25
John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641 This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report) . Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Facility Assessment Report Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors Campus Summary Main 1927 64,300 $4,005,810 2 Annex 1996 14,400 $996,665 1 Leased-Pre K 1995 13,767 $606,421 1 SITE $399,115 Campus Total $6,008,010 92,467 Building: Main Category: Building Exterior Item - Type Quantity Unit Rank Cost Group Entrance Entrance Control - Audio 6 EA 1 $497 Entrance Control - Audio and Video 6 EA 1 $702 Exterior Doors - Exterior Steel Door 6 EA 17 $8,169 Exterior Doors - Exterior Wood Door 4 EA 2 $7,645 Exterior Doors - Transom Lite 5 EA 1 $822 Exterior Doors - Transom Lite 6 EA 11 $3,446 Exterior Stairs - Concrete 5 LF 25 $2,740 Exterior Stairs - Concrete 6 LF 293 $23,958 Exterior Stairs - Steel or Aluminum 6 LF 15 $58 Exterior Stairs - Stone 6 LF 252 $28,472 Power Door Operator and Controls 6 EA 2 $0 Ramp Handrail - Wood_Ramp Handrail 6 LF 65 $563 Ramps - Concrete 6 LF 115 $17,277 Ramps - Wood Ramp 6 LF 30 $4,507 Stair Handrail - Steel_Stair Handrail 6 LF 101 $875 Fire Escape Fire Escape 6 LF 90 $56,858 Page 1 of 25 BARRY Assessment Date: 10/20/2015

John Barry Elementary School

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report) . Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.

Facility Assessment Report

Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors

Campus Summary

Main 1927 64,300 $4,005,8102

Annex 1996 14,400 $996,6651

Leased-Pre K 1995 13,767 $606,4211

SITE $399,115

Campus Total $6,008,01092,467

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Entrance

Entrance Control - Audio 6EA1 $497

Entrance Control - Audio and Video 6EA1 $702

Exterior Doors - Exterior Steel Door 6EA17 $8,169

Exterior Doors - Exterior Wood Door 4EA2 $7,645

Exterior Doors - Transom Lite 5EA1 $822

Exterior Doors - Transom Lite 6EA11 $3,446

Exterior Stairs - Concrete 5LF25 $2,740

Exterior Stairs - Concrete 6LF293 $23,958

Exterior Stairs - Steel or Aluminum 6LF15 $58

Exterior Stairs - Stone 6LF252 $28,472

Power Door Operator and Controls 6EA2 $0

Ramp Handrail - Wood_Ramp Handrail 6LF65 $563

Ramps - Concrete 6LF115 $17,277

Ramps - Wood Ramp 6LF30 $4,507

Stair Handrail - Steel_Stair Handrail 6LF101 $875

Fire Escape

Fire Escape 6LF90 $56,858

Page 1 of 25BARRY Assessment Date: 10/20/2015

Page 2: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Fire Escape

Foundation

Foundation - Concrete 5LF250 $137,984

Foundation - Concrete 7LF1,153 $0

Superstructure - Concrete 7SF64,300 $0

Lighting

Exterior Lighting - Parapet or Roof Mounted 6EA17 $9,121

Exterior Lighting - Wall Mounted 6EA10 $2,887

Roof System

Cell Tower 6EA1 $736

Chimney - Brick Chimney- Concrete/ Mortar Liner 6LF90 $85,921

Coping - Terra Cotta 5LF1,103 $185,142

Coping - Terra Cotta 6LF210 $6,745

Downspouts - Exterior Downspouts 6LF65 $2,160

Downspouts - Interior Downspouts 6LF245 $8,142

Parapet - 16" - 30" Height 5LF903 $156,233

Parapet - 16" - 30" Height 6LF210 $8,390

Parapet - Parapet > 30" 5LF200 $49,344

Roof - Asphalt Shingle 6SF1,260 $5,784

Roof - Modified Bitumen 4SF27,510 $754,134

Roof - Modified Bitumen 6SF2,766 $26,026

Roof Structure - Concrete 7SF2,766 $0

Roof Structure - Steel with Clay Tile Arch 7SF27,510 $0

Walls

Cheek-Wall - Concrete 5SF104 $2,452

Cornice - Terra Cotta 6LF1,118 $38,769

Exterior Walls - Brick 6SF38,500 $258,759

Windows

Guard - Guards wire guard 6SF1,920 $24,518

Lintels - Steel 6LF30 $871

Lintels - Terra Cotta 6LF370 $0

Windows - Sash Aluminum Double-pane 6SF7,700 $57,477

Building Exterior Subtotal: $1,978,187

Page 2 of 25BARRY Assessment Date: 10/20/2015

Page 3: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Automatic Transfer Switch 6EA1 $408

