15
Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., Burgess, S. and Smith, N. (2016) Development of a benchmark for green infrastruc- ture. In: UK-Ireland Planning Research Conference, University of Cardiff, Wales, UK, 6-7 September 2016. Available from: http://eprints.uwe.ac.uk/30057 We recommend you cite the published version. The publisher’s URL is: http://eprints.uwe.ac.uk/30057/ Refereed: No (no note) Disclaimer UWE has obtained warranties from all depositors as to their title in the material deposited and as to their right to deposit such material. UWE makes no representation or warranties of commercial utility, title, or fit- ness for a particular purpose or any other warranty, express or implied in respect of any material deposited. UWE makes no representation that the use of the materials will not infringe any patent, copyright, trademark or other property or proprietary rights. UWE accepts no liability for any infringement of intellectual property rights in any material deposited but will remove such material from public view pend- ing investigation in the event of an allegation of any such infringement. PLEASE SCROLL DOWN FOR TEXT.

Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

  • Upload
    lecong

  • View
    219

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., Burgess, S. andSmith, N. (2016) Development of a benchmark for green infrastruc-ture. In: UK-Ireland Planning Research Conference, University ofCardiff, Wales, UK, 6-7 September 2016. Available from: http://eprints.uwe.ac.uk/30057

We recommend you cite the published version.The publisher’s URL is:http://eprints.uwe.ac.uk/30057/

Refereed: No

(no note)

Disclaimer

UWE has obtained warranties from all depositors as to their title in the materialdeposited and as to their right to deposit such material.

UWE makes no representation or warranties of commercial utility, title, or fit-ness for a particular purpose or any other warranty, express or implied in respectof any material deposited.

UWE makes no representation that the use of the materials will not infringeany patent, copyright, trademark or other property or proprietary rights.

UWE accepts no liability for any infringement of intellectual property rightsin any material deposited but will remove such material from public view pend-ing investigation in the event of an allegation of any such infringement.

PLEASE SCROLL DOWN FOR TEXT.

Page 2: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Planning Research Conference 2016

Setting the standard for green infrastructure

Gemma Jerome

Danielle Sinnett 1Mortlock, Roger 2Calvert, Tom 1Burgess, SarahSmith, Nick 11

1 Centre for Sustainable Planning and Environments, UWE Bristol

2 GloucestershireWildlife Trust

6-7 September 2016

Page 3: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Promoting the form, role and benefits of GI and ecosystem services at a range of spatial scales

Page 4: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Securing implementation is key

Page 5: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Contrasting development opportunities

Page 6: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Urban planning and Gl policy context

Page 7: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Setting GI priorities

Page 8: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Taking a partnership approach

Local Planning Authorities

Tewkesbury Borough Council

Stroud District Council

Cheltenham Borough Council

Cotswold District Council

Gloucester City Council

South Gloucestershire Council

BANES Council

Development schemes (live planning applications)

West of Stonehouse, Stroud (2000+ new homes; strategic allocation; outline plan approved; at detailed design stage and reserved matters)

Chesterton, Cirencester (Cirencester urban extension; strategic allocation; outline plan submitted, awaiting determination)

Former Filton Airfield, South Glos. (mixed use development; strategic allocation; pre-application)

Elms Park, North West Cheltenham (4000+ new homes; strategic allocation; pre-application)

Ecotricity ‘Eco Park’, Stroud (green technology park and sporting venue; not in plan i.e. speculative; outline submitted, awaiting determination)

Planning policy documents

Tewkesbury Borough (Local) Plan – Green Infrastructure Strategy

South Glos. Council – Green Infrastructure Strategy

BANES – West of England Green Infrastructure Strategy

Page 9: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Development of a local GI benchmark

• Agreement to develop a local GI benchmark

• Project extension to explore the potential for a national GI benchmark

- Desk study to review existing benchmarks in the sector

- Expert symposia to test these findings with stakeholders and end-users

Page 10: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Review of existing standards and benchmarks

Page 11: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Stakeholders involved to date

Page 12: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Scope

Award

Operation

• Need / market• Terminology• Focus of criteria

• Spatial scale / project relevance• Nature of users• Fit with other benchmarks / standards

• Relationship with planning

• Assessment timing

• Cost• Type of guidance

• Calculating performance

• Grading of award

• Method of assessment• Nature and expertise of the

assessors• Transparency of the process

• Marketing of the benchmark• Monitoring and review

Page 13: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

Beta-benchmark creation

Two levels

“Normalising a green infrastructure approach / raising the baseline”Achieve – this is what good GI looks likeExcellent – this is what exemplary GI looks like

Mandatory Standards

to establish that a scheme has adopted a green infrastructure approach which is sustainable

Thematic standards Wildlife Water Wellbeing

Desk study Different scoring methodologies testedOption selected based on desk study and consultation with customers = ‘Strict’ Two levels

Findings from customer requirements testing (‘Frontrunner testing’)Standards at correct level; parity; themes are helpful; ‘Pending’ award at Outline assists planning conditions/ s.106

Page 14: Jerome, G., Sinnett, D., Mortlock, R., Calvert, T., …eprints.uwe.ac.uk/30057/1/PRC2016_GI benchmark_6Sept2016.pdf Refereed: No (no note) Disclaimer UWE has obtained warranties from

• Technical guidance to be published alongside

• Desk-study testing

• Internal ‘operational’ review

• External review

• Front runner testing

Ensuring successfulimplementation