Upload
reuel
View
28
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Review Meeting by Central Steering Committee 20 December, 2013 DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT GOVERNMENT OF JHARKHAND. JHARKHAND STATE PROFILE. Area in % Area in Lakhs Ha * Total Geographical Area: 79.71 * Total Cultivable Land :38.00 - PowerPoint PPT Presentation
Citation preview
Review Meeting by Central Steering Committee
20 December, 2013
DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT
GOVERNMENT OF JHARKHAND.
JHARKHAND STATE PROFILE
2
Area in % Area in % Area in Lakhs HaArea in Lakhs Ha
* * Total Geographical AreaTotal Geographical Area : : 79.71 79.71 * * Total Cultivable Land Total Cultivable Land :: 38.00 38.00 * * Net Sown AreaNet Sown Area :: 28.08% 28.08% 23.6223.62* * Current FallowCurrent Fallow :: 11.12%11.12% 8.878.87* * Other FallowOther Fallow :: 08.46%08.46% 6.756.75* * ForestForest :: 29.20%29.20% 23.2823.28* * Barren LandsBarren Lands :: 7.20%7.20% 5.745.74* * Non – Agricultural UseNon – Agricultural Use :: 8.60%8.60% 6.866.86* * Pasture and Other Grazing Pasture and Other Grazing
LandLand :: 2.48%2.48% 1.971.97* * Cultivable Waste LandCultivable Waste Land :: 3.44%3.44% 2.742.74* * Irrigated landIrrigated land :: 12.73%12.73% 3.0073.007* * Cropping Intensity Cropping Intensity :: 116%116%
Implementation Impact of BGREI in the State
Implementation Impact of BGREI in the State
Wide acceptance of technological interventions like line sowing
and line transplanting of Paddy.
Reduction in cost of cultivation by effective weed management
Acceptance of mechanized paddy cultivation (Direct sowing by
Drum Seeder)
Yield advantage by use of Micro Nutrient (Zinc Sulphate)
Spread effect of cluster approach in demonstration
Demonstration of efficient use management of water, IPM / INM
on a sustainable basis.
• Expansion of HYV / Hybrid seeds through System of Rice
Intensification (SRI).
• Productivity of Rice have gone over 100 % in some districts namely
Seraikella,
Bokaro, E. Singhbhum, Jamtara etc.
• In 2011-12 area covered through SRI was 29125 ha which rose to
145000 ha in
2012-13 but due to erratic rainfall in this year area covered through
SRI is
92000 ha.
• In 2011-12 Hybrid seed distributed under Subsidy was 9000 qtl.
Which
increased to 42000 qtl in 2012-13 and went to around 60000 qtl. In
2013-14.
• 14205.50 ha. of Rice Fellow area Converted into double cropped
area
• Successful execution of Pani Panchayat System has been developed
• 9090 Nos. of Beneficiaries has been benefited under this scheme
Contd……
5
FINANCIAL PROGRESS UNDER BGREI
Year Allocation Total Release
Expenditure UC Submitted
2010-11 29.60 14.80 14.80 14.80
2011-12 31.68 31.68 31.68 31.68
2012-13 59.00 59.00 45.84 45.84
12013-14 85.81 42.90 18.97 0.00
Total 206.09 148.38 111.29 92.32
Rs. In Crore
Progress of Block Demonstration of Rice under BGREI (2011-12)
Physical TargetIn Ha
Physical Achievement
in Ha
Financial Target in Lakh
Financial Achievement in
Lakh
17000 17000 1298.14 948.12342
S No. Particulars Progress in quantitative term
1. No. of Block Covered 41
2. No. of Panchayat Covered 245
3. No. of Village covered 799
4. Targeted Area in Ha 17000
5. Coverage in Ha 17000
8. Total beneficiaries (Farmers) 24841
Progress of Block Demonstration of Rice under BGREI (2012-13)
Physical TargetIn Ha
Physical Achievement
in Ha
Financial Target in Lakh
Financial Achievement in
Lakh
54000 53000 3537.23-
2461.1985
S No. Particulars Progress in quantitative term
1. No. of Block Covered 63
2. No. of Panchayat Covered 433
3. No. of Village covered 1477
4. Targeted Area in Ha 54000
5. Coverage in Ha 53000
8. Total beneficiaries (Farmers) 66264
Progress of Block Demonstration of Rice under BGREI (2013-14)
Physical TargetIn Ha
Physical Achievement
in Ha
Financial Target in Lakh
Financial Achievement in
Lakh
65250 60200 4292.667 1897.00
S No. Particulars Progress in quantitative term
1. No. of Block Covered 82
2. No. of Panchayat Covered 546
3. No. of Village covered 1557
4. Targeted Area in Ha 65250
5. Coverage in Ha 60400
8. Total beneficiaries (Farmers)
75225
S No.