Emergency A/C Power - Auditoium and Aisle Lighting 6SF3,040 $1,608

Emergency A/C Power - Corridors and Stairs 6SF12,150 $3,649

Emergency A/C Power - Gym 6SF2,800 $1,041

Emergency A/C Power - Lunchrooms 6SF1,150 $428

Emergency Battery Packs - Auditoium and Aisle Lighting 6EA2 $405

Exit Signs - Auditoium 2EA6 $3,273

Exit Signs - Corridors and Stairs 2EA20 $10,910

Exit Signs - Gym 2EA8 $4,626

Exit Signs - Lunchroom 2EA6 $3,273

Security System - CCTV 6SF64,300 $19,309

Security System - Intrusion Detection 6SF64,300 $16,551

Main Service

Independent Electrical Service for emergency power 6EA1 $2,921

Main Electrical Service - 1200 A 120/208/3PH 6EA1 $5,078

PA System 6SF64,300 $21,148

Power Distribution

Lighting and Power Panels - 100 A 6EA9 $2,692

Lighting and Power Panels - Above 100 A 6EA4 $1,988

Main Distribution Panels - 400 - 600 amp 6EA4 $2,111

Main Distribution Panels - Greater than 600 amp 6EA1 $730

Electrical System Subtotal: $102,149

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost Group

Fire Alarm

Fire Alarm Panel 6EA1 $6,406

Fire Alarm Strobe Lights 6SF64,300 $22,987

Fire Alarm_System 6SF64,300 $31,263

Safty System Subtotal: $60,656

Building: Main

Page 3 of 25BARRY Assessment Date: 10/20/2015

Page 4: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Air Handling Systems

Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - 15001 - 25000 cfm 5EA2 $88,525

Air Handling Unit- Package Single Zone- Indoor- Steam Coils - 4000-8000 cfm 5EA2 $52,885

Air Intake 5EA1 $7,471

Air Intake 7EA3 $0

Auxiliaries - 15001 - 25000 cfm 5EA2 $29,798

Reheat Boxes - Reheat Boxes with Steam Coil 6EA13 $13,665

Return Duct Work - Indoor- Vertical Shaft and Ducts 7LF200 $0

Zone Dampers 6EA33 $27,490

Boiler Systems

Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200 HP 5EA2 $34,033

Chemical Feeder 6EA1 $1,078

Combustion Dampers 6EA2 $818

Condensate Pump 6EA2 $4,042

Feed Water Pumps and Tank 6EA1 $2,545

Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 151 - 200 HP 5EA2 $34,033

Piping - Condensate Pipe- Steel 6LF400 $755

Piping - Steam Pipe- Steel 6LF400 $755

Steam Traps 5EA70 $92,043

Gas Booster

Gas Booster 6EA2 $998

Heating Devices

Fin Tube - Steam 6LF80 $755

Radiators - Steam 5EA33 $55,285

Unit Heater - Steam 6EA1 $278

Wall Heater - Electric 5EA12 $6,439

Wall Heater - Electric 6EA4 $556

Temperature Control

Electric Thermostat 6EA2 $0

Pneumatic System 6SF16 $8

Thermostats - Pneumatic 5EA16 $0

Thermostats - Pneumatic 6EA15 $0

Ventilation

Exhaust Fans- Indoor - 500 - 1500 CFM 6EA3 $1,777

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM 4EA1 $6,392

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM 6EA1 $592

Page 4 of 25BARRY Assessment Date: 10/20/2015

Page 5: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Mechanical System Subtotal: $463,017

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost Group

Hot Water

Gas Heater - 150000 - 300000 BTU/HR 5EA1 $2,249

Piping

Domestic Piping-Cold Water from Risers to Fixtures 6SF64,300 $12,873

Domestic Piping-Cold Water Horizontal Lines 6SF64,300 $15,631

Domestic Piping-Cold Water Risers 6SF64,300 $11,953

Domestic Piping-Hot Water from Risers to Fixtures 6SF64,300 $10,114

Domestic Piping-Hot Water Horizontal Lines 6SF64,300 $11,953

Domestic Piping-Hot Water Return Lines 6SF64,300 $9,195

Domestic Piping-Hot Water Return Risers 6SF64,300 $9,195

Sanitary Piping 6SF64,300 $58,847

Storm Piping 6SF64,300 $56,089

Vent Piping 6SF64,300 $43,216

Pumps

Pumps - Sump-Simplex 5EA2 $11,253

Plumbing System Subtotal: $252,570

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Art Room (1 room)

AC Units 6EA1 $496

Casework 6LF20 $505

Ceiling - Lay-in 5SF32 $255

Ceiling - Lay-in 6SF690 $2,072

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Wood 6SF722 $5,090

Lighting - Lay-in 7EA12 $0

Marker Board 7LF30 $0

Page 5 of 25BARRY Assessment Date: 10/20/2015

Page 6: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Art Room (1 room)

Walls - Plaster/Drywall 6SF928 $2,561

Computer Lab (1 room)

