Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January 16, 2008

Jan. 16, 208 CoW1 - Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January

Embed Size (px)

Citation preview

Jan. 16, 208 CoW 1

-

Light Rail Transit

Improving mobility

Easingcongestion

Strengtheningour communities

Central Corridor

Committee of the WholeJanuary 16, 2008

Jan. 16, 208 CoW 2

2008 Project Schedule

Light Rail Transit

Central Corridor

3

2008 Critical Milestones

Key scope information

Key scope decisions– Circulate SDEIS

– SDEIS public hearing

– City/County approval of PE

– Update cost estimates

Request to enter Final Design

Light Rail Transit

Central Corridor

Jan.Jan.

Sept.Sept.

Aug.Aug.

MayMay

JulyJuly

Feb.Feb.

JulyJuly

Jan. 16, 208 CoW 4

Updated Draft EIS (DEIS) Cost Estimate

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 5

Annualized capital and operating costs

Annual travel time savings

CEI =

Light Rail Transit

Central Corridor

FTA Cost Effectiveness Index

Jan. 16, 208 CoW 6

CEI Value Needed to Advance ProjectLight Rail

Transit

Central Corridor

Enter Final Design

≤ $23.99

Secure Full Funding Grant

≤ $23.99

Jan. 16, 208 CoW 7

Original DEIS CEI StatusLight Rail

Transit

Central Corridor

Cost $932 M

Ridership 43,300

CEI $24.84

Jan. 16, 208 CoW 8

FTA Preliminary Engineering RequestsLight Rail

Transit

Central Corridor

• Increase Inflation Rate

• Increase Contingency

• Include Financing Cost

Jan. 16, 208 CoW 9

$932M Estimate Includes…

• East Bank Tunnel

• St. Paul Fourth St. to Union Depot

• University Ave. Reconstruction

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 10

$932M Estimate Does Not Include…

• Increased Inflation Rate

• Increased Contingency

• Financing Costs

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 11

Updated DEIS Cost EstimateLight Rail

Transit

Central Corridor

DEIS Baseline $932M

Contingency +$42M

Construction -$31M

Professional Services +$41M

Subtotal $984M

Financing Costs +$6M

Total $990M

Difference +$58M

Jan. 16, 208 CoW 12

Updated CEI StatusLight Rail Transit

Central Corridor

Cost $990M

Ridership 43,940

CEI $26.05

Jan. 16, 208 CoW 13

Findings of the Infill Stations Study

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 14

Findings of the Infill Stations Study

• Analyze– Ridership

– Travel time

– Cost

– Cost Effectiveness Index (CEI)

