFACE WATER AND SUBSURFACE (GROUND) WATER FROM FLOWING INTO EXCAVATIONS AND FROM FLOODING
THE SITE AND SURROUNDING AREA.
2. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. REMOVE WATER TO PREVENT SOIL CHANGES DETRIMENTAL TO
STABILITY OF SUBGRADES AND FOUNDATIONS. PROVIDE AND MAINTAIN PUMPS, WELL POINTS, SUMPS, SUCTION AND
DISCHARGE LINES, AND OTHER DEWATERING SYSTEM COMPONENTS NECESSARY TO CONVEY WATER AWAY FROM
EXCAVATIONS.
3. IF THE SOILS BECOME DISTURBED AND UNSTABLE, THEY SHALL BE REMOVED AND REPLACED WITH DRIER COMPACTED FILL.
ALTERNATIVELY, THE DISTURBED AND UNSTABLE SOILS MAY BE SCARIFIED, DRIED AND RECOMPACTED BACK INTO PLACE
UNDER FAVORABLE WEATHER CONDITIONS.
4. CONVEY WATER REMOVED FROM EXCAVATIONS AND RAIN WATER TO COLLECTING OR RUN-OFF AREAS. ESTABLISH AND
MAINTAIN TEMPORARY DRAINAGE DITCHES AND OTHER DIVERSIONS OUTSIDE EXCAVATION LIMITS FOR EACH STRUCTURE. DO
NOT USE TRENCH EXCAVATIONS AS TEMPORARY DRAINAGE DITCHES.
5. DO NOT PLACE FILL OR COMPACT FILL IN STANDING WATER OR OVER SOFTENED SOILS.
EROSION CONTROL NOTES
6
C2.1
1
C2.1
2
C2.1
1. ALL STORM SEWER PIPE SHALL BE PVC PIPE (ASTM D3034, SDR 26) INSTALLED IN ACCORDANCE WITH ASTM D2321, UNLESS
OTHERWISE NOTED.
5. FLEXIBLE JOINTS AT STORM SEWER PIPE CONNECTIONS TO STRUCTURES:
a. IN ACCORDANCE WITH MINNESOTA PLUMBING CODE, PROVIDE FLEXIBLE JOINTS AT ALL PIPE CONNECTIONS TO ALL
STORM SEWER STRUCTURES.
b. ACCEPTABLE MANUFACTURERS / PRODUCTS:
i. FERNCO, “CONCRETE MANHOLE ADAPTORS” OR “LARGE-DIAMETER WATERSTOPS”
ii. PRESS-SEAL, WATERSTOP GROUTING RINGS”
ij. OR APPROVED EQUAL.
3. LOCATE ALL EXISTING UTILITIES, VERIFY LOCATION, SIZE AND INVERT ELEVATION OF ALL EXISTING UTILITIES. VERIFY
LOCATIONS, SIZES AND ELEVATIONS OF SAME BEFORE BEGINNING CONSTRUCTION.
4. ANY MANHOLE, CATCH BASIN, STORM SEWER, SANITARY SEWER, DRAINTILE OR OTHER POTENTIAL SOURCE FOR
CONTAMINATION SHALL BE INSTALLED AT LEAST 10 FEET HORIZONTALLY FROM ANY WATERMAIN PER MN PLUMBING CODE.
THIS ISOLATION DISTANCE SHALL BE MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE
CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR PIPING OR SIMILAR).
5. ABANDONING EXISTING SEWER SERVICES OR MAKING NEW CONNECTIONS TO CITY SEWER MUST BE DONE TO CITY
STANDARDS BY A LICENSED HOUSE DRAIN CONTRACTOR UNDER A PERMIT FROM PUBLIC WORKS SEWER SECTION
(651-266-6234).