AC Units 6EA2 $991

Casework 6LF20 $505

Ceiling - Lay-in 6SF720 $2,162

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Wood 6SF720 $5,076

Lighting - Lay-in 7EA12 $0

Marker Board 7LF60 $0

Walls - Plaster/Drywall 6SF918 $2,534

Wireless System 7EA1 $0

Kindergarten (6 rooms)

AC Units 6EA7 $3,469

Casework 6LF89 $2,248

Ceiling - Lay-in 5SF733 $4,393

Ceiling - Lay-in 6SF3,222 $9,676

Doors - Transom Window 6SF54 $914

Doors - Wood Doors inclu hw 6EA8 $2,408

Floor - Terrazzo 6SF337 $737

Floor - Tile 6SF1,432 $3,133

Floor - Wood 6SF2,186 $15,411

Lighting - Lay-in 7EA67 $0

Marker Board 7LF165 $0

Storage/ Closet 6SF110 $798

Walls - Plaster/Drywall 5SF2 $10

Walls - Plaster/Drywall 6SF5,463 $15,077

Regular Classroom (12 rooms)

AC Units 6EA12 $5,947

Casework 6LF199 $5,026

Ceiling - Lay-in 5SF48 $383

Ceiling - Lay-in 6SF8,568 $25,730

Doors - Transom Window 5SF9 $381

Doors - Transom Window 6SF90 $1,524

Doors - Wood Doors inclu hw 5EA1 $1,174

Doors - Wood Doors inclu hw 6EA18 $5,418

Page 6 of 25BARRY Assessment Date: 10/20/2015

Page 7: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Regular Classroom (12 rooms)

Floor - Wood 6SF8,616 $60,742

Lighting - Lay-in 7EA144 $0

Marker Board 7LF510 $0

Walls - Plaster/Drywall 5SF68 $347

Walls - Plaster/Drywall 6SF10,972 $30,282

Special Education (1 room)

AC Units 6EA1 $496

Casework 6LF20 $505

Ceiling - Lay-in 6SF471 $1,414

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile 6SF471 $1,031

Lighting - Lay-in 7EA8 $0

Marker Board 7LF10 $0

Walls - Plaster/Drywall 6SF918 $2,534

Classrooms Subtotal: $225,415

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Administrative Suites/Offices

AC Unit 5EA1 $1,826

AC Unit 6EA4 $1,982

Ceiling - Lay-in 6SF961 $2,886

Ceiling - Plaster/Drywall 5SF129 $1,182

Ceiling - Plaster/Drywall 6SF687 $2,377

Doors - Transom Window 6SF18 $305

Doors - Wood Doors inclu hw 5EA1 $1,174

Doors - Wood Doors inclu hw 6EA8 $2,408

Floor - Carpet 6SF531 $1,131

Floor - Tile 4SF129 $1,109

Floor - Tile 6SF1,117 $2,444

Lighting - Lay-in 7EA15 $0

Lighting - Pendent/Surface 4EA2 $1,081

Lighting - Pendent/Surface 7EA5 $0

Page 7 of 25BARRY Assessment Date: 10/20/2015

Page 8: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Administrative Suites/Offices

