Upload
asmarazzak
View
220
Download
0
Embed Size (px)
Citation preview
8/6/2019 Jitu Resume 1 (1)
1/2
CURRICULUM VITAE
Jitendra S. Parsutkar Permanent AddressS/O. Shrirang .R. Parsutkar
Mobile: +91-9860989882 Babupeth Ward No: [email protected] Gadge Baba Chowk; MahadeO
jitu_27181@ rediffmail.com Mandir,ChandrapurM.S (India).Pin: 442403
CAREER OBJECTIVE
To utilize my knowledge and skills in an optimum manner for the development oforganization and self as a whole.
Educational Qualification :
Diploma in Electrical Engineering from Sri Sai Polytechnic, Chandrapur in 2010With 64%.
Passed ITI in Electrician from Chandrapur in 2000 with 75%.
Passed 10+2 Exam from L.T.V.Junior College Chandrapur in 1998 with 58%
Details of Employment: Presently working as Sr. Technician in GUPTA ENERGY LTD. 2x60 MW TPS from
2009 to till date Working as a Sr. Technician in Murli Cement Industries Ltd. 2.14 MTPa cement plant
from July 2006 to October 2009
Worked as an Electrician in Grace Industries Ltd, Tadali from 2004-2005. Worked as an Apprenticeship Electrician in 66 KV Substation (M.S.E.B Balharshah)
from 2001-2003.
Current Position: Sr. Technician.
Job Profile:
Erection & commissioning:
Execution of project activities of various stationary & rotating equipmentin Arealike Raw Mill, Coal Mill, Kiln, Cooler and Cement Mill Area.
HT-LT Switchgear (Make Siemens), Transformer (EMCO Make),Motor(SIMO, CHINA,Make), AC & DC drives ( Make ABB).
Salient features of the previous Plant:
Total installed capacity 3 X 16 MW. Captive power plant
Cement Plant of 2.14 MTPa.
8/6/2019 Jitu Resume 1 (1)
2/2
Work Responsibilities of the Previous plant :
Doing preventive maintenance.Attending to maintenance & trouble shooting works of LT & HT drives & Switchgear
(Like ABB make SF6, Asia MOCB, Crompton Greaves Vacuum Breaker, EE ACB, L & TACB, Merlin Gerin etc.), VFD drives (, Siemens, ABB etc.), Battery, Fire Hydrant system,
Creating a safe working environment by encouraging the workmen.
Work Responsibilities of the Present plant :
Total installed capacity 2x60 MW. CFBC Boiler power plant. Working in 220kv switch yard erection.
6.6 KV HT System.
HT< Breaker testing and maintenance (11kv).
DC Emergency system, Battery, Emergency lighting system.
HT Breakers-Installation, testing, interlocks with bus PT etc at Siemens Breakers.
Working on relays Siemens.
Work on Transformer testing and commissioning of 1MVA to 75 MVA power
Transformer.
Achievement:
Actively involved in erection & commissioning of Murli Industries Cement Plant.Experience in commissioning of 320KVA DG (Cummins and Caterpillar),VFD drives, MCCs& PMCCs, HT switchgear etc.
Personal Information:
Fathers Name Shri. Shrirang.R. ParsutkarDate of Birth May 27th 1980Nationality IndianMarital Status UnmarriedLanguage Proficiency Marathi, English & Hindi
Declaration:
I hereby declare that the information furnished above is true to the best of my
knowledge and belief.
Date: 8-7-11
Place: chandrapur
(Jitendra. S.Parsutkar)