20
Jefferson Parish Emergency Management New EOC/911 Center

Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Jefferson ParishEmergency Management

New EOC/911 Center

Page 2: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Building Construction Facts

- Construction was completed in November 2010 and occupied in April 2011

- Building is 67,000 Square feet and is seven feet above sea level.

- Is designed to withstand Category 4 Hurricane Force Winds ( up to 155mph) and to be self sufficient for one week.

- Has redundant electrical service receiving power from two separate sub stations (Gretna & Harvey) and is backed up with two separate generators.

- Has an on site water well, a non-potable water tank, and a sewerage tank with its own lift station to maintain the use of toilets and showers in the event parish services are interrupted.

- Is equipped with security gates and closed circuit security cameras.

Page 3: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Has a 12,000 gallon diesel tank which supports the 2 generators that will power the building.

Page 4: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Has a full-sized commercial kitchen and a walk in cooler/freezer

Page 5: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Has Sleeping Quarters for 150 Emergency Personnel

Page 6: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square
Page 7: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Mobile Command Vehicle

Jefferson ParishEmergency Management

Special Equipment

Page 8: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Jefferson ParishEmergency Management

Special Equipment

Mobile Communications Vehicle

Page 9: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Jefferson ParishEmergency Management

Special Equipment

Search & Rescue Boat Portable Light Towers

Page 10: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Jefferson ParishEmergency Management

Special Equipment

Portable Generators Surveillance Camera Trailer

Page 11: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square
Page 12: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square
Page 13: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square
Page 14: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square
Page 15: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

HSPD-5 was issued by President Bush on February 28, 2003, to improve management of domestic incidents by establishing a single, comprehensive national incident management system. The Homeland Security Act of 2002, created the Department of Homeland Security (DHS) and assigned the Secretary of Homeland Security responsibility for coordinating federal emergency operations within the United States. Federal emergency operations include preparing for, responding to, and recovering from terrorist attacks, major disasters, and other emergencies.

HSPD-5 also recognizes the role that state, tribal, and local governments; nongovernmental organizations; and the private sector play in managing incidents. Initial responsibility for managing domestic incidents generally falls on state and local authorities. When their resources are overwhelmed, or when federal property is involved, the federal government provides assistance.

In order to provide a consistent, coordinated, nation-wide approach for emergency operations across all levels of government, HSPD-5 directed DHS to develop and administer a National Incident Management System (NIMS) and a National Response Plan. Together, NIMS and the NRP provide an approach for federal, state, and local governments to effectively prepare for, respond to, and recover from domestic incidents, regardless of cause, size, or complexity

Page 16: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Governor Kathleen Blanco signed EXECUTIVE ORDER KBB 05-61 on October 13, 2005, which states “The National Incident Management System (NIMS) is hereby established within the Louisiana Office of Homeland Security and Emergency Preparedness as the state of Louisiana's standard for incident management .” It also stated “beginning in fiscal year 2005, adoption of NIMS will be a requirement for receipt of sub-grant funds from the Louisiana Office of Homeland Security and Emergency Preparedness. “

On October 4, 2006 the Jefferson Parish Council passed Resolution #106432 adopting the National Incident Management System.

Page 17: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

Managing an IncidentThe National Incident Management System (NIMS) provides a systematic, proactive approach to guide departments and agencies at all levels of government, nongovernmental organizations, and the private sector to work seamlessly to prevent, protect against, respond to, recover from, and mitigate the effects of incidents, regardless of cause, size, location, or complexity, in order to reduce the loss of life and property and harm to the environment.

Page 18: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

EOC Staff and Org ChartDirector

Asst. Director Typist Clerk III

Administrative Assistant

Training & Exercises Homeland

Security Grants

Critical

Infrastructure/

EMS Licensing

LogisticsInformation

Technology

Building Maintenance

Page 19: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

John Young

Parish President

Chief Operating Officer

Public Information Officer

Deputy Chief Operating

Officer

EOC Manager

Assistant EOC Manager

Operations Chief

Deputy Operations Chief

ESF 3

Public Works

ESF 4

Fire

ESF 8

Hospitals/

EMS

ESF 9

Search n

Rescue

ESF 10

Hazmat

ESF 12

Utilities

ESF 13

Law

Enforcement

Planning Section

Chief

GIS

Display

Processor

Situation Unit

Resources

Unit

Documentation

Unit

Demobilization

Unit

Logistics Section

Chief

ESF 1

Transportation

ESF 2

Communications

ESF 6

Mass Care

ESF 14

FEMA

Food Unit

Facility Unit

Finance Section

Chief

Time Unit

Procurement

Unit

Cost Unit

Liaison OfficersMunicipalities

Page 20: Jefferson Parish Emergency Management · 1/30/2015  · Building Construction Facts - Construction was completed in November 2010 and occupied in April 2011 - Building is 67,000 Square

The Emergency Management Institute (EMI) offers self-paced courses designed for people who have emergency management responsibilities and the general public. FEMA’s Independent Study Program offers courses that support the nine mission areas identified by the National Preparedness Goal.

IS-100.b - Introduction to Incident Command Systemhttp://training.fema.gov/EMIWeb/IS/IS100b.asp

IS-200.b - ICS for Single Resources and Initial Action Incidentshttp://training.fema.gov/EMIWeb/IS/IS200b.asp

IS-700.a NIMS An Introductionhttp://training.fema.gov/EMIWeb/IS/is700a.asp

IS-800.B National Response Framework, An Introductionhttp://training.fema.gov/EMIWeb/IS/IS800b.asp

IS-908 - Emergency Management for Senior Officialshttp://training.fema.gov/EMIWeb/IS/is908.asp

•Incident Management •Operational Planning •Disaster Logistics •Emergency Communications •Service to Disaster Victims

•Continuity Programs•Public Disaster Communications•Integrated Preparedness•Hazard Mitigation