13
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904

Embed Size (px)

Citation preview

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

•SLB and DCC commissioning for 904

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

•SLB commissioning for 904

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

SLB Production StatusSLB Production Status

•SLB Production (1210 Boards)•Pre production assembly of 100 Boards just arriving to CERN.

•JTAG test bench (Infra + Inter) working!

•SLB Output has to have 2 output formats : STC and RC (software controlled)

•Firmware in final test stage, BIST!

•Assembly of the remaining boards will follow after acceptance

of the 1st batch. Being delivered to CERN this week!

• Full Production of the PCBs had some delay !

(PCB Production Frames Quality)

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

SLB PCB Production FrameSLB PCB Production Frame

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

904 commissioning904 commissioning

•100 SLBs tested by end of APRIL!•HCAL ok! ECAL ok!

•Cables to be ordered soon! •(25 minimum), connectors from WU

•decision on length (10m)

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

•DCC commissioning for 904

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

DCC Pre Production StatusDCC Pre Production Status

•DCC Pre Production (8 Boards)•1 DCC “kit” in 867 (H4 conditions)

-Recabling done

• Pre production assembly 8 Boards! -Processing (BARCO)

• Production of the PCBs had 1 weeks delay !-CERN procedures adds a 2 week delay + Easter!

• DCC Tester Firmware Revision-Ordered 35 NGKs TX

• Start DCC tests in end of April/May

• DCC mechanics “a la HCAL”-Front Panel production

•Progressive DCC delivery -> May -> July

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

DCC V1DCC V1

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

DCC distribution DCC distribution

•DCC Prototypes:•1 Bldg 867

•1 RPC Group

•DCC Pre Production (8 Boards)• 3 DCC for 867

•Will be used as production spares !

• 1 DCC for Cosmic Tests (H4),

• 2 DCC for Magnet tests,

• 1 DCC (Lab)

• 1 DCC Preshower (?), spare.

• 1 DCC , PCB only, for TOTEM

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

DCC vs SM10 Integration at 867DCC vs SM10 Integration at 867

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

• CCS (Kostas)• TTC emulator/encoding

• DCC • 70 Channels + SR

• Slink 64 (FEDKIT) • Slink adaptor (PCB full production done!)

• OD Backplane • Pre-production of 10 (ongoing)

• VME Bridge (SBS620) • Crate Configuration

Commissioning for 904Commissioning for 904

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

• New DCC Tester and TCC Tester productionMain Board redesign and production! Production of 9 Optical ModulesAssembly of all and tests.

• 35 NGK 8ch TX Special Production 3 Months delivery time, 40 k USD

• MANPOWER Availability!!!• no NEW testers available Before OCTOBER!

Commissioning for 904 (2)Commissioning for 904 (2)

José C. Da SilvaOFF DETECTOR WORSHOP, April 7, 2005, Lisboa

• JTAG test bench ready

• Production tests of the SLBs

• SLB Cables for 904

• Support ongoing tests on 867 with DCC#1

• Pre-Production and tests of 8 DCC

• Pre-Production of OD Backplanes

• Slink Adaptors Assembly

Ongoing/PlanningOngoing/Planning

SLB

DCC