36
Review Meeting by Central Steering Committee 20 December, 2013 DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT GOVERNMENT OF JHARKHAND.

JHARKHAND STATE PROFILE

  • Upload
    reuel

  • View
    28

  • Download
    0

Embed Size (px)

DESCRIPTION

Review Meeting by Central Steering Committee 20 December, 2013 DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT GOVERNMENT OF JHARKHAND. JHARKHAND STATE PROFILE. Area in % Area in Lakhs Ha * Total Geographical Area: 79.71 * Total Cultivable Land :38.00 - PowerPoint PPT Presentation

Citation preview

Page 1: JHARKHAND STATE PROFILE

Review Meeting by Central Steering Committee

20 December, 2013

DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT

GOVERNMENT OF JHARKHAND.

Page 2: JHARKHAND STATE PROFILE

JHARKHAND STATE PROFILE

2

Area in % Area in % Area in Lakhs HaArea in Lakhs Ha

* * Total Geographical AreaTotal Geographical Area : : 79.71 79.71 * * Total Cultivable Land Total Cultivable Land :: 38.00 38.00 * * Net Sown AreaNet Sown Area :: 28.08% 28.08% 23.6223.62* * Current FallowCurrent Fallow :: 11.12%11.12% 8.878.87* * Other FallowOther Fallow :: 08.46%08.46% 6.756.75* * ForestForest :: 29.20%29.20% 23.2823.28* * Barren LandsBarren Lands :: 7.20%7.20% 5.745.74* * Non – Agricultural UseNon – Agricultural Use :: 8.60%8.60% 6.866.86* * Pasture and Other Grazing Pasture and Other Grazing

LandLand :: 2.48%2.48% 1.971.97* * Cultivable Waste LandCultivable Waste Land :: 3.44%3.44% 2.742.74* * Irrigated landIrrigated land :: 12.73%12.73% 3.0073.007* * Cropping Intensity Cropping Intensity :: 116%116%

Page 3: JHARKHAND STATE PROFILE

Implementation Impact of BGREI in the State

Implementation Impact of BGREI in the State

Wide acceptance of technological interventions like line sowing

and line transplanting of Paddy.

Reduction in cost of cultivation by effective weed management

Acceptance of mechanized paddy cultivation (Direct sowing by

Drum Seeder)

Yield advantage by use of Micro Nutrient (Zinc Sulphate)

Spread effect of cluster approach in demonstration

Demonstration of efficient use management of water, IPM / INM

on a sustainable basis.

Page 4: JHARKHAND STATE PROFILE

• Expansion of HYV / Hybrid seeds through System of Rice

Intensification (SRI).

• Productivity of Rice have gone over 100 % in some districts namely

Seraikella,

Bokaro, E. Singhbhum, Jamtara etc.

• In 2011-12 area covered through SRI was 29125 ha which rose to

145000 ha in

2012-13 but due to erratic rainfall in this year area covered through

SRI is

92000 ha.

• In 2011-12 Hybrid seed distributed under Subsidy was 9000 qtl.

Which

increased to 42000 qtl in 2012-13 and went to around 60000 qtl. In

2013-14.

• 14205.50 ha. of Rice Fellow area Converted into double cropped

area

• Successful execution of Pani Panchayat System has been developed

• 9090 Nos. of Beneficiaries has been benefited under this scheme

Contd……

Page 5: JHARKHAND STATE PROFILE

5

FINANCIAL PROGRESS UNDER BGREI

Year Allocation Total Release

Expenditure UC Submitted

2010-11 29.60 14.80 14.80 14.80

2011-12 31.68 31.68 31.68 31.68

2012-13 59.00 59.00 45.84 45.84

12013-14 85.81 42.90 18.97 0.00

Total 206.09 148.38 111.29 92.32

Rs. In Crore

Page 6: JHARKHAND STATE PROFILE

Progress of Block Demonstration of Rice under BGREI (2011-12)

