10
Jeju, 13 – 16 May 2013 Standards for Shared ICT TTA IPR Activities TTA IPR Activities Boomi KANG, Boomi KANG, TTA TTA Document No: GSC17-IPR-08 Source: TTA Contact: Boomi, KANG ([email protected]) GSC Session: IPR Agenda Item: 4.7

Jeju, 13 – 16 May 2013Standards for Shared ICT TTA IPR Activities Boomi KANG, TTA Document No: GSC17-IPR-08 Source: TTA Contact: Boomi, KANG ([email protected])

Embed Size (px)

Citation preview

Jeju, 13 – 16 May 2013 Standards for Shared ICT

TTA IPR ActivitiesTTA IPR Activities

Boomi KANG,Boomi KANG,

TTATTA

Document No:

GSC17-IPR-08

Source: TTA

Contact: Boomi, KANG ([email protected])

GSC Session:

IPR

Agenda Item:

4.7

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT2

TTA CommitteeTTA Committee

Coordination CommitteeStrategic Planning Committee

ICT Terminology Committee

[ As of April 2013 ]

PSC, Response to International LBS Standard, Electromagnetic Compatibility, Marine Communication, Propagation Characteristics, Protection of People from Electromagnetic Wave, Infrastructure Communication, Collaborative IT Car, In-vehicle Network Interworking, RFID Radio Access /Network working, RFID Application and Security

Radio CommunicationsRadio Communications(TC3)(TC3)

WPAN, LBS, Radio resources, Telematics/ITS, RFID/USN, PPDR, Magnetic Field / Sound wave Communication

Visual Light Communication Service, Data Model/Spec, Reference Model/Architecture, Spatial Information/Web Service, UBGI, Organic Electronic Device, Game Technologies, DRM

IT ApplicationIT Application(TC4)(TC4)

Multimedia application, Public Information , NGIS, Intelligent Service Robot, Post PC, Welfare Communication, SoC, SOA, u-health, Cloud Computing, Digital Contents, IT appliance’s wireless power transmission.

62 Working Groups (WG)62 Working Groups (WG) ※ ※ 1 Special WG under TC1 Special WG under TC61 Project Groups (PG)61 Project Groups (PG)7 Technical7 Technical

Committees (TC)Committees (TC)

Optical Subscriber Network, MPLS-TP, WiBro6, Lower Power IP Networking, Multihoming Networking, IoT, Smart Grid, Power Induction , Surge Protection

Optical Transmission, Optical Internet, Network Management,NGN, VoIP, Charging & Interconnection, IPv6, Internet AddressResource, Digital Home, Quality of Service, protection of facilities,Ethernet, IPTV/N-Screen, Future Internet

TelecommunicationTelecommunication(TC2)(TC2)

Mobile Web, Ubiquitous Web Application

Infra S/W Infra S/W (TC6)(TC6) Embedded S/W, Open Software, Software Quality Evaluation,WEB, Metadata, e-navigation, e-publishing, CPS

Hybrid DMB, Terrestrial Wave Advanced Codec Transmitter-receiver Interface, UHDTV Standardization, Cable UHD Broadcasting Standardization, Cable Broadcasting International Standardization, Clear-QAM Standardization, Broadcastion Program loudness level, SmartTV App. Services, 3DTV Transmission and ReceptionSpecifications, 3DTV International Standardization

BroadcastingBroadcasting(TC8)(TC8)

Mobile Broadcasting, Terrestrial Broadcasting, Cable Broadcasting, Interaction Broadcasting,Satellite Broadcasting, 3DTV

Information security infrastructure, Personal Information service/ID management, Cyber Security, Application Security/AssessmentAuthentication, Biometrics

Information Information SecuritySecurity(TC5)(TC5)