6. THE CONTRACTOR SHALL, AT THE COMPLETION OF THE PROJECT, PROVIDE AS-BUILT DRAWINGS ILLUSTRATING ALL UTILITY
WORK INCLUDING STORM SEWER, WATERMAIN, DRAIN TILE AND SANITARY SEWER AND ALL APPURTENANCES WHICH WERE
INSTALLED OR ENCOUNTERED ON THE SITE. CONSTRUCTION RECORD DRAWINGS SHALL BE SUBMITTED TO:
ANCA SIMA
PUBLIC WORKS SEWERS DIVISION
700 CITY HALL ANNEX
25 WEST 4th STREET
SAINT PAUL, MN 55102
UTILITY NOTES
1"x12" FLAT TILE
1.) Top of top nut of fire hydrant at the northeast quadrant of Territorial Road and Cromwell Avenue.
Elevation = 201.00 feet
2.) Top of top nut of fire hydrant at the northwest quadrant of Territorial Road and Hunt Place.
Elevation = 201.41 feet
Note: Elevations shown are based on City of St. Paul datum. Add 694.10 feet to convert to mean sea
level datum.
BENCHMARKS (FIELD VERIFY BEFORE USING)
5
C2.1
4
C2.1
The following is from the Storm Water Pollution Prevention Plan Narrative, Section 01 89 13 of the Project Manual. In accordance withSection 31 00 00, the Contractor shall be responsible for full implementation of and maintenance required by the SWPPP Narrative untilthe Notice of Termination is approved by the MPCA. Should differences arise between the SWPPP Narrative information describedbelow and the information contained within the SWPPP Narrative, bound into the Project Manual, the SWPPP in the Project Manualshall govern.
V. General Construction Sequence
A. Erosion Control Devices, noted herein, include:1. Silt fence2. Sediment Control Device at storm sewer inlets3. Sediment log4. Rock construction entrance5. Rock check dams6. Rip rap7. Storm water treatment basins8. Temporary sediment basins9. Storm sewer systems10. Temporary outlet pipes11. Erosion control blanket12. Temporary seeding13. Final seeding / sodding14. Temporary / permanent vegetation15. Other features identified by the Minnesota Pollution Control Agency, City or Engineer as a Best Management Practice (BMP) device.
B. Contractor shall apply for NPDES Phase II Permit within 24 hours of award of Contract.1. The Contractor shall post the permit in the job site trailer or other suitable temporary storage area.
C. Review the SWPPP and its sequencing and requirements. The Contractor shall notify the Engineer if site conditions, construction sequencing, or other items aredifferent or require modification from this written SWPPP. The Engineer will review the suggested modifications and amend the SWPPP accordingly.
D. Following review of the SWPPP plans commence with the following construction sequence:1. Install perimeter silt fence where indicated on the Drawings. Silt fence shall be as specified in Section 31 25 00.2. Have silt fence and other erosion control devices inspected by local authorities, as required by the local authority.3. Construct the rock construction entrance.4. Strip and stockpile topsoil from the entire site. Provide temporary seed and mulch on stockpile as described herein.5. Establish the concrete truck washout area and post with a sign.6. Construct the permanent storm sewer system.7. Construct Sediment Control Devices at proposed storm sewer inlets (hay bales around castings and silt fence under castings will not be acceptable).8. Begin synthetic turf field construction.9. Use a temporary irrigation system to keep seeded areas adequately watered.10. Remove temporary outlet devices.11. Provide final stabilization and cleanup of the site.
E. Provide maintenance to erosion control devices and BMP’s to comply with the requirements of the permit.
F. Re-install all sediment control practices that have been adjusted or removed to accommodate short-term activates, such as passage of construction vehicles orequipment, immediately after the short-term activity has been completed. All sediment control practices shall be re-installed before the next precipitation event ifthe short term activity is not complete.
G. Inspect erosion control devices and provide routine maintenance as follows:1. Inspect erosion control a minimum of once per week and after each rain event measuring 0.5" or more. Record inspection on log posted in Contractor’s
construction trailer or other suitable temporary storage area.a. Records of each inspection and maintenance activity shall include:
(1) Date and time of inspections(2) Name of person conducting inspection(3) Findings of inspections, including recommendations for corrective actions(4) Corrective actions taken (including dates, times, and party completing maintenance activities(5) Date and amount of all rainfall events greater than one quarter inch (0.25 inch) in 24 hours(6) Documentation of changes made to the SWPPP as required by the NPDES General Stormwater Permit for Construction Activity (MN R100001)
b. Inspections are not required where the ground is frozen. The required inspectionsand maintenance schedule must begin within 24 hours after runoff occurs at the site or 24 hours prior to resuming construction, whichever comes first.