Physical TargetIn Ha

Physical Achievement

in Ha

Financial Target in Lakh

Financial Achievement in

Lakh

17000 17000 1298.14 948.12342

S No. Particulars Progress in quantitative term

1. No. of Block Covered 41

2. No. of Panchayat Covered 245

3. No. of Village covered 799

4. Targeted Area in Ha 17000

5. Coverage in Ha 17000

8. Total beneficiaries (Farmers) 24841

Page 7: JHARKHAND STATE PROFILE

Progress of Block Demonstration of Rice under BGREI (2012-13)

Physical TargetIn Ha

Physical Achievement

in Ha

Financial Target in Lakh

Financial Achievement in

Lakh

54000 53000 3537.23-

2461.1985

S No. Particulars Progress in quantitative term

1. No. of Block Covered 63

2. No. of Panchayat Covered 433

3. No. of Village covered 1477

4. Targeted Area in Ha 54000

5. Coverage in Ha 53000

8. Total beneficiaries (Farmers) 66264

Page 8: JHARKHAND STATE PROFILE

Progress of Block Demonstration of Rice under BGREI (2013-14)

Physical TargetIn Ha

Physical Achievement

in Ha

Financial Target in Lakh

Financial Achievement in

Lakh

65250 60200 4292.667 1897.00

S No. Particulars Progress in quantitative term

1. No. of Block Covered 82

2. No. of Panchayat Covered 546

3. No. of Village covered 1557

4. Targeted Area in Ha 65250

5. Coverage in Ha 60400

8. Total beneficiaries (Farmers)

75225

Page 9: JHARKHAND STATE PROFILE

S No.

Name of District

Block (Nos.)

Panchayat

(No.)

Village (No.)

Targeted Area (ha)

Coverage (In ha)

Total Farmers

1. Lohardaga 1 5 8 1000 1000 677

2. E. Singhbhum 4 79 306 1000 1000 1525

3. Giridih 1 4 30 1000 1000 1718

4. Koderma 6 4 13 1000 1000 1302

5. Sahebganj 2 8 35 1000 1000 2500

6. Palamau 2 8 25 1000 1000 984

7. Bokaro 2 10 16 1000 1000 1612

8. Godda 3 15 40 1000 1000 2500

9. Latehar 1 5 17 1000 1000 1025

10. Dumka 7 39 134 1000 1000 1164

11. Garhwa 2 15 29 1000 1000 650

12. Deoghar 4 18 40 1000 1000 3147

13. Pakur 1 14 35 1000 1000 872

14. Jamtara 1 4 21 1000 1000 1425

15. Seraikella 1 3 20 1000 1000 1213

16. Dhanbad 2 12 20 1000 1000 1527

17. Chatra 1 2 10 1000 1000 1000

Total 41 245 799 17000 17000 24841

Page 10: JHARKHAND STATE PROFILE

S No. Name of District

Block (Nos.)

Panchayat

(No.)

Village (No.)

Targeted Area (ha)

Coverage (In ha)

Total Farmers

1. Lohardaga 3 21 29 3000 3000 2780

2. E. Singhbhum 4 57 200 4000 4000 5039

3. Giridih 4 29 86 4000 4000 4090

4. Koderma 4 29 119 3000 3000 4196

5. Sahebganj 3 22 65 3000 3000 3257

6. Palamau 3 19 93 3000 3000 3474

7. Bokaro 3 22 57 3000 3000 3674

8. Godda 3 29 63 3000 3000 3716

9. Latehar 1 4 19 2000 1000 1100

10. Dumka 6 44 188 4000 4000 2537

11. Garhwa 3 21 66 3000 3000 3920

12. Deoghar 4 34 196 4000 4000 4662

13. Pakur 3 8 26 3000 3000 3000

14. Jamtara 3 14 19 3000 3000 3554

15. Seraikella 6 32 87 4000 4000 9365

16. Dhanbad 5 32 96 2000 2000 3292

17. Chatra 4 16 67 3000 3000 4351

Total 63 433 1477 54000 53000 66264

Page 11: JHARKHAND STATE PROFILE

S No. Name of District

Block (Nos.)

Panchayat (No.)

Village (No.)