Name of District
Block (Nos.)
Panchayat
(No.)
Village (No.)
Targeted Area (ha)
Coverage (In ha)
Total Farmers
1. Lohardaga 1 5 8 1000 1000 677
2. E. Singhbhum 4 79 306 1000 1000 1525
3. Giridih 1 4 30 1000 1000 1718
4. Koderma 6 4 13 1000 1000 1302
5. Sahebganj 2 8 35 1000 1000 2500
6. Palamau 2 8 25 1000 1000 984
7. Bokaro 2 10 16 1000 1000 1612
8. Godda 3 15 40 1000 1000 2500
9. Latehar 1 5 17 1000 1000 1025
10. Dumka 7 39 134 1000 1000 1164
11. Garhwa 2 15 29 1000 1000 650
12. Deoghar 4 18 40 1000 1000 3147
13. Pakur 1 14 35 1000 1000 872
14. Jamtara 1 4 21 1000 1000 1425
15. Seraikella 1 3 20 1000 1000 1213
16. Dhanbad 2 12 20 1000 1000 1527
17. Chatra 1 2 10 1000 1000 1000
Total 41 245 799 17000 17000 24841
S No. Name of District
Block (Nos.)
Panchayat
(No.)
Village (No.)
Targeted Area (ha)
Coverage (In ha)
Total Farmers
1. Lohardaga 3 21 29 3000 3000 2780
2. E. Singhbhum 4 57 200 4000 4000 5039
3. Giridih 4 29 86 4000 4000 4090
4. Koderma 4 29 119 3000 3000 4196
5. Sahebganj 3 22 65 3000 3000 3257
6. Palamau 3 19 93 3000 3000 3474
7. Bokaro 3 22 57 3000 3000 3674
8. Godda 3 29 63 3000 3000 3716
9. Latehar 1 4 19 2000 1000 1100
10. Dumka 6 44 188 4000 4000 2537
11. Garhwa 3 21 66 3000 3000 3920
12. Deoghar 4 34 196 4000 4000 4662
13. Pakur 3 8 26 3000 3000 3000
14. Jamtara 3 14 19 3000 3000 3554
15. Seraikella 6 32 87 4000 4000 9365
16. Dhanbad 5 32 96 2000 2000 3292
17. Chatra 4 16 67 3000 3000 4351
Total 63 433 1477 54000 53000 66264
S No. Name of District
Block (Nos.)
Panchayat (No.)
Village (No.)
Targeted Area (ha)
Coverage (In ha)
Total Farmers
1. Lohardaga 4 19 113 4000 4000 3371
2. E. Singhbhum 4 18 28 4000 4000 5028
3. Giridih 4 32 119 4000 3435 4421
4. Koderma 6 34 97 5000 5000 6210
5. Sahebganj 6 56 92 5000 5000 6538
6. Palamau 4 35 92 5000 4000 4892
7. Bokaro 4 54 54 4000 4000 4076
8. Godda 4 22 76 4000 3400 4860
9. Latehar 3 18 69 3000 3000 3980
10. Dumka 9 45 132 3000 3000 4765
11. Garhwa 4 28 98 5000 4000 4322
12. Deoghar 4 11 52 3000 2800 4164
13. Pakur 3 17 28 3250 3000 4068
14. Jamtara 6 18 81 3000 3000 3036
15. Seraikella 6 19 122 4000 3000 5020
16. Dhanbad 8 108 219 3000 2500 2364
17. Chatra 3 12 65 3000 3000 4110
Total 82 546 1537 65250 60135 75225
PROGRESS REPORT of BGREI (2013-14)
S No. Name of Dist. Prodn. In Block Demon.(X)
Production in Farmers Field (Y)
Increase in %(X-Y)/y *100
1 Godda 60.00 21.50 179
2 Seraikella 68.88 32.41 113
3 Deoghar 40.29 28.78 40
4 Giridih 49.48 30.33 63
5 Bokaro 62.10 25.01 148
6 Lohardaga 54.00 35.00 54
7 Chatra 60.95 42.00 45
8 Latehar 40.00 27.00 48
9 Palamau 50.594 29.42 72
10 E. Singhbhum 67.00 32.00 109
11 Jamtara 64.00 28.50 125
12 Pakur 31.00 14.00 121
13 Dumka 40.15 24.13 66
14 Dhanbad 46.30 44.73 4
15. Koderma 49.00 29.15 68
16. Sahibganj 30.43 17.73 72
17. Garhwa 53.45 40.60 32
Comparative Yield under Block Demonstration in comparison to rice in farmers field in 2011-12
S No. Name of Dist. Prodn. In Block Demon.(X)
Production in Farmers Field (Y)
Increase in %(X-Y)/y *100
