Citation preview
Jan. 16, 208 CoW 1
-
Light Rail Transit
Improving mobility
Easingcongestion
Strengtheningour communities
Central Corridor
Committee of the WholeJanuary 16, 2008
3
2008 Critical Milestones
Key scope information
Key scope decisions– Circulate SDEIS
– SDEIS public hearing
– City/County approval of PE
– Update cost estimates
Request to enter Final Design
Light Rail Transit
Central Corridor
Jan.Jan.
Sept.Sept.
Aug.Aug.
MayMay
JulyJuly
Feb.Feb.
JulyJuly
Jan. 16, 208 CoW 5
Annualized capital and operating costs
Annual travel time savings
CEI =
Light Rail Transit
Central Corridor
FTA Cost Effectiveness Index
Jan. 16, 208 CoW 6
CEI Value Needed to Advance ProjectLight Rail
Transit
Central Corridor
Enter Final Design
≤ $23.99
Secure Full Funding Grant
≤ $23.99
Jan. 16, 208 CoW 7
Original DEIS CEI StatusLight Rail
Transit
Central Corridor
Cost $932 M
Ridership 43,300
CEI $24.84
Jan. 16, 208 CoW 8
FTA Preliminary Engineering RequestsLight Rail
Transit
Central Corridor
• Increase Inflation Rate
• Increase Contingency
• Include Financing Cost
Jan. 16, 208 CoW 9
$932M Estimate Includes…
• East Bank Tunnel
• St. Paul Fourth St. to Union Depot
• University Ave. Reconstruction
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 10
$932M Estimate Does Not Include…
• Increased Inflation Rate
• Increased Contingency
• Financing Costs
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 11
Updated DEIS Cost EstimateLight Rail
Transit
Central Corridor
DEIS Baseline $932M
Contingency +$42M
Construction -$31M
Professional Services +$41M
Subtotal $984M
Financing Costs +$6M
Total $990M
Difference +$58M
Jan. 16, 208 CoW 12
Updated CEI StatusLight Rail Transit
Central Corridor
Cost $990M
Ridership 43,940
CEI $26.05
Jan. 16, 208 CoW 14
Findings of the Infill Stations Study
• Analyze– Ridership
– Travel time
– Cost
– Cost Effectiveness Index (CEI)
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 15
Findings of the Infill Stations StudyLight Rail
Transit
Central Corridor
Hamline Victoria Western
Snelling Lexington Dale Rice
16
Findings of the Infill Stations Study
• Transfers station boardings from one station to another
• Reduces corridor ridership by ~400 people
• Does not change Midway ridership
Light Rail Transit
Central Corridor
Station LPA Add Hamline
Add Victoria
Add Western
Snelling 2,840 2,530 2,820 2,830
Hamline -- 490 -- --
Lexington 1,070 880 930 1,050
Victoria -- -- 320 --
Dale 750 730 580 760
Western -- -- 280
Rice 1,320 1,290 1,290 1,120
Midway ridership
5,980 5,920 5,940 6,040
Jan. 16, 208 CoW 17
Findings of the Infill Stations Study
• Increases travel time
• Increases cost $5.5M/station
• Increases project CEI by $0.28-0.50
Light Rail Transit
Central Corridor
LPA Add Hamline
Add Victoria
Add Western
Travel Time
38:53 39:30 39:20 39:19
CEI $26.05 $26.33 $26.51 $26.55
Jan. 16, 208 CoW 19
Downtown St. Paul Alignments StudiedLight Rail
Transit
Central Corridor
• DEIS– No changes
proposed– Used for
comparison of alternatives
Jan. 16, 208 CoW 20
Downtown St. Paul Alignments StudiedLight Rail
Transit
Central Corridor
• DEIS w/ diagonal– Consistent with
St. Paul’s Development Strategy
– Less impact on District Energy
– ROW costs not anticipated
– Reduces CEI
Jan. 16, 208 CoW 21
Downtown St. Paul Alignments StudiedLight Rail
Transit
Central Corridor
• 4th St. to Wacouta Mid-Block– Requires elevated
crossing @ Kellogg
– Impacts bus circulation @ the Depot Concourse
– Requires taking property
Jan. 16, 208 CoW 22
Downtown St. Paul Alignments StudiedLight Rail
Transit
Central Corridor
• 4th St. to Broadway– Meets concourse
level– At grade crossing
of Kellogg
– Lesser impact to bus circulation @ the Depot Concourse
Jan. 16, 208 CoW 23
Downtown St. Paul Alignments StudiedLight Rail
Transit
Central Corridor
• 2nd St. Viaduct– Requires
reconstruction of viaduct, closes 2nd St. to traffic
– Potential closing of 4th and Cedar
– Requires tunnel beneath Kellogg and park
– Cultural resources and park impacts
Jan. 16, 208 CoW 24
Downtown St. Paul Capital & Operating Cost
Difference from DEIS
Light Rail Transit
Central Corridor
AlternativeDEIS with diagonal
Wacouta Mid-Block Broadway
2nd St. Viaduct
Change in Capital Cost ($) -2.6M +32.2M +42.1 M +57.8 M
Change in Op. Cost
($) -76,000 +806,000 +1,088,000 +679,000
Jan. 16, 208 CoW 25