Targeted Area (ha)

Coverage (In ha)

Total Farmers

1. Lohardaga 4 19 113 4000 4000 3371

2. E. Singhbhum 4 18 28 4000 4000 5028

3. Giridih 4 32 119 4000 3435 4421

4. Koderma 6 34 97 5000 5000 6210

5. Sahebganj 6 56 92 5000 5000 6538

6. Palamau 4 35 92 5000 4000 4892

7. Bokaro 4 54 54 4000 4000 4076

8. Godda 4 22 76 4000 3400 4860

9. Latehar 3 18 69 3000 3000 3980

10. Dumka 9 45 132 3000 3000 4765

11. Garhwa 4 28 98 5000 4000 4322

12. Deoghar 4 11 52 3000 2800 4164

13. Pakur 3 17 28 3250 3000 4068

14. Jamtara 6 18 81 3000 3000 3036

15. Seraikella 6 19 122 4000 3000 5020

16. Dhanbad 8 108 219 3000 2500 2364

17. Chatra 3 12 65 3000 3000 4110

Total 82 546 1537 65250 60135 75225

PROGRESS REPORT of BGREI (2013-14)

Page 12: JHARKHAND STATE PROFILE

S No. Name of Dist. Prodn. In Block Demon.(X)

Production in Farmers Field (Y)

Increase in %(X-Y)/y *100

1 Godda 60.00 21.50 179

2 Seraikella 68.88 32.41 113

3 Deoghar 40.29 28.78 40

4 Giridih 49.48 30.33 63

5 Bokaro 62.10 25.01 148

6 Lohardaga 54.00 35.00 54

7 Chatra 60.95 42.00 45

8 Latehar 40.00 27.00 48

9 Palamau 50.594 29.42 72

10 E. Singhbhum 67.00 32.00 109

11 Jamtara 64.00 28.50 125

12 Pakur 31.00 14.00 121

13 Dumka 40.15 24.13 66

14 Dhanbad 46.30 44.73 4

15. Koderma 49.00 29.15 68

16. Sahibganj 30.43 17.73 72

17. Garhwa 53.45 40.60 32

Comparative Yield under Block Demonstration in comparison to rice in farmers field in 2011-12

Page 13: JHARKHAND STATE PROFILE

S No. Name of Dist. Prodn. In Block Demon.(X)

Production in Farmers Field (Y)

Increase in %(X-Y)/y *100

1 Godda 42.16 42.31 -0.352 Seraikella 45.00 28.57 57.513 Deoghar 45.30 28.00 61.794 Giridih 62.48 30.71 103.455 Bokaro 44.38 29.42 50.856 Lohardaga 71.66 49.00 46.247 Chatra 71.20 59.00 20.688 Latehar 38.30 34.00 12.659 Palamau 56.28 33.51 67.9510 E. Singhbhum 53.62 28.92 85.4111 Jamtara 49.46 28.05 76.3312 Pakur 53.60 27.46 95.1913 Dumka 39.12 30.28 29.1914 Dhanbad 57.16 25.50 124.1615. Koderma 36.30 31.68 14.5816. Sahibganj 35.00 19.95 75.4417. Garhwa 59.80 35.40 68.93

Comparative Yield under Block Demonstration in comparison to rice in farmers field in 2012-13

Page 14: JHARKHAND STATE PROFILE

S No.

Component Unit Target As approved by

SLSC

Achievement

Phy. Fin. Phy. Fin.

I. Demonstration - RICE

i Upland Rice

ii Shallow Rice 5 5000 395.60 5000 278.96

iii Medium Water Rice 4 4000 316.48 4000 219.64

iv Deep Water Rice

v HYV 4 4000 274.08 4000 187.39

vi Hybrid Rice 4 4000 312.68 4000 262.14

Sub Total (Demonstration)

17000 1298.84

17000 948.13

Rs. In Lakhs

INTERVENTION WISE PHYSICAL & FINANCIAL ACHIEVEMENT (2011-12)

Page 15: JHARKHAND STATE PROFILE

S No.

