AgendaPresentation MH + PuMHaIntroduction JIT – Just In TimeGame 1BreakGame 2Summery

Production developmentManagement and training

ABB

Hydro automation structure

Gargnäs Forsa Trä

Mälarenergi

NCC

MdH

Calesco Foil

Flextronics(Enics)

Margareta Hammarström

Gränges Foral

Stoneridge

Bombardier

Bulten

JIT-game.Just In Time production flow exercise based on push respectively pull approach to show the difference in the resulting flow.

JIT-game A work shop in Just In Time

Just-In-Time

Is an operating methodology having as its basic objective the

systematic elimination of WASTE

Elimination of Waste

Flow EmployeeInvolvement Quality

Uniform plant loadReduced setup timeOverlapping operationPull system (linking operations)JIT purchasing

JIT Philosophy

Wath is Just-In-Time about?It is about elimination the wastes of:TimeOver productionStorageWaitingDelayTransport

It focusses on waste by focussing onTIME

The key themes

Time managementSimplicityVisibilitySynchronisationContinous improvementTotal involvement

Acitvities which cost time and moneyscrap inspection holding receiving accepting requestingenquiring counting transmitting trackingfiling handling picking hiding rework releasing rejectionauthorising servicing issuing recording reviewinglocating fetching placing finding unpacking chasing servicing expediting rectifying measuing repacking copying posting

Each of these adds cost and time to the job:

None of them adds any value

JIT-just In TimeWhat do we need to do - to bring it about?

FlowQualityFlexibilityInvolvement

Patnershipwith supplier

Understand theneed of the customer

IntroductionAnakron Ltd - a company with traditional

manufacturingBREAKStremline Ltd - a company with Just-In-

Time manufacturingSummary and following up of the results

JIT-game A work shop in Just In Time

JIT-Game

Cashflow

Manufacturing

1.To supplier 2.From customer

Leadtime

Material costs

Overhead20%

Materials75%

Direct wage costs5%

Capital Employd

LeadTime

LT

Time

Time

+

-

+

-

JIT-just In TimeWhat do we need to do - to bring it about?

FlowQualityFlexibilityInvolvement

Patnershipwith supplier

Understand theneed of the customer

The three cooks

The productionprocess The customer

The supplier

JIT-just In TimeWhat do we need to do - to bring it about?

FlowQualityFlexibilityInvolvement

Patnershipwith supplier

Understand theneed of the customer

Customer needsTime

Delivery timeLead time

QualityPPM

Cost

JIT-just In TimeWhat do we need to do - to bring it about?

FlowQualityFlexibilityInvolvement

Patnershipwith supplier

Understand theneed of the customer

Flow

Telephone assembly

Telephone assembly

From One person assemblingone productat a time

ToSeveral peopleassemblingseveral products simultaneouslyin a measured flow

Production flowCustomer requirement: 50/day => 400min => 8,0 min/pieceManufacturing time = 45 minNo. of operational steps: 45/8,0 = 5,6 => 6 steps

8,0 8,0 8,0 8,08,0

X XX X

Customer order

Customer

X

5,0

X

Quality

Cp = Tolerance intervall/ 6*sigma

Cpk = (Average value-Tolerance limit)/ 3 sigma

Cp = 1,5Cpk = 1,5

Cp = 1,0Cpk = 1,0

Cp = 0,75Cpk = 0,75

Cp = 1,5Cpk = 0,5

Pareto analysis

02468

1012

Solder

bead

sSho

rt-cir

cuit

Orienta

tion f

ault

Projec

tion

Incor

rect v

alue

TemperatureVia-holePressure

Fixture Fluxing agent Component moulding

Solder beads

Capability studies

Fishbone diagram

Flexibility and involvement

Keywords for all employees: flexibility and involvement.

Minimum requirement: to be able to move up and down the flow by at least one operation.

All employees involved in making continuous improvements.

Remuneration system that encourages flexibility and participation.

To tear down barriers between departments and functions.

Operation1

Operation2

Operation3

Operation4X X X

JIT-just In TimeWhat do we need to do - to bring it about?

FlowQualityFlexibilityInvolvement

Patnershipwith supplier

Understand theneed of the customer

Supplier strategies – Benefits of cooperation

Greater flexibilityGreater certainty in planningLower stock levelsGreater certainty of demandImproved capacity utilisationImproved qualityStreamlined administrationEnhanced competitive position