Radio Access, Network and Service, ITU-R WP5D, Disaster SMS, Service and Network, External Interface of Terminals, Mobile Service Standardization, Mobile Advertising Technology, RCS, Push Service, Cell Phone Shutter Sound, VoLTE, VHT in 60GHz, 5GHz Wireless LAN VHT, Wireless LAN DtoD, Narrow band WLAN, SDR, PES, Service and Structure, Wireless Charging Interface, Evaluation

TC7 Standard Maintenance Special TeamIMT(4G) IMT(4G) (TC7)(TC7)IMT-Advanced, IMT WiBro, Mobile Platform and Service,WLAN, CR, VHO, Satellite IMT Evaluation, M2M, Wireless Charging and Application

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT3

TTA IPR SC & AHGTTA IPR SC & AHG• IPR Special Committee has the responsibility for

updating the TTA IPR policy and guidelines.• Project Group may make the IPR AHG for studying

the IPR issues relating to standardization work item.

Coordination CommitteeStrategic Planning Committee

ICT Terminology Committee

61 Project Groups (PG)61 Project Groups (PG)7 Technical7 TechnicalCommittees (TC)Committees (TC)

IPR Special Committee

DMB/ WiBro (expired)IPR Adhoc Group

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT4

TTA Deliverables StatusTTA Deliverables Status

Total

11,989

Radio & Broadcasting Radio & Broadcasting 7,833

(65%) 7,833

(65%)

Telecommunication

1,607(14%)

1,607(14%)ICT Application

2,549(21%)

2,549(21%)

[ As of December 2012 ][ As of December 2012 ]

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT5

Statistics of TTA Statistics of TTA IPR DeclarationIPR Declaration

Note :This is excluded from declaration of 3GPPs’ TS related patents.You can find the information on website : http://www.tta.or.kr/English/new/external_relations/IMT2000.jsp

As of April. 2013

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT6

TTA TTA IPR Declaration DBIPR Declaration DB

Standards IPR Holder Number of declarations

- Deliverable number- Title of Deliverable- IPR Holder

http://committee.tta.or.kr/join/ipr_list.jsp

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT7

TTA IPR PolicyTTA IPR Policy• IPR Disclosure

– Anyone proposing a TTA standards item or anyone having interests in it, from the outset, draw the attention of TTA to any known IPR or to any known pending IPR application, by notifying relevant information to the Secretariat of TTA.

• Terms and Conditions for granting licenses– without compensation and on a non-discriminatory basis– reasonable terms and conditions and non-discriminatory basis

• TTA responsibility– TTA shall not be responsible for the accuracy and validity of

relevant IPRs claimed by IPR holders, and – TTA shall not be involved in the arbitration of disputes between

IPR holders and users of TTA standards.

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT8

TTA IPR Issues (1)TTA IPR Issues (1)• IPR SC(Special Committee) restarted on April

2013.– 1st meeting : April 5, 2013– 2nd meeting : April 29, 2013– 3rd meeting : May 28, 2013

• IPR SC members are 26 from 16 TTA members.

• IPR SC tasks are as follows :– discuss the IPR Policy and guidelines of TTA,– update the IPR relating rules of TTA,– consider the Database of IPR declaration in TTA Web, – study the copyrights, and so on.

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT9

TTA IPR Issues (2)TTA IPR Issues (2)• Changes of Surroundings

– May 2011, IP Framework Act enacted– Dec. 2011, Korea FTC published “Model Operating

for SSO”– June 2012, TTA Operating Rules for Standardization

amended– ITU has been trying to update its patent guidelines– TTA members have more interests in “Standards

Essential Patent” issues than before.

GSC17-IPR-08

GSC-17, Jeju / Korea Standards for Shared ICT10

TTA IPR Issues (3)TTA IPR Issues (3)

• The issues discussed in IPR SC are :– clarification of IPR information notification :

who, when, what, and how, etc.; – the effectiveness of Written Declarations :

irrevocable, worldwide, reciprocity and transfer;

– improvement of TTA IP database;– copyright issues in referencing or

incorporating the other SDOs’ deliverables into TTA standards;

– S/W Copyrights, etc.