Component Unit Target As approved by

SLSC

Achievement

Phy. Fin. Phy. Fin.

I. Demonstration - RICE

i Upland Rice

ii Shallow Rice 17 17000 1104.49

17000 872.742

iii Medium Water Rice 10 10000 649.70 10000 392.946

iv Deep Water Rice

v HYV 10 10000 643.70 10000 404.728

vi Hybrid Rice 17 17000 1139.34

16000 790.782

Sub Total (Demonstration)

54000 3537.23

53000 2461.1985

Rs. In Lakhs

INTERVENTION WISE PHYSICAL & FINANCIAL ACHIEVEMENT (2012-13)

Page 16: JHARKHAND STATE PROFILE

S No.

Component Unit Target As approved by

SLSC

Achievement

Phy. Fin. Phy. Fin.

I. Demonstration - RICE

i Upland Rice 5 5000 324.85

ii Shallow Rice 18 18000 1169.46 18000 611.20

iii Medium Water Rice 17 17000 1124.09 17900 602.65

iv Deep Water Rice

v HYV 15.25 15250 981.6425 15000 468.20

vi Hybrid Rice 10 10000 670.2 9300 214.95

Sub Total (Demonstration)

65250 4270.2425

60135 1897.00

Rs. In Lakhs

INTERVENTION WISE PHYSICAL & FINANCIAL ACHIEVEMENT (2013-14)

Page 17: JHARKHAND STATE PROFILE

• As decided in SLSC meeting Water Harvesting Structures on the pattern of RADP will be constructed in beneficiaries’ field for command area of 2 ha.

Strategy for Site Specific Activities

Sl. No.

Name of Implement Unit Rate/Unit (For 2 ha. Command

area)

Assistance @ 50% of cost or<=

per unit

Total cost (In

lakh)

1 2 3 4 5 6

1 Preparation of Water Harvesting Structure

(Dova/Jalkund) 20m x 20m x 3m

2487 Re. 1.38 lakh 0.69 1716.03

• For implementation of this activity survey is undergoing and execution will start after Harvesting is over.

Page 18: JHARKHAND STATE PROFILE

Strategy for Marketing Support

• For primary Processing activities supporting machines will be made available to Lamps/Pacs of demonstration area so that after procurement storage of grains can be made in proper way.

Sl. No.

Name of Implement

UnitApproximat

e rate (1 set)

Assistance @50% of cost

Cost

1 2 3 4 5 61 Moisture Meter 260 0.180 0.090 23.40002 Bagging Machine 130 2.000 1.000 130.00003 Weighing Machine 260 0.190 0.095 24.7000

4Bag Closing

Machine390 0.140 0.070 27.3000

5 Grain Grader 32500 0.040 0.020650.00 (@50%

Subsidy)Total 855.40

Page 19: JHARKHAND STATE PROFILE

Strategy for Asset building Activity

• It has been decided to distribute following implements among the beneficiaries. Assessment of requirement has been made and distribution will be made accordingly.

Sl. No.

Name of Implement

UnitApproximat

e rate (1 set)

Assistance @50% of cost

Cost

1 2 3 4 5 6

1 Pump set 6000 0.20 0.10 600.00

2 Conoweeder 30000 0.18 0.09 270.00

3 Rotavator 60 0.90 0.20 18.00

4 Thresher 300 0.45 0.12 36.00

5 Paddy Reaper 150 1.03 0.15 22.50

Lift Irrigation 190 4.50 4.05@ 90% 769.50

Total 1716.00

Page 20: JHARKHAND STATE PROFILE

Physical & Financial Achievement Under BGREI Scheme During the year 2010-11 to 2011-12

Phy. In No.- Fin. In. Lakh

Sl. No.

Name of Scheme

Financial Year

Work Compon

ent

Target Achievement No. of Benf.

Benefited

Impact – Extra Irrigation Potential

developed and also increases

Cropping intencity

Remarks

Phy. Fin. Phy. Fin.

