Job Performance Requirement 10-17. Horseshoe Load. A Start the load at a rear corner of the hose bed with the hose on its side. JPR 10-17A. B Lay the hose toward the front wall of the hose bed and then along the wall to the other side and back toward the rear. JPR 10-17B. - PowerPoint PPT Presentation

Citation preview

Page 1: Job Performance Requirement  10-17

Job PerformanceRequirement 10-17

Horseshoe Load

Page 2: Job Performance Requirement  10-17

A Start the load at a rear corner of thehose bed with the hose on its side.

JPR 10-17A

Page 3: Job Performance Requirement  10-17

B Lay the hose toward the front wall of the hosebed and then along the wall to the other side

and back toward the rear.

JPR 10-17B

Page 4: Job Performance Requirement  10-17

C At the rear, fold the hose alongside itself andhead back to where it started. Fold it again and

another “U” is formed.

JPR 10-17C

Page 5: Job Performance Requirement  10-17

D When the bed is filled, start a new layer by laying the hose flat on its side and continue to the front of

the bed. Continue the hose down the side of thebed toward the rear, or

JPR 10-17D

Page 6: Job Performance Requirement  10-17

E lay a few flakes of hose on top longways for quick access. Attach a hose strap, ball valve, hose bag, or other set of appliances or devices deemed necessary

for quick deployment.