Power Distribution 5EA6 $23,110

Power Distribution 6EA50 $106,244

Walls - Masonry 6SF643 $2,023

Walls - Plaster/Drywall 4SF650 $6,544

Walls - Plaster/Drywall 6SF4,115 $11,357

Auditorium & Theater

Balcony Seating 6EA90 $15,652

Ceiling - Plaster/Drywall 5SF20 $630

Ceiling - Plaster/Drywall 6SF3,020 $25,177

Doors - Wood Doors inclu hw 6EA4 $1,204

Floor - Carpet 5SF477 $2,449

Floor - Concrete Epoxy/ Painted 6SF2,563 $1,356

Lighting - Chandelier, Incandescent 7EA8 $0

Lighting - Pendent/Surface 7EA3 $0

Lighting - Wall Mounted 7EA11 $0

Main Floor Seating 6EA288 $50,088

Sound System 6EA1 $10,721

Stage 6SF405 $2,340

Stage Curtain 6EA2 $0

Stage Lighting System 6EA1 $8,077

Stage-Stairs - Wood 6LF10 $117

Storage/ Closet 6SF190 $1,378

Walls - Plaster/Drywall 5SF6 $68

Walls - Plaster/Drywall 6SF6,036 $28,743

Gymnasia

Ceiling - Plaster/Drywall 5SF25 $501

Ceiling - Plaster/Drywall 6SF2,775 $15,317

Doors - Transom Window 6SF16 $271

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Wood 6SF2,800 $19,740

Lighting - Metal Halide/Sodium Vapor 7EA8 $0

Walls - Plaster/Drywall 6SF3,724 $10,278

Walls - Structural Glazed Tile 6SF1,540 $4,845

Kitchen

Ceiling - Plaster/Drywall 6SF592 $2,049

Doors - Wood Doors inclu hw 6EA1 $301

Page 8 of 25BARRY Assessment Date: 10/20/2015

Page 9: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Kitchen

Floor - Tile Ceramic/ Porcelain 6SF592 $1,253

Lighting - Pendent/Surface 7EA4 $0

Walls - Plaster/Drywall 5SF4 $20

Walls - Plaster/Drywall 6SF746 $2,059

Walls - Structural Glazed Tile 6SF250 $787

Library

AC Unit 6EA3 $1,487

Casework 6LF60 $1,515

Ceiling - Lay-in 5SF40 $319

Ceiling - Lay-in 6SF1,963 $5,895

Doors - Side-lite 6SF60 $1,003

Doors - Transom Window 6SF27 $457

Doors - Wood Doors inclu hw 6EA5 $1,505

Floor - Carpet 6SF1,271 $2,708

Floor - Tile 6SF732 $1,602

Lighting - Lay-in 7EA34 $0

Walls - Plaster/Drywall 5SF6 $31

Walls - Plaster/Drywall 6SF2,728 $7,529

Lunch & Multipurpose Room

AC Unit 3EA1 $6,086

Ceiling - Lay-in 5SF16 $128

Ceiling - Lay-in 6SF1,290 $3,874

Chalk Board 4LF6 $551

Doors - Transom Window 6SF18 $305

Doors - Wood Doors inclu hw 5EA2 $2,348

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Terrazzo 6SF107 $234

Floor - Tile 6SF1,199 $2,623

Lighting - Lay-in 7EA25 $0

Serving Line 6LF14 $833

Storage/ Closet 6SF7 $51

Walls - Plaster/Drywall 6SF2,117 $5,843

Mechanical/ Service Rooms

Boiler Room 5SF2,544 $41,036

Coal Room 5SF1,100 $17,743

Interior Stairs 6LF50 $451

Page 9 of 25BARRY Assessment Date: 10/20/2015

Page 10: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Mechanical/ Service Rooms