Downtown St. Paul Travel Time
Difference from DEIS
Light Rail Transit
Central Corridor
AlternativeDEIS with diagonal
Wacouta Mid-Block Broadway
2nd St. Viaduct
Change in Travel Time
(min:sec) -0:28 +1:58 +2:47 -0:53
Jan. 16, 208 CoW 26
Downtown St. Paul Ridership
Difference from DEIS
Light Rail Transit
Central Corridor
AlternativeDEIS with diagonal
Wacouta Mid-Block Broadway
2nd St. Viaduct
Change in Ridership -990 +170 +150 -780
Jan. 16, 208 CoW 27
Downtown St. Paul CEI Difference from DEISLight Rail
Transit
Central Corridor
AlternativeDEIS with diagonal
Wacouta Mid-Block Broadway
2nd St. Viaduct
Change in CEI from DEIS ($) -0.39 +0.83 +1.21 +1.55
Jan. 16, 208 CoW 28
Washington Avenue East Bank Tunnel and At-Grade Alternatives
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 30
DEIS Tunnel
• 2050 feet in length
• East Bank Station open air in portal in front of Coffman Union
• University and private ROW required
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 32
Realigned Tunnel Alternative
• Extends tunnel 950 feet• Includes East Bank Station underground
with mezzanine• Requires University & private ROW• Assumes existing four-lane configuration
on Washington Ave.• Maintains all existing traffic movements &
bus stops• Assumes traffic impacts include 10% of
vehicles divert off Washington Ave.
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 36
At-Grade Alternative
• LRT center running along Washington Avenue
• East Bank Station is split side platform• University and private ROW required• One through lane each direction on
Washington Avenue• Left turn lanes at Church, Harvard, Oak• Bus stop pull-outs at Coffman Union
and at Walnut St.• Assumes traffic impacts include 10% of
vehicles divert off Washington Avenue
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 37
East Bank AlternativesLight Rail Transit
Central Corridor
Change from DEIS
East Bank Realigned Tunnel At-Grade
Change in Travel Time (min:sec) -0:12 +1:36
Ridership +450 -1,660
Jan. 16, 208 CoW 38
East Bank AlternativesLight Rail Transit
Central Corridor
Change from DEIS
Realigned Tunnel At-Grade
Capital Cost +$110 to +$130 M -$128 to -$148M
O&M Cost -$80,000 -$260,000
CEI +$2.51 to +$3.05 -$2.79 to -$3.33
Jan. 16, 208 CoW 39
East Bank Alternatives Prelim. Traffic Analysis ResultsLight Rail
Transit
Central Corridor
Tunnel Option: Intersections of Concern
At Grade Option: Intersections of Concern
Jan. 16, 208 CoW 40
East Bank Alternatives Continue Collaboration
• Realigned tunnel– Examine potential cost savings
• At-grade alignment– Continue to refine traffic operations– Examine service and emergency
vehicle access – Pedestrian safety– University and private ROW including
sidewalks– Continue to identify and analyze
mitigation measures
Light Rail Transit
Central Corridor
Jan. 16, 208 CoW 42
Light Rail Transit
Central Corridor
Project Issues Costs/Savings
Project Issue
Est. Change in Cost
Est. Change in CEI
Hiawatha/Central Connection +$7.5M +$0.20
Washington Ave. Bridge +$25M +$0.67
East Bank Realigned Tunnel +$110 to +$130 M
+$2.51 to +$3.05
East Bank At Grade -$128 to -$148M
-$2.79 to -$3.33
Jan. 16, 208 CoW 43
Light Rail Transit
Central Corridor
Project Issues Costs/Savings
Project Issue
Est. Change in Cost
Est. Change in CEI
Downtown St. Paul Alignment• DEIS w/diagonal station • Concourse via Wacouta mid-block• Concourse via Broadway• Concourse via 2nd St. Viaduct
- $2.6M
+$32.3M
+$42.2M
+$57.8M
- $0.39
+$0.83
+$1.21
+$1.55
3-car platforms +$15M +$0.40
Jan. 16, 208 CoW 44
Light Rail Transit
Central Corridor
Project Issues Costs/Savings
Project Issue
Est. Change in Cost
Est. Change in CEI
Add station at Victoria +$5.5M +$0.46
Add station at Western +$5.5M +$0.28
Add station at Hamline +$5.5M +$0.50
Reconstruct ROW - $25M - $0.67
MCRR bridge clearance - $1.5M - $0.04
Jan. 16, 208 CoW 45
Light Rail Transit
Central Corridor
Project Issues Costs/Savings Summary
(in millions)
Change from Updated DEIS Cost
Estimated Project Total
All Cost Elements + $252 $1,242
All Saving Elements - $177 $ 813
Jan. 16, 208 CoW 46
Light Rail Transit
Central Corridor
More Information
Check out our website:
• www.centralcorridor.org
Contact the Central Corridor Project Office:
• 540 Fairview Avenue North, Suite 200Griggs Midway Building
St. Paul, MN 55104