The Design and Construction

of Hybrid Soil Nail/MSE Walls

John G. Delphia, P.E.

TxDOT Bridge Division

Geotechnical Branch

Page 2: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

COMMON RETAINING WALL TYPESMSECONCRETE BLOCK TEMPORARY EARTH SPREAD FOOTING

Gabions Drilled Shaft

Tiedback

Soil Nail

Hybrid Walls –

MSE/Soil Nail

RETAINING

WALL

SELECTION

FILL SITUATIONS CUT SITUATIONSCUT/FILL

SITUATIONS

DRILLED SHAFT

TIEDBACK

SOIL NAIL

MSE WITH SHORING

SPREAD FOOTING

WITH SHORING

DRILLED SHAFT

MSE WITH SHORING

SPREAD FOOTING

WITH SHORING

HYBRID – SOIL NAIL/MSE

MSE

CONCRETE BLOCK

SPREAD FOOTING

TEMPORARY EARTH

GABION

Page 3: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

MSE Wall

Page 4: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Soil Nail Wall

“Texas Turn Around”

Page 5: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Hybrid WallsMSE Wall in

front of a Soil

Nail Wall

Soil Nail Wall adjacent

to Tied-Back Wall

Soil Nail WallMSE

Wall

Tied-Back Wall Soil Nail Wall

Tied-Back WallSoil Nail Wall

Page 6: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Widening of Existing Roadway

Fill Wall

Cut Wall

Existing Roadway

Geometry

Proposed Roadway

Geometry

What wall type would you choose?

Page 7: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Shoring

Existing

Ground

Page 8: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

HYBRID SOIL NAIL/MSE WALL

MSE (Fill) Wall on top of Soil Nail (Cut) Wall

Page 9: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

HYBRID SOIL NAIL/MSE WALL

• Consider when existing ground line is not coincident with top of wall.

• Function of:– Wall Height; Fill vs. Cut

– Soil Conditions

– Aesthetic Considerations

– Phasing Requirements

– Etc.,

Very Project Specific

Page 10: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Soil Nail WallFill vs. Cut

Fill < 3’

Page 11: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Fill vs. Cut

Fill < 3’

Page 12: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Hybrid Soil Nail/MSE Wall

Fill vs. Cut

Fill > 3’

Case 1 Case 2

Page 13: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1 – IH 35 Comal Co.

Fill vs. Cut

Fill > 3’

Case 1

Page 14: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1 – IH 35 Comal Co.

Cut = 28’

Fill = 10’

Existing

Ground

Page 15: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

• Establish wall geometry including bottom

of wall profile.

• Determine soil design parameters.

• Determine controlling loading condition

and appropriate analysis approach.

• Insure that the proposed wall geometry will

be globally stable.

Case History 1 – IH 35 Comal Co.

Page 16: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1 – IH 35 Comal Co.

MSE Wall

Soil Nail WallTemporary

Special

Shoring

Soil Nail Wall

MSE Wall

GEOMETRY

Page 17: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Design of the Soil Nail WallTwo Options

Option 1

Model the Entire System

Option 2

Model the Soil Nail Wall Only

& consider MSE Wall/Roadway

as a Surcharge & Horizontal

Shear

Surcharge from Roadway and Fill

Surcharge from Roadway

MSE Wall

Soil Nail

Wall

Fill

Soil

Nail

Wall

Horizontal Shear

at Base of MSE

Wall

Page 18: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Option 1

Model the Entire System

Option 2

Model the Soil Nail Wall Only

& consider MSE Wall/Roadway

as a Vertical Surcharge &

Horizontal Shear

Nail Length = 28 ft Nail Length = 26 ft

Page 19: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Nail Sizing Guidelines

• 8” diameter soil nails

• #8 grade 60 threadbar

• 3.5’ X 3.5’ horizontal and vertical

spacing

Page 20: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1 – IH 35 Comal Co.

Global Stability Check

Page 21: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Design Details• Not a Standard !!

• Not a proprietary system. No vendor.

• Complete details must be provided.

Page 22: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Specific Nail Locations

11.5 ft

28.0 ft

Page 23: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1Completed Temp. Face

Page 24: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1Completed Temp. Face

Page 25: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1Completed Temp. Face

Page 26: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 1 Finished Wall – Precast Panel Fascia

Page 27: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Design Considerations

1. MSE Wall conflict with soil nails

2. Can a vertical wall face be used

instead of an offset wall face

Page 28: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Design –

Project Specific

Conflicts at the Top of Wall

Soil

Nail

Wall

MSE

Wall

Page 29: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Vertical Wall Face

Interface of MSE/Soil Nail Wall

Page 30: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Vertical Wall FaceNote water seepage

from the panels with

horizontal joints near

the bottom of the MSE

Wall

Approximate location of the

bottom of the MSE Wall

Page 31: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Vertical Wall Face

Interface of MSE/Soil Nail Wall

Page 32: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 2 – US 67 Sherwood Way

Fill vs. Cut

Fill > 3’

Case 2

Page 33: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 2 – US 67 Sherwood Way

Page 34: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 2 – US 67 Sherwood Way

Page 35: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 2 – US 67 Sherwood Way

Page 36: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 2

Constructing Gunnite

Fascia to receive TEW

Page 37: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Case History 2

Finished Wall

Page 38: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

HYBRID SOIL NAIL/MSE WALL

• Consider when existing ground line is not coincident with top of wall.

• Function of:– Wall Height; Fill vs. Cut

– Soil Conditions

– Aesthetic Considerations (facing options)

– Drainage

– Phasing Requirements

– Etc.,

– Very Project Specific

In Conclusion:

Page 39: John Delphia Design and Construction of Hybrid Soil Nail-MSE Wall

Questions?