Janitor's Closet 5SF100 $1,613

Janitor's Closet 6SF90 $645

Mechanical/ Service Rooms 5SF686 $11,065

Storage Room 5SF9,100 $146,787

Restroom

Accessories 6SF2,189 $20,190

Ceiling - Lay-in 6SF111 $333

Ceiling - Plaster/Drywall 6SF2,078 $7,191

Doors - Transom Window 6SF144 $2,438

Doors - Wood Doors inclu hw 6EA19 $5,719

Floor - Tile Ceramic/ Porcelain 5SF1 $21

Floor - Tile Ceramic/ Porcelain 6SF2,189 $4,633

Floor Drain 6EA8 $8,473

Hand Dryer 6EA16 $3,681

Lavatory 6EA16 $5,114

Lighting - Lay-in 7EA1 $0

Lighting - Pendent/Surface 7EA33 $0

Lighting - Wall Mounted 7EA2 $0

Partitions 5EA21 $15,768

Partitions 6EA19 $5,642

Urinals 4EA1 $7,669

Urinals 6EA19 $6,384

Walls - Masonry 6SF2,592 $8,154

Walls - Plaster/Drywall 5SF2 $10

Walls - Plaster/Drywall 6SF3,780 $10,432

Walls - Structural Glazed Tile 6SF882 $2,857

Water Closet 6EA41 $13,775

Rooms (Other Than Classrooms) Subtotal: $770,558

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Corridor

Ceiling - Lay-in 5SF80 $714

Ceiling - Lay-in 6SF8,242 $24,751

Page 10 of 25BARRY Assessment Date: 10/20/2015

Page 11: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Corridor

Ceiling - Plaster/Drywall 6SF554 $3,430

Doors - Wood Doors include hw 6EA11 $3,311

Drinking Fountains - Single Fountain 6EA8 $2,206

Floor - Terrazzo 6SF1,406 $11,802

Floor - Tile/Sheet 6SF7,470 $4,059

Lighting - Lay-in 7EA104 $0

Lighting - Pendent/Surface 7EA13 $0

Lighting - Wall Mounted 7EA4 $0

Stairs - Terrazzo 6LF19 $176

Student Lockers - One Tier 6EA466 $43,261

Walls - Plaster/Drywall 6SF6,436 $28,531

Walls - Structural Glazed Tile 6SF1,340 $4,216

Safety

Camera Viewing Station 6EA2 $1,365

Security Cameras 6EA12 $2,328

Stairs

Ceiling - Plaster/Drywall 5SF126 $1,898

Ceiling - Plaster/Drywall 6SF346 $2,533

Floor - Terrazzo 6SF536 $4,499

Handrails 6LF248 $2,149

Stairs - Terrazzo 6LF108 $1,002

Walls - Plaster/Drywall 5SF28 $174

Walls - Plaster/Drywall 6SF3,932 $10,852

Building Interior Subtotal: $153,259

Total Building Cost $4,005,810

Building: Annex

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Entrance

Entrance Control - Audio 6EA1 $497

Exterior Doors - Exterior Steel Door 6EA6 $2,883

Power Door Operator and Controls 6EA1 $0

Page 11 of 25BARRY Assessment Date: 10/20/2015

Page 12: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Annex

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Foundation

Foundation - Concrete 7LF560 $0

Superstructure - Metal Deck/ Concrete Topping 7SF14,400 $0

Lighting

Exterior Lighting - Wall Mounted 6EA9 $2,599

Roof System

Chimney - Metal Flue 6LF5 $791

Downspouts - Exterior Downspouts 6LF44 $1,462

Roof - Metal 6SF18,000 $241,184

Roof Structure - Steel / Metal Deck/ Concrete Topping 7SF14,400 $0

Walls

Canopy - Metal 6SF70 $1,504

Exterior Walls - Brick 6SF5,775 $38,814

Windows

Guard - Guards perforated 6SF1,470 $18,772

Lintels - Steel 6LF277 $8,041

Windows - Casement Aluminum Double-pane 6SF1,470 $10,973

Building Exterior Subtotal: $327,519

Building: Annex

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Automatic Transfer Switch 6EA1 $408

Emergency A/C Power - Corridors and Stairs 6SF1,300 $390

Exit Signs - Corridors and Stairs 2EA6 $3,273

Security System - CCTV 6SF14,400 $4,324

Security System - Intrusion Detection 6SF14,400 $3,707

Main Service

Independent Electrical Service for emergency power 6EA1 $2,921

Main Electrical Service - 800 A and Less than 120/208/3PH 6EA1 $3,398

PA System 6SF14,400 $4,736

Power Distribution

Lighting and Power Panels - 100 A 6EA2 $598

Page 12 of 25BARRY Assessment Date: 10/20/2015

Page 13: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Annex

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Power Distribution

Lighting and Power Panels - Above 100 A 6EA1 $497

Main Distribution Panels - 400 - 600 amp 6EA1 $528

Electrical System Subtotal: $24,780

Building: Annex

Category: Safty System

Item - Type Quantity Unit Rank Cost Group

Fire Alarm

Fire Alarm Panel 6EA1 $6,406

Fire Alarm Strobe Lights 6SF14,400 $5,148

Fire Alarm_System 6SF14,400 $7,001

Sprinkler System

Sprinkler Heads 7SF14,400 $0

Sprinkler Piping 7SF14,400 $0

Wet Sprinkler System 7SF14,400 $0

Safty System Subtotal: $18,555

Building: Annex

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Air Handling Systems

Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils - 4000-8000 cfm 5EA1 $26,442

Air Intake 6EA1 $5,765

Boiler Systems

Boiler Auxiliary- Non Condensing Hot Water - 2001 - 3000 MBH 5EA2 $89,093

Chemical Pot Feeder 6EA1 $725

Combustion Dampers 6EA2 $818

Glycol Feed System 6EA1 $539

Hot Water Pump 6EA2 $748

Non Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 2001 - 3000 MBH

5EA2 $120,265

Water Fill System 6EA1 $1,168

Page 13 of 25BARRY Assessment Date: 10/20/2015

Page 14: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Annex

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Heating Devices

Cabinet Heaters - With Hot Water Coil 6EA2 $709

Unit Heater - Electric 6EA2 $556

Mechanical Plumbing

Hydronic Supply and Return - Galvanized 6LF600 $46,392

Temperature Control

Electric Thermostat 6EA14 $0

Unit Ventilation

Unit Ventilators- Floor Mounted- Hot Water w/ DX Cooling Coil & w/ Self Contained

Compressors

5EA12 $118,569

Ventilation

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM 6EA1 $592

Exhaust Fans- Roof Mounted - 500 - 1500 CFM 6EA3 $1,777

Mechanical System Subtotal: $414,159

Building: Annex

Category: Plumbing System

Item - Type Quantity Unit Rank Cost Group

Hot Water

Gas Heater - Less than 150000 BTU/HR 6EA1 $310

Piping

Domestic Piping-Cold Water Horizontal Lines 6SF14,400 $3,501

Domestic Piping-Hot Water Horizontal Lines 6SF14,400 $2,677

Domestic Piping-Hot Water Return Lines 6SF14,400 $2,059

Sanitary Piping 6SF14,400 $13,179

Storm Piping 6SF14,400 $12,561

Vent Piping 6SF14,400 $9,678

Plumbing System Subtotal: $43,965

Building: Annex

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Page 14 of 25BARRY Assessment Date: 10/20/2015

Page 15: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Annex

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Regular Classroom (10 rooms)

Ceiling - Lay-in 5SF56 $447

Ceiling - Lay-in 6SF8,664 $26,018

Ceiling - Plaster/Drywall 5SF4 $37

Doors - Steel Doors incl hw 7EA10 $0

Floor - Tile 6SF8,724 $19,087

Lighting - Lay-in 6EA90 $10,708

Marker Board 7LF294 $0

Walls - Concrete Block 6SF6,218 $18,228

Walls - Plaster/Drywall 5SF5 $26

Walls - Plaster/Drywall 6SF4,113 $11,351

Special Education (1 room)

