Jitu Resume 1 (1)

Embed Size (px)

Citation preview

  • 8/6/2019 Jitu Resume 1 (1)

    1/2

    CURRICULUM VITAE

    Jitendra S. Parsutkar Permanent AddressS/O. Shrirang .R. Parsutkar

    Mobile: +91-9860989882 Babupeth Ward No: [email protected] Gadge Baba Chowk; MahadeO

    jitu_27181@ rediffmail.com Mandir,ChandrapurM.S (India).Pin: 442403

    CAREER OBJECTIVE

    To utilize my knowledge and skills in an optimum manner for the development oforganization and self as a whole.

    Educational Qualification :

    Diploma in Electrical Engineering from Sri Sai Polytechnic, Chandrapur in 2010With 64%.

    Passed ITI in Electrician from Chandrapur in 2000 with 75%.

    Passed 10+2 Exam from L.T.V.Junior College Chandrapur in 1998 with 58%

    Details of Employment: Presently working as Sr. Technician in GUPTA ENERGY LTD. 2x60 MW TPS from

    2009 to till date Working as a Sr. Technician in Murli Cement Industries Ltd. 2.14 MTPa cement plant

    from July 2006 to October 2009

    Worked as an Electrician in Grace Industries Ltd, Tadali from 2004-2005. Worked as an Apprenticeship Electrician in 66 KV Substation (M.S.E.B Balharshah)

    from 2001-2003.

    Current Position: Sr. Technician.

    Job Profile:

    Erection & commissioning:

    Execution of project activities of various stationary & rotating equipmentin Arealike Raw Mill, Coal Mill, Kiln, Cooler and Cement Mill Area.

    HT-LT Switchgear (Make Siemens), Transformer (EMCO Make),Motor(SIMO, CHINA,Make), AC & DC drives ( Make ABB).

    Salient features of the previous Plant:

    Total installed capacity 3 X 16 MW. Captive power plant

    Cement Plant of 2.14 MTPa.

  • 8/6/2019 Jitu Resume 1 (1)

    2/2

    Work Responsibilities of the Previous plant :

    Doing preventive maintenance.Attending to maintenance & trouble shooting works of LT & HT drives & Switchgear

    (Like ABB make SF6, Asia MOCB, Crompton Greaves Vacuum Breaker, EE ACB, L & TACB, Merlin Gerin etc.), VFD drives (, Siemens, ABB etc.), Battery, Fire Hydrant system,

    Creating a safe working environment by encouraging the workmen.

    Work Responsibilities of the Present plant :

    Total installed capacity 2x60 MW. CFBC Boiler power plant. Working in 220kv switch yard erection.

    6.6 KV HT System.

    HT&LT Breaker testing and maintenance (11kv).

    DC Emergency system, Battery, Emergency lighting system.

    HT Breakers-Installation, testing, interlocks with bus PT etc at Siemens Breakers.

    Working on relays Siemens.

    Work on Transformer testing and commissioning of 1MVA to 75 MVA power

    Transformer.

    Achievement:

    Actively involved in erection & commissioning of Murli Industries Cement Plant.Experience in commissioning of 320KVA DG (Cummins and Caterpillar),VFD drives, MCCs& PMCCs, HT switchgear etc.

    Personal Information:

    Fathers Name Shri. Shrirang.R. ParsutkarDate of Birth May 27th 1980Nationality IndianMarital Status UnmarriedLanguage Proficiency Marathi, English & Hindi

    Declaration:

    I hereby declare that the information furnished above is true to the best of my

    knowledge and belief.

    Date: 8-7-11

    Place: chandrapur

    (Jitendra. S.Parsutkar)