1 2 3 4 5 6 7 8 9 10 11

1 BGREI 2010-11

BPCD 232

2317.877

232

1170.359 3480 No. 5108 -LBCD 232 232

Lift Irrg. 232 232

Total of 2010-11 232, 232, 232

2317.88 232, 232, 232 1097.43 3480 No. 5108 ha.

2 BGREI

2011-12

BPCD - - -

1170.359 - -For fulfil of

liabilities of 2010-11

LBCD - - -

Lift Irrg. - - -

2011-12

BPCD 175

1685.69

175

1121.91 2625 No. 3925.50 ha. LBCD 167 167

Lift Irrg. 160 160

Total of 2011-12 175, 167, 160 1685.69 175, 167, 160 2292.269 2625 No. 3925.50 ha.

Page 21: JHARKHAND STATE PROFILE

Physical & Financial Achievement Under BGREI Scheme During the Year 2012-13 to 2013-14

Phy. In No.- Fin. In. Lakh

Sl. No.

Name of Scheme

Financial Year

Work Compon

ent

Target Achievement No. of Benf. Benefited

Impact – Extra Irrigation Potential developed and also increases Cropping

intencity

Remarks

Phy. Fin. Phy. Fin.

1 2 3 4 5 6 7 8 9 10 11

1 BGREI

2012-13

BPCD - - -

547.48 - - For fulfil of liabilities of 2011-12LBCD - - -

Lift Irrg. - - -

2012-13 Lift Irrg. 600 2430.00 431 1671.06 6465 No. 5172 ha.

Total of 2012-13 600 2430.00 431 2218.54 6465 No. 5172 ha.

2 BGREI 2013-14 Lift Irrg. 190 769.50 - - - -

Site selection is under process & scheme will bee executed soon

Page 22: JHARKHAND STATE PROFILE

Field Visit

Page 23: JHARKHAND STATE PROFILE

Jhfof/k ls /kku dh [ksrh dj jgs d`”kdksa dks rduhdh lykg nsrs gq, ftyk d`f”k inkf/kdkjh] iwohZ

flagHkwe

gfjr Økafr ;kstukUrZxr Jh fof/k ls /kku dh [ksrh dk fujh{k.k djrs gq, ftyk d`f”k inkf/kdkjh] iwohZ

flagHkweA

o"kZ 2012&13 esa gfjr Økafr foLrkj ;kstukUrZxr /kku

izR;{k.k dk;ZØe ds Nk;kfp=

Page 24: JHARKHAND STATE PROFILE

BGREI Demonstration / Farmers meeting in Dumka District

Page 25: JHARKHAND STATE PROFILE

Jhfof/k ls KRH-2 izHksn /kku dh jksiuh xk¡o& uk;dklkbZ

KRH-2 /kku dh [ksrh esa dksuksohMj pykrs gq, —”kd

o"kZ 2012&13 esa gfjr Økafr foLrkj ;kstukUrZxr /kku

izR;{k.k dk;ZØe ds Nk;kfp=

Page 26: JHARKHAND STATE PROFILE

Ekkuuh;k mik;qDr] iwohZ flagHkwe }kjk eqlkcuh iz[k.M ds xksgyk xzke ds —”kdksas }kjk Jh

fof/k /kku ls fd;s x;s [ksrh dk fujh{k.kA

gfjr Økafr ;kstukUrZxr —”kd dks dksuksohMj nsrs gq, ftyk —f”k

inkf/kdkjh] iwohZ flagHkwe

o"kZ 2012&13 esa gfjr Økafr foLrkj ;kstukUrZxr /kku

izR;{k.k dk;ZØe ds Nk;kfp=

Page 27: JHARKHAND STATE PROFILE
Page 28: JHARKHAND STATE PROFILE
Page 29: JHARKHAND STATE PROFILE
Page 30: JHARKHAND STATE PROFILE
Page 31: JHARKHAND STATE PROFILE
Page 32: JHARKHAND STATE PROFILE
Page 33: JHARKHAND STATE PROFILE
Page 34: JHARKHAND STATE PROFILE
Page 35: JHARKHAND STATE PROFILE
Page 36: JHARKHAND STATE PROFILE

THANK YOU