Vinit HansamuitSVP, Business & Organization Transformation November 2018
JOGMEC FORUM 2018 Keynote Speaker
PTTEP –JOGMEC Collaboration
Vision: Leading Asian E&P company driven by competitive performance, advanced technology and green practices
Mission: PTTEP operates globally to provide reliable energy supply and sustainable value to all stakeholders
40 Projects in 11 countriesProduction : 350,000 BOED
16 Technology ProgramsIncrease Exploration Success• Basin Analysis• Advanced Imaging
Green Practices• GHG Reduction• Waste Management• Water Management• Energy Efficiency
Enhance Production• Increase Recovery• Maximize Production• CO2 Management• Corrosion & Erosion Management• Sand Management• Smart Maintenance• Well Engineering
Technology for New Business• Robotics• Renewable Energy• Energy Storage
4 Technology Platforms
Enhance ProductionIncrease Exploration Success Green Practice Technology for New
Business
Proof of Concept Development
Phase 1Preliminary Study
Phase 2Lab Testing
Phase 3Prototype
Phase 4Pilot
Phase 5Deployment
Technology Development Portfolio
• Online UT• Top of the line
Corrosion Mitigation and Prediction Model
• PTTEP Corrosion Prediction Modelling based on Machine Learning
• Microbiologically Influenced Corrosion Project
• Advance coating by graphene
• Self-Cleaning Production Separator
• Automatic Fire Pixel Detection using Image Processing
• AI for Remote monitoring and diagnostics
• Asset Performance Management (APM)
• Portable Gas Shield Capsule
• Electromagnetic fluid movement monitoring
• CBIL for hydrocarbon extraction/recovery
• Production System Optimization Model
• In-House Software for Production Optimization (LINOPT)
• Pipeline installation optimization bymechanical interference joint(ZAP-LOK)
• Stochastic Seismic Inversion for Reservoir Modeling
• Synthetic Biogenic Gas
• Metal foams for air cooled heat transfer piping application
• Low salinity water flooding
• Chemical EOR for S1• Extremely Low BTU
Flare Tip Technology Development
• Artificial Lift Technology for Mature Field
• Well Completion Materials Optimization
• High Performance Water Based Mud
• In-situ pipeline Hg decontamination for decommissioning
• Hg removal by Metal Organic Framework (MOF)
• Metal foams for Hg removal
• Use of onshore drill cuttings waste as alternative material for construction
• Emulsion fuel by clustered water for diesel consumption reduction
• Vanadium Redox Flow battery (VRB)
• Lithium-Sulfur battery• Partial free energy
motor/generator
• CO2 removal by supersonic
• CO2 removal by Metal Organic Framework (MOF)
• CO2 Conversion to Carbonate-base product (CCC)
• Direct methane conversion to methanol
• CO2 conversion to CO by cold plasma
• Micro Algae for CO2 conversion to high value products
• Bioconversion of CO2 to biochemical thru fermentation
• Development of Carbon Nanotube from Flare or Associated Gas
• Underwater robot for subsea inspection (AUV)
• Advanced Subsea IRM• Jacket Inspection AUV• In-Pipe inspection
robots• NDT multi-rotor UAV• Explosion protected
UAV• Feasibility Study of
replacing the SAT diver operation with the ROV
• Advanced Structural Geological Modelling
• Seismic-while-drilling• Wireless Land
Seismic Acquisition System
Basin Analysis & Advanced
ImagingWell
Engineering
Increase Recovery & Maximize
Production
Corrosion & Erosion
ManagementSmart
MaintenanceRobotic
TechnologyGHG
ManagementWaste & WaterManagement
Energy Efficiency / Storage /
Renewable Energy
Project List by Value Chain
SWD, 1
EM, 22
CBIL, 2.7
TOLC, 17
Online UT, 5
Well Completion Materials Optimization, 13
Advance coating by graphene, 1
Carbon Nanotube, 12
CO2 Removal by Supersonic , 22
CO2 Removal by MOF, 11.00
Hg removal by MOF, 5.7
Hg removal by Metal foams , 2
Lithium-Sulfur …Vanadium Redox Flow battery, 1
PSO, 10
AUV for subsea pipeline inspection, 5
In-pipe Inspection Robot, 0.30
Explosion protected UAV, 1.9
NDT UAV, 0.5
Digital Predictive Maintenance, 27
Machine Learning for Corrosion Prediction, 10
Low BTU Flare Tip, 45
Advanced Subsea IRM, 13
In-situ pipeline Hg decontamination, 268
CO2 Conversion to Carbonate, 680
Zap-Lok, 58Methane conversion to methanol , 38
LINOPT, 137
Emulsion fuel, 57
0
1
5
25
125
625
1 2 3 4 5 6
Status as of May 2018
Maturity
Ben
efit
*Cumulative benefit till 2024
Phase
MMUSD*
Prelim Study Lab Testing Prototype Pilot Deployment
Technology Portfolio
Two heads are better than one
Collaboration is a key to success
What makes Collaboration Difficult
People and Organization are all different-Think in different ways about different things- Have different goals or strategy
https://www.purina.co.uk/dogs
What makes Collaboration Powerful
It requires a learning attitude- Open to the ideas, goals of others- Honesty about your own assumptions- Willingness to change your thinking
https://www.google.com
Simple Ways for Collaboration
Set clear objective and expectations Think of your own ideas as input, not out come Listen to learn, rather than judge Identify your strengths and weaknesses Define your role explicitly Communicate regularly Put things in writing Support one another
Working together is success
PTTEP-JOGMEC MOU
8 March 2017
M3 Gas Prospect
Volcanic Reservoir StudyPTTEP-MOECO-JOGMECFrom 2015-2017
Prior to MOU
PTTEP-JOGMEC MOU
Verify the Utilization of EM for deep oil reservoir observations
Monitor the conductive body in water flooding and EORDeploy the technology in monitoring Oil production and
other alike applicationsForm a new Business
in the future
375 km from BangkokDiscovered 1982Light Crude : 30+
APICurrent Production :
28,000 BPDWF and EOR have
been applied
Sirikit Oil Field
Electromagnetic Field Trial, Sirikit Oil FieldSurvey:1-15 November 2017
Surveys were carried outDuring the dry season inNovember
Promising Outcome2nd Survey is plannedExtend to 3D modelConclusion by Q2 ’19Deploy in both parties fieldsAim for Commercialization
st47st46
st45st44
st43st42 st41
st40st39
st38
st37st36
st35st34
st33
st32st31
st30st29
st28st27
st26st25
st24st23
st22st21
st20
st19st18
st17st16
st15st14
st13st12
st11st10
st9st8
st7st6st5 st4
st3st2
st1
Resi
stiv
ity (Ω
m)
0
5
10
14
WellSQUITEM St.
Legend
0 100 200Distance (m)
N
Resistivity Map of SQUITEM 1D inversion
A success case of partnerships and collaboration Everyone work towards common goal Share each other strengths Emphasize on clear communication between partners