Ceiling - Lay-in 6SF367 $1,102

Doors - Steel Doors incl hw 7EA1 $0

Floor - Tile 6SF367 $803

Lighting - Lay-in 6EA4 $476

Marker Board 7LF10 $0

Walls - Concrete Block 6SF200 $586

Walls - Plaster/Drywall 5SF5 $26

Walls - Plaster/Drywall 6SF632 $1,744

Classrooms Subtotal: $90,639

Building: Annex

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

MDF_IDF

Doors - Steel Doors incl hw 7EA1 $0

Finishes 4SF1 $28

Finishes 6SF60 $428

Ventilation and Cooling 6EA1 $1,855

Mechanical/ Service Rooms

Boiler Room 6SF340 $2,436

Janitor's Closet 5SF50 $807

Mechanical/ Service Rooms 6SF290 $2,078

Page 15 of 25BARRY Assessment Date: 10/20/2015

Page 16: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Annex

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Restroom

Accessories 6SF1,106 $10,201

Ceiling - Plaster/Drywall 6SF1,106 $3,827

Doors - Steel Doors incl hw 7EA2 $0

Floor - Concrete Epoxy/ Painted 6SF509 $269

Floor - Epoxy/ Painted 6SF509 $269

Floor - Tile 6SF88 $193

Floor Drain 6EA5 $5,296

Hand Dryer 6EA4 $920

Lavatory 6EA8 $2,557

Lighting - Lay-in 6EA12 $1,428

Partitions 6EA12 $3,563

Urinals 6EA6 $2,016

Walls - Concrete Block 6SF3,266 $9,574

Water Closet 6EA14 $4,704

Rooms (Other Than Classrooms) Subtotal: $52,448

Building: Annex

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Corridor

Ceiling - Lay-in 6SF1,564 $4,697

Ceiling - Plaster/Drywall 6SF258 $1,598

Doors - Steel Doors incl hw 7EA8 $0

Drinking Fountains - Single Fountain 6EA2 $551

Floor - Tile Ceramic/ Porcelain 6SF258 $719

Floor - Tile/Sheet 6SF1,564 $850

Lighting - Lay-in 6EA20 $2,380

Walls - Concrete Block 6SF4,577 $13,417

Safety

Security Cameras 6EA2 $388

Building Interior Subtotal: $24,600

Total Building Cost $996,665

Page 16 of 25BARRY Assessment Date: 10/20/2015

Page 17: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Leased-Pre K

Category: Building Exterior

Item - Type Quantity Unit Rank Cost Group

Entrance

Exterior Doors - Exterior Steel Door 6EA4 $1,922

Exterior Doors - Store Front 6EA9 $4,915

Exterior Doors - Transom Lite 6EA7 $2,193

Exterior Stairs - Concrete 6LF18 $1,472

Foundation

Foundation - Concrete 7LF640 $0

Superstructure - Slab on Grade 7SF13,767 $0

Lighting

Exterior Lighting - Wall Mounted 6EA19 $5,486

Roof System

Coping - Metal 6LF480 $15,417

Downspouts - Exterior Downspouts 6LF50 $1,662

Parapet - Parapet > 30" 6LF480 $30,682

Roof - Modified Bitumen 6SF10,000 $94,094

Roof Structure - Steel / Metal Deck/ Concrete Topping 7SF10,000 $0

Walls

Canopy - Fabric 6SF770 $11,826

Exterior Walls - Concrete Block 6SF3,800 $25,540

Exterior Walls - Stucco 6SF2,000 $9,581

Windows

Lintels - Steel 6LF175 $5,080

Skylite - Lexan 6SF80 $1,912

Storefront Windows 6SF1,053 $11,805

Building Exterior Subtotal: $223,586

Building: Leased-Pre K

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

Emergency Battery Packs - Corridors and Stairs 6EA12 $2,430

Exit Signs - Corridors and Stairs 6EA8 $1,198

Security System - CCTV 6SF13,767 $4,134

Security System - Intrusion Detection 6SF13,767 $3,544

Page 17 of 25BARRY Assessment Date: 10/20/2015

Page 18: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Leased-Pre K

Category: Electrical System

Item - Type Quantity Unit Rank Cost Group

Emergency System

UPS - Less than 30 KW 6EA1 $7,886

Main Service

Main Electrical Service - 800 A and 120/208/3PH 6EA1 $3,570

PA System 6SF13,767 $4,528

Power Distribution

Lighting and Power Panels - 100 A 6EA1 $299

Lighting and Power Panels - Above 100 A 6EA5 $2,485

Electrical System Subtotal: $30,074

Building: Leased-Pre K

Category: Safty System

Item - Type Quantity Unit Rank Cost Group

Fire Alarm

Fire Alarm Panel 6EA1 $6,406

Fire Alarm Strobe Lights 6SF13,767 $4,922

Fire Alarm_System 6SF13,767 $6,694

Sprinkler System

Sprinkler Heads 7SF13,767 $0

Sprinkler Piping 7SF13,767 $0

Wet Sprinkler System 7SF13,767 $0

Safty System Subtotal: $18,021

Building: Leased-Pre K

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Air Handling Systems

Roof Top Unit-Single Zone-Roof Mounted- Gas Heating and DX Cooling Coil - 5 - 10 tons 5EA4 $42,491