1 Godda 42.16 42.31 -0.352 Seraikella 45.00 28.57 57.513 Deoghar 45.30 28.00 61.794 Giridih 62.48 30.71 103.455 Bokaro 44.38 29.42 50.856 Lohardaga 71.66 49.00 46.247 Chatra 71.20 59.00 20.688 Latehar 38.30 34.00 12.659 Palamau 56.28 33.51 67.9510 E. Singhbhum 53.62 28.92 85.4111 Jamtara 49.46 28.05 76.3312 Pakur 53.60 27.46 95.1913 Dumka 39.12 30.28 29.1914 Dhanbad 57.16 25.50 124.1615. Koderma 36.30 31.68 14.5816. Sahibganj 35.00 19.95 75.4417. Garhwa 59.80 35.40 68.93
Comparative Yield under Block Demonstration in comparison to rice in farmers field in 2012-13
S No.
Component Unit Target As approved by
SLSC
Achievement
Phy. Fin. Phy. Fin.
I. Demonstration - RICE
i Upland Rice
ii Shallow Rice 5 5000 395.60 5000 278.96
iii Medium Water Rice 4 4000 316.48 4000 219.64
iv Deep Water Rice
v HYV 4 4000 274.08 4000 187.39
vi Hybrid Rice 4 4000 312.68 4000 262.14
Sub Total (Demonstration)
17000 1298.84
17000 948.13
Rs. In Lakhs
INTERVENTION WISE PHYSICAL & FINANCIAL ACHIEVEMENT (2011-12)
S No.
Component Unit Target As approved by
SLSC
Achievement
Phy. Fin. Phy. Fin.
I. Demonstration - RICE
i Upland Rice
ii Shallow Rice 17 17000 1104.49
17000 872.742
iii Medium Water Rice 10 10000 649.70 10000 392.946
iv Deep Water Rice
v HYV 10 10000 643.70 10000 404.728
vi Hybrid Rice 17 17000 1139.34
16000 790.782
Sub Total (Demonstration)
54000 3537.23
53000 2461.1985
Rs. In Lakhs
INTERVENTION WISE PHYSICAL & FINANCIAL ACHIEVEMENT (2012-13)
S No.
Component Unit Target As approved by
SLSC
Achievement
Phy. Fin. Phy. Fin.
I. Demonstration - RICE
i Upland Rice 5 5000 324.85
ii Shallow Rice 18 18000 1169.46 18000 611.20
iii Medium Water Rice 17 17000 1124.09 17900 602.65
iv Deep Water Rice
v HYV 15.25 15250 981.6425 15000 468.20
vi Hybrid Rice 10 10000 670.2 9300 214.95
Sub Total (Demonstration)
65250 4270.2425
60135 1897.00
Rs. In Lakhs
INTERVENTION WISE PHYSICAL & FINANCIAL ACHIEVEMENT (2013-14)
• As decided in SLSC meeting Water Harvesting Structures on the pattern of RADP will be constructed in beneficiaries’ field for command area of 2 ha.
Strategy for Site Specific Activities
Sl. No.
Name of Implement Unit Rate/Unit (For 2 ha. Command
area)
Assistance @ 50% of cost or<=
per unit
Total cost (In
lakh)
1 2 3 4 5 6
1 Preparation of Water Harvesting Structure
(Dova/Jalkund) 20m x 20m x 3m
2487 Re. 1.38 lakh 0.69 1716.03
• For implementation of this activity survey is undergoing and execution will start after Harvesting is over.
Strategy for Marketing Support
• For primary Processing activities supporting machines will be made available to Lamps/Pacs of demonstration area so that after procurement storage of grains can be made in proper way.
Sl. No.
Name of Implement
UnitApproximat
e rate (1 set)
Assistance @50% of cost
Cost
1 2 3 4 5 61 Moisture Meter 260 0.180 0.090 23.40002 Bagging Machine 130 2.000 1.000 130.00003 Weighing Machine 260 0.190 0.095 24.7000
4Bag Closing
Machine390 0.140 0.070 27.3000
5 Grain Grader 32500 0.040 0.020650.00 (@50%
Subsidy)Total 855.40
Strategy for Asset building Activity
• It has been decided to distribute following implements among the beneficiaries. Assessment of requirement has been made and distribution will be made accordingly.