2. Provide maintenance for all devices as follows:a. Silt fences, sediment logs, and erosion control devices at storm sewer inlets shall be inspected for depth of sediment, tears, to see if fabric is securely
attached to support posts or structure, and to see that posts and devices are securely in place.b. Silt fences, sediment logs and erosion control devices at storm sewer inlets, and other erosion control devices shall be cleaned when sediment reaches
1/3 the height of the erosion control device, within 24 hours.c. Rock construction entrances shall be inspected for clogging of river rock. River rock that has become clogged with sediment shall be removed and
replaced with fresh river rock.d. Repairs or replacements to all erosion control devices shall occur within 24 hours of discovery.e. Temporary diversion berms shall be inspected and any breaches promptly repaired.f. Tracked sediment from construction vehicles on to public streets and paved areas (including paved areas on the construction site) shall be removed
within 24 hours of discovery.g. Removal of sediment and restabilization of Surface Waters shall be accomplished within 7 days of discovery (note: surface waters include curb and
gutter, pavements, storm sewer, swales, or other similar storm water conveyance devices).h. Inlet protection may be removed if a local unit of government directs the permitee to do so because of a specific safety concern.
H. Provide dewatering of excavations as identified in Section 31 00 00.
I. Temporary Soil Stockpiles:1. Temporary soil stockpiles shall not be placed in surface waters of the state, including surface conveyances such as curb and gutter, swales, or ditches.2. Install silt fence at the base of the temporary soil stockpile (full perimeter).3. Temporary soil stockpiles shall be seeded with temporary seed mix and hydromulch when stockpiles are left inactive for seven (7) days. Note, this does not
apply to aggregate stockpiles or other stockpiles without significant silt, clay or organic components (clean aggregate stockpiles, clean rock, clean sand andsimilar clean aggregates).
J. Stabilize denuded areas within the following number of days of last construction activity (temporary or permanent) in that area:1. Within 7 days, except:
a. Temporary soil stockpiles shall be treated with appropriate erosion control measure, including silt fence and temporary seeding when stockpiles areleft inactive for periods longer than 7 days. Note, this does not apply to aggregate stockpiles or other stockpiles without significant silt, clay or organiccomponents (clean aggregate stockpiles, clean rock, clean sand and similar clean aggregates).
K. Provide maintenance of all seeded areas until fully established.
L. Provide cleaning of storm sewer system at the completion of the project. Cleaning shall include removal of accumulated sediment from all surface waters asdefined by the permit (for example, curb and gutter, pavements, swales, and storm sewer piping and structures).
M. Remove silt fence and erosion control devices at storm sewer inlets following full establishment of site vegetation. Dispose materials properly off-site.
N. Apply for Notice of Termination (NOT) with MPCA. NOT must be submitted within 30 days after:1. Site has undergone Final Stabilization (at least 80% vegetative cover), and2. Removal of all temporary erosion control measures (silt fence, etc.), and3. Final cleanout and maintenance of all permanent storm water facilities, and
