    National Training Programme for Franchisees

    )

    10-12 October,2011

    Venue: JKPDD JAMMU

  • 7/29/2019 Jammu RGGVY

    2/25

    RGGVY Scheme

    Er, A.K. BhagatREC New Delhi

  • 7/29/2019 Jammu RGGVY

    3/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Rajiv Gandhi Grameen Vidyutikaran Yojana - Scheme for RuralElectricity Infrastructure & Household Electrification launched byHonble Prime Minister on 4th April 2005 to achieve NCMP goal:

    augmenting and modernizing the rural electricityinfrastructure

    completion of rural households electrification in five years

    Existing schemes of Ministry of Power merged into RGGVYscheme : Accelerated Electrification of One Lakh Villages and One

    Crore Households Minimum needs programme(MNP)

  • 7/29/2019 Jammu RGGVY

    4/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Ultimate Goal

    Bridge the urban-rural gap

    Provide reliable and quality supply to ruralareas.

  • 7/29/2019 Jammu RGGVY

    5/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Objectives

    In 5 years

    Electrify all villages and habitations

    Provide access to electricity to all households

    Give electricity connection to Below Poverty Line (BPL)families free of charge

  • 7/29/2019 Jammu RGGVY

    6/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Accelerate rural development, generate employment andeliminate poverty through

    Irrigation

    Small scale industries

    Village and khadi industries

    Cold chains

    Health care Education and IT

  • 7/29/2019 Jammu RGGVY

    7/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    New Definition of Village Electrification

    A village would be declared electrified if :

    (i) Basic infrastructure such as distribution transformer anddistribution lines are provided in the inhabited locality as well as the

    dalit basti/hamlet where it exists. (For electrification through Non-Conventional Energy Sources a distribution transformer may not benecessary).

    (ii) Electricity is provided to public places like schools, panchayatoffices, health centers, dispensaries, community centers etc and

    (iii) The number of households electrified should be at least 10% oftotal households in the village.

  • 7/29/2019 Jammu RGGVY

    8/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Rural Electrification-a new perspective

    In rural India, 24 hours supply of electricity is necessaryfor broad based economic and human development-

    going beyond increasing agricultural production throughirrigation. It is an essential pre-requisite for:

    The second green revolution through establishment ofcold chains.

    The dispersal of industrial activity to rural areas through

    small scale industries. Provision of modern healthcare facilities.

    Use of IT in education and other productive activities.

  • 7/29/2019 Jammu RGGVY

    9/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana(RGGVY)

    Implementation Framework

    Preparation of District based detailed project reports for execution on turnkey basis. Involvement of central public sector undertakings of power ministry

    in implementation of some projects. Certification of electrified village by the concerned Gram Panchayat. Deployment of franchisee for the management of rural

    distribution for better consumer service and reduction inlosses. Undertaking by States for supply of electricity with minimum daily

    supply of 6- 8 hours of electricity in the RGGVY network.contd

  • 7/29/2019 Jammu RGGVY

    10/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana(RGGVY)

    Implementation Framework Making provision of requisite revenue subsidy by the state. Determination of Bulk Supply Tariff (BST) for franchisee in a

    manner that ensures commercial viability. Three tier quality monitoring Mechanism for XI Plan Schemes made

    mandatory. Web based monitoring of progress Release of funds linked to achievement of pre-determined

    milestones Electronic transfer of funds right up to the contractor level Notification of Rural Electrification Plans by the state governments.

    contd.

  • 7/29/2019 Jammu RGGVY

    11/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Funding Arrangement

    Ninety percent (90%) capital subsidy would be

    provided for overall cost of the projects under the

    scheme.States must make adequate arrangements for supply

    of electricity and there should be no discrimination inthe hours of supply between rural and urban

    households.

  • 7/29/2019 Jammu RGGVY

    12/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Scope

    Under the scheme, projects could be financed with capital subsidy forprovision of:

    Rural Electricity Distribution Backbone (REDB)

    Provision of 33/11 KV (or 66/11 KV) sub-stations ofadequate capacity and lines in blocks where these

    do not exist.

    Creation of Village Electrification Infrastructure (VEI)

    Electrification of un-electrified villages. Electrification of un-electrified habitations. Provision of distribution transformers of appropriate

    capacity in electrified villages / habitation(s).

  • 7/29/2019 Jammu RGGVY

    13/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Scope

    Decentralised Distributed Generation (DDG) and Supply

    Decentralized generation-cum-distribution from

    conventional sources for villages where grid

    connectivity is either not feasible or not cost effective 25,000 remote villages covered for financing under

    MNES not included

  • 7/29/2019 Jammu RGGVY

    14/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Scope

    Rural Household Electrification of Below Poverty Line

    Households:

    Electrification of un-electrified Below Poverty Line(BPL) households would be financed with 100% capitalsubsidy as per norms of Kutir Jyoti Programme in all rural

    habitations.