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 15

Findings of the Infill Stations StudyLight Rail

Transit

Central Corridor

Hamline Victoria Western

Snelling Lexington Dale Rice

16

Findings of the Infill Stations Study

• Transfers station boardings from one station to another

• Reduces corridor ridership by ~400 people

• Does not change Midway ridership

Light Rail Transit

Central Corridor

Station LPA Add Hamline

Add Victoria

Add Western

Snelling 2,840 2,530 2,820 2,830

Hamline -- 490 -- --

Lexington 1,070 880 930 1,050

Victoria -- -- 320 --

Dale 750 730 580 760

Western -- -- 280

Rice 1,320 1,290 1,290 1,120

Midway ridership

5,980 5,920 5,940 6,040

Jan. 16, 208 CoW 17

Findings of the Infill Stations Study

• Increases travel time

• Increases cost $5.5M/station

• Increases project CEI by $0.28-0.50

Light Rail Transit

Central Corridor

LPA Add Hamline

Add Victoria

Add Western

Travel Time

38:53 39:30 39:20 39:19

CEI $26.05 $26.33 $26.51 $26.55

Jan. 16, 208 CoW 18

Downtown St. Paul Alignment Alternatives

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 19

Downtown St. Paul Alignments StudiedLight Rail

Transit

Central Corridor

• DEIS– No changes

proposed– Used for

comparison of alternatives

Jan. 16, 208 CoW 20

Downtown St. Paul Alignments StudiedLight Rail

Transit

Central Corridor

• DEIS w/ diagonal– Consistent with

St. Paul’s Development Strategy

– Less impact on District Energy

– ROW costs not anticipated

– Reduces CEI

Jan. 16, 208 CoW 21

Downtown St. Paul Alignments StudiedLight Rail

Transit

Central Corridor

• 4th St. to Wacouta Mid-Block– Requires elevated

crossing @ Kellogg

– Impacts bus circulation @ the Depot Concourse

– Requires taking property

Jan. 16, 208 CoW 22

Downtown St. Paul Alignments StudiedLight Rail

Transit

Central Corridor

• 4th St. to Broadway– Meets concourse

level– At grade crossing

of Kellogg

– Lesser impact to bus circulation @ the Depot Concourse

Jan. 16, 208 CoW 23

Downtown St. Paul Alignments StudiedLight Rail

Transit

Central Corridor

• 2nd St. Viaduct– Requires

reconstruction of viaduct, closes 2nd St. to traffic

– Potential closing of 4th and Cedar

– Requires tunnel beneath Kellogg and park

– Cultural resources and park impacts

Jan. 16, 208 CoW 24

Downtown St. Paul Capital & Operating Cost

Difference from DEIS

Light Rail Transit

Central Corridor

AlternativeDEIS with diagonal

Wacouta Mid-Block Broadway

2nd St. Viaduct

Change in Capital Cost ($) -2.6M +32.2M +42.1 M +57.8 M

Change in Op. Cost

($) -76,000 +806,000 +1,088,000 +679,000

Jan. 16, 208 CoW 25

Downtown St. Paul Travel Time

Difference from DEIS

Light Rail Transit

Central Corridor

AlternativeDEIS with diagonal

Wacouta Mid-Block Broadway

2nd St. Viaduct

Change in Travel Time

(min:sec) -0:28 +1:58 +2:47 -0:53

Jan. 16, 208 CoW 26

Downtown St. Paul Ridership

Difference from DEIS

Light Rail Transit

Central Corridor

AlternativeDEIS with diagonal

Wacouta Mid-Block Broadway

2nd St. Viaduct

Change in Ridership -990 +170 +150 -780

Jan. 16, 208 CoW 27

Downtown St. Paul CEI Difference from DEISLight Rail

Transit

Central Corridor

AlternativeDEIS with diagonal

Wacouta Mid-Block Broadway

2nd St. Viaduct

Change in CEI from DEIS ($) -0.39 +0.83 +1.21 +1.55

Jan. 16, 208 CoW 28

Washington Avenue East Bank Tunnel and At-Grade Alternatives

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 29

East Bank Alternatives - DEISLight Rail

Transit

Central Corridor

Jan. 16, 208 CoW 30

DEIS Tunnel

• 2050 feet in length

• East Bank Station open air in portal in front of Coffman Union

• University and private ROW required

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 31

East Bank AlternativesRealigned TunnelLight Rail

Transit

Central Corridor

Jan. 16, 208 CoW 32

Realigned Tunnel Alternative

• Extends tunnel 950 feet• Includes East Bank Station underground

with mezzanine• Requires University & private ROW• Assumes existing four-lane configuration

on Washington Ave.• Maintains all existing traffic movements &

bus stops• Assumes traffic impacts include 10% of

vehicles divert off Washington Ave.

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 33

East Bank Station with MezzanineLight Rail

Transit

Central Corridor

Jan. 16, 208 CoW 34

East Bank Station with MezzanineLight Rail

Transit

Central Corridor

Jan. 16, 208 CoW 35

East Bank AlternativesAt-GradeLight Rail

Transit

Central Corridor

Jan. 16, 208 CoW 36

At-Grade Alternative

• LRT center running along Washington Avenue

• East Bank Station is split side platform• University and private ROW required• One through lane each direction on

Washington Avenue• Left turn lanes at Church, Harvard, Oak• Bus stop pull-outs at Coffman Union

and at Walnut St.• Assumes traffic impacts include 10% of

vehicles divert off Washington Avenue

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 37

East Bank AlternativesLight Rail Transit

Central Corridor

Change from DEIS

East Bank Realigned Tunnel At-Grade

Change in Travel Time (min:sec) -0:12 +1:36

Ridership +450 -1,660

Jan. 16, 208 CoW 38

East Bank AlternativesLight Rail Transit

Central Corridor

Change from DEIS

Realigned Tunnel At-Grade

Capital Cost +$110 to +$130 M -$128 to -$148M

O&M Cost -$80,000 -$260,000

CEI +$2.51 to +$3.05 -$2.79 to -$3.33

Jan. 16, 208 CoW 39

East Bank Alternatives Prelim. Traffic Analysis ResultsLight Rail

Transit

Central Corridor

Tunnel Option: Intersections of Concern

At Grade Option: Intersections of Concern

Jan. 16, 208 CoW 40

East Bank Alternatives Continue Collaboration

• Realigned tunnel– Examine potential cost savings

• At-grade alignment– Continue to refine traffic operations– Examine service and emergency

vehicle access – Pedestrian safety– University and private ROW including

sidewalks– Continue to identify and analyze

mitigation measures

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 41

Project Issues Cost/Savings Options

Light Rail Transit

Central Corridor

Jan. 16, 208 CoW 42

Light Rail Transit

Central Corridor

Project Issues Costs/Savings

Project Issue

Est. Change in Cost

Est. Change in CEI

Hiawatha/Central Connection +$7.5M +$0.20

Washington Ave. Bridge +$25M +$0.67

East Bank Realigned Tunnel +$110 to +$130 M

+$2.51 to +$3.05

East Bank At Grade -$128 to -$148M

-$2.79 to -$3.33

Jan. 16, 208 CoW 43

Light Rail Transit

Central Corridor

Project Issues Costs/Savings

Project Issue

Est. Change in Cost

Est. Change in CEI

Downtown St. Paul Alignment• DEIS w/diagonal station • Concourse via Wacouta mid-block• Concourse via Broadway• Concourse via 2nd St. Viaduct

- $2.6M

+$32.3M

+$42.2M

+$57.8M

- $0.39

+$0.83

+$1.21

+$1.55

3-car platforms +$15M +$0.40

Jan. 16, 208 CoW 44

Light Rail Transit

Central Corridor

Project Issues Costs/Savings

Project Issue

Est. Change in Cost

Est. Change in CEI

Add station at Victoria +$5.5M +$0.46

Add station at Western +$5.5M +$0.28

Add station at Hamline +$5.5M +$0.50

Reconstruct ROW - $25M - $0.67

MCRR bridge clearance - $1.5M - $0.04

Jan. 16, 208 CoW 45

Light Rail Transit

Central Corridor

Project Issues Costs/Savings Summary

(in millions)

Change from Updated DEIS Cost

Estimated Project Total

All Cost Elements + $252 $1,242

All Saving Elements - $177 $ 813

Jan. 16, 208 CoW 46

Light Rail Transit

Central Corridor

More Information

Check out our website:

• www.centralcorridor.org

Contact the Central Corridor Project Office:

• 540 Fairview Avenue North, Suite 200Griggs Midway Building

St. Paul, MN 55104

• 651-602-1940

[email protected]