4. Completion of all maintenance activities and site cleanup.
EXCERPT FROM THE SWPPP NARRATIVE
8
C2.1
City- 0
4/0
4/1
7
City- 0
6/1
4/1
7
FIE
LD
C
ON
ST
RU
CT
IO
N
JO
Y O
F T
HE
P
EO
PL
E
So
uth
S
ain
t A
nth
on
y R
ec
re
atio
n C
en
te
r
89
0 C
RO
MW
EL
L A
VE
NU
E
ST
. P
AU
L, M
N 5
51
14
SIT
E D
ET
AIL
S
17060
02/15/2017
MLB
DA
R
6
ROCK CONSTRUCTION
ENTRANCE
EXISTING PAVEMENT TO REMAIN
2" TO 3" WASHED ROCK
NOTE: PROVIDE WHERE CONSTRUCTION TRAFFIC
ENTERS OR EXITS THE CONSTRUCTION SITE
6" MINIMUM THICKNESS
5
0
'
M
I
N
I
M
U
M
SILT FENCE
NORMAL USE
POSTS:
(IF USED WITHOUT
SUPPORT FENCE)
WOOD
2" SQ. (MIN)
@ 4' (MAX)
SPACING
METAL
1.0 lbs/lf (MIN.) "T" OR
"U" SECTION @ 4'
(MAX) SPACING
DIR
EC
TIO
N O
F
RU
NO
FF
FL
O
W
NOTE: DEPENDING UPON CONFIGURATION, ATTACH TO WIRE MESH WITH
HOG RINGS, STEEL POSTS WITH TIE WIRES, OR WOOD POSTS WITH STAPLES
5' MIN. LENGTH POST
SILT FENCE FABRIC
OVERLAP FABRIC 6" AND
FASTEN @ 2' INTERVALS
EXTEND WIRE MESH INTO TRENCH
FABRIC ANCHORAGE
TRENCH BACKFILL WITH
TAMPED NATURAL SOIL
6" MIN.
6" MIN.
NATURAL SOIL
24" MIN. BURY DEPTH
30" MIN.
METAL STAKE OR
WOOD POST
OPTIONAL SUPPORT
FENCE (WIRE MESH)
FLAT DT TO COLLECTOR PIPE
CONNECTION
GRANITE (POROUS AGGREGATE)
TRAP ROCK (POROUS AGGREGATE)
TURF CARPET WITH IN-FILL BY OTHERS
SAND
SUBBASE
PREPARED SUBGRADE
SUBGRADE ELEVATION
VARIES - REFER TO PLAN
AND DETAILS
1" x 12" FLAT TILE
8" COLLECTOR PIPE
4" DRAIN TILE
12" FLAT AdvanEDGE
OUTLET ADAPTER
22° BEND
4 x 8 WYE
4 x 8 WYE
4" DRAIN TILE
12" FLAT AdvanEDGE
OUTLET ADAPTER
1" x 12" FLAT TILE
SECTION
PLAN
8" COLLECTOR PIPE
8" COLLECTOR PIPE
NOTE:
ATTACH A GREEN #12 SOLID
COPPER TRACER WIRE WITH
BROWN STRIPE TO PIPE AT 3'
0.C. WITH PLASTIC ZIP-TIES
(OR APPROVED EQUAL).
CLEANOUT ASSEMBLY
MCDONALD 74M "A"
SERIES CAST IRON
METER PIT FRAME
AND COVER
FITTING HUB WITH 4"
THREADED PLUG. APPLY
TEFLON THREAD TAPE,
OR APPROVED EQUAL,
OVER THREADS.
FINISH GRADE
LEAVE 24" OF EXCESS
WIRE AT SURFACE
TRACER WIRE
MAIN
RE
FE
R T
O P
LA
N
15"
11
1
2
"
4"
PIPE BEDDING - PVC
NOTES:
TRENCH SIDEWALLS TO MEET O.S.H.A REQUIREMENTS.
UPPER 3 FT. OF BACKFILL SHALL BE COMPACTED TO AT LEAST 100%
STANDARD PROCTOR DRY DENSITY. BELOW THIS ELEVATION, BACKFILL
SHALL BE COMPACTED TO AT LEAST 95% STANDARD PROCTOR DRY DENSITY.
SEWER INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321.
DEPTH (VARIES)
6" MIN.
1/8 O.D.
(6" MIN.)
O.D. + 2' (MAX)
PIPE DIA.