    Households above poverty line would be paying for theirconnections at prescribed connection charges and no

    subsidy would be available for this purpose.

    The scheme covers the entire country

  • 7/29/2019 Jammu RGGVY

    15/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Franchisees

    In the management of rural distribution through franchisees

    who may be Non-Governmental Organisations (NGOs), Users

    Association, Cooperatives or individual entrepreneurs.

    The Panchayat institutions would be associated.

    The franchisees arrangement may be for system beyond and

    including feeders from substation or from and including Distribution

    Transformer(s).

  • 7/29/2019 Jammu RGGVY

    16/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Revenue Sustainability

    Based on the consumer mix and the prevailing consumer tariff

    and likely load, the Bulk Supply Tariff (BST) for the franchisee

    would be determined after ensuring commercial viability of the

    franchisee.

    This Bulk Supply Tariff would be fully factored into the submissions

    of the State Utilities to the State Electricity Regulatory

    Commissions (SERCs) for their revenue requirements and tariff

    determination. The State Government under the Electricity Act is required to

    provide the requisite revenue subsidies to the State Utilities if it

    would like tariff for any category of consumers to be lower

    that the tariff determined by the SERC.

  • 7/29/2019 Jammu RGGVY

    17/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Release Of Capital Subsidy

    The capital subsidy for eligible projects under the scheme would

    be given through REC and projects shall be implemented fulfilling

    the conditionality

    In the event projects are not implemented satisfactorily in

    accordance with the conditionalities indicated above, the capital

    subsidy could be converted into interest bearing loans.

  • 7/29/2019 Jammu RGGVY

    18/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Projects under RGGVY (As on 30/06/11)

    i. Projects received by REC 577Districts

    619 projects ii. Projects sanctioned 546 Districts 563

    projects

    iii. Under scrutiny with REC 31 Districts 46Projects

    Cont.

  • 7/29/2019 Jammu RGGVY

    19/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    (As on 30/06/11)

    i. Sanctioned cost Rs. 26353.51crore

    ii Revised cost Rs.32697.34 crore

    iii. Funds released Rs. 25547.20 crore.

    iv. Un-electrified villages covered 110321

    v. UE electrified 97940(88.78%)

    vi. Electrified villages covered 349098

    vii. Electrification completed 205086(57.8%)

    Cont

  • 7/29/2019 Jammu RGGVY

    20/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    (As on 30/06/11) RHH Covered(incl BPL) 4,15,24,584 RHH Electrified(incl BPL) 1,82,28130 BPL HH covered 2,30,59,089 BPL HH electrified 1,65,79,340 Panchayat certificates received

    80,000(approx) X. Formation of District committees 27 states Xi. Franchisee system in place 16 states, under

    process 12 states.

  • 7/29/2019 Jammu RGGVY

    21/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY

    As on (30/06/11)RGGVY Projects sanctioned to J&K state No. of Projects 14 Distt 14

    Blocks 134 Villages 283 (UE) 6050(Electrified) RHH 295221 BPL HH 136730 BPL HH Electrified 34041

    Sanctioned/Revised cost/ Rs.844.20 crore Amount Disbursed Rs.661.80crore

  • 7/29/2019 Jammu RGGVY

    22/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Scope Of Work

    Under the scheme, projects could be financed with capital subsidy for;

    Rural Electricity Distribution Backbone (REDB)

    Provision of 33/11 KV (or 66/11 KV) sub-stations of adequate capacity andlines in blocks where these do not exist

    Provision of capacity augmentation of existing 33/11 KV (or 66/11

    KV) sub-stations on furnishing suitable justification

    Creation of Village Electrification Infrastructure (VEI)

    Electrification of un-electrified habitations. Provision of distribution transformers of appropriate

    capacity in electrified villages / habitation(s)

    11 KV feeders, main and spur lines

    Cont.

  • 7/29/2019 Jammu RGGVY

    23/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY)

    Scope Of Work

    L.T. feeders and lines including augmentation of heavily loaded LTfeeders, as required

    Circuit breakers, Isolators etc. for existing 11KV feeders

    Service connectionsto BPL Households

    Meters at - 11 KV feeders and distribution transformers on LT side

    Metering for all consumer connections

    Cont

  • 7/29/2019 Jammu RGGVY

    24/25

    Rajiv Gandhi Gramin Vidyutikaran Yojana(RGGVY)

    Cost Estimates

    Detailed Cost Estimates

    The basis should be the latest available cost data

    obtained on competitive bids