Roof Top Unit-Single Zone-Roof Mounted- Gas Heating and DX Cooling Coil - 5 - 10 tons 7EA2 $0

Temperature Control

Electric Thermostat 6EA6 $0

Ventilation

Exhaust Fans- Indoor - Less than 500 CFM 6EA9 $2,666

Page 18 of 25BARRY Assessment Date: 10/20/2015

Page 19: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Leased-Pre K

Category: Mechanical System

Item - Type Quantity Unit Rank Cost Group

Ventilation

Exhaust Fans- Roof Mounted - 1501 - 8000 CFM 6EA6 $3,554

Roof Mounted Duct Work 6LF20 $7,580

Mechanical System Subtotal: $56,292

Building: Leased-Pre K

Category: Plumbing System

Item - Type Quantity Unit Rank Cost Group

Hot Water

Electric Heater - Less than 20 KW 6EA3 $2,047

Piping

Domestic Piping-Cold Water Horizontal Lines 6SF10,000 $2,431

Domestic Piping-Hot Water Horizontal Lines 6SF10,000 $1,859

Domestic Piping-Hot Water Return Lines 6SF10,000 $1,430

Sanitary Piping 6SF10,000 $9,152

Storm Piping 6SF10,000 $8,723

Vent Piping 6SF10,000 $6,721

Plumbing System Subtotal: $32,363

Building: Leased-Pre K

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Pre School (2 rooms)

Casework 6LF15 $379

Ceiling - Lay-in 5SF52 $415

Ceiling - Lay-in 6SF9,873 $29,649

Floor - Tile 5SF65 $375

Floor - Tile 6SF9,925 $21,715

Lighting - Lay-in 7EA107 $0

Storage/ Closet 6SF1,569 $11,375

Walls - Concrete Block 6SF1,332 $3,905

Walls - Plaster/Drywall 6SF4,881 $13,471

Work Sink 6EA2 $758

Page 19 of 25BARRY Assessment Date: 10/20/2015

Page 20: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Leased-Pre K

Category: Classrooms

Item - Type Quantity Unit Rank Cost Group

Classrooms Subtotal: $82,041

Building: Leased-Pre K

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Administrative Suites/Offices

Ceiling - Lay-in 5SF10 $80

Ceiling - Lay-in 6SF2,124 $6,378

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Carpet 6SF1,699 $3,620

Floor - Tile 5SF6 $35

Floor - Tile 6SF429 $939

Lighting - Lay-in 6EA28 $3,331

Power Distribution 6EA50 $106,244

Walls - Plaster/Drywall 7SF3,160 $0

Lunch & Multipurpose Room

Ceiling - Lay-in 6SF360 $1,081

Floor - Tile 5SF15 $86

Floor - Tile 6SF345 $755

Lighting - Lay-in 7EA4 $0

Walls - Concrete Block 6SF240 $704

Walls - Plaster/Drywall 6SF590 $1,628

Mechanical/ Service Rooms

Janitor's Closet 6SF82 $587

Storage Room 6SF26 $186

Restroom

Accessories 6SF355 $3,274

Ceiling - Lay-in 6SF355 $1,066

Doors - Wood Doors inclu hw 5EA1 $1,174

Doors - Wood Doors inclu hw 6EA9 $2,709

Floor - Tile 5SF355 $1,601

Floor Drain 6EA10 $10,592

Lavatory 6EA10 $3,196

Lighting - Lay-in 7EA5 $0

Lighting - Pendent/Surface 6EA3 $372

Lighting - Pendent/Surface 7EA2 $0

Page 20 of 25BARRY Assessment Date: 10/20/2015

Page 21: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Building: Leased-Pre K