FINAL SUBGRADE
HAND TAMPED
SAND
TURF SECTION AT
PRACTICE FIELD
6" DEPTH
3
4
" GRANITE
(POROUS AGGREGATE)
2" DEPTH TRAP ROCK
(POROUS AGGREGATE)
TURF CARPET WITH
IN-FILL - BY OTHERS
GEOTEXTILE
FABRIC
SAND
SUBBASE
GRASS
2"
1" x 12"
FLAT TILE
1" x 12"
FLAT TILE
8" COLLECTOR PIPE -
ELEVATION VARIES -
REFER TO PLAN
6" DRAIN TILE
INV. = 199.00
3" MIN. PEA ROCK
AROUND DRAINTILE
3" MIN. PEA ROCK
AROUND DRAINTILE
GEOTEXTILE FABRIC
GEOTEXTILE
FABRIC
1
1
MIN. 6"
TOPSOIL
FIELD CURB
7
C2.1
SAND INV. = 199.00
30" MIN
STORM SEWER MANHOLE
48"
FL
OW
FL
OW
6
1
BASES SHALL BE 8" STANDARD PRECAST WITH 2" LEAN GROUT,
OR POURED 8" SLAB REINFORCED WITH 6" x 6" 10/10 MESH
COVER SHALL BE
STAMPED
"STORM SEWER"
"RIM ELEVATION"
PRECAST COVER -
8" THICK
STEPS - INSTALL ON
DOWNSTREAM SIDE
@ 16" O.C.
RUBBER GASKET -
TYP AT ALL JOINTS
PRECAST CONCRETE
SECTION
PROVIDE FLEXIBLE
JOINT - REFER TO
SPECS
GROUT SHELF AND
CHANNELS
PROVIDE FLEXIBLE JOINT -
REFER TO SPECS
STORM SEWER PIPE - SEE
PLAN FOR LOCATION,
INVERT, AND SIZES
MIN. 2 AND MAX. 5 ADJUSTING
RINGS. GROUT BETWEEN
RINGS, CASTING, AND ALONG
OUTSIDE.
METAL SEWER CASTING - REFER
TO PLAN FOR TYPE
City- 0
4/0
4/1
7
12" CURB & SYNTHETIC TURF
12"
PREPARED
SUBGRADE
DRAINAGE FABRIC
(MIRAFI #180N)
1"x12" "FLAT" DRAIN TILE
12"X14" CONCRETE
CURB - REFER
TO PLAN FOR
LOCATION AND
LIMITS
NAILER BOARD
FASTENED TO CURB
1" RADIUS (TYP) EXCEPT FOR
AREA ABUTTING PAVEMENT
WHERE IT SHALL BE 1/2" RAD.
GRASS
6" GRANITE (POROUS
AGGREGATE)
2" TRAP ROCK
(POROUS AGGREGATE)
TURF CARPET WITH IN-FILL
SAND SUBBASE
CONCRETE WALK/SLAB
2" MIN.
5" (MIN) CONCRETE WALK
4" SAND BASE
SOD FLUSH WITH TOP OF WALK
COMPACTED SUBGRADE
PROVIDE 2% CROSS SLOPE (TYP)
REFER TO GRADING PLAN FOR
DIRECTION
DOWNHILL
SIDE
UPHILL
SIDE
1"
SOD RECESSED 1" BELOW TOP OF WALK
City- 0
6/1
4/1
7
1'-0"
MIN
1'-0"
MIN
2.5 X BALL DIA. MIN.
DECIDUOUS TREE
EXPOSE ROOT FLARE AND SET AT
GRADE
SHREDDED HARDWOOD MULCH
(4" MIN DEPTH)
PLANTING SOIL (MIN. DIMENSION
SHOWN)
SOIL SAUCER: USED PREPARED
SOIL (4" MIN.)
REMOVE BURLAP AND ROPES FROM
TOP 1/3rd OF ROOT BALL, CUT WIRE
BASKET DOWN TO SECOND
HORIZONTAL WIRE FROM THE
BOTTOM, AND DISPOSE OF OFF-SITE.
PREPARED SUBSOIL TO FORM
PEDESTAL TO PREVENT SETTLING.
CONTRACTOR IS RESPONSIBLE TO
MAINTAIN TREES IN A PLUMB POSITION
THROUGHOUT THE MAINTENANCE PERIOD.