Sl. No.
Name of Implement
UnitApproximat
e rate (1 set)
Assistance @50% of cost
Cost
1 2 3 4 5 6
1 Pump set 6000 0.20 0.10 600.00
2 Conoweeder 30000 0.18 0.09 270.00
3 Rotavator 60 0.90 0.20 18.00
4 Thresher 300 0.45 0.12 36.00
5 Paddy Reaper 150 1.03 0.15 22.50
Lift Irrigation 190 4.50 4.05@ 90% 769.50
Total 1716.00
Physical & Financial Achievement Under BGREI Scheme During the year 2010-11 to 2011-12
Phy. In No.- Fin. In. Lakh
Sl. No.
Name of Scheme
Financial Year
Work Compon
ent
Target Achievement No. of Benf.
Benefited
Impact – Extra Irrigation Potential
developed and also increases
Cropping intencity
Remarks
Phy. Fin. Phy. Fin.
1 2 3 4 5 6 7 8 9 10 11
1 BGREI 2010-11
BPCD 232
2317.877
232
1170.359 3480 No. 5108 -LBCD 232 232
Lift Irrg. 232 232
Total of 2010-11 232, 232, 232
2317.88 232, 232, 232 1097.43 3480 No. 5108 ha.
2 BGREI
2011-12
BPCD - - -
1170.359 - -For fulfil of
liabilities of 2010-11
LBCD - - -
Lift Irrg. - - -
2011-12
BPCD 175
1685.69
175
1121.91 2625 No. 3925.50 ha. LBCD 167 167
Lift Irrg. 160 160
Total of 2011-12 175, 167, 160 1685.69 175, 167, 160 2292.269 2625 No. 3925.50 ha.
Physical & Financial Achievement Under BGREI Scheme During the Year 2012-13 to 2013-14
Phy. In No.- Fin. In. Lakh
Sl. No.
Name of Scheme
Financial Year
Work Compon
ent
Target Achievement No. of Benf. Benefited
Impact – Extra Irrigation Potential developed and also increases Cropping
intencity
Remarks
Phy. Fin. Phy. Fin.
1 2 3 4 5 6 7 8 9 10 11
1 BGREI
2012-13
BPCD - - -
547.48 - - For fulfil of liabilities of 2011-12LBCD - - -
Lift Irrg. - - -
2012-13 Lift Irrg. 600 2430.00 431 1671.06 6465 No. 5172 ha.
Total of 2012-13 600 2430.00 431 2218.54 6465 No. 5172 ha.
2 BGREI 2013-14 Lift Irrg. 190 769.50 - - - -
Site selection is under process & scheme will bee executed soon
Field Visit
Jhfof/k ls /kku dh [ksrh dj jgs d`”kdksa dks rduhdh lykg nsrs gq, ftyk d`f”k inkf/kdkjh] iwohZ
flagHkwe
gfjr Økafr ;kstukUrZxr Jh fof/k ls /kku dh [ksrh dk fujh{k.k djrs gq, ftyk d`f”k inkf/kdkjh] iwohZ
flagHkweA
o"kZ 2012&13 esa gfjr Økafr foLrkj ;kstukUrZxr /kku
izR;{k.k dk;ZØe ds Nk;kfp=
BGREI Demonstration / Farmers meeting in Dumka District
Jhfof/k ls KRH-2 izHksn /kku dh jksiuh xk¡o& uk;dklkbZ
KRH-2 /kku dh [ksrh esa dksuksohMj pykrs gq, —”kd
o"kZ 2012&13 esa gfjr Økafr foLrkj ;kstukUrZxr /kku
izR;{k.k dk;ZØe ds Nk;kfp=
Ekkuuh;k mik;qDr] iwohZ flagHkwe }kjk eqlkcuh iz[k.M ds xksgyk xzke ds —”kdksas }kjk Jh
fof/k /kku ls fd;s x;s [ksrh dk fujh{k.kA
gfjr Økafr ;kstukUrZxr —”kd dks dksuksohMj nsrs gq, ftyk —f”k
inkf/kdkjh] iwohZ flagHkwe
o"kZ 2012&13 esa gfjr Økafr foLrkj ;kstukUrZxr /kku
izR;{k.k dk;ZØe ds Nk;kfp=
THANK YOU