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost Group

Restroom

Walls - Concrete Block 6SF180 $528

Walls - Plaster/Drywall 5SF2 $10

Walls - Plaster/Drywall 6SF1,792 $4,946

Water Closet 5EA1 $1,344

Water Closet 6EA9 $3,024

Rooms (Other Than Classrooms) Subtotal: $159,791

Building: Leased-Pre K

Category: Building Interior

Item - Type Quantity Unit Rank Cost Group

Corridor

Ceiling - Lay-in 6SF389 $1,168

Drinking Fountains - Single Fountain 6EA1 $276

Floor - Tile/Sheet 6SF389 $211

Lighting - Pendent/Surface 7EA4 $0

Walls - Plaster/Drywall 6SF586 $2,598

Building Interior Subtotal: $4,253

Total Building Cost $606,421

SITE

Category: Site

Item - Type Quantity Unit Rank Cost Group

Civil/Drainage

Civil/ Drainage - Catch Basin 6EA10 $10,938

Civil/ Drainage - Site Manhole 6EA10 $14,927

Fencing

Fencing - Chain Link 5LF100 $6,099

Fencing - Chain Link 6LF1,275 $23,939

Landscape

Benches 6EA2 $860

Landscape - Grass 6SF16,971 $14,076

Landscape - Hardscape- Concrete 5SF7,500 $70,142

Page 21 of 25BARRY Assessment Date: 10/20/2015

Page 22: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

SITE

Category: Site

Item - Type Quantity Unit Rank Cost Group

Landscape

Landscape - Hardscape- Concrete 6SF3,600 $21,879

Parkway trees 6EA59 $38,943

Play Area - Asphalt/ Hardscape 6SF43,420 $104,933

Trash Receptacles 6EA2 $625

Parking Lot

Concrete Curbs 6LF175 $2,247

Interior Plantings 6LF60 $2,553

Surface - Asphalt 6SF13,650 $32,988

Playground

Equipment - School Age 5-12 6EA1 $3,546

Surface - Square Rubber Mats 5SF2,400 $24,230

Sidewalks

Sidewalks - Internal Walks 6LF250 $3,003

Sidewalks - Perimeter Sidewalks 6SF10,832 $21,531

Signage

Flag Pole - Flag Pole 6EA1 $1,657

Marquee - Free Standing Back lighted w/ LED 6EA1 $0

Site Subtotal: $399,115

Total Site Cost $399,115

Campus Total ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.

$6,008,010

Page 22 of 25BARRY Assessment Date: 10/20/2015

Page 23: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Definitions

● Quantity

● Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,

depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and

additional work triggered by building codes.

means, for each item, the total number (or amount) of that item that exists and was evaluated.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like

chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

● Cost

● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to

alleviate overcrowding; these are viewed as separate capital needs.

Page 23 of 25BARRY Assessment Date: 10/20/2015

Page 24: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

YNY40132131824722201201Regular ClassroomArt Room 2nd Floor

YNY401061174823720203203Regular ClassroomComputer Lab 2nd Floor

YNY40132131823715101101Regular ClassroomKindergarten 1st Floor

YNY40132131821717103103KindergartenKindergarten 1st Floor

YNY40132131821752104104Regular ClassroomKindergarten 1st Floor

NNY40132131823715106106Regular ClassroomKindergarten 1st Floor

YNY40421337Teacher lunch200Faculty LoungeKindergarten 2nd Floor

YNY40132131823719207207Science ClassroomKindergarten 2nd Floor

YNY40132131824722107107Regular ClassroomRegular Classroom 1st Floor

YNY40132131824674108108Regular ClassroomRegular Classroom 1st Floor

YNY40132131823718109109Regular ClassroomRegular Classroom 1st Floor

YNY40132131821725110110Regular ClassroomRegular Classroom 1st Floor

YNY40132131824725202202Regular ClassroomRegular Classroom 2nd Floor

YNY40132131823725204204Science ClassroomRegular Classroom 2nd Floor

YNY40132131821718205205Regular ClassroomRegular Classroom 2nd Floor

YNY40132131824721206206Regular ClassroomRegular Classroom 2nd Floor

YNY40132131823720208208Regular ClassroomRegular Classroom 2nd Floor

YNY40132131823720209209Science ClassroomRegular Classroom 2nd Floor

YYY40132131823730210210Regular ClassroomRegular Classroom 2nd Floor

YNY40132131823718211211Regular ClassroomRegular Classroom 2nd Floor

YNY407978621471100100Special Education 1st Floor

Annex

YNY40104102167186711Regular ClassroomRegular Classroom 1st Floor

YNY4010410216718711010Regular ClassroomRegular Classroom 1st Floor

YNY40104102167187122Regular ClassroomRegular Classroom 1st Floor

YNY40104102167186833Regular ClassroomRegular Classroom 1st Floor

YNY40104102167187844Regular ClassroomRegular Classroom 1st Floor

YNY40104102167187155Regular ClassroomRegular Classroom 1st Floor

NNY40104102167188066Regular ClassroomRegular Classroom 1st Floor

YNY40104102167187177Regular ClassroomRegular Classroom 1st Floor

YNY40104102167188088Regular ClassroomRegular Classroom 1st Floor

YNY40104102167186799Regular ClassroomRegular Classroom 1st Floor

YNN4000640367NABetween 4 & 6OfficeSpecial Education 1st Floor

Leased-Pre K

YNN40037232016,594N/A4362 B & APre SchoolPre School 1st Floor

Page 24 of 25BARRY Assessment Date: 10/20/2015

Page 25: John Barry Elementary School

John Barry Elementary School2828 N Kilbourn Ave Chicago, IL 60641

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Leased-Pre K

YNN40032026013,331N/A4634 A/BPre SchoolPre School 1st Floor

Page 25 of 25BARRY Assessment Date: 10/20/2015