Upload
queens-post
View
259
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Community Board 3 and bike lanes
Citation preview
108th Street Bicycle Network Connection
2015
New York City Department of Transportation Presented May 11, 2015 to Queens Community Board 3 Transportation Committee
Background
DOT is planning a redesign of 111 St in CB4
Community interest in a bicycle route as part of design
Proposed connection to 34 Av bike lanes and Flushing Bay Promenade in
CB3 via 108 St
2
Ro
ose
velt
Av
114 St Flushing Meadows
Corona Park
Lon
g Is
lan
d E
xpy
7-train
46
Av
CB3 CB4
Flushing Bay Promenade
Existing Conditions: 108 St, Roosevelt Ave to Northern Blvd
3 108 St looking north from 36 Av
Proposed Conditions: 108 St, Roosevelt Ave to Northern Blvd
4
Example of Shared Lanes
West Broadway, Manhattan 5
Existing Conditions: 108 St/31 Dr, Northern Blvd to Ditmars Blvd
6 31 Dr looking north towards Ditmars Blvd
Existing Conditions: 108 St/31 Dr, Northern Blvd to Ditmars Blvd
7
Example of Bike Lanes
8 73 Av, Queens
Summary of Proposed Enhancements
108 St, Roosevelt Ave to Northern Blvd: install shared lane markings
108 St & 31 Dr, Northern Blvd to Ditmars Blvd: install bike lanes
Benefits:
Connects the Flushing Bay Promenade and 34 Av bicycle lanes to the proposed bicycle
route to Flushing Meadows Corona Park in CB4
No travel lane removal
No parking removal
9
Ro
ose
velt
Av Flushing Meadows
Corona Park
CB3 CB4
Flushing Bay Promenade
10
Contact:
Queens Borough Commissioners Office at 212-839-2510 or [email protected]