3
1 JITENDRA KUMAR PANDEY Mobile No. : 08964851491 E-mail : [email protected] ______________________________________________________________________ __________________________________________ To achieve proficiency in the field of engineering and grow as an efficient engineer by delivering the best of my abilities and knowledge. PROFESSIONAL EXPERIENCE: Total Experience 5 year 4 month PRESENT EXPEREINCE: Company Name. : KSK Mahanadi Power Company Limited Duration : Sept 2015 to Till Date Designation : ENGINEER Current Location : KSK Mahanadi Power Company Limited 6x600 MW, Nariyara (C.G.) PREVIOUS EXPERIENCE: TEACHNICAL EXPERIENCE: 1) Company Name. : PRECISION ERECTORS & SERVICES PVT LTD Duration : June 2015 to August 2015 Designation : SENIOR ENGINEER Location : ADANI POWER MAHARASTRA LIMITED TIRORA 2x660MW (Phase-III) 2) Company : B. S. B. K Engineers Pvt Ltd Designation : Engineer Duration : January 2012 to May 2015 Project Done during Jan-2012 to May-2015:- 1.1 C.S.P.G.C.L. KORBA (EAST & WEST) ASH HANDLING PLANT 4x50 & 2X120MW KTPS & 4x210MW From Jan-2012 to August-2013. 1.2 TNEB (NORTH CHENNAI THERMAL POWER STATION-II) ASH HANDLING PLANT. 2x600MW From August-2013 to Oct-2013. 1.3 MATTUR THERMAL POWER STATION-II ASH HANDLING PLANT 1X600MW From Oct-2013 to Nov-2013. 1.4 NTPC SUPER THERMAL PLANT ASH HANDLING PLANT 2x500MW+ 2x660MW From Nov-2013 to Dec-2013. 1.5 ADANI POWER MAHARASTRA LIMITED TIRORA 5x660MW RESUME

jitu_updated_yahoo

Embed Size (px)

Citation preview

Page 1: jitu_updated_yahoo

1

JITENDRA KUMAR PANDEY

Mobile No. : 08964851491 E-mail : [email protected] ________________________________________________________________________________________________________________

To achieve proficiency in the field of engineering and grow as an efficient engineer by delivering the best of my abilities and knowledge.

PROFESSIONAL EXPERIENCE: Total Experience 5 year 4 month PRESENT EXPEREINCE:Company Name. : KSK Mahanadi Power Company Limited Duration : Sept 2015 to Till DateDesignation : ENGINEER Current Location : KSK Mahanadi Power Company Limited 6x600 MW, Nariyara (C.G.)

PREVIOUS EXPERIENCE:TEACHNICAL EXPERIENCE:1) Company Name. : PRECISION ERECTORS & SERVICES PVT LTD Duration : June 2015 to August 2015 Designation : SENIOR ENGINEER Location : ADANI POWER MAHARASTRA LIMITED TIRORA 2x660MW (Phase-III)

2) Company : B. S. B. K Engineers Pvt Ltd Designation : Engineer Duration : January 2012 to May 2015

Project Done during Jan-2012 to May-2015:-

1.1 C.S.P.G.C.L. KORBA (EAST & WEST) ASH HANDLING PLANT 4x50 & 2X120MW KTPS & 4x210MW From Jan-2012 to August-2013.

1.2 TNEB (NORTH CHENNAI THERMAL POWER STATION-II) ASH HANDLING PLANT. 2x600MW From August-2013 to Oct-2013.

1.3 MATTUR THERMAL POWER STATION-II ASH HANDLING PLANT 1X600MW From Oct-2013 to Nov-2013.

1.4 NTPC SUPER THERMAL PLANT ASH HANDLING PLANT 2x500MW+ 2x660MW From Nov-2013 to Dec-2013.

1.5 ADANI POWER MAHARASTRA LIMITED TIRORA 5x660MW From Jan-2014 to Aug-2014.

1.6 JINDAL POWER LIMITED TAMNAR 4x600MW From Sept-2014 to Nov-2014

1.7 ADANI POWER MAHARASTRA LIMITED TIRORA 5x660MW From Nov-2014 to May-2015

ACADEMIC EXPERIENCE:Company : Gargi Institute of Science & Technology, BhopalDesignation : LecturerDuration : September 2010 to July 2011

RESUME

Page 2: jitu_updated_yahoo

2

Job Profile: To monitor AHP operations including Pumps/ash disposal/ESP and bag filters/pipe line (Ash

dyke). My job profile includes to maintain the plant as instructed by the seniors and to handle the

workforce properly and to do their maximum utilization. Supervision and Troubleshooting of dry fly ash handling system (i.e. vacuum pump, compressors,

blowers, etc). Looking the operation of Dry Fly Ash Handling System and HCSD System. Maintain all operation related activities including log books and check list of auxiliaries. Inter-departmental co-ordination with Main Control Room, Chemistry, Safety, Ash Management

Group, Environment, and Security … etc. Run the system in scada and instruct about logic for smooth and safe operation.

Job Responsibility:

Responsible for safe and efficient plant operation start up, shut down, emergency handling, troubleshooting etc in ash handling.

To ensue ash handling plant availability (>95%). To coordinate with operations team to minimize idle running of the system. To ensure all desk parameters like pressure, vacuum are in prescribe limits. To coordinate with outsourcing agencies and ensure timely completion of work allocated. Monitor continual improvement in the operational parameters of AHP. Plan and ensure availability of all the inputs for smooth and efficient operation of AHP. Implement improvements suggested by efficiency cell to improve the operational parameters of the

plant. Coordinate with maintenance team to develop suitable solutions for key issues / problems observed

during the operation of plant. To coordinate with maintenance team to ensure timely rectification of equipment breakdown. Ensure all statutory safety standards are followed. To prepare MIS report periodically and submit to seniors for review.

Professional Qualification:

Completed BE with the specialization in Electronics and communication engineering from Rajiv Gandhi Technical University in 2008.

Computer Knowledge:

OPERATING SYSTEM: Windows XP, MS Office.

Achievements:

Got certificate for environment awareness exam. Got first prize in science modal competition in school. Played state level basketball in school. Got scholarship in school for APTECH computer education.

Personal Details:

Address : - S/o O. P. Pandey, E-212, Ketu Vihar, htps colony, darri (korba) Date Of Birth : - 11-10-1986 Languages Known : - English, Hindi. Area of Interest : - Listening music & Basketball.

Date: 16/June/16

Page 3: jitu_updated_yahoo

2

Place: Korba